Case Study
                                                                                            GEMASOLAR




SPECIAL AKOTRACE® ELECTRICAL HEAT-TRACING SOLUTION FOR
GEMASOLAR

PROJECT SHEET

  TEMPORARY JOINT VENTURE: SENER- COBRA
  PROMOTER: TORRESOL ENERGY
  CSP TECHNOLOGY: Tower CSP with direct molten salts.
  LOCATION: Fuentes de Andalucía (+37° 32’ 3.24”, -5° 18’ 47.59”)
  HEAT TRACING SYSTEM TECHNICAL DATA:
	       - Electrical heat-tracing system turnkey solution
	       - 10 engineers and 40 fitters
	       - 12 km of mineral insulation heating cable
	       - 400 active circuits
	       - Over 1400 control i/o
	       - 1 MW electrical power in 4 power distribution cabinets
	       - 7 months of execution


BACKGROUND

Torresol Energy is the owner of the first commercial plant in the world to apply
central tower CSP technology and thermal storage in molten salts. Some of the
features that make this plant singular and unique in the world are:

	       - Nominal rated electrical power: 19.9 MW
	       - Estimated net electrical power: 110 GWh/ year
	       - Solar field: with 2,650 heliostats in 185 hectares
	       - Thermal storage system: the hot salt storage tank allows an autonomy
	         of power generation of up to 15 hours without solar supply.



SENER has carried out the project engineering and it has been built by a Temporary Joint Venture made up of SENER
and COBRA.

This plant is a demonstration that two of the different factors that central tower CSP technologies have compared to other
CSP technologies and other renewable energies: the capacity for adjusting production to consumption demand.

The longer operating time of the plant in the absence of solar radiation and improved efficiency in the use of heat from the
sun make Gemasolar’s production much higher than what other technologies can reach in a facility with the same power
and it can modulate power generation and adjust it to peak hours outside solar radiation times and produce electrical
energy 24 hours a day for most of the year.

The technological difference supplied by this plant is basically the incorporation of a new thermal storage system
in molten salts which allows producing electricity in the absence of solar radiation.

Heat collected by the salts (capable of reaching temperatures over 500 ºC) is used to generate steam and, with this, produce
electric energy. Excess heat accumulated during the hours of sunshine is stored in the hot salt tank.




Given the technology used, Tower CSP with molten salts, one of the most critical systems in the project is the electrical
heat-tracing system to maintain and heat the molten salt circulation circuit.

To answer this technical challenge, SENER and COBRA contracted AKO as a partner to provide its electrical heat-tracing
solution, AKOTRACE®.
www.ako.com
Case Study
                                                                                                 GEMASOLAR




PROJECT CHALLENGES

Technical requirements, although largely already resolved by AKO in many projects
executed in solar thermal plants with parabolic trough and salt accumulation techno-
logy, added important differences such as:

	       - Process working and maximum material temperatures
	       - Heating times and remounting of process areas, such as the receiver
	         and the drainage circuits
	       - Tracing of critical points such as valve bonnets, pump heads and
	         upright pipes
	       - Availability and robustness of the control system
	       - Installation of circuits inside the tower and distribution of the power
	         cabinets, due to space limitations and atmospheric conditions


AKO SOLUTION

The scope of the AKO solution has been the execution of the turnkey electrical heat-tracing system, AKOTRACE®. AKO’s
strategic commitment to this project has been personally promoted by José Luis Bescós, General Manager of AKO: “It
has been a big technical and project and resource management challenge for AKO. We have learned a lot. We are proud of
the end result and of having taken part in our customer’s emblematic project”.

Part of the solutions during the basic engineering process were based on R&D activities, led by the Tracing Applications
Manager, Joaquim Pagá: “We had to resolve not only theoretically but also empirically certain aspects we consider key for
the success of the project testing in our AKOTRACE® Laboratory. Therefore, in addition to AKO’s internal knowledge, we
have turned to some partners from the science area who have helped us in both the mathematical modelling of thermody-
namic processes and in the properties of certain materials”.




This has allowed us to guarantee the performance of certain tracing circuits of critical points in the laboratory, both in tem-
perature and in maximum times of reaching the set point, minimising at all times the thermal stress the mineral insulation
cable is subjected to by improving our control algorithm. As, Joaquim Pagá, explaine:“in R&D we have been fully involved
in the start up of the system to check or adjust the foreseen performance”

In the AKOTRACE® solution it is worth mentioning that we have chosen different key technical characteristics for this
project:

	       - Mineral insulation cable with laser welding
	       - K thermocouple type probes with double redundancy
	       - Special construction and refrigeration for the panels inside the tower
	       - Additional safety temperature control protections
	       - Specific design of heaters for singular points
	       - Connection redundancy and system manageability from DCS

All in an execution time of 7 months. Both the installation and start-up process have also been a big challenge for the
project industrialisation team, led by Rafael Delgado, Director of AKO’s Project Business Unit: “The Temporary Joint
Venture’s demands during the installation and start-up have been very high. Not in vain, not only the heat-tracing system
is critical, but it is also one of the last systems to be installed and that is totally necessary for the plant’s product start up
timings. Also, as foreseeable in this type of innovative projects, improvements have been introduced during the execution,
both by engineering and by AKO, that we have included in the planning”.


www.ako.com
Case Study
                                                                                           GEMASOLAR




RESULTS

The plant was officially opened on 4 October, although it has been operating since
May 2011. The results obtained from the introduction of our AKOTRACE®.solution in
such an emblematic project are:

	 - Introduction of improvements in basic engineering and R&D in the form of 	
	   technical and technological solutions.
	 - Assurance of the criticality of the system with an efficient investment
	- Response in time to new technological challenges that have arisen
	 - Execution times adjusted to works building planning
	 - Training of the plant’s staff on the correct operation of the heat-tracing
	   system
	 - Transparent integration with the plant’s management system to make plant
	   maintainability easier

The execution of this projects rounds off the level of experience and knowledge
required due to its criticality in heat-tracing systems of concentration solar ther-
mal plants with salt accumulation

ABOUT AKO

Over 30 years of innovation and with 130 people team of in-house professionals AKO Electromecànica, S.A.L. is a Spanish
company leader in the Regulation and Control of Temperature with Electrical Heat Tracing Solutions for Thermo-Solar Power
Plants, that offers comprehensive support from project design and manufacturing, to technical assistance, to the System
commissioning (turnkey projects) and after-sales service. Electrical Heat Tracing System AKOTRACE® based the heating
cable technology, providing advantages and savings on energy and the overall cost of the installation, with a reliable and
secure management, ensuring the health, safety and respect for the environment.




www.ako.com

More Related Content

What's hot

Pope ATC LEED Profile
Pope ATC LEED ProfilePope ATC LEED Profile
Pope ATC LEED ProfileSean Haynes
 
AirClean Energy Company Overview - February 2016
AirClean Energy Company Overview - February 2016AirClean Energy Company Overview - February 2016
AirClean Energy Company Overview - February 2016
Blake Johnson
 
How You Can Save Energy & Money with Building Performance Analysis
How You Can Save Energy & Money with Building Performance AnalysisHow You Can Save Energy & Money with Building Performance Analysis
How You Can Save Energy & Money with Building Performance Analysis
Statybos Akademija
 
Allies for efficiency training chemeketa final locked
Allies for efficiency training   chemeketa final lockedAllies for efficiency training   chemeketa final locked
Allies for efficiency training chemeketa final locked
energytrustor
 
NZEB Office Building including renewable energy ratio calculation orla coyle
NZEB Office Building including renewable energy ratio calculation  orla coyleNZEB Office Building including renewable energy ratio calculation  orla coyle
NZEB Office Building including renewable energy ratio calculation orla coyle
SustainableEnergyAut
 
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research OutlookModelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Daniel Coakley
 
150312 updating history_deep_retrofits
150312 updating history_deep_retrofits150312 updating history_deep_retrofits
150312 updating history_deep_retrofitsmelanie_bissonnette
 
Research Proposal
Research ProposalResearch Proposal
Research Proposal
niveditmathur
 
Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1
Nicholas Naing
 
E.Berkay_EPRO Inc_ Company Profile
E.Berkay_EPRO Inc_ Company ProfileE.Berkay_EPRO Inc_ Company Profile
E.Berkay_EPRO Inc_ Company ProfileErdal Berkay
 
John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015John Hitt
 
NZEB Interm Specification by Sean Armstrong
NZEB Interm Specification by Sean ArmstrongNZEB Interm Specification by Sean Armstrong
NZEB Interm Specification by Sean Armstrong
SustainableEnergyAut
 
TotalEcoEnergy Smart homebuilding solutions
TotalEcoEnergy Smart homebuilding solutionsTotalEcoEnergy Smart homebuilding solutions
TotalEcoEnergy Smart homebuilding solutions
Azi Col
 
Whole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioWhole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudio
energytrustor
 
Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2
Nicholas Naing
 
Building performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overviewBuilding performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overview
Statybos Akademija
 
LEED_NC and LEED_EB
LEED_NC and LEED_EBLEED_NC and LEED_EB
LEED_NC and LEED_EB
Arn Akbarieh
 
Innovative thermal energy storage technologies (Vincent O'Brien)
Innovative thermal energy storage technologies (Vincent O'Brien)Innovative thermal energy storage technologies (Vincent O'Brien)
Innovative thermal energy storage technologies (Vincent O'Brien)campone
 
Energy Savings for Occupancy-Based Control of Variable-Air-Volume Systems
Energy Savings for Occupancy-Based Control of Variable-Air-Volume SystemsEnergy Savings for Occupancy-Based Control of Variable-Air-Volume Systems
Energy Savings for Occupancy-Based Control of Variable-Air-Volume Systems
melanie_bissonnette
 

What's hot (20)

Pope ATC LEED Profile
Pope ATC LEED ProfilePope ATC LEED Profile
Pope ATC LEED Profile
 
AirClean Energy Company Overview - February 2016
AirClean Energy Company Overview - February 2016AirClean Energy Company Overview - February 2016
AirClean Energy Company Overview - February 2016
 
How You Can Save Energy & Money with Building Performance Analysis
How You Can Save Energy & Money with Building Performance AnalysisHow You Can Save Energy & Money with Building Performance Analysis
How You Can Save Energy & Money with Building Performance Analysis
 
Allies for efficiency training chemeketa final locked
Allies for efficiency training   chemeketa final lockedAllies for efficiency training   chemeketa final locked
Allies for efficiency training chemeketa final locked
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
NZEB Office Building including renewable energy ratio calculation orla coyle
NZEB Office Building including renewable energy ratio calculation  orla coyleNZEB Office Building including renewable energy ratio calculation  orla coyle
NZEB Office Building including renewable energy ratio calculation orla coyle
 
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research OutlookModelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
 
150312 updating history_deep_retrofits
150312 updating history_deep_retrofits150312 updating history_deep_retrofits
150312 updating history_deep_retrofits
 
Research Proposal
Research ProposalResearch Proposal
Research Proposal
 
Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1
 
E.Berkay_EPRO Inc_ Company Profile
E.Berkay_EPRO Inc_ Company ProfileE.Berkay_EPRO Inc_ Company Profile
E.Berkay_EPRO Inc_ Company Profile
 
John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015
 
NZEB Interm Specification by Sean Armstrong
NZEB Interm Specification by Sean ArmstrongNZEB Interm Specification by Sean Armstrong
NZEB Interm Specification by Sean Armstrong
 
TotalEcoEnergy Smart homebuilding solutions
TotalEcoEnergy Smart homebuilding solutionsTotalEcoEnergy Smart homebuilding solutions
TotalEcoEnergy Smart homebuilding solutions
 
Whole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioWhole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudio
 
Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2
 
Building performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overviewBuilding performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overview
 
LEED_NC and LEED_EB
LEED_NC and LEED_EBLEED_NC and LEED_EB
LEED_NC and LEED_EB
 
Innovative thermal energy storage technologies (Vincent O'Brien)
Innovative thermal energy storage technologies (Vincent O'Brien)Innovative thermal energy storage technologies (Vincent O'Brien)
Innovative thermal energy storage technologies (Vincent O'Brien)
 
Energy Savings for Occupancy-Based Control of Variable-Air-Volume Systems
Energy Savings for Occupancy-Based Control of Variable-Air-Volume SystemsEnergy Savings for Occupancy-Based Control of Variable-Air-Volume Systems
Energy Savings for Occupancy-Based Control of Variable-Air-Volume Systems
 

Viewers also liked

How the Nintento Wii’s motion plus technology has opened the door to a wave o...
How the Nintento Wii’s motion plus technology has opened the door to a wave o...How the Nintento Wii’s motion plus technology has opened the door to a wave o...
How the Nintento Wii’s motion plus technology has opened the door to a wave o...HitReach
 
Csp today webinar
Csp today webinarCsp today webinar
Csp today webinarHitReach
 
Estela webinar
Estela webinarEstela webinar
Estela webinarHitReach
 
Ambata Presentation
Ambata PresentationAmbata Presentation
Ambata PresentationHitReach
 
Kustar webinar
Kustar webinarKustar webinar
Kustar webinarHitReach
 
Esia Presentation
Esia PresentationEsia Presentation
Esia PresentationHitReach
 
Sun Power Presentation
Sun Power PresentationSun Power Presentation
Sun Power PresentationHitReach
 

Viewers also liked (7)

How the Nintento Wii’s motion plus technology has opened the door to a wave o...
How the Nintento Wii’s motion plus technology has opened the door to a wave o...How the Nintento Wii’s motion plus technology has opened the door to a wave o...
How the Nintento Wii’s motion plus technology has opened the door to a wave o...
 
Csp today webinar
Csp today webinarCsp today webinar
Csp today webinar
 
Estela webinar
Estela webinarEstela webinar
Estela webinar
 
Ambata Presentation
Ambata PresentationAmbata Presentation
Ambata Presentation
 
Kustar webinar
Kustar webinarKustar webinar
Kustar webinar
 
Esia Presentation
Esia PresentationEsia Presentation
Esia Presentation
 
Sun Power Presentation
Sun Power PresentationSun Power Presentation
Sun Power Presentation
 

Similar to Special AKOTRACE® Electrical Heat Tracing Solution for Gemasolar Solar Power Plant

SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
ako_corporate
 
Matimba Power Station
Matimba Power StationMatimba Power Station
Matimba Power StationSite Web
 
Commercial presentation jan 2013
Commercial presentation   jan 2013Commercial presentation   jan 2013
Commercial presentation jan 2013Solmatix Renewables
 
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
Iceland Geothermal
 
ISTMO SOLAR PRESENTATION 2016_ ENG
ISTMO SOLAR PRESENTATION 2016_ ENGISTMO SOLAR PRESENTATION 2016_ ENG
ISTMO SOLAR PRESENTATION 2016_ ENGNicolas Baldrich
 
Km186 steam power plant with single dynamo
Km186 steam power plant with single dynamoKm186 steam power plant with single dynamo
Km186 steam power plant with single dynamo
1000kv technologies
 
Matimba Power Station
Matimba Power StationMatimba Power Station
Matimba Power Station
AGE Technologies
 
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
IrSOLaV Pomares
 
RCREEE-enerMENA_présentation algeria
RCREEE-enerMENA_présentation  algeriaRCREEE-enerMENA_présentation  algeria
RCREEE-enerMENA_présentation algeria
RCREEE
 
Adoption of supercritical technology (1)
Adoption of supercritical technology (1)Adoption of supercritical technology (1)
Adoption of supercritical technology (1)
HARSHIT GUPTA
 
Scarabeus Project
Scarabeus ProjectScarabeus Project
Scarabeus Project
Abengoa
 
118910007-Solar-Collectors.ppt
118910007-Solar-Collectors.ppt118910007-Solar-Collectors.ppt
118910007-Solar-Collectors.ppt
AhamBrahmasmiGaming
 
Solar Thermal Electricity – tower technology
Solar Thermal Electricity – tower technologySolar Thermal Electricity – tower technology
Solar Thermal Electricity – tower technology
Abengoa
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13Moore Sarah
 
Sekem Energy - ADA-project - Birgit Birnstingl 20130611
Sekem Energy - ADA-project - Birgit Birnstingl 20130611Sekem Energy - ADA-project - Birgit Birnstingl 20130611
Sekem Energy - ADA-project - Birgit Birnstingl 20130611
Sekem Energy
 
Results of DigitArc Electrode Regulator and SmartArc power input optimization...
Results of DigitArc Electrode Regulator and SmartArc power input optimization...Results of DigitArc Electrode Regulator and SmartArc power input optimization...
Results of DigitArc Electrode Regulator and SmartArc power input optimization...
AMI GE International
 
Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)
1000kv technologies
 
Thermojet - Apresentação de serviços - Livro 6/10
Thermojet - Apresentação de serviços - Livro 6/10Thermojet - Apresentação de serviços - Livro 6/10
Thermojet - Apresentação de serviços - Livro 6/10
R2S Apresentações
 

Similar to Special AKOTRACE® Electrical Heat Tracing Solution for Gemasolar Solar Power Plant (20)

SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
 
AKOTRACE: Case Study Andasol III
AKOTRACE: Case Study Andasol IIIAKOTRACE: Case Study Andasol III
AKOTRACE: Case Study Andasol III
 
Matimba Power Station
Matimba Power StationMatimba Power Station
Matimba Power Station
 
Commercial presentation jan 2013
Commercial presentation   jan 2013Commercial presentation   jan 2013
Commercial presentation jan 2013
 
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
 
ISTMO SOLAR PRESENTATION 2016_ ENG
ISTMO SOLAR PRESENTATION 2016_ ENGISTMO SOLAR PRESENTATION 2016_ ENG
ISTMO SOLAR PRESENTATION 2016_ ENG
 
Km186 steam power plant with single dynamo
Km186 steam power plant with single dynamoKm186 steam power plant with single dynamo
Km186 steam power plant with single dynamo
 
Matimba Power Station
Matimba Power StationMatimba Power Station
Matimba Power Station
 
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
 
RCREEE-enerMENA_présentation algeria
RCREEE-enerMENA_présentation  algeriaRCREEE-enerMENA_présentation  algeria
RCREEE-enerMENA_présentation algeria
 
Adoption of supercritical technology (1)
Adoption of supercritical technology (1)Adoption of supercritical technology (1)
Adoption of supercritical technology (1)
 
Scarabeus Project
Scarabeus ProjectScarabeus Project
Scarabeus Project
 
118910007-Solar-Collectors.ppt
118910007-Solar-Collectors.ppt118910007-Solar-Collectors.ppt
118910007-Solar-Collectors.ppt
 
Solar Thermal Electricity – tower technology
Solar Thermal Electricity – tower technologySolar Thermal Electricity – tower technology
Solar Thermal Electricity – tower technology
 
CV_AD1
CV_AD1CV_AD1
CV_AD1
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13
 
Sekem Energy - ADA-project - Birgit Birnstingl 20130611
Sekem Energy - ADA-project - Birgit Birnstingl 20130611Sekem Energy - ADA-project - Birgit Birnstingl 20130611
Sekem Energy - ADA-project - Birgit Birnstingl 20130611
 
Results of DigitArc Electrode Regulator and SmartArc power input optimization...
Results of DigitArc Electrode Regulator and SmartArc power input optimization...Results of DigitArc Electrode Regulator and SmartArc power input optimization...
Results of DigitArc Electrode Regulator and SmartArc power input optimization...
 
Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)
 
Thermojet - Apresentação de serviços - Livro 6/10
Thermojet - Apresentação de serviços - Livro 6/10Thermojet - Apresentação de serviços - Livro 6/10
Thermojet - Apresentação de serviços - Livro 6/10
 

Recently uploaded

Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
zechu97
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 

Recently uploaded (20)

Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 

Special AKOTRACE® Electrical Heat Tracing Solution for Gemasolar Solar Power Plant

  • 1. Case Study GEMASOLAR SPECIAL AKOTRACE® ELECTRICAL HEAT-TRACING SOLUTION FOR GEMASOLAR PROJECT SHEET TEMPORARY JOINT VENTURE: SENER- COBRA PROMOTER: TORRESOL ENERGY CSP TECHNOLOGY: Tower CSP with direct molten salts. LOCATION: Fuentes de Andalucía (+37° 32’ 3.24”, -5° 18’ 47.59”) HEAT TRACING SYSTEM TECHNICAL DATA: - Electrical heat-tracing system turnkey solution - 10 engineers and 40 fitters - 12 km of mineral insulation heating cable - 400 active circuits - Over 1400 control i/o - 1 MW electrical power in 4 power distribution cabinets - 7 months of execution BACKGROUND Torresol Energy is the owner of the first commercial plant in the world to apply central tower CSP technology and thermal storage in molten salts. Some of the features that make this plant singular and unique in the world are: - Nominal rated electrical power: 19.9 MW - Estimated net electrical power: 110 GWh/ year - Solar field: with 2,650 heliostats in 185 hectares - Thermal storage system: the hot salt storage tank allows an autonomy of power generation of up to 15 hours without solar supply. SENER has carried out the project engineering and it has been built by a Temporary Joint Venture made up of SENER and COBRA. This plant is a demonstration that two of the different factors that central tower CSP technologies have compared to other CSP technologies and other renewable energies: the capacity for adjusting production to consumption demand. The longer operating time of the plant in the absence of solar radiation and improved efficiency in the use of heat from the sun make Gemasolar’s production much higher than what other technologies can reach in a facility with the same power and it can modulate power generation and adjust it to peak hours outside solar radiation times and produce electrical energy 24 hours a day for most of the year. The technological difference supplied by this plant is basically the incorporation of a new thermal storage system in molten salts which allows producing electricity in the absence of solar radiation. Heat collected by the salts (capable of reaching temperatures over 500 ºC) is used to generate steam and, with this, produce electric energy. Excess heat accumulated during the hours of sunshine is stored in the hot salt tank. Given the technology used, Tower CSP with molten salts, one of the most critical systems in the project is the electrical heat-tracing system to maintain and heat the molten salt circulation circuit. To answer this technical challenge, SENER and COBRA contracted AKO as a partner to provide its electrical heat-tracing solution, AKOTRACE®. www.ako.com
  • 2. Case Study GEMASOLAR PROJECT CHALLENGES Technical requirements, although largely already resolved by AKO in many projects executed in solar thermal plants with parabolic trough and salt accumulation techno- logy, added important differences such as: - Process working and maximum material temperatures - Heating times and remounting of process areas, such as the receiver and the drainage circuits - Tracing of critical points such as valve bonnets, pump heads and upright pipes - Availability and robustness of the control system - Installation of circuits inside the tower and distribution of the power cabinets, due to space limitations and atmospheric conditions AKO SOLUTION The scope of the AKO solution has been the execution of the turnkey electrical heat-tracing system, AKOTRACE®. AKO’s strategic commitment to this project has been personally promoted by José Luis Bescós, General Manager of AKO: “It has been a big technical and project and resource management challenge for AKO. We have learned a lot. We are proud of the end result and of having taken part in our customer’s emblematic project”. Part of the solutions during the basic engineering process were based on R&D activities, led by the Tracing Applications Manager, Joaquim Pagá: “We had to resolve not only theoretically but also empirically certain aspects we consider key for the success of the project testing in our AKOTRACE® Laboratory. Therefore, in addition to AKO’s internal knowledge, we have turned to some partners from the science area who have helped us in both the mathematical modelling of thermody- namic processes and in the properties of certain materials”. This has allowed us to guarantee the performance of certain tracing circuits of critical points in the laboratory, both in tem- perature and in maximum times of reaching the set point, minimising at all times the thermal stress the mineral insulation cable is subjected to by improving our control algorithm. As, Joaquim Pagá, explaine:“in R&D we have been fully involved in the start up of the system to check or adjust the foreseen performance” In the AKOTRACE® solution it is worth mentioning that we have chosen different key technical characteristics for this project: - Mineral insulation cable with laser welding - K thermocouple type probes with double redundancy - Special construction and refrigeration for the panels inside the tower - Additional safety temperature control protections - Specific design of heaters for singular points - Connection redundancy and system manageability from DCS All in an execution time of 7 months. Both the installation and start-up process have also been a big challenge for the project industrialisation team, led by Rafael Delgado, Director of AKO’s Project Business Unit: “The Temporary Joint Venture’s demands during the installation and start-up have been very high. Not in vain, not only the heat-tracing system is critical, but it is also one of the last systems to be installed and that is totally necessary for the plant’s product start up timings. Also, as foreseeable in this type of innovative projects, improvements have been introduced during the execution, both by engineering and by AKO, that we have included in the planning”. www.ako.com
  • 3. Case Study GEMASOLAR RESULTS The plant was officially opened on 4 October, although it has been operating since May 2011. The results obtained from the introduction of our AKOTRACE®.solution in such an emblematic project are: - Introduction of improvements in basic engineering and R&D in the form of technical and technological solutions. - Assurance of the criticality of the system with an efficient investment - Response in time to new technological challenges that have arisen - Execution times adjusted to works building planning - Training of the plant’s staff on the correct operation of the heat-tracing system - Transparent integration with the plant’s management system to make plant maintainability easier The execution of this projects rounds off the level of experience and knowledge required due to its criticality in heat-tracing systems of concentration solar ther- mal plants with salt accumulation ABOUT AKO Over 30 years of innovation and with 130 people team of in-house professionals AKO Electromecànica, S.A.L. is a Spanish company leader in the Regulation and Control of Temperature with Electrical Heat Tracing Solutions for Thermo-Solar Power Plants, that offers comprehensive support from project design and manufacturing, to technical assistance, to the System commissioning (turnkey projects) and after-sales service. Electrical Heat Tracing System AKOTRACE® based the heating cable technology, providing advantages and savings on energy and the overall cost of the installation, with a reliable and secure management, ensuring the health, safety and respect for the environment. www.ako.com