SlideShare a Scribd company logo
Case Study
Introduction
An integral element of Slough Borough Council’s budget strategy in
the short and medium term relates to strategic asset management.
Their innovative approach in considering alternative uses of their
existing property portfolio is delivering impressive results. This
shift from the traditional to more contemporary practice provides a
route to continue capital investment in regeneration and community
improvements during the current turbulent financial climate.

The transformation programme, now firmly embedded in the
Council’s asset management strategy, began with a plan to convert
part of a run down community centre into an Early Years Centre.

The community centre was under utilised but offered the space
to provide broader community benefit. An existing nursery facility
nearby struggled with poor accommodation and lack of space. The
community centre provided the perfect location to provide the
local Chalvey area with an exemplar teaching and family facility for
children under 5. The success of the project is unprecedented and
has driven a further phase of investment utilising just 50% of the
original capital allocation.

Against a background of competitive tender, Paragon was set the
challenge to create a learning environment from a child’s point
of view. The in-house Paragon design team considered layout,
equipment, workplace environments and standards of care and
education of children under 5 and their families. Where possible,
steps were taken to ensure sustainable materials were used and
energy efficiency was improved. The design offered flexibility and
the potential for future development. In particular, the children’s
rooms and outdoor play spaces were capable of multiple uses.

This scheme represents a part of the massive refurbishment of the
Community Centre. Following the success of the Early Years project
Paragon has been instructed to undertake the design and fit out
of the remainder of the building, creating a new self service local
library and modern well equipped learning and community rooms.
Client

Slough Borough Council
Chalvey Early Years Centre




Location

The Green,
Slough,
Berkshire,
SL1 2SP
Scope of Works
off site

Building analysis

Full architectural and structural design

Access statement

Listed approvals

Bespoke procurement

Cost management

Detailed programming

Reconfiguration of site boundaries and
site drainage

Installation of new utilities

Full fit out with special kit play items

New front curtain walling
Client Contacts

Julie Evans

Strategic Director of Resources
julie.evans@slough.gov.uk



Diane Lister

Head Teacher, Chalvey EYC

diane@chalveyeyc.slough.sch.uk



Clair Pyper

Strategic Director of Education and

Children’s Services

clair.pyper@slough.gov.uk
Scope of Works
on site

Breakout areas
Childrens toilets, changing areas and
washing facilities
Kitchen/ catering facilities
HVAC installation
Security installation
IT facilities
Communication and sound systems
Staff room and medical room
Flooring and Lighting
Signage and Graphics
All furniture and decoration
Bespoke joinery
External landscaping including car parks
Outdoor play area
Timescales
Design and procurement

                             - 6 weeks



Project management, fit-out and
installation

                             - 12 weeks




Project Size

7,000 ft2




Project Value

Circa £990,000




Contract Type

JCT 2005 Rev.2 2009 Design and Build
Project Details
•   Important aspects of the design have
    been developed through ‘the eyes
    of a child’ with potential for future
    development/adaptation

•   Design features and use of colours
    would encourage creative play, are
    durable, cost effective, easy clean and
    low maintenance

•   The scheme provides a modern, fit for
    purpose centre that could provide a 30
    year maintainable “life”

•   The scheme is safe and secure for
    children and all other users

•   Attention has been paid to areas
    for children with special educational
    needs, playing particular attention to
    design details in the flooring and on
    the walls

•   The car park design incorporates 40
    staff spaces and 6 visitors parking
    spaces including disabled bays.
    The car park entrance was moved to
    ensure it is seen from the main office
    ensuring children’s safety at all times.
Paragon Interiors Group Plc

                                                                    Head Office
Paragon House | Orchard Place | Nottingham Business Park | Nottingham | NG8 6PX
                                            t: 0115 951 9512 f: 0115 951 9513



                                                              Manchester Office
                         Belvedere Building | Booth Street | Manchester | M2 4AW
                                                                t: 0161 235 0800



                                                    w: www.paragoninteriors.biz

More Related Content

What's hot

Anthony Hargreaves CV MTIB JUNE 2015 amended
Anthony Hargreaves CV MTIB JUNE 2015 amendedAnthony Hargreaves CV MTIB JUNE 2015 amended
Anthony Hargreaves CV MTIB JUNE 2015 amendedTony Work
 
William Kinsella CV 2016
William Kinsella CV 2016William Kinsella CV 2016
William Kinsella CV 2016Liam Kinsella
 
How to succeed on global markets english présentation 160112 extraits apec ...
How to succeed on global markets   english présentation 160112 extraits apec ...How to succeed on global markets   english présentation 160112 extraits apec ...
How to succeed on global markets english présentation 160112 extraits apec ...Valor (groupe Freelance.com)
 
Mr. Jian ZHENG CV English
Mr. Jian ZHENG CV EnglishMr. Jian ZHENG CV English
Mr. Jian ZHENG CV EnglishJian Zheng
 
BMT Presentation 2016 (1)
BMT Presentation 2016 (1)BMT Presentation 2016 (1)
BMT Presentation 2016 (1)Dai Tu Vo
 
David Gunn
David GunnDavid Gunn
David Gunn
David Gunn
 
Argenta case study
Argenta case studyArgenta case study
Argenta case study
Danny Mears
 
Lee Shipp CV 1
Lee Shipp CV 1Lee Shipp CV 1
Lee Shipp CV 1Lee Shipp
 
A platform for international business
A platform for international business A platform for international business
A platform for international business
ftaedu
 
Newdriver'sCV. (1)
Newdriver'sCV. (1)Newdriver'sCV. (1)
Newdriver'sCV. (1)John Conroy
 

What's hot (16)

CV NB290716
CV NB290716CV NB290716
CV NB290716
 
Maria_Hughes_0212
Maria_Hughes_0212Maria_Hughes_0212
Maria_Hughes_0212
 
CV_fx_UK_(5)
CV_fx_UK_(5)CV_fx_UK_(5)
CV_fx_UK_(5)
 
Anthony Hargreaves CV MTIB JUNE 2015 amended
Anthony Hargreaves CV MTIB JUNE 2015 amendedAnthony Hargreaves CV MTIB JUNE 2015 amended
Anthony Hargreaves CV MTIB JUNE 2015 amended
 
William Kinsella CV 2016
William Kinsella CV 2016William Kinsella CV 2016
William Kinsella CV 2016
 
Paul Slater CV
Paul Slater CVPaul Slater CV
Paul Slater CV
 
Document1
Document1Document1
Document1
 
How to succeed on global markets english présentation 160112 extraits apec ...
How to succeed on global markets   english présentation 160112 extraits apec ...How to succeed on global markets   english présentation 160112 extraits apec ...
How to succeed on global markets english présentation 160112 extraits apec ...
 
Mr. Jian ZHENG CV English
Mr. Jian ZHENG CV EnglishMr. Jian ZHENG CV English
Mr. Jian ZHENG CV English
 
BMT Presentation 2016 (1)
BMT Presentation 2016 (1)BMT Presentation 2016 (1)
BMT Presentation 2016 (1)
 
David Gunn
David GunnDavid Gunn
David Gunn
 
Argenta case study
Argenta case studyArgenta case study
Argenta case study
 
Lee Shipp CV 1
Lee Shipp CV 1Lee Shipp CV 1
Lee Shipp CV 1
 
A platform for international business
A platform for international business A platform for international business
A platform for international business
 
Neil CV New
Neil CV NewNeil CV New
Neil CV New
 
Newdriver'sCV. (1)
Newdriver'sCV. (1)Newdriver'sCV. (1)
Newdriver'sCV. (1)
 

Similar to Early Years Centre - Slough Borough Council

IAN REID CV- Project Management
IAN REID CV- Project ManagementIAN REID CV- Project Management
IAN REID CV- Project ManagementIan Reid
 
Internship Report_Vishak
Internship Report_VishakInternship Report_Vishak
Internship Report_VishakVishak Nambiar
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016Tim Read
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016Tim Read
 
MODE_Sector-Brochure_Industrial_V1_LQ
MODE_Sector-Brochure_Industrial_V1_LQMODE_Sector-Brochure_Industrial_V1_LQ
MODE_Sector-Brochure_Industrial_V1_LQRhonan OBrien
 
Baytree Dagenham Brochure
Baytree Dagenham BrochureBaytree Dagenham Brochure
Baytree Dagenham Brochure
Jonathan Priestley
 
Christopher Griffin Construction CV
Christopher Griffin Construction CVChristopher Griffin Construction CV
Christopher Griffin Construction CVChristopher Griffin
 
paul_jubb cv 16May15
paul_jubb cv  16May15paul_jubb cv  16May15
paul_jubb cv 16May15Paul Jubb
 
New Brochure 1 Clm
New Brochure 1   ClmNew Brochure 1   Clm
New Brochure 1 Clm
conradmaung
 
Age friendly innovation bootcamp
Age friendly innovation bootcampAge friendly innovation bootcamp
Age friendly innovation bootcamp
SoniaNaiba
 
Mike Johnson (JEAJ) amend [57398]
Mike Johnson (JEAJ) amend [57398]Mike Johnson (JEAJ) amend [57398]
Mike Johnson (JEAJ) amend [57398]Mike Johnson
 
Fourth Year Architecture Portfolio
Fourth Year Architecture PortfolioFourth Year Architecture Portfolio
Fourth Year Architecture Portfolio
Khadija Mahmoud
 
CV Nuno Peixoto - English2016 - October
CV Nuno Peixoto - English2016 - OctoberCV Nuno Peixoto - English2016 - October
CV Nuno Peixoto - English2016 - OctoberNuno Peixoto
 
Portfolio 2019
Portfolio 2019 Portfolio 2019
Portfolio 2019
Mohammed Fawaz
 
Rodwell Murwisi CV site manager 1
Rodwell Murwisi CV site manager 1Rodwell Murwisi CV site manager 1
Rodwell Murwisi CV site manager 1Rodi Murwisi
 
Dr Maurizio Pilu CDEC for HIE Expo 17 Oct 2013
Dr Maurizio Pilu CDEC for HIE Expo 17 Oct 2013Dr Maurizio Pilu CDEC for HIE Expo 17 Oct 2013
Dr Maurizio Pilu CDEC for HIE Expo 17 Oct 2013Maurizio Pilu
 
How to setup and lead a successfully PMO
How to setup and lead a successfully PMOHow to setup and lead a successfully PMO
How to setup and lead a successfully PMO
PMOfficers PMOAcademy
 
Project management(roro)
Project management(roro)Project management(roro)
Project management(roro)
AwZhiXuan
 

Similar to Early Years Centre - Slough Borough Council (20)

Gazette Issue 1 2016
Gazette Issue 1 2016Gazette Issue 1 2016
Gazette Issue 1 2016
 
IAN REID CV- Project Management
IAN REID CV- Project ManagementIAN REID CV- Project Management
IAN REID CV- Project Management
 
Internship Report_Vishak
Internship Report_VishakInternship Report_Vishak
Internship Report_Vishak
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
MODE_Sector-Brochure_Industrial_V1_LQ
MODE_Sector-Brochure_Industrial_V1_LQMODE_Sector-Brochure_Industrial_V1_LQ
MODE_Sector-Brochure_Industrial_V1_LQ
 
Baytree Dagenham Brochure
Baytree Dagenham BrochureBaytree Dagenham Brochure
Baytree Dagenham Brochure
 
Christopher Griffin Construction CV
Christopher Griffin Construction CVChristopher Griffin Construction CV
Christopher Griffin Construction CV
 
paul_jubb cv 16May15
paul_jubb cv  16May15paul_jubb cv  16May15
paul_jubb cv 16May15
 
New Brochure 1 Clm
New Brochure 1   ClmNew Brochure 1   Clm
New Brochure 1 Clm
 
Age friendly innovation bootcamp
Age friendly innovation bootcampAge friendly innovation bootcamp
Age friendly innovation bootcamp
 
Mike Johnson (JEAJ) amend [57398]
Mike Johnson (JEAJ) amend [57398]Mike Johnson (JEAJ) amend [57398]
Mike Johnson (JEAJ) amend [57398]
 
Fourth Year Architecture Portfolio
Fourth Year Architecture PortfolioFourth Year Architecture Portfolio
Fourth Year Architecture Portfolio
 
CV Nuno Peixoto - English2016 - October
CV Nuno Peixoto - English2016 - OctoberCV Nuno Peixoto - English2016 - October
CV Nuno Peixoto - English2016 - October
 
CV (aug15).Rev1
CV (aug15).Rev1CV (aug15).Rev1
CV (aug15).Rev1
 
Portfolio 2019
Portfolio 2019 Portfolio 2019
Portfolio 2019
 
Rodwell Murwisi CV site manager 1
Rodwell Murwisi CV site manager 1Rodwell Murwisi CV site manager 1
Rodwell Murwisi CV site manager 1
 
Dr Maurizio Pilu CDEC for HIE Expo 17 Oct 2013
Dr Maurizio Pilu CDEC for HIE Expo 17 Oct 2013Dr Maurizio Pilu CDEC for HIE Expo 17 Oct 2013
Dr Maurizio Pilu CDEC for HIE Expo 17 Oct 2013
 
How to setup and lead a successfully PMO
How to setup and lead a successfully PMOHow to setup and lead a successfully PMO
How to setup and lead a successfully PMO
 
Project management(roro)
Project management(roro)Project management(roro)
Project management(roro)
 

Early Years Centre - Slough Borough Council

  • 2.
  • 3. Introduction An integral element of Slough Borough Council’s budget strategy in the short and medium term relates to strategic asset management. Their innovative approach in considering alternative uses of their existing property portfolio is delivering impressive results. This shift from the traditional to more contemporary practice provides a route to continue capital investment in regeneration and community improvements during the current turbulent financial climate. The transformation programme, now firmly embedded in the Council’s asset management strategy, began with a plan to convert part of a run down community centre into an Early Years Centre. The community centre was under utilised but offered the space to provide broader community benefit. An existing nursery facility nearby struggled with poor accommodation and lack of space. The community centre provided the perfect location to provide the local Chalvey area with an exemplar teaching and family facility for children under 5. The success of the project is unprecedented and has driven a further phase of investment utilising just 50% of the original capital allocation. Against a background of competitive tender, Paragon was set the challenge to create a learning environment from a child’s point of view. The in-house Paragon design team considered layout, equipment, workplace environments and standards of care and education of children under 5 and their families. Where possible, steps were taken to ensure sustainable materials were used and energy efficiency was improved. The design offered flexibility and the potential for future development. In particular, the children’s rooms and outdoor play spaces were capable of multiple uses. This scheme represents a part of the massive refurbishment of the Community Centre. Following the success of the Early Years project Paragon has been instructed to undertake the design and fit out of the remainder of the building, creating a new self service local library and modern well equipped learning and community rooms.
  • 4. Client Slough Borough Council Chalvey Early Years Centre Location The Green, Slough, Berkshire, SL1 2SP
  • 5. Scope of Works off site Building analysis Full architectural and structural design Access statement Listed approvals Bespoke procurement Cost management Detailed programming Reconfiguration of site boundaries and site drainage Installation of new utilities Full fit out with special kit play items New front curtain walling
  • 6. Client Contacts Julie Evans Strategic Director of Resources julie.evans@slough.gov.uk Diane Lister Head Teacher, Chalvey EYC diane@chalveyeyc.slough.sch.uk Clair Pyper Strategic Director of Education and Children’s Services clair.pyper@slough.gov.uk
  • 7. Scope of Works on site Breakout areas Childrens toilets, changing areas and washing facilities Kitchen/ catering facilities HVAC installation Security installation IT facilities Communication and sound systems Staff room and medical room Flooring and Lighting Signage and Graphics All furniture and decoration Bespoke joinery External landscaping including car parks Outdoor play area
  • 8. Timescales Design and procurement - 6 weeks Project management, fit-out and installation - 12 weeks Project Size 7,000 ft2 Project Value Circa £990,000 Contract Type JCT 2005 Rev.2 2009 Design and Build
  • 9. Project Details • Important aspects of the design have been developed through ‘the eyes of a child’ with potential for future development/adaptation • Design features and use of colours would encourage creative play, are durable, cost effective, easy clean and low maintenance • The scheme provides a modern, fit for purpose centre that could provide a 30 year maintainable “life” • The scheme is safe and secure for children and all other users • Attention has been paid to areas for children with special educational needs, playing particular attention to design details in the flooring and on the walls • The car park design incorporates 40 staff spaces and 6 visitors parking spaces including disabled bays. The car park entrance was moved to ensure it is seen from the main office ensuring children’s safety at all times.
  • 10.
  • 11.
  • 12. Paragon Interiors Group Plc Head Office Paragon House | Orchard Place | Nottingham Business Park | Nottingham | NG8 6PX t: 0115 951 9512 f: 0115 951 9513 Manchester Office Belvedere Building | Booth Street | Manchester | M2 4AW t: 0161 235 0800 w: www.paragoninteriors.biz