This document provides a company profile for Stable Engineering Services, including:
- A brief history of the company starting in 1980 and expanding facilities in 1987.
- Core services such as mechanical fabrication, maintenance, and structural steel work.
- Leadership team and personnel with relevant experience.
- Certifications and policies on quality, safety, and environment.
- Equipment, facilities, and capabilities including workshops, cranes, and transport.
- Examples of completed projects for power, construction and industrial clients.
Reitmeier Mechanical has long been an advocate for recycling
utilizing salvaged and energy efficient products whenever
possible. After acquiring their new Corporate Offices located in
Tualatin, Oregon it was only natural that the complete TI
remodel be focused on building “Green” with the emphasis on
achieving LEED “Silver” certification.
Reitmeier Mechanical methodically sought to find participating
partners willing to recycle all the building materials found during
the demolition phase (i.e. wood, metal,gypsum board, copper
wiring, and plumbing fixtures).
The “Green” building techniques employed in the design phase
of this project focused on energy efficiency, while the
construction techniques primarily consisted of construction
waste diversion and material reuse. Both the lighting and the
HVAC systems were designed with a high degree of
controllability in order to optimize energy usage.
CPP certification - What is the CPP certification?Zabeel Institute
CPP certification is taken into consideration the "gold requirement" accreditation for safety management experts and also demonstrates your expertise and also expertise in 7 vital domain names of protection. Around the world identified as the requirement of excellence for safety and security management specialists.
This article discusses and explains to you CPP certification, and what is the CPP certification?
Recognized throughout career for being a production leader leveraging in depth knowledge of the manufacturing landscape to significantly increase the operational efficiency. Solid organizational, communication and people management skills. Seeking an Operations Management position in Production in which my natural leadership and my strong Operation experience are required to perform.
Recognized throughout career for being a production leader leveraging in depth knowledge of the manufacturing landscape to significantly increase the operational efficiency. Solid organizational, communication and people management skills. Seeking an Operations Management position in Production in which my natural leadership and my strong Operation experience are required to perform
Reitmeier Mechanical has long been an advocate for recycling
utilizing salvaged and energy efficient products whenever
possible. After acquiring their new Corporate Offices located in
Tualatin, Oregon it was only natural that the complete TI
remodel be focused on building “Green” with the emphasis on
achieving LEED “Silver” certification.
Reitmeier Mechanical methodically sought to find participating
partners willing to recycle all the building materials found during
the demolition phase (i.e. wood, metal,gypsum board, copper
wiring, and plumbing fixtures).
The “Green” building techniques employed in the design phase
of this project focused on energy efficiency, while the
construction techniques primarily consisted of construction
waste diversion and material reuse. Both the lighting and the
HVAC systems were designed with a high degree of
controllability in order to optimize energy usage.
CPP certification - What is the CPP certification?Zabeel Institute
CPP certification is taken into consideration the "gold requirement" accreditation for safety management experts and also demonstrates your expertise and also expertise in 7 vital domain names of protection. Around the world identified as the requirement of excellence for safety and security management specialists.
This article discusses and explains to you CPP certification, and what is the CPP certification?
Recognized throughout career for being a production leader leveraging in depth knowledge of the manufacturing landscape to significantly increase the operational efficiency. Solid organizational, communication and people management skills. Seeking an Operations Management position in Production in which my natural leadership and my strong Operation experience are required to perform.
Recognized throughout career for being a production leader leveraging in depth knowledge of the manufacturing landscape to significantly increase the operational efficiency. Solid organizational, communication and people management skills. Seeking an Operations Management position in Production in which my natural leadership and my strong Operation experience are required to perform
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
2. Contents
Stable Engineering Services.....................................................................................................................................1
History .....................................................................................................................................................................2
Mission Statement...................................................................................................................................................2
Vision.......................................................................................................................................................................2
Quality Policy...........................................................................................................................................................3
Occupational Health and Safety Policy Statement..................................................................................................4
Environmental Policy...............................................................................................................................................5
Organisational Chart................................................................................................................................................6
Key Personnel..........................................................................................................................................................6
Plant and Facilities...................................................................................................................................................8
Completed and Continuing Projects........................................................................................................................9
Photo Gallery.........................................................................................................................................................12
3. Company Profile 1 Revised 10/09/2015
Stable Engineering Services
Company Name: Stable Australia Pty Ltd
Trading Name: Stable Engineering Services
A.B.N: 98 006 667 358
Street Address: Lot 1, Firmins Lane, Morwell 3840
Postal Address: PO Box 380, Morwell. 3840
Telephone: (03) 5133 9955
Facsimile: (03) 5134 8850
Email: admin@stableengineering.com.au
Contact: Steven Buhagiar - General Manager
Certifications: Quality assured to ISO 9001: 2008 by SAI Global Reg No. QEC 21610
Services Provided: Maintenance and fabrication of pressure parts and structural steel
Mechanical fabrication and assembly
Maintenance of mechanical plant
Rotating equipment mechanical repairs & rebuilds
Labour hire for any site works
Design and installation of fire service
Project scheduling and measurement
Structural design and computations
CAD drafting
Hire of general plant and equipment
Transportation of components to & from worksites as well as general
pick up & delivery.
Main Workshop 2,100m2
- 1x10t & 2x20t gantry cranes - 11m hook
height
Lean-to (attached to main workshop) 1,000m2
, with 5t gantry crane
Paint Shed 1,200 m2
, with 16t gantry crane
Industrial land on over-dimensional route – 3.2ha (8 acres) hard stand,
4.8ha (12 acres) of storage area.
4. Company Profile 2 Revised 10/09/2015
History
Stable Australia Pty Ltd, trading as Stable Engineering Services, had its origin in the skill and
forethought of Mr John Buhagiar who commenced work as Stable Construction Pty Ltd in 1980, on
the S.E.C.V. Loy Yang Power Station Project, as a sub-contractor to EPT (Aust) Pty Ltd.
Steady growth occurred with concentration on general engineering, fabrication and installation of
structural and metal items with work being obtained through other associated contracts such as ICAL.
In 1987, to meet the needs of the growing business and to allow for a more efficient operation, Stable
Construction Pty Ltd established new premises on the corner of Firmins Lane and Tramway Road,
Morwell, on thirty acres of industrial land, and at the same time, changed its trading name to Stable
Engineering Services.
An intensive capital works program resulted in the upgrade of premises and, with the purchase of
heavy equipment and machinery, the type and range of product and services altered substantially.
However, the continual presence and updating of control procedures ensures that the high standard
set by John Buhagiar in 1980 are still being exceeded today.
Mission Statement
Our mission is to remain a leader in the engineering field, specializing in structural steel fabrication
and erection, mechanical fabrication and assembly and mechanical maintenance by providing cost
effective solutions to all client requirements.
Vision
The Company which;
LEADS in the Provision of Mechanical Engineering Services
PROVIDES a “Total Engineering Solution” incorporating Design, Manufacture and Maintenance
PROTECTS and promotes the interests of all stakeholders.
5. Company Profile 3 Revised 10/09/2015
Quality Policy
Stable Engineering Services is committed to implementing the quality principals and procedures
outlined in our documented quality management system that is structured on the requirements of AS
ISO 9001 – 2008.
This commitment is based upon our ability to understand the needs and expectations of our
customers, our motivation to improve the processes capable of meeting those needs and
expectations, and our creativity in capturing our superior level of service to meet the future needs and
expectations of all our stakeholders.
The quality objectives are derived from the Business Plan communicated via Stable Engineering
Services Quality Management System, which is available to all employees.
John Buhagiar
Managing Director
9th September, 2004
Revised: 29th March, 2007
Revised 1st February 2012
6. Company Profile 4 Revised 10/09/2015
Occupational Health and Safety Policy Statement
Stable Engineering Services recognises it’s legal and moral obligation to provide a safe and healthy
workplace to its employees and the community and is committed to implementing and maintaining
high levels of occupational health and safety practices.
Employer’s health and safety obligations
It is the responsibility of management to:
Maintain a safe working environment for all employees under the OH&S Act 2004.
Inform, train and supervise employees to ensure that they can work safely and without health risks.
Facilitate the appointment of OH&S representatives - management representatives nominated by
management, employee representatives by co-workers.
Give OH&S representatives paid time off work to perform their duties and to attend OH&S training
approved or run by Workcover.
Notify Workcover immediately of any workplace death or serious injury, or any incident that could
have caused death or serious injury.
Not interfere with the scene of a workplace death (except to help an injured person, to protect
someone whose health and safety is at risk, or to prevent further injury).
Employee’s health and safety obligations
It is the responsibility of employees to:
Comply with health and safety policy and procedures under the OH&S Act 2004;
Follow reasonable instructions that management gives on health and safety;
Use equipment provided to protect health and safety;
Ensure that you are not affected by alcohol or another drug that may endanger yourself and others.
Report potential or actual hazards, accidents, injuries or incidents
7. Company Profile 5 Revised 10/09/2015
Environmental Policy
General
The policy of Stable Australia Pty Ltd is that appropriate environmental safeguards are to be observed
at all times with respect to discharges to the workplace and the external environment.
Discharges
Environmental Protection Agency (EPA) discharge licence conditions are to be adhered to, and
wherever economically possible, improved upon.
Recycling
Wherever possible materials will be recycled and profitably disposed of in accordance with regulations
and good practice.
Pollutant Types and Sources
Personnel are to be made aware of main pollutants and are to take measures to control
• Process vapours - welding fume, cleaning fluids, process liquids
• Solid waste - used flux, packaging (Note: wherever possible drums should be returned to the
supplier and any financial deposit credited)
• Metal scrap - machining swarf and off-cuts, electrode stubs
• Liquid waste - basic treatment, waste removal (Note: EPA and Water Board legal restrictions)
• Noise & vibration - due to hammering, arc-gouging, grinding, etc.
• Gas emissions - preheat and heat treatments
• Hazardous areas - restricted access (Note: consider technically acceptable alternative process)
Energy Conservation
Personnel are to conserve energy and gas usage as far as practical to reduce greenhouse gas
emissions.
Undertaking
Further to the above policy Stable Australia Pty Ltd will undertake to comply with each individual site’s
policy with regard to the environment and specific job requirements prior to commencement of a job.
8. Company Profile 6 Revised 10/09/2015
Organisational Chart
General Manager
Steven Buhagiar
Office Manager
Cassie Spagnolo
Project Manager
Hunter Richardson
QA Manager
David Claxton
Workshop
Manager
Enzo Pistrin
OHS&E Officer
Optional Role
TBA
Contract
Technical
Contract
Commercial
Project Supervision
TBA
Document
Control
Optional Role
TBA
QC Manager/
Weld Inspector
(Enzo Pistrin)
Planning &
Estimating
Braeton Pearson
Coating
Inspector
TBA
Production Manager
Frank Tabone
Subcontractors:
Electrical, Plumbing,
Surveying, etc.
Key Personnel
Stable Engineering Services, with its diverse and experienced team of administrative and technical
staff, working along-side the skilled workshop and on-site tradesmen, equates to an engineering
solution for all associated works.
STEVEN BUHAGIAR – GENERAL MANAGER
Steven is the driving force of the organisation, taking great pride in its achievements and the team
who work hard for the company’s success. He is a qualified mechanical fitter who has learnt the
business from the ground up, under the guidance of his father and business founder, John. Steven
oversees and works wherever his efforts are required in all facets of the enterprise, leading by
example in operations, staff management, quality assurance and OH&S.
HUNTER RICHARDSON – PROJECT MANAGER
Hunter is widely experienced in project, operations and business management having spent over 25
years in civil construction, waste management, engineering consultancy, coal production,
manufacturing and heavy industry contracting. He is also skilled in development and administration of
business management, quality assurance and health and safety systems, heavy lifting and transport
logistics. Hunter holds a Bachelor of Engineering (Civil) with honours and a Certificate of Technology
Survey and Mapping to back up his strong work ethic and determination to deliver positive project
outcomes.
FRANK TABONE – PRODUCTION MANAGER
Frank joined Stable Australia and brought with him a wealth of expertise in maintenance and project
management. He is a qualified fitter and machinist who has worked throughout Australia and Oil
Sands in Canada in the capacity of Superintendent or Manager running many oil and gas, coal,
construction, maintenance and major plant outage projects. Frank is a highly motivated and organised
manager with great capacity to oversee and coordinate large and complex works.
Frank holds a Diploma in Business and is licenced to perform most high risk work.
9. Company Profile 7 Revised 10/09/2015
BRAETON PEARSON – ESTIMATING & PLANNING MANAGER
Braeton is a very strong project engineer with an eye for detail. He holds a Bachelor of Engineering
Mechatronics, with honours, complimenting his solid experience in job estimating, project planning,
subcontractor management and systems management. Braeton has been instrumental in the
successful delivery of Stable Australia’s projects, providing essential, dependable engineering support
and advice. Braeton is also well versed in contract execution, enabling him to quickly understand and
setup systems to support specific project requirements.
ENZO PISTRIN – WORKSHOP MANAGER
Enzo is the power plant of the Stable Engineering workshops with a reputation for reliable delivery of
quality products. He has extensive experience in steel fabrication, having worked in power,
construction and maintenance industries throughout Australia. Enzo’s qualifications include
boilermaking, with over 30 years of experience, International Welding Specialist, incorporating
AS1796 – 2001 Certificate 10 and Welding Supervisor to AS 2214 – 2004. He has specific knowledge
of fabrication, construction refurbishment and maintenance in mechanical applications and has been
directly involved in major outages and general maintenance in Latrobe Valley power stations. Enzo is
a skilled workforce coordinator, quality control manager and administrator.
CASSIE SPAGNOLO – OFFICE MANAGER
Stable Australia’s Finance & Administration Manager and Quality Assurance administrator, Cassie’s
role also incorporates responsibility for the co-ordination of client requirements for site personnel and
equipment. Cassie is a competent Internal Auditor having successfully completed units BSBAUD402B
“Participate in a Quality Audit” and BSBAUD504B “Report on a Quality Audit” for the nationally
recognised course Management Systems Auditing.
DAVID CLAXTON – QA MANAGER
David is a knowledgeable and experience quality assurance systems manager who has also had an
equally respectable career in manufacturing and business management. He provides QA systems
support for the organisation, to develop and maintain ISO 9001 certification.
10. Company Profile 8 Revised 10/09/2015
Plant and Facilities
Listed below are a few examples of the company’s Plant & Equipment
50-tonne all-terrain crane, 20-tonne articulated Franna crane, 8-tonne non-slewing mobile crane,
prime movers, field vehicles, 9-tonne tray truck, 900cfm compressor, 300cfm compressor, knuckle
boom lift 45ft, PK700DMS bandsaw, 700mm x 400mm capacity, 100-tonne cropping machine, 4m x
6mm guillotine, 155-tonne press, roll-groove machine, sub-arc welder, various welders, rigging
equipment, plasma cutter.
Shop Description
• Main Workshop 2,100m2
, with 1 x 10t and 2 x 20t gantry cranes - 11m hook height
• Lean-to (attached to main workshop) 1,000m2
, with 5t gantry crane
• Paint Shed 1,200 m2
, with 16t gantry crane
• Centrally located near Latrobe Valley based Power Stations and Industrial Sites and located
on an over-dimensional route
• 8ha (20 acres) of Industrial land – 2.5ha (6 acres) hard stand, 5.2ha (13 acres) of storage
area.
• Secure store 170 m2
, including heated welding consumables cabinet and oven.
Personnel
Stable Engineering Services’ comprehensive skilled work force has the ability to succeed in all
activities associated with structural and mechanical fabrication, installation work and pressure parts.
And now demonstrates the ability to perform work on rotating equipment with mechanical repairs &
rebuilds to pumps, gearboxes, valves, electric motors etc. The management team has the depth of
technical and design knowledge vital to the successful completion of all projects undertaken
regardless of size or specialization.
Specialty Skills
• High Pressure Parts Work
• Installation of Fire Service Systems
• Large involvement in Turbine Overhauls
• Process Plant Installation and Commissioning
• Pipe Spooling
• Tank fabrication
• Rotating Equipment
Availability
• 24-Hour Facilities
• Hire of General Plant and Equipment
• Labour Hire
• Storage Facility
• Transportation
11. Company Profile 9 Revised 10/09/2015
Completed and Continuing Projects
CB&I
Longford Gas Conditioning Plant – Offsite Module Fabrication & Underground Piping
• Fabricate and deliver underground piping, approximately 10,000 dia-inch
• Fabricate and assemble 42-off pressure piping and process modules for transport and delivery
to site.
• Completion and supply of comprehensive Fabrication Records Books.
• Peak workforce of 100, 2 shifts x 6 days per week.
• Multi-disciplinary workforce – Fitting, welding, rigging, electrical.
SP Ausnet
• Shop detail, supply, fabricate, trial assemble, galvanise and deliver electrical transmission
towers and structures.
Hazelwood Power Corporation Ltd. (now International Power)
• Overhaul of Main Mill, FD Fan and ID Fan Motor Coolers.
• Overhaul of Rotary Air Heater Heat Exchangers.
• No: 5 Boiler - Re-welding of Drum Downcomer and Economiser nozzles. Machining and
Overhaul of Drum and Boiler safety valves.
• Fabrication of Precipitator Ash Hoppers for units 8.
• No.1 Boiler Superheater Inlet Header.
• Manufacture of Unit 1 Condensate and Cooling Water lines.
• Supply of 1800m 750NB Open cut Ring main Pipeline.
• Supply of Gas Ducts stainless steel expansion joints.
• Redesign and supply of Slide Gate Valve for ash discharge.
• Slot Bunker Upgrade – Replacement of chutes & trouser legs on conveyors 191, 192, 193,
194, 195 and 196
• Installation of positive drive system on travelling conveyors at Hazelwood Raw Coal Bunker.
• Fabrication and installation of Sensor Platforms at coal bunker
• Fabrication Travelling Tripper for TS2 Stacker
Murray Goulbourn Milk Factory
• Maffra - New Boiler installation, steam condensate and gas pipe installations.
David Brown Pty Ltd
• Pt. Kembla Steel Processing Plan - Structural steel cones and supports structure.
H.R.L. Technology Pty Ltd
• Installation of Briquette Chip Blower Plant.
• Fire Service Pipeline Installation.
Transfield Fabrication
• Energy Brix Australia - Fabrication of Mill Ducts.
Energy Brix Australia Corporation Pty Ltd
• Briquette Receivable System (Pneumatic) - Manufacture, Installation and Commissioning -
Colac.
• Fabrication of Mill Duct and Mill Casing.
• No. 4 Turbine - (4) four yearly overhaul.
• B251 Conveyor Expansion Roller replacement.
• 'B' Factory Press Cooling Water Line replacement.
• Bunker beam replacement all eight Boilers
12. Company Profile 10 Revised 10/09/2015
W.M.C.
• Collar Hoppers for O.E.P. (Fabrication & Welding of 25, 32 & 50mm Plate)
E.P.T. Limited
• Fabrication and Mechanical Assembly, Delivery, Installation of Conveyor Intermediate Units
and Components.
Supaflo Technologies Pty Ltd
• Installation of Energy Brix Australia Sludge Thickener Plant pipe work,
Pumps and all Valving.
Thiess Contractors Pty Ltd
• Fulham Correctional Centre, Sale - Supply and Fabricate Structural Steel.
ICI Chorine & Derivatives
• Manufacture of H.P.C Carbonation Plant Structural Steel.
Loy Yang Power
• Sub-Contractor to Alstom for Unit 1 Generator Overhaul
• Fabrication major items used to aid the rebuilding of Generator at Loy Yang B
• Deluge Valve relocation Units 2 & 4 – bunkers & precipitators
• Fabrication PF Burner ducts
• Final assembly, machining, painting & delivery Dredger 16 Bucket Wheel.
Yallourn Energy
• Sub-Contractor to G.E.C. Alstom on all Major outages for Unit 1,2,3 & 4
• Replacement of Pressure Steam valves and all pressure welding requirements
• Supply, fabrication, galvanising, assembly and delivery of total of 655 conveyor units between
2005 and 2008.
Australian Paper
• Annual Overhaul of the Pine Kraft Processing Plant.
• Chemical preparation area pipe bridges 3 & 4
ABB Power Generation
• Fabrication of Unit 7 Precipitator Ash Hoppers for Hazelwood Power
• Fabrication of Unit 3 Eaves and Walls
Mitsui Babcock
• Fabrication of Unit 7 Boiler casing panels for Hazelwood Power.
Siemens Limited
• Replacement of Turbine Bellows at Loy Yang ‘A’ 4 x 500 megawatt Power station – Unit 4
• Replacement of LP 1 & 2 Turbine Inlet & Outlet Steam Bellows at Loy Yang “A” - Unit 3
• Removal & Re-installation of Cooling Tower Splash Pack at Loy Yang “A” Unit 3
• Overhaul Circulating Water System components at Loy Yang “A” Unit 1
• Fabrication of major items (150 tonne) used to aid in the rebuilding of generator at Loy Yang
B. Job was started within 24 hours of call and finished within 3 weeks.
Silcar Ltd
• Overhaul Circulating Water System components at Loy Yang “A” Unit 3
13. Company Profile 11 Revised 10/09/2015
The Reinforced Earth Company
• Morwell River Diversion Conveyor Tunnel Arch Sections- Supply, manufacture and deliver
1,118 units (8,500 tonne) to Yallourn Mine.
Clough Engineering Limited – Bassgas Project, Lang Lang.
• Fabrication, assembly & processing of pipe rack skids for Packages 1, 4, 5 & 6 & Fire Service.
This from a total of 8 packages.
Shedden Udhe – Mobil Altona Clean Fuels Venture
• Piperack Pre-assembled Units 3405 & 3406
• BRU Structure Pre-assembled Units 3401,3402, 3403, 9101 & 3701
Downer Power Transmission Pty Ltd – Iluka Resources Ltd
Murray Basin Douglas project
• Fabrication & assembly of Spiral Concentrators M1 – M10
Powercor Australia Ltd- Basslink Project
• Supply, fabrication and surface treatment of steelworks for LYPS 500kV Terminal Station.
• Supply, fabricate and deliver Platforms, CVT supports, Transformer bases and associated
items – Brunswick Terminal Station
• Supply and fabrication MLD Tower steel – Moorabool Terminal
Outokumpu Technologies Pty Ltd
• Supply, fabrication and delivery 1 x 22m Ash Thickener Tank and all components for
Hazelwood Mine.
• Fabrication of 8m & 14m tanks for Avebury Nickel Project Zeehan Tasmania
• Supply, fabrication, stress relieve and deliver 2 off rake drive units Avebury & Bolga.
Thiess John Holland – Eastlink Project
• Supply, Design/Drafting & fabrication of Pre- Cast Concrete Panel Moulds, Transport Frames
& miscellaneous steel fabrications
Port of Melbourne – Channel Widening Project
• Supply and fabricate HBMS Steel plates.
• Modification to Ripper Dragheads.
• Modification of Sweeper Bar
Loy Yang Power – D16 Bucket Wheel Boom Forechute
• Supply, fabricate and paint.
• Supply and fit out HMWPE wear plates.
International Power Hazelwood – Main Mill Classifiers
• Supply, fabricate and paint SS Classifiers
Australian Paper Maryvale – M5 Steam Pipe Upgrade
• Supply, fabricate and install pipe spooling.
Thiess Degremont
• RO Pipe Rack Modules 7, 8, 10 & 11 Victorian Desalination Plant
International Power Loy Yang B
• Unit 2 SSCC Hopper Repair Contract P1260
Loy Yang Power
• Feedpump Crane 1, 2, 3 & 4 Static Line Installation
14. Company Profile 12 Revised 10/09/2015
Photo Gallery
Longford Gas Conditioning Plant, spooling Longford Gas Conditioning Plant, traffic mgt.
Longford Gas Conditioning Plant, module assembly and fit-out in progress
15. Company Profile 13 Revised 10/09/2015
Port of Melbourne Steel slabs Port of Melbourne Sewer Plate
Bass Gas Pipe rack / Header assembly PF Duct and Structural Steel
Sub arc welding POM plate Side view of sub arc welding
16. Company Profile 14 Revised 10/09/2015
Ring Main Water Pipes, Bass Gas Project Bass Gas Pipe rack assembly
Bass Gas Pipe rack insulation PAU Pipe rack, Bass Gas Project
Feeder conveyor / Western Australia Feeder Conveyor / Western Australia
17. Company Profile 15 Revised 10/09/2015
Loy Yang CW System overhaul Mine conveyor idler frames
Loy Yang Condenser valve Safe removal of Condenser conduits
Condenser valve replacement
18. Company Profile 16 Revised 10/09/2015
1st half 22m tank 22m tank being transported to site
Transportation to Site Successful completion of 22m tank
D16 Bucket Wheel Boom Fore-chute
19. Company Profile 17 Revised 10/09/2015
D16 Bucket Wheel Boom Fore-chute
Main Mill Classifiers
20. Company Profile 18 Revised 10/09/2015
SBL Tank Top Strake Replacement SBL Tank Strake Fabrication
TS2 Stacker in service Replacement Non-return Valve
Site assembly of TS2 Stacker Overview of TS2 Stacker
21. Company Profile 19 Revised 10/09/2015
Mobil Clean fuels pipe rack Mobil Pipe rack header section
Loy Yang Unit 3 Major Outage, CW System