HTR Productions
 Date: Saturday 26th September 2015
 Start time: 14:00pm
 Shooting crew: Rikhel Trivedi – Director, Hassan Shahid -
Cameraman
 Cast crew: Jonathan Gardner
 Transport: bus, walking
 Equipment: Camera, Tripod, SD card, Batteries, wheelchair
 Pick up camera from school, call sheet has already been filled in and
booked for Saturday.
 Before we leave, we must make sure that the battery is fully
charged and that I have a spare battery as well as the charger.
 Once all the equipment is gathered, I check if all the equipment is
running smoothly and is ready to film on Saturday.
 Pick up wheelchair and make sure its not damaged in anyway.
Train station scene:
 This scene is very important as it is the suspenseful end of our short
film. We have to make sure we capture a range of close ups to
capture the emotion coming from our protagonist.
 Have to make sure that the station looks deserted, so we have to
wait till no one else is on the platform.
 Make sure we time our filming with the train as it arrives at
different times.
 Stay behind the yellow line on the platform, so we can make sure
we film safely.

Shooting plan day 2

  • 1.
  • 2.
     Date: Saturday26th September 2015  Start time: 14:00pm  Shooting crew: Rikhel Trivedi – Director, Hassan Shahid - Cameraman  Cast crew: Jonathan Gardner  Transport: bus, walking  Equipment: Camera, Tripod, SD card, Batteries, wheelchair
  • 3.
     Pick upcamera from school, call sheet has already been filled in and booked for Saturday.  Before we leave, we must make sure that the battery is fully charged and that I have a spare battery as well as the charger.  Once all the equipment is gathered, I check if all the equipment is running smoothly and is ready to film on Saturday.  Pick up wheelchair and make sure its not damaged in anyway.
  • 4.
    Train station scene: This scene is very important as it is the suspenseful end of our short film. We have to make sure we capture a range of close ups to capture the emotion coming from our protagonist.  Have to make sure that the station looks deserted, so we have to wait till no one else is on the platform.  Make sure we time our filming with the train as it arrives at different times.  Stay behind the yellow line on the platform, so we can make sure we film safely.