Sensor Technology
for the Automotive Market
2
Tyco Electronics Ltd. is a leading global provider of engineered electronic
components, network solutions and wireless systems, with customers in more
than 150 countries. We design, manufacture and market products for customers
in industries from automotive, appliances and aerospace and defense to
telecommunications, computers and consumer electronics. With over 8,000
engineers and worldwide manufacturing, sales and customer service capabilities,
Tyco Electronics’ commitment is our customers’ advantage.


G LO B A L AU TO M OT I V E D I V I S I O N
S E N S O R T E C H N O LO GY

Contactless measuring eliminates interference effects, wear and tear,
and provides increased reliability. Tyco Electronics, one of the largest
technology providers for the automobile industry, offers contactless
sensors for a variety of applications. As sensor manufacturer and
processing partner, Tyco Electronics also provides project planning
support for new sensor applications, assistance in the selection of the
appropriate sensor technology for the respective application, and
assistance with defining the corresponding mechanical, electrical and
magnetic interface. Tyco Electronics has a broad electromechanical
portfolio that includes robust housing technologies, connector systems,
and temperature stable designs based on foil and cable networks.
This combination of technologies and experience ensures that reliable
and cost effective sensor solutions are available for all application
types.




                                      3
PLCD sensor element
        for contactless travel and                                          U-magnet concept for
            angualr measurement                                         magnetically biased sensors




                                                                 SEMI-CONDUCTOR        SEMI-CONDUCTOR    MAGNETO-
A P P L I C AT I O N   REQUIREMENTS                                   SENSORS                SENSORS     INDUCTIVE
                                                                     HALL   EFFECT        MR   EFFECT   PLCD   SENSORS

T R AV E L    MEASUREMENT

Operating range < 15 mm
Operating range > 15 mm
ANGLE        MEASUREMENT

Tangential, operating range < 90˚
Axial, operating range > 90˚
SPEED        MEASUREMENT



I N T E G R AT I O N   REQUIREMENTS

Small Space
Large Operating range position tolerance
Large control distances (through structure walls)
ROBUSTNESS
High-precision performance with Mechanical load e.g. Vibration
High-precision performance with high ambient temperature




                        A U T O M O T I VAT E D I N E V E R Y D E TA I L

                        Our global automotive research centers are setting the technological
                        landscape by developing new technologies, products and production
                        processes. The increasingly fast growing number of functions in present
                        and future cars require varieties of powerful and versatile connection
                        systems. We compare existing standards with alternative possibilities
                        in which costs, functionality, dependability and serial production are
                        the basics of our procedures.



                                                                 4
TECHNOLOGY

Tyco Electronics has focused on contactless sensors solutions special for high
performing and sophisticated measurement tasks. Wear influences as well as
mechanical interactions between sensor and application parts are then avoided.
Beside the actual measurement requirements, the application conditions
determine the choice of the appropriate sensor technology. For contactless
measurements preferably magnetic sensor technologies are used:


• Semi-conductor sensors with integrated Hall
• Semi-conductor sensors with MR elements
• Magneto-inductive PLCD sensors
• Temperature sensor devices


Table (p.4) compares the characteristic application profile of these important
sensor technologies. Semi-conductor solutions with Hall and MR effect show
their advantages in their very compact and slim design. They are also
preferred in the design of complex sensor clusters. The combination with
different magnet configurations, typical integrated or moving magnets
obtains precise measurement results.


A very efficient and robust sensor technology is the Tyco Electronics
patented PLCD (Permanentmagnetic Linear Contactless Displacement
Sensor) Technology. For the linear position measurements this principle
has various advantages. The magnetic-inductive measuring principle
distinguishes for its very large operation tolerance field. This enables
the renunciation for specially guided or stored slider and records
reliably its highly precise measuring performance without any loss,
not being influenced by metal abrasions. The necessary driving
magnet can herewith be fixed directly on the setting element,               PLCD Gear & Shift travel
                                                                            sensor for Automated
whereas even driving distances through non-ferromagnetic walls
                                                                            Manual Transmission
with several millimetre thickness, are not an exclusion criteria for this
measuring principle. A fully enclosed design guarantees the robustness
of this measuring principle. Therefore the encapsulated sensor is
completely sealed and temperature resistant up to 160 °C.




                                                                            Door Locking Unit with
                                                                            integrated Hall-Devices




                                        5
COMPETENCIES

Tyco Electronics, as sensor manufacturer and development partner, utilizes its
experience to provide customer support on project work of new sensor
applications. Once the application has been analyzed, the suitable sensor
technology is selected and the corresponding mechanical, electrical and
magnetic interfaces are defined.
The design of the magnetic interface in particular requires a close cooperation
with the customer. Special attention is paid to the external influencing factors
of the applications.


During the design of the magnetic circuits, analytical and empirical methods
are used which take into account the magnetic polarization angle-error and
the surrounding magnet field influences. State-of-the-art procedures, involving
FEM calculations, are used to analyse or design magnetic circuits. Based on
the results of these calculations, the properties of the magnet arrangement
will be verified and optimised through prototype testing.




                                                              FEM calculation for dimensioning the
                                                              magnetic sensor interface




                                       6
Specific integrated electronic units ensure reliable signal conditioning and
implementation of additional functions such as advanced signal evaluations,
generation of control signals and complex diagnostic features. The electronic
functions are designed with efficient ASIC technologies.


The selection of materials is determined by technical constructive requirements
as well as on the environmental conditions. The wide temperature-load profile,
high vibration strains and many different chemical liquids define the requirements
regarding robustness and sealing of the respective sensor technology. The
product architecture is defined by the application space requirements and the
required connector or pigtail requirements. For hermetic and oil-tight sealing
the sensor housings are molded without blowholes and closed with
laser-welded housing covers.


Extensive component tests and life tests under application conditions provide
the proof for a reliable and durable sensor design.




PLCD sensor module for gear                 Digital and linear position
and shift measurement                       measurement for clutch
                                            master cylinder




P R O J E C T P L A N N I N G A N D A S S I S TA N C E

As sensor manufacturer and processing partner, Tyco Electronics also
provides project planning support for new sensor applications, assistance
in the selection of the appropriate sensor technology for the respective
application, and assistance with defining the corresponding mechanical,
electrical and magnetic interface.




                                        7
A P P L I C AT I O N S

Tyco Electronics offers a comprehensive portfolio of sensors for the automotive
industry, including switching, travel, rotational, speed and temperature. The
primary focus is on contactless technologies to ensure a high level measuring
performance, longterm reliability, and the elimination of interference effects
and wear and tear.


Tyco Electronics is the leading supplier for contactless sensors for hydraulic,
pneumatic and electro-mechanical actuators used on cars, trucks and busses.
Typical applications are:
 • Automated Transmission and Clutch Systems
 • Turbocharger, Throttle, Exhaust Gas Recirculation (EGR), Manifold Intake
 • Generator, Alternator
 • Electrical Powered Assisted Steering (EPAS)
 • Convertibles
In addition to the controlled actuator segment, Tyco Electronics also offers a
wide range of innovative and cost-effective sensor solutions for following
applications:
 • Seat Sensors (track position, occupant weight, buckle)
 • Clutch- and Brake Pedal Switches
 • ABS Wheel Speed
 • Cam- and Crankshaft
 • Transmission Gear Wheels
 • Chassis Level
 • Door- and Tailgate Latches
 • Outer Air Temperature
 • Fuel Level




    R E L AT E D                T E C H N O L O G I E S




                INDUCTIVE       MECHATRONICS          TERMINALS   &
                SYSTEMS                               CONNECTORS




                                      8
PLCD travel      Integrated PLCD            Contactless            Seat track position
sensor for       travel sensor for          throttle               sensor (integrated
hydraulic        pneumatic cylinder         position sensor        magnet)
cylinder




                                                                      Contactless and redundant
                                                           brakelight switch (integrated magnet)




               ALTERNATIVE     CABLE ASSEMBLY     HIGH SPEED          POWER         RELAYS   &       WIRELESS
              POWER SYSTEMS       SYSTEMS       DATA NETWORKING     DISTRIBUTION    SWITCHING      TECHNOLOGIES
                                                                      SYSTEMS       MODULES



  O T H E R   T Y C O         E L E C T R O N I C S               A U T O M O T I V E            T E C H N O L O G I E S



                                                               9
T YCO E L E C T R O N I C S                                                    “AT YO U R S E R V I C E ”




@                                                                            Tyco Electronics Online
                                                                             The Tyco Electronics website is an innovative and
                                                                             interactive source for application information,
                                                                             product updates and technical solutions.
                                                                             Our step-by-step software makes our website
                                                                             intuitive and user-friendly to better serve you !
                                                                             Please contact us at :
                                                                             www.tycoelectronics.com/automotive



                    Internet Homepage
                    www.tycoelectronics.com
                    www.tycoelectronics.com/automotive                       Product Information Center
                                                                             (PIC)
                    Electronic Internet Catalog
                                                                             You can rely on Tyco Electronics PIC Team to
                    www.catalog.tycoelectronics.com
                                                                             provide you support for answers to your
                                                                             general information or technical questions in
                                                                             an efficient and effective manner.
                                                                             To reach our PIC staff, please contact your
                                                                             local Tyco Electronics organization.




         Product and Machine Literature
 Tyco Electronics offers a variety of product specific catalogs, brochures
             and high impact flyers to help better serve you !
         For more information on literature for Tyco Electronics’
 Global Automotive Division, please contact your local Tyco Electronics
       Organization or go to www.tycoelectronics.com/automotive




                                                                 10
T YCO E L E C T R O N I C S                                                          G L O B A L C O N TA C T S



Americas
Argentina – Buenos Aires      Canada – Toronto                     Mexico – Mexico City             United States
Phone: +54-11-4733-2200       Phone: +905-475-6222                 Phone: +52-55-1106-0800          Harrisburg, PA
Fax:    +54-11-4733-2211      Fax:    +905-474-5520                        +01-800-733-8926         Phone: +1-717-564-0100
                              Product Information Center:          Fax:    +52-55-1106-0901         Fax:    +1-717-986-7575
Brasil – São Paulo            Phone: +905-470-4425                                                  Product Information Center:
Phone: +55-11-2103-6105       Fax:    +905-474-5525                                                 Phone: +1-800-522-6752
Fax:     +55-11-2103-6204                                          For Latin/South American         Fax:    +1-717-986-7575
                              Colombia – Bogota                    Countries not shown
                              Phone: +57-1-231-9398                Phone: +54-11-4733-2015          Troy, MI
                              Fax:   +57-1-660-0206                Fax:    +54-11-4733-2083         Phone: +1-248-273-3359
                                                                                                    Fax:     +1-248-273-3322



Asia/Pacific
Australia – Sydney            Japan – Kawasaki, Kanagawa           New Zealand – Auckland           Singapore – Singapore
Phone: +61-2-9554-2600        Phone: +81-44-844-8111               Phone: +64-9-634-4580            Phone: +65-6482-0311
Fax:    +61-2-9502-2556       Fax:    +81-44-812-3207              Fax:   +64-9-634-4586            Fax:   +65-6482-1012
Product Information Center:   Product Information Center:
Phone: +61-2-9840-8200        Phone: +81-44-844-8013               Philippines – Makati City        Taiwan – Taipei
Fax:    +61-2-9634-6188       Fax:    +81-44-812-3200              Phone: +632-848-0171             Phone: +886-2-8768-2788
                                                                   Fax:    +632-867-8661            Fax:    +886-2-8768-2268
India – Bangalore             Korea – Seoul
Phone: +91-80-285-40800       Phone: +82-2-3415-4500               People’s Republic of China       Thailand – Bangkok
Fax:     +91-80-285-40820     Fax:    +82-2-3486-3810              Hong Kong                        Phone: +66-2-955-0500
                                                                   Phone: +852-2735-1628            Fax:    +66-2-955-0505
Indonesia – Jakarta           Malaysia – Selangor                  Fax:    +852-2735-0243
Phone: +65-6482-0311          Phone: +60-3-7805-3055                                                Vietnam – Ho Chi Minh City
                                                                   Shanghai                         Phone: +84-8-930-5546
Fax:   +65-6482-1012          Fax:    +60-3-7805-3066
                                                                   Phone: +86-21-2407-1588          Fax:   +84-8-930-3443
                                                                   Fax:   +86-21-2407-1599



Europe/Middle East /Africa
Austria – Vienna              France – Cergy-Pontoise Cedex        Lithuania and Latvia             South Africa – Port Elizabeth
Phone: +43-1-905-60-0         Phone: +33-1-3420-8888               Lithuania – Vilnius              Phone: +27-41-503-4500
Fax:   +43-1-905-60-1333      Fax:   +33-1-3420-8600               Phone: +370-5-213-1402           Fax:   +27-41-581-0440
Product Information Center:   Product Information Center:          Fax:   +370-5-213-1403
Phone: +43-1-905-60-1249      Phone: +33-1-3420-8686               Product Information Center:      Spain – Barcelona
Fax:   +43-1-905-60-1251      Fax:   +33-1-3420-8623               Phone: +370-5-211-3016           Phone: +34-93-291-0330
                                                                   Fax:   +370-5-213-1403           Fax:   +34-93-201-7879
Belgium – Kessel-Lo           France Export Divisions –
Phone: +32-16-352-300         Cergy-Pontoise Cedex                 Netherlands – ’s-Hertogenbosch   Sweden – Upplands Väsby
Fax:   +32-16-352-352         Phone: +33-1-3420-8866               Phone: +31-73-6246-246           Phone: +46-8-50-72-50-00
                              Fax:   +33-1-3420-8300               Fax:   +31-73-6212-365           Fax:   +46-8-50-72-50-01
Bulgaria – Sofia                                                   Product Information Center:
Phone: +359-2-971-2152        Germany – Bensheim                                                    Switzerland – Steinach
                                                                   Phone: +31-73-6246-999           Phone: +41-71-447-0447
Fax:   +359-2-971-2153        Phone: +49-6251-133-0                Fax:   +31-73-6246-998
                              Fax:   +49-6251-133-1600                                              Fax:   +41-71-447-0444
Czech Republic and Slovakia   Product Information Center:          Norway – Nesbru
Czech Republic – Kurim                                                                              Turkey – Istanbul
                              Phone: +49-6251-133-1999             Phone: +47-66-77-88-50           Phone: +90-212-281-8181-83
Phone: +420-541-162-111       Fax:   +49-6251-133-1988             Fax:   +47-66-77-88-55
Fax:   +420-541-162-223                                                                                    +90-212-282-5130/5430
Product Information Center:   Greece – Athens                      Poland – Warsaw                  Fax:   +90-212-281-8184
Phone: +420-541-162-113       Phone: +30-210-9370-396/397          Phone: +48-22-4576-700           Ukraine – Kiev
Fax:   +420-541-162-132       Fax:   +30-210-9370-655              Fax:   +48-22-4576-720           Phone: +380-44-206-2265
                                                                   Product Information Center:      Fax:   +380-44-206-2264
Denmark – Glostrup            Hungary – Budapest                   Phone: +48-22-4576-704
Phone: +45-43-48-04-00        Phone: +36-1-289-1000                                                 Product Information Center:
                                                                   Fax:   +48-22-4576-720           Phone: +380-44-206-2265
Fax:   +45-43-44-14-14        Fax:   +36-1-289-1010
                              Product Information Center:          Romania – Bucharest              Fax:   +380-44-206-2264
Egypt – Cairo                 Phone: +36-1-289-1016                Phone: +40-21-311-3479/3596
Phone: +202-419-2334                                                                                United Kingdom –
                              Fax:   +36-1-289-1017                Fax:   +40-21-312-0574           Stanmore, Middlesex
Fax:   +202-417-7647
                              Ireland – Dublin                     Russia – Moscow                  Phone: +44-8706-080208
Estonia – Tartu               Phone: +353-1-866-5612               Phone: +7-495-790-7902           Fax:   +44-208-954-6234
Phone: +372-5138-274          Fax:    +353-1-866-5714              Fax:   +7-495-721-1893           Product Information Center:
Fax:   +372-7400-779                                               Product Information Center:      Freephone (UK only):
                              Israel – Petach-Tikva                Phone: +7-495-790-7902-404              +0800-267-666
Finland – Helsinki            Phone: +972-3-929-0999                                                Phone: +44-8706-080208
Phone: +358-95-12-34-20                                            Fax:   +7-495-790-7902-401
                              Fax:     +972-3-919-1088                                              Fax:   +44-208-420-8095
Fax:   +358-95-12-34-250                                           Russia – St. Petersburg
                              Italy – Collegno (Torino)            Phone: +7-812-718-8192
                              Phone: +39-011-4012-111              Fax:   +7-812-718-8193
                              Fax:    +39-011-4031-116
                              Product Information Center:          Slovenia – Ljubljana
                              Phone: +39-011-4012-428              Phone: +386-1561-3270
                              Fax:    +39-011-40-287-428           Fax:   +386-1561-3240


                                                                                                     www.tycoelectronics.com

                                                              11
Tyco Electronics AMP GmbH
AMPèrestr. 12-14
64625 Bensheim / Germany
Phone: +49-(0)6251-133-0
Fax:   +49-(0)6251-133-1600

www.tycoelectronics.com
TE Logo and Tyco Electronics
are trademarks

Tyco Electronics AMP GmbH certified
acc. ISO 14001 and ISO/TS 16949:2002

© 2007 Tyco Electronics Ltd.
1308086-2 Rev. 12-2007 3.5M ST

Sensor Technologies

  • 1.
    Sensor Technology for theAutomotive Market
  • 2.
  • 3.
    Tyco Electronics Ltd.is a leading global provider of engineered electronic components, network solutions and wireless systems, with customers in more than 150 countries. We design, manufacture and market products for customers in industries from automotive, appliances and aerospace and defense to telecommunications, computers and consumer electronics. With over 8,000 engineers and worldwide manufacturing, sales and customer service capabilities, Tyco Electronics’ commitment is our customers’ advantage. G LO B A L AU TO M OT I V E D I V I S I O N S E N S O R T E C H N O LO GY Contactless measuring eliminates interference effects, wear and tear, and provides increased reliability. Tyco Electronics, one of the largest technology providers for the automobile industry, offers contactless sensors for a variety of applications. As sensor manufacturer and processing partner, Tyco Electronics also provides project planning support for new sensor applications, assistance in the selection of the appropriate sensor technology for the respective application, and assistance with defining the corresponding mechanical, electrical and magnetic interface. Tyco Electronics has a broad electromechanical portfolio that includes robust housing technologies, connector systems, and temperature stable designs based on foil and cable networks. This combination of technologies and experience ensures that reliable and cost effective sensor solutions are available for all application types. 3
  • 4.
    PLCD sensor element for contactless travel and U-magnet concept for angualr measurement magnetically biased sensors SEMI-CONDUCTOR SEMI-CONDUCTOR MAGNETO- A P P L I C AT I O N REQUIREMENTS SENSORS SENSORS INDUCTIVE HALL EFFECT MR EFFECT PLCD SENSORS T R AV E L MEASUREMENT Operating range < 15 mm Operating range > 15 mm ANGLE MEASUREMENT Tangential, operating range < 90˚ Axial, operating range > 90˚ SPEED MEASUREMENT I N T E G R AT I O N REQUIREMENTS Small Space Large Operating range position tolerance Large control distances (through structure walls) ROBUSTNESS High-precision performance with Mechanical load e.g. Vibration High-precision performance with high ambient temperature A U T O M O T I VAT E D I N E V E R Y D E TA I L Our global automotive research centers are setting the technological landscape by developing new technologies, products and production processes. The increasingly fast growing number of functions in present and future cars require varieties of powerful and versatile connection systems. We compare existing standards with alternative possibilities in which costs, functionality, dependability and serial production are the basics of our procedures. 4
  • 5.
    TECHNOLOGY Tyco Electronics hasfocused on contactless sensors solutions special for high performing and sophisticated measurement tasks. Wear influences as well as mechanical interactions between sensor and application parts are then avoided. Beside the actual measurement requirements, the application conditions determine the choice of the appropriate sensor technology. For contactless measurements preferably magnetic sensor technologies are used: • Semi-conductor sensors with integrated Hall • Semi-conductor sensors with MR elements • Magneto-inductive PLCD sensors • Temperature sensor devices Table (p.4) compares the characteristic application profile of these important sensor technologies. Semi-conductor solutions with Hall and MR effect show their advantages in their very compact and slim design. They are also preferred in the design of complex sensor clusters. The combination with different magnet configurations, typical integrated or moving magnets obtains precise measurement results. A very efficient and robust sensor technology is the Tyco Electronics patented PLCD (Permanentmagnetic Linear Contactless Displacement Sensor) Technology. For the linear position measurements this principle has various advantages. The magnetic-inductive measuring principle distinguishes for its very large operation tolerance field. This enables the renunciation for specially guided or stored slider and records reliably its highly precise measuring performance without any loss, not being influenced by metal abrasions. The necessary driving magnet can herewith be fixed directly on the setting element, PLCD Gear & Shift travel sensor for Automated whereas even driving distances through non-ferromagnetic walls Manual Transmission with several millimetre thickness, are not an exclusion criteria for this measuring principle. A fully enclosed design guarantees the robustness of this measuring principle. Therefore the encapsulated sensor is completely sealed and temperature resistant up to 160 °C. Door Locking Unit with integrated Hall-Devices 5
  • 6.
    COMPETENCIES Tyco Electronics, assensor manufacturer and development partner, utilizes its experience to provide customer support on project work of new sensor applications. Once the application has been analyzed, the suitable sensor technology is selected and the corresponding mechanical, electrical and magnetic interfaces are defined. The design of the magnetic interface in particular requires a close cooperation with the customer. Special attention is paid to the external influencing factors of the applications. During the design of the magnetic circuits, analytical and empirical methods are used which take into account the magnetic polarization angle-error and the surrounding magnet field influences. State-of-the-art procedures, involving FEM calculations, are used to analyse or design magnetic circuits. Based on the results of these calculations, the properties of the magnet arrangement will be verified and optimised through prototype testing. FEM calculation for dimensioning the magnetic sensor interface 6
  • 7.
    Specific integrated electronicunits ensure reliable signal conditioning and implementation of additional functions such as advanced signal evaluations, generation of control signals and complex diagnostic features. The electronic functions are designed with efficient ASIC technologies. The selection of materials is determined by technical constructive requirements as well as on the environmental conditions. The wide temperature-load profile, high vibration strains and many different chemical liquids define the requirements regarding robustness and sealing of the respective sensor technology. The product architecture is defined by the application space requirements and the required connector or pigtail requirements. For hermetic and oil-tight sealing the sensor housings are molded without blowholes and closed with laser-welded housing covers. Extensive component tests and life tests under application conditions provide the proof for a reliable and durable sensor design. PLCD sensor module for gear Digital and linear position and shift measurement measurement for clutch master cylinder P R O J E C T P L A N N I N G A N D A S S I S TA N C E As sensor manufacturer and processing partner, Tyco Electronics also provides project planning support for new sensor applications, assistance in the selection of the appropriate sensor technology for the respective application, and assistance with defining the corresponding mechanical, electrical and magnetic interface. 7
  • 8.
    A P PL I C AT I O N S Tyco Electronics offers a comprehensive portfolio of sensors for the automotive industry, including switching, travel, rotational, speed and temperature. The primary focus is on contactless technologies to ensure a high level measuring performance, longterm reliability, and the elimination of interference effects and wear and tear. Tyco Electronics is the leading supplier for contactless sensors for hydraulic, pneumatic and electro-mechanical actuators used on cars, trucks and busses. Typical applications are: • Automated Transmission and Clutch Systems • Turbocharger, Throttle, Exhaust Gas Recirculation (EGR), Manifold Intake • Generator, Alternator • Electrical Powered Assisted Steering (EPAS) • Convertibles In addition to the controlled actuator segment, Tyco Electronics also offers a wide range of innovative and cost-effective sensor solutions for following applications: • Seat Sensors (track position, occupant weight, buckle) • Clutch- and Brake Pedal Switches • ABS Wheel Speed • Cam- and Crankshaft • Transmission Gear Wheels • Chassis Level • Door- and Tailgate Latches • Outer Air Temperature • Fuel Level R E L AT E D T E C H N O L O G I E S INDUCTIVE MECHATRONICS TERMINALS & SYSTEMS CONNECTORS 8
  • 9.
    PLCD travel Integrated PLCD Contactless Seat track position sensor for travel sensor for throttle sensor (integrated hydraulic pneumatic cylinder position sensor magnet) cylinder Contactless and redundant brakelight switch (integrated magnet) ALTERNATIVE CABLE ASSEMBLY HIGH SPEED POWER RELAYS & WIRELESS POWER SYSTEMS SYSTEMS DATA NETWORKING DISTRIBUTION SWITCHING TECHNOLOGIES SYSTEMS MODULES O T H E R T Y C O E L E C T R O N I C S A U T O M O T I V E T E C H N O L O G I E S 9
  • 10.
    T YCO EL E C T R O N I C S “AT YO U R S E R V I C E ” @ Tyco Electronics Online The Tyco Electronics website is an innovative and interactive source for application information, product updates and technical solutions. Our step-by-step software makes our website intuitive and user-friendly to better serve you ! Please contact us at : www.tycoelectronics.com/automotive Internet Homepage www.tycoelectronics.com www.tycoelectronics.com/automotive Product Information Center (PIC) Electronic Internet Catalog You can rely on Tyco Electronics PIC Team to www.catalog.tycoelectronics.com provide you support for answers to your general information or technical questions in an efficient and effective manner. To reach our PIC staff, please contact your local Tyco Electronics organization. Product and Machine Literature Tyco Electronics offers a variety of product specific catalogs, brochures and high impact flyers to help better serve you ! For more information on literature for Tyco Electronics’ Global Automotive Division, please contact your local Tyco Electronics Organization or go to www.tycoelectronics.com/automotive 10
  • 11.
    T YCO EL E C T R O N I C S G L O B A L C O N TA C T S Americas Argentina – Buenos Aires Canada – Toronto Mexico – Mexico City United States Phone: +54-11-4733-2200 Phone: +905-475-6222 Phone: +52-55-1106-0800 Harrisburg, PA Fax: +54-11-4733-2211 Fax: +905-474-5520 +01-800-733-8926 Phone: +1-717-564-0100 Product Information Center: Fax: +52-55-1106-0901 Fax: +1-717-986-7575 Brasil – São Paulo Phone: +905-470-4425 Product Information Center: Phone: +55-11-2103-6105 Fax: +905-474-5525 Phone: +1-800-522-6752 Fax: +55-11-2103-6204 For Latin/South American Fax: +1-717-986-7575 Colombia – Bogota Countries not shown Phone: +57-1-231-9398 Phone: +54-11-4733-2015 Troy, MI Fax: +57-1-660-0206 Fax: +54-11-4733-2083 Phone: +1-248-273-3359 Fax: +1-248-273-3322 Asia/Pacific Australia – Sydney Japan – Kawasaki, Kanagawa New Zealand – Auckland Singapore – Singapore Phone: +61-2-9554-2600 Phone: +81-44-844-8111 Phone: +64-9-634-4580 Phone: +65-6482-0311 Fax: +61-2-9502-2556 Fax: +81-44-812-3207 Fax: +64-9-634-4586 Fax: +65-6482-1012 Product Information Center: Product Information Center: Phone: +61-2-9840-8200 Phone: +81-44-844-8013 Philippines – Makati City Taiwan – Taipei Fax: +61-2-9634-6188 Fax: +81-44-812-3200 Phone: +632-848-0171 Phone: +886-2-8768-2788 Fax: +632-867-8661 Fax: +886-2-8768-2268 India – Bangalore Korea – Seoul Phone: +91-80-285-40800 Phone: +82-2-3415-4500 People’s Republic of China Thailand – Bangkok Fax: +91-80-285-40820 Fax: +82-2-3486-3810 Hong Kong Phone: +66-2-955-0500 Phone: +852-2735-1628 Fax: +66-2-955-0505 Indonesia – Jakarta Malaysia – Selangor Fax: +852-2735-0243 Phone: +65-6482-0311 Phone: +60-3-7805-3055 Vietnam – Ho Chi Minh City Shanghai Phone: +84-8-930-5546 Fax: +65-6482-1012 Fax: +60-3-7805-3066 Phone: +86-21-2407-1588 Fax: +84-8-930-3443 Fax: +86-21-2407-1599 Europe/Middle East /Africa Austria – Vienna France – Cergy-Pontoise Cedex Lithuania and Latvia South Africa – Port Elizabeth Phone: +43-1-905-60-0 Phone: +33-1-3420-8888 Lithuania – Vilnius Phone: +27-41-503-4500 Fax: +43-1-905-60-1333 Fax: +33-1-3420-8600 Phone: +370-5-213-1402 Fax: +27-41-581-0440 Product Information Center: Product Information Center: Fax: +370-5-213-1403 Phone: +43-1-905-60-1249 Phone: +33-1-3420-8686 Product Information Center: Spain – Barcelona Fax: +43-1-905-60-1251 Fax: +33-1-3420-8623 Phone: +370-5-211-3016 Phone: +34-93-291-0330 Fax: +370-5-213-1403 Fax: +34-93-201-7879 Belgium – Kessel-Lo France Export Divisions – Phone: +32-16-352-300 Cergy-Pontoise Cedex Netherlands – ’s-Hertogenbosch Sweden – Upplands Väsby Fax: +32-16-352-352 Phone: +33-1-3420-8866 Phone: +31-73-6246-246 Phone: +46-8-50-72-50-00 Fax: +33-1-3420-8300 Fax: +31-73-6212-365 Fax: +46-8-50-72-50-01 Bulgaria – Sofia Product Information Center: Phone: +359-2-971-2152 Germany – Bensheim Switzerland – Steinach Phone: +31-73-6246-999 Phone: +41-71-447-0447 Fax: +359-2-971-2153 Phone: +49-6251-133-0 Fax: +31-73-6246-998 Fax: +49-6251-133-1600 Fax: +41-71-447-0444 Czech Republic and Slovakia Product Information Center: Norway – Nesbru Czech Republic – Kurim Turkey – Istanbul Phone: +49-6251-133-1999 Phone: +47-66-77-88-50 Phone: +90-212-281-8181-83 Phone: +420-541-162-111 Fax: +49-6251-133-1988 Fax: +47-66-77-88-55 Fax: +420-541-162-223 +90-212-282-5130/5430 Product Information Center: Greece – Athens Poland – Warsaw Fax: +90-212-281-8184 Phone: +420-541-162-113 Phone: +30-210-9370-396/397 Phone: +48-22-4576-700 Ukraine – Kiev Fax: +420-541-162-132 Fax: +30-210-9370-655 Fax: +48-22-4576-720 Phone: +380-44-206-2265 Product Information Center: Fax: +380-44-206-2264 Denmark – Glostrup Hungary – Budapest Phone: +48-22-4576-704 Phone: +45-43-48-04-00 Phone: +36-1-289-1000 Product Information Center: Fax: +48-22-4576-720 Phone: +380-44-206-2265 Fax: +45-43-44-14-14 Fax: +36-1-289-1010 Product Information Center: Romania – Bucharest Fax: +380-44-206-2264 Egypt – Cairo Phone: +36-1-289-1016 Phone: +40-21-311-3479/3596 Phone: +202-419-2334 United Kingdom – Fax: +36-1-289-1017 Fax: +40-21-312-0574 Stanmore, Middlesex Fax: +202-417-7647 Ireland – Dublin Russia – Moscow Phone: +44-8706-080208 Estonia – Tartu Phone: +353-1-866-5612 Phone: +7-495-790-7902 Fax: +44-208-954-6234 Phone: +372-5138-274 Fax: +353-1-866-5714 Fax: +7-495-721-1893 Product Information Center: Fax: +372-7400-779 Product Information Center: Freephone (UK only): Israel – Petach-Tikva Phone: +7-495-790-7902-404 +0800-267-666 Finland – Helsinki Phone: +972-3-929-0999 Phone: +44-8706-080208 Phone: +358-95-12-34-20 Fax: +7-495-790-7902-401 Fax: +972-3-919-1088 Fax: +44-208-420-8095 Fax: +358-95-12-34-250 Russia – St. Petersburg Italy – Collegno (Torino) Phone: +7-812-718-8192 Phone: +39-011-4012-111 Fax: +7-812-718-8193 Fax: +39-011-4031-116 Product Information Center: Slovenia – Ljubljana Phone: +39-011-4012-428 Phone: +386-1561-3270 Fax: +39-011-40-287-428 Fax: +386-1561-3240 www.tycoelectronics.com 11
  • 12.
    Tyco Electronics AMPGmbH AMPèrestr. 12-14 64625 Bensheim / Germany Phone: +49-(0)6251-133-0 Fax: +49-(0)6251-133-1600 www.tycoelectronics.com TE Logo and Tyco Electronics are trademarks Tyco Electronics AMP GmbH certified acc. ISO 14001 and ISO/TS 16949:2002 © 2007 Tyco Electronics Ltd. 1308086-2 Rev. 12-2007 3.5M ST