This document presents a geologic section of a diversion structure for the 840 MW Suki Kinari Hydropower Project. The section shows elevations and projected distances of four boreholes, labeled BH-1 through BH-4, along with elevations of three feasibility-stage boreholes. Various geologic units are displayed, including quartz mica schist, quartzite, dolerite, terrace deposits, and colluvial deposits. Legend information and notes provide further details on geologic units, borehole locations, and seismic line positions.