INTRODUCTORY  PRESENTATION May 12, 2010 B -1206, Grow More Towers, Plot No. 5, Sector 2, Kharghar, Navi Mumbai  –  410210, India  :   [email_address]   : +919967822993
Confidential Our vision, mission & values What exactly do we do? Demonstrated RoI  People profile we’ve dealt with The team Content
Confidential Our Vision SHAW MACONS VISION … Started up with a vision of building a Global Coaching & Consulting company.  The Company’s VISION is to HELP BUILD GLOBAL ORGANIZATIONS AS WELL AS LEADERS FOR TOMORROW.  We provide clients with customized solutions that include strategic consulting services, tailor made leadership development interventions and  specific assessments as well as Leadership (Executive) Coaching.
Confidential Our Mission SHAW MACONS MISSION … To build leadership where there is a commitment to taking risks, the courage to lead by example, think big thoughts and the passion to bring those thoughts to reality.  Building client specific leadership competencies that impact the entire organization.
Confidential Our Values SHAW MACONS VALUE SYSTEM … We value our clients  We value the opportunity within human potential We value the hunger from the gut for continuous learning and development We value the achievement of goals and  We value the potential for breakthrough results Shaw Macons facilitates success for it’s clients through a wide selection of material that reflects Global thinking based on the network of successful leaders in business and the field of human development.
Confidential Our vision, mission & values What exactly do we do? Demonstrated RoI  People profile we’ve dealt with The team Content
Customized Solutions The choice of engagement depends on the organisation’s current status. We proficiently diagnose the level and provide clients with customized solutions that include strategic consulting, development interventions and  specific assessments with Executive Coaching. Establish a foundation  Standardization Low Process Maturity Ad hoc processes, constantly reinvented & often seem chaotic Acquiring Talent w/o  Job Descriptions Managing training w/o individual development plans Improve competitive edge for the organisation  Individual Development Planning Leadership Coaching Intervention Manpower Planning  Organisation Structuring Performance & Potential Measuring Competency Mapping Succession Planning Talent  Management Status High Process Maturity Improved Process Maturity Processes Processes Health Check, Employees’ Engagement Study Building  Key Processes & Practices Productivity & Best Practice building for Standardization Best in Breed Practices Confidential
Confidential Some Offering … Start with a detailed process  health check Build frame work for  Organisation Structuring   Policy with process for  Workforce Planning Lay out the policy and process for  Talent Acquisition  (Hiring) Competency  Framework  Development Talent  Retention  processes Performance Measuring System Succession Planning Individual Development Planning Leadership Coaching PLAN Assess, Define, & Build IMPLEMENT Communicate & Commit SUSTAIN Reinforce & Measure Alignment & Integration Evaluate Impact Communication – Learning - Reinforcement
Confidential Health Check … The detailing for a  Health Check  would involve Understand the business strategy,  Identify the formal and informal stake holders across the levels, Interview key performers and stakeholders,  Designing the structured questionnaire, Administer the questionnaire, Collate the relevant material and facts, Analyze the data Develop a detailed implementation strategy  and Finally, report out with the next steps that the organisation should follow through on Back to list
Confidential Organisation Structuring … An  Organisation Structuring  exercise involves Understand the business strategy,  Study the industry specifics, Develop the model template for the core functions, Designing the structure, Build scalability Define core job description templates Assemble the data Develop the detailed implementation strategy  Determine frequency of validation and Finally, report out with the documentation to follow through Back to list
Confidential Workforce Planning … The detailing for a  Workforce Planning system  would involve Demand Management - demand is identified and made measurable by key data.  Plan for gender, cultural and religious diversity,  Forecast work orders to help plan the number and skills of technical members that will be needed.  Workforce Scheduler - uses predefined rules to optimize the schedule and use of resources Workforce Dispatcher - assigning work orders within predefined zones to particular technicians  Communicate on real time basis Finally, report out with the documentation to follow through Back to list
Confidential Talent Acquisition … A  Talent Acquisition  system involves Workflow based on Workforce planning, Requisitioning of requirement,  Sourcing methods, Specific functional competency based interviewing, Candidates verification process, Managing compensation fitment Negotiation and Offer letter The pre joining and joining process, Finally, the documentation to follow through on the system Note : Training & Certification for Competency based interviewing can be run separately as an intervention if the client so desires, at an investment. Back to list
Confidential Competency Development … Competency  Framework  Development  detailing would involve Understand business strategy,  Interview key performers and  Interview key stakeholders,  Examples of effective and ineffective behavior related to job are collected from people with knowledge of job., Developing a model with behaviorally anchored rating scales (BARS*), Reclassify the incidents  Convert these behaviors in to performance dimensions Test and validate the model  Developing a detailed implementation strategy  Finally, report out including next steps that the organisation should follow through on Back to list
Confidential Talent Retention … The  Talent Retention & Attrition Management  system includes  Understanding the attrition issue The pre joining workflow The on boarding process The cost of attrition Retention management & control Engagement challenges The (EWS) Early Warning System Note : Training & Certification with coaching on the Early Warning System can be run separately as an intervention if the client so desires, at an investment. Back to list
Confidential Productivity Improvement … The design of a  Performance Management  system would involve Understanding the organisational performance measurement maturity, Design the process to evolve from a subjective (person dependant) system to an objective (result focused), transparent system, Setting up the organisation, function and individual performance target setting system Setting up the frequency of monitoring, measuring and reviewing performance Linkage to managing Reward & Recognition Finally, the documentation to follow through on the system Note : Coaching leadership to  effectively deliver feedback  is run as a separate intervention. Back to list
Confidential Succession Planning … The design of a  Succession Planning system  requires Demand Management - measurable by key data, The design of the Organisation’s Human Resource Planning,  People and position tracking, The “What & How” framework, The frequency of review Finally, report out with the system documentation to follow through for future implementation Back to list
Confidential Individual Development Plan … The system of an  Individual Development Planning  cycle includes Methods of engagement  in evaluation of individual knowledge, skills and competencies, Direct and transparent discussion about performance, potential and career goals  It’s alignment with the Organisation’s Human Resource Plan … People and position tracking, The “What & How” framework for the individual’s development process The frequency of review and  Finally, report out with the system documentation to follow through for future implementation Back to list
Confidential Our Offering …  continued Leadership Coaching Our passion for Leadership Coaching makes Bomi bring in specialised competencies, taking the client’s leadership through building behavioral process maturity as well as the oraganisation’s individual leadership competencies at it’s apex level. Bomi’s Coaching interventions include Executive Coaching, Career Coaching, and Life Coaching using the NeuroLeadership Model of Results Coaching Systems (Australia). He has extensive experience in using various psychometric tools (such as MBTI, 360 degrees and DISC) and is a Life member of the National HRD Network for the past 15 years. Back to list
Confidential Our vision, mission & values What exactly do we do? Demonstrated RoI  People profile we’ve dealt with The team Content
Called by Dell in April 2005 to set up HR Generalist function  across India Created the employees’  Retention Blue Book  with controls, saving US$ 1.3 billion per annum, that became Global Standards acknowledged by Dell’s Leaders across EMEA, APAC besides India Global Lead  for  Agents’ Certification Programme  at Dell for Contact Centers World Wide … created the framework, trained the trainers to run the Certification Programme with potential savings of US$ 28 million per annum APJ  Regional Lead  for  Business Continuity & Recovery Planning .  Operations Auditor  for the  Dell – Malaysia (Mfg. facility)  besides the four sites across India Demonstrated Return on Investment Confidential
Recalled  by the Reliance Group in June 2007 Set up systems & controls at Reliance Life Sciences  leading to Saving employee costs by 33%, Increased headcount from 783 in July 2007 to 1306 by March 2008 with  52% post graduates & PhDs …  instrumental in more than double the turn over in the following year Rs.78 Cr. revenue FY’07 – ’08 Rs.207Cr. revenue FY’08 – ‘09 Demonstrated Return on Investment Confidential
Confidential Our vision, mission & values What exactly do we do? Demonstrated RoI  People profile we’ve dealt with The team Content
Confidential People profile …  Over the last fifteen years, Bomi h as been  a mentor to  The CEO of an Office Automation Company Managing Committee of an Imaging Systems Company Executive Director of a Software Development Company Presidents of Oil & Gas, Agrotech, Infrastructure and Cellular divisions Managing Director of a Software Systems Company a coach to  A Bio Pharma CEO from Germany and  Another Bio Pharma CEO in UK Two CEOs in Clinical Research & Semiconductor in USA,  Two Presidents of Solar, Health Care & Bio fuels businesses He’s worked with the Senior Management Teams from nationalities across the globe, including China, Singapore, Malaysia, Philippines and Australia.
The International CoheChange Network : A body of International Leadership Consulting & Coaching is a Global group of Coaches, Trainers and Consultants with a background in intercultural environments across many parts of the globe. Bomi is the only Indian figure in this Global Group with members from United States, United Kingdom, France, Italy, Germany, Belguim, Switzerland, Czech Republic, Gautemala and South Africa. To view The International CoheChange Network  please go to  http://thecohechangenetwork.com/  in your browser or click  here . To view Bomi’s profile at the Coach Exchange click  here . Our International Connections …  Confidential
Confidential Our Friends & Advisors Dr. John C Beck – Dean at Globis University, Tokyo, Japan. President at North Star Leadership Group. CEO at The Attention Company  Frank Flynn – Head of Organizational Behavior at the Graduate School of Business at Stanford University Romi Malhotra – Serial entrepreneur and ex Managing Director of Dell International Services in India. Founder & CEO at Dominion CXO Forum and Leadership Development, now MD of  Linkage Inc.,  in India
A few of our Customers & Consultancy Assignments  HR Strategic Planning + Organisation Structuring as well as Key Talent Acquisition and Management System for Veling Aircraft Parts and Components (VAPAC) in Dubai Set Up Training, Learning & Development function @ JW Marriott's (Ducet Group) of Hotels – Dubai Identified causes, Strategized and Initiated specific OD interventions @ Four Seasons Hotel – London System on Managing Attrition@ Dell Health Check (employee engagement survey), Organization Structuring, Revamping their Compensation Structure and introducing a Succession Planning System @ Convonix (Internet Marketing Company) Confidential
Confidential Just some of the programs / workshops conducted by our key facilitator include  @ Greaves Cotton  – Finance for Non Finance & around 20 MDPs @ Eicher  – 16 programs on Basics of TQM & 12 others on TQM @ Modi Group  – 18 workshops on Leadership through Quality @ IDM (HCL Group)  – 6 workshops on Business Process Reengineering @ (RPG) Searle  – 18 workshops on Performance Management, Succession Planning @ Reliance Industries  –  60 workshops on Performance Management, communications & MDPs @ Ducet  – 6 workshops on Customer Interface @ Dell  – approximately 48 Workshops on Managing Attrition, 3 workshops on Succession Planning & 12 workshops on Industrial Relations @ Reliance Life Sciences  – more than 20 MDPs @ Monster.com  – Strategic Leadership Workshop @ BHEL  – “Dealing with Ambiguity” for their top line management team @ TNT  – 3 workshops on MDP These does not include other programs that he has conducted on various other platforms like NHRDN, NIPM, Etc Programs / workshops conducted include …
Confidential Our vision, mission & values What exactly do we do? Demonstrated RoI  People profile we’ve dealt with The team Content
Confidential The Team The Company’s started by Bomi Manekshaw 22 years corporate experience Group HR Head – Reliance Life Sciences National Director – HR Generalist for Dell International Services  Has been Head of HR for more than 30 industry verticals including  Heavy Engineering,  Infrastructure,  Automotive,  Oil & Gas,  Coal Bed Methane,  Petroleum,  Agrochemicals,  Bio fuel,  Bio Pharma, Pharmaceuticals,  Clinical Research,  Healthcare,  Insurance,  Office Automation,  Telecom (cellular & fixed lines),  IT (software & hardware) plus ITeS,  Solar,  Semiconductor and several others
Confidential The Team Bomi is … A Graduate in Psychology from University of Bombay. A Masters’ in Organisational Behavior from Independence, Missouri – USA,  A Post Grad. in Training and Development and  A Bachelor of General Law from University of Bombay. Currently pursuing the ICF Master Coach Certification with Results Coaching Systems (Australia) BUT ABOVE ALL … Over the last decade plus, h e’s been a coach to CEOs from USA, Germany  as well as UK. He has worked with the Senior Management from across a very wide range of nationalities worldwide, including Singapore, China, Malaysia, Philippines and Australia.
THANK YOU  May 12, 2010

Shawmacons - Profile

  • 1.
    INTRODUCTORY PRESENTATIONMay 12, 2010 B -1206, Grow More Towers, Plot No. 5, Sector 2, Kharghar, Navi Mumbai – 410210, India : [email_address] : +919967822993
  • 2.
    Confidential Our vision,mission & values What exactly do we do? Demonstrated RoI People profile we’ve dealt with The team Content
  • 3.
    Confidential Our VisionSHAW MACONS VISION … Started up with a vision of building a Global Coaching & Consulting company. The Company’s VISION is to HELP BUILD GLOBAL ORGANIZATIONS AS WELL AS LEADERS FOR TOMORROW. We provide clients with customized solutions that include strategic consulting services, tailor made leadership development interventions and specific assessments as well as Leadership (Executive) Coaching.
  • 4.
    Confidential Our MissionSHAW MACONS MISSION … To build leadership where there is a commitment to taking risks, the courage to lead by example, think big thoughts and the passion to bring those thoughts to reality. Building client specific leadership competencies that impact the entire organization.
  • 5.
    Confidential Our ValuesSHAW MACONS VALUE SYSTEM … We value our clients We value the opportunity within human potential We value the hunger from the gut for continuous learning and development We value the achievement of goals and We value the potential for breakthrough results Shaw Macons facilitates success for it’s clients through a wide selection of material that reflects Global thinking based on the network of successful leaders in business and the field of human development.
  • 6.
    Confidential Our vision,mission & values What exactly do we do? Demonstrated RoI People profile we’ve dealt with The team Content
  • 7.
    Customized Solutions Thechoice of engagement depends on the organisation’s current status. We proficiently diagnose the level and provide clients with customized solutions that include strategic consulting, development interventions and specific assessments with Executive Coaching. Establish a foundation Standardization Low Process Maturity Ad hoc processes, constantly reinvented & often seem chaotic Acquiring Talent w/o Job Descriptions Managing training w/o individual development plans Improve competitive edge for the organisation Individual Development Planning Leadership Coaching Intervention Manpower Planning Organisation Structuring Performance & Potential Measuring Competency Mapping Succession Planning Talent Management Status High Process Maturity Improved Process Maturity Processes Processes Health Check, Employees’ Engagement Study Building Key Processes & Practices Productivity & Best Practice building for Standardization Best in Breed Practices Confidential
  • 8.
    Confidential Some Offering… Start with a detailed process health check Build frame work for Organisation Structuring Policy with process for Workforce Planning Lay out the policy and process for Talent Acquisition (Hiring) Competency Framework Development Talent Retention processes Performance Measuring System Succession Planning Individual Development Planning Leadership Coaching PLAN Assess, Define, & Build IMPLEMENT Communicate & Commit SUSTAIN Reinforce & Measure Alignment & Integration Evaluate Impact Communication – Learning - Reinforcement
  • 9.
    Confidential Health Check… The detailing for a Health Check would involve Understand the business strategy, Identify the formal and informal stake holders across the levels, Interview key performers and stakeholders, Designing the structured questionnaire, Administer the questionnaire, Collate the relevant material and facts, Analyze the data Develop a detailed implementation strategy and Finally, report out with the next steps that the organisation should follow through on Back to list
  • 10.
    Confidential Organisation Structuring… An Organisation Structuring exercise involves Understand the business strategy, Study the industry specifics, Develop the model template for the core functions, Designing the structure, Build scalability Define core job description templates Assemble the data Develop the detailed implementation strategy Determine frequency of validation and Finally, report out with the documentation to follow through Back to list
  • 11.
    Confidential Workforce Planning… The detailing for a Workforce Planning system would involve Demand Management - demand is identified and made measurable by key data. Plan for gender, cultural and religious diversity, Forecast work orders to help plan the number and skills of technical members that will be needed. Workforce Scheduler - uses predefined rules to optimize the schedule and use of resources Workforce Dispatcher - assigning work orders within predefined zones to particular technicians Communicate on real time basis Finally, report out with the documentation to follow through Back to list
  • 12.
    Confidential Talent Acquisition… A Talent Acquisition system involves Workflow based on Workforce planning, Requisitioning of requirement, Sourcing methods, Specific functional competency based interviewing, Candidates verification process, Managing compensation fitment Negotiation and Offer letter The pre joining and joining process, Finally, the documentation to follow through on the system Note : Training & Certification for Competency based interviewing can be run separately as an intervention if the client so desires, at an investment. Back to list
  • 13.
    Confidential Competency Development… Competency Framework Development detailing would involve Understand business strategy, Interview key performers and Interview key stakeholders, Examples of effective and ineffective behavior related to job are collected from people with knowledge of job., Developing a model with behaviorally anchored rating scales (BARS*), Reclassify the incidents Convert these behaviors in to performance dimensions Test and validate the model Developing a detailed implementation strategy Finally, report out including next steps that the organisation should follow through on Back to list
  • 14.
    Confidential Talent Retention… The Talent Retention & Attrition Management system includes Understanding the attrition issue The pre joining workflow The on boarding process The cost of attrition Retention management & control Engagement challenges The (EWS) Early Warning System Note : Training & Certification with coaching on the Early Warning System can be run separately as an intervention if the client so desires, at an investment. Back to list
  • 15.
    Confidential Productivity Improvement… The design of a Performance Management system would involve Understanding the organisational performance measurement maturity, Design the process to evolve from a subjective (person dependant) system to an objective (result focused), transparent system, Setting up the organisation, function and individual performance target setting system Setting up the frequency of monitoring, measuring and reviewing performance Linkage to managing Reward & Recognition Finally, the documentation to follow through on the system Note : Coaching leadership to effectively deliver feedback is run as a separate intervention. Back to list
  • 16.
    Confidential Succession Planning… The design of a Succession Planning system requires Demand Management - measurable by key data, The design of the Organisation’s Human Resource Planning, People and position tracking, The “What & How” framework, The frequency of review Finally, report out with the system documentation to follow through for future implementation Back to list
  • 17.
    Confidential Individual DevelopmentPlan … The system of an Individual Development Planning cycle includes Methods of engagement in evaluation of individual knowledge, skills and competencies, Direct and transparent discussion about performance, potential and career goals It’s alignment with the Organisation’s Human Resource Plan … People and position tracking, The “What & How” framework for the individual’s development process The frequency of review and Finally, report out with the system documentation to follow through for future implementation Back to list
  • 18.
    Confidential Our Offering… continued Leadership Coaching Our passion for Leadership Coaching makes Bomi bring in specialised competencies, taking the client’s leadership through building behavioral process maturity as well as the oraganisation’s individual leadership competencies at it’s apex level. Bomi’s Coaching interventions include Executive Coaching, Career Coaching, and Life Coaching using the NeuroLeadership Model of Results Coaching Systems (Australia). He has extensive experience in using various psychometric tools (such as MBTI, 360 degrees and DISC) and is a Life member of the National HRD Network for the past 15 years. Back to list
  • 19.
    Confidential Our vision,mission & values What exactly do we do? Demonstrated RoI People profile we’ve dealt with The team Content
  • 20.
    Called by Dellin April 2005 to set up HR Generalist function across India Created the employees’ Retention Blue Book with controls, saving US$ 1.3 billion per annum, that became Global Standards acknowledged by Dell’s Leaders across EMEA, APAC besides India Global Lead for Agents’ Certification Programme at Dell for Contact Centers World Wide … created the framework, trained the trainers to run the Certification Programme with potential savings of US$ 28 million per annum APJ Regional Lead for Business Continuity & Recovery Planning . Operations Auditor for the Dell – Malaysia (Mfg. facility) besides the four sites across India Demonstrated Return on Investment Confidential
  • 21.
    Recalled bythe Reliance Group in June 2007 Set up systems & controls at Reliance Life Sciences leading to Saving employee costs by 33%, Increased headcount from 783 in July 2007 to 1306 by March 2008 with 52% post graduates & PhDs … instrumental in more than double the turn over in the following year Rs.78 Cr. revenue FY’07 – ’08 Rs.207Cr. revenue FY’08 – ‘09 Demonstrated Return on Investment Confidential
  • 22.
    Confidential Our vision,mission & values What exactly do we do? Demonstrated RoI People profile we’ve dealt with The team Content
  • 23.
    Confidential People profile… Over the last fifteen years, Bomi h as been a mentor to The CEO of an Office Automation Company Managing Committee of an Imaging Systems Company Executive Director of a Software Development Company Presidents of Oil & Gas, Agrotech, Infrastructure and Cellular divisions Managing Director of a Software Systems Company a coach to A Bio Pharma CEO from Germany and Another Bio Pharma CEO in UK Two CEOs in Clinical Research & Semiconductor in USA, Two Presidents of Solar, Health Care & Bio fuels businesses He’s worked with the Senior Management Teams from nationalities across the globe, including China, Singapore, Malaysia, Philippines and Australia.
  • 24.
    The International CoheChangeNetwork : A body of International Leadership Consulting & Coaching is a Global group of Coaches, Trainers and Consultants with a background in intercultural environments across many parts of the globe. Bomi is the only Indian figure in this Global Group with members from United States, United Kingdom, France, Italy, Germany, Belguim, Switzerland, Czech Republic, Gautemala and South Africa. To view The International CoheChange Network please go to http://thecohechangenetwork.com/ in your browser or click here . To view Bomi’s profile at the Coach Exchange click here . Our International Connections … Confidential
  • 25.
    Confidential Our Friends& Advisors Dr. John C Beck – Dean at Globis University, Tokyo, Japan. President at North Star Leadership Group. CEO at The Attention Company Frank Flynn – Head of Organizational Behavior at the Graduate School of Business at Stanford University Romi Malhotra – Serial entrepreneur and ex Managing Director of Dell International Services in India. Founder & CEO at Dominion CXO Forum and Leadership Development, now MD of Linkage Inc., in India
  • 26.
    A few ofour Customers & Consultancy Assignments HR Strategic Planning + Organisation Structuring as well as Key Talent Acquisition and Management System for Veling Aircraft Parts and Components (VAPAC) in Dubai Set Up Training, Learning & Development function @ JW Marriott's (Ducet Group) of Hotels – Dubai Identified causes, Strategized and Initiated specific OD interventions @ Four Seasons Hotel – London System on Managing Attrition@ Dell Health Check (employee engagement survey), Organization Structuring, Revamping their Compensation Structure and introducing a Succession Planning System @ Convonix (Internet Marketing Company) Confidential
  • 27.
    Confidential Just someof the programs / workshops conducted by our key facilitator include @ Greaves Cotton – Finance for Non Finance & around 20 MDPs @ Eicher – 16 programs on Basics of TQM & 12 others on TQM @ Modi Group – 18 workshops on Leadership through Quality @ IDM (HCL Group) – 6 workshops on Business Process Reengineering @ (RPG) Searle – 18 workshops on Performance Management, Succession Planning @ Reliance Industries – 60 workshops on Performance Management, communications & MDPs @ Ducet – 6 workshops on Customer Interface @ Dell – approximately 48 Workshops on Managing Attrition, 3 workshops on Succession Planning & 12 workshops on Industrial Relations @ Reliance Life Sciences – more than 20 MDPs @ Monster.com – Strategic Leadership Workshop @ BHEL – “Dealing with Ambiguity” for their top line management team @ TNT – 3 workshops on MDP These does not include other programs that he has conducted on various other platforms like NHRDN, NIPM, Etc Programs / workshops conducted include …
  • 28.
    Confidential Our vision,mission & values What exactly do we do? Demonstrated RoI People profile we’ve dealt with The team Content
  • 29.
    Confidential The TeamThe Company’s started by Bomi Manekshaw 22 years corporate experience Group HR Head – Reliance Life Sciences National Director – HR Generalist for Dell International Services Has been Head of HR for more than 30 industry verticals including Heavy Engineering, Infrastructure, Automotive, Oil & Gas, Coal Bed Methane, Petroleum, Agrochemicals, Bio fuel, Bio Pharma, Pharmaceuticals,  Clinical Research, Healthcare, Insurance, Office Automation, Telecom (cellular & fixed lines), IT (software & hardware) plus ITeS, Solar, Semiconductor and several others
  • 30.
    Confidential The TeamBomi is … A Graduate in Psychology from University of Bombay. A Masters’ in Organisational Behavior from Independence, Missouri – USA, A Post Grad. in Training and Development and A Bachelor of General Law from University of Bombay. Currently pursuing the ICF Master Coach Certification with Results Coaching Systems (Australia) BUT ABOVE ALL … Over the last decade plus, h e’s been a coach to CEOs from USA, Germany as well as UK. He has worked with the Senior Management from across a very wide range of nationalities worldwide, including Singapore, China, Malaysia, Philippines and Australia.
  • 31.
    THANK YOU May 12, 2010