SlideShare a Scribd company logo
SLUM FREE CITY
SLUM FREE CITY
B H U J
Pilot and Preparation
BHUJ MUNICIPALITY
Old Nagarpalika
New Nagarpalika
BHADA Boundary
Bhuj Slums
Bhuj Slums
• 70% slum populations resident for more than 20
70% slum populations resident for more than 20
years; 5% less than 5 years.
• Average size of house plots is 60 80 sqm
• Average size of house plots is 60‐80 sqm
• Average incomes is Rs 3‐6500/‐
• Well serviced with electricity (100%), water supply
(80%), aanganwadi’s (70%)
Goals
Goals
• To create a slum free model in Bhuj for small
To create a slum free model in Bhuj for small
towns (less than 5 lacs population) for the State
and the Country
and the Country.
This category constitutes 50 % of the urban population of
which 4 lac families live in slums of Gujarat.
j
Small town slums constitute local homogeneous
groups,(as against migrant labor), that often pre‐date the
growth of kasbas into Municipal towns.
Land management (Bapadayalu nagar)
Land management (Bapadayalu nagar)
0%
Total Developped
land with
government
28%
Land require to
build 288 Housing
48%
0%
0%
28%
Less New
infrastructure
15%
0%
0%
0%
0%
0%
Less Existing
Dproad and pond
9%
0%
0%
0%
LAND AT CITY LEVEL
Slums can be settled on 3% land and
Slums can be settled on 3% land and
release 99 ha for other purpose.
Settlements
Total Area
settlements
No. of
Slum
Existing
Slum Area
Slum
Percentage
inSQ. MTR
No. of
Slum
Household
Land
Requirement Percentage
Land
Release
Settlements settlements Slum Slum Area inSQ. MTR Household Requirement Percentage Release
Area 1 15,63,773 121,417 1.37 % 80 9,636 0.62 % 11,781
Area 2 47,44,554 24 5,42,021 11.42 % 2,1982,63,736 5.56 % 2,78,285
, , , , , , , , ,
Area 3 1,33,05,375 12 7,00,651 5.27 % 4,7235,66,808 4.26 % 1,33,843
Area 4 1,61,94,295 5 1,06,617 0.66 % 696 83,556 0.52 % 23,061
Area 5 89,25,228 7 3,47,066 3.89 % 1,6742,00,904 2.25 % 1,46,162
Area 6 45,00,666 26 7,76,467 17.25 % 3,1223,74,616 8.32 % 4,01,851
Total 4,92,33,890 75 24,94,239 5.07 % 12,494 14,99,256 3.05 % 9,94,983
Objectives
Objectives
• One – Implement a pilot project in four slumsof
One Implement a pilot project in four slumsof
314 homes including Infrastructure and Public
spaces in five months
spaces in five months.
• Two – Develop the institutional capacities of
Nagarpalika and other agencies of Bhuj town
Nagarpalika and other agencies of Bhuj town
towards Slum free city to be achieved in 3‐5 years.
This will demonstrate implementation with speed and quality;
and a participatory approach for such towns.
Land distribution and cost of spare land
Area of Publics Green
Land for sale
Commercia
Land distribution and cost of spare land
Name of Area settlements Housing paces Roads spaces l land free
Bhimrao Nagar 5000 2420 373 1143 660 412
Ramdev Nagar 22390 7120 2150 5150 2350 2850 2770
Rawalwadi (devipujak) 24060 7110 1670 3290 4430 1660 5900
Bapadayalu(kolivas) 6962 2480 910 1000 600 200 1772
Total 58412 19130 5103 10583 8040 5122 10442
% of Area 32.8 8.7 18.1 13.8 8.8 17.9
Value of Land As per market Rates
Land Area Rate Value
Commercial 5122 10000 5,12,20,000
Residential 10442 5000 5,22,10,000
Total value 10,34,30,000
HOUSE DESING OPTION 1
HOUSE DESING OPTION 2
STREET VIEWS
CLUSTER
DETAIL ESTIMATE OF PROPOSED PILOT PROJECT UNDER RAJIV AWAS YOJNA
SLUM IMPROVEMENT PLAN ‐ BHUJ (KUTCH)
SUMMARY OF COST
S D i i f I A (i L )
Sr.no. Description of Item Amount (in Lacs)
1 Cost of 293 Dus at Bhuj ‐ Kutch
Cost of 37 Dwelling Units at Bhimrao Nagar ₹ 172.29
Cost of 109 Dus Dwelling Units at Juni Ravalwadi ₹ 507.56
Cost of 38 Dwelling Units at Kolivas Bapadayalu Nagar ₹ 176 95
Cost of 38 Dwelling Units at Kolivas‐Bapadayalu Nagar ₹ 176.95
Cost of 109 Dwelling Units at Ramdev nagar ₹ 495.49
Sub total 1 ₹ 1,352.28
Built up Area pr DU 1 = 40.53 sq.mt.
Carpet Area pr DU 1 = 30.00 sq.mt.
Built up Area pr DU 2 = 40.40 sq.mt.
Carpet Area pr DU 2 = 32.58 sq.mt.
2 Services
Water Supply Works ₹ 25.15
Sewerage System ₹ 32.99
3 Roads & Pathways ₹ 248.31
4 External Electrification Works 39.15
5 Cost of Demolition of Existing Structures & Carting it to the outer skirtes of the City ₹ 14.20
Sub total 2 ₹ 359.80
Cost of construction sub total (1+2) ₹ 1,712.08
6 O & M Charges @ 2% of Project Cost ₹ 34 24
6 O & M Charges @ 2% of Project Cost ₹ 34.24
7 Add Service Tax 4.05% ₹ 69.34
8 Detail Project Report Preparation, Management, Supervision & Quality Control @ 5% ₹ 85.60
Sub total 3 ₹ 189.18
Total Project cost ₹ 1,901.26
પ્રો કટ અમલીકરણ નું માળખું .
શહર િવકાસ અને શહર
શહર િવકાસ અન શહર
આવાસ િવભાગ .
ડી આઈ
રેવે ય ડી .આઈ
.એલ.આર.
રવ યુ
િવભાગ .
નગર પાિલકા ભુજ
ભાડા
હુ રશાળા
કે.એમ.વી.એસ.
િવ તાર ની પડ પ ી પુન: વસન
સિમિત .
Objective 2
Preparation for Slum free city Bhuj
Preparation for Slum‐free city, Bhuj
– Nagarpalika/Collector to set up Slum Rehab Steering
Committee chaired by MLA, Bhuj
– Set up ‘Slum Rehab Division’ in Bhuj
Nagarpalika/Collectorate with dedicated Officer on sp.
Nagarpalika/Collectorate with dedicated Officer on sp.
Duty. Set up Finance, Implementation and Monitoring cells
– Upgrade capacities of
BhADA to appro e micro plans
BhADA – to approve micro plans
Revenue/DILR – to approve and demark land for housing.
– Develop PPP with civil society organizations for technical,
i l d
social and management support to program
– Development of SOP’s for the program/Slum Rehab
Committees (SRC)/Beneficiary list
Methodology
Methodology
– Slum Rehab Committees (SRC) set up in each slum
Slum Rehab Committees (SRC) set up in each slum
will be the key Implementing Agency. They will
assist in :
• Finalization of beneficiary list
• Finalization of technical plan
• Selection of contractors
Selection of contractors
• Monitoring of construction
• Dispute resolution
Fi i l di l
• Financial dispersal to contractors
• Reporting to Slum Sabha
– Setu’s will be facilitation centers to assist the
Setu s will be facilitation centers to assist the
Nagarpalika’s Slum Rehab Division and the Slum Rehab
Committees implement the program.
– One Setu for every 500 homes
Each Setu with Social, Technical and Administrative Staff,
placed by KMVS, Hunnarshala and Nagarpalika
respectively.
Set s ill be managed b Abhi an (Set )
– Setus will be managed by Abhiyan (Setu)
Thankyou
y
Slum_Free_Bhuj_Anandiben 1-Sandeep Virmani.pdf

More Related Content

Similar to Slum_Free_Bhuj_Anandiben 1-Sandeep Virmani.pdf

Jal nirmal delhi 20-9-2013
Jal nirmal delhi 20-9-2013Jal nirmal delhi 20-9-2013
Jal nirmal delhi 20-9-2013
IRC
 
Sustainable Development sector in Vibrant Gujarat Summit
Sustainable Development sector in Vibrant Gujarat SummitSustainable Development sector in Vibrant Gujarat Summit
Sustainable Development sector in Vibrant Gujarat Summit
Vibrant Gujarat
 
Detail state wise slums TELAGANA
Detail state wise slums TELAGANADetail state wise slums TELAGANA
Detail state wise slums TELAGANA
rajitk97
 
Mnrega
MnregaMnrega
City development plan guwahati
City development plan guwahatiCity development plan guwahati
City development plan guwahati
Anupama Krishnan
 
Karnataka Renewable Energy Development Limited
Karnataka Renewable Energy Development LimitedKarnataka Renewable Energy Development Limited
Karnataka Renewable Energy Development Limited
TiE Bangalore
 
BWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreBWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities Bnagalore
ADDA
 
PRESENTATION-SBM
PRESENTATION-SBMPRESENTATION-SBM
PRESENTATION-SBM
Nagesh Prabhu Chinivartha
 
Basic services to urban poor (Bsup)
Basic services to urban poor (Bsup)Basic services to urban poor (Bsup)
Basic services to urban poor (Bsup)
padamatikona swapnika
 
SLUM REHABILITATION PROGRAMME (In Situ ) in Ahmedabad, India
SLUM REHABILITATION PROGRAMME (In Situ ) in Ahmedabad, IndiaSLUM REHABILITATION PROGRAMME (In Situ ) in Ahmedabad, India
SLUM REHABILITATION PROGRAMME (In Situ ) in Ahmedabad, India
Regional Urban Upgrading Working Group (RUUWG)
 
Swachh Bharat Abhiyan
Swachh Bharat AbhiyanSwachh Bharat Abhiyan
Swachh Bharat Abhiyan
Shashank Kanavalli
 
Annual Regional Review & Progress Report of LGCDP & MoFALD, Pokhara
Annual Regional Review & Progress Report of LGCDP & MoFALD, PokharaAnnual Regional Review & Progress Report of LGCDP & MoFALD, Pokhara
Annual Regional Review & Progress Report of LGCDP & MoFALD, Pokhara
Ekendra Lamsal
 
Latur, Patna RP & PMAY, Rurban Scheme
Latur, Patna RP & PMAY, Rurban SchemeLatur, Patna RP & PMAY, Rurban Scheme
Latur, Patna RP & PMAY, Rurban Scheme
Hrishikesh Satpute
 
Smart Village a Case Study of Kolavada Village
Smart Village a Case Study of Kolavada VillageSmart Village a Case Study of Kolavada Village
Smart Village a Case Study of Kolavada Village
IRJET Journal
 
Davao bottom up budgeting
Davao bottom up budgetingDavao bottom up budgeting
Davao bottom up budgeting
WBKDC
 
Amrut ppt
Amrut pptAmrut ppt
Amrut ppt
Pankaj Maurya
 
Capacity Building Plan for World Bank _2 Jan03_
Capacity Building Plan for World Bank _2 Jan03_Capacity Building Plan for World Bank _2 Jan03_
Capacity Building Plan for World Bank _2 Jan03_
S.Ananthanarayana Sharma
 
Presentation 20 october 2010
Presentation 20 october 2010Presentation 20 october 2010
Maharashtra(4)
Maharashtra(4)Maharashtra(4)
Maharashtra(4)
Harish Gupta
 
Smart Cities (India)
Smart Cities (India)Smart Cities (India)
Smart Cities (India)
Rathnavel Ponnuswami
 

Similar to Slum_Free_Bhuj_Anandiben 1-Sandeep Virmani.pdf (20)

Jal nirmal delhi 20-9-2013
Jal nirmal delhi 20-9-2013Jal nirmal delhi 20-9-2013
Jal nirmal delhi 20-9-2013
 
Sustainable Development sector in Vibrant Gujarat Summit
Sustainable Development sector in Vibrant Gujarat SummitSustainable Development sector in Vibrant Gujarat Summit
Sustainable Development sector in Vibrant Gujarat Summit
 
Detail state wise slums TELAGANA
Detail state wise slums TELAGANADetail state wise slums TELAGANA
Detail state wise slums TELAGANA
 
Mnrega
MnregaMnrega
Mnrega
 
City development plan guwahati
City development plan guwahatiCity development plan guwahati
City development plan guwahati
 
Karnataka Renewable Energy Development Limited
Karnataka Renewable Energy Development LimitedKarnataka Renewable Energy Development Limited
Karnataka Renewable Energy Development Limited
 
BWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreBWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities Bnagalore
 
PRESENTATION-SBM
PRESENTATION-SBMPRESENTATION-SBM
PRESENTATION-SBM
 
Basic services to urban poor (Bsup)
Basic services to urban poor (Bsup)Basic services to urban poor (Bsup)
Basic services to urban poor (Bsup)
 
SLUM REHABILITATION PROGRAMME (In Situ ) in Ahmedabad, India
SLUM REHABILITATION PROGRAMME (In Situ ) in Ahmedabad, IndiaSLUM REHABILITATION PROGRAMME (In Situ ) in Ahmedabad, India
SLUM REHABILITATION PROGRAMME (In Situ ) in Ahmedabad, India
 
Swachh Bharat Abhiyan
Swachh Bharat AbhiyanSwachh Bharat Abhiyan
Swachh Bharat Abhiyan
 
Annual Regional Review & Progress Report of LGCDP & MoFALD, Pokhara
Annual Regional Review & Progress Report of LGCDP & MoFALD, PokharaAnnual Regional Review & Progress Report of LGCDP & MoFALD, Pokhara
Annual Regional Review & Progress Report of LGCDP & MoFALD, Pokhara
 
Latur, Patna RP & PMAY, Rurban Scheme
Latur, Patna RP & PMAY, Rurban SchemeLatur, Patna RP & PMAY, Rurban Scheme
Latur, Patna RP & PMAY, Rurban Scheme
 
Smart Village a Case Study of Kolavada Village
Smart Village a Case Study of Kolavada VillageSmart Village a Case Study of Kolavada Village
Smart Village a Case Study of Kolavada Village
 
Davao bottom up budgeting
Davao bottom up budgetingDavao bottom up budgeting
Davao bottom up budgeting
 
Amrut ppt
Amrut pptAmrut ppt
Amrut ppt
 
Capacity Building Plan for World Bank _2 Jan03_
Capacity Building Plan for World Bank _2 Jan03_Capacity Building Plan for World Bank _2 Jan03_
Capacity Building Plan for World Bank _2 Jan03_
 
Presentation 20 october 2010
Presentation 20 october 2010Presentation 20 october 2010
Presentation 20 october 2010
 
Maharashtra(4)
Maharashtra(4)Maharashtra(4)
Maharashtra(4)
 
Smart Cities (India)
Smart Cities (India)Smart Cities (India)
Smart Cities (India)
 

Recently uploaded

The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
mamamaam477
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))
shivani5543
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Introduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptxIntroduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptx
MiscAnnoy1
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...
UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...
UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...
amsjournal
 

Recently uploaded (20)

The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Introduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptxIntroduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptx
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...
UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...
UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...
 

Slum_Free_Bhuj_Anandiben 1-Sandeep Virmani.pdf

  • 1. SLUM FREE CITY SLUM FREE CITY B H U J Pilot and Preparation BHUJ MUNICIPALITY
  • 2.
  • 3.
  • 4.
  • 5.
  • 7.
  • 8.
  • 9. Bhuj Slums Bhuj Slums • 70% slum populations resident for more than 20 70% slum populations resident for more than 20 years; 5% less than 5 years. • Average size of house plots is 60 80 sqm • Average size of house plots is 60‐80 sqm • Average incomes is Rs 3‐6500/‐ • Well serviced with electricity (100%), water supply (80%), aanganwadi’s (70%)
  • 10. Goals Goals • To create a slum free model in Bhuj for small To create a slum free model in Bhuj for small towns (less than 5 lacs population) for the State and the Country and the Country. This category constitutes 50 % of the urban population of which 4 lac families live in slums of Gujarat. j Small town slums constitute local homogeneous groups,(as against migrant labor), that often pre‐date the growth of kasbas into Municipal towns.
  • 11.
  • 12.
  • 13. Land management (Bapadayalu nagar) Land management (Bapadayalu nagar) 0% Total Developped land with government 28% Land require to build 288 Housing 48% 0% 0% 28% Less New infrastructure 15% 0% 0% 0% 0% 0% Less Existing Dproad and pond 9% 0% 0% 0%
  • 14.
  • 15. LAND AT CITY LEVEL Slums can be settled on 3% land and Slums can be settled on 3% land and release 99 ha for other purpose. Settlements Total Area settlements No. of Slum Existing Slum Area Slum Percentage inSQ. MTR No. of Slum Household Land Requirement Percentage Land Release Settlements settlements Slum Slum Area inSQ. MTR Household Requirement Percentage Release Area 1 15,63,773 121,417 1.37 % 80 9,636 0.62 % 11,781 Area 2 47,44,554 24 5,42,021 11.42 % 2,1982,63,736 5.56 % 2,78,285 , , , , , , , , , Area 3 1,33,05,375 12 7,00,651 5.27 % 4,7235,66,808 4.26 % 1,33,843 Area 4 1,61,94,295 5 1,06,617 0.66 % 696 83,556 0.52 % 23,061 Area 5 89,25,228 7 3,47,066 3.89 % 1,6742,00,904 2.25 % 1,46,162 Area 6 45,00,666 26 7,76,467 17.25 % 3,1223,74,616 8.32 % 4,01,851 Total 4,92,33,890 75 24,94,239 5.07 % 12,494 14,99,256 3.05 % 9,94,983
  • 16. Objectives Objectives • One – Implement a pilot project in four slumsof One Implement a pilot project in four slumsof 314 homes including Infrastructure and Public spaces in five months spaces in five months. • Two – Develop the institutional capacities of Nagarpalika and other agencies of Bhuj town Nagarpalika and other agencies of Bhuj town towards Slum free city to be achieved in 3‐5 years. This will demonstrate implementation with speed and quality; and a participatory approach for such towns.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32. Land distribution and cost of spare land Area of Publics Green Land for sale Commercia Land distribution and cost of spare land Name of Area settlements Housing paces Roads spaces l land free Bhimrao Nagar 5000 2420 373 1143 660 412 Ramdev Nagar 22390 7120 2150 5150 2350 2850 2770 Rawalwadi (devipujak) 24060 7110 1670 3290 4430 1660 5900 Bapadayalu(kolivas) 6962 2480 910 1000 600 200 1772 Total 58412 19130 5103 10583 8040 5122 10442 % of Area 32.8 8.7 18.1 13.8 8.8 17.9 Value of Land As per market Rates Land Area Rate Value Commercial 5122 10000 5,12,20,000 Residential 10442 5000 5,22,10,000 Total value 10,34,30,000
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 41.
  • 42.
  • 44.
  • 45.
  • 47.
  • 48.
  • 50.
  • 51.
  • 52. DETAIL ESTIMATE OF PROPOSED PILOT PROJECT UNDER RAJIV AWAS YOJNA SLUM IMPROVEMENT PLAN ‐ BHUJ (KUTCH) SUMMARY OF COST S D i i f I A (i L ) Sr.no. Description of Item Amount (in Lacs) 1 Cost of 293 Dus at Bhuj ‐ Kutch Cost of 37 Dwelling Units at Bhimrao Nagar ₹ 172.29 Cost of 109 Dus Dwelling Units at Juni Ravalwadi ₹ 507.56 Cost of 38 Dwelling Units at Kolivas Bapadayalu Nagar ₹ 176 95 Cost of 38 Dwelling Units at Kolivas‐Bapadayalu Nagar ₹ 176.95 Cost of 109 Dwelling Units at Ramdev nagar ₹ 495.49 Sub total 1 ₹ 1,352.28 Built up Area pr DU 1 = 40.53 sq.mt. Carpet Area pr DU 1 = 30.00 sq.mt. Built up Area pr DU 2 = 40.40 sq.mt. Carpet Area pr DU 2 = 32.58 sq.mt. 2 Services Water Supply Works ₹ 25.15 Sewerage System ₹ 32.99 3 Roads & Pathways ₹ 248.31 4 External Electrification Works 39.15 5 Cost of Demolition of Existing Structures & Carting it to the outer skirtes of the City ₹ 14.20 Sub total 2 ₹ 359.80 Cost of construction sub total (1+2) ₹ 1,712.08 6 O & M Charges @ 2% of Project Cost ₹ 34 24 6 O & M Charges @ 2% of Project Cost ₹ 34.24 7 Add Service Tax 4.05% ₹ 69.34 8 Detail Project Report Preparation, Management, Supervision & Quality Control @ 5% ₹ 85.60 Sub total 3 ₹ 189.18 Total Project cost ₹ 1,901.26
  • 53. પ્રો કટ અમલીકરણ નું માળખું . શહર િવકાસ અને શહર શહર િવકાસ અન શહર આવાસ િવભાગ . ડી આઈ રેવે ય ડી .આઈ .એલ.આર. રવ યુ િવભાગ . નગર પાિલકા ભુજ ભાડા હુ રશાળા કે.એમ.વી.એસ. િવ તાર ની પડ પ ી પુન: વસન સિમિત .
  • 54. Objective 2 Preparation for Slum free city Bhuj Preparation for Slum‐free city, Bhuj – Nagarpalika/Collector to set up Slum Rehab Steering Committee chaired by MLA, Bhuj – Set up ‘Slum Rehab Division’ in Bhuj Nagarpalika/Collectorate with dedicated Officer on sp. Nagarpalika/Collectorate with dedicated Officer on sp. Duty. Set up Finance, Implementation and Monitoring cells – Upgrade capacities of BhADA to appro e micro plans BhADA – to approve micro plans Revenue/DILR – to approve and demark land for housing. – Develop PPP with civil society organizations for technical, i l d social and management support to program – Development of SOP’s for the program/Slum Rehab Committees (SRC)/Beneficiary list
  • 55. Methodology Methodology – Slum Rehab Committees (SRC) set up in each slum Slum Rehab Committees (SRC) set up in each slum will be the key Implementing Agency. They will assist in : • Finalization of beneficiary list • Finalization of technical plan • Selection of contractors Selection of contractors • Monitoring of construction • Dispute resolution Fi i l di l • Financial dispersal to contractors • Reporting to Slum Sabha
  • 56. – Setu’s will be facilitation centers to assist the Setu s will be facilitation centers to assist the Nagarpalika’s Slum Rehab Division and the Slum Rehab Committees implement the program. – One Setu for every 500 homes Each Setu with Social, Technical and Administrative Staff, placed by KMVS, Hunnarshala and Nagarpalika respectively. Set s ill be managed b Abhi an (Set ) – Setus will be managed by Abhiyan (Setu)