Management & Consulting Services
Aus einem Guss – The Perfect Cast




                        welcome     herzlich willkommen
Management & Consulting Services
Results count – Experience matters
                                                                                     Teaser
                    25 Years of track record as Managing Director in
                    different companies in the Automotive Industry                    Vision
                                                                                    Mission
                    12 Years of track record for leading a global group of
                    up to 11 companies world-wide                                 Paradigm
                    12 Years of track record for Corporate Governance            Motivation
                    in international organizations                                    Profile
                    6 successful Green-Field-Investments                      Development
                    Responsible execution of turnarounds                     ServicesOffered
                    Responsible execution of plant-closures                          Results

                    Market-Leadership with Hydro Aluminum’s
                    Business Unit Castings

                                                                                  Nextpage



                    Insider of the Aluminum Casting Market
                    Expert in Aluminum Casting Technology                           Contact
                    Expert in Manufacturing Systems
                    Expert in Marketing and Sales
Management & Consulting Services
Results count – Experience matters
                                                                     Teaser

Complex tasks to which SMETAN engineering can provide a               Vision
                                                                    Mission
valuable contribution include:
                                                                  Paradigm
                                                                 Motivation
   Consolidating the Footprint and the Product Portfolio              Profile
   Continuous Improvement and Re-Engineering of               Development
   Manufacturing Processes and Value Chains                  ServicesOffered
   Step-Change Projects in Product and Process Development           Results

   Major Capital Expenditure, in particular Green-Field
   investments
                                                              Previous page
   New Start-Ups and Program Launches of significance             Nextpage
   Restructuring of Companies and Divisions                          Home

   Divestment of Subsidiaries and Divisions                        Question

   Closure and Relocation of Subsidiaries or Departments
                                                                    Contact
Management & Consulting Services
Results count – Experience matters
                                                                          Teaser
“During my time as a manager in the automotive supply                      Vision
industry I was constantly striving to confer such demanding and          Mission
complex tasks on outstanding executives with many years of             Paradigm
professional experience, who were removed from the daily              Motivation
routine as far as possible.                                                Profile

Due to their well established professional competence and          Development
leadership skills these managers always succeeded in              ServicesOffered
orientating all internal and external participants, who formed            Results
part in the tasks in a very efficient and, at the same time,
target-oriented way, and in so doing discover risks in such a
timely manner so that appropriate measures could take effect.      Previous page

Their understanding of reality, taken from their personal track        Nextpage
record, in most cases succeeded upon mere wishful thinking                Home
                                                                        Question
By means of this structured split of day-to-day business from
project work, the whole organization gained considerably
                                                                         Contact
dynamics and efficiency!
Management & Consulting Services
Results count – Experience matters
                                                                            Teaser
But, similar to a mountain guide for instance, these managers                Vision
had to walk certain routes several times themselves, before                Mission
they could safely guide others on these routes.                          Paradigm
                                                                        Motivation
It is especially their self-confidence, which creates trust in an
                                                                             Profile
undertaking and stabilizes teams.
                                                                     Development
It is especially in critical paths that a special level of          ServicesOffered
professionalism and persistence is required, which can only                 Results
emerge from one’s own personal experience.
The professional leaves nothing to chance, rather he knows
when to use ‚an additional clamp‘, before risking a ‚fall on a       Previous page
long rope‘.”                                                             Nextpage
                                                                            Home
                                                                          Question
(Herbert Smetan)
                                                                           Contact
Management & Consulting Services
Results count – Experience matters
                                                                           Teaser
                                                                            Vision
               For me, it is of course beyond any doubt that              Mission
                 you and your team are perfectly capable of             Paradigm
                   providing such professional competence              Motivation
                     and leadership skills to your personnel.               Profile
                      If you have appropriate time so to do!        Development
                        If not, please call me or send a note!     ServicesOffered

                                         I will surely help you!           Results

                                           You can count on it!
                                                      Promised!
                                                                    Previous page
                                                                        Nextpage



                                                                             Print
                                               Yours sincerely            Contact
                                              Herbert Smetan
Vision
the holistic approach towards operational management...
                                                                            Teaser
                                                                             Vision
                                                                           Mission
                                                                         Paradigm
                                                                        Motivation
                                                                             Profile
                                                                     Development
                                                                    ServicesOffered
                                                                            Results




„My vision is the outstanding product that sets the industry         Previous page
standard – in terms of design, characteristics, price and                Nextpage
reliability – and which offers the client competitive advantages,           Home
thus improving his market position.“                                      Question


(Herbert Smetan)                                                           Contact
Mission
….creating sustainable cost leadership ….
                                                                       Teaser
                                                                        Vision
                                                                      Mission
                                                                    Paradigm
                                                                   Motivation
                                                                        Profile
                                                                Development
                                                               ServicesOffered
                                                                       Results




“My mission is to manufacture this product using robust         Previous page
processes within a balanced production chain, which is based        Nextpage
on well designed, highly reliable equipment and capable                Home
tooling and by this creating sustainable cost leadership.”           Question


(Herbert Smetan)                                                      Contact
Mission
….creating sustainable cost leadership ….
                                                                            Teaser
Daring to pursue solutions that redefine the industry standard               Vision
with optimum resource usage becomes possible if one is not                 Mission
intimidated by confronting the complexity of the task and, with          Paradigm
foresight, has solutions available to apply to the areas in which       Motivation
latent risks may become manifest.                                            Profile

Manufacturing processes that are validated with a realistic          Development
attitude, in combination with reliable hardware solutions and a     ServicesOffered
fine-tuned material flow, make it possible to secure the long-              Results
term success of this approach by means of the ‘continuous
improvement’ methodology.
                                                                     Previous page
The consensus between management and employees is the
ultimate requirement for the group dynamic necessary for the             Nextpage
sustainable successful company!                                             Home
                                                                          Question


(Herbert Smetan)                                                           Contact
“simply be better”
  ….through highly efficient value chains
                                                                                           Teaser
                                                                                            Vision
                                                                                          Mission
                                                                                        Paradigm
                                                                                       Motivation
                                                                                            Profile
                                      ProcessCapability
                                                                                    Development
                                                                                   ServicesOffered
                                                                  Quality                  Results
         Reward-
          System                   Product
Operational
Effectiveness                                                                       Previous page
                                                                                        Nextpage
                                                                                           Home
                                                                                         Question


                                                                                          Contact

...the complexity of which is resulting from a multitude of diverse interactions
“simply be better”                            (1)



….through highly efficient value chains
                                                                          Teaser
„ Successful companies focus on the production process, since              Vision
profit isn’t generated through accounting!                               Mission
                                                                       Paradigm
Only optimally fine-tuned manufacturing sets the standard for
                                                                      Motivation
quality, costs and product availability – and by this also
                                                                           Profile
represents the precondition for the successful positioning of a
company in globalized competition!                                 Development
                                                                  ServicesOffered
Companies focused on continuous development of their                      Results
market share, as well as the expansion of their target market,
would do well to disregard discussions regarding hidden
defects in their products.
                                                                   Previous page
The product quality is determined             exclusively   by         Nextpage
manufacturing, not by inspection.                                         Home
Products that are flawless with regard to the specification can         Question
only be produced in consistently validated processes.
                                                                         Contact
“simply be better”                             (2)



….through highly efficient value chains
                                                                           Teaser
Further, high-performance processes only result in a consistent             Vision
production flow in reliable and well-tuned production facilities          Mission
in which ongoing client demand can be met without significant           Paradigm
warehousing of products while employing exemplary labour,              Motivation
equipment and resource efficiency.                                          Profile

Appropriate business processes ensure as well operating cost        Development
management in company administration. This includes                ServicesOffered
management systems for quality assurance, work safety and                  Results
environmental protection.
Only in the product, that is in the process of formation, do the
                                                                    Previous page
capabilities of human, machine, tool, process and material flow
come together to demonstrate the suitability of the solution            Nextpage
chosen.                                                                    Home
                                                                         Question
The fulcrum and linchpin for sustainable success of a
production concept lies particularly in the robustness of the
                                                                          Contact
chosen production process.
“simply be better”                             (3)



….through highly efficient value chains
                                                                           Teaser
This is why a firm hold on reality is relevant for the whole                Vision
system during the validation phase of the later production                Mission
process and set-up.                                                     Paradigm
                                                                       Motivation
Mistakes in this step of any program can usually only be
                                                                            Profile
compensated by dealing with symptoms, since the time and
financial means for correcting the root-causes are often lacking    Development
in later phases of a project.                                      ServicesOffered
                                                                           Results
Consequently, the Project Management Systems in leading
companies assume the defensive function of ensuring the
prevention of economic effects resulting from unexpected
                                                                    Previous page
launching issues.
                                                                        Nextpage
The same applies to the reliability of the hardware used. While            Home
purchase decisions regarding private acquisitions are                    Question
increasingly based on the many available performance
comparisons, the selection of production facilities and
                                                                          Contact
resources is less frequently based on such a fundamental
analysis.
“simply be better”                             (4)



….through highly efficient value chains
                                                                           Teaser
In this connection, quality defects and hardware malfunctions               Vision
as well as their interactions are clearly the main reasons for            Mission
the instability of a generally unsatisfactory and cost-intensive        Paradigm
production concept.                                                    Motivation
                                                                            Profile
If the production chain is not reliably coordinated, then energy
efficient process layouts become a mere farce and production        Development
itself becomes a game of the dice.                                 ServicesOffered
                                                                           Results
In the end, the people involved hold everything together.
This is why the entire production process in all its complexity
must be manageable and comprehensible, able to be taught            Previous page
and learned.                                                            Nextpage

The consensus between management and employees should                      Home
serve to support the necessary curiosity.                                Question
                                                                             Print
Because only by constructively managing mistakes are we able              Contact
to discover new and better ways of doing things.
(Herbert Smetan)
“simply be better”                                                                                   (5)



   “and a pure hypothetical example….”
                                                                                                                                        Teaser
                                               15
                                                                                                                                         Vision
                                              14
                                                                                                 advantage                             Mission
costs




                                                             costs
                                         13
                                       12
                                      11                                                                              15             Paradigm
                                     10
                                    9                                                                            14

                                8
                                                                                                         12 13                      Motivation
                                                                                                         11
                            7
                                                                                                      9 10                               Profile
                        6                                                                         8
                    5                                                                        7                                   Development
                                                                                         6
                4
                                                                                                                                ServicesOffered
                                                                                     5
            3                                                                    4
                                                                             3
            2
                                                                                                                                        Results
        1                                                            1   2


                                               value added                                                        value added

 “Let us start for a virtual plant tour in your company and follow
 the material flow of one of your mainstay of sales. Doing so we                                                                 Previous page
 incorporate every single production step into a chart, which shows                                                                  Nextpage
 costs above added value. The “red lines” herein form those costs,                                                                      Home
 which do not lead to any added value at all. In impulse one thinks,                                                                  Question
 that this does not exist in your company, and we state that your
                                                                                                                                          Print
 stocks are of full of these and that your fork-lift trucks do not carry
                                                                                                                                       Contact
 anything else around for most of the time. And then reflect for a
 while and allow the thought for a moment that the right hand
 chart could be that of one of your competitors.”
Motivation                                    (1)



There is a perfect solution……….
                                                                          Teaser
                                                                           Vision
                                                                         Mission
                                                                       Paradigm
                                                                      Motivation
                                                                           Profile
                                                                   Development
                                                                  ServicesOffered
                                                                          Results


…….and together we will find it
                                                                   Previous page
“I have always been looking for the new and I have always
                                                                       Nextpage
been questioning critically the established. But both, entering
‘virgin territory’ as well as changing the status quo does not            Home
only demand the courage to take risks, but also that sort of            Question
acting responsible, which allows the risk to become
controllable.”                                                           Contact

(Herbert Smetan)
Motivation                                       (2)



There is a perfect solution……….
                                                                             Teaser
“These experiences allowed me to recognize early on that                      Vision
every realisable task can be achieved with the help of a                    Mission
professional, systematic approach.                                        Paradigm
Even in the case of green-field projects at a new site, in which a       Motivation
new product was to be produced using a new process, with                      Profile
completely new staff, implementing a realistic, comprehensive         Development
approach to achieving the goal allowed the project to succeed        ServicesOffered
without deviating substantially from the established schedule                Results
or budget.
I was consistently responsible for all of these green-field
projects from the development and project phase through to            Previous page
the time at which the facilities could be operated at the                 Nextpage
intended performance level.                                                  Home
                                                                           Question


                                                                            Contact
Motivation                                                                 (3)



There is a perfect solution……….
                                                                                                                Teaser
In this manner, I was sequentially given responsibility for a                                                    Vision
group of up to 11 companies (see below) in total, located in                                                   Mission
Western and Central Europe, as well as in Latin America and                                                  Paradigm
the Asia-Pacific region, which in 2006 confirmed their                                                      Motivation
outstanding positioning and performance as industry standard                                                     Profile
through a number of leading management consultant firms. >                                               Development
The product portfolio and footprint were continually optimized                                          ServicesOffered
so that eventually the group essentially concentrated on the                                                    Results
manufacturing of high-performance engine blocks and cylinder
heads from the light weight material of aluminum.
                                                                                                         Previous page
I would now like to offer the insights gained from my extensive
international experience to the entire industry worldwide, as                                                Nextpage
an independent management consultant.                                                                           Home
                                                                                                              Question


                                                                                                               Contact

Bielsko-Biala/Poland, Charlottenberg/Sweden, Dillingen/Germany, Györ/Hungary,    Leeds/Great Britain,
Linz/Austria, Most/Czech Republic, Nanjing/China, Saltillo/Mexico, Wernigerode/Germany, Ziar/Slovakia
Motivation                                     (4)



There is a perfect solution……….
                                                                           Teaser
I willingly bring to the table my ability – developed during the            Vision
course of my involvement in the global and internationalized              Mission
automotive supply industry – to reliably evaluate the                   Paradigm
performance potential of companies operating in very                   Motivation
different, even contradictory environments.                                 Profile

For over a decade during my career, I frequently had the            Development
opportunity to accompany companies in Western and Central          ServicesOffered
Europe, Asia and Latin America over the course of their very               Results
successful growth – often as supervisory board chair.
The efficiency of mature business processes is particularly
                                                                    Previous page
apparent in corporate governance, since only then corporate
governance is able to ensure clear and decisive assessment of           Nextpage
a company’s current business situation without bias and allow              Home
for the evaluation of proposed corrective counter measures.“             Question
                                                                             Print
(Herbert Smetan)
                                                                          Contact
Profile                                                                              (1)



    visionary plot– structured implementation
                                                                                                                         Teaser
                                                                                                                          Vision
                                                                                                                        Mission
                                                                                                                      Paradigm
                                                                                                                     Motivation
                                                                                                                          Profile
                                                                                                                  Development
                                                                                                                 ServicesOffered
                                                                                                                         Results

Boeing 767-Flight-Simulator at the Lufthansa-Trainings-Centre at Frankfurt Rhein-Main- Airport   on 14.04.2007



    „During almost four decades in the aluminum foundry industry                                                  Previous page
    I have repeatedly taken responsibility for pioneering projects                                                    Nextpage
    for first-class car components, which within the industry never                                                      Home
    failed to attracted a high degree of attention.“                                                                   Question

    (Herbert Smetan)
                                                                                                                        Contact
Profile                                       (2)



visionary plot– structured implementation
                                                                          Teaser
These include noteworthy technical innovations as well as                  Vision
important large-scale investments both in Germany and                    Mission
abroad, for which I was also responsible during their initial          Paradigm
operative phases.                                                     Motivation
                                                                           Profile
I was able to fundamentally contribute to the character of the
Aluminium Foundry Industry through this work.                      Development
                                                                  ServicesOffered
The decisive factor was that all these projects without                   Results
exception were realized within set budget constraints and also
achieved all project goals. These goals included precise
adherence to the business plan, as well as the punctual release
                                                                   Previous page
of a qualitatively and quantitatively irreproachable product.
                                                                       Nextpage
I consider these the foundations of reliable and professional             Home
work, or better, of ‘Right and Good Management.’                        Question


                                                                         Contact
Profile                                       (3)



visionary plot– structured implementation
                                                                         Teaser
Wherever progress is made, where new territory is to be                   Vision
entered, people are subject to risks that can be managed with           Mission
the right methodology, and thus made calculable.                      Paradigm
                                                                     Motivation
It has always been particularly important to me, and has
                                                                          Profile
fundamentally become part of my understanding, to develop
the requisite methodology systematically, and to continually      Development
refine it.                                                       ServicesOffered
                                                                         Results
This is because, for me, leaving the result of a project to
chance is not an alternative.
Neither is reluctance to enter new territory, since it is only    Previous page
beyond the horizon of the known that long-term success lies           Nextpage
hidden.                                                                  Home
For me, the manufacturing process lies at the centre of this           Question
structured manner of working.
                                                                        Contact
Profile                                       (4)



visionary plot– structured implementation
                                                                          Teaser
It is of equally high importance to me to develop a hypothesis             Vision
concerning the functional character of each manufacturing                Mission
process, and to confirm or reject it with the variation in             Paradigm
parameters and to validate it before I further stabilize the          Motivation
process by limiting the variance and continue attempts to                  Profile
improve it.                                                        Development
Without a reliable understanding of the actual functional         ServicesOffered
model, every Six Sigma strategy is condemned to ineffectuality!           Results

Wherever we are concerned with professionals in their field,
we develop trust in these individuals and cultivate the feeling
                                                                   Previous page
that we can rely on them, and not the feeling that we are at
their mercy.                                                           Nextpage
                                                                          Home
It is of prime importance to me to prove to everyone that their         Question
trust in my work is well-placed, in both personal and business
contexts.
                                                                         Contact
Profile                                      (5)



visionary plot– structured implementation
                                                                        Teaser
The same professional approach is also important when it is a            Vision
question of permanently maintaining and improving high-                Mission
performance manufacturing facilities.                                Paradigm
                                                                    Motivation
In the hands of corporate governance, continuous status
                                                                         Profile
information becomes an efficient navigation system when
based on a system of meaningful Key Performance Indicators .     Development
                                                                ServicesOffered
Should it become necessary to close, restructure or divest              Results
companies or divisions, dealing with matters professionally
creates trust for people with realistic views.
At the end, wherever we go, however we do, whatever we           Previous page
change we have to take the people with us.                           Nextpage

The only constant in our world is change, without which there           Home
would be no progress.                                                 Question


                                                                       Contact
(Herbert Smetan)
Profile                                        (6)



visionary plot– structured implementation
                                                                           Teaser
“Well-managed organizations can be recognized in that their                 Vision
decisions are always made at the lowest possible hierarchical             Mission
level in the organization, and are based on reliable information        Paradigm
and appropriate business processes.”                                   Motivation
                                                                            Profile
(Viable System Model)
                                                                    Development
“In poorly managed organizations, the boss always makes the        ServicesOffered
decisions – which do not appear to be motivated by any kind of             Results
logic!”
(wide-spread employee opinion)
                                                                    Previous page
“A company’s work-safety performance is the best early
                                                                        Nextpage
indicator for the acceptance of management within a company.
                                                                           Home
If one assumes that this consensus fundamentally determines              Question
employee motivation, then this index becomes one of the                      Print
most important management instruments.”                                   Contact
(Herbert Smetan)
Profile                                       (1)



personal back-ground
                                                                          Teaser
                                                                           Vision
                                                                         Mission
                                                                       Paradigm
                                                                      Motivation
                                                                           Profile
                                                                   Development
                                                                  ServicesOffered
                                                                          Results
                                                                              CV
Hobbies: „By jogging and bicycle touring I train to improve my
stamina. During extended hill walks I marvel at what               Previous page
motivation is able to activate reserves. And when occasionally         Nextpage
playing golf I feel humbled.                                              Home
In my younger days I learned during challenging offshore                Question
sailing cruises, that it is only oneself who sets ones limits.”
                                                                         Contact
(Herbert Smetan)
Profile                                        (2)



personal back-ground
                                                                             Teaser
                                                                              Vision
                                                                            Mission
                                                                          Paradigm
                                                                         Motivation
                                                                              Profile
                                                                      Development
                                                                     ServicesOffered
                                                                             Results
                                                                                 CV
Mode of working: “Based upon my experience in medium-sized
industry I feel at home in this environment. And I know to strike     Previous page
the right note, which most of the time guarantees its effect. Thus        Nextpage
my working method is not always perceived enjoyable.                         Home
But the person for me is the pivot and focus of a corporation and          Question
his trust is paramount!”                                                       Print
                                                                            Contact
(Herbert Smetan)
Career                                        (1)



holistic thinking – focused acting
                                                                          Teaser
                                                                           Vision
                                                                         Mission
                                                                       Paradigm
                                                                      Motivation
                                                                           Profile
                                                                   Development
                                                                  ServicesOffered
                                                                          Results
                                                                   intabular form
                                                                       education
                                                                   Previous page
„ Though I was originally compelled to study physics, I later
                                                                       Nextpage
discovered my more pragmatic interests and decided to study
engineering sciences. Having been trained as a molder in an art           Home
and metal foundry, casting and materials were the obvious               Question
choice for me when it came time to specialize.”
                                                                         Contact
(Herbert Smetan)
Career                                         (2)



holistic thinking – focused acting
                                                                           Teaser
“In addition to my enthusiasm for free shaping (acquired as a               Vision
molder working with artistic castings), after completing my               Mission
studies it was my fascination in Aluminum as a light weight
                                                                        Paradigm
construction material that moved me to explore the
                                                                       Motivation
possibilities of this combination.
                                                                            Profile
Applied research at a leading company in this market segment        Development
was the next logical step, though I first acquired some            ServicesOffered
exceptional leadership experience at an iron foundry.                      Results
Unfortunately at this time research centers in the so-called        intabular form
‘ivory tower’ were not very well respected in the real world –          education
that is, in operations.                                             Previous page

For this reason, after a few years I decided to re-enter the            Nextpage
‘lion’s den’.                                                              Home
                                                                         Question
This was one of the most productive phases of my career, as I
began to test in the real world all the knowledge I had acquired
                                                                          Contact
in the ‘ivory tower’.
Career                                           (3)



holistic thinking – focused acting
                                                                             Teaser
Most of my inventions soon came to be seen as real
                                                                              Vision
innovations.
                                                                            Mission
When I walk through foundries today, I am excited to witness              Paradigm
practices that originated from my own initiative in those early          Motivation
years:                                                                        Profile
Degassing of molten Aluminum by means of inert gases,                 Development
gassing liquid metals by means of Hydrogen-Nitrogen-gas-             ServicesOffered
mixtures, grain refinement and permanent modification                        Results
directly in foundry operations by means of master-alloys.             intabular form
                                                                          education
Electronic pressure control in low-pressure casting facilities.
                                                                      Previous page
And, last but not least, the most recent initiative for the use of        Nextpage
inorganic binders in the aluminum casting industry.
                                                                             Home
It was above all these successes as I made the switch from                 Question
research to manufacturing that pushed me to look for even
greater challenges.                                                         Contact
Career                                        (4)



holistic thinking – focused acting
                                                                          Teaser
It was quite opportune when a client for cast light metal
                                                                           Vision
wheels decided to cast these wheels in his own foundry in
France and to use the counter pressure casting process that              Mission
was invented in Bulgaria.                                              Paradigm
                                                                      Motivation
It should be noted that this was in 1980, when Eastern Europe              Profile
was still closed behind the Iron Curtain and the import of any
                                                                   Development
technology to this country was adversely affected by various
                                                                  ServicesOffered
embargos imposed by the United States.
                                                                          Results
Yet the most serious problems were solved step by step and         intabular form
the first successful counter pressure foundry eventually began         education
operations outside of the Eastern Block.                           Previous page
After this success the idea aroused of creating forging quality        Nextpage
from the “first heat” by means of this innovative new casting             Home
process.                                                                Question


                                                                         Contact
Career                                        (5)



holistic thinking – focused acting
                                                                          Teaser
As is seldom the case, the industry was apparently not ready               Vision
for such advancements as chassis components cast in                      Mission
aluminum, and it is only now – some 25 years later – that this
                                                                       Paradigm
idea has begun to re-establish itself.
                                                                      Motivation
For me these successes were the starting point for more                    Profile
demanding leadership challenges at the level of top                Development
management.                                                       ServicesOffered
Here too it was my creativity in combination with my                      Results
extremely structured manner of working that helped me at the       intabular form
young age of 36 to convince an entrenched, traditional                 education
company to undergo massive change and thus to create the           Previous page
decisive basis for this company’s turn-around.                         Nextpage
For me the years of this turn-around were crucial in firming up           Home
my conviction of the importance of the individual and of his or         Question
her contribution to overall success.
                                                                         Contact
Career                                           (6)



holistic thinking – focused acting
                                                                              Teaser
At that time I received the offer of becoming the person in                    Vision
charge of the most innovative (and at the same time the most                 Mission
riskiest) investment project in the European Aluminum Casting
                                                                           Paradigm
Industry – the construction of a factory for the production of
                                                                          Motivation
engine blocks and cylinder heads made of aluminum by the
means of the core package process that until then had only                     Profile
been used for low-volume production.                                   Development
                                                                      ServicesOffered
I began the project in 1991, after the fall of the Iron Curtain, by           Results
looking for the right location. Subsequently a new factory was
                                                                       intabular form
built in a new location (Dillingen/D) where a new, innovative              Education
product was to be produced by means of a new, half-baked
casting method and with a new, completely inexperienced                Previous page
work-force.                                                                Nextpage
                                                                              Home
More skeptic people than me called this the perfect                         Question
description of a total disaster.
And yet somehow my structured process focus that had                         Contact
previously proved so dependable allowed me to perfectly
master this complex challenge as well!
Career                                       (7)



holistic thinking – focused acting
                                                                        Teaser
As a result I was placed in charge of a group of companies,              Vision
where I was now repeatedly confronted with the task of                 Mission
handling additional green-field investments, all of which I
                                                                     Paradigm
successfully concluded and was able to leverage for healthy
                                                                    Motivation
company growth.
                                                                         Profile
In total I was awarded responsibility of a group of up to 11     Development
companies; their internationally outstanding and even leading   ServicesOffered
positioning and performance was attested by well-known,                 Results
independent consulting firms in 2006 in the course of the
                                                                 intabular form
divestment of this business unit.                                    Education
The product portfolio and footprint were continually improved    Previous page
so that the group came to focus primarily on the                     Nextpage
manufacturing of engine blocks and cylinder heads at the                Home
leading edge of performance cast of the light weight                  Question
construction material aluminum.
                                                                       Contact
Career                                             (8)



holistic thinking – focused acting
                                                                                Teaser
In the process of this focused restructuring, additional state of the            Vision
art capacity had to be created continually, thus setting the                   Mission
standard for the industry. In addition, outdated operations had
                                                                             Paradigm
either to be closed or fully modernized.
                                                                            Motivation
These measures included restructuring of the entire product                      Profile
portfolio in the direction of high-quality and high-performance          Development
components. Finally, thanks to the combination of outstanding           ServicesOffered
production and carefully coordinated market segmentation, Hydro                 Results
Aluminum’s Castings Business emerged as the industry leader.
                                                                         intabular form
Hence products which were not under the price-pressure of                    education
commodities could be acquired. Dependable product quality                Previous page
made it possible to provide stable, inter-continental delivery to            Nextpage
the global automobile industry and so led to scale effects in the               Home
group’s cost structure.                                                       Question
Crucial for this success were the consensus within management
regarding a targeted strategy and the market presence that was                 Contact
completely unique.
Career                                          (9)



holistic thinking – focused acting
                                                                            Teaser
Nevertheless, in a global, inter-cultural setting it is important            Vision
not only to create consensus at the management level, but                  Mission
also to integrate motivated employees into the process as well.
                                                                         Paradigm
As an engineer one quickly acquires the reputation of a                 Motivation
technocrat, perhaps because it is a common trait of our                      Profile
profession always to expect an appropriate reaction to any           Development
impulse, like a ball that always moves in the same direction        ServicesOffered
when struck. I have often attempted to improve the                          Results
performance of companies by means of ambitious goals. Of
                                                                     intabular form
course company staff and leadership are only able to achieve             education
these goals if the individuals involved see themselves as a
unified group.                                                       Previous page
                                                                         Nextpage
Once I was able to create the right group dynamics by                       Home
evaluating the company culture and the behavior of individuals            Question
in the group, teams almost always achieved these ambitious
goals thanks to their motivated work.
                                                                           Contact
Career                                        (10)



holistic thinking – focused acting
                                                                          Teaser
Yet these goals should be defined by those in the group who                Vision
are to make significant contributions.                                   Mission
Goals defined together are perceived far differently by                Paradigm
employees. I attribute this very clear shift to a phenomenon          Motivation
known as ‘alignment.’ The accuracy of forecasts as well as the             Profile
commitment to fulfill these forecasts increased considerably.      Development
And the synergies created lead to extraordinary economic          ServicesOffered
results. From my point of view the “buy-in” of employees to all           Results
essential measures is always worth having, even if it takes        intabular form
some time to obtain it.                                                education
                                                                   Previous page
In fact all of my success is a result of having been able to
generate enthusiasm among my employees for my goals.                   Nextpage
                                                                          Home
Let us do so together.”                                                 Question
                                                                            Print
                                                                         Contact
(Herbert Smetan)
Portfolio of services
problem solving – decisions correctly taken
                                                                             Teaser
                             Our Portfolio of Services:                      Vision
                                                                           Mission
                                Detect Opportunities                      Paradigm
                                Develop Strategies                      Motivation
                                Capture Potentials
                                                                             Profile
                                Initiate Change
                                                                      Development
                                Create Sustainability
                                                                    ServicesOffered

                             As your advisors we will not                   Results
                                                                 CoreCompetencies
                             only hand-over our final
                                                                CooperationPartners
                             report but develop together
                             with your team the right and             Previous page
                             suitable concept. Together                  Nextpage
                             with your team we will as well                 Home
                             support the execution of the
                                                                          Question
                             related action-plan until the
                             targeted result will be reliably
                             and sustainably achieved.                     Contact
Portfolio of services
    problem solving – decisions correctly taken
                                                                                                  Teaser
                                                                                                  Vision
           from our perspective the significant improvement of value chains is                  Mission
                                                only feasible in teams of highly               Paradigm
                        create sustainability       qualified, motivated people              Motivation
Smetan Engineering




                                                                                                  Profile
                                                        who are simultaneously
                                                                                           Development
                                                          in mutual consensus.           ServicesOffered

                                                           The implementation                    Results
                                                                                      CoreCompetencies
                          implementation                   competency related        CooperationPartners
                                -
                                                            requires experience            Previous page
                            competency
                                                                                              Nextpage
                                                            with motley teams,
Co-operation Partner




                                                                                                 Home
                                                            interdisciplinary, for             Question
                            capture potentials           the most part without
                                                                                                Contact
                                                      any hierarchical structure
                             initiate change
                                                 known from real organizations”
Portfolio of services                           (1)



problem solving – decisions correctly taken
                                                                                Teaser
  detect opportunities                                                          Vision
     Analysis of the positioning in the market, market                        Mission
     segmentation and competitive landscape                                  Paradigm
     Analysis of the positioning in technology of products, of             Motivation
     processes und of manufacturing                                             Profile
     Analysis of the Foot-Print and the Product-Portfolio                Development
     Analysis of financial performance and realistic improvement       ServicesOffered
     potentials
                                                                               Results
   develop strategies                                               CoreCompetencies
     Systematic Workshops to develop mid-term- and long-term       CooperationPartners
     strategy ‘fit for future ?/!’
                                                                         Previous page
     Develop Road-Map towards sustainable financial
     improvements                                                           Nextpage

     Master-Plan for fundamental changes in Foot-Print and                     Home
     Product-Portfolio                                                       Question
     Mutual identification of growth potentials and exit
     opportunities                                                            Contact
Portfolio of services                             (2)



problem solving – decisions correctly taken
                                                                                    Teaser
  capture potentials                                                                Vision

     Re-Engineering of existing manufacturing lines and value                     Mission
     chains                                                                      Paradigm
     engineering and erection of new manufacturing lines in                    Motivation
     ‚State-of-the-Art‘-technology                                                  Profile
     Introduction of new products on the basis of existing core
     competencies                                                            Development
     Development of new markets within the existing product                ServicesOffered
     portfolio                                                                     Results
                                                                        CoreCompetencies
  initiate change                                                      CooperationPartners
     create acceptance for change within management and
     employees                                                               Previous page
     development of a mutually supported company vision                         Nextpage
     Initiate consensus regarding the nature of necessary changes                  Home
     Redesign of the organization structure on the basis of existing             Question
     competencies
     Acceptance of deficits
                                                                                  Contact
     Definition of a human resources development program
     according the company’s needs
Portfolio of services                              (3)



problem solving – decisions correctly taken
                                                                                   Teaser
  Create sustainability                                                            Vision
                                                                                 Mission
     Consolidation of the product-, process- and material-portfolio
                                                                                Paradigm
     Significant improvement and stabilization of manufacturing               Motivation
     processes in use                                                              Profile
                                                                            Development
     Optimization and completion of the existing equipment
                                                                          ServicesOffered
     Re-Engineering of the value chain                                            Results
                                                                       CoreCompetencies
     Introduction of reliable business processes                      CooperationPartners
     Introduction of a meaningful set of Key Performance Indicators         Previous page
     and a related Bench-Marking-System                                        Nextpage
     (operational & financial)
                                                                                  Home
     Consolidation of the Foot-Print considering market and cost                Question
     optimization requirements                                                      Print
                                                                                 Contact
      Smetan Engineering - Network          Co-operation partner
Core Competencies                              (1)



complex systems – the approach distinguishes
                                                                  Teaser
                                                                  Vision
                                                                Mission
                                                               Paradigm
                                                             Motivation
                                                                  Profile
                                                           Development
                                                         ServicesOffered
                                                                 Results
                                                      CoreCompetencies
                                                     CooperationPartners

                                                           Previous page
                                                              Nextpage
                                                                 Home
                                                               Question


„At the end it is always the person who matters!                Contact
Especially when it comes to consulting!“
(Herbert Smetan)
Core Competencies                            (2)



complex systems – the approach distinguishes
                                                                              Teaser
  25 years as Managing Director in different companies                        Vision
                                                                            Mission
  12 years success as Senior Vice President of a Business Unit
                                                                           Paradigm
  12 years success in Corporate Governance                               Motivation
   6 successful Green-Field-Investments                                       Profile

  Responsible execution of Turnarounds                                 Development
                                                                     ServicesOffered
  Responsible execution of plant closures and relocations
                                                                             Results
  Market Leadership with Business Unit Castings                   CoreCompetencies
  of Hydro Aluminium Automotive                                  CooperationPartners

  Insider des Aluminium Casting Business                               Previous page
                                                                          Nextpage
  Expert of Aluminium Casting Technology
                                                                             Home
  Expert in Manufacturing Systems                                          Question
  Expert in Marketing and Sales
                                                                            Contact
Core Competencies                                (3)



complex systems – the approach distinguishes
                                                                                  Teaser
„I regard it as my personal strengths, to go to the bottom of                     Vision
problems by using a structured and systematic approach in                       Mission
order to create robust and sustainable solutions. By now, some                 Paradigm
of these have already changed the yardstick of the global                    Motivation
Aluminium Casting Industry.                                                       Profile
Despite of all this I usually stay pragmatic which is quite                Development
evident in the light of the numerous projects I have                     ServicesOffered
successfully managed to establish.                                               Results
                                                                      CoreCompetencies
Naturally I prefer to create New. But quite often facts and
                                                                     CooperationPartners
figures are evidence of the needs to consolidate existing first as
a precondition of further healthy growth.                                  Previous page
                                                                              Nextpage
Despite the habit that I rely on facts and figures, I am not a
                                                                                 Home
technocrat.
                                                                               Question
I see the development and the change of the people in the
enterprise as the most important task of companies which will                   Contact
be coping with the markets and the industry successfully.
Core Competencies                              (4)



complex systems – the approach distinguishes
                                                                                Teaser
                                                                                Vision
                                                                              Mission
                                                                             Paradigm
                                                                           Motivation
                                                                                Profile
                                                                         Development
                                                                       ServicesOffered
                                                                               Results
                                                                    CoreCompetencies
                                                                   CooperationPartners
According to one of the theorems of cybernetics the complexity
of a system (company) has to be larger than the one of its               Previous page
environment (market or industry) to exist in it successfully.               Nextpage
                                                                               Home
Until today, at least for the time being, the responsible and
                                                                             Question
competent person is needed who's creativity is determined by the
small but crucial element of being always better than the                        Print
competitors in the relevant market.”                                          Contact

(Herbert Smetan)
Co-operation Partners
our partners….
                                                                                  Teaser
   Malik                Management Zentrum Sankt Gallen/CH                        Vision
                        www.malik-mzsg.ch
                                                                                Mission
   CPO                  Management Consultants Mainz/D
                        www.cpo-mainz.com                                      Paradigm
   MFB                  Manage Future Business Wiesbaden/D                   Motivation
                        www.mfbresultants.com                                     Profile
   Knight Wendling      Foundry Engineering Düsseldorf/D                   Development
                        www.knightwendling.de
                                                                         ServicesOffered
   IQube                Consulting Group Sankt Gallen/CH                         Results
                        www.iqube-group.com
                                                                      CoreCompetencies
   KIEFABER             MANAGEMENT-SYSTEMS Kirkel/D                  CooperationPartners
                        www.kiefaber.info
                                                                           Previous page
   Fill                 Machinery- and Production Lines Gurten/A
                        www.fill.co.at                                        Nextpage
   Becker GmbH          CAD-CAM-CAST Steffenberg-Quotshausen/D                   Home
                        www.beckerccc.com                                      Question
   Meissner AG          Tooling and Pattern Company Biedenkopf/D
                        www.meissner-ag.de
                                                                                Contact
   VIS/ual/ CON/tact/   Marketing-& Advertising Agency Differten/D
                        www.visual-contact.eu
Co-operation Partners
   ….and their task-specific integration
                                                                                            Teaser
                                                                                            Vision
                                                                                          Mission
                                                                                         Paradigm
                                                                                       Motivation
                                   ProcessCapability                                        Profile
                                                                                     Development
                                                                                   ServicesOffered
                                                                                           Results
                                 Product                                        CoreCompetencies
 Operational                                                                   CooperationPartners
 Effectiveness                                                                       Previous page
                                                                                        Nextpage
                                                                                           Home
                                                                                         Question


                                                                                          Contact

Economical success = f(specific market position x operational effectiveness)
Co-operation Partners
„together we move on“
                                                                                 Teaser
The topic-specific integration of a team of internal and external                Vision
experts ensures the most effective examination of your unique                  Mission
problem and represents by this the most reliable approach                     Paradigm
towards a certain and reliable solution.                                    Motivation
From our point of view the responsible consultant team has to                    Profile
act exclusively in the back-ground in order to compensate for             Development
temporary gaps in your organization to initiate and support the         ServicesOffered
necessary change process, simultaneously with the goal to                       Results
qualify your people to close the gap which we will be creating       CoreCompetencies
when leaving again.                                                 CooperationPartners

The result of our consulting support (R) equals to the product            Previous page
of the quality of a solution (Q) and their acceptance by your                Nextpage
team (A):                                                                       Home

                           R=QxA                                              Question
                                                                                  Print
Our special approach ensures both through the active                           Contact
involvement of your team in the project work, outstanding
quality in combination with an unreserved acceptance.
Results                                      (1)



…..and what I have managed to accomplish so far
                                                                       Teaser
                                                                        Vision
                                                                      Mission
                                                                    Paradigm
                                                                   Motivation
                                                                        Profile
                                                                Development
                                                               ServicesOffered
                                                                       Results


  1975 Fundamental scientific work regarding intermetallic
       bonds between iron and aluminium materials               Previous page
  1976 Fundamental scientific work regarding castability of         Nextpage
       the alloy AlSi17Cu4NiTi in the case of complex engine           Home
       blocks using the Low Pressure Casting Process                 Question
  1980 Development of different high-quality automotive
       components in aluminium on Green-Sand-Molding-                 Contact
       Lines
Results                                     (2)



…..and what I have managed to accomplish so far
                                                                      Teaser
  1980 Introduction of the Counter Pressure Casting Process            Vision
  1983 for the mass-production of cast aluminium wheels in           Mission
       cross-spoke-design in co-operation with                     Paradigm
       „Technology of Metals“ Sofia/ Bulgaria (Publication)       Motivation
                                                                       Profile
  1983 Further development of the Counter Pressure Process
                                                               Development
  1986 to produce high-quality chassis components for
                                                              ServicesOffered
       passenger cars in aluminium forging alloys in co-
                                                                      Results
       operation with Maschinenfabrik Müller-Weingarten
       (Publication)

  1986 Restructuring of the company Kloth Senking              Previous page
  1991 Metallgießerei GmbH with its divisions                      Nextpage
       Aluminium-Sand-, -Die- and - HPD- Casting as well              Home
       as Magnesium-Sand Casting and Zink-HPD-Casting               Question
  1989 Post Merger Integration of the company after the
  1990 acquisition by Thyssen Guss AG from Salzgitter AG             Contact
Results                                      (3)



…..and what I have managed to accomplish so far
                                                                          Teaser
  1991 Engineering and construction of an Aluminium Foundry                Vision
  1995 for Engine Blocks and Cylinder Heads in                           Mission
       Dillingen/Germany according the Core-Package-Process            Paradigm
       in co-operation with Knight Wendling Foundry                   Motivation
       Engineering and +GF+ Foundry Equipment division                     Profile
       including Product- and Process-Development, site-
                                                                   Development
       selection and permissions (Publication)
                                                                  ServicesOffered
  1995 Management of the plan, launching of the foundry and               Results
  1998 doubling of installed capacity.
       Acquisition of further products.
                                                                   Previous page
  1997 Construction and launch of a SPM-foundry for Cylinder           Nextpage
       Heads in Györ/Hungary                                              Home
                                                                        Question
  1998    Engineering, construction and launch of a SPM-foundry
         for Cylinder Heads in Saltillo/Mexico
                                                                         Contact
Results                                     (4)



…..and what I have managed to accomplish so far
                                                                          Teaser
  1999 Closure of the first SPM-foundry in Leeds/UK                        Vision
  1999 Introduction of new and standardized Business                     Mission
       Processes at VAW and the Business Unit Castings                 Paradigm
  2000 Restructuring of a SPM-foundry in Linz/Austria                 Motivation
                                                                           Profile
  2001 Engineering, construction and launch of a Core-Package-
       foundry for Engine Blocks in Saltillo/Mexico                Development
                                                                  ServicesOffered
  2001 Restructuring of the organization of VAW Aluminium AG
                                                                          Results
       towards divisional structure.
  2002 Closure of the second SPM-foundry in Leeds/UK and
       relocation of production to Györ/Hungary
                                                                   Previous page
  2002 Project Manager of Post Merger Integration Process              Nextpage
       after the acquisition of VAW by Norsk Hydro ASA Oslo
                                                                          Home
       for the Automotive Division
                                                                        Question
  2002 Syntegration Work-shop „Fit for Future“ for the Business
       Unit Castings in co-operation with Management
                                                                         Contact
       Zentrum Sankt Gallen which marks the turning point
       towards sustainable economical success of BU Castings
Results                                      (5)



…..and what I have managed to accomplish so far
                                                                         Teaser
  2003   Engineering, construction an launch of a second Core-            Vision
         Package-foundry for V-Engine Blocks in                         Mission
         Dillingen/Germany (Publication)                              Paradigm
  2003 Evaluation of Company Culture and 360°-Feedbacks of           Motivation
       the management levels in co-operation with CPO                     Profile
       Management Consultants Mainz marks the turning             Development
       point in the Company Culture in the Business Unit         ServicesOffered
       Castings                                                          Results

  2004 Restructuring of the organization of the BU Castings
       towards a Cluster-Structure according the Viable
       System Model in co-operation with Management               Previous page
       Zentrum Sankt Gallen                                           Nextpage
                                                                         Home
  2007 Project Manager in the Post Merger Integration Process
                                                                       Question
       after the acquisition of BU Castings by Nemak S.A. for
       Europe and Asia/Pacific.
                                                                        Contact
Results                                       (6)



…..and what I have managed to accomplish so far
                                                                              Teaser
  2007    Evaluation of Company Culture and 360°-Feedbacks of                  Vision
         the management levels for a problem plant in co-                    Mission
         operation with CPO Management Consultants Mainz                   Paradigm
                                                                          Motivation
  2007 Customer Perceived Value Evaluation - world-wide-
                                                                               Profile
       in co-operation with
       Management Zentrum Sankt Gallen                                 Development
                                                                      ServicesOffered
  2008 Syntegration-workshop „Fit for Future“ for a problem                   Results
       plant in co-operation with
       Management Zentrum Sankt Gallen
  2008 Cultural Shift Program with THT (Trompenaars-Hampden-Turner)    Previous page
       for the global ‚New Nemak‘ Integration, targeting cultural          Nextpage
       reconciliation of the multinational group.                             Home
                                                                            Question
  2009    Foundation of the own Consultant Company
                                                                                Print
         SMETAN engineering GmbH with focus towards an
                                                                             Contact
         integrated approach towards the manufacturing
         industry (Publications)
Contact data

                                                                                 Teaser
SMETAN engineering GmbH                                                           Vision

                      (in the process of foundation)                            Mission
                                                                              Paradigm
               Auf der Hardt         34
                                                                             Motivation
D-66780        Rehlingen - Siersburg
                                                                                  Profile
Phone:         +49(0)6835/607242                                          Development
                                                                         ServicesOffered
Mobile:        +49(0)172 /6803945
                                                                                 Results
Fax:           +49(0)6835/607241

e-Mail:        info@Smetan-Engineering.com
                                                                          Previous page
Web-Page:      www.Smetan-Engineering.com
                                                                                 Home
                                                                               Question
Managing Director:                    Dipl.-Ing. Herbert Smetan                    Print
Chairman of the Supervisory Board:    Dr. Dieter Braun                          Contact
Associated Partners:                  Herbert Smetan, Hannes Hundegger
Back-Up-Information
Profile
personal back-ground
                                                                   Teaser
in     1950   born in Germany /District of Goeppingen               Vision
                                                                  Mission
from   1956   Elementary Scholl                                 Paradigm
to     1964   in the District of Goeppingen
                                                               Motivation
from   1964   Apprenticeship as a moulder for                       Profile
 to    1967   bronze art sculptures                         Development
              at Art- and Bronze Foundry                   ServicesOffered
              Ernst Strassacker KG in Süssen                       Results
              District of Goeppingen
from   1967    Technical College
 to    1968   (University Entrance Qualification)           Previous page
              at Vocational Scholl in Goeppingen                Nextpage

from   1968   Studies at the faculty of Foundry- and               Home
to     1971   Material Science at the Polytechnikum in           Question
              Friedberg/Hessia                                       Print
              (Graduate Engineer for Foundry Technology)          Contact
Profile                                    (1)



reliable Knowledge – generated by experience
                                                                     Teaser
                                                                      Vision
from 1971   Bopp & Reuther GmbH in Mannheim                         Mission
to   1973   Head of Core Shop and Shell-Mould Foundry             Paradigm
                                                                 Motivation
                                                                      Profile
from 1973   MAHLE GmbH in Stuttgart - Bad Cannstatt
                                                              Development
to   1978   Scientist in the
                                                             ServicesOffered
            Research- and Development Department Stuttgart
                                                                     Results
from 1978   Department Manager
to   1979   in the Low Pressure Foundry Markgröningen
                                                              Previous page
from 1979   +Georg Fischer+ GmbH in Mettmann                      Nextpage
to   1980   Project Manager for Process Development                  Home
            of high-quality Aluminium Castings                     Question
            on Green-Sand Molding-Lines
                                                                    Contact
Profile                                     (2)



reliable Knowledge – generated by experience
                                                                          Teaser
                                                                           Vision
from 1980   Compagnie Europeene                                          Mission
to   1983   de Techniques de Fonderie SA                               Paradigm

            in Soultzmatt / Haute Rhin (France)                       Motivation
                                                                           Profile
            Director of the Aluminium Wheel Foundry
                                                                   Development
                                                                  ServicesOffered
from 1983   ALUTEAM                                                       Results
 to  1986   Form- und Schmiedetechnik GmbH in Duren
            Department Manager for Product- and Process
            Development for Aluminium - Castings- and -Forgings    Previous page
                                                                       Nextpage
from 1986   Kloth-Senking Metallgießerei GmbH                             Home
to   1991   in Hildesheim                                               Question
            Managing Director (Technique and Sales)
                                                                         Contact
Profile                                               (3)



reliable Knowledge – generated by experience
                                                                           Teaser
                                                                            Vision
from 1991    VAW alucast GmbH in Dillingen / Saar                         Mission
to   1997    Chairman of the joint Management Board                     Paradigm

             (formerly EB-Präzisionsguss GmbH / founded 1992 )         Motivation
                                                                            Profile
                                                                    Development
since 1998   VAW motor GmbH in Bonn
                                                                   ServicesOffered
             Managing Director of the Holding                              Results
             of the Engine Casting Division

since 2000   VAW automotive products in Bonn                        Previous page
             Senior Vice President of Business Unit Castings            Nextpage
             Sole responsibility for the Engine Casting Division           Home
                                                                         Question


                                                                          Contact
Profile                                                (4)



reliable Knowledge – generated by experience
                                                                                         Teaser
                                                                                          Vision
since 2002   Hydro Aluminium Automotive in Köln                                         Mission
             Senior Vice President der Business Unit Castings                         Paradigm

             Sole responsibility for the Casting Division                            Motivation
                                                                                          Profile
             (after acquisition of VAW aluminium AG by Norsk Hydro ASA Norway)
                                                                                  Development
                                                                                 ServicesOffered
from 2007    Nemak Europe GmbH in Frankfurt                                              Results
to   2009    Chief Executive Officer of
             European and Asian/Pacific Operations
             (after acquisition of Hydro Aluminium Castings by Nemak S.A.         Previous page
                                                      Monterrey/Mexico)               Nextpage
                                                                                         Home
                                                                                       Question
                                                                                           Print
                                                                                        Contact
Profile                                 (1)



new perspectives – through further education
                                                                   Teaser
1976 IT-Systems and Technology       VHS                            Vision
     Accounting / Controlling        MAHLE                        Mission
     Value Analysis / Value Design   MAHLE                      Paradigm
                                                               Motivation
                                                                    Profile
1976 Problem Solving Methodology     MAHLE
                                                            Development
     Economics                       MAHLE
                                                           ServicesOffered
     Meetings and Discussions        MAHLE                         Results


1977 Alloying with Grey Cast Iron     VDG
     Statistical Method              Technische Akademie    Previous page
     Jurisprudence for engineers      MAHLE                     Nextpage
                                                                   Home
                                                                 Question
1980 Economically Operating Plants   REFA
                                                                  Contact
1984 Sales Psychology                F&A
Profile                                      (2)



new perspectives – through further education
                                                                         Teaser
1987 Management Training Level 1          F&A                             Vision
                                                                        Mission
1988    Logistics-Workshop                Prof. Wildemann             Paradigm
       Logistics and Productivity         Technische Akademie        Motivation
                                                                          Profile
1989 Management Training Level 2          F&A                     Development
                                                                 ServicesOffered

1993 Lean Management / Kaizen             Kaizen-Institut                Results


1995 Advanced Business English            Berlitz
                                                                  Previous page
                                                                      Nextpage
1996 Negotiating in English               Lufthansa Consulting
                                                                         Home
     Française intermédiaire d’affaires   Berlitz                      Question

1997 Harvard Negotiation Techniques       European Business             Contact
                                          School
Profile                                                (3)



new perspectives – through further education
                                                                               Teaser
1998 Top Executive Seminar                          MZSG St. Gallen             Vision
                                                                              Mission
1999 VIAG International                             IMD Lausanne
     Management Seminar                                                     Paradigm
                                                                           Motivation
2001 Open Syntegration Workshop                     MZSG St. Gallen             Profile
2003 Viable System Model                            MZSG St. Gallen     Development
     complex organizations                                             ServicesOffered
                                                                               Results


Language Skills:      English, business fluent in written and spoken
                      French, business fluent in spoken,                Previous page
                      profound knowledge in written French                  Nextpage
                                                                               Home
                                                                             Question
from    1973       Diverse lectures and key notes on international               Print
until   today      congresses as well as diverse publications in the
                                                                              Contact
                   international special press media
                   in German, English and French
Success Story Hydro Aluminium BU Castings
EBIT on Capital Employed

  EBIT / CE 20
    (%)


           15



           10



            5



            0
                 A2003   A2004   A2005   E2006   P2007   P2008   P2009   P2010


           -5
Success Story Hydro Aluminium BU Castings
EBIT DA versus Cash-Flow
                                                         20%
                                                                     EBITDA [%]
Hydro Business Unit Castings                                                                                       Hydro Castings
                                                                                                                    Hydro Castings

vs. key competitors                                      18%

and other big auto suppliers:
                                                                                                                                              Continental
Cash Flow and EBITDA                                     16%

[2004; 2005]                                             14%                                                                         Tomkins
                                                                                                   Progress    Kolbenschmidt

Hydro‘s cash-flow is low                                                                                           BorgWarner        Shiloh
                                                         12%                                   Bosch
compared to key suppliers;
however, big differences                                                                                      Valeo
                                                         10%                           ZF
between Business Units                                                                             Wagon
                                         American Axle                                             Magna      Tenneco
                                                                                       GKN
                                                         8%
                                                                                   Federal Mogul
                                                                                       Dana
                                                         6%
                                                                                             ArvinMeritor
                                                                     Sumitomo
                                                         4%

                                                                                                                                     Cash Flow [%]

    -8%          -6%            -4%           -2%              0%            2%               4%              6%           8%            10%                12%



      Note: w/o magnesium, cash flow = EBITDA - CAPEX           Source: AlixPartners
Success Story Hydro Aluminium BU Castings
Key Performance Indicators
 2 yr. revenue CAGR, 2005                         EBITDA [% rev.], 2005                             Cash Flow [% rev.], 2005

                                                              Castings 19,1%


                                    15,5%
                                                                                                                               11,4%

             Castings 12,3%                                                          14,5%
                                                                                                               Castings 9,2%
                                                                      9,1%

                                                                                                                      5,6%


                                                      5,0%
                     2,7%


     -2,8%



                                                                                                       -1,7%
 Bottom 25%        Average        Top 25%          Bottom 25% Average                Top 25%        Bottom 25% Average         Top 25%

 World                                                   World                                             World



Note: w/o magnesium, cash flow = EBITDA - CAPEX   Source: Hydro Automotive, AlixPartners database      <

Smetan Engineering Company Presentation English

  • 2.
    Management & ConsultingServices Aus einem Guss – The Perfect Cast welcome herzlich willkommen
  • 3.
    Management & ConsultingServices Results count – Experience matters Teaser 25 Years of track record as Managing Director in different companies in the Automotive Industry Vision Mission 12 Years of track record for leading a global group of up to 11 companies world-wide Paradigm 12 Years of track record for Corporate Governance Motivation in international organizations Profile 6 successful Green-Field-Investments Development Responsible execution of turnarounds ServicesOffered Responsible execution of plant-closures Results Market-Leadership with Hydro Aluminum’s Business Unit Castings Nextpage Insider of the Aluminum Casting Market Expert in Aluminum Casting Technology Contact Expert in Manufacturing Systems Expert in Marketing and Sales
  • 4.
    Management & ConsultingServices Results count – Experience matters Teaser Complex tasks to which SMETAN engineering can provide a Vision Mission valuable contribution include: Paradigm Motivation Consolidating the Footprint and the Product Portfolio Profile Continuous Improvement and Re-Engineering of Development Manufacturing Processes and Value Chains ServicesOffered Step-Change Projects in Product and Process Development Results Major Capital Expenditure, in particular Green-Field investments Previous page New Start-Ups and Program Launches of significance Nextpage Restructuring of Companies and Divisions Home Divestment of Subsidiaries and Divisions Question Closure and Relocation of Subsidiaries or Departments Contact
  • 5.
    Management & ConsultingServices Results count – Experience matters Teaser “During my time as a manager in the automotive supply Vision industry I was constantly striving to confer such demanding and Mission complex tasks on outstanding executives with many years of Paradigm professional experience, who were removed from the daily Motivation routine as far as possible. Profile Due to their well established professional competence and Development leadership skills these managers always succeeded in ServicesOffered orientating all internal and external participants, who formed Results part in the tasks in a very efficient and, at the same time, target-oriented way, and in so doing discover risks in such a timely manner so that appropriate measures could take effect. Previous page Their understanding of reality, taken from their personal track Nextpage record, in most cases succeeded upon mere wishful thinking Home Question By means of this structured split of day-to-day business from project work, the whole organization gained considerably Contact dynamics and efficiency!
  • 6.
    Management & ConsultingServices Results count – Experience matters Teaser But, similar to a mountain guide for instance, these managers Vision had to walk certain routes several times themselves, before Mission they could safely guide others on these routes. Paradigm Motivation It is especially their self-confidence, which creates trust in an Profile undertaking and stabilizes teams. Development It is especially in critical paths that a special level of ServicesOffered professionalism and persistence is required, which can only Results emerge from one’s own personal experience. The professional leaves nothing to chance, rather he knows when to use ‚an additional clamp‘, before risking a ‚fall on a Previous page long rope‘.” Nextpage Home Question (Herbert Smetan) Contact
  • 7.
    Management & ConsultingServices Results count – Experience matters Teaser Vision For me, it is of course beyond any doubt that Mission you and your team are perfectly capable of Paradigm providing such professional competence Motivation and leadership skills to your personnel. Profile If you have appropriate time so to do! Development If not, please call me or send a note! ServicesOffered I will surely help you! Results You can count on it! Promised! Previous page Nextpage Print Yours sincerely Contact Herbert Smetan
  • 8.
    Vision the holistic approachtowards operational management... Teaser Vision Mission Paradigm Motivation Profile Development ServicesOffered Results „My vision is the outstanding product that sets the industry Previous page standard – in terms of design, characteristics, price and Nextpage reliability – and which offers the client competitive advantages, Home thus improving his market position.“ Question (Herbert Smetan) Contact
  • 9.
    Mission ….creating sustainable costleadership …. Teaser Vision Mission Paradigm Motivation Profile Development ServicesOffered Results “My mission is to manufacture this product using robust Previous page processes within a balanced production chain, which is based Nextpage on well designed, highly reliable equipment and capable Home tooling and by this creating sustainable cost leadership.” Question (Herbert Smetan) Contact
  • 10.
    Mission ….creating sustainable costleadership …. Teaser Daring to pursue solutions that redefine the industry standard Vision with optimum resource usage becomes possible if one is not Mission intimidated by confronting the complexity of the task and, with Paradigm foresight, has solutions available to apply to the areas in which Motivation latent risks may become manifest. Profile Manufacturing processes that are validated with a realistic Development attitude, in combination with reliable hardware solutions and a ServicesOffered fine-tuned material flow, make it possible to secure the long- Results term success of this approach by means of the ‘continuous improvement’ methodology. Previous page The consensus between management and employees is the ultimate requirement for the group dynamic necessary for the Nextpage sustainable successful company! Home Question (Herbert Smetan) Contact
  • 11.
    “simply be better” ….through highly efficient value chains Teaser Vision Mission Paradigm Motivation Profile ProcessCapability Development ServicesOffered Quality Results Reward- System Product Operational Effectiveness Previous page Nextpage Home Question Contact ...the complexity of which is resulting from a multitude of diverse interactions
  • 12.
    “simply be better” (1) ….through highly efficient value chains Teaser „ Successful companies focus on the production process, since Vision profit isn’t generated through accounting! Mission Paradigm Only optimally fine-tuned manufacturing sets the standard for Motivation quality, costs and product availability – and by this also Profile represents the precondition for the successful positioning of a company in globalized competition! Development ServicesOffered Companies focused on continuous development of their Results market share, as well as the expansion of their target market, would do well to disregard discussions regarding hidden defects in their products. Previous page The product quality is determined exclusively by Nextpage manufacturing, not by inspection. Home Products that are flawless with regard to the specification can Question only be produced in consistently validated processes. Contact
  • 13.
    “simply be better” (2) ….through highly efficient value chains Teaser Further, high-performance processes only result in a consistent Vision production flow in reliable and well-tuned production facilities Mission in which ongoing client demand can be met without significant Paradigm warehousing of products while employing exemplary labour, Motivation equipment and resource efficiency. Profile Appropriate business processes ensure as well operating cost Development management in company administration. This includes ServicesOffered management systems for quality assurance, work safety and Results environmental protection. Only in the product, that is in the process of formation, do the Previous page capabilities of human, machine, tool, process and material flow come together to demonstrate the suitability of the solution Nextpage chosen. Home Question The fulcrum and linchpin for sustainable success of a production concept lies particularly in the robustness of the Contact chosen production process.
  • 14.
    “simply be better” (3) ….through highly efficient value chains Teaser This is why a firm hold on reality is relevant for the whole Vision system during the validation phase of the later production Mission process and set-up. Paradigm Motivation Mistakes in this step of any program can usually only be Profile compensated by dealing with symptoms, since the time and financial means for correcting the root-causes are often lacking Development in later phases of a project. ServicesOffered Results Consequently, the Project Management Systems in leading companies assume the defensive function of ensuring the prevention of economic effects resulting from unexpected Previous page launching issues. Nextpage The same applies to the reliability of the hardware used. While Home purchase decisions regarding private acquisitions are Question increasingly based on the many available performance comparisons, the selection of production facilities and Contact resources is less frequently based on such a fundamental analysis.
  • 15.
    “simply be better” (4) ….through highly efficient value chains Teaser In this connection, quality defects and hardware malfunctions Vision as well as their interactions are clearly the main reasons for Mission the instability of a generally unsatisfactory and cost-intensive Paradigm production concept. Motivation Profile If the production chain is not reliably coordinated, then energy efficient process layouts become a mere farce and production Development itself becomes a game of the dice. ServicesOffered Results In the end, the people involved hold everything together. This is why the entire production process in all its complexity must be manageable and comprehensible, able to be taught Previous page and learned. Nextpage The consensus between management and employees should Home serve to support the necessary curiosity. Question Print Because only by constructively managing mistakes are we able Contact to discover new and better ways of doing things. (Herbert Smetan)
  • 16.
    “simply be better” (5) “and a pure hypothetical example….” Teaser 15 Vision 14 advantage Mission costs costs 13 12 11 15 Paradigm 10 9 14 8 12 13 Motivation 11 7 9 10 Profile 6 8 5 7 Development 6 4 ServicesOffered 5 3 4 3 2 Results 1 1 2 value added value added “Let us start for a virtual plant tour in your company and follow the material flow of one of your mainstay of sales. Doing so we Previous page incorporate every single production step into a chart, which shows Nextpage costs above added value. The “red lines” herein form those costs, Home which do not lead to any added value at all. In impulse one thinks, Question that this does not exist in your company, and we state that your Print stocks are of full of these and that your fork-lift trucks do not carry Contact anything else around for most of the time. And then reflect for a while and allow the thought for a moment that the right hand chart could be that of one of your competitors.”
  • 17.
    Motivation (1) There is a perfect solution………. Teaser Vision Mission Paradigm Motivation Profile Development ServicesOffered Results …….and together we will find it Previous page “I have always been looking for the new and I have always Nextpage been questioning critically the established. But both, entering ‘virgin territory’ as well as changing the status quo does not Home only demand the courage to take risks, but also that sort of Question acting responsible, which allows the risk to become controllable.” Contact (Herbert Smetan)
  • 18.
    Motivation (2) There is a perfect solution………. Teaser “These experiences allowed me to recognize early on that Vision every realisable task can be achieved with the help of a Mission professional, systematic approach. Paradigm Even in the case of green-field projects at a new site, in which a Motivation new product was to be produced using a new process, with Profile completely new staff, implementing a realistic, comprehensive Development approach to achieving the goal allowed the project to succeed ServicesOffered without deviating substantially from the established schedule Results or budget. I was consistently responsible for all of these green-field projects from the development and project phase through to Previous page the time at which the facilities could be operated at the Nextpage intended performance level. Home Question Contact
  • 19.
    Motivation (3) There is a perfect solution………. Teaser In this manner, I was sequentially given responsibility for a Vision group of up to 11 companies (see below) in total, located in Mission Western and Central Europe, as well as in Latin America and Paradigm the Asia-Pacific region, which in 2006 confirmed their Motivation outstanding positioning and performance as industry standard Profile through a number of leading management consultant firms. > Development The product portfolio and footprint were continually optimized ServicesOffered so that eventually the group essentially concentrated on the Results manufacturing of high-performance engine blocks and cylinder heads from the light weight material of aluminum. Previous page I would now like to offer the insights gained from my extensive international experience to the entire industry worldwide, as Nextpage an independent management consultant. Home Question Contact Bielsko-Biala/Poland, Charlottenberg/Sweden, Dillingen/Germany, Györ/Hungary, Leeds/Great Britain, Linz/Austria, Most/Czech Republic, Nanjing/China, Saltillo/Mexico, Wernigerode/Germany, Ziar/Slovakia
  • 20.
    Motivation (4) There is a perfect solution………. Teaser I willingly bring to the table my ability – developed during the Vision course of my involvement in the global and internationalized Mission automotive supply industry – to reliably evaluate the Paradigm performance potential of companies operating in very Motivation different, even contradictory environments. Profile For over a decade during my career, I frequently had the Development opportunity to accompany companies in Western and Central ServicesOffered Europe, Asia and Latin America over the course of their very Results successful growth – often as supervisory board chair. The efficiency of mature business processes is particularly Previous page apparent in corporate governance, since only then corporate governance is able to ensure clear and decisive assessment of Nextpage a company’s current business situation without bias and allow Home for the evaluation of proposed corrective counter measures.“ Question Print (Herbert Smetan) Contact
  • 21.
    Profile (1) visionary plot– structured implementation Teaser Vision Mission Paradigm Motivation Profile Development ServicesOffered Results Boeing 767-Flight-Simulator at the Lufthansa-Trainings-Centre at Frankfurt Rhein-Main- Airport on 14.04.2007 „During almost four decades in the aluminum foundry industry Previous page I have repeatedly taken responsibility for pioneering projects Nextpage for first-class car components, which within the industry never Home failed to attracted a high degree of attention.“ Question (Herbert Smetan) Contact
  • 22.
    Profile (2) visionary plot– structured implementation Teaser These include noteworthy technical innovations as well as Vision important large-scale investments both in Germany and Mission abroad, for which I was also responsible during their initial Paradigm operative phases. Motivation Profile I was able to fundamentally contribute to the character of the Aluminium Foundry Industry through this work. Development ServicesOffered The decisive factor was that all these projects without Results exception were realized within set budget constraints and also achieved all project goals. These goals included precise adherence to the business plan, as well as the punctual release Previous page of a qualitatively and quantitatively irreproachable product. Nextpage I consider these the foundations of reliable and professional Home work, or better, of ‘Right and Good Management.’ Question Contact
  • 23.
    Profile (3) visionary plot– structured implementation Teaser Wherever progress is made, where new territory is to be Vision entered, people are subject to risks that can be managed with Mission the right methodology, and thus made calculable. Paradigm Motivation It has always been particularly important to me, and has Profile fundamentally become part of my understanding, to develop the requisite methodology systematically, and to continually Development refine it. ServicesOffered Results This is because, for me, leaving the result of a project to chance is not an alternative. Neither is reluctance to enter new territory, since it is only Previous page beyond the horizon of the known that long-term success lies Nextpage hidden. Home For me, the manufacturing process lies at the centre of this Question structured manner of working. Contact
  • 24.
    Profile (4) visionary plot– structured implementation Teaser It is of equally high importance to me to develop a hypothesis Vision concerning the functional character of each manufacturing Mission process, and to confirm or reject it with the variation in Paradigm parameters and to validate it before I further stabilize the Motivation process by limiting the variance and continue attempts to Profile improve it. Development Without a reliable understanding of the actual functional ServicesOffered model, every Six Sigma strategy is condemned to ineffectuality! Results Wherever we are concerned with professionals in their field, we develop trust in these individuals and cultivate the feeling Previous page that we can rely on them, and not the feeling that we are at their mercy. Nextpage Home It is of prime importance to me to prove to everyone that their Question trust in my work is well-placed, in both personal and business contexts. Contact
  • 25.
    Profile (5) visionary plot– structured implementation Teaser The same professional approach is also important when it is a Vision question of permanently maintaining and improving high- Mission performance manufacturing facilities. Paradigm Motivation In the hands of corporate governance, continuous status Profile information becomes an efficient navigation system when based on a system of meaningful Key Performance Indicators . Development ServicesOffered Should it become necessary to close, restructure or divest Results companies or divisions, dealing with matters professionally creates trust for people with realistic views. At the end, wherever we go, however we do, whatever we Previous page change we have to take the people with us. Nextpage The only constant in our world is change, without which there Home would be no progress. Question Contact (Herbert Smetan)
  • 26.
    Profile (6) visionary plot– structured implementation Teaser “Well-managed organizations can be recognized in that their Vision decisions are always made at the lowest possible hierarchical Mission level in the organization, and are based on reliable information Paradigm and appropriate business processes.” Motivation Profile (Viable System Model) Development “In poorly managed organizations, the boss always makes the ServicesOffered decisions – which do not appear to be motivated by any kind of Results logic!” (wide-spread employee opinion) Previous page “A company’s work-safety performance is the best early Nextpage indicator for the acceptance of management within a company. Home If one assumes that this consensus fundamentally determines Question employee motivation, then this index becomes one of the Print most important management instruments.” Contact (Herbert Smetan)
  • 27.
    Profile (1) personal back-ground Teaser Vision Mission Paradigm Motivation Profile Development ServicesOffered Results CV Hobbies: „By jogging and bicycle touring I train to improve my stamina. During extended hill walks I marvel at what Previous page motivation is able to activate reserves. And when occasionally Nextpage playing golf I feel humbled. Home In my younger days I learned during challenging offshore Question sailing cruises, that it is only oneself who sets ones limits.” Contact (Herbert Smetan)
  • 28.
    Profile (2) personal back-ground Teaser Vision Mission Paradigm Motivation Profile Development ServicesOffered Results CV Mode of working: “Based upon my experience in medium-sized industry I feel at home in this environment. And I know to strike Previous page the right note, which most of the time guarantees its effect. Thus Nextpage my working method is not always perceived enjoyable. Home But the person for me is the pivot and focus of a corporation and Question his trust is paramount!” Print Contact (Herbert Smetan)
  • 29.
    Career (1) holistic thinking – focused acting Teaser Vision Mission Paradigm Motivation Profile Development ServicesOffered Results intabular form education Previous page „ Though I was originally compelled to study physics, I later Nextpage discovered my more pragmatic interests and decided to study engineering sciences. Having been trained as a molder in an art Home and metal foundry, casting and materials were the obvious Question choice for me when it came time to specialize.” Contact (Herbert Smetan)
  • 30.
    Career (2) holistic thinking – focused acting Teaser “In addition to my enthusiasm for free shaping (acquired as a Vision molder working with artistic castings), after completing my Mission studies it was my fascination in Aluminum as a light weight Paradigm construction material that moved me to explore the Motivation possibilities of this combination. Profile Applied research at a leading company in this market segment Development was the next logical step, though I first acquired some ServicesOffered exceptional leadership experience at an iron foundry. Results Unfortunately at this time research centers in the so-called intabular form ‘ivory tower’ were not very well respected in the real world – education that is, in operations. Previous page For this reason, after a few years I decided to re-enter the Nextpage ‘lion’s den’. Home Question This was one of the most productive phases of my career, as I began to test in the real world all the knowledge I had acquired Contact in the ‘ivory tower’.
  • 31.
    Career (3) holistic thinking – focused acting Teaser Most of my inventions soon came to be seen as real Vision innovations. Mission When I walk through foundries today, I am excited to witness Paradigm practices that originated from my own initiative in those early Motivation years: Profile Degassing of molten Aluminum by means of inert gases, Development gassing liquid metals by means of Hydrogen-Nitrogen-gas- ServicesOffered mixtures, grain refinement and permanent modification Results directly in foundry operations by means of master-alloys. intabular form education Electronic pressure control in low-pressure casting facilities. Previous page And, last but not least, the most recent initiative for the use of Nextpage inorganic binders in the aluminum casting industry. Home It was above all these successes as I made the switch from Question research to manufacturing that pushed me to look for even greater challenges. Contact
  • 32.
    Career (4) holistic thinking – focused acting Teaser It was quite opportune when a client for cast light metal Vision wheels decided to cast these wheels in his own foundry in France and to use the counter pressure casting process that Mission was invented in Bulgaria. Paradigm Motivation It should be noted that this was in 1980, when Eastern Europe Profile was still closed behind the Iron Curtain and the import of any Development technology to this country was adversely affected by various ServicesOffered embargos imposed by the United States. Results Yet the most serious problems were solved step by step and intabular form the first successful counter pressure foundry eventually began education operations outside of the Eastern Block. Previous page After this success the idea aroused of creating forging quality Nextpage from the “first heat” by means of this innovative new casting Home process. Question Contact
  • 33.
    Career (5) holistic thinking – focused acting Teaser As is seldom the case, the industry was apparently not ready Vision for such advancements as chassis components cast in Mission aluminum, and it is only now – some 25 years later – that this Paradigm idea has begun to re-establish itself. Motivation For me these successes were the starting point for more Profile demanding leadership challenges at the level of top Development management. ServicesOffered Here too it was my creativity in combination with my Results extremely structured manner of working that helped me at the intabular form young age of 36 to convince an entrenched, traditional education company to undergo massive change and thus to create the Previous page decisive basis for this company’s turn-around. Nextpage For me the years of this turn-around were crucial in firming up Home my conviction of the importance of the individual and of his or Question her contribution to overall success. Contact
  • 34.
    Career (6) holistic thinking – focused acting Teaser At that time I received the offer of becoming the person in Vision charge of the most innovative (and at the same time the most Mission riskiest) investment project in the European Aluminum Casting Paradigm Industry – the construction of a factory for the production of Motivation engine blocks and cylinder heads made of aluminum by the means of the core package process that until then had only Profile been used for low-volume production. Development ServicesOffered I began the project in 1991, after the fall of the Iron Curtain, by Results looking for the right location. Subsequently a new factory was intabular form built in a new location (Dillingen/D) where a new, innovative Education product was to be produced by means of a new, half-baked casting method and with a new, completely inexperienced Previous page work-force. Nextpage Home More skeptic people than me called this the perfect Question description of a total disaster. And yet somehow my structured process focus that had Contact previously proved so dependable allowed me to perfectly master this complex challenge as well!
  • 35.
    Career (7) holistic thinking – focused acting Teaser As a result I was placed in charge of a group of companies, Vision where I was now repeatedly confronted with the task of Mission handling additional green-field investments, all of which I Paradigm successfully concluded and was able to leverage for healthy Motivation company growth. Profile In total I was awarded responsibility of a group of up to 11 Development companies; their internationally outstanding and even leading ServicesOffered positioning and performance was attested by well-known, Results independent consulting firms in 2006 in the course of the intabular form divestment of this business unit. Education The product portfolio and footprint were continually improved Previous page so that the group came to focus primarily on the Nextpage manufacturing of engine blocks and cylinder heads at the Home leading edge of performance cast of the light weight Question construction material aluminum. Contact
  • 36.
    Career (8) holistic thinking – focused acting Teaser In the process of this focused restructuring, additional state of the Vision art capacity had to be created continually, thus setting the Mission standard for the industry. In addition, outdated operations had Paradigm either to be closed or fully modernized. Motivation These measures included restructuring of the entire product Profile portfolio in the direction of high-quality and high-performance Development components. Finally, thanks to the combination of outstanding ServicesOffered production and carefully coordinated market segmentation, Hydro Results Aluminum’s Castings Business emerged as the industry leader. intabular form Hence products which were not under the price-pressure of education commodities could be acquired. Dependable product quality Previous page made it possible to provide stable, inter-continental delivery to Nextpage the global automobile industry and so led to scale effects in the Home group’s cost structure. Question Crucial for this success were the consensus within management regarding a targeted strategy and the market presence that was Contact completely unique.
  • 37.
    Career (9) holistic thinking – focused acting Teaser Nevertheless, in a global, inter-cultural setting it is important Vision not only to create consensus at the management level, but Mission also to integrate motivated employees into the process as well. Paradigm As an engineer one quickly acquires the reputation of a Motivation technocrat, perhaps because it is a common trait of our Profile profession always to expect an appropriate reaction to any Development impulse, like a ball that always moves in the same direction ServicesOffered when struck. I have often attempted to improve the Results performance of companies by means of ambitious goals. Of intabular form course company staff and leadership are only able to achieve education these goals if the individuals involved see themselves as a unified group. Previous page Nextpage Once I was able to create the right group dynamics by Home evaluating the company culture and the behavior of individuals Question in the group, teams almost always achieved these ambitious goals thanks to their motivated work. Contact
  • 38.
    Career (10) holistic thinking – focused acting Teaser Yet these goals should be defined by those in the group who Vision are to make significant contributions. Mission Goals defined together are perceived far differently by Paradigm employees. I attribute this very clear shift to a phenomenon Motivation known as ‘alignment.’ The accuracy of forecasts as well as the Profile commitment to fulfill these forecasts increased considerably. Development And the synergies created lead to extraordinary economic ServicesOffered results. From my point of view the “buy-in” of employees to all Results essential measures is always worth having, even if it takes intabular form some time to obtain it. education Previous page In fact all of my success is a result of having been able to generate enthusiasm among my employees for my goals. Nextpage Home Let us do so together.” Question Print Contact (Herbert Smetan)
  • 39.
    Portfolio of services problemsolving – decisions correctly taken Teaser Our Portfolio of Services: Vision Mission Detect Opportunities Paradigm Develop Strategies Motivation Capture Potentials Profile Initiate Change Development Create Sustainability ServicesOffered As your advisors we will not Results CoreCompetencies only hand-over our final CooperationPartners report but develop together with your team the right and Previous page suitable concept. Together Nextpage with your team we will as well Home support the execution of the Question related action-plan until the targeted result will be reliably and sustainably achieved. Contact
  • 40.
    Portfolio of services problem solving – decisions correctly taken Teaser Vision from our perspective the significant improvement of value chains is Mission only feasible in teams of highly Paradigm create sustainability qualified, motivated people Motivation Smetan Engineering Profile who are simultaneously Development in mutual consensus. ServicesOffered The implementation Results CoreCompetencies implementation competency related CooperationPartners - requires experience Previous page competency Nextpage with motley teams, Co-operation Partner Home interdisciplinary, for Question capture potentials the most part without Contact any hierarchical structure initiate change known from real organizations”
  • 41.
    Portfolio of services (1) problem solving – decisions correctly taken Teaser detect opportunities Vision Analysis of the positioning in the market, market Mission segmentation and competitive landscape Paradigm Analysis of the positioning in technology of products, of Motivation processes und of manufacturing Profile Analysis of the Foot-Print and the Product-Portfolio Development Analysis of financial performance and realistic improvement ServicesOffered potentials Results develop strategies CoreCompetencies Systematic Workshops to develop mid-term- and long-term CooperationPartners strategy ‘fit for future ?/!’ Previous page Develop Road-Map towards sustainable financial improvements Nextpage Master-Plan for fundamental changes in Foot-Print and Home Product-Portfolio Question Mutual identification of growth potentials and exit opportunities Contact
  • 42.
    Portfolio of services (2) problem solving – decisions correctly taken Teaser capture potentials Vision Re-Engineering of existing manufacturing lines and value Mission chains Paradigm engineering and erection of new manufacturing lines in Motivation ‚State-of-the-Art‘-technology Profile Introduction of new products on the basis of existing core competencies Development Development of new markets within the existing product ServicesOffered portfolio Results CoreCompetencies initiate change CooperationPartners create acceptance for change within management and employees Previous page development of a mutually supported company vision Nextpage Initiate consensus regarding the nature of necessary changes Home Redesign of the organization structure on the basis of existing Question competencies Acceptance of deficits Contact Definition of a human resources development program according the company’s needs
  • 43.
    Portfolio of services (3) problem solving – decisions correctly taken Teaser Create sustainability Vision Mission Consolidation of the product-, process- and material-portfolio Paradigm Significant improvement and stabilization of manufacturing Motivation processes in use Profile Development Optimization and completion of the existing equipment ServicesOffered Re-Engineering of the value chain Results CoreCompetencies Introduction of reliable business processes CooperationPartners Introduction of a meaningful set of Key Performance Indicators Previous page and a related Bench-Marking-System Nextpage (operational & financial) Home Consolidation of the Foot-Print considering market and cost Question optimization requirements Print Contact Smetan Engineering - Network Co-operation partner
  • 44.
    Core Competencies (1) complex systems – the approach distinguishes Teaser Vision Mission Paradigm Motivation Profile Development ServicesOffered Results CoreCompetencies CooperationPartners Previous page Nextpage Home Question „At the end it is always the person who matters! Contact Especially when it comes to consulting!“ (Herbert Smetan)
  • 45.
    Core Competencies (2) complex systems – the approach distinguishes Teaser 25 years as Managing Director in different companies Vision Mission 12 years success as Senior Vice President of a Business Unit Paradigm 12 years success in Corporate Governance Motivation 6 successful Green-Field-Investments Profile Responsible execution of Turnarounds Development ServicesOffered Responsible execution of plant closures and relocations Results Market Leadership with Business Unit Castings CoreCompetencies of Hydro Aluminium Automotive CooperationPartners Insider des Aluminium Casting Business Previous page Nextpage Expert of Aluminium Casting Technology Home Expert in Manufacturing Systems Question Expert in Marketing and Sales Contact
  • 46.
    Core Competencies (3) complex systems – the approach distinguishes Teaser „I regard it as my personal strengths, to go to the bottom of Vision problems by using a structured and systematic approach in Mission order to create robust and sustainable solutions. By now, some Paradigm of these have already changed the yardstick of the global Motivation Aluminium Casting Industry. Profile Despite of all this I usually stay pragmatic which is quite Development evident in the light of the numerous projects I have ServicesOffered successfully managed to establish. Results CoreCompetencies Naturally I prefer to create New. But quite often facts and CooperationPartners figures are evidence of the needs to consolidate existing first as a precondition of further healthy growth. Previous page Nextpage Despite the habit that I rely on facts and figures, I am not a Home technocrat. Question I see the development and the change of the people in the enterprise as the most important task of companies which will Contact be coping with the markets and the industry successfully.
  • 47.
    Core Competencies (4) complex systems – the approach distinguishes Teaser Vision Mission Paradigm Motivation Profile Development ServicesOffered Results CoreCompetencies CooperationPartners According to one of the theorems of cybernetics the complexity of a system (company) has to be larger than the one of its Previous page environment (market or industry) to exist in it successfully. Nextpage Home Until today, at least for the time being, the responsible and Question competent person is needed who's creativity is determined by the small but crucial element of being always better than the Print competitors in the relevant market.” Contact (Herbert Smetan)
  • 48.
    Co-operation Partners our partners…. Teaser Malik Management Zentrum Sankt Gallen/CH Vision www.malik-mzsg.ch Mission CPO Management Consultants Mainz/D www.cpo-mainz.com Paradigm MFB Manage Future Business Wiesbaden/D Motivation www.mfbresultants.com Profile Knight Wendling Foundry Engineering Düsseldorf/D Development www.knightwendling.de ServicesOffered IQube Consulting Group Sankt Gallen/CH Results www.iqube-group.com CoreCompetencies KIEFABER MANAGEMENT-SYSTEMS Kirkel/D CooperationPartners www.kiefaber.info Previous page Fill Machinery- and Production Lines Gurten/A www.fill.co.at Nextpage Becker GmbH CAD-CAM-CAST Steffenberg-Quotshausen/D Home www.beckerccc.com Question Meissner AG Tooling and Pattern Company Biedenkopf/D www.meissner-ag.de Contact VIS/ual/ CON/tact/ Marketing-& Advertising Agency Differten/D www.visual-contact.eu
  • 49.
    Co-operation Partners ….and their task-specific integration Teaser Vision Mission Paradigm Motivation ProcessCapability Profile Development ServicesOffered Results Product CoreCompetencies Operational CooperationPartners Effectiveness Previous page Nextpage Home Question Contact Economical success = f(specific market position x operational effectiveness)
  • 50.
    Co-operation Partners „together wemove on“ Teaser The topic-specific integration of a team of internal and external Vision experts ensures the most effective examination of your unique Mission problem and represents by this the most reliable approach Paradigm towards a certain and reliable solution. Motivation From our point of view the responsible consultant team has to Profile act exclusively in the back-ground in order to compensate for Development temporary gaps in your organization to initiate and support the ServicesOffered necessary change process, simultaneously with the goal to Results qualify your people to close the gap which we will be creating CoreCompetencies when leaving again. CooperationPartners The result of our consulting support (R) equals to the product Previous page of the quality of a solution (Q) and their acceptance by your Nextpage team (A): Home R=QxA Question Print Our special approach ensures both through the active Contact involvement of your team in the project work, outstanding quality in combination with an unreserved acceptance.
  • 51.
    Results (1) …..and what I have managed to accomplish so far Teaser Vision Mission Paradigm Motivation Profile Development ServicesOffered Results 1975 Fundamental scientific work regarding intermetallic bonds between iron and aluminium materials Previous page 1976 Fundamental scientific work regarding castability of Nextpage the alloy AlSi17Cu4NiTi in the case of complex engine Home blocks using the Low Pressure Casting Process Question 1980 Development of different high-quality automotive components in aluminium on Green-Sand-Molding- Contact Lines
  • 52.
    Results (2) …..and what I have managed to accomplish so far Teaser 1980 Introduction of the Counter Pressure Casting Process Vision 1983 for the mass-production of cast aluminium wheels in Mission cross-spoke-design in co-operation with Paradigm „Technology of Metals“ Sofia/ Bulgaria (Publication) Motivation Profile 1983 Further development of the Counter Pressure Process Development 1986 to produce high-quality chassis components for ServicesOffered passenger cars in aluminium forging alloys in co- Results operation with Maschinenfabrik Müller-Weingarten (Publication) 1986 Restructuring of the company Kloth Senking Previous page 1991 Metallgießerei GmbH with its divisions Nextpage Aluminium-Sand-, -Die- and - HPD- Casting as well Home as Magnesium-Sand Casting and Zink-HPD-Casting Question 1989 Post Merger Integration of the company after the 1990 acquisition by Thyssen Guss AG from Salzgitter AG Contact
  • 53.
    Results (3) …..and what I have managed to accomplish so far Teaser 1991 Engineering and construction of an Aluminium Foundry Vision 1995 for Engine Blocks and Cylinder Heads in Mission Dillingen/Germany according the Core-Package-Process Paradigm in co-operation with Knight Wendling Foundry Motivation Engineering and +GF+ Foundry Equipment division Profile including Product- and Process-Development, site- Development selection and permissions (Publication) ServicesOffered 1995 Management of the plan, launching of the foundry and Results 1998 doubling of installed capacity. Acquisition of further products. Previous page 1997 Construction and launch of a SPM-foundry for Cylinder Nextpage Heads in Györ/Hungary Home Question 1998 Engineering, construction and launch of a SPM-foundry for Cylinder Heads in Saltillo/Mexico Contact
  • 54.
    Results (4) …..and what I have managed to accomplish so far Teaser 1999 Closure of the first SPM-foundry in Leeds/UK Vision 1999 Introduction of new and standardized Business Mission Processes at VAW and the Business Unit Castings Paradigm 2000 Restructuring of a SPM-foundry in Linz/Austria Motivation Profile 2001 Engineering, construction and launch of a Core-Package- foundry for Engine Blocks in Saltillo/Mexico Development ServicesOffered 2001 Restructuring of the organization of VAW Aluminium AG Results towards divisional structure. 2002 Closure of the second SPM-foundry in Leeds/UK and relocation of production to Györ/Hungary Previous page 2002 Project Manager of Post Merger Integration Process Nextpage after the acquisition of VAW by Norsk Hydro ASA Oslo Home for the Automotive Division Question 2002 Syntegration Work-shop „Fit for Future“ for the Business Unit Castings in co-operation with Management Contact Zentrum Sankt Gallen which marks the turning point towards sustainable economical success of BU Castings
  • 55.
    Results (5) …..and what I have managed to accomplish so far Teaser 2003 Engineering, construction an launch of a second Core- Vision Package-foundry for V-Engine Blocks in Mission Dillingen/Germany (Publication) Paradigm 2003 Evaluation of Company Culture and 360°-Feedbacks of Motivation the management levels in co-operation with CPO Profile Management Consultants Mainz marks the turning Development point in the Company Culture in the Business Unit ServicesOffered Castings Results 2004 Restructuring of the organization of the BU Castings towards a Cluster-Structure according the Viable System Model in co-operation with Management Previous page Zentrum Sankt Gallen Nextpage Home 2007 Project Manager in the Post Merger Integration Process Question after the acquisition of BU Castings by Nemak S.A. for Europe and Asia/Pacific. Contact
  • 56.
    Results (6) …..and what I have managed to accomplish so far Teaser 2007 Evaluation of Company Culture and 360°-Feedbacks of Vision the management levels for a problem plant in co- Mission operation with CPO Management Consultants Mainz Paradigm Motivation 2007 Customer Perceived Value Evaluation - world-wide- Profile in co-operation with Management Zentrum Sankt Gallen Development ServicesOffered 2008 Syntegration-workshop „Fit for Future“ for a problem Results plant in co-operation with Management Zentrum Sankt Gallen 2008 Cultural Shift Program with THT (Trompenaars-Hampden-Turner) Previous page for the global ‚New Nemak‘ Integration, targeting cultural Nextpage reconciliation of the multinational group. Home Question 2009 Foundation of the own Consultant Company Print SMETAN engineering GmbH with focus towards an Contact integrated approach towards the manufacturing industry (Publications)
  • 57.
    Contact data Teaser SMETAN engineering GmbH Vision (in the process of foundation) Mission Paradigm Auf der Hardt 34 Motivation D-66780 Rehlingen - Siersburg Profile Phone: +49(0)6835/607242 Development ServicesOffered Mobile: +49(0)172 /6803945 Results Fax: +49(0)6835/607241 e-Mail: info@Smetan-Engineering.com Previous page Web-Page: www.Smetan-Engineering.com Home Question Managing Director: Dipl.-Ing. Herbert Smetan Print Chairman of the Supervisory Board: Dr. Dieter Braun Contact Associated Partners: Herbert Smetan, Hannes Hundegger
  • 58.
  • 59.
    Profile personal back-ground Teaser in 1950 born in Germany /District of Goeppingen Vision Mission from 1956 Elementary Scholl Paradigm to 1964 in the District of Goeppingen Motivation from 1964 Apprenticeship as a moulder for Profile to 1967 bronze art sculptures Development at Art- and Bronze Foundry ServicesOffered Ernst Strassacker KG in Süssen Results District of Goeppingen from 1967 Technical College to 1968 (University Entrance Qualification) Previous page at Vocational Scholl in Goeppingen Nextpage from 1968 Studies at the faculty of Foundry- and Home to 1971 Material Science at the Polytechnikum in Question Friedberg/Hessia Print (Graduate Engineer for Foundry Technology) Contact
  • 60.
    Profile (1) reliable Knowledge – generated by experience Teaser Vision from 1971 Bopp & Reuther GmbH in Mannheim Mission to 1973 Head of Core Shop and Shell-Mould Foundry Paradigm Motivation Profile from 1973 MAHLE GmbH in Stuttgart - Bad Cannstatt Development to 1978 Scientist in the ServicesOffered Research- and Development Department Stuttgart Results from 1978 Department Manager to 1979 in the Low Pressure Foundry Markgröningen Previous page from 1979 +Georg Fischer+ GmbH in Mettmann Nextpage to 1980 Project Manager for Process Development Home of high-quality Aluminium Castings Question on Green-Sand Molding-Lines Contact
  • 61.
    Profile (2) reliable Knowledge – generated by experience Teaser Vision from 1980 Compagnie Europeene Mission to 1983 de Techniques de Fonderie SA Paradigm in Soultzmatt / Haute Rhin (France) Motivation Profile Director of the Aluminium Wheel Foundry Development ServicesOffered from 1983 ALUTEAM Results to 1986 Form- und Schmiedetechnik GmbH in Duren Department Manager for Product- and Process Development for Aluminium - Castings- and -Forgings Previous page Nextpage from 1986 Kloth-Senking Metallgießerei GmbH Home to 1991 in Hildesheim Question Managing Director (Technique and Sales) Contact
  • 62.
    Profile (3) reliable Knowledge – generated by experience Teaser Vision from 1991 VAW alucast GmbH in Dillingen / Saar Mission to 1997 Chairman of the joint Management Board Paradigm (formerly EB-Präzisionsguss GmbH / founded 1992 ) Motivation Profile Development since 1998 VAW motor GmbH in Bonn ServicesOffered Managing Director of the Holding Results of the Engine Casting Division since 2000 VAW automotive products in Bonn Previous page Senior Vice President of Business Unit Castings Nextpage Sole responsibility for the Engine Casting Division Home Question Contact
  • 63.
    Profile (4) reliable Knowledge – generated by experience Teaser Vision since 2002 Hydro Aluminium Automotive in Köln Mission Senior Vice President der Business Unit Castings Paradigm Sole responsibility for the Casting Division Motivation Profile (after acquisition of VAW aluminium AG by Norsk Hydro ASA Norway) Development ServicesOffered from 2007 Nemak Europe GmbH in Frankfurt Results to 2009 Chief Executive Officer of European and Asian/Pacific Operations (after acquisition of Hydro Aluminium Castings by Nemak S.A. Previous page Monterrey/Mexico) Nextpage Home Question Print Contact
  • 64.
    Profile (1) new perspectives – through further education Teaser 1976 IT-Systems and Technology VHS Vision Accounting / Controlling MAHLE Mission Value Analysis / Value Design MAHLE Paradigm Motivation Profile 1976 Problem Solving Methodology MAHLE Development Economics MAHLE ServicesOffered Meetings and Discussions MAHLE Results 1977 Alloying with Grey Cast Iron VDG Statistical Method Technische Akademie Previous page Jurisprudence for engineers MAHLE Nextpage Home Question 1980 Economically Operating Plants REFA Contact 1984 Sales Psychology F&A
  • 65.
    Profile (2) new perspectives – through further education Teaser 1987 Management Training Level 1 F&A Vision Mission 1988 Logistics-Workshop Prof. Wildemann Paradigm Logistics and Productivity Technische Akademie Motivation Profile 1989 Management Training Level 2 F&A Development ServicesOffered 1993 Lean Management / Kaizen Kaizen-Institut Results 1995 Advanced Business English Berlitz Previous page Nextpage 1996 Negotiating in English Lufthansa Consulting Home Française intermédiaire d’affaires Berlitz Question 1997 Harvard Negotiation Techniques European Business Contact School
  • 66.
    Profile (3) new perspectives – through further education Teaser 1998 Top Executive Seminar MZSG St. Gallen Vision Mission 1999 VIAG International IMD Lausanne Management Seminar Paradigm Motivation 2001 Open Syntegration Workshop MZSG St. Gallen Profile 2003 Viable System Model MZSG St. Gallen Development complex organizations ServicesOffered Results Language Skills: English, business fluent in written and spoken French, business fluent in spoken, Previous page profound knowledge in written French Nextpage Home Question from 1973 Diverse lectures and key notes on international Print until today congresses as well as diverse publications in the Contact international special press media in German, English and French
  • 67.
    Success Story HydroAluminium BU Castings EBIT on Capital Employed EBIT / CE 20 (%) 15 10 5 0 A2003 A2004 A2005 E2006 P2007 P2008 P2009 P2010 -5
  • 68.
    Success Story HydroAluminium BU Castings EBIT DA versus Cash-Flow 20% EBITDA [%] Hydro Business Unit Castings Hydro Castings Hydro Castings vs. key competitors 18% and other big auto suppliers: Continental Cash Flow and EBITDA 16% [2004; 2005] 14% Tomkins Progress Kolbenschmidt Hydro‘s cash-flow is low BorgWarner Shiloh 12% Bosch compared to key suppliers; however, big differences Valeo 10% ZF between Business Units Wagon American Axle Magna Tenneco GKN 8% Federal Mogul Dana 6% ArvinMeritor Sumitomo 4% Cash Flow [%] -8% -6% -4% -2% 0% 2% 4% 6% 8% 10% 12% Note: w/o magnesium, cash flow = EBITDA - CAPEX Source: AlixPartners
  • 69.
    Success Story HydroAluminium BU Castings Key Performance Indicators 2 yr. revenue CAGR, 2005 EBITDA [% rev.], 2005 Cash Flow [% rev.], 2005 Castings 19,1% 15,5% 11,4% Castings 12,3% 14,5% Castings 9,2% 9,1% 5,6% 5,0% 2,7% -2,8% -1,7% Bottom 25% Average Top 25% Bottom 25% Average Top 25% Bottom 25% Average Top 25% World World World Note: w/o magnesium, cash flow = EBITDA - CAPEX Source: Hydro Automotive, AlixPartners database <