An Initiative of ICRISAT-WWF Project




 S ust ai


                                             SugarCane
                                      iv e
                                  ti a t
    na




                                ni
            bl
                 eS              eI
                    u g a rc a n

 Volume 1 Issue 1 November 2009
                                                matters



                                                                                   Nov ‘09
                                                                                             1




                                                                                      SugarCane
                                                                                   matters




“More with Less”
 An initiative in sustainable sugarcane production
Sugarcane is an important crop in India and it will continue to be so in
                                                                   future. But it is facing a major crisis, and there are many reasons for it. One
                                                                   of the most important is the water crisis. The yields are low, the cost of

                                             Foreword
                                                                   facts, but what is unknown so far and is becoming increasingly important
                                                                   is climate change. Until now climate change was debated by non-farming
                                                                   community, primarily scientists and lately politicians, but farmers have
Contents                                                           already begun to experience it. Climate change is adding to the uncertainty

“More with Less”
An initiative in
sustainable sugarcane
production                               4                         planted. As such the water requirement is almost the whole year round. In a
Dr. V. Vinod Goud                                                  country like India where during the grueling summer, water becomes acute,
                                                                   sugarcane puts a heavy strain on the depleted resource. And if that summer
Sweet Revolution,                                                  were to become little more acute due to climate change, the implications
2009! SSI gives birth
to Neo-Agriculture                       7
Frank A. Hilario                                                   But the Climate change - which is directly affecting the crop - is also going
                                                                   to be biggest opportunity for sugarcane in terms of market opportunity.
SSI interventions :                                                There is an increasing demand for ethanol - the climate friendly fuel. Given
The progress made                                                  that sugarcane is a future crop, it needs to be cultivated with futuristic
and the plans ahead                     11                         concepts and methods. The old way of growing sugarcane not only will
Dr. N. Loganandhan                                                 push the farmers into deeper debts, but it will also lose the freshly opening
                                                                   market opportunities for ethanol. So sugarcane, a crop with great future
SSI: A New                                                         and potential to address the most pressed global issue - climate change -
Experience in                                                      has to be cultivated with radically different approaches and methods. That is
Sugarcane Cultivation                                              the reason SSI - Sustainable Sugarcane Initiative - has been put together.
Shri. P. K. Singh
                                                                   Until now the fundamental thinking in agriculture has been ‘more to get a
Minister with a                                                    little more’. This path has reached its dead end and the more has become
                                             Dr. Biksham Gujja
farmer’s heart and soul 17                                         ever more and margins to farmers have become very little. The result has
                                             Team Leader,
Dr. Amrik Singh                              ICRISAT-WWF project   plunged Rural India into a four-fold crisis: One, the farmers are borrowing
                                                                   more and more and not able to pay back due to dwindling yields and increase
                                                                   in costs. Also, farmers are not able to pay the laborers as much as the fast
in Nayagarh District                                               growing industrial sector. This is driving them to migration, to the cities.
of Orissa                               18
Sraban Kumar Dalai and Arundhati Jena                              Two - Since agricultural wages are not competitive, the government has to
                                                                   pump in large amounts of money to keep the rural people employed, often
                                                                   in jobs which may not be directly linked to production or enhancement
Age Farmer of SSI                       20                         of agricultural productivity. Since the workers have been ‘employed’ by
Manisha Agarwal                                                    governments as part of creating livelihoods (ex. NREGA), farmers complain
                                                                   that they are not getting enough labor in time for the regular agricultural
Fundamentals of SSI                     22                         operations. The story is far from over yet.




 We invite sugarcane farmers, scientists, agriculture                         Chief Editor: Dr. Biksham Gujja
                                                                              Editor-in-charge: Manisha Agarwal        Layout and Design:
 on innovations, practices in sugarcane and share ideas                                                                Akshakala
                                                                              Editorial team:
 and feedback on the articles in the Newsletter. We also                      Anuradha S. Echambadi                    Map and Technical Support:
 invite news items, events and information on seminars/                       Dr. V. Vinod Goud                        Sraban Kumar Dalai
 workshops/trainings with photographs to the following                        Dr. N. Loganandhan                       Admin. Support:
 email ID: m.agarwal@cgiar.org                                                Manisha Agarwal                          R. Padma Reddy
Three - Excessive use of fertilizers, which are of course            The Sustainable Sugarcane Initiative (SSI) has to be seen in this
heavily subsidized, indiscriminate use of pesticides,                context. It is already a big success. Already it has caught the
massive pumping of ground water with free electricity,               attention of many stakeholders - farmers, millers, agricultural
all of the above have contributed to soil degradation,               equipment manufacturers, researchers, and even the policy
over-exploitation of ground water, pollution of rivers               makers. Again, SSI is not magic or some mystifying technology.
and prevalence of health hazards, etc. The ecological                It is even now evolving and is like open source programming.
degradation in turn is resulting in the decline of yields and        Many farmers are going to add and modify to the method to suite
increasing costs in agriculture.
                                                                     though - it is possible to use a lot less sugarcane to plant the
                                                                     crop, it is possible to grow a nursery without any additional costs,
and intensity of rainfall and associated with it, the availability   it is possible to plant wide and most importantly, it is possible to


in the same area in the same year. This will only further add        depending on several factors.

                                                                     The SSI manual released in May 2009 attracted the attention of
These are but some of the problems and list might go                 many stakeholders. The process of working together to scale it up
on and on. Regarding solutions, there is no new ‘magic’              is on. All the stakeholders - farmers, millers, agriculture equipment
technological breakthrough in the near future like                   manufacturers and policy makers, need to have a combined vision
improved varieties, Hybrids, GMs, etc. While there was some


as exciting to the farmers. On the contrary, they would              assist them in improving their cane production while reducing the Nov ‘09
need to invest even more to get access to them. The ‘More            costs. SSI will help farmers to adapt to the uncertainties of climate




                                                                                                                                                SugarCane
to get little more’ strategy has increased the government            change while at the same time contributing to the reduction in
spending on fertilizer subsidy, large resources have to be           the release of greenhouse gases, by producing more ethanol. It is




                                                                                                                                             matters
diverted to rural employment, construction of large water            adaptation and mitigation, both as part of the same intervention.
infrastructure to divert the non-existent or uncertain water         SSI is going to help reduce the human footprint on planet earth
resources, subsidizing the farmers to pump out ground water

these measures seem to be working.                                   This newsletter is a forum to assist that process of scaling up the

As mentioned before, there are no magic solutions to                 experiences of the SSI demonstration sites. More importantly, the
the present agricultural problems. So the question is,               farmers behind this, the farmers who have done pioneering work,
‘Is it possible to produce more with less?’ Certainly, the           have been given focus. We also give a brief taste of the progress in
question might sound unrealistic. But that is the challenge.         our systematic demonstration sites. This only a beginning and we are
                                                                     sure SSI is certainly going to effect a change in the way sugarcane
method has proved that it is indeed possible to produce              is cultivated. We invite individuals and institutions to be part of
                                                                     this process and use this newsletter to improve the understanding
less water. The results are out there in the public domain to
verify. For any agriculture practice, the ultimate test is the
acceptance of farmers. SRI has been accepted by millions             and add to the knowledge base in improving the sugar sector.
of farmers and many more will do the same. SRI has not
only changed the method of rice cultivation but has also
transformed the thinking process for future agriculture.                                                              Dr. Biksham Gujja




                                                                                     For further feedback and information contact:
Published by:                       NOTE: The views and opinions expressed
ICRISAT-WWF Project,                in this Newsletter are authors’ own and          Editorial Desk,
ICRISAT,                                                                             ICRISAT-WWF Project,
Patancheru,                         of the ICRISAT-WWF project and SSI
                                    partners.
                                    Cover Photo Courtesy:                            Email: m.agarwal@cgiar.org,
Email: p.reddy@cgiar.org            ICRISAT-WWF Project Team                         manisha.manvi@gmail.com
CoverStory


                    “More with Less”
                              An initiative in sustainable sugarcane production
                    Water is proving to be one of the major constraints for Indian farmers affecting the


                    by climate change are debilitating the sugarcane farmers in the country today.

                                Dr. V. Vinod Goud                             Rice, sugarcane and cotton are among the
                                                                              highest water guzzling crops. Sugarcane

                              The       effects of climate change are
                                        becoming apparent more and
                              more all over the world and agriculture is
                                                                              water to produce 1 kg of cane. Besides,
                                                                              sugarcane is one of the most important
                              the most affected due to changes in the         commercial crops in India both for its sugar
                                                                              and other by-products. India ranks second in
                              rainfall has led to shortfalls in food          the world, after Brazil, in terms of sugarcane
                              supplies and spiralling prices of essential     growing area (4.1 m ha) and production.
                              food commodities.                               Sugar industry is the second largest in
                                                                              the country in the agro-processing sector
                              The mitigation of the effects of climate
                              change is complicated due to its
SugarCane




                              multidimensional nature. In agriculture, this
       matters




                              necessitates identifying and developing
                              better crop management options, which           potential to address energy needs through
                              can tolerate water shortages and adapt to       Cogen and ethanol production.
   4
Nov ‘09                       the extremes of weather induced by climatic
                              change and yet produce more without             Of late, there is increasing concern about
                              putting pressure on the ecosystem.              low productivity in most of the sugarcane
During the SSI Training Manual Release: From (Lto R) Dr. S. P. Wani, Principal Scientist, ICRISAT; Shri. Prabhakar Reddy, President,
                       Farmers Federation of AP; Dr. Biksham Gujja, Team Leader, ICRISAT-WWF Project, Dr. William Dar, Director General, ICRISAT;
                       Shri. Sucha Singh,Hon’ble Agriculture Minister, Punjab; Dr. Dave Hoisington, Deputy Director General-Research, ICRISAT;
                       Dr. Vithal Rajan, Board of Directors, KCP Sugars; Shri. P. K. Singh, General Manager-Cane, Triveni Engineering & Industries Ltd


producing states in India - in AP, where                                  to climatic change, as revealed in a                        no choice but to shift to remunerative
                                                                          recent four-year study conducted by                         commercial crops.
                                                                          the World Bank.
                                                                                                                                      Under these circumstances, if India has       Nov ‘09
2008-09; in UP, the average number of                                     While sugar mills are suffering due                         to sustain its sugarcane production




                                                                                                                                                                                       SugarCane
millable canes per unit area has come                                     to inadequate supply of cane for
                                                                          crushing, the sugarcane farmers are                         productivity of sugarcane per unit of




                                                                                                                                                                                    matters
                                                                          facing problems of their own. On                            land, water, labour and capital all at
t/ha, though this state has the largest                                   the one hand, the cost of cultivating                       the same time, while striking a balance
area under cultivation of sugarcane.                                      cane is increasing and on the other,                        between economy and ecology.
                                                                          the prices offered by the factories are
Sugarcane production is expected                                          making it uneconomical to continue                          Responding to this need, World
                                                                          its cultivation. Therefore, farmers have                    Wide Fund for Nature (WWF) has
                                                                                                                                      partnered with International Crops
                                                                                                                                      Research Institute for the Semi-Arid
State-wise Area, Production and Productivity of Sugarcane                                                                             Tropics (ICRISAT) to explore options
in India (2006-07)                                                                                                                    for “Improving water productivity in
                                                                                                                                      Agriculture” in order to improve water

                                                                                                                                      freshwater ecosystems.
   200
                                                                                                                                      Based on the principles of ‘more with
                                                                                                                                      less’ in agriculture, the project initiated

   100
                                                                                                                                      largest water-guzzling crop - through

                                                                                                                                      research and policy advocacy to
                                                                                                                                      popularise and mainstream the System

       0
                                                                                                                                      rice cultivation (see website: www.sri-
             sh


                   m


                          r

                                    at


                                           a

                                                       ka


                                                                 h

                                                                            ra


                                                                                  a

                                                                                          ab


                                                                                                      u

                                                                                                             sh


                                                                                                                         nd


                                                                                                                                  l
                                                                                                                                ga
                        ha




                                           an




                                                                                 iss
                                                                 es




                                                                                                   ad
                  sa




                                                                          ht
                                 jar
          de




                                                    ta




                                                                                                             de
                                                                                        nj




                                                                                                                     ha

                                                                                                                                en
                       Bi




                                                                 d




                                                                                 Or
                                         ry




                                                                                               il N




                                                                                                                                      india.net). Encouraged by the results in
                  As




                                                                        as
                                                  na




                                                                                       Pu
                               Gu
        ra




                                                              ra




                                                                                                           ra


                                                                                                                     k

                                                                                                                              tB
                                     Ha




                                                                                                                  ra
                                                                      ar
         P




                                                            aP




                                                                                                        rP
                                                   r




                                                                                               m
                                                Ka




                                                                                                                ta
                                                                     ah




                                                                                                                          es
      ra




                                                                                            Ta

                                                                                                      ta
                                                         hy




                                                                                                              Ut


                                                                                                                         W
  dh




                                                                 M




                                                                                                   Ut
                                                    ad
 An




                                                   M




                            Area (‘0000 ha)              Production (MT)               Productivity (t/ha)
                                                                                                                                      now, the focus shifted to sugarcane in
                               Source: Directorate of Economics and Statistics, Ministry of Agriculture                               the last one and half years.
SSI methods popular among farmers
                                                                                                                and sugar industries. After the book
                                                                                                                release , the wide media coverage of
                                                                                                                the event generated huge interest
                                                                                                                regarding the SSI methods among
                                                                                                                industrialists, farmers and the State
                                                                                                                Agriculture Ministries across India
                                                                                                                and other countries. The Manual is
                                                                                                                now ready for publication in Hindi,

                                                                                                                partnership with various Government

                                                                                                                for farmers to read and understand
                                                                                                                them in their own language.
                               The Triveni Industry team during a training session at ICRISAT


                 Inspired by the principles of SRI, the         water abstractions and farm chemical            and demonstration plots are being set
                 project team started identifying,              usage.                                          up in partnership with industries, NGOs
                                                                                                                and farmers in states such as Uttar
                 practices in sugarcane already in use          The objective of this exercise was              Pradesh, Punjab, Tamil Nadu, Andhra
                 in the public domain for long but              to understand the problems of                   Pradesh, Karnataka and Orissa.
                 limited to a few farmers.                      growing sugarcane and to study the
                                                                innovations in reducing the inputs and          The results so far have been very
SugarCane




                 SSI was evolved after one and half             cost of cultivation while improving             encouraging in the demonstrations
       matters




                 years of extensive consultations               yields and incomes of the farmers.              plots. The tillering and crop growth
                 with progressive sugarcane farmers                                                             are much better than the sugarcane
                 across the country combining the                                                               crops grown under conventional
Nov ‘09          cane planting innovations, better              “SSI Training Manual: Sustainable               methods.
                 plant and water management and
                                                                Sugarcane Cultivation in India” in              A long-term strategy is being
                 of which will accrue to the cane               English was published and launched              developed to scale up SSI in all
                 producer and mill owner on the                 by Dr. William Dar, the Director                sugarcane growing states in order to
                 one hand and on the other, to the              General of ICRISAT at an event                  make a dent in the sugar industry and
                 environment as a result of reduced             organised to introduce and make the             target at improving the conservation
                                                                                                                of water in sugarcane cultivation
                                                                                                                in particular and the agricultural
                                                                                                                sector in the country in general. It is
                                                                                                                imperative that a consortium based
                                                                                                                institutional mechanism be evolved,
                                                                                                                with an objective of generating


                                                                                                                farmers, researchers, equipment and
                                                                                                                machinery interests. This would help
                                                                                                                in promoting wider adaptation of SSI,
                                                                                                                along with active Government support
                                                                                                                - in the form appropriate policy as well

                                                                                                                least one third of India’s total sugarcane



                                                                                                                         Dr. V. Vinod Goud is the Project Coordinator
                                                                                                                         for the ICRISAT-WWF Project at ICRISAT,
                               Dr. Vinod Goud inspecting the nursery seedlings at Farmer Makhan Singh’s place            Patancheru
The following article was written by Frank A. Hilario and is a detailed analysis of the present world
situation of sugarcane and sugar industry and how well the SSI Manual of ICRISAT-WWF can come to
the rescue of the resources strapped farmers. It has been reproduced here with his kind permission.



Sweet Revolution, 2009! SSI gives birth to Neo-Agriculture
                      Frank A. Hilario                                                inputs need to be decreased. Our
                                           hectares, reportedly the Philippines’      technical knowledge needs to change
                   May 27, 2009            largest     sugarcane     plantation       for the better, and not only in making
                                                                                      things clear to the layman.
                   Revised 29 May 2009     Province is next to Pangasinan. I
                   at 0949 Manila time     preferred the light one ‘with a warm       We Filipinos learned to produce sugar
                                           honey color                                                                    s
SWEET LOVE C12H22O11, Sweet Ignore         (billingston.co.uk). Today, raw sugar,
                                           muscovado is considered a health           Sugar History Newsletter July 2004).
                                           food. Not surprisingly, it has all         Today, some 170 years later, the way
saccharine. I like it harvested from       the natural vitamins & minerals in         we grow sugarcane leaves much to
                                           sugarcane juice (sugarindia.com). I        be desired.
I like it cultured on soil rather than     love it!
cultured on Petri dishes or whatever. I                                               Actually, the world over, most                              Nov ‘09
want to be in the US, the home of the      Raw sugar is a major export of the                                                                               7
                                                                                      sugarcane farmers have much to




                                                                                                                                                     SugarCane
brave and the land of the free. But I      Philippines. For 2009, the country will    learn about raising cane. We need
don’t want to be sugar-free.                                             e the US     a Sweet Revolution in sugarcane




                                                                                                                                                  matters
                                           is importing for the year (March 2009,     farming in response to the realities
I’m in the Philippines; I am a farmer’s    agriculture-ph.com). How sweet!            of climate change (global warming/

the natural to the man-made. Today,        We Filipinos are good in raising Cain,     (like too much fertilizer), and
I want to talk nicely about sweetness.     that’s for sure. If you didn’t know, you   dwindling resources (like the water
Grown by mild-mannered chemists            have not been reading the papers.
                                           Now, are we Filipinos good in raising      are overdrawn).
Saccharin is sweet; grown by tough-
talking farmers on uneven farms with       writing this long essay. But we are        For sugarcane farmers in the dry
hard methods, C12H22O11, sugar is          good producers of sugar. In crop year      tropics, who can they turn to, to
sweet and delectable.                                                                 learn to grow sugarcane much, much
                                                                                      better? The Brazilians are the biggest
And that would be muscovado. In the        compared to 1998-1999 largely due          sugarcane producers in the world,
                                           to higher sugar recovery                   but Brazil doesn’t have the drylands
shorts going to grade school in the        the increase can also be attributed        that we have. In the 2007-2008
village of Sanchez in the sleepy town of   to ‘favorable climatic conditions,         season, total sugarcane production
Asingan, Pangasinan in Central Luzon       adoption of high-yielding varieties,       was estimated highest in Brazil at 491
in the Philippines, I had muscovado        improved cultural practices, increased
in my pocket somewhere to bring            farm inputs, and better milling            tonnes (commodityonline.com). So
out as snack. Were we poor? Not
really, but I have always been a sweet     goliath.ecnext.com). (I tried hard but
tooth; I loved the brown color and         I couldn’t get 2007 or 2008 data on
the God-given sweetness. Asingan           recovery rate.)                                                                            SSI is
never had a sugarcane plantation,                                                                                                   sugarcane
but we always had muscovado. It
                                                                                       S ust ai




                                           The problem there is that ‘favorable                                                    agriculture
                                                                                                                            iv e
                                                                                                                        ti a t




must have come from Tarlac, from           climatic conditions’ doesn’t apply                                                      at its best.
                                                                                          na




                                                                                                                      ni




                                                                                                  bl
                                                                                                       eS              eI
the Central Azucarera De Tarlac, the       anymore; cultural practices need to                            u g a rc a n
maybe we should go to India and learn                    In fact, in 510 BC            In this unusual Age of Climate
                 from the Indians. After all, in history,             Emperor Darius of Persia
                                                                       invaded India and found          the panda is talking to the plant.
                 grown in that country (Wikipedia).                     ‘the reed which gives           Based in Switzerland, the current
                 Except the latest news is that, in                      honey without bees’            top panda of WWF is President Chief
                 contrast to the Philippines, last year               (quoted by ANN in sucrose.com).   Emeka Anyaoku of Nigeria; based in
                 India had a decline in recovery rate,                                                  India, the current top crop of ICRISAT
                 which is the amount of sugar you                                                       is Director General William Dar of the
                                                             huge mistake is that they have been
                 commodityonline.com).                                                                  were thinking of, if vaguely, if I may
                                                             it comes to the growing of sugarcane:
                 Consider: The above production              too much water for the canes in the        the concept of optimum sustainable
                                                                                                        yield. OSY is where you decrease the
                 yield estimates change during the
                 year as the weather changes; after          And that’s one of the modern Indian        water, fertilizer and seed in particular
                 all, in agriculture, harvests are only as   lessons we can learn on campus at
                 good as the weather allows. So, expect      ICRISAT at Patancheru. As far as I
                 that for any growing season, any            know, they are very serious when           OSY one better; it so happens that
                 country’s sugarcane yield estimates         they say, ‘We need to explore every        in SSI, while you decrease the costs,
                 will be revised at least 4 times: early     possible approach to reduce the water      you increase the yield. Plow in less,
                 in the year, before harvest, harvest        input to all crops, particularly those
                 time, then afterwards.                      which excessively depend on scarce         agriculture at its best.
                                                             resources.’ That’s ICRISAT Director
SugarCane




                                                             General William Dar speaking. In           The ICRISAT-WWF partnership is a
       matters




                                                             other words, he is telling us we have      revelation. The WWF has a mandate
                                                             to save on water, and so do our            of protecting ecosystems; considering
                 your weather. And why is that? As far       crops. I know him personally to be a       that, ‘ICRISAT is collaborating with
   8
Nov ‘09          as I can tell, the telling effect of the    non-traditional and out-of-the-box         WWF to understand and integrate the
                 weather is felt by plants via the water     manager-thinker, looking for, in his       ecological concerns of agriculture,’
                 in the soil. Water is that important.       own words, ‘approaches wherein the         Dar says. ‘This partnership is unique,
                                                             resource inputs are low and yields are     and we are looking forward to many
                 Mark Twain did say, ‘Everybody talks        high.’ The mantra of the Consultative      more practical results on the ground.’
                 about the weather, but nobody does          Group on International Agricultural        Not just theories but practices.
                 anything about it.’ In this age of          Research, CGIAR, is ‘Doing More with
                 Climate Change, I say we need to and                                                   And so, on March 2009, the ICRISAT-
                 indeed we can modify the weather, if                                                   WWF project came up with a training
                 we simply modify the water in the soil:     that kind of farming is contrary to        manual with the long title, Sustainable
                 how much is in it and how much the          textbook economics, isn’t it? As well      Sugarcane Initiative (SSI): Improving
                 plants are taking out and transpiring       as textbook agriculture.                   Sugarcane Cultivation in India. Dated
                 from it. We need to practice out-of-                                                   March 2009 and released May, the
                 the-box water management.                   Going-against-the-grain-of accepted
                                                             practices was very much in the minds       with plenty of photographs, freely
                 I did say we should go to India and         of the experts when they worked            downloadable from here: panda.org.
                 learn. You know, we learn from              out the joint project Sustainable
                 mistakes, preferably those of others,       Sugarcane Initiative, SSI. I’m referring   About the training manual, Project
                 preferably big. In this case, India is      to the World Wide Fund for Nature,         Leader Gujja says that ‘the inspiration
                 the biggest sugar producer in the           WWF and the International Crops            for putting this package together
                 world                                       Research Institute for the Semi-Arid       is from the successful approach of
                 they must make big mistakes there.          Tropics, ICRISAT. The Team Leader
                                                             for the SSI project is Biksham Gujja       which has been proven to need less
                 Persia invaded India and found ‘the                                                    water and yet to yield more. And do
                 reed which gives honey without bees’        Project Scientist for WWF based at the     you know who invented SRI? It was
                 (quoted by ANN in sucrose.com). Now         ICRISAT headquarters in Patancheru,        Fr Henri De Laulanie SJ who spent
                 then, the Indians have been raising
Malagasy rice farmers in Madagascar          pre-climate change agriculturists         prescribed for SSI/neo-agriculture
(ANN, ciifad.cornell.edu). He came up        think of that?! They couldn’t have        for sugarcane (mostly from the SSI
                                             because they were not thinking out        training manual):
De Laulanie, along with some Malagasy        of the box. Now, neo-agriculturists, as
colleagues set up a non-government           well as neo-economists perforce must      (1) Raise single-budded setts in nursery.
organization, NGO, the Association           think of water used in production, not
Tefy Saina, to help improve lives in         as a dependent but an independent               coconut coir. Being hygroscopic,
Madagascar. ‘Tefy Saina’ means, in           variable, something that can be to              the coir absorbs water 8-9 times its
Malagasy, ‘to improve the mind.’             the highest degree manipulated,                 own weight, then slowly releases
Cornell International Institute for Food,    controlled, varied or changed. This is          the precious liquid to the feeding
Agriculture and Development, is now          water before the bridge.                        roots of the setts. Also, nursery-
working with Tefy Saina. The Jesuits                                                         raised settlings are excellent for
can teach even the experts a thing or        The ICRISAT-WWF sugarcane scientists
two about culture and agriculture.           may have been thinking more of Indian
                                             sugarcane farmers than those in other           same age as the ones growing in
From SRI to SSI. The SSI approach has        lands, but that was natural. They had
been tested by farmers in different          enough problems in India already! Neo-          same time.
climatic zones of India: Punjab, Uttar       agriculture will have greater impact
Pradesh, Andhra Pradesh, Karnataka           in India than the Philippines, simply     (2)
and Orissa (KV Kumanath, 07 May,             because in the Land of the Maharajas,           days old). By then, the settlings
thehindubusinessline.com).        With                                                       are old enough and vigorous
very encouraging results, Gujja says         farmers, and that number is more                to withstand the shock of
he expects that the SSI practice will        than the entire population of Canada,           transplanting. Well-developed, the      Nov ‘09
replace farmer’s practice in sugarcane                                                       setts can compete with the weeds                  9




                                                                                                                                        SugarCane
                                             million in 2021 (sustreport.org). This          better, and can increase cane yield
ethique.org). I expect the same for          is not to mention the multiplier effect




                                                                                                                                     matters
the Philippines.                                                                             1994, University of the Ryukyus,
                                             depend on employment generated by               rms1.agsearch.agropedia.affrc.
In fact, SSI is the new economics of                                                         go.jp).
                                             using sugar.
call it from here on, because it’s new
and because I believe the concepts           It is true that we have only
are applicable with other crops. This is     Filipino sugarcane farmers (Katharine
the Sweet Revolution of 2009 I refer                                                         times more millable canes because
to in the title to this essay.               even then, all of them too have to              the setts produce more tillers. It
                                             practice neo-agriculture for cane               also reduces the number of setts
Call it SSI or call it neo-agriculture, it   starting right now. Filipinos, neo-
has been shown to work in practice,          farmers of sugarcane? That would be             setts to 4,000 single-budded setts
not simply in theory. One Indian farmer,     sweet music to my ears.                         to an acre.
PK Singh, in Uttar Pradesh found that
cane yields went up to 100 tonnes to         For starters, here are some techniques    (4) Apply a trash mulch. Apply
a hectare as against a ‘normal’ yield of
                                                                                             of planting. Mulching is the best
com). That’s an increase in yield of          In fact, SSI is the new                        practice in controlling weeds.
                                             economics of agriculture                        Trash mulch can also increase
                                              – neo-agriculture I shall                      yield and decrease energy cost (AC
                                                call it from here on,                        Srivastava, 2002, asae.frymulti.
recommendation that caught my eye              because it’s new and                          com). I myself have written about
is that on water. If you follow neo-           because I believe the                         what Edward H Faulkner calls
agriculture, all things being equal, your    concepts are applicable                         trash farming in my ‘Lesson of
                                             with other crops. This is                       the Water Cycle’ (20 April 2008,
irrigation and your output will be up        the Sweet Revolution of                         americanchronicle.com).
                                              2009 I refer to in the
economics of agriculture. Why didn’t            title to this essay.                                           (Contd. on page 14)
SSI Introduced Districts in India




                 tillers                           Women labourers chipping buds
                                                         from the canes
SugarCane
       matters




  10
Nov ‘09




                                                                                    Farmer watering the nursery
                                                                                            seedlings




                                                            Young seedlings ready
                                                             for transplantation




Transplantation between rows of
           intercrops




                                              Cutting of mother shoot
This article presents a brief overview
SSI interventions                                                                        of the progress made so far and the
                                                                                         future plans as part of this process.
              The progress made and the plans ahead
                                                                                         Uttar Pradesh
              The following is a brief report on the interventions
              taken up by ICRISAT-WWF project this year
              in some states across the country.                                         and production of sugarcane at

  Dr. N. Loganandhan                                                                     biggest sugar mills are located in
                                                                                         this state. During September 2008,

                                                                                         Engineering and Industries (Sugars),
                                                                                         UP, the third largest producer
                                                                                         in the country, visited the WWF

                                                                                         theoretical inputs in classrooms and

                                                                                         innovative farmers. Detailed practical
                                                                                         information on bud chip nursery,
                                                                                         planting techniques and water saving
                                                                                         technologies was imparted to them.
                                                                                                                                    Nov ‘09
                                                                                                                                              11
                                                                                         The visiting staff of Triveni Sugars was




                                                                                                                                       SugarCane
                                                                                         impressed with the seed saving, wide
                                                                                         spacing and water saving potential




                                                                                                                                    matters
                                                                                         of the SSI methods. Subsequently, a
                                                                                         partnership has been established with
                                                                                         them as a consequence of which, it
                                                                                         was decided to conduct experimental

T  o create awareness about the SSI
   methods among farmers, sugar
                                              of disseminating these practices through
                                              capacity development programmes            factory locations.

holders, and review its adoptability in       in different states across India. The
                                              following table details the training          The trials began during February
WWF Project team has taken initiative         programmes undertaken so far:                 - March this year at four sugar
                                                                                            factories located at Khatauli in
                                                                                            Muzaffarnagar, Deoband in Saha-
SSI trainings organized by the ICRISAT-WWF Project team
                                                                                            ranpur, Sabitgarh in Bulandshahar
(Sep 2008 to July 2009)
                                                                                            and Chandanpur in J.P Nagar.
 State           Organization              Date of training       No. of participants
                                                                  Staff   Farmers           About one lakh seedlings were
 Uttar Pradesh Triveni Engineering                                        --
 Punjab          Agricultural Technology   21-22 January, 2009    --                        acres.
                 Management Agency
                 (ATMA), Government of                                                      Experiments comprising different
                 India, Gurdaspur                                                           treatments are being tried out
 Orissa          NIRMAN, Nayagarh          21-22 January, 2009    1                         considering the variations like plant
 Karnataka       Outreach, Bidar                                  2
 Tamil Nadu      Thumbal SRI Farmers’                             --      8                 direction (N-S and E-W), furrow
                 Association, Salem,                                                        and drip irrigation, organic and
                 Ponni Sugars, Erode                                                        inorganic fertilizers, intercropping
 Andhra          Kakatiya Sugars, Kham-    8-10 July, 2009                --                etc., along with a control plot
 Pradesh         mam district
                                                                                            with conventional practices to
compare with the performance of           the farmers from ATMA. Farmers            coco-pith were provided to them to
                    SSI methods.                                                                        raise nursery. Farmers got involved
                                                              March and May. It was interesting         in the activities very actively and
                 Performance so far                           to note that they have also tried out
                                                              several other materials like sawdust,     status of the crops with promising
                    saved during the nursery stage            vermi-compost, poultry feed, etc., for    performance of the sugarcane crop
                                                              raising bud chip nursery, in the place    under SSI. Details in this regard
                    More number of tillers were seen          of coco-pith.                             can be read from another exclusive
                    per clump (about 8 on an average                                                    article in this publication.
                                                              The present scenario and
                                                              performance                               Andhra Pradesh
                    Compared to control plots, only              At present, 7 farmers are practicing   In 2008-09, the productivity in
                                                                 SSI in an area of 8 acres in this      sugarcane in Andhra Pradesh was
                                                                 state.                                 reduced to 77 t/ha as against 82 t/

                    The girth (about 10 cm) of individual        The crop shows healthy signs in        the demand for SSI methods from
                    canes is comparatively better in SSI         terms of increase in tiller count      many farmers and industry staff, a
                    plots                                                                               need for establishing model farms
                                                                 their earlier experience).             in the vicinity of ICRISAT was felt.
                 Future plans                                                                           In the month of March 2009, about
                 Impressed by the results so far, the            Intercrops like maize and bhendi       10,000 seedlings were provided to
                 management has decided to upscale               have been successfully tried by        two farmers of nearby Madgi and
                 this method and so has planned to               the farmers.                           Hathanura villages. In the month of
SugarCane




                                                                                                        July 2009, a training programme was
       matters




                                                                 As the seedlings were well
                                                                 established while earthing up,         Kakatiya Sugars in Khammam district
                 been initiated and the planting will be         lodging of the crop was minimal.       by the SSI project team.
  12
Nov ‘09          carried out in November 2009.
                                                              The path ahead                            In August 20-21, an experience
                 Punjab                                       In the Kisan Mela conducted at            sharing workshop on better manage-
                 Sugarcane is one of the major crops          Gurdaspur on 10th September 2009,         ment practices was organized by
                 of Punjab, thanks to the availability                                                  the Consortium of Indian Farmers’
                 of abundant water resources. Punjab          interest to try this new method and       Association (CIFA ) in Hyderabad, with
                 farmers are known for their enthusiasm       registered their names to know more       support from the ICRISAT-WWF Project
                 in adopting any innovative technology        about it. It is learnt that trainings     for selected innovative farmers from
                 as was evident from the time of Green        would soon be conducted for these         Karnataka, Tamil Nadu, Andhra Pradesh
                 Revolution. In the month of January          registered farmers by ATMA and            and Maharashtra. Delivering the
                                                              selected farmers among the trainees       Special Message, Dr. Lakshmi Narayana,
                 Gurdaspur district, underwent the SSI        would be supported with materials to      I.A.S, Commissioner of Sugarcane,
                 training supported by the ICRISAT-                                                     Government of Andhra Pradesh said he
                 WWF project. Soon after the training,                                                  was indeed happy to see the presence
                 the farmers initiated the activities of      Orissa                                    of farmers’ associations participating in
                                                              Along with the Punjab farmers, six
                 from the trainees, some of their             farmers and a staff member from           to all farmers. He added that, it is indeed
                 neighboring farmers also undertook           NIRMAN, a local NGO of Nayagarh           wonderful that SSI is getting such wide
                 the SSI practices. Especially, Shri. Sucha   district, Orissa, underwent the           publicity and as soon as the Manual
                 Singh Langah, the Hon’ble Minister for       training in the month of January.         was released, word came from the Chief
                 Agriculture, Government of Punjab has        After the completion of the               Minister and meetings were convened
                 shown keen interest and has taken up         programme, the farmers appreciated        the very next day with the Assistant
                                                              the cost effective SSI practices and      Cane Commissioners and Managing
                                                              showed keen interest in taking up SSI     Directors as well as managers of mills,
                 Efforts taken                                in 4 acres under rainfed conditions.      both public and private, to discuss at
                 Materials like bud-chippers, trays           Support in terms of materials like        greater length the SSI methods and how
                 and coco-pith were distributed to            shade net shed, plastic trays and         to disseminate the information. Eminent
to take it up in a limited area to begin
                                                                                                with in the forthcoming season.

                                                                                                Further follow up and progress
                                                                                                   Some support in terms of trays and

                                                                                                   were given during the month of
                                                                                                   July 2009, to kick start the process
                                                                                                   of establishing bud chip nursery


                                                                                                   Subsequently, a two-day meeting
                                                                                                   was organized at Koutha B village
                                                                                                   of Bidar on 17th and 18th September
                                                                                                   2009, in order to initiate the planting
                                                                                                   in the coming October season.
                 Shri. Laxmi Narayana, Cane Comissioner, Govt. of AP, lighting the ceremonial


                 Management Practices for Improving Productivity in Sugarcane’ at Hyderabad        in the programme organized by
                 in the month of August 2009.                                                      Outreach. Six farmers and three
                                                                                                   staff members from AME, another
                                                                                                   reputed NGO based in Bangalore
sugarcane scientists Dr. Hapse and                                                                 and working in the Dharwad                Nov ‘09
Dr. N.V Naidu participated and shared                farmer, Mr. Manik Reddy.                      district also participated.




                                                                                                                                                SugarCane
their experiences with the farmers.
                                                 Future developments                               The Chief Guest of the function, the




                                                                                                                                             matters
appreciated by the sugarcane experts                Mr. Anji Reddy is planning to                  Assistant General Manager (AGM)
                                                    establish a bigger nursery to                  of NABARD, encouraged the women
cost of cultivation and improvement                 supply bud chip seedlings to other             members of Self-Help-Groups to
                                                    farmers as additional income                   take up the bud chip nursery as
deliberations.                                      generating activity.                           an income generating activity. He

The present situation                                Plans are on to bring in more                 to raise the shade net shed and
  Mr. Anji Reddy, whose case history                 farmers under SSI with support                procurement of required materials
  is carried in this newsletter, has                 from the State Government and                 to initiate it as a group activity.
                                                     nearby mills.
   acres more, during the month of                                                                 Nursery activities were initiated
   June. This he has done by raising                 Kakatiya Sugars is planing to
   his own nursery.                                                                                this autumn season.

   He has planted soya bean as                                                                  Future developments
   intercrop in both the plots. The              Karnataka                                         More training programmes in
   cane crop shows healthy growth                Karnataka is also another state with              other nearby districts like Bijapur,
                                                 high productivity of cane (88t/ha                 Bagalkote etc., will be taken up.
   tillers (on an average) in each of            in 2007). It is known for its rich belt
   the clumps.                                   of sugarcane farming, thanks to the               Demonstration plots will be
                                                 Cauvery River basin. Six farmers and              established in at least one acre
                                                 two staff members from Outreach,                  in each district with the technical
   visitors, be it farmers, staff of             a well known Bangalore based NGO                  support of ICRISAT-WWF project.
   sugar industries from neighbouring            working in the Bidar district of Karna-
                                                                                                   Publication of Manuals in local
                                                 to undergo training during March this             languages will be taken up in the
   The crop performance is equally               year. They found the SSI methods to be            near future with support from
   good under sub-surface drip                   very innovative and expressed interest            NABARD.
Tamil Nadu                                   their selection of 11-month old        practices shows that the sugarcane
                                                              canes, there were no such issues       farming community has received the
                                                                                                     SSI methodology well. The ongoing
                 (2007). The state is known for its well                                             performance of the crop is quite
                 organized cooperative and private            Presently, crops look healthy with
                 sugar mills. Eight farmers (two              an average of 18 tillers per clump.    compared to the crops being cultivated
                 supported by Ponni Sugars, Erode                                                    in the conventional methods.
                 and six from SRI Farmers’ Association,       On 22nd June 2009, an awareness
                 Thumbal, Salem district) attended a          programme on SSI was organized at
                 2-day training programme on SSI in           Thumbal with the support of the SRI    that the present signs are indicators
                 the month of May 2009.                       Farmers’ Association, sponsored by     of a good harvest. More data
                                                              NABARD.                                and information with regard to
                 Progress so far                                                                     improvement in yields and savings
                    Nursery materials to cover an area        Needed support was assured             in inputs will be shared in this
                    of 10 acres were provided to the          from AGM, NABARD for the SSI           newsletter in the coming months.
                    Salem farmers on their request.           trainings in the state.                With the support from farmers, mills,
                                                                                                     NGOs and government agencies
                    Planting was initiated in an area      Conclusion
                                                           It is quite encouraging to note the
                    Baskaran and Mr. Vinod during          wide adoption of SSI methods by           the sugarcane sector of India in the
                    June-July 2009.                        farmers, millers and government           future.
                                                           agencies alike. The fact that almost
                                                           all the farmers who underwent the                  Dr. N. Loganandhan is the Visiting Scientist
SugarCane




                    observed in the nursery due to         training in SSI methods adopted the                at ICRISAT-WWF Project
       matters




  14
Nov ‘09




                                                           (7) Do bio-control of pests. Instead of      conducive for stubble growth.
                                                               applying pesticides, learn to apply      Cut the canes close to the ground
                              Sweet Revolution...              biological methods of minimizing         level.
                              (Contd. from page 9)             pest damage to your crop. An
                                                                                                     So: Neo-agriculture is not only saving
                                                              Lady bugs are predators of aphids,     on water but also saving on fertilizer,
                                   Do alternate furrow        mites, scale insects (Erv Evans,       saving on seed, saving on cost,
                    irrigation to minimize water loss,        NC State U, ces.ncsu.edu), and
                    or employ a drip irrigation system.       caterpillars (Washington State U,      pollution of the soil, water and air.
                    Drip irrigation is where you get          spokane-county.wsu.edu).               This is a paradigm shift in thinking
                                                                                                     agriculture. I can imagine that neo-
                                                           (8) Intercrop. You can intercrop          agriculture is also good for other
                    Go organic. Gradually switch from          wheat, potato, cowpea, French         high-value crops like hybrid rice,
                    inorganic to organic manures and           bean, chickpea, watermelon and        fancy rice, tropical fruits, vegetables,
                    bio-fertilizers. These are natural         many other crops with sugarcane
                    materials and do not pose any              with your wider spacing between       climate in understanding agriculture.
                    danger to the crop or soil. Organic        rows and hills. Aside from the        Biksham Gujja imagines SSI will
                    methods help directly reduce the           extra income, the intercrops will
                    carbon footprint of sugarcane              help control weed growth because      in India. Beyond SSI, I am already
                    farming by reducing use of farm            of the combined denser canopy of      imagining Sweet Revolution! 2009.
                    chemicals that require fossil fuels        the crops, depriving the weeds of
                    that emit carbon dioxide in their          sunlight.
                    production. Organic methods also                                                          Frank A.Hilario is a popular Filipino writer
                                                                                                              who is known for his extensive writings on
                    help build soil, not only add to its   (9) Ratoon. Harvest the plant crop                 issues of agriculture and other
                    fertility.                                 when weather conditions are                    world concerns
As a consequence, the period
SSI: A New Experience                                                                    for tillering phase is reduced

             in Sugarcane Cultivation
                                                                                         the distance between two rows is

                                                                                         This causes competition for sun
industry and farmers. And now, encouraged by the results, they plan to                   light and air among the tillers,
                                                                                         which in turn causes severe tiller
                                                                                         mortality and heterogeneous cane.

                Shri. P. K. Singh          It is not that the new technologies           Inadequate and imbalanced ferti-
                                           tried have not given results, but the         lizer dosage with more focus on
Background                                 fact remains that even after giving           use of Nitrogenous Fertilizer.
The role of sugarcane in uplifting rural   results, those technologies could not
economy particularly in the Northern       be further scaled up. This is either          Over dependence on monsoons
plains of India is well accepted. Even     due to some adaptability issue or             is adversely affecting the yields
                                                                                         especially in the case of failure
cane has over the years lost its place     understand or even due to last minute         of or variation in the monsoon
                                           cost enhancement. It is important             pattern.
farmers today consider sugarcane           that the technology is farmer friendly,
as one of many alternatives. Several       economical and easy to implement in           Lower yields in ratoons due to        Nov ‘09
factors can be attributed for this         order to improve yields on a sustainable      improper ratoon management




                                                                                                                                  SugarCane
                                           basis. However, before getting into           practices.
reduction in returns per unit area         the technological aspects, it is better




                                                                                                                               matters
of sugarcane, in spite of increase in      to understand the problems and the            Irrigation method followed led not
cane prices. This is mainly because of     factors affecting cane yield in U.P.          only to wastage of water but also
lower yields and increase in the cost      Lower yields in U.P can be attributed         created anaerobic condition in the
of inputs.                                 to the following factors:-
                                                                                         affect the frequency of irrigation.
The paying capacities of the factories        most of the planting is done
have also dwindled because of lower           after the harvest of wheat in the       There are several other factors
sugar recovery, affecting the cane            month of April and May, thus
payment to farmers which has                  reducing the life span of the crop.     quality, use of organic manure, plant
further aggravated the situation.

the farmer in sugarcane can only
be restored if he is sure of better
returns on sustainable basis. The
three variables affecting the returns
are yield per unit area, cost of
cultivation and certainly the price
of the output. The third variable is
largely dependent on many volatile
factors and Government polices,
which are generally not in the hands
of the farming community and the

i.e. yield and cost of production
can certainly be addressed. Several
attempts have been made in the
past and some new ones are being
tried for improving yields.
protection measures etc., which are                                                   distinct difference is visible between the
                 also attributed to lower yields. As a                                                 SSI plots and the conventional plots.
                 result of these factors, not only is the
                 individual cane weight very low (at an                                                Results
                                                                                                       Following are some of the observations
                 the number of millable canes per unit                                                 from the SSI trials:-
                                                                                                          Enhanced number of millable canes/
                 the average yield ranges from a mere                                                     clump (8 Millable canes per clump

                 of U.P. Until and unless farmers start
                 getting a yield of 100 tonnes/ha on a                                                    millable canes which is the actual
                 sustainable basis, the future of sugar        Reducing water requirement by              potential of the technology)
                 industry will remain uncertain and
                 India might end up becoming the net                                                      Increase in the girth of each cane
                 importer of sugar.
                                                            Before taking this technology to the
                 In view of the above facts and
                 replicability issues of the potential      method will be tested in the Triveni
                 technologies, the possibility of getting   mill farms, located in different units.
                 a yield at the above mentioned level
                 in larger area was a distant dream.
                 But that was until SSI, the sugarcane      Deoband in Saharanpur, Sabitgarh              Homogeneous cane in SSI with
                 version of SRI came into the picture.      in Bulandshahar and Chandanpur in             uniform height and girth as against
SugarCane




                                                            J.P Nagar. Apart from adaptability of         canes of varied height and girth in
       matters




                 Opportunities offered by SSI               SSI, effort was dedicated to study the        the conventional plot
                 The following opportunities in this        impact of the following variables:-
                 technology are immediately apparent:-          Impact of various spacings on the         Net reduction in irrigation hours
Nov ‘09             Addresses the issue of late plant-          performance of SSI                        and this in spite of increased
                    ing by raising seedlings and their                                                    frequency of irrigation
                    transplantation later on which act-
                    ually advances the entire process          North- South Vs. East -West                The average weight per cane is

                    Addresses the issue of narrow              Impact of Ammonium Sulphate in
                    spacing as the technology is based         the place of Urea                          harvest. Being new to the technology,
                    on successful exploitation of                                                         some errors occurred inadvertently
                    sunlight and air by following wider        Impact of organic farming by using         or else the performance would have
                                                               Nava Dhanya and Amritpani                  been even better

                    Addresses the problem of improper          Performance of different seed           Learnings:
                    method of irrigation, namely,                                                      Some of the learnings to enhance the
                                                               budded setts                            performance, experienced as part of
                                                                                                       the process need to be mentioned:-
                                                               Effect of different intercrops on SSI      Selection of bud while chipping
                    requirement, as only the bud is                                                       and for use as seed material is very
                    used as seed material                      Effect of Drip Irrigation                  important

                 With this background, Triveni colla-          Varietal interaction with SSI              Grading at 20-22 days’ stages
                                                                                                          should be done very cautiously
                 Project for studying the feasibility       One treatment of conventional method
                 of this technology in U.P. with the        as control was also under taken to study      In no case should weak seedlings
                 following terms of reference:              the net gains and all expenses incurred       be transplanted
                     Initial target yield of 90 tonnes/     are recorded for each treatment.
                                                            Although there are still almost 4 more        Pocket application of fertilizer
                    tonnes/ha                               months left to harvest the crop, a            improves its uptake and effect
Minister with a                                                                         as a part of which he began the chip
                                                                                        bud nursery in March of this year.
         farmer’s heart and soul                                                        He has been actively involved in the
                                                                                        propagation of the SSI methods to
          The crisis in conventional sugarcane cultivation in Punjab                    other farmers in the state, bringing
          has been becoming more and more acute every year. It is                       more and more focus through
          hardly surprising then that the farmers in the state are more                 the media. His keen interest in SSI
          than willing to experiment with the new method of SSI for                     prompted him to visit the ICRISAT-
          improved production and overall productivity of sugarcane.
                                                                                        scientists to further enhance his
  Dr. Amrik Singh                          The benefits – both short term               knowledge. It was during this visit
                                          and long term – of SSI were so                that he was able to participate in
                                          easily apparent that Shri. Sucha
years old, has been the Minister of        Singh Langah, the Minister for               Trainer’s Manual.
Agriculture for the State of Punjab          Agriculture, Government of
                                          Punjab, who himself is a farmer,              As the minister is new to this method,
                                           took up SSI in his fields and is             he has been encountering problems
taken up cultivation of sugarcane and     today the greatest advocate of                in implementing the SSI practices in
                                                  SSI in his state.
His introduction to the SSI methods                                                     late May, a little later than the other
came when he was invited to attend                                                      farmers, the growth of cane was slower,
a four-day Agriculture Development                                                      though the tillering is quite good at an
Exhibition and Workshop, organized                                                                                                             Nov ‘09
by the Agricultural Technology                                                          8-10 tillers in the conventional method.                     17




                                                                                                                                                  SugarCane
Management        Agency     (ATMA),                                                    Speaking about the SSI methods and
Gurdaspur under the aegis of Dr.                                                        practices, Shri. Sucha Singh Langah




                                                                                                                                               matters
Amrik Singh, Deputy Project Director,                                                   says, “As a farmer and the Minister
ATMA, Gurdaspur who gave a detailed                                                     for Agriculture, I understand that SSI
presentation of the SSI methods.

Shri. Langah was so impressed with        Hon’ble Punjab Agriculture Minister           Punjab”.
the possibilities of this new method      Shri. Sucha Singh (right) with the Director
that he decided to implement it on        General of ICRISAT, Dr. William Dar (left)               Dr. Amrik Singh is the Deputy Project
an experimental basis in 1½ acres         during the SSI Training Manual release                   Director, ATMA at Gurdaspur




   Light earthing up is essential         technology. Encouraged by the initial         the concerns of farmers, industry
   for increasing tillering. Proper       response, Triveni is now providing            and the ecological activists. The
   compaction of earth near the stem      the raised plantlets to the farmers to        Government agencies and Agriculture
   is real earthing up or else there is                                                 Universities should certainly adopt
   no use of earthing up                  stage, the nursery raising activity will      and take forward this technology,
                                                                                        which has been invented by the
With    certain    precautions     and    part of the next phase as a strategy          farmers themselves.
                                          for scaling up this technology.
comes naturally with experience -                                                         Encouraged by the results in the
the technology can very well give a       Transporting coco pith from South             trial plots, Triveni is now scaling it up
                                          India is the only concern, as it
on experimental plots but on mass         increases the cost of nursery raising.
scale also. Wider spacing of rows         Already other alternatives to coco
eases the entire activity taken up, as    pith are being explored, which shall          already been initiated and the planting
                                          further reduce the cost.                      will be done in November 2009.
for movement and reduced number
of rows to work. Hence, SSI is a          This technology is seen as a suitable                    P.K. Singh is the General Manager (Cane),
very easy to use and farmer friendly      and promising alternative to address                     Triveni sugars
Nayagarh District of Orissa
                 Though the farmers of Orissa have been into sugarcane cultivation
                 for a long time now, SSI is a new arena into which these farmers are
                 stepping in with caution but also happiness in their hearts. Below is
                 the intervention of ICRISAT-WWF in extending the necessary technical


                                     Sraban Kumar Dalai and Arundhati Jena

                 Overview                                   in yield beyond 70 t/ha, even though
                                                            the area under sugarcane has more
                                                            than doubled!
                 the forest area, with a population of
                                                            A Sustainable Sugarcane Initiative
                 rainfall of 1449.1 mm.                     (SSI) training was organized along        problems were encountered here due
                                                            with practical demonstrations at          to ant, termite and rat infestation.
                 There are six sugar mills in Orissa        WWF-ICRISAT, followed by a field
                 which are in operation, including the      visit on January 20-21, 2009. Four        Later, coco-pith was prepared at
                 Nayagarh Sugar Complex Pvt. Ltd            farmers from Nayagarh district of
                 in Nayagarh. Now, according to the         Orissa attended it. Apart from these      waste and vermi-compost. During
SugarCane




                 State Government and Team Orissa (a                                                  the months of February and March,
       matters




                 State Government agency working on         motivated by the SSI methods.             farmers started raising a nursery in
                 industrial promotion) Report, there        They are all marginal and small
                 are going to be 14 sugar projects          land holding sugarcane farmers.           under the supervision of their staff.
  18
Nov ‘09          in the state. Also, it is interesting to   A total of 4 acres were brought           The nursery seedlings were healthy
                 note that the paddy area has been          under cultivation using this method       and the transplantation was done
                 increasingly diverted to non-paddy         in Biruda, Ikiri, Tipura villages of      during the last week of March and
                                                            Nayagarh district with the support
                 2007 in the state. Sugarcane is one        of NIRMAN, a local NGO.                   three farmers initiated intercropping
                 of the preferred crops for diversion,                                                                           Bhendi or
                 replacing paddy. Area diverted             The materials used for raising nursery    Okra) crop.
                 to sugarcane crop during kharif            like bud chipper, shade net shed, trays
                                                            and a small quantity of coco-pith         Results
                 hectares in the above mentioned            were provided through the WWF-
                 years respectively. If the statistics of   ICRISAT project to kick start the
                 sugarcane area and productivity in         SSI adoption in Orissa. In the initial
                 Nayagarh district were to be observed      period, farmers used decomposed
                 for the last 8 years, it shows that the    sawdust, coir waste, vermi-compost,

                 ha. And there was no improvement           acre land in their backyard. Some         inches, and the height of canes varies


                                                                                              80
                                                                                                      Future plans
                                                                                              70
                                                                                                      NIRMAN has conducted meetings
                  4000                                                                                in two villages of Khairapati and
                                                              Yield (t/ha)                            Gopalpur where 7 farmers from the
                                                                                              40
                                                                                                      former village agreed to go for SSI
                  2000
                                                                                              20
                  1000
                                                              Area (in ha)
                                                                                              10      latter village agreed to go for it in
                     0                                                                        0
                         1999-00   2000-01   2001-02                                2007-08
                                                                                                      are planned in the remaining 12
villages. Most of the local
         Farmer’s Experience                                                    Farmer’s Name:      farmers have agreed to adopt
                                                                                Natabar Gochhi
                                                                                                    SSI after seeing the current
                                                                                Dist:
                                                                                Nayagarh, Orissa
                                                                                                    year’s results. NIRMAN has
         cultivation. After attending the training programme and practical
                                                                                                    planned to cover more areas
                                                                                                    with centralized nursery by
                                                                                                    the end of this year.
         along with vermi-compost to raise the nursery. He used about 90
                                                                                                     Sraban Kumar Dalai is the GIS Coordinator
         age of the plant is 7 months with 8-10 tillers on an average per                            for ICRISAT-WWF Project


                                                                                                     Arundhati Jena is the cordinator at NIRMAN,
                                                                                                     an NGO in Nayagarh, Orissa




         Mr. Gochhi says that SSI requires less than half of the water that
         was normally used, as furrow irrigation is practiced just to wet the
         soil. But it is sad to know that the farmers had to buy water from

         six months, mostly from January to June. Nonetheless, adoption
         of SSI has reduced the burden of this farmer to some extent by
         saving on water, which otherwise he would have to buy.
                                                                                                                                                   Nov ‘09
                                                                                                                                                         19




                                                                                                                                                      SugarCane
                                                                                                                                                   matters
After the release of the SSI Training Manual and the media
attention given to SSI method - terming it as a ‘Ray of Hope
for Sugarcane Farmers’ - representatives from sugar industry
across the country visited ICRISAT to know more about the
methods. Some of the visits were captured on camera.




                                                               1        2

                                                               4        3




                                                                           of Ponni Sugars (May 2, 2009)
                                                                        4. Visit of staff from EID Parry’s from Chennai (May 8, 2008)
Anji Reddy
                                                                          The New Age Farmer of SSI
                                                            Anji Reddy was able to make use of the knowledge of researchers and
                                                            scientists on the one hand and his own experiences on the other to
                                                            effectively implement the SSI methods in his small plot of land. He took
                                                            a bold leap into the Unknown, as it were, and came up smelling roses.
                                                            This is his story and his experience with SSI which is indeed emulatory.

                                                                              Manisha Agarwal
                 is an enthusiastic, practical and
                 innovative farmer. He is agile, has
                 keen interest and has the capacities       Tamil Nadu on an exposure visit and      months, then there will be an assured
                 to go to the core of the problem,          learnt about new methodologies in        yield of 100 tonnes per acre (For this
                 whereby his innovativeness. Life has       running a nursery. He was introduced
                 completely changed for Anji Reddy          to the ICRISAT-WWF project team
                 since he implemented the SSI method        at the same time and was provided
                 in his one acre plot which he has now      seedlings, training and technical        Saving in Labour
                                                            support. Anji Reddy was able to get      Anji Reddy says, “In conventional
                                                            the other materials like shade net,      farming, a sugarcane farmer is
                 SSI all over the state for other farmers   plastic trays and coco pith. Other       spending more on the laborers as they
SugarCane




                 to emulate.                                than the materials, he was able to       are demanding high wages while the
       matters




                                                            get lot of technical support also from   factory owners are refusing to pay
                                                            the team and he attended several         remunerative prices for the cane so
                                                            meetings and workshops during this       more and more farmers are reduced
  20
Nov ‘09                                                     period organized by ICRISAT-WWF          to shifting to other lucrative crops.
                 includes farmers, industrial and           Project.                                 But if a farmer adopts SSI, then
                 factory representatives and media, to                                               the labour requirement is reduced.
                 see and learn more from and about          Anji Reddy began SSI in 1 acre           For example: In the conventional
                 this new and innovative method.            as a trial. He expressed that with       method, if 4 tonnes of cane needs
                 Over the last few months, Anji Reddy       the conventional method of cane          to be cut for setts, then at least 8
                 has been featured as an innovative                                                  laborers are required at the rate of
                 and progressive farmer in most of the      labor was immense but with the           2 people for each tonne. Now with
                 audio-visual as well as print media.       new SSI method, not so much labor        the SSI method, not more than 2
                                                            is required. There is lesser use of      people are required as the seed cane
                 Anji Reddy, a Graduate in Geology,         chemical fertilizer as organic compost
                 lives in Madgi village of Zaheerabad       is used more and the usage of seed       Which means a farmer can save up to
                 Mandal in Medak district and               is less and there is greater saving of
                 comes from a family dependent on           water.                                   also reduced during transplantation
                 agriculture. Initially when he began                                                and other intercultivation practices
                 cultivation, he tried several crops        Saving in Seed Material                  because of wider spacing in the SSI
                 unsuccessfully and so moved to             Today, Anji Reddy uses 2½ tonnes         methods.”
                 sugarcane as it was more resistant to
                                                            yield in this method would then be 80    Intercrops – A Bonus
                                                            tonnes and more, if the weather and      Intercropping is another practice
                                                            climactic conditions are conducive.      which Anji Reddy feels is like a boon
                 tonnes of cane as setts.
                                                                                                     is planted immediately after planting
                 Tryst with SSI                                                                      the sugarcane, then the risk of weeds
                                                            sugar per acre.                          growing would come down drastically.
                 the Hapse method of cultivation and                                                 As such there is a need for weeding
                 decided to experiment with it in his       He says that if the crops were to be     only twice within the crop period”.
Speaking about the various inter
crops that can be sown along with         can also include paddy, pigeon pea,       irrigation can actually be used for 2
cane, Anji Reddy says, “French beans      all varieties of vegetables, etc. So,     acres of cane and intercrops now. The
can be sown in June and Potato            totally, in 11 months, 2 intercrops can   drip system that I have installed is
in October. Though sugarcane              be cultivated.”                           working very well with the intercrops
cultivation is becoming more and                                                    as well”.
more risky, through the SSI method        Fertilizers – Chemical to
and intercropping, there is much less     Organic                                   Fruits of Success are Sweet
expenditure, in spite of the hike in      “Since I began to follow the SSI          Indeed!
prices of almost every commodity          method, I was able to reduce the          Anji Reddy says, “I am able to get a
today. While the cane seedlings are       usage of fertilizers by as much as
getting ready in the nursery, the                                                   Rupees per acre on an average, after
intercrop can be sown in between the      the fertilizer all over the crop in the   all the costs are paid off. The money
rows. If the soil is black cotton soil,                                             is saved at every level, when buying
then soya bean is a very good option.     that was released to the crop through     seed, when buying fertilizers, and
                                          the drip irrigation. This ensured
                                          that fertilizer reached the roots of      wages. Added to all this, the yield is
which is a bonus to the income from       each plant, which is the aim of the       doubled.
the sugarcane harvest. The total cost     application. Another option for the
of cultivation under SSI does not cross   farmer is to make a small deep hole
                                          near each of the plants and put the       to 40 tonnes, today I can get even
                                          fertilizer in this hole for it to reach   100 tonnes per acre. The number of
“Two legume crops, if sown, can fetch     the roots directly.”                      millable tillers has increased from         Nov ‘09
                                                                                                                                          21




                                                                                                                                   SugarCane
acre. In a cycle of one sugarcane crop    Water – Saved and                         the cane has also increased manifold.
                                          Regenerated                               And this became possible because of




                                                                                                                                matters
melon can be sown, to be harvested                                                  the SSI methods”.
                                          when compared to the conventional
                                          method. Water gets saved right
                                                                                                       Manisha Agarwal is the
or green chillies can be sown and         from the time of raising the nursery.
these can be harvested at the end of      The amount of water that goes into                           ICRISAT-WWF project.
Fundamentals of
                                                 Sustainable Sugarcane Initiative (SSI) aims at providing practical
                                                 options to farmers in improving the productivity of land, water
                                                 and labour, all at the same time. SSI is also expected to
                                                 reduce the overall pressure on water resources and
                                                 contribute to recovery of ecosystems in the
                                                 long run. Below is a description in
                                                 brief of some of the essential                                                What is SSI?
                                                 practices under SSI.
 S ust ai




                                          iv e                                              Sustainable Sugarcane Initiative (SSI) is a system of
                                                                                                 better management practices that involves use of
                                        ti a t

                                                                                        less seeds, less water and optimum utilisation of fertilizers
       na




                                      ni



                bl
                     eS              eI
                        u g a rc a n                                      It is an alternative to the conventional seed, water and space intensive
                                                                                              sugarcane cultivation. The main principles of SSI are:




                                                           1     Raising nursery
                                                                 using single
                                                                 budded chips                                         3         Maintaining
                                                                                                                                wider spacing in
SugarCane
      matters




                        Conventional sugarcane cultivation consumes two to               SSI advocates wider spacing between rows and plants

                        cuttings, called setts, are used as seed material. On the
 22
 22
Nov ‘09
Nov ‘09

                        setts, the area of bud only is chipped with the help of a
                        instrument called Bud Chipper. The chipped buds are then         three budded setts. Hence, wider spacing in planting
                                                                                         under SSI supports easy air and sunlight penetration in
                                                                                         the crop canopy for better and healthier cane growth.
                        be cut to be used for bud chips as seed materials. A point
                        to be noted here is, unlike the conventional method, the
                        seed requirement comes down due to minimum spacing




                                                                                                    4
                                                          2        Transplanting
                                                                   seedlings
                                                                                          raising planting stock in nursery and other water saving
                                                                                          techniques like furrow irrigation, irrigation through
                                                                                          alternate furrows, drip irrigation and so on. Flooding the
                         used for planting. By then the seedlings are healthy, robust
                                                                                          not only huge quantity of water (consequently more
                         nurturing, grading and maintenance in the nursery.               power) but also affects the growth of the crop.
5        Encouraging application of
                    organic manure, better cultural
                    and plant protection measures


In SSI, farmers are encouraged to practice organic
                                                                   on the irrigation methods applied)


                                                                   months) by raising intercrops

method of cultivation like incorporation of organic
                                                                   on how effectively the SSI practices are
manures, application of bio-fertilizers, and use of bio-
                                                                   implemented)
control measures and so on. Trash mulching and earthing
up practices are highly recommended for retention of               Additional income from intercrops
moisture, enhanced microbial activity and aeration to the

weeds get converted into manure during the earthing

Gradual reduction of inorganic and adoption of organic
                                                               Other advantages of SSI are: –
in external inputs and improving the quality of cane.
                                                                   B                                                 Nov ‘09
                                                                                                                      Nov ‘09




                                                                                                                         SugarCane
                                                                                                                         SugarCane
                                                                   R




                                                                                                                     matters
                                                                                                                     matters
                                                                   Easy transport of young seedlings for longer
                                                                   distance

                                                                   Intercultural operations carried out easily due
                                                                   to wider spacing




                    6
                                                                   More accessibility to air and sunlight
                              Practicing
                              intercropping to utilize             Reduction in lodging due to earthing up
                              land effectively
                                                                   Increase in healthy plant growth due to
                                                                   mulching
SSI supports intercropping in sugarcane with crops like
wheat, potato, cowpea, French beans, chick pea, water              Reduction in use of chemical fertilizers due
melon, brinjal and so on. This practice not only reduces           to use of organic manure produced as part of
                                                                   mulching
also provides extra income to farmers, in addition to the          Increase in length and weight of each cane
effective utilization of land.
                                                                   High number of millable canes

depending upon the agro-climatic conditions and the                Reduction in duration of crop

Sugar mills can promote SSI in their operational areas             Optimum land utilisation
to improve productivity and for assured supply of
quality cane, to run the factories for a longer period.     For the complete Training Manual (English) on SSI methods,
Either enterprising farmers can set up nurseries to sell    visit www.sri-india.net or www.panda.org (http://www.
plants to neighbouring farmers and/or mills can establish
decentralised nurseries in their operational area to help   Improving-sugarcane-cultivation-in-India
motivate farmers to go for SSI.
Quotes
Sustainable Sugarcane Initiative is people oriented and           There are several subsidies and schemes available to
it will increase productivity and will put to place coping        sugarcane farmers today. They should make use of these
mechanism in future that is to come.                              subsides vis-à-vis the SSI Training Manual for improved
                                          Dr. William Dar,        production and productivity.
                                 Director General, ICRISAT                                            Dr. Laxmi Narayana,
                                                                                          I.A.S, Commissioner of Sugarcane,
It is an innovative idea, and it is nice to see so many farmers                              Government of Andhra Pradesh
taking up the SSI methods.
                                          Dr. Dave Hoisington,
                Deputy Director General- Research, ICRISAT
                                                                  very little costs/investments by introducing innovative
SSI initiative will bring new hope in sugarcane cultivation       technologies.
for Punjab.
                                         Shri. Sucha Singh,                                                 Dr. N.V. Naidu,
                         Hon’ble Agriculture Minister, Punjab                                            Principal Scientist,
                                                                              Regional Agriculture Research Station (RARS),
Sustainable Sugarcane Initiative (SSI) has great potential                                    Anakapalli in Andhra Pradesh

when more and more farmers adopt this technology of
‘growing more with less’ across the sugarcane growing             and describe in detail proper management practices in
states in the country.                                            order to reduce the cost of cultivation, improve water
                         Shri. Dhruv Mohan Sawhney,               management and increase productivity and will be
                       Chairman and Managing Director,            extremely useful to both sugarcane farmers and sugar
                             Triveni Engineering Co. Ltd.         producers.”

The training manual is quite useful and I am sure that it                                   - Dr. P. Murugesa Boopathy,
will prove useful in achieving the set goals.                                                              Vice Chancellor,
                                       Dr. N. Vijayan Nair,                      Tamil Nadu Agricultural University (TNAU),
                     Director Sugarcane Breeding Institute,                                                    Coimbatore
                                    Coimbatore, Tamil Nadu




                                            Forthcoming Publications




        SSI Training Manual                         SSI Training Manual                      SSI Training Manual
              in Hindi                                    in Telugu                                in Tamil




                                                                   An Initiative of ICRISAT-WWF Project

SSI Newsletters

  • 1.
    An Initiative ofICRISAT-WWF Project S ust ai SugarCane iv e ti a t na ni bl eS eI u g a rc a n Volume 1 Issue 1 November 2009 matters Nov ‘09 1 SugarCane matters “More with Less” An initiative in sustainable sugarcane production
  • 2.
    Sugarcane is animportant crop in India and it will continue to be so in future. But it is facing a major crisis, and there are many reasons for it. One of the most important is the water crisis. The yields are low, the cost of Foreword facts, but what is unknown so far and is becoming increasingly important is climate change. Until now climate change was debated by non-farming community, primarily scientists and lately politicians, but farmers have Contents already begun to experience it. Climate change is adding to the uncertainty “More with Less” An initiative in sustainable sugarcane production 4 planted. As such the water requirement is almost the whole year round. In a Dr. V. Vinod Goud country like India where during the grueling summer, water becomes acute, sugarcane puts a heavy strain on the depleted resource. And if that summer Sweet Revolution, were to become little more acute due to climate change, the implications 2009! SSI gives birth to Neo-Agriculture 7 Frank A. Hilario But the Climate change - which is directly affecting the crop - is also going to be biggest opportunity for sugarcane in terms of market opportunity. SSI interventions : There is an increasing demand for ethanol - the climate friendly fuel. Given The progress made that sugarcane is a future crop, it needs to be cultivated with futuristic and the plans ahead 11 concepts and methods. The old way of growing sugarcane not only will Dr. N. Loganandhan push the farmers into deeper debts, but it will also lose the freshly opening market opportunities for ethanol. So sugarcane, a crop with great future SSI: A New and potential to address the most pressed global issue - climate change - Experience in has to be cultivated with radically different approaches and methods. That is Sugarcane Cultivation the reason SSI - Sustainable Sugarcane Initiative - has been put together. Shri. P. K. Singh Until now the fundamental thinking in agriculture has been ‘more to get a Minister with a little more’. This path has reached its dead end and the more has become Dr. Biksham Gujja farmer’s heart and soul 17 ever more and margins to farmers have become very little. The result has Team Leader, Dr. Amrik Singh ICRISAT-WWF project plunged Rural India into a four-fold crisis: One, the farmers are borrowing more and more and not able to pay back due to dwindling yields and increase in costs. Also, farmers are not able to pay the laborers as much as the fast in Nayagarh District growing industrial sector. This is driving them to migration, to the cities. of Orissa 18 Sraban Kumar Dalai and Arundhati Jena Two - Since agricultural wages are not competitive, the government has to pump in large amounts of money to keep the rural people employed, often in jobs which may not be directly linked to production or enhancement Age Farmer of SSI 20 of agricultural productivity. Since the workers have been ‘employed’ by Manisha Agarwal governments as part of creating livelihoods (ex. NREGA), farmers complain that they are not getting enough labor in time for the regular agricultural Fundamentals of SSI 22 operations. The story is far from over yet. We invite sugarcane farmers, scientists, agriculture Chief Editor: Dr. Biksham Gujja Editor-in-charge: Manisha Agarwal Layout and Design: on innovations, practices in sugarcane and share ideas Akshakala Editorial team: and feedback on the articles in the Newsletter. We also Anuradha S. Echambadi Map and Technical Support: invite news items, events and information on seminars/ Dr. V. Vinod Goud Sraban Kumar Dalai workshops/trainings with photographs to the following Dr. N. Loganandhan Admin. Support: email ID: m.agarwal@cgiar.org Manisha Agarwal R. Padma Reddy
  • 3.
    Three - Excessiveuse of fertilizers, which are of course The Sustainable Sugarcane Initiative (SSI) has to be seen in this heavily subsidized, indiscriminate use of pesticides, context. It is already a big success. Already it has caught the massive pumping of ground water with free electricity, attention of many stakeholders - farmers, millers, agricultural all of the above have contributed to soil degradation, equipment manufacturers, researchers, and even the policy over-exploitation of ground water, pollution of rivers makers. Again, SSI is not magic or some mystifying technology. and prevalence of health hazards, etc. The ecological It is even now evolving and is like open source programming. degradation in turn is resulting in the decline of yields and Many farmers are going to add and modify to the method to suite increasing costs in agriculture. though - it is possible to use a lot less sugarcane to plant the crop, it is possible to grow a nursery without any additional costs, and intensity of rainfall and associated with it, the availability it is possible to plant wide and most importantly, it is possible to in the same area in the same year. This will only further add depending on several factors. The SSI manual released in May 2009 attracted the attention of These are but some of the problems and list might go many stakeholders. The process of working together to scale it up on and on. Regarding solutions, there is no new ‘magic’ is on. All the stakeholders - farmers, millers, agriculture equipment technological breakthrough in the near future like manufacturers and policy makers, need to have a combined vision improved varieties, Hybrids, GMs, etc. While there was some as exciting to the farmers. On the contrary, they would assist them in improving their cane production while reducing the Nov ‘09 need to invest even more to get access to them. The ‘More costs. SSI will help farmers to adapt to the uncertainties of climate SugarCane to get little more’ strategy has increased the government change while at the same time contributing to the reduction in spending on fertilizer subsidy, large resources have to be the release of greenhouse gases, by producing more ethanol. It is matters diverted to rural employment, construction of large water adaptation and mitigation, both as part of the same intervention. infrastructure to divert the non-existent or uncertain water SSI is going to help reduce the human footprint on planet earth resources, subsidizing the farmers to pump out ground water these measures seem to be working. This newsletter is a forum to assist that process of scaling up the As mentioned before, there are no magic solutions to experiences of the SSI demonstration sites. More importantly, the the present agricultural problems. So the question is, farmers behind this, the farmers who have done pioneering work, ‘Is it possible to produce more with less?’ Certainly, the have been given focus. We also give a brief taste of the progress in question might sound unrealistic. But that is the challenge. our systematic demonstration sites. This only a beginning and we are sure SSI is certainly going to effect a change in the way sugarcane method has proved that it is indeed possible to produce is cultivated. We invite individuals and institutions to be part of this process and use this newsletter to improve the understanding less water. The results are out there in the public domain to verify. For any agriculture practice, the ultimate test is the acceptance of farmers. SRI has been accepted by millions and add to the knowledge base in improving the sugar sector. of farmers and many more will do the same. SRI has not only changed the method of rice cultivation but has also transformed the thinking process for future agriculture. Dr. Biksham Gujja For further feedback and information contact: Published by: NOTE: The views and opinions expressed ICRISAT-WWF Project, in this Newsletter are authors’ own and Editorial Desk, ICRISAT, ICRISAT-WWF Project, Patancheru, of the ICRISAT-WWF project and SSI partners. Cover Photo Courtesy: Email: m.agarwal@cgiar.org, Email: p.reddy@cgiar.org ICRISAT-WWF Project Team manisha.manvi@gmail.com
  • 4.
    CoverStory “More with Less” An initiative in sustainable sugarcane production Water is proving to be one of the major constraints for Indian farmers affecting the by climate change are debilitating the sugarcane farmers in the country today. Dr. V. Vinod Goud Rice, sugarcane and cotton are among the highest water guzzling crops. Sugarcane The effects of climate change are becoming apparent more and more all over the world and agriculture is water to produce 1 kg of cane. Besides, sugarcane is one of the most important the most affected due to changes in the commercial crops in India both for its sugar and other by-products. India ranks second in rainfall has led to shortfalls in food the world, after Brazil, in terms of sugarcane supplies and spiralling prices of essential growing area (4.1 m ha) and production. food commodities. Sugar industry is the second largest in the country in the agro-processing sector The mitigation of the effects of climate change is complicated due to its SugarCane multidimensional nature. In agriculture, this matters necessitates identifying and developing better crop management options, which potential to address energy needs through can tolerate water shortages and adapt to Cogen and ethanol production. 4 Nov ‘09 the extremes of weather induced by climatic change and yet produce more without Of late, there is increasing concern about putting pressure on the ecosystem. low productivity in most of the sugarcane
  • 5.
    During the SSITraining Manual Release: From (Lto R) Dr. S. P. Wani, Principal Scientist, ICRISAT; Shri. Prabhakar Reddy, President, Farmers Federation of AP; Dr. Biksham Gujja, Team Leader, ICRISAT-WWF Project, Dr. William Dar, Director General, ICRISAT; Shri. Sucha Singh,Hon’ble Agriculture Minister, Punjab; Dr. Dave Hoisington, Deputy Director General-Research, ICRISAT; Dr. Vithal Rajan, Board of Directors, KCP Sugars; Shri. P. K. Singh, General Manager-Cane, Triveni Engineering & Industries Ltd producing states in India - in AP, where to climatic change, as revealed in a no choice but to shift to remunerative recent four-year study conducted by commercial crops. the World Bank. Under these circumstances, if India has Nov ‘09 2008-09; in UP, the average number of While sugar mills are suffering due to sustain its sugarcane production SugarCane millable canes per unit area has come to inadequate supply of cane for crushing, the sugarcane farmers are productivity of sugarcane per unit of matters facing problems of their own. On land, water, labour and capital all at t/ha, though this state has the largest the one hand, the cost of cultivating the same time, while striking a balance area under cultivation of sugarcane. cane is increasing and on the other, between economy and ecology. the prices offered by the factories are Sugarcane production is expected making it uneconomical to continue Responding to this need, World its cultivation. Therefore, farmers have Wide Fund for Nature (WWF) has partnered with International Crops Research Institute for the Semi-Arid State-wise Area, Production and Productivity of Sugarcane Tropics (ICRISAT) to explore options in India (2006-07) for “Improving water productivity in Agriculture” in order to improve water freshwater ecosystems. 200 Based on the principles of ‘more with less’ in agriculture, the project initiated 100 largest water-guzzling crop - through research and policy advocacy to popularise and mainstream the System 0 rice cultivation (see website: www.sri- sh m r at a ka h ra a ab u sh nd l ga ha an iss es ad sa ht jar de ta de nj ha en Bi d Or ry il N india.net). Encouraged by the results in As as na Pu Gu ra ra ra k tB Ha ra ar P aP rP r m Ka ta ah es ra Ta ta hy Ut W dh M Ut ad An M Area (‘0000 ha) Production (MT) Productivity (t/ha) now, the focus shifted to sugarcane in Source: Directorate of Economics and Statistics, Ministry of Agriculture the last one and half years.
  • 6.
    SSI methods popularamong farmers and sugar industries. After the book release , the wide media coverage of the event generated huge interest regarding the SSI methods among industrialists, farmers and the State Agriculture Ministries across India and other countries. The Manual is now ready for publication in Hindi, partnership with various Government for farmers to read and understand them in their own language. The Triveni Industry team during a training session at ICRISAT Inspired by the principles of SRI, the water abstractions and farm chemical and demonstration plots are being set project team started identifying, usage. up in partnership with industries, NGOs and farmers in states such as Uttar practices in sugarcane already in use The objective of this exercise was Pradesh, Punjab, Tamil Nadu, Andhra in the public domain for long but to understand the problems of Pradesh, Karnataka and Orissa. limited to a few farmers. growing sugarcane and to study the innovations in reducing the inputs and The results so far have been very SugarCane SSI was evolved after one and half cost of cultivation while improving encouraging in the demonstrations matters years of extensive consultations yields and incomes of the farmers. plots. The tillering and crop growth with progressive sugarcane farmers are much better than the sugarcane across the country combining the crops grown under conventional Nov ‘09 cane planting innovations, better “SSI Training Manual: Sustainable methods. plant and water management and Sugarcane Cultivation in India” in A long-term strategy is being of which will accrue to the cane English was published and launched developed to scale up SSI in all producer and mill owner on the by Dr. William Dar, the Director sugarcane growing states in order to one hand and on the other, to the General of ICRISAT at an event make a dent in the sugar industry and environment as a result of reduced organised to introduce and make the target at improving the conservation of water in sugarcane cultivation in particular and the agricultural sector in the country in general. It is imperative that a consortium based institutional mechanism be evolved, with an objective of generating farmers, researchers, equipment and machinery interests. This would help in promoting wider adaptation of SSI, along with active Government support - in the form appropriate policy as well least one third of India’s total sugarcane Dr. V. Vinod Goud is the Project Coordinator for the ICRISAT-WWF Project at ICRISAT, Dr. Vinod Goud inspecting the nursery seedlings at Farmer Makhan Singh’s place Patancheru
  • 7.
    The following articlewas written by Frank A. Hilario and is a detailed analysis of the present world situation of sugarcane and sugar industry and how well the SSI Manual of ICRISAT-WWF can come to the rescue of the resources strapped farmers. It has been reproduced here with his kind permission. Sweet Revolution, 2009! SSI gives birth to Neo-Agriculture Frank A. Hilario inputs need to be decreased. Our hectares, reportedly the Philippines’ technical knowledge needs to change May 27, 2009 largest sugarcane plantation for the better, and not only in making things clear to the layman. Revised 29 May 2009 Province is next to Pangasinan. I at 0949 Manila time preferred the light one ‘with a warm We Filipinos learned to produce sugar honey color s SWEET LOVE C12H22O11, Sweet Ignore (billingston.co.uk). Today, raw sugar, muscovado is considered a health Sugar History Newsletter July 2004). food. Not surprisingly, it has all Today, some 170 years later, the way saccharine. I like it harvested from the natural vitamins & minerals in we grow sugarcane leaves much to sugarcane juice (sugarindia.com). I be desired. I like it cultured on soil rather than love it! cultured on Petri dishes or whatever. I Actually, the world over, most Nov ‘09 want to be in the US, the home of the Raw sugar is a major export of the 7 sugarcane farmers have much to SugarCane brave and the land of the free. But I Philippines. For 2009, the country will learn about raising cane. We need don’t want to be sugar-free. e the US a Sweet Revolution in sugarcane matters is importing for the year (March 2009, farming in response to the realities I’m in the Philippines; I am a farmer’s agriculture-ph.com). How sweet! of climate change (global warming/ the natural to the man-made. Today, We Filipinos are good in raising Cain, (like too much fertilizer), and I want to talk nicely about sweetness. that’s for sure. If you didn’t know, you dwindling resources (like the water Grown by mild-mannered chemists have not been reading the papers. Now, are we Filipinos good in raising are overdrawn). Saccharin is sweet; grown by tough- talking farmers on uneven farms with writing this long essay. But we are For sugarcane farmers in the dry hard methods, C12H22O11, sugar is good producers of sugar. In crop year tropics, who can they turn to, to sweet and delectable. learn to grow sugarcane much, much better? The Brazilians are the biggest And that would be muscovado. In the compared to 1998-1999 largely due sugarcane producers in the world, to higher sugar recovery but Brazil doesn’t have the drylands shorts going to grade school in the the increase can also be attributed that we have. In the 2007-2008 village of Sanchez in the sleepy town of to ‘favorable climatic conditions, season, total sugarcane production Asingan, Pangasinan in Central Luzon adoption of high-yielding varieties, was estimated highest in Brazil at 491 in the Philippines, I had muscovado improved cultural practices, increased in my pocket somewhere to bring farm inputs, and better milling tonnes (commodityonline.com). So out as snack. Were we poor? Not really, but I have always been a sweet goliath.ecnext.com). (I tried hard but tooth; I loved the brown color and I couldn’t get 2007 or 2008 data on the God-given sweetness. Asingan recovery rate.) SSI is never had a sugarcane plantation, sugarcane but we always had muscovado. It S ust ai The problem there is that ‘favorable agriculture iv e ti a t must have come from Tarlac, from climatic conditions’ doesn’t apply at its best. na ni bl eS eI the Central Azucarera De Tarlac, the anymore; cultural practices need to u g a rc a n
  • 8.
    maybe we shouldgo to India and learn In fact, in 510 BC In this unusual Age of Climate from the Indians. After all, in history, Emperor Darius of Persia invaded India and found the panda is talking to the plant. grown in that country (Wikipedia). ‘the reed which gives Based in Switzerland, the current Except the latest news is that, in honey without bees’ top panda of WWF is President Chief contrast to the Philippines, last year (quoted by ANN in sucrose.com). Emeka Anyaoku of Nigeria; based in India had a decline in recovery rate, India, the current top crop of ICRISAT which is the amount of sugar you is Director General William Dar of the huge mistake is that they have been commodityonline.com). were thinking of, if vaguely, if I may it comes to the growing of sugarcane: Consider: The above production too much water for the canes in the the concept of optimum sustainable yield. OSY is where you decrease the yield estimates change during the year as the weather changes; after And that’s one of the modern Indian water, fertilizer and seed in particular all, in agriculture, harvests are only as lessons we can learn on campus at good as the weather allows. So, expect ICRISAT at Patancheru. As far as I that for any growing season, any know, they are very serious when OSY one better; it so happens that country’s sugarcane yield estimates they say, ‘We need to explore every in SSI, while you decrease the costs, will be revised at least 4 times: early possible approach to reduce the water you increase the yield. Plow in less, in the year, before harvest, harvest input to all crops, particularly those time, then afterwards. which excessively depend on scarce agriculture at its best. resources.’ That’s ICRISAT Director SugarCane General William Dar speaking. In The ICRISAT-WWF partnership is a matters other words, he is telling us we have revelation. The WWF has a mandate to save on water, and so do our of protecting ecosystems; considering your weather. And why is that? As far crops. I know him personally to be a that, ‘ICRISAT is collaborating with 8 Nov ‘09 as I can tell, the telling effect of the non-traditional and out-of-the-box WWF to understand and integrate the weather is felt by plants via the water manager-thinker, looking for, in his ecological concerns of agriculture,’ in the soil. Water is that important. own words, ‘approaches wherein the Dar says. ‘This partnership is unique, resource inputs are low and yields are and we are looking forward to many Mark Twain did say, ‘Everybody talks high.’ The mantra of the Consultative more practical results on the ground.’ about the weather, but nobody does Group on International Agricultural Not just theories but practices. anything about it.’ In this age of Research, CGIAR, is ‘Doing More with Climate Change, I say we need to and And so, on March 2009, the ICRISAT- indeed we can modify the weather, if WWF project came up with a training we simply modify the water in the soil: that kind of farming is contrary to manual with the long title, Sustainable how much is in it and how much the textbook economics, isn’t it? As well Sugarcane Initiative (SSI): Improving plants are taking out and transpiring as textbook agriculture. Sugarcane Cultivation in India. Dated from it. We need to practice out-of- March 2009 and released May, the the-box water management. Going-against-the-grain-of accepted practices was very much in the minds with plenty of photographs, freely I did say we should go to India and of the experts when they worked downloadable from here: panda.org. learn. You know, we learn from out the joint project Sustainable mistakes, preferably those of others, Sugarcane Initiative, SSI. I’m referring About the training manual, Project preferably big. In this case, India is to the World Wide Fund for Nature, Leader Gujja says that ‘the inspiration the biggest sugar producer in the WWF and the International Crops for putting this package together world Research Institute for the Semi-Arid is from the successful approach of they must make big mistakes there. Tropics, ICRISAT. The Team Leader for the SSI project is Biksham Gujja which has been proven to need less Persia invaded India and found ‘the water and yet to yield more. And do reed which gives honey without bees’ Project Scientist for WWF based at the you know who invented SRI? It was (quoted by ANN in sucrose.com). Now ICRISAT headquarters in Patancheru, Fr Henri De Laulanie SJ who spent then, the Indians have been raising
  • 9.
    Malagasy rice farmersin Madagascar pre-climate change agriculturists prescribed for SSI/neo-agriculture (ANN, ciifad.cornell.edu). He came up think of that?! They couldn’t have for sugarcane (mostly from the SSI because they were not thinking out training manual): De Laulanie, along with some Malagasy of the box. Now, neo-agriculturists, as colleagues set up a non-government well as neo-economists perforce must (1) Raise single-budded setts in nursery. organization, NGO, the Association think of water used in production, not Tefy Saina, to help improve lives in as a dependent but an independent coconut coir. Being hygroscopic, Madagascar. ‘Tefy Saina’ means, in variable, something that can be to the coir absorbs water 8-9 times its Malagasy, ‘to improve the mind.’ the highest degree manipulated, own weight, then slowly releases Cornell International Institute for Food, controlled, varied or changed. This is the precious liquid to the feeding Agriculture and Development, is now water before the bridge. roots of the setts. Also, nursery- working with Tefy Saina. The Jesuits raised settlings are excellent for can teach even the experts a thing or The ICRISAT-WWF sugarcane scientists two about culture and agriculture. may have been thinking more of Indian sugarcane farmers than those in other same age as the ones growing in From SRI to SSI. The SSI approach has lands, but that was natural. They had been tested by farmers in different enough problems in India already! Neo- same time. climatic zones of India: Punjab, Uttar agriculture will have greater impact Pradesh, Andhra Pradesh, Karnataka in India than the Philippines, simply (2) and Orissa (KV Kumanath, 07 May, because in the Land of the Maharajas, days old). By then, the settlings thehindubusinessline.com). With are old enough and vigorous very encouraging results, Gujja says farmers, and that number is more to withstand the shock of he expects that the SSI practice will than the entire population of Canada, transplanting. Well-developed, the Nov ‘09 replace farmer’s practice in sugarcane setts can compete with the weeds 9 SugarCane million in 2021 (sustreport.org). This better, and can increase cane yield ethique.org). I expect the same for is not to mention the multiplier effect matters the Philippines. 1994, University of the Ryukyus, depend on employment generated by rms1.agsearch.agropedia.affrc. In fact, SSI is the new economics of go.jp). using sugar. call it from here on, because it’s new and because I believe the concepts It is true that we have only are applicable with other crops. This is Filipino sugarcane farmers (Katharine the Sweet Revolution of 2009 I refer times more millable canes because to in the title to this essay. even then, all of them too have to the setts produce more tillers. It practice neo-agriculture for cane also reduces the number of setts Call it SSI or call it neo-agriculture, it starting right now. Filipinos, neo- has been shown to work in practice, farmers of sugarcane? That would be setts to 4,000 single-budded setts not simply in theory. One Indian farmer, sweet music to my ears. to an acre. PK Singh, in Uttar Pradesh found that cane yields went up to 100 tonnes to For starters, here are some techniques (4) Apply a trash mulch. Apply a hectare as against a ‘normal’ yield of of planting. Mulching is the best com). That’s an increase in yield of In fact, SSI is the new practice in controlling weeds. economics of agriculture Trash mulch can also increase – neo-agriculture I shall yield and decrease energy cost (AC call it from here on, Srivastava, 2002, asae.frymulti. recommendation that caught my eye because it’s new and com). I myself have written about is that on water. If you follow neo- because I believe the what Edward H Faulkner calls agriculture, all things being equal, your concepts are applicable trash farming in my ‘Lesson of with other crops. This is the Water Cycle’ (20 April 2008, irrigation and your output will be up the Sweet Revolution of americanchronicle.com). 2009 I refer to in the economics of agriculture. Why didn’t title to this essay. (Contd. on page 14)
  • 10.
    SSI Introduced Districtsin India tillers Women labourers chipping buds from the canes SugarCane matters 10 Nov ‘09 Farmer watering the nursery seedlings Young seedlings ready for transplantation Transplantation between rows of intercrops Cutting of mother shoot
  • 11.
    This article presentsa brief overview SSI interventions of the progress made so far and the future plans as part of this process. The progress made and the plans ahead Uttar Pradesh The following is a brief report on the interventions taken up by ICRISAT-WWF project this year in some states across the country. and production of sugarcane at Dr. N. Loganandhan biggest sugar mills are located in this state. During September 2008, Engineering and Industries (Sugars), UP, the third largest producer in the country, visited the WWF theoretical inputs in classrooms and innovative farmers. Detailed practical information on bud chip nursery, planting techniques and water saving technologies was imparted to them. Nov ‘09 11 The visiting staff of Triveni Sugars was SugarCane impressed with the seed saving, wide spacing and water saving potential matters of the SSI methods. Subsequently, a partnership has been established with them as a consequence of which, it was decided to conduct experimental T o create awareness about the SSI methods among farmers, sugar of disseminating these practices through capacity development programmes factory locations. holders, and review its adoptability in in different states across India. The following table details the training The trials began during February WWF Project team has taken initiative programmes undertaken so far: - March this year at four sugar factories located at Khatauli in Muzaffarnagar, Deoband in Saha- SSI trainings organized by the ICRISAT-WWF Project team ranpur, Sabitgarh in Bulandshahar (Sep 2008 to July 2009) and Chandanpur in J.P Nagar. State Organization Date of training No. of participants Staff Farmers About one lakh seedlings were Uttar Pradesh Triveni Engineering -- Punjab Agricultural Technology 21-22 January, 2009 -- acres. Management Agency (ATMA), Government of Experiments comprising different India, Gurdaspur treatments are being tried out Orissa NIRMAN, Nayagarh 21-22 January, 2009 1 considering the variations like plant Karnataka Outreach, Bidar 2 Tamil Nadu Thumbal SRI Farmers’ -- 8 direction (N-S and E-W), furrow Association, Salem, and drip irrigation, organic and Ponni Sugars, Erode inorganic fertilizers, intercropping Andhra Kakatiya Sugars, Kham- 8-10 July, 2009 -- etc., along with a control plot Pradesh mam district with conventional practices to
  • 12.
    compare with theperformance of the farmers from ATMA. Farmers coco-pith were provided to them to SSI methods. raise nursery. Farmers got involved March and May. It was interesting in the activities very actively and Performance so far to note that they have also tried out several other materials like sawdust, status of the crops with promising saved during the nursery stage vermi-compost, poultry feed, etc., for performance of the sugarcane crop raising bud chip nursery, in the place under SSI. Details in this regard More number of tillers were seen of coco-pith. can be read from another exclusive per clump (about 8 on an average article in this publication. The present scenario and performance Andhra Pradesh Compared to control plots, only At present, 7 farmers are practicing In 2008-09, the productivity in SSI in an area of 8 acres in this sugarcane in Andhra Pradesh was state. reduced to 77 t/ha as against 82 t/ The girth (about 10 cm) of individual The crop shows healthy signs in the demand for SSI methods from canes is comparatively better in SSI terms of increase in tiller count many farmers and industry staff, a plots need for establishing model farms their earlier experience). in the vicinity of ICRISAT was felt. Future plans In the month of March 2009, about Impressed by the results so far, the Intercrops like maize and bhendi 10,000 seedlings were provided to management has decided to upscale have been successfully tried by two farmers of nearby Madgi and this method and so has planned to the farmers. Hathanura villages. In the month of SugarCane July 2009, a training programme was matters As the seedlings were well established while earthing up, Kakatiya Sugars in Khammam district been initiated and the planting will be lodging of the crop was minimal. by the SSI project team. 12 Nov ‘09 carried out in November 2009. The path ahead In August 20-21, an experience Punjab In the Kisan Mela conducted at sharing workshop on better manage- Sugarcane is one of the major crops Gurdaspur on 10th September 2009, ment practices was organized by of Punjab, thanks to the availability the Consortium of Indian Farmers’ of abundant water resources. Punjab interest to try this new method and Association (CIFA ) in Hyderabad, with farmers are known for their enthusiasm registered their names to know more support from the ICRISAT-WWF Project in adopting any innovative technology about it. It is learnt that trainings for selected innovative farmers from as was evident from the time of Green would soon be conducted for these Karnataka, Tamil Nadu, Andhra Pradesh Revolution. In the month of January registered farmers by ATMA and and Maharashtra. Delivering the selected farmers among the trainees Special Message, Dr. Lakshmi Narayana, Gurdaspur district, underwent the SSI would be supported with materials to I.A.S, Commissioner of Sugarcane, training supported by the ICRISAT- Government of Andhra Pradesh said he WWF project. Soon after the training, was indeed happy to see the presence the farmers initiated the activities of Orissa of farmers’ associations participating in Along with the Punjab farmers, six from the trainees, some of their farmers and a staff member from to all farmers. He added that, it is indeed neighboring farmers also undertook NIRMAN, a local NGO of Nayagarh wonderful that SSI is getting such wide the SSI practices. Especially, Shri. Sucha district, Orissa, underwent the publicity and as soon as the Manual Singh Langah, the Hon’ble Minister for training in the month of January. was released, word came from the Chief Agriculture, Government of Punjab has After the completion of the Minister and meetings were convened shown keen interest and has taken up programme, the farmers appreciated the very next day with the Assistant the cost effective SSI practices and Cane Commissioners and Managing showed keen interest in taking up SSI Directors as well as managers of mills, Efforts taken in 4 acres under rainfed conditions. both public and private, to discuss at Materials like bud-chippers, trays Support in terms of materials like greater length the SSI methods and how and coco-pith were distributed to shade net shed, plastic trays and to disseminate the information. Eminent
  • 13.
    to take itup in a limited area to begin with in the forthcoming season. Further follow up and progress Some support in terms of trays and were given during the month of July 2009, to kick start the process of establishing bud chip nursery Subsequently, a two-day meeting was organized at Koutha B village of Bidar on 17th and 18th September 2009, in order to initiate the planting in the coming October season. Shri. Laxmi Narayana, Cane Comissioner, Govt. of AP, lighting the ceremonial Management Practices for Improving Productivity in Sugarcane’ at Hyderabad in the programme organized by in the month of August 2009. Outreach. Six farmers and three staff members from AME, another reputed NGO based in Bangalore sugarcane scientists Dr. Hapse and and working in the Dharwad Nov ‘09 Dr. N.V Naidu participated and shared farmer, Mr. Manik Reddy. district also participated. SugarCane their experiences with the farmers. Future developments The Chief Guest of the function, the matters appreciated by the sugarcane experts Mr. Anji Reddy is planning to Assistant General Manager (AGM) establish a bigger nursery to of NABARD, encouraged the women cost of cultivation and improvement supply bud chip seedlings to other members of Self-Help-Groups to farmers as additional income take up the bud chip nursery as deliberations. generating activity. an income generating activity. He The present situation Plans are on to bring in more to raise the shade net shed and Mr. Anji Reddy, whose case history farmers under SSI with support procurement of required materials is carried in this newsletter, has from the State Government and to initiate it as a group activity. nearby mills. acres more, during the month of Nursery activities were initiated June. This he has done by raising Kakatiya Sugars is planing to his own nursery. this autumn season. He has planted soya bean as Future developments intercrop in both the plots. The Karnataka More training programmes in cane crop shows healthy growth Karnataka is also another state with other nearby districts like Bijapur, high productivity of cane (88t/ha Bagalkote etc., will be taken up. tillers (on an average) in each of in 2007). It is known for its rich belt the clumps. of sugarcane farming, thanks to the Demonstration plots will be Cauvery River basin. Six farmers and established in at least one acre two staff members from Outreach, in each district with the technical visitors, be it farmers, staff of a well known Bangalore based NGO support of ICRISAT-WWF project. sugar industries from neighbouring working in the Bidar district of Karna- Publication of Manuals in local to undergo training during March this languages will be taken up in the The crop performance is equally year. They found the SSI methods to be near future with support from good under sub-surface drip very innovative and expressed interest NABARD.
  • 14.
    Tamil Nadu their selection of 11-month old practices shows that the sugarcane canes, there were no such issues farming community has received the SSI methodology well. The ongoing (2007). The state is known for its well performance of the crop is quite organized cooperative and private Presently, crops look healthy with sugar mills. Eight farmers (two an average of 18 tillers per clump. compared to the crops being cultivated supported by Ponni Sugars, Erode in the conventional methods. and six from SRI Farmers’ Association, On 22nd June 2009, an awareness Thumbal, Salem district) attended a programme on SSI was organized at 2-day training programme on SSI in Thumbal with the support of the SRI that the present signs are indicators the month of May 2009. Farmers’ Association, sponsored by of a good harvest. More data NABARD. and information with regard to Progress so far improvement in yields and savings Nursery materials to cover an area Needed support was assured in inputs will be shared in this of 10 acres were provided to the from AGM, NABARD for the SSI newsletter in the coming months. Salem farmers on their request. trainings in the state. With the support from farmers, mills, NGOs and government agencies Planting was initiated in an area Conclusion It is quite encouraging to note the Baskaran and Mr. Vinod during wide adoption of SSI methods by the sugarcane sector of India in the June-July 2009. farmers, millers and government future. agencies alike. The fact that almost all the farmers who underwent the Dr. N. Loganandhan is the Visiting Scientist SugarCane observed in the nursery due to training in SSI methods adopted the at ICRISAT-WWF Project matters 14 Nov ‘09 (7) Do bio-control of pests. Instead of conducive for stubble growth. applying pesticides, learn to apply Cut the canes close to the ground Sweet Revolution... biological methods of minimizing level. (Contd. from page 9) pest damage to your crop. An So: Neo-agriculture is not only saving Lady bugs are predators of aphids, on water but also saving on fertilizer, Do alternate furrow mites, scale insects (Erv Evans, saving on seed, saving on cost, irrigation to minimize water loss, NC State U, ces.ncsu.edu), and or employ a drip irrigation system. caterpillars (Washington State U, pollution of the soil, water and air. Drip irrigation is where you get spokane-county.wsu.edu). This is a paradigm shift in thinking agriculture. I can imagine that neo- (8) Intercrop. You can intercrop agriculture is also good for other Go organic. Gradually switch from wheat, potato, cowpea, French high-value crops like hybrid rice, inorganic to organic manures and bean, chickpea, watermelon and fancy rice, tropical fruits, vegetables, bio-fertilizers. These are natural many other crops with sugarcane materials and do not pose any with your wider spacing between climate in understanding agriculture. danger to the crop or soil. Organic rows and hills. Aside from the Biksham Gujja imagines SSI will methods help directly reduce the extra income, the intercrops will carbon footprint of sugarcane help control weed growth because in India. Beyond SSI, I am already farming by reducing use of farm of the combined denser canopy of imagining Sweet Revolution! 2009. chemicals that require fossil fuels the crops, depriving the weeds of that emit carbon dioxide in their sunlight. production. Organic methods also Frank A.Hilario is a popular Filipino writer who is known for his extensive writings on help build soil, not only add to its (9) Ratoon. Harvest the plant crop issues of agriculture and other fertility. when weather conditions are world concerns
  • 15.
    As a consequence,the period SSI: A New Experience for tillering phase is reduced in Sugarcane Cultivation the distance between two rows is This causes competition for sun industry and farmers. And now, encouraged by the results, they plan to light and air among the tillers, which in turn causes severe tiller mortality and heterogeneous cane. Shri. P. K. Singh It is not that the new technologies Inadequate and imbalanced ferti- tried have not given results, but the lizer dosage with more focus on Background fact remains that even after giving use of Nitrogenous Fertilizer. The role of sugarcane in uplifting rural results, those technologies could not economy particularly in the Northern be further scaled up. This is either Over dependence on monsoons plains of India is well accepted. Even due to some adaptability issue or is adversely affecting the yields especially in the case of failure cane has over the years lost its place understand or even due to last minute of or variation in the monsoon cost enhancement. It is important pattern. farmers today consider sugarcane that the technology is farmer friendly, as one of many alternatives. Several economical and easy to implement in Lower yields in ratoons due to Nov ‘09 factors can be attributed for this order to improve yields on a sustainable improper ratoon management SugarCane basis. However, before getting into practices. reduction in returns per unit area the technological aspects, it is better matters of sugarcane, in spite of increase in to understand the problems and the Irrigation method followed led not cane prices. This is mainly because of factors affecting cane yield in U.P. only to wastage of water but also lower yields and increase in the cost Lower yields in U.P can be attributed created anaerobic condition in the of inputs. to the following factors:- affect the frequency of irrigation. The paying capacities of the factories most of the planting is done have also dwindled because of lower after the harvest of wheat in the There are several other factors sugar recovery, affecting the cane month of April and May, thus payment to farmers which has reducing the life span of the crop. quality, use of organic manure, plant further aggravated the situation. the farmer in sugarcane can only be restored if he is sure of better returns on sustainable basis. The three variables affecting the returns are yield per unit area, cost of cultivation and certainly the price of the output. The third variable is largely dependent on many volatile factors and Government polices, which are generally not in the hands of the farming community and the i.e. yield and cost of production can certainly be addressed. Several attempts have been made in the past and some new ones are being tried for improving yields.
  • 16.
    protection measures etc.,which are distinct difference is visible between the also attributed to lower yields. As a SSI plots and the conventional plots. result of these factors, not only is the individual cane weight very low (at an Results Following are some of the observations the number of millable canes per unit from the SSI trials:- Enhanced number of millable canes/ the average yield ranges from a mere clump (8 Millable canes per clump of U.P. Until and unless farmers start getting a yield of 100 tonnes/ha on a millable canes which is the actual sustainable basis, the future of sugar Reducing water requirement by potential of the technology) industry will remain uncertain and India might end up becoming the net Increase in the girth of each cane importer of sugar. Before taking this technology to the In view of the above facts and replicability issues of the potential method will be tested in the Triveni technologies, the possibility of getting mill farms, located in different units. a yield at the above mentioned level in larger area was a distant dream. But that was until SSI, the sugarcane Deoband in Saharanpur, Sabitgarh Homogeneous cane in SSI with version of SRI came into the picture. in Bulandshahar and Chandanpur in uniform height and girth as against SugarCane J.P Nagar. Apart from adaptability of canes of varied height and girth in matters Opportunities offered by SSI SSI, effort was dedicated to study the the conventional plot The following opportunities in this impact of the following variables:- technology are immediately apparent:- Impact of various spacings on the Net reduction in irrigation hours Nov ‘09 Addresses the issue of late plant- performance of SSI and this in spite of increased ing by raising seedlings and their frequency of irrigation transplantation later on which act- ually advances the entire process North- South Vs. East -West The average weight per cane is Addresses the issue of narrow Impact of Ammonium Sulphate in spacing as the technology is based the place of Urea harvest. Being new to the technology, on successful exploitation of some errors occurred inadvertently sunlight and air by following wider Impact of organic farming by using or else the performance would have Nava Dhanya and Amritpani been even better Addresses the problem of improper Performance of different seed Learnings: method of irrigation, namely, Some of the learnings to enhance the budded setts performance, experienced as part of the process need to be mentioned:- Effect of different intercrops on SSI Selection of bud while chipping requirement, as only the bud is and for use as seed material is very used as seed material Effect of Drip Irrigation important With this background, Triveni colla- Varietal interaction with SSI Grading at 20-22 days’ stages should be done very cautiously Project for studying the feasibility One treatment of conventional method of this technology in U.P. with the as control was also under taken to study In no case should weak seedlings following terms of reference: the net gains and all expenses incurred be transplanted Initial target yield of 90 tonnes/ are recorded for each treatment. Although there are still almost 4 more Pocket application of fertilizer tonnes/ha months left to harvest the crop, a improves its uptake and effect
  • 17.
    Minister with a as a part of which he began the chip bud nursery in March of this year. farmer’s heart and soul He has been actively involved in the propagation of the SSI methods to The crisis in conventional sugarcane cultivation in Punjab other farmers in the state, bringing has been becoming more and more acute every year. It is more and more focus through hardly surprising then that the farmers in the state are more the media. His keen interest in SSI than willing to experiment with the new method of SSI for prompted him to visit the ICRISAT- improved production and overall productivity of sugarcane. scientists to further enhance his Dr. Amrik Singh The benefits – both short term knowledge. It was during this visit and long term – of SSI were so that he was able to participate in easily apparent that Shri. Sucha years old, has been the Minister of Singh Langah, the Minister for Trainer’s Manual. Agriculture for the State of Punjab Agriculture, Government of Punjab, who himself is a farmer, As the minister is new to this method, took up SSI in his fields and is he has been encountering problems taken up cultivation of sugarcane and today the greatest advocate of in implementing the SSI practices in SSI in his state. His introduction to the SSI methods late May, a little later than the other came when he was invited to attend farmers, the growth of cane was slower, a four-day Agriculture Development though the tillering is quite good at an Exhibition and Workshop, organized Nov ‘09 by the Agricultural Technology 8-10 tillers in the conventional method. 17 SugarCane Management Agency (ATMA), Speaking about the SSI methods and Gurdaspur under the aegis of Dr. practices, Shri. Sucha Singh Langah matters Amrik Singh, Deputy Project Director, says, “As a farmer and the Minister ATMA, Gurdaspur who gave a detailed for Agriculture, I understand that SSI presentation of the SSI methods. Shri. Langah was so impressed with Hon’ble Punjab Agriculture Minister Punjab”. the possibilities of this new method Shri. Sucha Singh (right) with the Director that he decided to implement it on General of ICRISAT, Dr. William Dar (left) Dr. Amrik Singh is the Deputy Project an experimental basis in 1½ acres during the SSI Training Manual release Director, ATMA at Gurdaspur Light earthing up is essential technology. Encouraged by the initial the concerns of farmers, industry for increasing tillering. Proper response, Triveni is now providing and the ecological activists. The compaction of earth near the stem the raised plantlets to the farmers to Government agencies and Agriculture is real earthing up or else there is Universities should certainly adopt no use of earthing up stage, the nursery raising activity will and take forward this technology, which has been invented by the With certain precautions and part of the next phase as a strategy farmers themselves. for scaling up this technology. comes naturally with experience - Encouraged by the results in the the technology can very well give a Transporting coco pith from South trial plots, Triveni is now scaling it up India is the only concern, as it on experimental plots but on mass increases the cost of nursery raising. scale also. Wider spacing of rows Already other alternatives to coco eases the entire activity taken up, as pith are being explored, which shall already been initiated and the planting further reduce the cost. will be done in November 2009. for movement and reduced number of rows to work. Hence, SSI is a This technology is seen as a suitable P.K. Singh is the General Manager (Cane), very easy to use and farmer friendly and promising alternative to address Triveni sugars
  • 18.
    Nayagarh District ofOrissa Though the farmers of Orissa have been into sugarcane cultivation for a long time now, SSI is a new arena into which these farmers are stepping in with caution but also happiness in their hearts. Below is the intervention of ICRISAT-WWF in extending the necessary technical Sraban Kumar Dalai and Arundhati Jena Overview in yield beyond 70 t/ha, even though the area under sugarcane has more than doubled! the forest area, with a population of A Sustainable Sugarcane Initiative rainfall of 1449.1 mm. (SSI) training was organized along problems were encountered here due with practical demonstrations at to ant, termite and rat infestation. There are six sugar mills in Orissa WWF-ICRISAT, followed by a field which are in operation, including the visit on January 20-21, 2009. Four Later, coco-pith was prepared at Nayagarh Sugar Complex Pvt. Ltd farmers from Nayagarh district of in Nayagarh. Now, according to the Orissa attended it. Apart from these waste and vermi-compost. During SugarCane State Government and Team Orissa (a the months of February and March, matters State Government agency working on motivated by the SSI methods. farmers started raising a nursery in industrial promotion) Report, there They are all marginal and small are going to be 14 sugar projects land holding sugarcane farmers. under the supervision of their staff. 18 Nov ‘09 in the state. Also, it is interesting to A total of 4 acres were brought The nursery seedlings were healthy note that the paddy area has been under cultivation using this method and the transplantation was done increasingly diverted to non-paddy in Biruda, Ikiri, Tipura villages of during the last week of March and Nayagarh district with the support 2007 in the state. Sugarcane is one of NIRMAN, a local NGO. three farmers initiated intercropping of the preferred crops for diversion, Bhendi or replacing paddy. Area diverted The materials used for raising nursery Okra) crop. to sugarcane crop during kharif like bud chipper, shade net shed, trays and a small quantity of coco-pith Results hectares in the above mentioned were provided through the WWF- years respectively. If the statistics of ICRISAT project to kick start the sugarcane area and productivity in SSI adoption in Orissa. In the initial Nayagarh district were to be observed period, farmers used decomposed for the last 8 years, it shows that the sawdust, coir waste, vermi-compost, ha. And there was no improvement acre land in their backyard. Some inches, and the height of canes varies 80 Future plans 70 NIRMAN has conducted meetings 4000 in two villages of Khairapati and Yield (t/ha) Gopalpur where 7 farmers from the 40 former village agreed to go for SSI 2000 20 1000 Area (in ha) 10 latter village agreed to go for it in 0 0 1999-00 2000-01 2001-02 2007-08 are planned in the remaining 12
  • 19.
    villages. Most ofthe local Farmer’s Experience Farmer’s Name: farmers have agreed to adopt Natabar Gochhi SSI after seeing the current Dist: Nayagarh, Orissa year’s results. NIRMAN has cultivation. After attending the training programme and practical planned to cover more areas with centralized nursery by the end of this year. along with vermi-compost to raise the nursery. He used about 90 Sraban Kumar Dalai is the GIS Coordinator age of the plant is 7 months with 8-10 tillers on an average per for ICRISAT-WWF Project Arundhati Jena is the cordinator at NIRMAN, an NGO in Nayagarh, Orissa Mr. Gochhi says that SSI requires less than half of the water that was normally used, as furrow irrigation is practiced just to wet the soil. But it is sad to know that the farmers had to buy water from six months, mostly from January to June. Nonetheless, adoption of SSI has reduced the burden of this farmer to some extent by saving on water, which otherwise he would have to buy. Nov ‘09 19 SugarCane matters After the release of the SSI Training Manual and the media attention given to SSI method - terming it as a ‘Ray of Hope for Sugarcane Farmers’ - representatives from sugar industry across the country visited ICRISAT to know more about the methods. Some of the visits were captured on camera. 1 2 4 3 of Ponni Sugars (May 2, 2009) 4. Visit of staff from EID Parry’s from Chennai (May 8, 2008)
  • 20.
    Anji Reddy The New Age Farmer of SSI Anji Reddy was able to make use of the knowledge of researchers and scientists on the one hand and his own experiences on the other to effectively implement the SSI methods in his small plot of land. He took a bold leap into the Unknown, as it were, and came up smelling roses. This is his story and his experience with SSI which is indeed emulatory. Manisha Agarwal is an enthusiastic, practical and innovative farmer. He is agile, has keen interest and has the capacities Tamil Nadu on an exposure visit and months, then there will be an assured to go to the core of the problem, learnt about new methodologies in yield of 100 tonnes per acre (For this whereby his innovativeness. Life has running a nursery. He was introduced completely changed for Anji Reddy to the ICRISAT-WWF project team since he implemented the SSI method at the same time and was provided in his one acre plot which he has now seedlings, training and technical Saving in Labour support. Anji Reddy was able to get Anji Reddy says, “In conventional the other materials like shade net, farming, a sugarcane farmer is SSI all over the state for other farmers plastic trays and coco pith. Other spending more on the laborers as they SugarCane to emulate. than the materials, he was able to are demanding high wages while the matters get lot of technical support also from factory owners are refusing to pay the team and he attended several remunerative prices for the cane so meetings and workshops during this more and more farmers are reduced 20 Nov ‘09 period organized by ICRISAT-WWF to shifting to other lucrative crops. includes farmers, industrial and Project. But if a farmer adopts SSI, then factory representatives and media, to the labour requirement is reduced. see and learn more from and about Anji Reddy began SSI in 1 acre For example: In the conventional this new and innovative method. as a trial. He expressed that with method, if 4 tonnes of cane needs Over the last few months, Anji Reddy the conventional method of cane to be cut for setts, then at least 8 has been featured as an innovative laborers are required at the rate of and progressive farmer in most of the labor was immense but with the 2 people for each tonne. Now with audio-visual as well as print media. new SSI method, not so much labor the SSI method, not more than 2 is required. There is lesser use of people are required as the seed cane Anji Reddy, a Graduate in Geology, chemical fertilizer as organic compost lives in Madgi village of Zaheerabad is used more and the usage of seed Which means a farmer can save up to Mandal in Medak district and is less and there is greater saving of comes from a family dependent on water. also reduced during transplantation agriculture. Initially when he began and other intercultivation practices cultivation, he tried several crops Saving in Seed Material because of wider spacing in the SSI unsuccessfully and so moved to Today, Anji Reddy uses 2½ tonnes methods.” sugarcane as it was more resistant to yield in this method would then be 80 Intercrops – A Bonus tonnes and more, if the weather and Intercropping is another practice climactic conditions are conducive. which Anji Reddy feels is like a boon tonnes of cane as setts. is planted immediately after planting Tryst with SSI the sugarcane, then the risk of weeds sugar per acre. growing would come down drastically. the Hapse method of cultivation and As such there is a need for weeding decided to experiment with it in his He says that if the crops were to be only twice within the crop period”.
  • 21.
    Speaking about thevarious inter crops that can be sown along with can also include paddy, pigeon pea, irrigation can actually be used for 2 cane, Anji Reddy says, “French beans all varieties of vegetables, etc. So, acres of cane and intercrops now. The can be sown in June and Potato totally, in 11 months, 2 intercrops can drip system that I have installed is in October. Though sugarcane be cultivated.” working very well with the intercrops cultivation is becoming more and as well”. more risky, through the SSI method Fertilizers – Chemical to and intercropping, there is much less Organic Fruits of Success are Sweet expenditure, in spite of the hike in “Since I began to follow the SSI Indeed! prices of almost every commodity method, I was able to reduce the Anji Reddy says, “I am able to get a today. While the cane seedlings are usage of fertilizers by as much as getting ready in the nursery, the Rupees per acre on an average, after intercrop can be sown in between the the fertilizer all over the crop in the all the costs are paid off. The money rows. If the soil is black cotton soil, is saved at every level, when buying then soya bean is a very good option. that was released to the crop through seed, when buying fertilizers, and the drip irrigation. This ensured that fertilizer reached the roots of wages. Added to all this, the yield is which is a bonus to the income from each plant, which is the aim of the doubled. the sugarcane harvest. The total cost application. Another option for the of cultivation under SSI does not cross farmer is to make a small deep hole near each of the plants and put the to 40 tonnes, today I can get even fertilizer in this hole for it to reach 100 tonnes per acre. The number of “Two legume crops, if sown, can fetch the roots directly.” millable tillers has increased from Nov ‘09 21 SugarCane acre. In a cycle of one sugarcane crop Water – Saved and the cane has also increased manifold. Regenerated And this became possible because of matters melon can be sown, to be harvested the SSI methods”. when compared to the conventional method. Water gets saved right Manisha Agarwal is the or green chillies can be sown and from the time of raising the nursery. these can be harvested at the end of The amount of water that goes into ICRISAT-WWF project.
  • 22.
    Fundamentals of Sustainable Sugarcane Initiative (SSI) aims at providing practical options to farmers in improving the productivity of land, water and labour, all at the same time. SSI is also expected to reduce the overall pressure on water resources and contribute to recovery of ecosystems in the long run. Below is a description in brief of some of the essential What is SSI? practices under SSI. S ust ai iv e Sustainable Sugarcane Initiative (SSI) is a system of better management practices that involves use of ti a t less seeds, less water and optimum utilisation of fertilizers na ni bl eS eI u g a rc a n It is an alternative to the conventional seed, water and space intensive sugarcane cultivation. The main principles of SSI are: 1 Raising nursery using single budded chips 3 Maintaining wider spacing in SugarCane matters Conventional sugarcane cultivation consumes two to SSI advocates wider spacing between rows and plants cuttings, called setts, are used as seed material. On the 22 22 Nov ‘09 Nov ‘09 setts, the area of bud only is chipped with the help of a instrument called Bud Chipper. The chipped buds are then three budded setts. Hence, wider spacing in planting under SSI supports easy air and sunlight penetration in the crop canopy for better and healthier cane growth. be cut to be used for bud chips as seed materials. A point to be noted here is, unlike the conventional method, the seed requirement comes down due to minimum spacing 4 2 Transplanting seedlings raising planting stock in nursery and other water saving techniques like furrow irrigation, irrigation through alternate furrows, drip irrigation and so on. Flooding the used for planting. By then the seedlings are healthy, robust not only huge quantity of water (consequently more nurturing, grading and maintenance in the nursery. power) but also affects the growth of the crop.
  • 23.
    5 Encouraging application of organic manure, better cultural and plant protection measures In SSI, farmers are encouraged to practice organic on the irrigation methods applied) months) by raising intercrops method of cultivation like incorporation of organic on how effectively the SSI practices are manures, application of bio-fertilizers, and use of bio- implemented) control measures and so on. Trash mulching and earthing up practices are highly recommended for retention of Additional income from intercrops moisture, enhanced microbial activity and aeration to the weeds get converted into manure during the earthing Gradual reduction of inorganic and adoption of organic Other advantages of SSI are: – in external inputs and improving the quality of cane. B Nov ‘09 Nov ‘09 SugarCane SugarCane R matters matters Easy transport of young seedlings for longer distance Intercultural operations carried out easily due to wider spacing 6 More accessibility to air and sunlight Practicing intercropping to utilize Reduction in lodging due to earthing up land effectively Increase in healthy plant growth due to mulching SSI supports intercropping in sugarcane with crops like wheat, potato, cowpea, French beans, chick pea, water Reduction in use of chemical fertilizers due melon, brinjal and so on. This practice not only reduces to use of organic manure produced as part of mulching also provides extra income to farmers, in addition to the Increase in length and weight of each cane effective utilization of land. High number of millable canes depending upon the agro-climatic conditions and the Reduction in duration of crop Sugar mills can promote SSI in their operational areas Optimum land utilisation to improve productivity and for assured supply of quality cane, to run the factories for a longer period. For the complete Training Manual (English) on SSI methods, Either enterprising farmers can set up nurseries to sell visit www.sri-india.net or www.panda.org (http://www. plants to neighbouring farmers and/or mills can establish decentralised nurseries in their operational area to help Improving-sugarcane-cultivation-in-India motivate farmers to go for SSI.
  • 24.
    Quotes Sustainable Sugarcane Initiativeis people oriented and There are several subsidies and schemes available to it will increase productivity and will put to place coping sugarcane farmers today. They should make use of these mechanism in future that is to come. subsides vis-à-vis the SSI Training Manual for improved Dr. William Dar, production and productivity. Director General, ICRISAT Dr. Laxmi Narayana, I.A.S, Commissioner of Sugarcane, It is an innovative idea, and it is nice to see so many farmers Government of Andhra Pradesh taking up the SSI methods. Dr. Dave Hoisington, Deputy Director General- Research, ICRISAT very little costs/investments by introducing innovative SSI initiative will bring new hope in sugarcane cultivation technologies. for Punjab. Shri. Sucha Singh, Dr. N.V. Naidu, Hon’ble Agriculture Minister, Punjab Principal Scientist, Regional Agriculture Research Station (RARS), Sustainable Sugarcane Initiative (SSI) has great potential Anakapalli in Andhra Pradesh when more and more farmers adopt this technology of ‘growing more with less’ across the sugarcane growing and describe in detail proper management practices in states in the country. order to reduce the cost of cultivation, improve water Shri. Dhruv Mohan Sawhney, management and increase productivity and will be Chairman and Managing Director, extremely useful to both sugarcane farmers and sugar Triveni Engineering Co. Ltd. producers.” The training manual is quite useful and I am sure that it - Dr. P. Murugesa Boopathy, will prove useful in achieving the set goals. Vice Chancellor, Dr. N. Vijayan Nair, Tamil Nadu Agricultural University (TNAU), Director Sugarcane Breeding Institute, Coimbatore Coimbatore, Tamil Nadu Forthcoming Publications SSI Training Manual SSI Training Manual SSI Training Manual in Hindi in Telugu in Tamil An Initiative of ICRISAT-WWF Project