GAUTHAM S
No: 15/1, V.O.C Street,
Thavittupalayam,
Anthiyur,
Erode – 638 501
Mobile: +91 9489892500 Email: gsgautham181@gmail.com
Personal Profile
Father’s Name SUNDARARAJAN G
Date of Birth 05-Sep-1991
Gender Male
Nationality Indian
Marital Status Single
Languages Tamil, English,
Known Kannada
Objective
Seeking innovative and challenging career in
the professionally managed and dynamic organization
which enables me to utilize my analytical abilities through
working in a participative work environment and provide
opportunities for development and responsibilities to
contribute towards organization.
Education
2009-2013
 BE in Mechanical Engineering from
Kongu Engineering College, Erode
 CGPA 8.39
2007-2009
 HSC from Ideal Higher Secondary School,
Anthiyur, Erode
 Percentage 92.92%
2006-2007
 SSLC from Ideal Higher Secondary School,
Anthiyur, Erode
 Percentage 91.20%
Industrial Experience
 Presently working as a Design Executive in Toshiba Machine Chennai Private Ltd.,
Chembarampakkam, Chennai since September-2015.
Company Profile
Toshiba Machine (Chennai) Pvt. Ltd (TMIC) is the leading high-end plastics injection molding
machines and auxiliary equipment manufacturers in India. TMIC is a wholly owned company of Toshiba
Machine Company of Japan. Toshiba Machine factories spread across Japan, China, Thailand and India,
and offer competitive products and services to clients that would equip them with a leading edge in the
market place.
Job Responsibilities
 Preparation of Bill of material, Instruction Manuals and Flow diagrams/drawings as per customer
requirements.
 3D modeling of new products development and design improvement products in auxiliary
equipment of Injection Molding Machine like vacuum loaders, Dryers, Chillers, granulators and
blending units done by Creo 2.0 and Slidworks 2012.
 2D modeling of process flow diagram for system and material installation in new/existing plastic
processing plant establishment by AutoCAD.
 Worked as a Production Engineer Trainee in Switching Technologies Gunther Ltd.,
MEPZ, Chennai from June-2014 to August-2015.
Company Profile
A large manufacturer of reed relay sensors production MNC Company in India, owned by
COMUS GROUP INTERNATIONAL. It manufactures different types of reed switches and various
relays & sensors for COMUS Belgium, COMUS USA and ASSEMTECH USA.
Job Responsibilities
 Managing production, range monitoring & control of products, process improvements and
documentation.
 Adept in managing Production & Manpower planning operations, conducting productivity
analysis, troubleshooting.
 Responsible for scrap reduction and daily/ monthly production targets.
 Worked as an QA/QC Engineer in Ace Petro Networks India Pvt Ltd, Ambattur, Chennai
from July 2013 to October 2013
Company Profile
API Specification Q1, ISO 9001:2008 and ISO/ TS 29001 certified company and manufacturer of
RTJ metal gaskets, Flange connecters and other well-head components. Main customers are APN
SINGAPORE PTE LTD, AKER SOLUTIONS, BHEL, CAMERON and TAFE.
Job Responsibilities
 In Process Quality In-charge & collection of all data for documentation from EDS and Problem
analysis chart.
 Worked on API 6A products like RTJ Gaskets, Flanges and Valve components and 5S.
 Design and Development of new products in well head components.
 Ensuring adherence to quality standards, implementing stringent quality control systems and
reduce rejection level & rework.
Industrial Projects Done
1. Project Name: “Compact Dehumidifier”
Project Description: Compact Dehumidifiers are in combined form of dehumidifier and drying
bin with stand-by mode operation. It has easy mobility. Less cost while comparing with separate
dehumidifier and drying bin.
My Designation: Design Executive
My Roles & Responsibilities: I have done preparation of bill of materials, drying bin design
and material collecting suction box with stand-by mode operation. By using Creo 2.0, I designed
drying bin for plastic granules’ storage.
Project Duration: 5 months
2. Project Name: “Vacuum Loader with integrated Cyclone Separator”
Project Description: Vacuum Loader with integrated Cyclone Separator has cyclone dust
separator unit is connected with inlet of material conveying blower station. This cyclone
separator internally has a fine dust filter and dust collecting chamber, which are used to collect
more dust/ impurities from plastic materials. It increases the reliability of plastic products.
My Designation: Design Executive
My Roles & Responsibilities: I have done cyclone separator unit design by using Creo 2.0 and
Auto CAD. Cyclone Seperator is manufactured by Aluminium material in order to reduce the
overall weight and cost of the product.
Project Duration: 3 months
3. Project Name: “Crystallizing Hot Air Dryer”
Project Description: Crystallizing hot air dryer is used to convert the plastic flake materials
into crystalline form to avoid lump formation in drying bin during pre-heating.
My Designation: Design Executive
My Roles & Responsibilities: Selection of vacuum loader with adaptor and vertical rotating
shaft two pairs of 2 blades set for changing the plastic flakes into crystalline form. By using 3D
Modeling in Creo 2.0, adaptor and blades and shaft assembly are done.
Project Duration: 2 months
4. Project Name: “Automated High Pressurized Sealing Head Block”
Project Description: A fully designed and fabricated component by using Pro Engineer and
AutoCAD, Which is used for sealing the reeds (Fe-Ni blades) with IR absorbing, lead free and
low evaporating glass tubes at high pressure up to 10 bar.
Company Name: Switching Technologies Gunther Limited
My Designation: Production Engineer Trainee
My Roles & Responsibilities: By using 3D modeling in Pro Engineer Wildfire 5.0 and
AutoCAD 2013, I designed the inner and outer blocks. In order to withstand the high pressure
in the head block, I chose brass material. Fully forged brass material was used for head block.
Already Existing Block design’s dimensions and tolerances were modified in order reduce the
scrap rate.
Project Duration: 6 months
5. Project Name: “Fully Automatic Controlled Stopper for Loading Unit”
Project Description: An automatic controlled stopper unit has two sensing units in top &
bottom reed loading units. It monitors the shooting of the reed blades. If the first/top reed is
loaded improperly, signal from the sensing unit in first/top will be interrupted. At that time
stopper unit will stop the further second/ bottom reed loading. It will send the signal to control
computer.
Company Name: Switching Technologies Gunther Limited
My Designation: Production Engineer Trainee
My Roles & Responsibilities: I have done the design of stopper unit, which is done by Pro
Engineer Wildfire 5.0 and Solidworks 2012. This project was done with support of electronics
department. This system connected with pneumatic supply. This pneumatic and input and
output air flow valves were designed by me for high reliability, less friction and long life time.
Project Duration: 3 months
Academic Projects Done
• Design & Fabrication of Portable Laminating Machine by using Pro Engineer Wildfire
4.0 and AutoCAD 2010 -A compact in size and less cost of manufacturing. In this machine,
we can laminate different size of sheets, papers.
• Design & Fabrication of Mortar Coating Machine by using Pro Engineer wildfire 5.0-To
eliminate the more manpower in the masonry work; hence an unskilled person will handle the
MCM easily. Coating over the horizontal surface is achieved in a short time by a person and it
gives a better finishing over the surface.
• Study of Corrosion Behaviour of AA 6061 by Friction Stir Welding- focused on the effect
pitting process and corrosion rate at different speeds and provides an overview on a pitting
corrosion of aluminium 6061 alloy at the nugget zone.
• Magnetic Refrigeration- A type of “Non-conventional Refrigeration”. Here, Magnetic Source
is refrigerant improves the COP. It is eco-friendly and Pollution free.
Software Exposure
 ERP Tool : JD EDWARDS
 Operating System : Windows XP/7/8/10
 Mechanical Design Tools : Creo 2.0
AutoCAD 2013
Basics of Solidworks 2012
I hereby declare that the above-mentioned information is correct up to my knowledge and I bear
the responsibility for the correctness of the above-mentioned particulars.
Place:
Date: (GAUTHAM S)

S.Gautham- Design Executive- Curriculum Vitae

  • 1.
    GAUTHAM S No: 15/1,V.O.C Street, Thavittupalayam, Anthiyur, Erode – 638 501 Mobile: +91 9489892500 Email: gsgautham181@gmail.com Personal Profile Father’s Name SUNDARARAJAN G Date of Birth 05-Sep-1991 Gender Male Nationality Indian Marital Status Single Languages Tamil, English, Known Kannada Objective Seeking innovative and challenging career in the professionally managed and dynamic organization which enables me to utilize my analytical abilities through working in a participative work environment and provide opportunities for development and responsibilities to contribute towards organization. Education 2009-2013  BE in Mechanical Engineering from Kongu Engineering College, Erode  CGPA 8.39 2007-2009  HSC from Ideal Higher Secondary School, Anthiyur, Erode  Percentage 92.92% 2006-2007  SSLC from Ideal Higher Secondary School, Anthiyur, Erode  Percentage 91.20%
  • 2.
    Industrial Experience  Presentlyworking as a Design Executive in Toshiba Machine Chennai Private Ltd., Chembarampakkam, Chennai since September-2015. Company Profile Toshiba Machine (Chennai) Pvt. Ltd (TMIC) is the leading high-end plastics injection molding machines and auxiliary equipment manufacturers in India. TMIC is a wholly owned company of Toshiba Machine Company of Japan. Toshiba Machine factories spread across Japan, China, Thailand and India, and offer competitive products and services to clients that would equip them with a leading edge in the market place. Job Responsibilities  Preparation of Bill of material, Instruction Manuals and Flow diagrams/drawings as per customer requirements.  3D modeling of new products development and design improvement products in auxiliary equipment of Injection Molding Machine like vacuum loaders, Dryers, Chillers, granulators and blending units done by Creo 2.0 and Slidworks 2012.  2D modeling of process flow diagram for system and material installation in new/existing plastic processing plant establishment by AutoCAD.  Worked as a Production Engineer Trainee in Switching Technologies Gunther Ltd., MEPZ, Chennai from June-2014 to August-2015. Company Profile A large manufacturer of reed relay sensors production MNC Company in India, owned by COMUS GROUP INTERNATIONAL. It manufactures different types of reed switches and various relays & sensors for COMUS Belgium, COMUS USA and ASSEMTECH USA. Job Responsibilities  Managing production, range monitoring & control of products, process improvements and documentation.  Adept in managing Production & Manpower planning operations, conducting productivity analysis, troubleshooting.  Responsible for scrap reduction and daily/ monthly production targets.
  • 3.
     Worked asan QA/QC Engineer in Ace Petro Networks India Pvt Ltd, Ambattur, Chennai from July 2013 to October 2013 Company Profile API Specification Q1, ISO 9001:2008 and ISO/ TS 29001 certified company and manufacturer of RTJ metal gaskets, Flange connecters and other well-head components. Main customers are APN SINGAPORE PTE LTD, AKER SOLUTIONS, BHEL, CAMERON and TAFE. Job Responsibilities  In Process Quality In-charge & collection of all data for documentation from EDS and Problem analysis chart.  Worked on API 6A products like RTJ Gaskets, Flanges and Valve components and 5S.  Design and Development of new products in well head components.  Ensuring adherence to quality standards, implementing stringent quality control systems and reduce rejection level & rework. Industrial Projects Done 1. Project Name: “Compact Dehumidifier” Project Description: Compact Dehumidifiers are in combined form of dehumidifier and drying bin with stand-by mode operation. It has easy mobility. Less cost while comparing with separate dehumidifier and drying bin. My Designation: Design Executive My Roles & Responsibilities: I have done preparation of bill of materials, drying bin design and material collecting suction box with stand-by mode operation. By using Creo 2.0, I designed drying bin for plastic granules’ storage. Project Duration: 5 months
  • 4.
    2. Project Name:“Vacuum Loader with integrated Cyclone Separator” Project Description: Vacuum Loader with integrated Cyclone Separator has cyclone dust separator unit is connected with inlet of material conveying blower station. This cyclone separator internally has a fine dust filter and dust collecting chamber, which are used to collect more dust/ impurities from plastic materials. It increases the reliability of plastic products. My Designation: Design Executive My Roles & Responsibilities: I have done cyclone separator unit design by using Creo 2.0 and Auto CAD. Cyclone Seperator is manufactured by Aluminium material in order to reduce the overall weight and cost of the product. Project Duration: 3 months 3. Project Name: “Crystallizing Hot Air Dryer” Project Description: Crystallizing hot air dryer is used to convert the plastic flake materials into crystalline form to avoid lump formation in drying bin during pre-heating. My Designation: Design Executive My Roles & Responsibilities: Selection of vacuum loader with adaptor and vertical rotating shaft two pairs of 2 blades set for changing the plastic flakes into crystalline form. By using 3D Modeling in Creo 2.0, adaptor and blades and shaft assembly are done. Project Duration: 2 months 4. Project Name: “Automated High Pressurized Sealing Head Block” Project Description: A fully designed and fabricated component by using Pro Engineer and AutoCAD, Which is used for sealing the reeds (Fe-Ni blades) with IR absorbing, lead free and low evaporating glass tubes at high pressure up to 10 bar. Company Name: Switching Technologies Gunther Limited
  • 5.
    My Designation: ProductionEngineer Trainee My Roles & Responsibilities: By using 3D modeling in Pro Engineer Wildfire 5.0 and AutoCAD 2013, I designed the inner and outer blocks. In order to withstand the high pressure in the head block, I chose brass material. Fully forged brass material was used for head block. Already Existing Block design’s dimensions and tolerances were modified in order reduce the scrap rate. Project Duration: 6 months 5. Project Name: “Fully Automatic Controlled Stopper for Loading Unit” Project Description: An automatic controlled stopper unit has two sensing units in top & bottom reed loading units. It monitors the shooting of the reed blades. If the first/top reed is loaded improperly, signal from the sensing unit in first/top will be interrupted. At that time stopper unit will stop the further second/ bottom reed loading. It will send the signal to control computer. Company Name: Switching Technologies Gunther Limited My Designation: Production Engineer Trainee My Roles & Responsibilities: I have done the design of stopper unit, which is done by Pro Engineer Wildfire 5.0 and Solidworks 2012. This project was done with support of electronics department. This system connected with pneumatic supply. This pneumatic and input and output air flow valves were designed by me for high reliability, less friction and long life time. Project Duration: 3 months
  • 6.
    Academic Projects Done •Design & Fabrication of Portable Laminating Machine by using Pro Engineer Wildfire 4.0 and AutoCAD 2010 -A compact in size and less cost of manufacturing. In this machine, we can laminate different size of sheets, papers. • Design & Fabrication of Mortar Coating Machine by using Pro Engineer wildfire 5.0-To eliminate the more manpower in the masonry work; hence an unskilled person will handle the MCM easily. Coating over the horizontal surface is achieved in a short time by a person and it gives a better finishing over the surface. • Study of Corrosion Behaviour of AA 6061 by Friction Stir Welding- focused on the effect pitting process and corrosion rate at different speeds and provides an overview on a pitting corrosion of aluminium 6061 alloy at the nugget zone. • Magnetic Refrigeration- A type of “Non-conventional Refrigeration”. Here, Magnetic Source is refrigerant improves the COP. It is eco-friendly and Pollution free. Software Exposure  ERP Tool : JD EDWARDS  Operating System : Windows XP/7/8/10  Mechanical Design Tools : Creo 2.0 AutoCAD 2013 Basics of Solidworks 2012 I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.
  • 7.