TABLE OF CONTENTS
CHAPTER
NO.
CONTENTS PAGE NO.
1
INTRODUCTION
1.1
ABOUT SIEMENS INDIA LTD. 2-3
1.2
OBJECTIVES OF THE STUDY 3
1.3 RESEARCH METHODOLOGY 3
1.4 SCOPE OF THE STUDY 4
REPORT SUMMARY 5
2
SAP AND LOGISTICS
2.1
INTRODUCTION TO SAP
SOFTWARE
6-8
2.2
WORKING OF THE LOGISTICS
DEPARTMENT
8-12
3
INTERNSHIP EXPERINCE AND
COMPANY ANALYSIS
3.1
DAILY TASKS PERFORMED
13-15
3.2
COMPANY SWOT ANALYSIS
16
3.3 CURRENT MARKET SCENERIO 17-18
CONCLUSION
2
SIEMENS INDIA LTD.
INTRODUCTION
1.1 ABOUT THE COMPANY
Siemens in India has a history dating back to 1867 when our founder Werner von Siemens took a
bold decision to build a telegraph line from London to Kolkata. This happened within 20 years of
the company’s foundation in 1847.
The line, stretching for 11,000 kilometers, was one of the fastest and most reliable telegraph
links in the world, and passed through four different sovereign territories and the Black Sea. The
line was completed in 1870, overcoming financial, technical and logistical challenges. A
message could be transmitted in 28 minutes instead of the 30 days that mail took between India
and England.
Siemens set up a branch in India as early as 1922, in Mumbai and Kolkata. Though the
company’s assets were confiscated during World War II as enemy property forcing it to shut
operations, Siemens re-entered India after the war. It started operations as the “Siemens
Division” of “Protos Engineering", a local contracting company. Siemens was engaged in sales
and service (mostly repair and assembly) of our own brand of switchgear and switchboards. Its
first workshop was located under the bridge of, what is today, the Mahalaxmi Railway Station in
Mumbai.
In 1957, Siemens was incorporated as a company under the Indian Companies Act as Siemens
Engineering & Manufacturing Co. of India Pvt. Ltd. In 1961, Siemens became a public limited
company with restricted external shareholding and was listed in the Bombay Stock Exchange a
decade later.A factory was set up in 1957 in Worli to manufacture switchboards and another was
set up in 1959 for medical equipment. Production of motors commenced at Kalwa in 1966 and
another switchboard factory was set up in Nashik in 1981.
Siemens Ltd. Started operations at two greenfield factories in Goa, with an investment of around
Rs. 200 crores. The factories are equipped with state-of-the-art manufacturing equipment using
lean processes similar to Siemens’ award-winning factory at Berlin.
3
SIEMENS ENERGY AND AUTOMATION LTD. PLANT ,GOA
Siemens Ltd. Started operations at two greenfield factories in Goa, with an investment of around
Rs. 200 crores. The factories are equipped with state-of-the-art manufacturing equipment using
lean processes similar to Siemens’ award-winning factory at Berlin.
The factories will produce a range of products for power distribution of industries, utilities,
power plants, infrastructure and cities. The products include medium voltage gas-insulated
switchgears of up to 36kV, primary distribution switchgears, locally-developed products like
ring main units (RMU) and compact substations (CSS) for power distribution, numerical
protection relays, telecontrol devices for smart grids, electromechanical auxiliary and trip relays.
The factories will have their own in-house Research and Development units.
Today, Siemens in India has a sales and service network that spans across the entire country, 23
manufacturing plants, eight centers of competence and 11 R&D centers.
1.2 OBJECTIVESOF THE STUDY
 To learn and study about SAP software, its benefits and working of the logistics
department.
 To learn and gain knowledge from the internship at Siemens.
1.3 RESEARCHMETHODOLOGY
The research methods used for the study were through primary sources as well as secondary
sources.
4
Information was provided by a personal conversation with the Logistics Manager and the Quality
Management team.
Information was also obtained through secondary sources i.e. articles and online research papers
1.4 SCOPE OF STUDY
This study will provide students and future interns with insights into of a multinational company
and provide them ideas for future research, helping them to develop a reliable knowledge base
about the organization and also prepare people with the expertise, commitment, and skills for
management, marketing, and operations positions in these types of organizations.
This report also provides a brief current market scenario of the company to know what are the
current plans and issues of the company and how the company is doing in the global markets.
5
REPORT SUMMARY
Our summer internship in Siemens energy and automation Ltd. Goa began on 11th May
2015 and ended on 20th June 2015. The timings of the internship were from 8 am to 5:30
pm.
Six weeks of internship at Siemens gave us experience and knowledge about the working
environment of the company and how it functions. Since our internship was specifically
done in the logistics department, we have gained deeper knowledge about logistics.
The department introduced us to a range of tasks to work on such as Data entry in
accounting books and SAP system, Invoice matching, Quality incoming, Material parts
evaluation, Inventory evaluation, Material number evaluation, Segregating PCBs (printed
circuit boards), Labeling PCBs, Creation of material numbers, Quantity verification,
Finding material location, Data entry of exports and imports, Clearing MRB (material
rejection block), Filing incoming inspection data, Clearing inspection lots and line
clearing lots, Labeling BOMs (bill of material), Scanning material barcodes, Creation of
delivery notes, transfer orders and purchase orders, Quality Management module entry,
Maintaining inspection records. Performing all of these tasks gave an experience of the
work done in the logistics department and how it helps the organization to function.
6
CHAPTER – 2 SAP AND THE LOGISTICS
DEPARTMENT
The EA factory at Verna Goa produces Products and Systems. The Products manufactured at
Siemens EA factory at Verna Goa are Relays (Devices), Sockets, Test Switches and PCBAs. The
Systems manufactured are Panels.
Siemens EA Goa manufacturing facility includes PCB assembly (SMT and THT), Device
assembly and complete inspection and testing of all PCBS’s / Devices to ensure the products
meets specification.
The factory manufactures Energy Automation Devices for Smart Grid. The products are
Protection Relays, RTUs (Remote Terminal Units), CRP (Control Relay Panel), Test Plugs and
Test Switches.
Siemens EA plant has following departments:
 Business Administration – Commercial
 Supply Chain Management-SCM
 Logistics
 Production
 R&D
 Infra & Maintenance
 PLM – Product Lifecycle Management
 Quality
 HR
2.1 SAP SOFTWARE
SAP software is a German multinational software known for helping enterprises in accounting
management and resource planning. The software allows organizations to manage business
operations, and usually refers to set of modular applications that collect and integrate data from
different aspects of the business.
2.1.1 Business Benefits of SAP
 Improves Alignment of Strategies and Operations
 Improves Productivity and Insight
7
 Reduces Costs through Increased Flexibility
 Supports changing Industry Requirements
 Reduces Risks
 Improves Financial Management and Corporate Governance
 Optimize IT spending
 Provide immediate access to enterprise information
2.1.2 How SAP helps Siemens?
SAP paved a path to the automation of end to end business processes at Siemens, thereby
reducing operational costs and simplifying, optimizing and innovating business across entire
value chain.
SAP benefits:
 Integrates Siemen’s finance, purchasing, material functions and planning and
maintenance function.
 Affordable and Reliable
 Flexible to support Siemens specific business functions.
 Increases efficiency in Operations
 Promotes cooperation and healthy interaction between different departments.
 Common database increases information sharing
 Provides User friendly interface to the Siemens end user
 Automation of labor-intensive transaction possessing. The skilled finance professionals
can provide greater value to Siemens – through operational insights, strategic actions for
improved performance.
 Manages logistics business functions
 Optimizes physical flow of materials
 Simplifies Order to Cash cycle
 Helps to respond faster and reach further
 Curbs the integration cost over a long period by deploying the components required for
the business at the time .
8
Major Business challenges today are globalization, compresses business cycle, increased
customer expectations, goals of increased productivity. SAP helps Siemens boosts performance
by achieving major goals like:
 Simplify reporting
 Improve Business processes
 Increase relationship with Suppliers(Vendors of Materials) and Customers
 Speed up operations
 Optimize resources
 Deliver premium service to customers
 Enhance customer satisfaction
 Reduces Costs through Increased Flexibility
 Reduces Risks
2.2 Working of the Logistics department
2.2.1 What is Logistics?
Logistics is considered to be the complete process involving planning, managing and controlling
the flow of goods and services, information, real-time data and human resources from the point
of origin to the point of destination. There is hardly any manufacturing or marketing activity that
can be achieved without the support of an effective logistical department.
The logistics process consists of the process of integration of several aspects such as material
handling, warehousing, information, transportation, packaging and inventory. The primary duty
of an effective logistics system is to ensure geographical repositioning of unfinished goods, and
it is also concerned with the finished inventories of the organization being at the required place at
the lowest possible cost.
2.2.2 Functions of the logistics department
The logistics department is entrusted with the responsibilities of ensuring that the entire process
of logistics is maintained and developed in accordance with the goals of the business at an
economical cost. The tasks of the logistics department involve storage, distribution,
warehousing, movement of goods from one place to another (internally or externally), tracking
9
and delivery of goods. It includes a complete process of planning, managing, controlling and
coordination to make sure that the goods reach the right place, at the right time, for the right cost
and in a right condition. The various tasks performed by the department may be summarized as
follows:
1. Ensuring all the requirements of the customers are met on time in an efficient and safe
manner.
2. To coordinate with third party logistics (3PLs).
3. To ensure that there is a safe and timely dispatch of goods.
4. To draft plans, policies and procedures for successful implementation of logistics system.
5. To ensure that the business goals of the organization are in synchronization with logistics
system.
6. To create and maintain customer support.
7. To maintain coordination with vendors, service providers and transport carriers.
8. To ensure that no fraud is committed.
9. To ensure timely supply and payment of goods and reduce inventories.
The department also performs numerous other tasks, namely:
1. Customer service management process - The department ensures that the goods are
reached on time, in a safe condition and at the right place. It also serves as a middleman
between organization, vendors and carriers for tracking down the geographical location
of the goods and thereby provide customer support.
2. Procurement process - Strategic plans are developed by the department to support
development of fresh product and manufacturing flow management. This helps in
bringing raw materials or semi-finished goods to the premises of the organization in a
safe and proper condition at an economical cost. This also involves interactions with
3PLs. The department is also responsible for coordination with suppliers with regard to
scheduling, hedging and timely delivery.
3. Physical distribution - This process is concerned with the movement of finished goods
to reach the point of destination. The department is responsible for the selection of the
best mode of transportation while delivering the goods to the place of destination.
10
Thus it can be rightly concluded that the logistics department does play an important role
in ensuring the delivery of goods and is therefore rightly considered as an integral part of
a modern-day organization.
2.2.3 Material Management Cycle
Material Master
The material master contains all data required to define and manage material. It integrates
data from engineering, manufacturing, sales and distribution, purchasing, accounting, and
other departments.
The material master is used as a source of data for processing throughout the material
management cycle.
11
The following steps decribe the process of material master :-
1. Determination of Requirements
Materials requirements are identified either in the user departments or via materials planning
and control. (The regular checking of stock levels of materials defined by master records and
forecasting on the basis of past usage.) You can enter purchase requisitions yourself, or they can
be generated automatically by the materials planning and control system.
2. Source Determination
The Purchasing component helps you identify potential sources of supply based on past orders
and existing longer-term purchase agreements. This speeds the process of creating requests for
quotation , which can be sent to vendors electronically via SAP, if desired.
3. Vendor Selection
The system is capable of simulating pricing scenarios, allowing you to compare a number of
different quotations. Rejection letters can be sent automatically.
4. Purchase Order Processing
The Purchasing system adopts information from the requisition and the quotation to help you
create a purchase order. As with purchase requisitions, you can generate Pos yourself or have the
system generate them automatically. Vendor scheduling agreements and contracts (in the SAP
System, types of longer-term purchase agreement) are also supported.
5. Purchase Order Follow-Up
The system checks the reminder periods you have specified and – if necessary – automatically
prints reminders or expediters at the predefined intervals. It also provides you with an up-to-date
status of all purchase requisitions, quotations, and purchase orders.
12
6. Goods Receiving and Inventory Management
Goods Receiving personnel can confirm the receipt of goods simply by entering the Po number.
By specifying permissible tolerances, buyers can limit over- and under deliveries of ordered
goods.
7. Invoice verification
The system supports the checking and matching of invoices. The accounts payable clerk is
notified of quantity and price variances because the system has access to PO and goods receipt
data. This speeds the process of auditing and clearing invoices for payment.
13
CHAPTER 3 – INTERNSHIP EXPERIENCE
AND COMPANY ANALYSIS
INTERNSHIP EXPERIENCE
3.1 DAILY TASKS PERFORMED DURING INTERNSHIP
 Data entry in accounting books and SAP system -SAP software known for helping
enterprises in accounting management and resource planning, it allows organizations to
manage business operations, and usually refers to set of modular applications that collect
and integrate data from different aspects of the business.
 Invoice matching – matching and arranging original export invoices with the duplicates
(copies).
 Quality incoming inspection – inspecting whether finished goods and material parts are
damaged or have to be sent back to seller.
 Material parts evaluation – checking any damage in material parts.
 Inventory evaluation – verifying whether inventory is stored at the designated places and
if the quantity matches with that entered in the system.
 Material number evaluation – checking of material number for any mistakes as it can
affect the identification and placement of the material.
 Segregating PCBs (printed circuit boards) – separating the damaged PCBs from the
non damaged PCBs.
 Labeling PCBs – labeling bar codes on PCBs.
 Creation of material numbers – creating material numbers in the SAP system for new
incoming material for identification and placement.
 Quantity verification – verifying whether material quantity matches the quantity entered
in the SAP system.
 Finding material location – verifying if material is stored according to their designated
location numbers in order to avoid identification confusion.
14
 Data entry of exports and imports – entering data (details) of every material that is
being exported or imported.
 Clearing MRB (material rejection block) – clearing already checked damaged goods
from the MRB block.
 Filing incoming inspection data – filing and making data entry of incoming inspection
details.
 Clearing inspection lots and line clearing lots – clearing and moving out inspected
material lots.
 Labeling BOMs (bill of material) – labeling material bills on finished goods as per their
material number.
 Scanning material barcodes – scanning material barcodes for system entry and record
keeping.
 Creation of delivery notes, transfer orders and purchase orders – these are created in
order to keep records, to make safe deliveries and right deliveries.
 Quality Management module entry - With the functions of the Quality Management
(QM) module, you can implement the most important elements of a QM system, such as
Basic data (for example, material master, catalogs, inspection characteristics, inspection
methods and sampling procedures), Inspection planning, Sales and Distribution,
Inspection lot processing (inspection lot creation and inspection lot completion),
Recording results, Defects recording, Sample management, Dynamic modification etc.
 Maintaining inspection records – filing of inspection material records in books and
system.
15
3.2 SWOT ANALYSIS
STRENGTHS
 Experienced business units
 Monetary assistance
 Existing distribution and sales network
 Barriers of market entry
 High growth rate
WEAKNESSES
 Future competition
 Competitive market
 Costs
 Tax structure
 Future profitability
OPPURTUNITIES
 Income level is at constant increase
 Growing demand
 New products and services
 New markets
 Global markets
THREATS
 Global economy
 Increase in labor costs
 Price changes
 External business risks
 Financial capacity
 Increasing costs
16
3.3 CURRENT MARKET SCENARIO OF SIEMENS
3.3.1 HIKING PROFITS
The company follows October-September as its financial year. In the second quarter (January-
March) of the year 2014-15, profit after tax has risen about 36 percent i.e Rs 120 crore compared
to Rs 88.3 crore in December quarter.Total income from operations is likely to rise 0.2 percent
year-on-year to Rs 2,713 crore in the quarter ended March 2014. Operating profit (EBITDA)
may climb 18.5 percent on yearly basis to Rs 221 crore and margin may expand by 120 basis
points to 8.1 percent in the quarter gone by. Additionally, raw material imports stand at 55
percent of raw material cost and 82 percent of imports are from the network of Siemens AG.
Order inflows Over the last 4 quarters, Siemens maintained order inflows in the range of Rs
2,500-3,000 crore, barring the last quarter where order inflows slipped to Rs 2,089 crore.
3.3.2 FRONTIER PARTNER PROGRAM
Siemens, one of the world’s oldest and most respected companies that invests over $1 billion a
year for research in the US, is now embracing 3D printing–and a handful of the impressive
startup companies that are currently involved in offering substantial contributions–by inviting
them to join the Frontier Partner Program, managed by Siemens Technology to Business (TTB).
The startups can look forward to accessing numerous developmental resources that include a
year-long license to the comprehensive suite of Siemens project lifecycle management (PLM)
software–to be used for new product development in 3D printing, robotics, and more. Startup
partners will also be provided with mentors from Siemens and have access to others who are
using the software as well.
17
The list of Frontier partners announced today are:
 Authentise – engineering software to securely stream 3D designs directly to printers
 Avante Technology – providing software that repairs and prepares 3D files for printing
 Matterfab – developing a metal 3D printer for industrial use
 MatterMachine – providing a platform enabling scalable bespoke manufacturing
 nTopology –building software to generate optimized 3D lattice structures
CONCLUSION
The internship at Siemens gave us experience and knowledge about the working environment of
the company and how it functions. Performing all of the given tasks gave an experience of the
work done in the logistics department and how it helps the organization to function and so we
have gained deeper knowledge about logistics.
18

More Related Content

What's hot

Summer Training Report
Summer Training ReportSummer Training Report
Summer Training Report
Prateek Dubey
 
Industrial Training Report-II-DIMO
Industrial Training Report-II-DIMOIndustrial Training Report-II-DIMO
Industrial Training Report-II-DIMOThushan Sivalingam
 
TRAINING REPORT ON INDUSTRIAL AUTOMATION- PLC SCADA, VARIABLE FREQUENCY DRIVE
TRAINING REPORT ON INDUSTRIAL AUTOMATION- PLC SCADA, VARIABLE FREQUENCY DRIVETRAINING REPORT ON INDUSTRIAL AUTOMATION- PLC SCADA, VARIABLE FREQUENCY DRIVE
TRAINING REPORT ON INDUSTRIAL AUTOMATION- PLC SCADA, VARIABLE FREQUENCY DRIVE
AKSHAY SACHAN
 
Training report of PLC
Training report of PLCTraining report of PLC
Training report of PLC
Sumit Patidar
 
Summer Internship Report on PLC
Summer Internship Report on PLCSummer Internship Report on PLC
Summer Internship Report on PLC
Sudeep Giri
 
Plc and scada
Plc and scadaPlc and scada
Plc and scada
Ratnesh Verma
 
Power point presentation on Industrial Automation
Power point presentation on Industrial AutomationPower point presentation on Industrial Automation
Power point presentation on Industrial Automation
JaiPrakash337
 
Hr project bescom-proj.report
Hr project bescom-proj.reportHr project bescom-proj.report
Hr project bescom-proj.report
disha chauhan
 
Plc & Scada report 4
Plc & Scada report 4Plc & Scada report 4
Plc & Scada report 4
Lakshminarayan Solanki
 
Training Report on Automation
Training Report on AutomationTraining Report on Automation
Training Report on Automation
FellowBuddy.com
 
Industrial Training Report - SLT
Industrial Training Report - SLTIndustrial Training Report - SLT
Industrial Training Report - SLT
sivakumar haameshan
 
INDUSTRIAL AUTOMATION ( SHUBHAM KURDIYA)
INDUSTRIAL AUTOMATION ( SHUBHAM KURDIYA)INDUSTRIAL AUTOMATION ( SHUBHAM KURDIYA)
INDUSTRIAL AUTOMATION ( SHUBHAM KURDIYA)
Řőmĕő Šhűbhąm
 
Industrial Training Report on PLC & SCADA
Industrial Training Report on PLC & SCADAIndustrial Training Report on PLC & SCADA
Industrial Training Report on PLC & SCADA
Aman Jaiswal
 
Smart door project report shivnaresh likhar
Smart door project report shivnaresh likharSmart door project report shivnaresh likhar
Smart door project report shivnaresh likhar
Shivnaresh Likhar
 
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORTINTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
shone john
 
INTERNSHIP CERTIFICATE.PDF
INTERNSHIP CERTIFICATE.PDFINTERNSHIP CERTIFICATE.PDF
INTERNSHIP CERTIFICATE.PDFPraveen Kumar
 
Report OF Summer Training inHAVELLS INDIA LTD.(Lighting Fixture Division Neem...
Report OF Summer Training inHAVELLS INDIA LTD.(Lighting Fixture Division Neem...Report OF Summer Training inHAVELLS INDIA LTD.(Lighting Fixture Division Neem...
Report OF Summer Training inHAVELLS INDIA LTD.(Lighting Fixture Division Neem...
PPT4U
 
Industrial Training on PLC SCADA HMI for fresher engineers
Industrial Training on PLC SCADA HMI for fresher engineersIndustrial Training on PLC SCADA HMI for fresher engineers
Industrial Training on PLC SCADA HMI for fresher engineers
Sneha Yadav
 
MBA Summer Internship Project Report
MBA Summer Internship Project ReportMBA Summer Internship Project Report
MBA Summer Internship Project Report
prateek tyagi
 
Kirloskar electric ltd. internship report
Kirloskar electric ltd. internship reportKirloskar electric ltd. internship report
Kirloskar electric ltd. internship report
Pranit Patil
 

What's hot (20)

Summer Training Report
Summer Training ReportSummer Training Report
Summer Training Report
 
Industrial Training Report-II-DIMO
Industrial Training Report-II-DIMOIndustrial Training Report-II-DIMO
Industrial Training Report-II-DIMO
 
TRAINING REPORT ON INDUSTRIAL AUTOMATION- PLC SCADA, VARIABLE FREQUENCY DRIVE
TRAINING REPORT ON INDUSTRIAL AUTOMATION- PLC SCADA, VARIABLE FREQUENCY DRIVETRAINING REPORT ON INDUSTRIAL AUTOMATION- PLC SCADA, VARIABLE FREQUENCY DRIVE
TRAINING REPORT ON INDUSTRIAL AUTOMATION- PLC SCADA, VARIABLE FREQUENCY DRIVE
 
Training report of PLC
Training report of PLCTraining report of PLC
Training report of PLC
 
Summer Internship Report on PLC
Summer Internship Report on PLCSummer Internship Report on PLC
Summer Internship Report on PLC
 
Plc and scada
Plc and scadaPlc and scada
Plc and scada
 
Power point presentation on Industrial Automation
Power point presentation on Industrial AutomationPower point presentation on Industrial Automation
Power point presentation on Industrial Automation
 
Hr project bescom-proj.report
Hr project bescom-proj.reportHr project bescom-proj.report
Hr project bescom-proj.report
 
Plc & Scada report 4
Plc & Scada report 4Plc & Scada report 4
Plc & Scada report 4
 
Training Report on Automation
Training Report on AutomationTraining Report on Automation
Training Report on Automation
 
Industrial Training Report - SLT
Industrial Training Report - SLTIndustrial Training Report - SLT
Industrial Training Report - SLT
 
INDUSTRIAL AUTOMATION ( SHUBHAM KURDIYA)
INDUSTRIAL AUTOMATION ( SHUBHAM KURDIYA)INDUSTRIAL AUTOMATION ( SHUBHAM KURDIYA)
INDUSTRIAL AUTOMATION ( SHUBHAM KURDIYA)
 
Industrial Training Report on PLC & SCADA
Industrial Training Report on PLC & SCADAIndustrial Training Report on PLC & SCADA
Industrial Training Report on PLC & SCADA
 
Smart door project report shivnaresh likhar
Smart door project report shivnaresh likharSmart door project report shivnaresh likhar
Smart door project report shivnaresh likhar
 
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORTINTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
 
INTERNSHIP CERTIFICATE.PDF
INTERNSHIP CERTIFICATE.PDFINTERNSHIP CERTIFICATE.PDF
INTERNSHIP CERTIFICATE.PDF
 
Report OF Summer Training inHAVELLS INDIA LTD.(Lighting Fixture Division Neem...
Report OF Summer Training inHAVELLS INDIA LTD.(Lighting Fixture Division Neem...Report OF Summer Training inHAVELLS INDIA LTD.(Lighting Fixture Division Neem...
Report OF Summer Training inHAVELLS INDIA LTD.(Lighting Fixture Division Neem...
 
Industrial Training on PLC SCADA HMI for fresher engineers
Industrial Training on PLC SCADA HMI for fresher engineersIndustrial Training on PLC SCADA HMI for fresher engineers
Industrial Training on PLC SCADA HMI for fresher engineers
 
MBA Summer Internship Project Report
MBA Summer Internship Project ReportMBA Summer Internship Project Report
MBA Summer Internship Project Report
 
Kirloskar electric ltd. internship report
Kirloskar electric ltd. internship reportKirloskar electric ltd. internship report
Kirloskar electric ltd. internship report
 

Viewers also liked

Siemens internship 2011
Siemens internship 2011Siemens internship 2011
Siemens internship 2011
Shashidhar Shenoy
 
Motor Burnout and Under voltage protection
Motor Burnout and Under voltage protection Motor Burnout and Under voltage protection
Motor Burnout and Under voltage protection
Soumik Bakshi
 
Zibens un pārsprieguma aizsardzība
Zibens un pārsprieguma aizsardzībaZibens un pārsprieguma aizsardzība
Zibens un pārsprieguma aizsardzība
Elektrumlv
 
GSM Based Prepaid Remote Energy Meter & OverVoltage Protection
GSM Based Prepaid Remote Energy Meter & OverVoltage ProtectionGSM Based Prepaid Remote Energy Meter & OverVoltage Protection
GSM Based Prepaid Remote Energy Meter & OverVoltage ProtectionPringil Alphanso
 
Protection against overvoltage
Protection against overvoltageProtection against overvoltage
Protection against overvoltage
vishalgohel12195
 
Cochin Shipyard Limited- Organisational Study
Cochin Shipyard Limited- Organisational StudyCochin Shipyard Limited- Organisational Study
Cochin Shipyard Limited- Organisational Study
Kishore Raveendran
 
Summer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul MehraSummer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul Mehra
Rahul Mehra
 
Organisational Study Report of Cochin Shipyard Limited
Organisational Study Report of Cochin Shipyard LimitedOrganisational Study Report of Cochin Shipyard Limited
Organisational Study Report of Cochin Shipyard Limited
Kishore Raveendran
 
Protection against overvoltages
Protection against overvoltagesProtection against overvoltages
Protection against overvoltagesMaryam Nawaz
 
Digital marketing strategy presentation siemens
Digital marketing strategy presentation siemensDigital marketing strategy presentation siemens
Digital marketing strategy presentation siemens
mullern1
 
Presentation on Over-/under-voltage protection of electrical appliance
Presentation on Over-/under-voltage protection of electrical appliancePresentation on Over-/under-voltage protection of electrical appliance
Presentation on Over-/under-voltage protection of electrical appliance
Nishant Kumar
 
GSM BASED PREPAID ENERGY METER BILLING VIA SMS
GSM BASED PREPAID ENERGY METER BILLING VIA SMSGSM BASED PREPAID ENERGY METER BILLING VIA SMS
GSM BASED PREPAID ENERGY METER BILLING VIA SMS
SRINIVAS REDDY
 
OVER VOLTAGE UNDER VOLTAGE TRIPPING MECHANISM
OVER VOLTAGE UNDER VOLTAGE TRIPPING MECHANISMOVER VOLTAGE UNDER VOLTAGE TRIPPING MECHANISM
OVER VOLTAGE UNDER VOLTAGE TRIPPING MECHANISM
saigoud8121
 
CASE_STUDY ON SIEMENS COMPANY
CASE_STUDY ON SIEMENS COMPANYCASE_STUDY ON SIEMENS COMPANY
CASE_STUDY ON SIEMENS COMPANY
Devansh Sharma
 

Viewers also liked (15)

Siemens internship 2011
Siemens internship 2011Siemens internship 2011
Siemens internship 2011
 
Motor Burnout and Under voltage protection
Motor Burnout and Under voltage protection Motor Burnout and Under voltage protection
Motor Burnout and Under voltage protection
 
Zibens un pārsprieguma aizsardzība
Zibens un pārsprieguma aizsardzībaZibens un pārsprieguma aizsardzība
Zibens un pārsprieguma aizsardzība
 
GSM Based Prepaid Remote Energy Meter & OverVoltage Protection
GSM Based Prepaid Remote Energy Meter & OverVoltage ProtectionGSM Based Prepaid Remote Energy Meter & OverVoltage Protection
GSM Based Prepaid Remote Energy Meter & OverVoltage Protection
 
Protection against overvoltage
Protection against overvoltageProtection against overvoltage
Protection against overvoltage
 
Cochin Shipyard Limited- Organisational Study
Cochin Shipyard Limited- Organisational StudyCochin Shipyard Limited- Organisational Study
Cochin Shipyard Limited- Organisational Study
 
Summer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul MehraSummer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul Mehra
 
Organisational Study Report of Cochin Shipyard Limited
Organisational Study Report of Cochin Shipyard LimitedOrganisational Study Report of Cochin Shipyard Limited
Organisational Study Report of Cochin Shipyard Limited
 
Protection against overvoltages
Protection against overvoltagesProtection against overvoltages
Protection against overvoltages
 
Digital marketing strategy presentation siemens
Digital marketing strategy presentation siemensDigital marketing strategy presentation siemens
Digital marketing strategy presentation siemens
 
Presentation on Over-/under-voltage protection of electrical appliance
Presentation on Over-/under-voltage protection of electrical appliancePresentation on Over-/under-voltage protection of electrical appliance
Presentation on Over-/under-voltage protection of electrical appliance
 
GSM BASED PREPAID ENERGY METER BILLING VIA SMS
GSM BASED PREPAID ENERGY METER BILLING VIA SMSGSM BASED PREPAID ENERGY METER BILLING VIA SMS
GSM BASED PREPAID ENERGY METER BILLING VIA SMS
 
prepaid energy meter
prepaid energy meterprepaid energy meter
prepaid energy meter
 
OVER VOLTAGE UNDER VOLTAGE TRIPPING MECHANISM
OVER VOLTAGE UNDER VOLTAGE TRIPPING MECHANISMOVER VOLTAGE UNDER VOLTAGE TRIPPING MECHANISM
OVER VOLTAGE UNDER VOLTAGE TRIPPING MECHANISM
 
CASE_STUDY ON SIEMENS COMPANY
CASE_STUDY ON SIEMENS COMPANYCASE_STUDY ON SIEMENS COMPANY
CASE_STUDY ON SIEMENS COMPANY
 

Similar to Siemens EA ltd. Internship report

MES (Manufacturing Execution System) Pocket Guide
MES (Manufacturing Execution System) Pocket GuideMES (Manufacturing Execution System) Pocket Guide
MES (Manufacturing Execution System) Pocket Guide
Vera Leonik-Shilyaeva
 
Calvin Wee Resume 2015 Apr 27
Calvin Wee Resume 2015 Apr 27Calvin Wee Resume 2015 Apr 27
Calvin Wee Resume 2015 Apr 27Calvin Wee
 
Next Gen ADM: The future of application services.
Next Gen ADM: The future of application services.Next Gen ADM: The future of application services.
Next Gen ADM: The future of application services.
IBM
 
iMark Company Brochure
iMark Company BrochureiMark Company Brochure
iMark Company Brochure
imark360
 
STUDY & ANALYSIS OF MODERN INSTRUMENTS FOR PROCESS AUTOMATION & CONTROL- 6 mo...
STUDY & ANALYSIS OF MODERN INSTRUMENTS FOR PROCESS AUTOMATION & CONTROL- 6 mo...STUDY & ANALYSIS OF MODERN INSTRUMENTS FOR PROCESS AUTOMATION & CONTROL- 6 mo...
STUDY & ANALYSIS OF MODERN INSTRUMENTS FOR PROCESS AUTOMATION & CONTROL- 6 mo...
puneet8589
 
999saeed
999saeed999saeed
999saeed
saeed Tawfiq
 
13.spime senselabs
13.spime senselabs13.spime senselabs
13.spime senselabs
EITESANGO
 
Energy Management Solution - iARMS-EMS/PMS
Energy Management Solution - iARMS-EMS/PMSEnergy Management Solution - iARMS-EMS/PMS
Energy Management Solution - iARMS-EMS/PMS
Envision Enterprise Solutions America Inc.
 
Case Study: Increasing Produban's Critical Systems Availability and Performance
Case Study: Increasing Produban's Critical Systems Availability and PerformanceCase Study: Increasing Produban's Critical Systems Availability and Performance
Case Study: Increasing Produban's Critical Systems Availability and Performance
CA Technologies
 
Mayor Farm Manager
Mayor Farm ManagerMayor Farm Manager
Mayor Farm Manager
Patrick Ogbuitepu
 
IRJET- Vendor Management System using Machine Learning
IRJET-  	  Vendor Management System using Machine LearningIRJET-  	  Vendor Management System using Machine Learning
IRJET- Vendor Management System using Machine Learning
IRJET Journal
 
OPTiiM Company Brief 20-04-2016nf
OPTiiM Company Brief 20-04-2016nfOPTiiM Company Brief 20-04-2016nf
OPTiiM Company Brief 20-04-2016nfDaniel Lorer
 
Devoteam itsmf 2021 - from business automation to continuous value-driven i...
Devoteam   itsmf 2021 - from business automation to continuous value-driven i...Devoteam   itsmf 2021 - from business automation to continuous value-driven i...
Devoteam itsmf 2021 - from business automation to continuous value-driven i...
itSMF Belgium
 
Next Gen ADM: The future of application services.
Next Gen ADM: The future of application services. Next Gen ADM: The future of application services.
Next Gen ADM: The future of application services.
IBM
 
Iqms at STRUGIS ERP
Iqms at STRUGIS ERPIqms at STRUGIS ERP
Iqms at STRUGIS ERP
vivek_goyal87
 
5 Steps to Get Precise SAP Impact-Based Testing
5 Steps to Get Precise SAP Impact-Based Testing5 Steps to Get Precise SAP Impact-Based Testing
5 Steps to Get Precise SAP Impact-Based Testing
TurnKey Solutions
 

Similar to Siemens EA ltd. Internship report (20)

MES (Manufacturing Execution System) Pocket Guide
MES (Manufacturing Execution System) Pocket GuideMES (Manufacturing Execution System) Pocket Guide
MES (Manufacturing Execution System) Pocket Guide
 
Calvin Wee Resume 2015 Apr 27
Calvin Wee Resume 2015 Apr 27Calvin Wee Resume 2015 Apr 27
Calvin Wee Resume 2015 Apr 27
 
Next Gen ADM: The future of application services.
Next Gen ADM: The future of application services.Next Gen ADM: The future of application services.
Next Gen ADM: The future of application services.
 
iMark Company Brochure
iMark Company BrochureiMark Company Brochure
iMark Company Brochure
 
STUDY & ANALYSIS OF MODERN INSTRUMENTS FOR PROCESS AUTOMATION & CONTROL- 6 mo...
STUDY & ANALYSIS OF MODERN INSTRUMENTS FOR PROCESS AUTOMATION & CONTROL- 6 mo...STUDY & ANALYSIS OF MODERN INSTRUMENTS FOR PROCESS AUTOMATION & CONTROL- 6 mo...
STUDY & ANALYSIS OF MODERN INSTRUMENTS FOR PROCESS AUTOMATION & CONTROL- 6 mo...
 
999saeed
999saeed999saeed
999saeed
 
13.spime senselabs
13.spime senselabs13.spime senselabs
13.spime senselabs
 
Energy Management Solution - iARMS-EMS/PMS
Energy Management Solution - iARMS-EMS/PMSEnergy Management Solution - iARMS-EMS/PMS
Energy Management Solution - iARMS-EMS/PMS
 
Case Study: Increasing Produban's Critical Systems Availability and Performance
Case Study: Increasing Produban's Critical Systems Availability and PerformanceCase Study: Increasing Produban's Critical Systems Availability and Performance
Case Study: Increasing Produban's Critical Systems Availability and Performance
 
Mayor Farm Manager
Mayor Farm ManagerMayor Farm Manager
Mayor Farm Manager
 
IRJET- Vendor Management System using Machine Learning
IRJET-  	  Vendor Management System using Machine LearningIRJET-  	  Vendor Management System using Machine Learning
IRJET- Vendor Management System using Machine Learning
 
ERP-02
ERP-02ERP-02
ERP-02
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
OPTiiM Company Brief 20-04-2016nf
OPTiiM Company Brief 20-04-2016nfOPTiiM Company Brief 20-04-2016nf
OPTiiM Company Brief 20-04-2016nf
 
Devoteam itsmf 2021 - from business automation to continuous value-driven i...
Devoteam   itsmf 2021 - from business automation to continuous value-driven i...Devoteam   itsmf 2021 - from business automation to continuous value-driven i...
Devoteam itsmf 2021 - from business automation to continuous value-driven i...
 
Baldev CV
Baldev CVBaldev CV
Baldev CV
 
Next Gen ADM: The future of application services.
Next Gen ADM: The future of application services. Next Gen ADM: The future of application services.
Next Gen ADM: The future of application services.
 
Iqms at STRUGIS ERP
Iqms at STRUGIS ERPIqms at STRUGIS ERP
Iqms at STRUGIS ERP
 
5 Steps to Get Precise SAP Impact-Based Testing
5 Steps to Get Precise SAP Impact-Based Testing5 Steps to Get Precise SAP Impact-Based Testing
5 Steps to Get Precise SAP Impact-Based Testing
 
RFP.docx
RFP.docxRFP.docx
RFP.docx
 

Recently uploaded

1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
Steve Thomason
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
PedroFerreira53928
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
Excellence Foundation for South Sudan
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
Fundacja Rozwoju Społeczeństwa Przedsiębiorczego
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
EduSkills OECD
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
Vivekanand Anglo Vedic Academy
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
Nguyen Thanh Tu Collection
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
PedroFerreira53928
 

Recently uploaded (20)

1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 

Siemens EA ltd. Internship report

  • 1. 0 Vidya Vikas Mandal`s SHREE DAMODAR COLLEGE OF COMMERCE AND ECONOMICS REPORT ON SIEMENS ENERGY AND AUTOMATION LTD. DONE BY PIANCA GRACIAS WAYNE FERNANDES GUIDED BY Ms.Swati Bhat (ASST. PROF. IN MANAGEMENT) THIRD YEAR BACHELOR IN BUSINESS ADMINISTRATION (FINANCIAL SERVICES) 2015-2016 INTERNSHIP VENUE: SIEMENS ENERGY AND AUTOMATION LTD. GOA
  • 2. 1 TABLE OF CONTENTS CHAPTER NO. CONTENTS PAGE NO. 1 INTRODUCTION 1.1 ABOUT SIEMENS INDIA LTD. 2-3 1.2 OBJECTIVES OF THE STUDY 3 1.3 RESEARCH METHODOLOGY 3 1.4 SCOPE OF THE STUDY 4 REPORT SUMMARY 5 2 SAP AND LOGISTICS 2.1 INTRODUCTION TO SAP SOFTWARE 6-8 2.2 WORKING OF THE LOGISTICS DEPARTMENT 8-12 3 INTERNSHIP EXPERINCE AND COMPANY ANALYSIS 3.1 DAILY TASKS PERFORMED 13-15 3.2 COMPANY SWOT ANALYSIS 16 3.3 CURRENT MARKET SCENERIO 17-18 CONCLUSION
  • 3. 2 SIEMENS INDIA LTD. INTRODUCTION 1.1 ABOUT THE COMPANY Siemens in India has a history dating back to 1867 when our founder Werner von Siemens took a bold decision to build a telegraph line from London to Kolkata. This happened within 20 years of the company’s foundation in 1847. The line, stretching for 11,000 kilometers, was one of the fastest and most reliable telegraph links in the world, and passed through four different sovereign territories and the Black Sea. The line was completed in 1870, overcoming financial, technical and logistical challenges. A message could be transmitted in 28 minutes instead of the 30 days that mail took between India and England. Siemens set up a branch in India as early as 1922, in Mumbai and Kolkata. Though the company’s assets were confiscated during World War II as enemy property forcing it to shut operations, Siemens re-entered India after the war. It started operations as the “Siemens Division” of “Protos Engineering", a local contracting company. Siemens was engaged in sales and service (mostly repair and assembly) of our own brand of switchgear and switchboards. Its first workshop was located under the bridge of, what is today, the Mahalaxmi Railway Station in Mumbai. In 1957, Siemens was incorporated as a company under the Indian Companies Act as Siemens Engineering & Manufacturing Co. of India Pvt. Ltd. In 1961, Siemens became a public limited company with restricted external shareholding and was listed in the Bombay Stock Exchange a decade later.A factory was set up in 1957 in Worli to manufacture switchboards and another was set up in 1959 for medical equipment. Production of motors commenced at Kalwa in 1966 and another switchboard factory was set up in Nashik in 1981. Siemens Ltd. Started operations at two greenfield factories in Goa, with an investment of around Rs. 200 crores. The factories are equipped with state-of-the-art manufacturing equipment using lean processes similar to Siemens’ award-winning factory at Berlin.
  • 4. 3 SIEMENS ENERGY AND AUTOMATION LTD. PLANT ,GOA Siemens Ltd. Started operations at two greenfield factories in Goa, with an investment of around Rs. 200 crores. The factories are equipped with state-of-the-art manufacturing equipment using lean processes similar to Siemens’ award-winning factory at Berlin. The factories will produce a range of products for power distribution of industries, utilities, power plants, infrastructure and cities. The products include medium voltage gas-insulated switchgears of up to 36kV, primary distribution switchgears, locally-developed products like ring main units (RMU) and compact substations (CSS) for power distribution, numerical protection relays, telecontrol devices for smart grids, electromechanical auxiliary and trip relays. The factories will have their own in-house Research and Development units. Today, Siemens in India has a sales and service network that spans across the entire country, 23 manufacturing plants, eight centers of competence and 11 R&D centers. 1.2 OBJECTIVESOF THE STUDY  To learn and study about SAP software, its benefits and working of the logistics department.  To learn and gain knowledge from the internship at Siemens. 1.3 RESEARCHMETHODOLOGY The research methods used for the study were through primary sources as well as secondary sources.
  • 5. 4 Information was provided by a personal conversation with the Logistics Manager and the Quality Management team. Information was also obtained through secondary sources i.e. articles and online research papers 1.4 SCOPE OF STUDY This study will provide students and future interns with insights into of a multinational company and provide them ideas for future research, helping them to develop a reliable knowledge base about the organization and also prepare people with the expertise, commitment, and skills for management, marketing, and operations positions in these types of organizations. This report also provides a brief current market scenario of the company to know what are the current plans and issues of the company and how the company is doing in the global markets.
  • 6. 5 REPORT SUMMARY Our summer internship in Siemens energy and automation Ltd. Goa began on 11th May 2015 and ended on 20th June 2015. The timings of the internship were from 8 am to 5:30 pm. Six weeks of internship at Siemens gave us experience and knowledge about the working environment of the company and how it functions. Since our internship was specifically done in the logistics department, we have gained deeper knowledge about logistics. The department introduced us to a range of tasks to work on such as Data entry in accounting books and SAP system, Invoice matching, Quality incoming, Material parts evaluation, Inventory evaluation, Material number evaluation, Segregating PCBs (printed circuit boards), Labeling PCBs, Creation of material numbers, Quantity verification, Finding material location, Data entry of exports and imports, Clearing MRB (material rejection block), Filing incoming inspection data, Clearing inspection lots and line clearing lots, Labeling BOMs (bill of material), Scanning material barcodes, Creation of delivery notes, transfer orders and purchase orders, Quality Management module entry, Maintaining inspection records. Performing all of these tasks gave an experience of the work done in the logistics department and how it helps the organization to function.
  • 7. 6 CHAPTER – 2 SAP AND THE LOGISTICS DEPARTMENT The EA factory at Verna Goa produces Products and Systems. The Products manufactured at Siemens EA factory at Verna Goa are Relays (Devices), Sockets, Test Switches and PCBAs. The Systems manufactured are Panels. Siemens EA Goa manufacturing facility includes PCB assembly (SMT and THT), Device assembly and complete inspection and testing of all PCBS’s / Devices to ensure the products meets specification. The factory manufactures Energy Automation Devices for Smart Grid. The products are Protection Relays, RTUs (Remote Terminal Units), CRP (Control Relay Panel), Test Plugs and Test Switches. Siemens EA plant has following departments:  Business Administration – Commercial  Supply Chain Management-SCM  Logistics  Production  R&D  Infra & Maintenance  PLM – Product Lifecycle Management  Quality  HR 2.1 SAP SOFTWARE SAP software is a German multinational software known for helping enterprises in accounting management and resource planning. The software allows organizations to manage business operations, and usually refers to set of modular applications that collect and integrate data from different aspects of the business. 2.1.1 Business Benefits of SAP  Improves Alignment of Strategies and Operations  Improves Productivity and Insight
  • 8. 7  Reduces Costs through Increased Flexibility  Supports changing Industry Requirements  Reduces Risks  Improves Financial Management and Corporate Governance  Optimize IT spending  Provide immediate access to enterprise information 2.1.2 How SAP helps Siemens? SAP paved a path to the automation of end to end business processes at Siemens, thereby reducing operational costs and simplifying, optimizing and innovating business across entire value chain. SAP benefits:  Integrates Siemen’s finance, purchasing, material functions and planning and maintenance function.  Affordable and Reliable  Flexible to support Siemens specific business functions.  Increases efficiency in Operations  Promotes cooperation and healthy interaction between different departments.  Common database increases information sharing  Provides User friendly interface to the Siemens end user  Automation of labor-intensive transaction possessing. The skilled finance professionals can provide greater value to Siemens – through operational insights, strategic actions for improved performance.  Manages logistics business functions  Optimizes physical flow of materials  Simplifies Order to Cash cycle  Helps to respond faster and reach further  Curbs the integration cost over a long period by deploying the components required for the business at the time .
  • 9. 8 Major Business challenges today are globalization, compresses business cycle, increased customer expectations, goals of increased productivity. SAP helps Siemens boosts performance by achieving major goals like:  Simplify reporting  Improve Business processes  Increase relationship with Suppliers(Vendors of Materials) and Customers  Speed up operations  Optimize resources  Deliver premium service to customers  Enhance customer satisfaction  Reduces Costs through Increased Flexibility  Reduces Risks 2.2 Working of the Logistics department 2.2.1 What is Logistics? Logistics is considered to be the complete process involving planning, managing and controlling the flow of goods and services, information, real-time data and human resources from the point of origin to the point of destination. There is hardly any manufacturing or marketing activity that can be achieved without the support of an effective logistical department. The logistics process consists of the process of integration of several aspects such as material handling, warehousing, information, transportation, packaging and inventory. The primary duty of an effective logistics system is to ensure geographical repositioning of unfinished goods, and it is also concerned with the finished inventories of the organization being at the required place at the lowest possible cost. 2.2.2 Functions of the logistics department The logistics department is entrusted with the responsibilities of ensuring that the entire process of logistics is maintained and developed in accordance with the goals of the business at an economical cost. The tasks of the logistics department involve storage, distribution, warehousing, movement of goods from one place to another (internally or externally), tracking
  • 10. 9 and delivery of goods. It includes a complete process of planning, managing, controlling and coordination to make sure that the goods reach the right place, at the right time, for the right cost and in a right condition. The various tasks performed by the department may be summarized as follows: 1. Ensuring all the requirements of the customers are met on time in an efficient and safe manner. 2. To coordinate with third party logistics (3PLs). 3. To ensure that there is a safe and timely dispatch of goods. 4. To draft plans, policies and procedures for successful implementation of logistics system. 5. To ensure that the business goals of the organization are in synchronization with logistics system. 6. To create and maintain customer support. 7. To maintain coordination with vendors, service providers and transport carriers. 8. To ensure that no fraud is committed. 9. To ensure timely supply and payment of goods and reduce inventories. The department also performs numerous other tasks, namely: 1. Customer service management process - The department ensures that the goods are reached on time, in a safe condition and at the right place. It also serves as a middleman between organization, vendors and carriers for tracking down the geographical location of the goods and thereby provide customer support. 2. Procurement process - Strategic plans are developed by the department to support development of fresh product and manufacturing flow management. This helps in bringing raw materials or semi-finished goods to the premises of the organization in a safe and proper condition at an economical cost. This also involves interactions with 3PLs. The department is also responsible for coordination with suppliers with regard to scheduling, hedging and timely delivery. 3. Physical distribution - This process is concerned with the movement of finished goods to reach the point of destination. The department is responsible for the selection of the best mode of transportation while delivering the goods to the place of destination.
  • 11. 10 Thus it can be rightly concluded that the logistics department does play an important role in ensuring the delivery of goods and is therefore rightly considered as an integral part of a modern-day organization. 2.2.3 Material Management Cycle Material Master The material master contains all data required to define and manage material. It integrates data from engineering, manufacturing, sales and distribution, purchasing, accounting, and other departments. The material master is used as a source of data for processing throughout the material management cycle.
  • 12. 11 The following steps decribe the process of material master :- 1. Determination of Requirements Materials requirements are identified either in the user departments or via materials planning and control. (The regular checking of stock levels of materials defined by master records and forecasting on the basis of past usage.) You can enter purchase requisitions yourself, or they can be generated automatically by the materials planning and control system. 2. Source Determination The Purchasing component helps you identify potential sources of supply based on past orders and existing longer-term purchase agreements. This speeds the process of creating requests for quotation , which can be sent to vendors electronically via SAP, if desired. 3. Vendor Selection The system is capable of simulating pricing scenarios, allowing you to compare a number of different quotations. Rejection letters can be sent automatically. 4. Purchase Order Processing The Purchasing system adopts information from the requisition and the quotation to help you create a purchase order. As with purchase requisitions, you can generate Pos yourself or have the system generate them automatically. Vendor scheduling agreements and contracts (in the SAP System, types of longer-term purchase agreement) are also supported. 5. Purchase Order Follow-Up The system checks the reminder periods you have specified and – if necessary – automatically prints reminders or expediters at the predefined intervals. It also provides you with an up-to-date status of all purchase requisitions, quotations, and purchase orders.
  • 13. 12 6. Goods Receiving and Inventory Management Goods Receiving personnel can confirm the receipt of goods simply by entering the Po number. By specifying permissible tolerances, buyers can limit over- and under deliveries of ordered goods. 7. Invoice verification The system supports the checking and matching of invoices. The accounts payable clerk is notified of quantity and price variances because the system has access to PO and goods receipt data. This speeds the process of auditing and clearing invoices for payment.
  • 14. 13 CHAPTER 3 – INTERNSHIP EXPERIENCE AND COMPANY ANALYSIS INTERNSHIP EXPERIENCE 3.1 DAILY TASKS PERFORMED DURING INTERNSHIP  Data entry in accounting books and SAP system -SAP software known for helping enterprises in accounting management and resource planning, it allows organizations to manage business operations, and usually refers to set of modular applications that collect and integrate data from different aspects of the business.  Invoice matching – matching and arranging original export invoices with the duplicates (copies).  Quality incoming inspection – inspecting whether finished goods and material parts are damaged or have to be sent back to seller.  Material parts evaluation – checking any damage in material parts.  Inventory evaluation – verifying whether inventory is stored at the designated places and if the quantity matches with that entered in the system.  Material number evaluation – checking of material number for any mistakes as it can affect the identification and placement of the material.  Segregating PCBs (printed circuit boards) – separating the damaged PCBs from the non damaged PCBs.  Labeling PCBs – labeling bar codes on PCBs.  Creation of material numbers – creating material numbers in the SAP system for new incoming material for identification and placement.  Quantity verification – verifying whether material quantity matches the quantity entered in the SAP system.  Finding material location – verifying if material is stored according to their designated location numbers in order to avoid identification confusion.
  • 15. 14  Data entry of exports and imports – entering data (details) of every material that is being exported or imported.  Clearing MRB (material rejection block) – clearing already checked damaged goods from the MRB block.  Filing incoming inspection data – filing and making data entry of incoming inspection details.  Clearing inspection lots and line clearing lots – clearing and moving out inspected material lots.  Labeling BOMs (bill of material) – labeling material bills on finished goods as per their material number.  Scanning material barcodes – scanning material barcodes for system entry and record keeping.  Creation of delivery notes, transfer orders and purchase orders – these are created in order to keep records, to make safe deliveries and right deliveries.  Quality Management module entry - With the functions of the Quality Management (QM) module, you can implement the most important elements of a QM system, such as Basic data (for example, material master, catalogs, inspection characteristics, inspection methods and sampling procedures), Inspection planning, Sales and Distribution, Inspection lot processing (inspection lot creation and inspection lot completion), Recording results, Defects recording, Sample management, Dynamic modification etc.  Maintaining inspection records – filing of inspection material records in books and system.
  • 16. 15 3.2 SWOT ANALYSIS STRENGTHS  Experienced business units  Monetary assistance  Existing distribution and sales network  Barriers of market entry  High growth rate WEAKNESSES  Future competition  Competitive market  Costs  Tax structure  Future profitability OPPURTUNITIES  Income level is at constant increase  Growing demand  New products and services  New markets  Global markets THREATS  Global economy  Increase in labor costs  Price changes  External business risks  Financial capacity  Increasing costs
  • 17. 16 3.3 CURRENT MARKET SCENARIO OF SIEMENS 3.3.1 HIKING PROFITS The company follows October-September as its financial year. In the second quarter (January- March) of the year 2014-15, profit after tax has risen about 36 percent i.e Rs 120 crore compared to Rs 88.3 crore in December quarter.Total income from operations is likely to rise 0.2 percent year-on-year to Rs 2,713 crore in the quarter ended March 2014. Operating profit (EBITDA) may climb 18.5 percent on yearly basis to Rs 221 crore and margin may expand by 120 basis points to 8.1 percent in the quarter gone by. Additionally, raw material imports stand at 55 percent of raw material cost and 82 percent of imports are from the network of Siemens AG. Order inflows Over the last 4 quarters, Siemens maintained order inflows in the range of Rs 2,500-3,000 crore, barring the last quarter where order inflows slipped to Rs 2,089 crore. 3.3.2 FRONTIER PARTNER PROGRAM Siemens, one of the world’s oldest and most respected companies that invests over $1 billion a year for research in the US, is now embracing 3D printing–and a handful of the impressive startup companies that are currently involved in offering substantial contributions–by inviting them to join the Frontier Partner Program, managed by Siemens Technology to Business (TTB). The startups can look forward to accessing numerous developmental resources that include a year-long license to the comprehensive suite of Siemens project lifecycle management (PLM) software–to be used for new product development in 3D printing, robotics, and more. Startup partners will also be provided with mentors from Siemens and have access to others who are using the software as well.
  • 18. 17 The list of Frontier partners announced today are:  Authentise – engineering software to securely stream 3D designs directly to printers  Avante Technology – providing software that repairs and prepares 3D files for printing  Matterfab – developing a metal 3D printer for industrial use  MatterMachine – providing a platform enabling scalable bespoke manufacturing  nTopology –building software to generate optimized 3D lattice structures CONCLUSION The internship at Siemens gave us experience and knowledge about the working environment of the company and how it functions. Performing all of the given tasks gave an experience of the work done in the logistics department and how it helps the organization to function and so we have gained deeper knowledge about logistics.
  • 19. 18