1. Engineering and design are critical factors that can make or break a solar project. Good design can result in 3 lakh kWh more output annually. 2. Technology should be selected based on location and site conditions, as more expensive options do not necessarily mean better output. 3. Nearly 70% of projects are underperforming due to lack of pre-project evaluation of site conditions and development of a feasibility report. 4. Financial modeling of costs, expenses, and financing is important for project success and different models should be considered. 5. Legal contracts like EPC and PPA can face challenges years later without input from domain experts during drafting.