SECURITY CHECKLIST
(To be completed on Weekly basis)
Page 1 of 1 Form # HSEQ- SC (Rev 2 - Mar 23)
Project Information
Project Name:
Location: Company Name:
Date: Time :
ITEMS TO BE CHECKED Yes No N/A Comments
1. Hoarding encloses all construction activities.
2. No unauthorised entry to the project
3. Hoarding secure and not damaged.
4. Hoarding not less than 2 meters high.
5. Hoarding inspected both inside and outside.
6. Hoarding support posts securely anchored.
7. Materials/rubble/litter along hoarding.
8. Surveillance of gates maintained while the area open.
9. Warning signs fixed to hoarding
10. Adequate lighting at gates/at boundary
11. Control movement of material in and out of the project
12. Safe access & good visibility for plant & vehicles entering
and leaving site.
13. Pedestrians segregated from vehicle access ways
14. Reversing vehicles accompanied by banksmen
15. Condition of vehicle and pedestrian routes maintained
16. Warning signs posted e.g. maximum speed limit, traffic
direction, pedestrian routes etc.
17. Bus drop off and pick up areas no risk to pedestrians
18. Housekeeping
19. No sleeping on the site except for rest area
20. Safe Stacking & Storage
21. Night shift: Lighting adequate
22. Security equipment: torches, radios etc. in place
23. Security hand over book completed, no deviations
recorded in the Book
24. Others ( Specify)
Remarks:
Inspected By: Signature:
Reviewed By HSE Manager / In charge : Signature:

SECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docx

  • 1.
    SECURITY CHECKLIST (To becompleted on Weekly basis) Page 1 of 1 Form # HSEQ- SC (Rev 2 - Mar 23) Project Information Project Name: Location: Company Name: Date: Time : ITEMS TO BE CHECKED Yes No N/A Comments 1. Hoarding encloses all construction activities. 2. No unauthorised entry to the project 3. Hoarding secure and not damaged. 4. Hoarding not less than 2 meters high. 5. Hoarding inspected both inside and outside. 6. Hoarding support posts securely anchored. 7. Materials/rubble/litter along hoarding. 8. Surveillance of gates maintained while the area open. 9. Warning signs fixed to hoarding 10. Adequate lighting at gates/at boundary 11. Control movement of material in and out of the project 12. Safe access & good visibility for plant & vehicles entering and leaving site. 13. Pedestrians segregated from vehicle access ways 14. Reversing vehicles accompanied by banksmen 15. Condition of vehicle and pedestrian routes maintained 16. Warning signs posted e.g. maximum speed limit, traffic direction, pedestrian routes etc. 17. Bus drop off and pick up areas no risk to pedestrians 18. Housekeeping 19. No sleeping on the site except for rest area 20. Safe Stacking & Storage 21. Night shift: Lighting adequate 22. Security equipment: torches, radios etc. in place 23. Security hand over book completed, no deviations recorded in the Book 24. Others ( Specify) Remarks: Inspected By: Signature: Reviewed By HSE Manager / In charge : Signature: