Sewer Appurtenances
Sanitary Engineering
Introduction
● These are structures or devices in a sewerage system
● Constructed at suitable intervals along sewer line
● They assist in operation and functioning and maintenance of the sewerage
system
Manholes
Objectives
● Cleaning
● Testing
● Inspection
● Maintenance
● Removal of obstructions
Location
● Every change of alignment
● Every change in gradient
● Every change in size (dia)
● At every junction
● At regular interval (in case of straight alignment)
Shallow Manhole
● 0.7-0.9m in depth
● Made in domestic areas
Deep Manhole
● Depth more than 1.5m
Construction of Manhole
Manhole Cover
● Made of cast iron, it rests over the frame
● Clear cover of opening not less than 50 cm
● Top level is kept same as level of pavement
Access Shaft
● Upper portion of manhole which gives access to working chamber
● Dimensions less than that of working chamber
● Rectangular: 0.6m* 0.75m
● Circular: 0.6 to 0.75m in dia
● Steps made in it to access working chamber
● Made of bricks
Working chamber
● Lower portion of manhole
● Provides workspace
● Size: circular 1.2m dia
● Rectangular: 0.9m * 1.2m
● Made of brick masonry or cement concrete
● Bottom portion is called benching, made of cement concrete
Manhole Diagram
Drop Manhole
● Constructed to connect a high level branch sewer to a low level main sewer
● Elevation difference more than 0.6m
● Made to avoid splashing sewage on working chamber
● Plug opened while inspecting and cleaning
Lamp Hole
Purpose
● Inspection
● Ventilation
● Flushing (using perforated cover or removing cover)
Catch Basin (Catch Pits)
● For retention of debris in storm water
● If this not present, debris is carried to the sewer
● Helps in settlement of sand, grit, debris from storm drainage
● Settled matter are cleaned periodically
Flushing Tanks
● Provided when there are high chances of blockage
● Blockage occurs when self cleansing velocity is too small or when pipe doesnt
have enough slope
● Also placed at dead end points of sewer
● These hold water temporarily
The water in flushing tank is thrown into sewer for flushing purpose so that the
blockage is removed
Automatic Flushing Tank
Manually Operating
● Consists of a concrete chamber connected to water supply
● Outflow pipe is present, which has a valve so that water can be discharged to
the sewer for flushing
● Gate valve is opened or closed manually
Grease and oil traps
● If sand has to also be removed, dead space kept at bottom of the chamber for
sand to be deposited
Inverted Siphons
● It is a sewer section obstructed lower than the adjacent sewer sections
● Runs full under gravity with pressure greater than atmospheric
● Differs from a true siphon
● Here, it runs with flow line below HGL and therefore under pressure, above
atmospheric
Sewer outlet
● A masonry head structure, made at the bank of streams to discharge into river
● Last point of sewer line
Ventilating Shaft
● A vertical column made of cast iron or steel pipes
● At top of shaft, a copper wire cage or cowl is provided
● Prevents accumulation of gases like ammonia, methane, h2s, co2, etc
● Height must be greater than height of nearby buildings
● Provided every 200-300m
Completed
Sewer Appurtenances.pdf
Sewer Appurtenances.pdf
Sewer Appurtenances.pdf

More Related Content

Similar to Sewer Appurtenances.pdf

Sewer appertunces
Sewer appertuncesSewer appertunces
Sewer appertunces
Sonakshi Bhattacharjee
 
Manholes, by mayank agrawal
Manholes, by mayank agrawalManholes, by mayank agrawal
Manholes, by mayank agrawal
Mayank Agrawal
 
Pumps, a prime mover, pumping system layout.ppt
Pumps, a prime mover, pumping system layout.pptPumps, a prime mover, pumping system layout.ppt
Pumps, a prime mover, pumping system layout.ppt
RatnakarPatil12
 
TRAPS AND ITS TYPES USED IN A BUILDING
TRAPS AND ITS TYPES USED IN A  BUILDING TRAPS AND ITS TYPES USED IN A  BUILDING
TRAPS AND ITS TYPES USED IN A BUILDING
BISHAL KHANAL
 
House Drainage System
House Drainage SystemHouse Drainage System
House Drainage System
GAURAV. H .TANDON
 
Pumping Stations
Pumping StationsPumping Stations
Pumping Stations
GAURAV. H .TANDON
 
Building drainage system
Building drainage systemBuilding drainage system
Building drainage system
Dipesh Jain
 
buildingdranagesystem-L-3.pdf
buildingdranagesystem-L-3.pdfbuildingdranagesystem-L-3.pdf
buildingdranagesystem-L-3.pdf
TaranJot7
 
Excavation and Ground water control1.pptx
Excavation and Ground water control1.pptxExcavation and Ground water control1.pptx
Excavation and Ground water control1.pptx
ssusercbae26
 
intakes structures ......................................... .pptx
intakes structures ......................................... .pptxintakes structures ......................................... .pptx
intakes structures ......................................... .pptx
DIVYA8090
 
APPURTENANCES.pptx
APPURTENANCES.pptxAPPURTENANCES.pptx
APPURTENANCES.pptx
razay1
 
housedrainagesystem-PPT.pptx
housedrainagesystem-PPT.pptxhousedrainagesystem-PPT.pptx
housedrainagesystem-PPT.pptx
Mood Naik
 
Plumbing services in high rise building and group housing
Plumbing services in high rise building and group housingPlumbing services in high rise building and group housing
Plumbing services in high rise building and group housing
Rohit Bhatt
 
Building dranage system
Building dranage systemBuilding dranage system
Building dranage system
utsavkhatri1
 
unit ii.pptx
unit  ii.pptxunit  ii.pptx
unit ii.pptx
GokulKannan194051
 
Sewer Appurtanances
Sewer AppurtanancesSewer Appurtanances
Sewer Appurtanances
Akepati S. Reddy
 
Plain sedimentation tanks ,Types & Design considerations
Plain sedimentation tanks ,Types & Design considerations Plain sedimentation tanks ,Types & Design considerations
Plain sedimentation tanks ,Types & Design considerations
Anshika Saxena
 
Fluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfFluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdf
LokmanDridah
 
Plumbing_architecture_corporate interiors
Plumbing_architecture_corporate interiorsPlumbing_architecture_corporate interiors
Plumbing_architecture_corporate interiors
Akshay Bhatia
 
Collection and Distribution of Water: Intakes
Collection and Distribution of Water: IntakesCollection and Distribution of Water: Intakes
Collection and Distribution of Water: Intakes
Divine Abaloyan
 

Similar to Sewer Appurtenances.pdf (20)

Sewer appertunces
Sewer appertuncesSewer appertunces
Sewer appertunces
 
Manholes, by mayank agrawal
Manholes, by mayank agrawalManholes, by mayank agrawal
Manholes, by mayank agrawal
 
Pumps, a prime mover, pumping system layout.ppt
Pumps, a prime mover, pumping system layout.pptPumps, a prime mover, pumping system layout.ppt
Pumps, a prime mover, pumping system layout.ppt
 
TRAPS AND ITS TYPES USED IN A BUILDING
TRAPS AND ITS TYPES USED IN A  BUILDING TRAPS AND ITS TYPES USED IN A  BUILDING
TRAPS AND ITS TYPES USED IN A BUILDING
 
House Drainage System
House Drainage SystemHouse Drainage System
House Drainage System
 
Pumping Stations
Pumping StationsPumping Stations
Pumping Stations
 
Building drainage system
Building drainage systemBuilding drainage system
Building drainage system
 
buildingdranagesystem-L-3.pdf
buildingdranagesystem-L-3.pdfbuildingdranagesystem-L-3.pdf
buildingdranagesystem-L-3.pdf
 
Excavation and Ground water control1.pptx
Excavation and Ground water control1.pptxExcavation and Ground water control1.pptx
Excavation and Ground water control1.pptx
 
intakes structures ......................................... .pptx
intakes structures ......................................... .pptxintakes structures ......................................... .pptx
intakes structures ......................................... .pptx
 
APPURTENANCES.pptx
APPURTENANCES.pptxAPPURTENANCES.pptx
APPURTENANCES.pptx
 
housedrainagesystem-PPT.pptx
housedrainagesystem-PPT.pptxhousedrainagesystem-PPT.pptx
housedrainagesystem-PPT.pptx
 
Plumbing services in high rise building and group housing
Plumbing services in high rise building and group housingPlumbing services in high rise building and group housing
Plumbing services in high rise building and group housing
 
Building dranage system
Building dranage systemBuilding dranage system
Building dranage system
 
unit ii.pptx
unit  ii.pptxunit  ii.pptx
unit ii.pptx
 
Sewer Appurtanances
Sewer AppurtanancesSewer Appurtanances
Sewer Appurtanances
 
Plain sedimentation tanks ,Types & Design considerations
Plain sedimentation tanks ,Types & Design considerations Plain sedimentation tanks ,Types & Design considerations
Plain sedimentation tanks ,Types & Design considerations
 
Fluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfFluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdf
 
Plumbing_architecture_corporate interiors
Plumbing_architecture_corporate interiorsPlumbing_architecture_corporate interiors
Plumbing_architecture_corporate interiors
 
Collection and Distribution of Water: Intakes
Collection and Distribution of Water: IntakesCollection and Distribution of Water: Intakes
Collection and Distribution of Water: Intakes
 

Recently uploaded

Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 

Recently uploaded (20)

Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 

Sewer Appurtenances.pdf

  • 2. Introduction ● These are structures or devices in a sewerage system ● Constructed at suitable intervals along sewer line ● They assist in operation and functioning and maintenance of the sewerage system
  • 4. Objectives ● Cleaning ● Testing ● Inspection ● Maintenance ● Removal of obstructions
  • 5. Location ● Every change of alignment ● Every change in gradient ● Every change in size (dia) ● At every junction ● At regular interval (in case of straight alignment)
  • 6. Shallow Manhole ● 0.7-0.9m in depth ● Made in domestic areas Deep Manhole ● Depth more than 1.5m
  • 7. Construction of Manhole Manhole Cover ● Made of cast iron, it rests over the frame ● Clear cover of opening not less than 50 cm ● Top level is kept same as level of pavement Access Shaft ● Upper portion of manhole which gives access to working chamber ● Dimensions less than that of working chamber ● Rectangular: 0.6m* 0.75m ● Circular: 0.6 to 0.75m in dia ● Steps made in it to access working chamber ● Made of bricks
  • 8. Working chamber ● Lower portion of manhole ● Provides workspace ● Size: circular 1.2m dia ● Rectangular: 0.9m * 1.2m ● Made of brick masonry or cement concrete ● Bottom portion is called benching, made of cement concrete
  • 10. Drop Manhole ● Constructed to connect a high level branch sewer to a low level main sewer ● Elevation difference more than 0.6m ● Made to avoid splashing sewage on working chamber ● Plug opened while inspecting and cleaning
  • 11.
  • 13.
  • 14. Purpose ● Inspection ● Ventilation ● Flushing (using perforated cover or removing cover)
  • 15. Catch Basin (Catch Pits) ● For retention of debris in storm water ● If this not present, debris is carried to the sewer ● Helps in settlement of sand, grit, debris from storm drainage ● Settled matter are cleaned periodically
  • 16.
  • 17.
  • 18.
  • 19. Flushing Tanks ● Provided when there are high chances of blockage ● Blockage occurs when self cleansing velocity is too small or when pipe doesnt have enough slope ● Also placed at dead end points of sewer ● These hold water temporarily The water in flushing tank is thrown into sewer for flushing purpose so that the blockage is removed
  • 21. Manually Operating ● Consists of a concrete chamber connected to water supply ● Outflow pipe is present, which has a valve so that water can be discharged to the sewer for flushing ● Gate valve is opened or closed manually
  • 22.
  • 23. Grease and oil traps
  • 24.
  • 25. ● If sand has to also be removed, dead space kept at bottom of the chamber for sand to be deposited
  • 26. Inverted Siphons ● It is a sewer section obstructed lower than the adjacent sewer sections ● Runs full under gravity with pressure greater than atmospheric ● Differs from a true siphon ● Here, it runs with flow line below HGL and therefore under pressure, above atmospheric
  • 27.
  • 28. Sewer outlet ● A masonry head structure, made at the bank of streams to discharge into river ● Last point of sewer line
  • 29. Ventilating Shaft ● A vertical column made of cast iron or steel pipes ● At top of shaft, a copper wire cage or cowl is provided ● Prevents accumulation of gases like ammonia, methane, h2s, co2, etc ● Height must be greater than height of nearby buildings ● Provided every 200-300m