Paper for the 2010 DDESB Seminar

Explosives Safety Planner Community Development and Sustainment

Presenter: Johnathan Stacy, Facilities Certification Branch (N547)
Naval Ordnance Safety and Security Activity
Farragut Hall, 3817 Strauss Ave, Suite 108
Indian Head, MD 20640-5151
(301) 744-6059
johnathan.r.stacy@navy.mil

Co-Author: Karen Jones, Community Planner
Naval Facilities Engineering Command, Washington
1314 Harwood Street SE
Washington Navy Yard, DC 20374-5018
(202) 685-8027
karen.l.jones@navy.mil

Biography: Johnathan Stacy currently works as a Senior Explosives Safety Engineer for
the Naval Ordnance Safety and Security Activity (NOSSA). He is the Navy’s
representative to the Department of Defense Explosives Safety Board (DDESB)
Automated Site Planning (ASP) Working Group and Explosives Safety Siting (ESS)
Configuration Control Board, and Co-Leader of the Department of the Navy (DON)
Explosives Safety Site Approval (ESA) Process Improvement Integrated Product Team
(IPT). He has 15 years of RDT&E experience in support of explosives manufacturing
processes, 3 years of environmental remediation, and 9 years in facilities planning and
explosives safety siting for the Navy.

Abstract: The Naval Ordnance Safety and Security Activity (NOSSA) and Naval
Facilities Engineering Command (NAVFAC) are examining approaches to developing a
sustainable community of explosives safety (ES) planners. Unique to the Navy, our ES
policies and guidance mandate the participation of our facility engineering/planning
professionals in the explosives safety site approval (ESA) process. Traditionally, the
planning community has been fairly stable at the installation level. With transformation
to enterprise management of Navy facilities, the planning community is now more
mobile, while at the same time we are demanding they master new enterprise tools, such
as the DDESB’s automated site planning tool (ASPT) and Navy’s geographical
information system (GIS). Experience within the Navy and the other Services has shown
that an ad hoc approach, driven at the installation level, results in gaps in support for the
development of ESA documentation and does not provide a clear chain of command to
defend resources to support manpower and enterprise tools. The structure of NAVFAC
provides a clear chain of command to defend resources, and provides personnel on the
ground at the installation level, with Regional resources to backfill gaps at the
installation. Effective Community Management, though, requires active participation
with clear roles and responsibilities at all levels, from the installation to the Echelon II
command. This paper will explore approaches to assure a stable work force with the
required skills.
Form Approved
                                     Report Documentation Page                                                                                                  OMB No. 0704-0188

Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington
VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it
does not display a currently valid OMB control number.


1. REPORT DATE                                                           2. REPORT TYPE                                                      3. DATES COVERED
JUL 2010                                                                 N/A                                                                    -
4. TITLE AND SUBTITLE                                                                                                                        5a. CONTRACT NUMBER
Explosives Safety Planner Community Development and Sustainment                                                                              5b. GRANT NUMBER

                                                                                                                                             5c. PROGRAM ELEMENT NUMBER

6. AUTHOR(S)                                                                                                                                 5d. PROJECT NUMBER

                                                                                                                                             5e. TASK NUMBER

                                                                                                                                             5f. WORK UNIT NUMBER

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES)                                                                                           8. PERFORMING ORGANIZATION
                                                                                                                                             REPORT NUMBER
Naval Ordnance Safety and Security Activity Farragut Hall, 3817 Strauss
Ave, Suite 108 Indian Head, MD 20640-5151
9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES)                                                                                      10. SPONSOR/MONITOR’S ACRONYM(S)

                                                                                                                                             11. SPONSOR/MONITOR’S REPORT
                                                                                                                                             NUMBER(S)

12. DISTRIBUTION/AVAILABILITY STATEMENT
Approved for public release, distribution unlimited
13. SUPPLEMENTARY NOTES
See also ADM002313. Department of Defense Explosives Safety Board Seminar (34th) held in Portland,
Oregon on 13-15 July 2010, The original document contains color images.
14. ABSTRACT
The Naval Ordnance Safety and Security Activity (NOSSA) and Naval Facilities Engineering Command
(NAVFAC) are examining approaches to developing a sustainable community of explosives safety (ES)
planners. Unique to the Navy, our ES policies and guidance mandate the participation of our facility
engineering/planning professionals in the explosives safety site approval (ESA) process. Traditionally, the
planning community has been fairly stable at the installation level. With transformation to enterprise
management of Navy facilities, the planning community is now more mobile, while at the same time we are
demanding they master new enterprise tools, such as the DDESBs automated site planning tool (ASPT) and
Navys geographical information system (GIS). Experience within the Navy and the other Services has
shown that an ad hoc approach, driven at the installation level, results in gaps in support for the
development of ESA documentation and does not provide a clear chain of command to defend resources to
support manpower and enterprise tools. The structure of NAVFAC provides a clear chain of command to
defend resources, and provides personnel on the ground at the installation level, with Regional resources to
backfill gaps at the installation. Effective Community Management, though, requires active participation
with clear roles and responsibilities at all levels, from the installation to the Echelon II command. This
paper will explore approaches to assure a stable work force with the required skills.
15. SUBJECT TERMS

16. SECURITY CLASSIFICATION OF:                                                                               17. LIMITATION OF                18. NUMBER             19a. NAME OF
                                                                                                                   ABSTRACT                     OF PAGES              RESPONSIBLE PERSON
          a. REPORT                          b. ABSTRACT                          c. THIS PAGE
                                                                                                                       SAR                           19
     unclassified                         unclassified                         unclassified
Navy ES Planning

ES Planning is the Navy’s approach to manage explosives facilities throughout their life
cycle, from initial planning through decommissioning the facility, by combining the
knowledge of ES criteria and community/facility planning methods. The Navy
institutionalizes this philosophy through Navy guidance, OPNAVINST 8020.14,
NAVSEA OP 5, NAVFACINST 11010.45, and pending NOSSAINST 8020.22, that
require facility planner participation in generation and management of explosives safety
site approvals (ESA), in addition to requiring Public Works Officer (PWO) and
Explosives Safety Officer (ESO) approvals of all explosives safety site approval requests
(ESAR).

NAVFAC Involvement

NAVFAC involvement is critical for compliance with ES criteria. NAVFAC provides
facility life-cycle management—acquisition, sustainment, and disposal—as well as land
management for Naval installations. ES starts with requirements’ development and
continues through strategic planning and work induction. While the ESO is responsible
for providing ES oversight during project development and execution, the ESO must first
know a project is planned. Key to identifying projects that require ES evaluation by the
ESO, NOSSA, and the DDESB is notification from NAVFAC that a project is being
developed. NAVFAC is also a key technical player for the development of facility
requirements, review of designs, and monitoring construction. Finally, NAVFAC
maintains GeoReadiness data (enterprise GIS) – maps) and Real Property Inventory
(RPI), both critical in ESAR documentation development and land-use management.

Land Use Management and Work Induction

Land use management and work induction are the key to assuring facilities and land use
are in compliance with ES criteria. Land-use controls prevent incompatible facilities
from encroaching on explosives operations. Evaluation of proposed projects for ES
considerations—determine if they involve facilities or facility components requiring, or
covered by, ES criteria—at work induction/approval assures that ES criteria is addressed
before resources are committed to the project. This prevents both encroachment on
explosives facilities and unnecessary costs of retrofitting facilities to meet ES criteria post
construction.

Site Approval Development Team (SADT)

No single person or job description has all of the skills or knowledge to address all of the
mission and ES requirements for an explosives facility. Most explosives operations and
facilities involve trade- offs between mission and ES in order to meet the best balance.
As such, Navy guidance will require, at a minimum, the participation of the following in
the development of ESARs:
•   ESO;
   •   Facilities planner; and
   •   An operational technical representative—user of the proposed facility.

Depending on the complexity of the facility, the team may include Department of
Defense (DoD) blast design agency (Naval Facilities Engineering Service Center
(NAVFAC ESC) or the U.S. Army Engineering and Support Center, Huntsville
(USAESCH)), and NOSSA.

Key ES Planning Skills

When developing an ESAR package, the installation-level planner is key to the process.
They provide an understanding of:

   •   Facility, and master and regional planning;
   •   Facility acquisition processes and requirements;
   •   Basic GIS/mapping, using GeoReadiness (enterprise GIS);
   •   Facility-related ES criteria—Explosives Safety for Naval Facility Planning
       course—AMMO-36

Of these skills, the typical ESO would only be skilled in ES criteria.

Responsibilities

In the Navy ESA process, the NAVFAC planner has the following responsibilities:

   •   Team with ESO to generate ESAR documentation and manage life-cycle of
       land/facilities having ES considerations.
   •   Develop explosives safety quantity distance (ESQD) maps required for ESAR and
       master planning.
   •   Coordinate the acquisition of required design data with the facility acquisition
       process.
   •   Ensure changes in land-use are compatible with explosives land-use requirements
       (i.e., prevent encroachment on explosives facilities and operations).
   •   Support ES requirements and mitigate potential land use and operational conflicts
       through effective strategic and master planning efforts; ensure Master and
       Regional Plans incorporate and address ES considerations.


DDESB ASPT

DDESB has issued a mandate that all ESARs be prepared with the use of an ASPT by
2015. The Navy must submit an implementation plan to the DDESB by 30 December
2010. Facility planners, who have completed the AMMO-36 course, have the basic skills
to understand ASPT concepts/application, but will need an additional course that includes
use of ASPT to develop an ESAR package.
Community Management

To assure successful implementation of ASPT, NAVFAC must develop and manage an
ES Planning Community in order to assure ES Planning Community maintains the
needed qualifications and certifications. Development of the required ES Planning and
ASPT skill sets, through mentoring, course training, and experience will take time. A 2-
year track to full development is likely, but the optimum timeline is yet to be determined.
To assure an adequate work force is available to meet projected ES planning work load,
cross-training and skill-set redundancy, including reach back and supplemental services,
will be required to address ES Planning turnover at the installation (PWD) and Facility
Engineering Commands (FECs) Echelon IV levels. Successful Community Management
may require an Echeon III (NAVFAC LANT/PAC) role.

FEC ES Planning Community Leader

To manage the ES Planning Community, the DON ESA Process Improvement IPT
recommends that NAVFAC move implementation of FEC-level technical review of
ESARs from the IPTs to a Core Business Development (BD) position, with IPT ES
Planners trained to provide reach back, project development, and master planning. Core
BD position would be responsible for:

   •   FEC technical review of ESARs;
   •   FEC representation on Explosives Safety Inspections (ESIs) and Ammunition and
       Hazardous Materials (AMHAZ) Handling Review Boards’
   •   FEC-level ES planning and ASPT “help desk”/mentoring for the PWDs;
   •   FEC reach back support for Public Works Departments (PWD)s;
   •   FEC monitoring and managing ES Planning Community development and
       sustainment;
   •   FEC coordinating w/PWD planners; and
   •   FEC ES subject matter expert (SME) on planning studies.

The key requirement is that an individual position be identified at the FEC (regional)
level that has both ES planning (ESAR development and ES-related master planning)
and ES Planning Community Management duties as a core component of their position.
Successful ES planning and ASPT implementation, at the FEC level, cannot be left as a
collateral duty.

NAVFAC HQ ES Planning Leadership

ES planning community development/sustainment and ASPT implementation will require
dedicated NAVFAC HQ-level leadership. A position needs to be identified and staffed
to:

   •   Provide Navy-wide ES Planning Community Leadership and ES Program
       Management;
•   Identify and champion resources for ASPT implementation and ES Planning;
   •   Co-Chair DON ESA Process Improvement IPT; and
   •   Provide leadership for implementation of ASPT.

The Navy’s commitment to an enterprise approach to facilities management, with
predictable and defensible resource requirements and standardized business practices,
cannot be achieved without HQ-level leadership.

Summary

Good ES Planning requires leadership at NAVFAC HQ and the FECs and is a core
facility management function. While the ESOs and NOSSA provide oversight of ES
criteria, execution of facilities-related criteria is NAVFAC’s responsibility. Successful
ASPT implementation, ES facilities life-cycle management, and ES strategic planning
services require an ES Planning Community equipped with the required skills, including
ASPT. Maintaining an ES Planning Community to meet projected workload will require
leadership and must be a core function—not a collateral duty.
Navy Explosives Safety Planning
Community Sustainment Concept


           Johnathan Stacy
           Naval Ordnance Safety & Security Activity
           Karen Jones
           Naval Facilities Engineering Command




                                            Revised: 29 Jun 2010
Agenda

• Navy Explosives Safety (ES) Planning
• Land Use Management and Work Induction
• Key ES Planning Skills
• Department of Defense Explosives Safety
  Board (DDESB) Automated Site Planning
  Tool (ASPT)
• Community Management


         EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT   2
Navy Explosives Safety Planning

• Explosives Safety (ES) Planning—combining
  knowledge of ES criteria and
  community/facility planning methods to
  manage explosives facilities
• Navy guidance requires facility planner
  participation in generation of explosives safety
  site approval requests (ESAR)
• Public Works Officer (PWO) and Explosives
  Safety Officer (ESO) must sign ESAR
          EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT   3
NAVFAC Involvement
• Naval Facilities Engineering Command (NAVFAC)
    • Facility life-cycle management
        (acquisition, sustainment, and disposal)
    • Land management
    • Requirements Development, Work Induction,
       Strategic Planning
• Project Development and Execution
     • Key to identifying projects that require ES evaluation by ESO,
       Naval Ordnance Safety and Security Activity (NOSSA), and
       DDESB
     • Develops facility requirements, reviews designs, and monitors
       construction
• Maintains GeoReadiness data (enterprise geographic
  information system (GIS) – maps), and Real Property
  Inventory (RPI)
              EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT   4
Land Use Management and Work
      Induction

• Key to assuring facilities and land use are in
  compliance with ES criteria
• Land-use controls prevent incompatible
  facilities from encroaching on explosives
  operations
• Evaluate projects early for ES considerations
  (determine if they involve facilities or facility
  components requiring, or covered by, ES
  criteria)
           EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT   5
Site Approval Development Team

Navy guidance will require, at a minimum, the
participation of the following in the development
of ESARs:
    • ESO
    • Facilities Planner
    • Operational technical representative—User of
      the proposed facility




          EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT   6
Key ES Planning Skills

• Understanding of facilities, and master and
  regional planning
• Understanding of facility acquisition processes
  and requirements
• Basic GIS/mapping using GeoReadiness
  (enterprise GIS)
• Understanding of facility-related ES criteria—
  Explosives Safety for Naval Facility Planning
  course—AMMO-36
          EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT   7
Responsibilities
• Team with ESO to generate ESAR
  documentation and manage life-cycle of
  land/facilities having ES considerations
• Develop explosives safety quantity distance
  (ESQD) maps required for ESAR and master
  planning
• Coordinate the acquisition of required design data
  with the facility acquisition process




           EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT   8
Responsibilities (Con’t)

• Ensure changes in land-use are compatible with
  explosives land-use requirements (i.e., prevent
  encroachment on explosives facilities and
  operations)
• Support ES requirements and mitigate potential
  land use and operational conflicts through
  effective strategic and master planning efforts;
  ensure Master and Regional Plans incorporate
  and address ES considerations

           EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT
DDESB Automated Site Planning
     Tool (ASPT)

• DDESB has issued a mandate that all ESARs
  be prepared with the use of an ASPT by 2015
• Navy must submit an implementation plan to
  DDESB by 30 Dec 2010
• Facility planners, who have completed
  AMMO-36 course, have the basic skills to
  understand ASPT concepts/application
• Need for additional course that includes use of
  ASPT to develop an ESAR package
          EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT   10
Community Management

NAVFAC develop and manage ES Planning
Community—Assure ES Planning community
maintains qualifications and certifications
    • Develop required ES Planning and ASPT skill sets
      through mentoring, course training, and experience (2-
      year track?—full development timeline TBD)
    • Cross-training and skill set redundancy optimum (reach
      back and supplemental services required to address ES
      Planning turnover at PWDs and Facility Engineering
      Commands (FECs), Echelon IV)
    • Potential Echeon III (NAVFAC LANT/PAC) role

           EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT   11
FEC ES Planning Community
           Leader
• Recommend that NAVFAC move implementation of FEC-
  level technical review of ESARs from the IPTs to a Core
  Business Development (BD) position (w/IPT ES Planner
  trained as reach back: work closely w/IPT Planners on project
  development and master planning)
• Core BD position would be responsible for:
     • Technical review of ESARs
     • ESI and AMHAZ Handling Review Board FEC Representation
     • FEC-level ES Planning and ASPT “help desk”/mentoring for the
       PWDs
     • Providing reach back support for PWDs
     • Monitoring and managing ES Planning Community development
       and sustainment for the FEC
     • Coordinating w/PWD Planners, serve as FEC ES subject matter
       expert (SME) on Planning Studies


             EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT    12
HQ ES Planning Leadership

ASPT implementation will require dedicated
NAVFAC HQ-level leadership
    • Provide Navy-wide ES Planning Community
      Leadership and ES Program Management
    • Identify and champion resources for ASPT
      implementation and ES Planning
    • Co-Chair Department of the Navy (DON)
      Explosives Safety Site Approval (ESA) Process
      Improvement IPT
    • Provide leadership for implementation of ASPT
          EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT   13
Summary

• Good ES Planning requires leadership at
  NAVFAC HQ and the FECs
• Successful ASPT implementation, ES
  facilities life-cycle management, and ES
  strategic planning services require an ES
  Planning Community equipped with the
  required skills to use ASPT
• ES Planning Community Leadership must be a
  core function - not a collateral
         EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT   14

More Related Content

Viewers also liked

Social media traning_for_mf_1
Social media traning_for_mf_1Social media traning_for_mf_1
Social media traning_for_mf_1pandec
 
Anlatimbozuklugu
AnlatimbozukluguAnlatimbozuklugu
Anlatimbozukluguyardimt
 
Selling You & Your Services Drupalcon 2009
Selling You & Your Services   Drupalcon 2009Selling You & Your Services   Drupalcon 2009
Selling You & Your Services Drupalcon 2009Neil Giarratana
 
Sfantul Valentin pe criza
Sfantul Valentin pe crizaSfantul Valentin pe criza
Sfantul Valentin pe crizaCarla Alman
 
Comp Plan Dvd[1]
Comp Plan Dvd[1]Comp Plan Dvd[1]
Comp Plan Dvd[1]skyallianz
 
Kelime çEşItleri
Kelime çEşItleriKelime çEşItleri
Kelime çEşItleriyardimt
 
Lucruri utile facebook
Lucruri utile facebookLucruri utile facebook
Lucruri utile facebookCarla Alman
 
Mainstreaming the Disruption: Up-skilling for Online Learning
Mainstreaming the Disruption: Up-skilling for Online LearningMainstreaming the Disruption: Up-skilling for Online Learning
Mainstreaming the Disruption: Up-skilling for Online LearningJeremy Williams
 
SöZcüKlerde Anlam
SöZcüKlerde AnlamSöZcüKlerde Anlam
SöZcüKlerde Anlamyardimt
 
Build Automation of PHP Applications
Build Automation of PHP ApplicationsBuild Automation of PHP Applications
Build Automation of PHP ApplicationsPavan Kumar N
 
Girnita DM Blood Transfusions
Girnita DM Blood TransfusionsGirnita DM Blood Transfusions
Girnita DM Blood TransfusionsDiana Girnita
 
Sözcükte Anlam Özellikleri
Sözcükte Anlam ÖzellikleriSözcükte Anlam Özellikleri
Sözcükte Anlam Özellikleriyardimt
 
Cum iubesc zodiile
Cum iubesc zodiileCum iubesc zodiile
Cum iubesc zodiileCarla Alman
 
Leveraging Digitised Intellectual Property to Build a Global Education Business
Leveraging Digitised Intellectual Property to Build a Global Education BusinessLeveraging Digitised Intellectual Property to Build a Global Education Business
Leveraging Digitised Intellectual Property to Build a Global Education BusinessJeremy Williams
 
Multilinguismo e società dell’interdipendenza
Multilinguismo e società dell’interdipendenzaMultilinguismo e società dell’interdipendenza
Multilinguismo e società dell’interdipendenzaFabrizio Faraco
 

Viewers also liked (20)

Social media traning_for_mf_1
Social media traning_for_mf_1Social media traning_for_mf_1
Social media traning_for_mf_1
 
Spanish mystery
Spanish mysterySpanish mystery
Spanish mystery
 
Anlatimbozuklugu
AnlatimbozukluguAnlatimbozuklugu
Anlatimbozuklugu
 
Selling You & Your Services Drupalcon 2009
Selling You & Your Services   Drupalcon 2009Selling You & Your Services   Drupalcon 2009
Selling You & Your Services Drupalcon 2009
 
Sfantul Valentin pe criza
Sfantul Valentin pe crizaSfantul Valentin pe criza
Sfantul Valentin pe criza
 
Comp Plan Dvd[1]
Comp Plan Dvd[1]Comp Plan Dvd[1]
Comp Plan Dvd[1]
 
Kelime çEşItleri
Kelime çEşItleriKelime çEşItleri
Kelime çEşItleri
 
Lucruri utile facebook
Lucruri utile facebookLucruri utile facebook
Lucruri utile facebook
 
Mainstreaming the Disruption: Up-skilling for Online Learning
Mainstreaming the Disruption: Up-skilling for Online LearningMainstreaming the Disruption: Up-skilling for Online Learning
Mainstreaming the Disruption: Up-skilling for Online Learning
 
SöZcüKlerde Anlam
SöZcüKlerde AnlamSöZcüKlerde Anlam
SöZcüKlerde Anlam
 
Urozhay
UrozhayUrozhay
Urozhay
 
Haiku
HaikuHaiku
Haiku
 
Build Automation of PHP Applications
Build Automation of PHP ApplicationsBuild Automation of PHP Applications
Build Automation of PHP Applications
 
Girnita DM Blood Transfusions
Girnita DM Blood TransfusionsGirnita DM Blood Transfusions
Girnita DM Blood Transfusions
 
Sözcükte Anlam Özellikleri
Sözcükte Anlam ÖzellikleriSözcükte Anlam Özellikleri
Sözcükte Anlam Özellikleri
 
21st Century Networking via Linkedin
21st Century Networking via Linkedin21st Century Networking via Linkedin
21st Century Networking via Linkedin
 
Cum iubesc zodiile
Cum iubesc zodiileCum iubesc zodiile
Cum iubesc zodiile
 
Leveraging Digitised Intellectual Property to Build a Global Education Business
Leveraging Digitised Intellectual Property to Build a Global Education BusinessLeveraging Digitised Intellectual Property to Build a Global Education Business
Leveraging Digitised Intellectual Property to Build a Global Education Business
 
Design for-supply
Design for-supplyDesign for-supply
Design for-supply
 
Multilinguismo e società dell’interdipendenza
Multilinguismo e società dell’interdipendenzaMultilinguismo e società dell’interdipendenza
Multilinguismo e società dell’interdipendenza
 

Similar to Navy's Approach to Managing Explosives Facilities

Estudio de la física de la teletransportacin
Estudio de la física de la teletransportacinEstudio de la física de la teletransportacin
Estudio de la física de la teletransportacinMorfeo1
 
Teleportación -teleportation-physics-study
Teleportación -teleportation-physics-studyTeleportación -teleportation-physics-study
Teleportación -teleportation-physics-studyEstrellaCosmoecologa
 
Afr icom 2007
Afr icom 2007Afr icom 2007
Afr icom 2007anondosha
 
Pendall Pers Surv
Pendall Pers SurvPendall Pers Surv
Pendall Pers Survpendalld
 
Master's Thesis_Reber_2007
Master's Thesis_Reber_2007Master's Thesis_Reber_2007
Master's Thesis_Reber_2007Dan Reber
 
Advice And Learning In Problem Solving
Advice And Learning In Problem SolvingAdvice And Learning In Problem Solving
Advice And Learning In Problem SolvingJeff Brooks
 
a276170.pdf
a276170.pdfa276170.pdf
a276170.pdfbedo39
 
DOD EA conference DoDAF in Action
DOD EA conference DoDAF in ActionDOD EA conference DoDAF in Action
DOD EA conference DoDAF in ActionPaul W. Johnson
 
Scorecard - A Case study of the Joint Strike Fighter Program
Scorecard - A Case study of the Joint Strike Fighter ProgramScorecard - A Case study of the Joint Strike Fighter Program
Scorecard - A Case study of the Joint Strike Fighter ProgramDragon029
 
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...Project Controls Expo
 

Similar to Navy's Approach to Managing Explosives Facilities (20)

Nwc usry
Nwc usryNwc usry
Nwc usry
 
Estudio de la física de la teletransportacin
Estudio de la física de la teletransportacinEstudio de la física de la teletransportacin
Estudio de la física de la teletransportacin
 
Teleportación -teleportation-physics-study
Teleportación -teleportation-physics-studyTeleportación -teleportation-physics-study
Teleportación -teleportation-physics-study
 
Afr icom 2007
Afr icom 2007Afr icom 2007
Afr icom 2007
 
Gun control pdf
Gun control pdfGun control pdf
Gun control pdf
 
Hec geo ras42-usersmanual
Hec geo ras42-usersmanualHec geo ras42-usersmanual
Hec geo ras42-usersmanual
 
Pendall Pers Surv
Pendall Pers SurvPendall Pers Surv
Pendall Pers Surv
 
Get tr doc
Get tr docGet tr doc
Get tr doc
 
Get tr doc
Get tr docGet tr doc
Get tr doc
 
A189218
A189218A189218
A189218
 
Master's Thesis_Reber_2007
Master's Thesis_Reber_2007Master's Thesis_Reber_2007
Master's Thesis_Reber_2007
 
Advice And Learning In Problem Solving
Advice And Learning In Problem SolvingAdvice And Learning In Problem Solving
Advice And Learning In Problem Solving
 
ADA613693
ADA613693ADA613693
ADA613693
 
Rr1770
Rr1770Rr1770
Rr1770
 
Ops Research_Narcam_1993-FAA-DOT
Ops Research_Narcam_1993-FAA-DOTOps Research_Narcam_1993-FAA-DOT
Ops Research_Narcam_1993-FAA-DOT
 
watchkeeper
watchkeeperwatchkeeper
watchkeeper
 
a276170.pdf
a276170.pdfa276170.pdf
a276170.pdf
 
DOD EA conference DoDAF in Action
DOD EA conference DoDAF in ActionDOD EA conference DoDAF in Action
DOD EA conference DoDAF in Action
 
Scorecard - A Case study of the Joint Strike Fighter Program
Scorecard - A Case study of the Joint Strike Fighter ProgramScorecard - A Case study of the Joint Strike Fighter Program
Scorecard - A Case study of the Joint Strike Fighter Program
 
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...
 

More from California Wildlife Conservation Board (11)

Building geo registered-x3_d
Building geo registered-x3_dBuilding geo registered-x3_d
Building geo registered-x3_d
 
Update on GeoReadiness (Cole)
Update on GeoReadiness (Cole)Update on GeoReadiness (Cole)
Update on GeoReadiness (Cole)
 
Navy's GIS Solution for Decision Support and Service-wide Data-Sharing, Paper...
Navy's GIS Solution for Decision Support and Service-wide Data-Sharing, Paper...Navy's GIS Solution for Decision Support and Service-wide Data-Sharing, Paper...
Navy's GIS Solution for Decision Support and Service-wide Data-Sharing, Paper...
 
Military Critical Infrastructure: GeoReadiness
Military Critical Infrastructure: GeoReadinessMilitary Critical Infrastructure: GeoReadiness
Military Critical Infrastructure: GeoReadiness
 
Geo-Enabling DoD Business Transformation: The Defense Installation Spatial Da...
Geo-Enabling DoD Business Transformation: The Defense Installation Spatial Da...Geo-Enabling DoD Business Transformation: The Defense Installation Spatial Da...
Geo-Enabling DoD Business Transformation: The Defense Installation Spatial Da...
 
NAVFAC Conference Briefing
NAVFAC Conference BriefingNAVFAC Conference Briefing
NAVFAC Conference Briefing
 
Roland Shield Sausage Room
Roland Shield Sausage RoomRoland Shield Sausage Room
Roland Shield Sausage Room
 
Nov2008 board meeting_presentation_draft_11192008_1045
Nov2008 board meeting_presentation_draft_11192008_1045Nov2008 board meeting_presentation_draft_11192008_1045
Nov2008 board meeting_presentation_draft_11192008_1045
 
Draft november2009 board_meeting_presentation_11162009_web_update
Draft november2009 board_meeting_presentation_11162009_web_updateDraft november2009 board_meeting_presentation_11162009_web_update
Draft november2009 board_meeting_presentation_11162009_web_update
 
February25 2010 Wcb Board Meeting Final For Web
February25 2010 Wcb Board Meeting Final For WebFebruary25 2010 Wcb Board Meeting Final For Web
February25 2010 Wcb Board Meeting Final For Web
 
Dfg Intranet Development
Dfg Intranet DevelopmentDfg Intranet Development
Dfg Intranet Development
 

Recently uploaded

Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 

Recently uploaded (20)

Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 

Navy's Approach to Managing Explosives Facilities

  • 1. Paper for the 2010 DDESB Seminar Explosives Safety Planner Community Development and Sustainment Presenter: Johnathan Stacy, Facilities Certification Branch (N547) Naval Ordnance Safety and Security Activity Farragut Hall, 3817 Strauss Ave, Suite 108 Indian Head, MD 20640-5151 (301) 744-6059 johnathan.r.stacy@navy.mil Co-Author: Karen Jones, Community Planner Naval Facilities Engineering Command, Washington 1314 Harwood Street SE Washington Navy Yard, DC 20374-5018 (202) 685-8027 karen.l.jones@navy.mil Biography: Johnathan Stacy currently works as a Senior Explosives Safety Engineer for the Naval Ordnance Safety and Security Activity (NOSSA). He is the Navy’s representative to the Department of Defense Explosives Safety Board (DDESB) Automated Site Planning (ASP) Working Group and Explosives Safety Siting (ESS) Configuration Control Board, and Co-Leader of the Department of the Navy (DON) Explosives Safety Site Approval (ESA) Process Improvement Integrated Product Team (IPT). He has 15 years of RDT&E experience in support of explosives manufacturing processes, 3 years of environmental remediation, and 9 years in facilities planning and explosives safety siting for the Navy. Abstract: The Naval Ordnance Safety and Security Activity (NOSSA) and Naval Facilities Engineering Command (NAVFAC) are examining approaches to developing a sustainable community of explosives safety (ES) planners. Unique to the Navy, our ES policies and guidance mandate the participation of our facility engineering/planning professionals in the explosives safety site approval (ESA) process. Traditionally, the planning community has been fairly stable at the installation level. With transformation to enterprise management of Navy facilities, the planning community is now more mobile, while at the same time we are demanding they master new enterprise tools, such as the DDESB’s automated site planning tool (ASPT) and Navy’s geographical information system (GIS). Experience within the Navy and the other Services has shown that an ad hoc approach, driven at the installation level, results in gaps in support for the development of ESA documentation and does not provide a clear chain of command to defend resources to support manpower and enterprise tools. The structure of NAVFAC provides a clear chain of command to defend resources, and provides personnel on the ground at the installation level, with Regional resources to backfill gaps at the installation. Effective Community Management, though, requires active participation with clear roles and responsibilities at all levels, from the installation to the Echelon II command. This paper will explore approaches to assure a stable work force with the required skills.
  • 2. Form Approved Report Documentation Page OMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 2. REPORT TYPE 3. DATES COVERED JUL 2010 N/A - 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Explosives Safety Planner Community Development and Sustainment 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER Naval Ordnance Safety and Security Activity Farragut Hall, 3817 Strauss Ave, Suite 108 Indian Head, MD 20640-5151 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release, distribution unlimited 13. SUPPLEMENTARY NOTES See also ADM002313. Department of Defense Explosives Safety Board Seminar (34th) held in Portland, Oregon on 13-15 July 2010, The original document contains color images. 14. ABSTRACT The Naval Ordnance Safety and Security Activity (NOSSA) and Naval Facilities Engineering Command (NAVFAC) are examining approaches to developing a sustainable community of explosives safety (ES) planners. Unique to the Navy, our ES policies and guidance mandate the participation of our facility engineering/planning professionals in the explosives safety site approval (ESA) process. Traditionally, the planning community has been fairly stable at the installation level. With transformation to enterprise management of Navy facilities, the planning community is now more mobile, while at the same time we are demanding they master new enterprise tools, such as the DDESBs automated site planning tool (ASPT) and Navys geographical information system (GIS). Experience within the Navy and the other Services has shown that an ad hoc approach, driven at the installation level, results in gaps in support for the development of ESA documentation and does not provide a clear chain of command to defend resources to support manpower and enterprise tools. The structure of NAVFAC provides a clear chain of command to defend resources, and provides personnel on the ground at the installation level, with Regional resources to backfill gaps at the installation. Effective Community Management, though, requires active participation with clear roles and responsibilities at all levels, from the installation to the Echelon II command. This paper will explore approaches to assure a stable work force with the required skills. 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF 18. NUMBER 19a. NAME OF ABSTRACT OF PAGES RESPONSIBLE PERSON a. REPORT b. ABSTRACT c. THIS PAGE SAR 19 unclassified unclassified unclassified
  • 3. Navy ES Planning ES Planning is the Navy’s approach to manage explosives facilities throughout their life cycle, from initial planning through decommissioning the facility, by combining the knowledge of ES criteria and community/facility planning methods. The Navy institutionalizes this philosophy through Navy guidance, OPNAVINST 8020.14, NAVSEA OP 5, NAVFACINST 11010.45, and pending NOSSAINST 8020.22, that require facility planner participation in generation and management of explosives safety site approvals (ESA), in addition to requiring Public Works Officer (PWO) and Explosives Safety Officer (ESO) approvals of all explosives safety site approval requests (ESAR). NAVFAC Involvement NAVFAC involvement is critical for compliance with ES criteria. NAVFAC provides facility life-cycle management—acquisition, sustainment, and disposal—as well as land management for Naval installations. ES starts with requirements’ development and continues through strategic planning and work induction. While the ESO is responsible for providing ES oversight during project development and execution, the ESO must first know a project is planned. Key to identifying projects that require ES evaluation by the ESO, NOSSA, and the DDESB is notification from NAVFAC that a project is being developed. NAVFAC is also a key technical player for the development of facility requirements, review of designs, and monitoring construction. Finally, NAVFAC maintains GeoReadiness data (enterprise GIS) – maps) and Real Property Inventory (RPI), both critical in ESAR documentation development and land-use management. Land Use Management and Work Induction Land use management and work induction are the key to assuring facilities and land use are in compliance with ES criteria. Land-use controls prevent incompatible facilities from encroaching on explosives operations. Evaluation of proposed projects for ES considerations—determine if they involve facilities or facility components requiring, or covered by, ES criteria—at work induction/approval assures that ES criteria is addressed before resources are committed to the project. This prevents both encroachment on explosives facilities and unnecessary costs of retrofitting facilities to meet ES criteria post construction. Site Approval Development Team (SADT) No single person or job description has all of the skills or knowledge to address all of the mission and ES requirements for an explosives facility. Most explosives operations and facilities involve trade- offs between mission and ES in order to meet the best balance. As such, Navy guidance will require, at a minimum, the participation of the following in the development of ESARs:
  • 4. ESO; • Facilities planner; and • An operational technical representative—user of the proposed facility. Depending on the complexity of the facility, the team may include Department of Defense (DoD) blast design agency (Naval Facilities Engineering Service Center (NAVFAC ESC) or the U.S. Army Engineering and Support Center, Huntsville (USAESCH)), and NOSSA. Key ES Planning Skills When developing an ESAR package, the installation-level planner is key to the process. They provide an understanding of: • Facility, and master and regional planning; • Facility acquisition processes and requirements; • Basic GIS/mapping, using GeoReadiness (enterprise GIS); • Facility-related ES criteria—Explosives Safety for Naval Facility Planning course—AMMO-36 Of these skills, the typical ESO would only be skilled in ES criteria. Responsibilities In the Navy ESA process, the NAVFAC planner has the following responsibilities: • Team with ESO to generate ESAR documentation and manage life-cycle of land/facilities having ES considerations. • Develop explosives safety quantity distance (ESQD) maps required for ESAR and master planning. • Coordinate the acquisition of required design data with the facility acquisition process. • Ensure changes in land-use are compatible with explosives land-use requirements (i.e., prevent encroachment on explosives facilities and operations). • Support ES requirements and mitigate potential land use and operational conflicts through effective strategic and master planning efforts; ensure Master and Regional Plans incorporate and address ES considerations. DDESB ASPT DDESB has issued a mandate that all ESARs be prepared with the use of an ASPT by 2015. The Navy must submit an implementation plan to the DDESB by 30 December 2010. Facility planners, who have completed the AMMO-36 course, have the basic skills to understand ASPT concepts/application, but will need an additional course that includes use of ASPT to develop an ESAR package.
  • 5. Community Management To assure successful implementation of ASPT, NAVFAC must develop and manage an ES Planning Community in order to assure ES Planning Community maintains the needed qualifications and certifications. Development of the required ES Planning and ASPT skill sets, through mentoring, course training, and experience will take time. A 2- year track to full development is likely, but the optimum timeline is yet to be determined. To assure an adequate work force is available to meet projected ES planning work load, cross-training and skill-set redundancy, including reach back and supplemental services, will be required to address ES Planning turnover at the installation (PWD) and Facility Engineering Commands (FECs) Echelon IV levels. Successful Community Management may require an Echeon III (NAVFAC LANT/PAC) role. FEC ES Planning Community Leader To manage the ES Planning Community, the DON ESA Process Improvement IPT recommends that NAVFAC move implementation of FEC-level technical review of ESARs from the IPTs to a Core Business Development (BD) position, with IPT ES Planners trained to provide reach back, project development, and master planning. Core BD position would be responsible for: • FEC technical review of ESARs; • FEC representation on Explosives Safety Inspections (ESIs) and Ammunition and Hazardous Materials (AMHAZ) Handling Review Boards’ • FEC-level ES planning and ASPT “help desk”/mentoring for the PWDs; • FEC reach back support for Public Works Departments (PWD)s; • FEC monitoring and managing ES Planning Community development and sustainment; • FEC coordinating w/PWD planners; and • FEC ES subject matter expert (SME) on planning studies. The key requirement is that an individual position be identified at the FEC (regional) level that has both ES planning (ESAR development and ES-related master planning) and ES Planning Community Management duties as a core component of their position. Successful ES planning and ASPT implementation, at the FEC level, cannot be left as a collateral duty. NAVFAC HQ ES Planning Leadership ES planning community development/sustainment and ASPT implementation will require dedicated NAVFAC HQ-level leadership. A position needs to be identified and staffed to: • Provide Navy-wide ES Planning Community Leadership and ES Program Management;
  • 6. Identify and champion resources for ASPT implementation and ES Planning; • Co-Chair DON ESA Process Improvement IPT; and • Provide leadership for implementation of ASPT. The Navy’s commitment to an enterprise approach to facilities management, with predictable and defensible resource requirements and standardized business practices, cannot be achieved without HQ-level leadership. Summary Good ES Planning requires leadership at NAVFAC HQ and the FECs and is a core facility management function. While the ESOs and NOSSA provide oversight of ES criteria, execution of facilities-related criteria is NAVFAC’s responsibility. Successful ASPT implementation, ES facilities life-cycle management, and ES strategic planning services require an ES Planning Community equipped with the required skills, including ASPT. Maintaining an ES Planning Community to meet projected workload will require leadership and must be a core function—not a collateral duty.
  • 7. Navy Explosives Safety Planning Community Sustainment Concept Johnathan Stacy Naval Ordnance Safety & Security Activity Karen Jones Naval Facilities Engineering Command Revised: 29 Jun 2010
  • 8. Agenda • Navy Explosives Safety (ES) Planning • Land Use Management and Work Induction • Key ES Planning Skills • Department of Defense Explosives Safety Board (DDESB) Automated Site Planning Tool (ASPT) • Community Management EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT 2
  • 9. Navy Explosives Safety Planning • Explosives Safety (ES) Planning—combining knowledge of ES criteria and community/facility planning methods to manage explosives facilities • Navy guidance requires facility planner participation in generation of explosives safety site approval requests (ESAR) • Public Works Officer (PWO) and Explosives Safety Officer (ESO) must sign ESAR EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT 3
  • 10. NAVFAC Involvement • Naval Facilities Engineering Command (NAVFAC) • Facility life-cycle management (acquisition, sustainment, and disposal) • Land management • Requirements Development, Work Induction, Strategic Planning • Project Development and Execution • Key to identifying projects that require ES evaluation by ESO, Naval Ordnance Safety and Security Activity (NOSSA), and DDESB • Develops facility requirements, reviews designs, and monitors construction • Maintains GeoReadiness data (enterprise geographic information system (GIS) – maps), and Real Property Inventory (RPI) EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT 4
  • 11. Land Use Management and Work Induction • Key to assuring facilities and land use are in compliance with ES criteria • Land-use controls prevent incompatible facilities from encroaching on explosives operations • Evaluate projects early for ES considerations (determine if they involve facilities or facility components requiring, or covered by, ES criteria) EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT 5
  • 12. Site Approval Development Team Navy guidance will require, at a minimum, the participation of the following in the development of ESARs: • ESO • Facilities Planner • Operational technical representative—User of the proposed facility EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT 6
  • 13. Key ES Planning Skills • Understanding of facilities, and master and regional planning • Understanding of facility acquisition processes and requirements • Basic GIS/mapping using GeoReadiness (enterprise GIS) • Understanding of facility-related ES criteria— Explosives Safety for Naval Facility Planning course—AMMO-36 EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT 7
  • 14. Responsibilities • Team with ESO to generate ESAR documentation and manage life-cycle of land/facilities having ES considerations • Develop explosives safety quantity distance (ESQD) maps required for ESAR and master planning • Coordinate the acquisition of required design data with the facility acquisition process EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT 8
  • 15. Responsibilities (Con’t) • Ensure changes in land-use are compatible with explosives land-use requirements (i.e., prevent encroachment on explosives facilities and operations) • Support ES requirements and mitigate potential land use and operational conflicts through effective strategic and master planning efforts; ensure Master and Regional Plans incorporate and address ES considerations EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT
  • 16. DDESB Automated Site Planning Tool (ASPT) • DDESB has issued a mandate that all ESARs be prepared with the use of an ASPT by 2015 • Navy must submit an implementation plan to DDESB by 30 Dec 2010 • Facility planners, who have completed AMMO-36 course, have the basic skills to understand ASPT concepts/application • Need for additional course that includes use of ASPT to develop an ESAR package EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT 10
  • 17. Community Management NAVFAC develop and manage ES Planning Community—Assure ES Planning community maintains qualifications and certifications • Develop required ES Planning and ASPT skill sets through mentoring, course training, and experience (2- year track?—full development timeline TBD) • Cross-training and skill set redundancy optimum (reach back and supplemental services required to address ES Planning turnover at PWDs and Facility Engineering Commands (FECs), Echelon IV) • Potential Echeon III (NAVFAC LANT/PAC) role EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT 11
  • 18. FEC ES Planning Community Leader • Recommend that NAVFAC move implementation of FEC- level technical review of ESARs from the IPTs to a Core Business Development (BD) position (w/IPT ES Planner trained as reach back: work closely w/IPT Planners on project development and master planning) • Core BD position would be responsible for: • Technical review of ESARs • ESI and AMHAZ Handling Review Board FEC Representation • FEC-level ES Planning and ASPT “help desk”/mentoring for the PWDs • Providing reach back support for PWDs • Monitoring and managing ES Planning Community development and sustainment for the FEC • Coordinating w/PWD Planners, serve as FEC ES subject matter expert (SME) on Planning Studies EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT 12
  • 19. HQ ES Planning Leadership ASPT implementation will require dedicated NAVFAC HQ-level leadership • Provide Navy-wide ES Planning Community Leadership and ES Program Management • Identify and champion resources for ASPT implementation and ES Planning • Co-Chair Department of the Navy (DON) Explosives Safety Site Approval (ESA) Process Improvement IPT • Provide leadership for implementation of ASPT EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT 13
  • 20. Summary • Good ES Planning requires leadership at NAVFAC HQ and the FECs • Successful ASPT implementation, ES facilities life-cycle management, and ES strategic planning services require an ES Planning Community equipped with the required skills to use ASPT • ES Planning Community Leadership must be a core function - not a collateral EXPLOSIVES SAFETY SITE APPROVAL PROCESS IPT 14