The Steps to Effective SharePoint Governance
Richard Harbridge – Senior SharePoint Evangelist


#SPCloud @RHarbridge
#SPGov @RHarbridge
Our Goal Today…
               From Here   To Here




#SPGov @RHarbridge
#SPGov @RHarbridge
#SPGov @RHarbridge
Why Do I Need
               Effective Governance?


#SPGov @RHarbridge
There are big risks that are
     almost always realized when you
              don’t have it!



#SPGov @RHarbridge
SharePoint Sprawl
  He was only intending to build a two-story
  house - larger than those of his neighbors to
  reflect his position as the city's richest man.
                                            “First I added three floors but then the house
                                            looked ungainly, like a mushroom," he said. "So
                                            I added another and it still didn't look right so I
                                            kept going…”

    Risk: Un-Managed Sites and Content were
    not periodically reviewed for accuracy and
    relevance.
#SPGov @RHarbridge
Quality Deterioration




    Risk: Did not ensure that content quality
    is maintained for the life of the portal.
#SPGov @RHarbridge
Frustration Failure




    Risk: Did not consistently provide a high
    quality user experience.
#SPGov @RHarbridge
Priority Paralysis
    Project                             Priority
    Fileshare Migration                     1
    Partner Extranet                        1
    Executives Kitten Picture Rotator       1
    Risk: Did not establish clear decision
    Legacy Application Integration          1
    Governance Planning                     1
    making authority/ownership and
    Put Out Server Room Fires               1
    escalation procedures so that conflicts are
#SPGov @RHarbridge in a timely manner.
    resolved
Ineffective Use of Time/Resources




    Risk: Did not ensure that the portal
    strategy is aligned with clear prioritized
#SPGov @RHarbridge objectives.
    business
It’s not just about insuring
     against or mitigating those risks!




#SPGov @RHarbridge
What does
                     that mean?



          Without effective governance
         organization, performance, and
       capability are significantly reduced.
#SPGov @RHarbridge
Without Governance




#SPGov @RHarbridge
Executing Governance




#SPGov @RHarbridge
With Governance




#SPGov @RHarbridge
The Outcome
           You can now communicate why
          Governance is important/required.



#SPGov @RHarbridge
What to watch out for…
          It’s not insurance. It makes your
      SharePoint investments more successful.



#SPGov @RHarbridge
Building The
                     Governance Teams


#SPGov @RHarbridge
How do we start?




#SPGov @RHarbridge
Recommended Governance Teams
 There are typically 5 teams for SharePoint Governance:
  Business Strategy Team
  Solutions/Technical Strategy Team
  Tactical Teams:
         Tactical Operations Team
         Tactical Development Team
         Tactical Support Team

#SPGov @RHarbridge
The Strategy Teams




#SPGov @RHarbridge
Governance Teams
           Business Strategy Team
           Solutions/Technical Strategy Team
           Tactical Teams:
               Tactical Operations Team
               Tactical Development Team
               Tactical Support Team
#SPGov @RHarbridge
Business Strategy Team
Role: Provide strategic insight,         Sample Representative Interests
                                         Executive Sponsor
      direction and prioritization for
                                         Knowledge Management
      the portal.                        Information/Technology Services
                                         Finance
                                         Sales and Marketing
                                         Human Resources
                                         Legal and Compliance
  Decentralized             Business     Operations
                                         People Development and Training
       IT                  Centralized
                                         Administration

#SPGov @RHarbridge
Define, Prioritize and Plan




#SPGov @RHarbridge
Governance Teams
           Business Strategy Team
           Solutions/Technical Strategy Team
           Tactical Teams:
               Tactical Operations Team
               Tactical Development Team
               Tactical Support Team
#SPGov @RHarbridge
Solution (Technical) Strategy Team
               Role: Provide technical insight,
                     direction and prioritization for
                     the portal.           Sample Representative Interests
                                                Application Development
                                                Infrastructure
                                                Enterprise Architecture
                                                Security
          Tip: If a business direction requires new
                                            People Development and Training
          integration or effort with other technologies
                                            Communications
          then a technical representative for that
          technology will be necessary.
#SPGov @RHarbridge
Map Solutions to Objectives
                                 Direct Relationship  Indirect Relationship
                        Centralize                      Automate and       Enhance       Reduce
                                        Enhance
                        Knowledge and                   Improve Business   Governance    Redundancy and
                                        Collaboration
                        Resources                       Processes          Model         Improve Efficiency
    Adjust Site
    Structure
                                                                                            
    Migrate File
    Shares
                                                                                             
    Create Dashboards                                                                       
    Workflow Solution                                                                        
    Configure Search
    Services
                                                                                            
    Branding                                                                  
                         * Objectives should be more specific – Example purposes only.
#SPGov @RHarbridge
SharePoint will be…
      Utilized by Business Users to develop and implement business solutions that use
       technology without IT’s direct involvement.
      Our primary unified application delivery platform.
      Our primary workflow/business process automation platform.
      Our intranet and communication center for internal corporate communications.

                SharePoint will not be…
      Our (external) web content management platform.
      Our primary document management platform.
      Our contact management platform.
#SPGov @RHarbridge
Strategic Responsibilities
       Defining Clear Objectives and Priorities
       High Level Solutions Definition and Ownership
       High Level Platform Classification
       Communication Planning and Management
       Resource/Capability Management
       Expectation Management



#SPGov @RHarbridge
Define Governance Control Levels
                                       Home Page
“PUBLIC” SITES: Open                                                 Tightly
to all employees                                                   controlled,
                                     Functional Areas                formal
                                                                   governance
                                    Department Site –
                                        “Public”
“PRIVATE” SITES: Open                                           Some control, some
to business group            Department Team Site – “Private”   formal governance
members
                                                                 Looser control,
                               Project/Initiative Team Sites
TEAM SITES: Generally open                                         less formal
to team members                                                   governance
                                 Personal Sites– My Sites
#SPGov @RHarbridge
The Tactical Teams




#SPGov @RHarbridge
Governance Teams
           Business Strategy Team
           Solutions/Technical Strategy Team
           Tactical Teams:
               Tactical Operations Team
               Tactical Development Team
               Tactical Support Team
#SPGov @RHarbridge
The Tactical Operations Team
    Role: Provide operational (IT-related)
          support and maintenance for Sample Representative Interests
          the system infrastructure      Infrastructure
                                             Domain Administrators
                                             Networking
                                             Servers and Environments
                                             Quality Assurance
            They manage the more routine maintenance of
                                           Security
            the system by performing nightly backups,
                                           Databases
            performance monitoring and analysis, and
            keeping the environment current with security
#SPGov @RHarbridge
            releases and upgrades.
Operations Responsibilities
     Objectives/Priorities
     Disaster Recovery Plan
     Storage and Quota Policies
     Monitoring Plans
     Maintenance Plans
     Service Level Agreements
     Security Policies
     Deployment Process, Policies, and Schedule
#SPGov @RHarbridge
Governance Teams
           Business Strategy Team
           Solutions/Technical Strategy Team
           Tactical Teams:
               Tactical Operations Team
               Tactical Development Team
               Tactical Support Team
#SPGov @RHarbridge
The Tactical Development Team
  Role: Customize/configure,
        personalize, and leverage           Sample Representative Interests
        SharePoint to achieve business      SharePoint Designer
        objectives.                         Visual Studio
                                            Source Control
                                            Quality Assurance
                                            Webparts
                                            Templates
           This team is a loosely-knit community who's
           membership ranges from highly skilled
           programmers to technically savvy end users in
#SPGov @RHarbridge of personalizing departmental team sites.
           charge
Development Responsibilities
     Objectives/Priorities
     Branding Guide
     SharePoint Designer Policy
     Workflow Policy
     Development Standards (Including OOTB vs Custom)
     Development Environment Policy
     Testing Requirements
     Deployment Process, Policies, and Schedule
#SPGov @RHarbridge   SharePoint Standards Online
Governance Teams
           Business Strategy Team
           Solutions/Technical Strategy Team
           Tactical Teams:
               Tactical Operations Team
               Tactical Development Team
               Tactical Support Team
#SPGov @RHarbridge
The Tactical Support Team
   Role: Provide support of the
                                            Sample Representative Interests
         SharePoint applications and
                                            Support and HelpDesk
         platform.                          People Development and Training
                                            Knowledge Management
                                            Taxonomy and Ontology
                                            Navigation and Organization
                                            Coaching
          Creates and manages a support system with
          effective training and proper channels of
          question or issue escalation and resolution. This
          team should also include influential users and
#SPGov @RHarbridge
          leaders.
Support Responsibilities
     Objectives/Priorities
     Site Classification and Platform Classification
     Site Provisioning Process/Questionnaire
     User Expectations Agreement
     Roles and Responsibilities
     Support Agreement(s)
     Training and Communication Plans
     MySite Policies (Pictures)…
#SPGov @RHarbridge
Support Responsibilities
     User Lifecycle Policy
     Taxonomy Management
     Social Policies
     Content Standards
     Legal and Compliance Policy
     Search Management



#SPGov @RHarbridge   SharePoint Standards Online
Multiple Tiers everything)
                 (You can’t know
                                 for Escalation
                                Tactical Support Team


                                      Help Desk


                                 Site Administrators


                                      End Users


                            Learning Libraries/Online/Help




#SPGov @RHarbridge
Measure to be proactive.
                     Learn and use data
                                        Support




#SPGov @RHarbridge
Deployment Process/Policies




                          Extremely Important! Ensure
                          you have clear schedules and
                          ownership.
#SPGov @RHarbridge
Governance Tip
                If possible have one member in all
                of the Governance teams or some
                members across multiple teams!




#SPGov @RHarbridge
Governance Tip
          Create a “Business Solution Governance
          Team”. This team allows you to find business
          users who want to be involved.




#SPGov @RHarbridge
The Outcome
     Everyone Achieves a Shared Understanding
          of SharePoint Related Processes.



#SPGov @RHarbridge
What to watch out for…
          Not just documents, policies, and
        procedures. It is an active and ongoing
                        process.


#SPGov @RHarbridge
Setting Up A
                     Governance Site


#SPGov @RHarbridge
Why a Governance Site?
  1. It’s a lot of content.
  2. It’s a collaborative process.
  3. It’s an ongoing process.
  4. Each piece of content should
     have a clear owner.
  5. Content will need to
     be shared.



#SPGov @RHarbridge
Governance Announcements




#SPGov @RHarbridge
SharePoint Solutions Listing



                     In addition you can also create a
                     ‘Roadmap’ or basically a Gantt Chart or
                     visual indicator of solutions to show
                     what you have achieved and where you
#SPGov @RHarbridge   are going with SharePoint.
Team Rosters and Definitions




#SPGov @RHarbridge
Policies, Standards and Guidelines
                                   Use Search, Metadata, and
                                   Approval Workflows to help
                                   improve management and user
                                   experience.

       For living documents/standards that
       require many authors try a Wiki!

#SPGov @RHarbridge   SharePoint Standards Online
FAQs and a Glossary




#SPGov @RHarbridge     SharePoint Glossary Online
Patterns and Practices




#SPGov @RHarbridge
Team Resources and Minutes




#SPGov @RHarbridge
Feedback and Surveys

                              Embed feedback
                              options throughout
                              the sites!
        Don’t forget to
        share stories!


#SPGov @RHarbridge
Self Help and Support Resources




#SPGov @RHarbridge
Self Help and Support Resources




#SPGov @RHarbridge
Complete Site Listing


   Include things like:
   • The owner and secondary owner of the site.
   • The purpose of the site.
   • The URL, Size, and Usage Level of the site.
   • The last time the site was engaged by the
       support team.
#SPGov @RHarbridge
The Outcome
    Using the SharePoint Platform we can more
    effectively manage SharePoint Governance.



#SPGov @RHarbridge
What to watch out for…
          Just having the Governance site isn’t
          enough. Content must remain fresh.



#SPGov @RHarbridge
Governance Resources



#SPGov @RHarbridge
IS



                     Use them.
#SPGov @RHarbridge
Governance Checklist




#SPGov @RHarbridge
TechNet, Community and More..




#SPGov @RHarbridge
are



                     Use them.
#SPGov @RHarbridge
No Single “Approach”
              Projects           Communities




              Tasks                 Practices
#SPGov @RHarbridge
Governance Control Levels
                                       Home Page
“PUBLIC” SITES: Open                                                  Tightly
to all employees                                                    controlled,
                                     Functional Areas                 formal
                                                                    governance
                                    Department Site –
                                        “Public”
“PRIVATE” SITES: Open                                           Some control, some
to business group            Department Team Site – “Private”   formal governance
members
                                                                  Looser control,
                               Project/Initiative Team Sites
TEAM SITES: Generally open                                          less formal
to team members                                                    governance
                                 Personal Sites– My Sites
#SPGov @RHarbridge
ITIL Framework




#SPGov @RHarbridge
COBIT Framework




#SPGov @RHarbridge
SharePoint Deployment and Governance using COBIT 4.1
                                  Chennault & Strain




#SPGov @RHarbridge
 http://www.amazon.com/SharePoint-Deployment-Governance-Using-COBIT/dp/1604201177
Microsoft Operations Framework
                    (MOF)




#SPGov @RHarbridge
SharePoint Maturity Model
                      Sadalit van Buren




#SPGov @RHarbridge   http://sharepointmaturity.com
The Outcome
         There is a ton of excellent material out
                  there to support you.



#SPGov @RHarbridge
What to watch out for…
     External best practices, policies, standards,
      and ideas may or may not be the right fit.



#SPGov @RHarbridge
Steps to Effective Governance…
        1. Understand The Need For Governance
        2. Build Your Governance Teams
        3. Understand How SharePoint Is/Should Be Used
        4. Develop/Practice Guidance and Policies
        5. Return to Step 2 and Repeat Steps 2 through 4
                   You Can Never Truly Achieve Perfect Governance.
        6. You Have Perfect Governance
                   So long as you are performing the steps
#SPGov @RHarbridge you are achieving Effective Governance.
Thank You
 Questions? Ideas? Feedback? Contact me:
    Twitter:    @RHarbridge
    Blog:       http://www.RHarbridge.com
    Email:      Richard@RHarbridge.com
    Resources:
         700+ SharePoint IA Slides at PracticalIntranet.com
         130+ SharePoint Standards at SPStandards.com
         15 Pages of Important Questions at SharePointDiagnostics.com


#SPGov @RHarbridge
Share Australia - The Steps To Effective SharePoint Governance

Share Australia - The Steps To Effective SharePoint Governance

  • 2.
    The Steps toEffective SharePoint Governance Richard Harbridge – Senior SharePoint Evangelist #SPCloud @RHarbridge
  • 3.
  • 4.
    Our Goal Today… From Here To Here #SPGov @RHarbridge
  • 5.
  • 6.
  • 7.
    Why Do INeed Effective Governance? #SPGov @RHarbridge
  • 8.
    There are bigrisks that are almost always realized when you don’t have it! #SPGov @RHarbridge
  • 9.
    SharePoint Sprawl He was only intending to build a two-story house - larger than those of his neighbors to reflect his position as the city's richest man. “First I added three floors but then the house looked ungainly, like a mushroom," he said. "So I added another and it still didn't look right so I kept going…” Risk: Un-Managed Sites and Content were not periodically reviewed for accuracy and relevance. #SPGov @RHarbridge
  • 10.
    Quality Deterioration Risk: Did not ensure that content quality is maintained for the life of the portal. #SPGov @RHarbridge
  • 11.
    Frustration Failure Risk: Did not consistently provide a high quality user experience. #SPGov @RHarbridge
  • 12.
    Priority Paralysis Project Priority Fileshare Migration 1 Partner Extranet 1 Executives Kitten Picture Rotator 1 Risk: Did not establish clear decision Legacy Application Integration 1 Governance Planning 1 making authority/ownership and Put Out Server Room Fires 1 escalation procedures so that conflicts are #SPGov @RHarbridge in a timely manner. resolved
  • 13.
    Ineffective Use ofTime/Resources Risk: Did not ensure that the portal strategy is aligned with clear prioritized #SPGov @RHarbridge objectives. business
  • 14.
    It’s not justabout insuring against or mitigating those risks! #SPGov @RHarbridge
  • 15.
    What does that mean? Without effective governance organization, performance, and capability are significantly reduced. #SPGov @RHarbridge
  • 16.
  • 17.
  • 18.
  • 19.
    The Outcome You can now communicate why Governance is important/required. #SPGov @RHarbridge
  • 20.
    What to watchout for… It’s not insurance. It makes your SharePoint investments more successful. #SPGov @RHarbridge
  • 21.
    Building The Governance Teams #SPGov @RHarbridge
  • 22.
    How do westart? #SPGov @RHarbridge
  • 23.
    Recommended Governance Teams There are typically 5 teams for SharePoint Governance:  Business Strategy Team  Solutions/Technical Strategy Team  Tactical Teams:  Tactical Operations Team  Tactical Development Team  Tactical Support Team #SPGov @RHarbridge
  • 24.
  • 25.
    Governance Teams  Business Strategy Team  Solutions/Technical Strategy Team  Tactical Teams:  Tactical Operations Team  Tactical Development Team  Tactical Support Team #SPGov @RHarbridge
  • 26.
    Business Strategy Team Role:Provide strategic insight, Sample Representative Interests Executive Sponsor direction and prioritization for Knowledge Management the portal. Information/Technology Services Finance Sales and Marketing Human Resources Legal and Compliance Decentralized Business Operations People Development and Training IT Centralized Administration #SPGov @RHarbridge
  • 27.
    Define, Prioritize andPlan #SPGov @RHarbridge
  • 28.
    Governance Teams  Business Strategy Team  Solutions/Technical Strategy Team  Tactical Teams:  Tactical Operations Team  Tactical Development Team  Tactical Support Team #SPGov @RHarbridge
  • 29.
    Solution (Technical) StrategyTeam Role: Provide technical insight, direction and prioritization for the portal. Sample Representative Interests Application Development Infrastructure Enterprise Architecture Security Tip: If a business direction requires new People Development and Training integration or effort with other technologies Communications then a technical representative for that technology will be necessary. #SPGov @RHarbridge
  • 30.
    Map Solutions toObjectives  Direct Relationship  Indirect Relationship Centralize Automate and Enhance Reduce Enhance Knowledge and Improve Business Governance Redundancy and Collaboration Resources Processes Model Improve Efficiency Adjust Site Structure      Migrate File Shares     Create Dashboards      Workflow Solution     Configure Search Services      Branding     * Objectives should be more specific – Example purposes only. #SPGov @RHarbridge
  • 31.
    SharePoint will be…  Utilized by Business Users to develop and implement business solutions that use technology without IT’s direct involvement.  Our primary unified application delivery platform.  Our primary workflow/business process automation platform.  Our intranet and communication center for internal corporate communications. SharePoint will not be…  Our (external) web content management platform.  Our primary document management platform.  Our contact management platform. #SPGov @RHarbridge
  • 32.
    Strategic Responsibilities  Defining Clear Objectives and Priorities  High Level Solutions Definition and Ownership  High Level Platform Classification  Communication Planning and Management  Resource/Capability Management  Expectation Management #SPGov @RHarbridge
  • 33.
    Define Governance ControlLevels Home Page “PUBLIC” SITES: Open Tightly to all employees controlled, Functional Areas formal governance Department Site – “Public” “PRIVATE” SITES: Open Some control, some to business group Department Team Site – “Private” formal governance members Looser control, Project/Initiative Team Sites TEAM SITES: Generally open less formal to team members governance Personal Sites– My Sites #SPGov @RHarbridge
  • 34.
  • 35.
    Governance Teams  Business Strategy Team  Solutions/Technical Strategy Team  Tactical Teams:  Tactical Operations Team  Tactical Development Team  Tactical Support Team #SPGov @RHarbridge
  • 36.
    The Tactical OperationsTeam Role: Provide operational (IT-related) support and maintenance for Sample Representative Interests the system infrastructure Infrastructure Domain Administrators Networking Servers and Environments Quality Assurance They manage the more routine maintenance of Security the system by performing nightly backups, Databases performance monitoring and analysis, and keeping the environment current with security #SPGov @RHarbridge releases and upgrades.
  • 37.
    Operations Responsibilities  Objectives/Priorities  Disaster Recovery Plan  Storage and Quota Policies  Monitoring Plans  Maintenance Plans  Service Level Agreements  Security Policies  Deployment Process, Policies, and Schedule #SPGov @RHarbridge
  • 38.
    Governance Teams  Business Strategy Team  Solutions/Technical Strategy Team  Tactical Teams:  Tactical Operations Team  Tactical Development Team  Tactical Support Team #SPGov @RHarbridge
  • 39.
    The Tactical DevelopmentTeam Role: Customize/configure, personalize, and leverage Sample Representative Interests SharePoint to achieve business SharePoint Designer objectives. Visual Studio Source Control Quality Assurance Webparts Templates This team is a loosely-knit community who's membership ranges from highly skilled programmers to technically savvy end users in #SPGov @RHarbridge of personalizing departmental team sites. charge
  • 40.
    Development Responsibilities  Objectives/Priorities  Branding Guide  SharePoint Designer Policy  Workflow Policy  Development Standards (Including OOTB vs Custom)  Development Environment Policy  Testing Requirements  Deployment Process, Policies, and Schedule #SPGov @RHarbridge SharePoint Standards Online
  • 41.
    Governance Teams  Business Strategy Team  Solutions/Technical Strategy Team  Tactical Teams:  Tactical Operations Team  Tactical Development Team  Tactical Support Team #SPGov @RHarbridge
  • 42.
    The Tactical SupportTeam Role: Provide support of the Sample Representative Interests SharePoint applications and Support and HelpDesk platform. People Development and Training Knowledge Management Taxonomy and Ontology Navigation and Organization Coaching Creates and manages a support system with effective training and proper channels of question or issue escalation and resolution. This team should also include influential users and #SPGov @RHarbridge leaders.
  • 43.
    Support Responsibilities  Objectives/Priorities  Site Classification and Platform Classification  Site Provisioning Process/Questionnaire  User Expectations Agreement  Roles and Responsibilities  Support Agreement(s)  Training and Communication Plans  MySite Policies (Pictures)… #SPGov @RHarbridge
  • 44.
    Support Responsibilities  User Lifecycle Policy  Taxonomy Management  Social Policies  Content Standards  Legal and Compliance Policy  Search Management #SPGov @RHarbridge SharePoint Standards Online
  • 45.
    Multiple Tiers everything) (You can’t know for Escalation Tactical Support Team Help Desk Site Administrators End Users Learning Libraries/Online/Help #SPGov @RHarbridge
  • 46.
    Measure to beproactive. Learn and use data Support #SPGov @RHarbridge
  • 47.
    Deployment Process/Policies Extremely Important! Ensure you have clear schedules and ownership. #SPGov @RHarbridge
  • 48.
    Governance Tip If possible have one member in all of the Governance teams or some members across multiple teams! #SPGov @RHarbridge
  • 49.
    Governance Tip Create a “Business Solution Governance Team”. This team allows you to find business users who want to be involved. #SPGov @RHarbridge
  • 50.
    The Outcome Everyone Achieves a Shared Understanding of SharePoint Related Processes. #SPGov @RHarbridge
  • 51.
    What to watchout for… Not just documents, policies, and procedures. It is an active and ongoing process. #SPGov @RHarbridge
  • 52.
    Setting Up A Governance Site #SPGov @RHarbridge
  • 53.
    Why a GovernanceSite? 1. It’s a lot of content. 2. It’s a collaborative process. 3. It’s an ongoing process. 4. Each piece of content should have a clear owner. 5. Content will need to be shared. #SPGov @RHarbridge
  • 54.
  • 55.
    SharePoint Solutions Listing In addition you can also create a ‘Roadmap’ or basically a Gantt Chart or visual indicator of solutions to show what you have achieved and where you #SPGov @RHarbridge are going with SharePoint.
  • 56.
    Team Rosters andDefinitions #SPGov @RHarbridge
  • 57.
    Policies, Standards andGuidelines Use Search, Metadata, and Approval Workflows to help improve management and user experience. For living documents/standards that require many authors try a Wiki! #SPGov @RHarbridge SharePoint Standards Online
  • 58.
    FAQs and aGlossary #SPGov @RHarbridge SharePoint Glossary Online
  • 59.
  • 60.
    Team Resources andMinutes #SPGov @RHarbridge
  • 61.
    Feedback and Surveys Embed feedback options throughout the sites! Don’t forget to share stories! #SPGov @RHarbridge
  • 62.
    Self Help andSupport Resources #SPGov @RHarbridge
  • 63.
    Self Help andSupport Resources #SPGov @RHarbridge
  • 64.
    Complete Site Listing Include things like: • The owner and secondary owner of the site. • The purpose of the site. • The URL, Size, and Usage Level of the site. • The last time the site was engaged by the support team. #SPGov @RHarbridge
  • 65.
    The Outcome Using the SharePoint Platform we can more effectively manage SharePoint Governance. #SPGov @RHarbridge
  • 66.
    What to watchout for… Just having the Governance site isn’t enough. Content must remain fresh. #SPGov @RHarbridge
  • 67.
  • 68.
    IS Use them. #SPGov @RHarbridge
  • 69.
  • 70.
    TechNet, Community andMore.. #SPGov @RHarbridge
  • 71.
    are Use them. #SPGov @RHarbridge
  • 72.
    No Single “Approach” Projects Communities Tasks Practices #SPGov @RHarbridge
  • 73.
    Governance Control Levels Home Page “PUBLIC” SITES: Open Tightly to all employees controlled, Functional Areas formal governance Department Site – “Public” “PRIVATE” SITES: Open Some control, some to business group Department Team Site – “Private” formal governance members Looser control, Project/Initiative Team Sites TEAM SITES: Generally open less formal to team members governance Personal Sites– My Sites #SPGov @RHarbridge
  • 74.
  • 75.
  • 76.
    SharePoint Deployment andGovernance using COBIT 4.1 Chennault & Strain #SPGov @RHarbridge http://www.amazon.com/SharePoint-Deployment-Governance-Using-COBIT/dp/1604201177
  • 77.
    Microsoft Operations Framework (MOF) #SPGov @RHarbridge
  • 78.
    SharePoint Maturity Model Sadalit van Buren #SPGov @RHarbridge http://sharepointmaturity.com
  • 79.
    The Outcome There is a ton of excellent material out there to support you. #SPGov @RHarbridge
  • 80.
    What to watchout for… External best practices, policies, standards, and ideas may or may not be the right fit. #SPGov @RHarbridge
  • 81.
    Steps to EffectiveGovernance… 1. Understand The Need For Governance 2. Build Your Governance Teams 3. Understand How SharePoint Is/Should Be Used 4. Develop/Practice Guidance and Policies 5. Return to Step 2 and Repeat Steps 2 through 4 You Can Never Truly Achieve Perfect Governance. 6. You Have Perfect Governance So long as you are performing the steps #SPGov @RHarbridge you are achieving Effective Governance.
  • 82.
    Thank You Questions?Ideas? Feedback? Contact me:  Twitter: @RHarbridge  Blog: http://www.RHarbridge.com  Email: Richard@RHarbridge.com  Resources: 700+ SharePoint IA Slides at PracticalIntranet.com 130+ SharePoint Standards at SPStandards.com 15 Pages of Important Questions at SharePointDiagnostics.com #SPGov @RHarbridge

Editor's Notes

  • #7 Dominating the skyline of Arkhangelsk, a city in Russia's far north-west, it is believed to be the world's tallest wooden house, soaring 13 floors to reach 144ft - about half the size of the tower of Big Ben. The house that Sutyagin built is also crumbling, incomplete and under threat of demolition from city authorities determined to end the former convict's eccentric 15-year project. When Sutyagin began work on his dacha in 1992, he claims he was only intending to build a two-storey house - larger than those of his neighbours to reflect his position as the city's richest man, but certainly not a contender for the Guinness Book of Records. However, convinced by a trip to see wooden houses in Japan and Norway, he concluded that he had not used roof space efficiently enough and decided to keep building. "First I added three floors but then the house looked ungainly, like a mushroom," he said. "So I added another and it still didn't look right so I kept going. What you see today is a happy accident."There were other motives too. Having grown up in a Soviet communal flat, Sutyagin said he felt lonely living by himself.Not only would his house make a perfect love nest for his molls, it could also accommodate the 18 executives at his construction company.
  • #8 A lot of this can seem daunting and I know one of the hardest things is figuring out how to do some of the things I have shown today. If you are interested in further training or assistance please let me know. Based on the number of people who are interested and the areas of interest we can schedule further training sessions to help everyone better use the SharePoint portal.It's our commitment to you that we will continue to hear your feedback and identify the issues. I encourage you to give us feedback during the coming months, and we will continue to deliver more and more functionality, more and more guidance to help you be successful with your application of SharePoint.Thank You for Reading/Listening