 INTRODUCTION
Definition :Rehabilitation
Sectors of Rehabilitation
Scale
 GLOBAL SCENARIO
Disaster
Displaced People
 CASE STUDIES
National-Bhuj
International-Colombia
 CHALLENGES
 CONCLUSION
STRUCTURE OF PRESENTATION
DIVERSITY IN RESPONSES
 Shelter programme design varies across
countries and types of crisis, with phase of
response, or amongst different organizations
within the same response.
SCALE VERSUS IMPACT
 Disasters and displacements vary significantly in
scale, and as a result so responses.
 In many cases, there is simply not sufficient
funding or capacity for organizations to provide
the support that is needed.
INTRODUCTION
 Rehabilitation refers to the actions taken in the
aftermath of a disaster to enable basic services to
resume functioning, assist victims’ self-help efforts
to repair physical damage and community facilities,
revive economic activities and provide support for
the psychological and social well being of the
survivors.
 It focuses on enabling the affected population to
resume more-or-less normal (pre-disaster)
patterns of life. It may be considered as transitional
phase between immediate relief and more major,
long-term development.
REHABILITATION
 Buildings
 Infrastructure
 Economic assets (including formal and formal
commercial sectors, industrial and agricultural
activities etc.)
 Administrative and political
 Psychological
 Cultural
Sectors vulnerable to disaster impact, and which,
therefore, will require rehabilitation and
reconstruction inputs.
GLOBAL SHELTER SCENARIO
Total number of refugees and IDPs was higher than
any other year in the 2015, with a total of
approximately 50 million displaced people around
the world.
In 2015, there were 371 reported natural disasters
(the highest value in the previous five years),
affecting over 108 million people (more than 2013
but less than 2014).
However, the numbers of people affected is not the
same as those with shelter needs.
People affected by Natural Disaster
Source: World Bank(Shelter Projects 2015 – 2016)
NATURAL DISASTERS
Asian countries are the worst affected.
In terms of displacement, India, China and
Nepal accounted for the highest numbers of
internally displaced people caused by natural
disasters during 2015 (3.7 million, 3.6 million
and 2.6 million respectively), mainly due to two
floods and storms, three typhoons and a flood,
and two earthquakes respectively.
RECONSTRUCTION OF HOUSES DAMAGED / DESTROYED
APPROACHES
• Owner Driven Reconstruction
• Public Private Partnership Program (PPPP)
• Under the PPPP the houses are reconstructed by
the NGOs for the beneficiaries to be registered in
the joint names of the husband and wife.
• All the houses should be insured.
• Financial, technical and material assistance
provided by the government.
• The designs for seismic reconstruction of houses
provided by the government.
• The material assistance provided through material
banks at subsidized rates.
• Design of model houses provided to the public to
choose from with an option to have one‟s own
design.
EARTHQUAKE INFORMATION
CASE STUDY– BHUJ EARTHQUAKE 2001,GUJARAT INDIA
Source: The UNDP/DMT Response to the Gujarat Earthquake: Some of its Good Practices
Magnitude: 6.9 on the Richter scale with epicentre at 20
K.M. North East of Bhuj
No of districts
affected
21 out of 25 districts
Most affected
areas
Kachchh, Ahmedabad, Jamnagar, Rajkot and
Surendranagar.
Death toll 20,000 approx.
Affected villages 7904 villages affected in 182 talukas in 21
districts
Affected
population
15.9 million (42.06%) affected out of total
population of 37.8 million
Damage  Houses Fully Destroyed 1.87 lakh (Pucca), 1.67
lakh (Kachcha) & 0.16 lakh (huts)
 Houses Partially Destroyed 5.01 lakh (Pucca),
3.87 lakh (Kachcha) & 0.34 lakh (huts)
 Total estimated loss of damage Rs. 21262
crore
Date and time of Occurrence of Earthquake: 26 January 2001 at 8:46 am
RECONSTRUCTION & REHABILITATION
To co-ordinate the massive effort, a nodal agency was created –
Gujarat State Disaster Management Authority
GSDMA
Emergency
response
Guidance &
Monitoring
Reconstruction
Planning and
Program
Management
Mitigation
Planning,
Monitoring,
Implementing
…which effectively co-ordinates with all the entities
associated with disaster management
REHABILITATION POLICY
Short and Medium term Rehabilitation Policy...
28Reconstruction and Rehabilitation packages
 Housing
 Rehabilitation of orphans and women
 Packages for rural artisans
 Packages for capacity building
 Packages for handicraft artisans
 Packages for agriculture
 Packages for industry, trade and services
 Package for tourism
RESPONSE ACTIVITIESGovernment of Gujarat (GoG) Set up
Gujarat State Disaster Management Authority (GSDMA) Implement the reconstruction and rehabilitation
US $1 billion
Government of Gujarat (GoG) FUNDING Economic rehabilitation 300,000 families.
US$2.5 million Small, medium and cottage industries.
Details Rs. in Crores
National Calamity Contingency Fund (NCCF) 500.00
Water supply (Rural and Urban) 100.00
Prompt Electricity Development (Restoration)
Programme (Rs.96 crore for Kachchh)
109.63
Indira Avas Yojna 49.00
Prime Minister Gramodaya Yojna 21.05
Slum Development 19.07
Prime Minister Gram Sadak Yojna 53.86
Operation Black Board Yojna 30.00
Total Rs. 882.61
Central Assistance received for emergency relief, rescue
and rehabilitation European Union (EU)
 Department for International Development (DFID)
 United States Agency for International Development
(USAID)
 Canadian International Development Agency (CIDA),
Bilateral Agencies
Source: High Commission of India, London, Press Release January 30, 2001, Gujarat
Earthquake Relief Update
Public sector industries provided huge donations for
rehabilitation. Housing and Urban Development
Corporation (HUDCO) and the National Housing Bank
(NHB), offered to provide financial assistance of US$400
million.
No. of houses damaged:
180,536 completely destroyed
913,297 partially damaged
Project target population:
23,000 Households
STATUS OF DAMAGE
SHELTER SIZE
Approximately 4m x 2½m
An international NGO worked in partnership with a
network of 22 local NGOs to rapidly implement a non-food
items distribution programme
80 Temporary Houses on land
bought near Al-Mahdi
Colony. The houses will have
steel frames so they can be
converted to permanent
homes later.
UNIT COST
varies
BHUJ, 2001- EARTHQUAKE
A low-cost shelter design was developed using low 1m walls and a
bamboo-framed and grass-thatched roof. With time it was recognised that
there was a need to preserve the grass for animal fodder, so the roofing
material was replaced with locally produced Mangalore clay tiles.
Many of the materials distributed to build shelters could be reused at a
later stage.
The criteria and procedures for the selection of
beneficiaries for relief distribution in the communities
were not always clearly defined. They were commonly
left to the subjective interpretation of the village-level
workers and the communities.
SOCIAL ISSUES
CONSTRUCTION
The dimensions of the shelters built were approximately
4m x 2½m. Although this provided a covered area of only
10m2 for a family, these dimensions were carefully selected
to focus on earthquake safety.
Cement, Bamboo, Woven mats, Wooden spacers, Wooden
rafter Wooden purlin, Roof tile, Roof ridge, Iron wire, Mild
steel rod were used for the construction.
LOCATION
On site, in the remaining open spaces. Eg. On the campus
of religious places Source: IASC Emergency Shelter Cluster, 2008
PUBLIC PRIVATE PARTNERSHIP PROGRAM
 (50% cost by NGOs & 50% by government)
 Number of villages adopted: 289
 Number of houses to be constructed: 37,673
 Houses completed: 27,432 (73%)
 Houses under construction: 10,241
 Villages adopted for infrastructure creation
RELOCATION OF VILLAGES
Full Relocation
 Number of villages: 24
 Houses to be relocated: 5,225
 Houses already relocated: 3,936 (75%)
Partial Relocation
 Number of villages: 37
 Houses to be relocated: 10,299
 Houses already relocated: 6,614 (64%)
Owner driven housing construction facilitated by
financial, material and technical assistance by
government .
INSTITUTIONAL MECHANISM
APPROACH ADOPTED
 Institute of Seismological Research (ISR)
 Gujarat Institute for Disaster Management
 3 regional centres for Emergency Response
planned in the cities of Ahmedabad, Surat &
Rajkot of Gujarat
 22 Observatories centres established and
upgraded
 Revision of State Relief Manual
WHAT HAS CHANGED?
Indicator Before the
Earthquake
(%)
After
Earthquake(
%)
Number of Pucca houses 66 100
Beneficiaries living in homes with
separate toilets
32 53
Insurance of reconstructed
houses
6 49
People knowing what to do
before, during and after a
disaster
0 80
Employment level among
women
42 92
Water supply through pipelines
at home
30 34
Quality of life index 1.00 1.143
 39% beneficiaries in the four towns (Bhuj, Bhacau,
Anjar and Rapar) are living in larger houses today
as compared to 15% in other towns
 The proportion of beneficiaries surveyed receiving
sweet water has increased by 10% in Kutch
District.
 23% more BPL families live in pucca houses as
compared to 14% more APL families
 More than 90% students who dropped out in both
primary and secondary schools have rejoined
 72% women surveyed have more income now
compared to pre-earthquake levels.
Source:V. Thiruppugazh (43 pre.pdf) What has changed after Gujarat earthquake 2001 ? http://www.jst.go.jp/astf/document/43abst.pdf
DISASTER MANAGEMENT-A PARADIGM SHIFT
 The Gujarat earthquake resulted in a paradigm shift in the policy from relief and humanitarian assistance
oriented post-disaster intervention to a pro-active prevention, mitigation and pre-disaster preparedness
 Comprehensive Gujarat State Disaster Management Policy(GSDMP) was declared in November, 2002
 For legal and regulatory requirement Gujarat State Disaster Management Act was enacted in March, 2003
GSDMA POLICY
 The policy resulted in a shift of focus from relief oriented approach to proactive disaster mitigation and risk
reduction.
 The policy identified hazard mitigation, vulnerability reduction, capacity building, integration of
development planning with disaster management and emergency preparedness.
 Defined roles and responsibilities of all stakeholders in various phases of disaster management
WHAT GSDMA HAS DONE
 Formulation of Policies
 Preparation of DM Plans
 Preparedness Initiatives
 Capacity Building
 Mitigation Measures
 Community Preparedness
WHY BEST PRACTICE?
Gujarat Earthquake Reconstruction as a role model for reconstruction by
 Earthquake reconstruction program in Bam, Iran
 Tsunami reconstruction programs in Srilanka and Indonesia
 Tsunami rehabilitation and reconstruction programs of India
INTERNATIONAL RECOGNITIONS
 GSDMA was awarded the UN Sasakawa Award for Disaster Reduction for the year 2003
 GSDMA awarded CAPAM award for Innovations in Governance
 GEERP awarded Green Award by World Bank for successfully integrating environmental concerns in the
emergency reconstruction program.
MITIGATION MEASURES -GUIDELINES
 Multi hazards resistant construction has been provided
 Local materials in hazard-resistant construction
 Guidelines specifically for low cost reconstruction and retrofitting
 General Development Control Regulation has been revised
 ‘Revision of Building Codes’ is being taken up as a separate study that will enquire into the suitability of the
existing building codes w.r.t. specific requirement of the region of Gujarat
CONCLUSION
 DM Shifted to Home Ministry in Government of India from Agriculture Ministry.
 Based on Gujarat Experience, a National level disaster management authority on the lines of GSDMA is
being worked out at the central government level
 The planning commission has recommended for utilizing 10% of the plan funds for pre-disaster
mitigation and planning activities
 Draft bill on National Disaster Management has been prepared
 Gujarat Experience resulted in a major change in the way reconstruction programs are being done in
India and the neighboring countries.
Source:V. Thiruppugazh (43 pre.pdf) What has changed after Gujarat earthquake 2001 ? http://www.jst.go.jp/astf/document/43abst.pdf
Disaster risk profile
Colombia has the 10th highest economic risk to three or more hazards
in the world, according to the Natural Disaster Hotspot study by the World Bank.
 Colombia is located in the north-west corner of South America
 Colombia's total area is 2,070,408 km 2 (1,141,748 km 2 of
mainland and 926,660 km 2 of territorial waters)
 Colombia ´s population is aprox. 48 million people(2011)
 Equatorial country which climate is determined by trade winds,
humidity and altitude – the temperature drops as the altitude
increases.
90% of the
emergencies are
related to hydro
climatological
phenomena
Total emergencies arranged by type
Source: Ministry of Environment and Sustainable Development Climate Change Division
Source:https://ipad.fas.usda.gov/highlights/2012/03/Colombia%20R
ain/images/Image1_000.png
CASE STUDY–FLOOD 2011 ,COLOMBIA
Disaster risk management framework
 Colombia has built a National System for
Disaster Management and Prevention,
articulated around a comprehensive
National Disaster Prevention and Attention
Plan.
 Since the early 2000s, Colombia has
decentralized disaster risk management
responsibilities and made disaster risk
management a national development
priority.
 Investments in disaster risk management,
 including risk reduction, are done at three
levels in Colombia involving the national
government, departmental governments,
and municipal governments.
Activities under the HYOGO framework for action(HFA)
It has strengthened information collection and
analytic capacity for early warning and risk mapping
related to hydrological, seismic and volcano events.
Source: UN Habitat Shelter Projects, 2011
COLOMBIA, 2011- FLOODS Project description
 The entire community of
Doña Ana to voluntarily
resettle to a new location,
due to severe annual
flooding.
 The project was
implemented by a
consortium which
included a private
foundation, public bodies
and aid organisations.
Project Timeline  Strong engagement of national authorities in both
project planning and resolution of land-tenure issues.
 Social and community mobilisation established a sense
of belonging as well as facilitating construction.
 Environmentally-friendly development: introduction of
new ecological water treatment plant.
 A holistic approach to the project included
socioeconomic support, psycho-social support, capacity
building of woman’s groups along with infrastructure
and education components.
Technical aspects of the project included:
 Land surveys to ensure a safe relocation site.
 The design and construction of durable housing,
based on minimum space standards and disaster-
resistant features.
 Water pumping with filtering beds to clean
waste-water before it returned to the lagoon.
 Rainwater harvesting.
 The project is unique in Colombia in its combination of funding from private foundations and civil
society, and implementation by a well established national humanitarian organisation, with the support
of the community and local government.
 The funding requirements of this multi-phased project may be difficult for other communities to
replicate, but the modalities and mechanisms of implementation of this programme demonstrate a
model that could be replicated in other areas of Colombia or other parts of the world.
 This project is an example of a success story for a community struggling with the adverse effects of
flooding, a situation many remote communities around the world find themselves in.
 The story of the project has been disseminated at a number of high-level conferences including the
World Urban Forum in Medellin.
WHY BEST PRACTICE?
Limited funding, limited time frames, the urgency of life-threatening situations, the flexibility of donors and
issues in relinquishing control, based on concerns over structural safety .
CHALLENGES
Affected people are the first responders after a disaster, and most projects identify how to support them in
finding temporary shelter solutions, or in their self-recovery.
There is a difference for what this means for those in protracted displacement, compared to those who are
able to rebuild where they have access to land to do so.
PEOPLE AS FIRST RESPONDERS
CONCLUSION
 Shelter is “more than just a roof”,
 It is not just the structure that protects from the elements, but is the series of activities that a household
undertakes to save and construct, adapt and expand a dwelling, as well as the range of continuing actions
and livelihoods that people do in and around their home.
SHELTER AS A PROCESS
REFERENCES
 V. Thiruppugazh (43 pre.pdf) What has changed after Gujarat earthquake 2001 ?
http://www.jst.go.jp/astf/document/43abst.pdf
 https://www.google.co.in/search?q=gujarat+earthquake
 “Gujarat: A Devastating Earthquake, published by the Directorate of Information, Gujarat State.
 http://shelterprojects.org/shelterprojects2013-2014/SP13-14_A02-Colombia-2011.pdf
 World Bank(2008) Disaster Risk Management in Latin America and the Caribbean Region:GFDRR Country
Notes
THANK YOU

More Related Content

What's hot

Solar cooker project_best_practices_manual
Solar cooker project_best_practices_manualSolar cooker project_best_practices_manual
Solar cooker project_best_practices_manualmechvignesan
 
07 a0123 sustainable development briefing note
07 a0123 sustainable development briefing note07 a0123 sustainable development briefing note
07 a0123 sustainable development briefing noteRajesh Yaramadi
 
Green Space and Communities: A Life's Work (Morning Session)
Green Space and Communities: A Life's Work (Morning Session)Green Space and Communities: A Life's Work (Morning Session)
Green Space and Communities: A Life's Work (Morning Session)groundworkpresentations
 
Good governance, equitable adaptation & building coalitions around climate ch...
Good governance, equitable adaptation & building coalitions around climate ch...Good governance, equitable adaptation & building coalitions around climate ch...
Good governance, equitable adaptation & building coalitions around climate ch...University of the Highlands and Islands
 
UNEP topic a, topic b and commitee background
UNEP topic a, topic b and commitee backgroundUNEP topic a, topic b and commitee background
UNEP topic a, topic b and commitee backgroundGera Morton
 
Change and nz_s_future_jan_22
Change and nz_s_future_jan_22Change and nz_s_future_jan_22
Change and nz_s_future_jan_22Nigel McTaptik
 
ELLA Learning Alliance on Climate Resilient Cities: Mexico City and Quito Cli...
ELLA Learning Alliance on Climate Resilient Cities: Mexico City and Quito Cli...ELLA Learning Alliance on Climate Resilient Cities: Mexico City and Quito Cli...
ELLA Learning Alliance on Climate Resilient Cities: Mexico City and Quito Cli...ELLA Programme
 
16.02, Segalas — Lecture on indicators
16.02, Segalas — Lecture on indicators16.02, Segalas — Lecture on indicators
16.02, Segalas — Lecture on indicatorsWDC_Ukraine
 
A case study on environment alokh
A case study on environment  alokhA case study on environment  alokh
A case study on environment alokhaloknitb
 
Climate hazard resilient cluster village – an answer
Climate hazard resilient cluster village – an answerClimate hazard resilient cluster village – an answer
Climate hazard resilient cluster village – an answerShashanka Saadi
 
2008 Winter Newsletter
2008 Winter Newsletter2008 Winter Newsletter
2008 Winter NewsletterDirect Relief
 
Day 2 for 2018 copyright ver.
Day 2 for 2018 copyright ver.Day 2 for 2018 copyright ver.
Day 2 for 2018 copyright ver.YuriOki
 
Professional Report - Master's Thesis
Professional Report - Master's ThesisProfessional Report - Master's Thesis
Professional Report - Master's ThesisMontgomery Norton
 
Nature and Green Spaces: Sources, Sites, and Systems of Resilience and Other ...
Nature and Green Spaces: Sources, Sites, and Systems of Resilience and Other ...Nature and Green Spaces: Sources, Sites, and Systems of Resilience and Other ...
Nature and Green Spaces: Sources, Sites, and Systems of Resilience and Other ...Keith G. Tidball
 
Green Infrastructure Studio- Final PDF
Green Infrastructure Studio- Final PDFGreen Infrastructure Studio- Final PDF
Green Infrastructure Studio- Final PDFGeorge Carter
 
Testimony-on-Community-Taskforce-for-City-Council-Com-on-Recovery-and-Resilie...
Testimony-on-Community-Taskforce-for-City-Council-Com-on-Recovery-and-Resilie...Testimony-on-Community-Taskforce-for-City-Council-Com-on-Recovery-and-Resilie...
Testimony-on-Community-Taskforce-for-City-Council-Com-on-Recovery-and-Resilie...Alana Tornello
 
Rain water Harvest
Rain water HarvestRain water Harvest
Rain water HarvestGoodzuma
 

What's hot (20)

Solar cooker project_best_practices_manual
Solar cooker project_best_practices_manualSolar cooker project_best_practices_manual
Solar cooker project_best_practices_manual
 
07 a0123 sustainable development briefing note
07 a0123 sustainable development briefing note07 a0123 sustainable development briefing note
07 a0123 sustainable development briefing note
 
Green Space and Communities: A Life's Work (Morning Session)
Green Space and Communities: A Life's Work (Morning Session)Green Space and Communities: A Life's Work (Morning Session)
Green Space and Communities: A Life's Work (Morning Session)
 
Good governance, equitable adaptation & building coalitions around climate ch...
Good governance, equitable adaptation & building coalitions around climate ch...Good governance, equitable adaptation & building coalitions around climate ch...
Good governance, equitable adaptation & building coalitions around climate ch...
 
UNEP topic a, topic b and commitee background
UNEP topic a, topic b and commitee backgroundUNEP topic a, topic b and commitee background
UNEP topic a, topic b and commitee background
 
Change and nz_s_future_jan_22
Change and nz_s_future_jan_22Change and nz_s_future_jan_22
Change and nz_s_future_jan_22
 
ELLA Learning Alliance on Climate Resilient Cities: Mexico City and Quito Cli...
ELLA Learning Alliance on Climate Resilient Cities: Mexico City and Quito Cli...ELLA Learning Alliance on Climate Resilient Cities: Mexico City and Quito Cli...
ELLA Learning Alliance on Climate Resilient Cities: Mexico City and Quito Cli...
 
16.02, Segalas — Lecture on indicators
16.02, Segalas — Lecture on indicators16.02, Segalas — Lecture on indicators
16.02, Segalas — Lecture on indicators
 
A case study on environment alokh
A case study on environment  alokhA case study on environment  alokh
A case study on environment alokh
 
Sustainability
SustainabilitySustainability
Sustainability
 
IUCN Water and Nature Initiative: Results and Resilience
IUCN Water and Nature Initiative: Results and ResilienceIUCN Water and Nature Initiative: Results and Resilience
IUCN Water and Nature Initiative: Results and Resilience
 
Climate hazard resilient cluster village – an answer
Climate hazard resilient cluster village – an answerClimate hazard resilient cluster village – an answer
Climate hazard resilient cluster village – an answer
 
2008 Winter Newsletter
2008 Winter Newsletter2008 Winter Newsletter
2008 Winter Newsletter
 
Day 2 for 2018 copyright ver.
Day 2 for 2018 copyright ver.Day 2 for 2018 copyright ver.
Day 2 for 2018 copyright ver.
 
Professional Report - Master's Thesis
Professional Report - Master's ThesisProfessional Report - Master's Thesis
Professional Report - Master's Thesis
 
Nature and Green Spaces: Sources, Sites, and Systems of Resilience and Other ...
Nature and Green Spaces: Sources, Sites, and Systems of Resilience and Other ...Nature and Green Spaces: Sources, Sites, and Systems of Resilience and Other ...
Nature and Green Spaces: Sources, Sites, and Systems of Resilience and Other ...
 
Green Infrastructure Studio- Final PDF
Green Infrastructure Studio- Final PDFGreen Infrastructure Studio- Final PDF
Green Infrastructure Studio- Final PDF
 
Testimony-on-Community-Taskforce-for-City-Council-Com-on-Recovery-and-Resilie...
Testimony-on-Community-Taskforce-for-City-Council-Com-on-Recovery-and-Resilie...Testimony-on-Community-Taskforce-for-City-Council-Com-on-Recovery-and-Resilie...
Testimony-on-Community-Taskforce-for-City-Council-Com-on-Recovery-and-Resilie...
 
Rain water Harvest
Rain water HarvestRain water Harvest
Rain water Harvest
 
Power to the people fivas 2010
Power to the people fivas 2010Power to the people fivas 2010
Power to the people fivas 2010
 

Similar to Urban Risk and Disaster Rehabilitation

Vulnerability to Resilience - Bangladesh
Vulnerability to Resilience - BangladeshVulnerability to Resilience - Bangladesh
Vulnerability to Resilience - BangladeshBayes Ahmed
 
Cyclone Fani Disaster Management – Odisha 2019.pptx
Cyclone Fani Disaster Management – Odisha 2019.pptxCyclone Fani Disaster Management – Odisha 2019.pptx
Cyclone Fani Disaster Management – Odisha 2019.pptxSanjayBhuyan3
 
Joint Secretary of Ministry of Finance, Government of Nepal(Nepal)
Joint Secretary of Ministry of Finance, Government of Nepal(Nepal)Joint Secretary of Ministry of Finance, Government of Nepal(Nepal)
Joint Secretary of Ministry of Finance, Government of Nepal(Nepal)BeGood Cafe -NGO-
 
Krishna Yadav, MCH2023, India
Krishna Yadav, MCH2023, IndiaKrishna Yadav, MCH2023, India
Krishna Yadav, MCH2023, IndiaMCH
 
New annual research session(ars) 2011
New  annual research session(ars) 2011New  annual research session(ars) 2011
New annual research session(ars) 2011S.T. Seelan
 
Disaster Management in Andhra Pradesh....pptx
Disaster Management in Andhra Pradesh....pptxDisaster Management in Andhra Pradesh....pptx
Disaster Management in Andhra Pradesh....pptxShamsMukhtar1
 
Earthquake
EarthquakeEarthquake
Earthquakecruzer5
 
CURRENT SCENARIO OF AFFORDABLE HOUSING SCHEMES IN KERALA
CURRENT SCENARIO OF AFFORDABLE HOUSING SCHEMES IN KERALACURRENT SCENARIO OF AFFORDABLE HOUSING SCHEMES IN KERALA
CURRENT SCENARIO OF AFFORDABLE HOUSING SCHEMES IN KERALAJOSIN MATHEW
 
Paradigm Shift In Disaster Management
Paradigm Shift In Disaster ManagementParadigm Shift In Disaster Management
Paradigm Shift In Disaster ManagementMd Quayyum
 
Masters degree, royal roads university, final field research thesis 2007 k.ru...
Masters degree, royal roads university, final field research thesis 2007 k.ru...Masters degree, royal roads university, final field research thesis 2007 k.ru...
Masters degree, royal roads university, final field research thesis 2007 k.ru...Kevin D. Rumsey
 
Disaster management (2)
Disaster management (2)Disaster management (2)
Disaster management (2)Balaji Almale
 
Disaster mgmt final_
Disaster mgmt final_Disaster mgmt final_
Disaster mgmt final_Anas Vj
 

Similar to Urban Risk and Disaster Rehabilitation (20)

Vulnerability to Resilience - Bangladesh
Vulnerability to Resilience - BangladeshVulnerability to Resilience - Bangladesh
Vulnerability to Resilience - Bangladesh
 
Cyclone Fani Disaster Management – Odisha 2019.pptx
Cyclone Fani Disaster Management – Odisha 2019.pptxCyclone Fani Disaster Management – Odisha 2019.pptx
Cyclone Fani Disaster Management – Odisha 2019.pptx
 
Project Brief AKRSP
Project Brief AKRSPProject Brief AKRSP
Project Brief AKRSP
 
Joint Secretary of Ministry of Finance, Government of Nepal(Nepal)
Joint Secretary of Ministry of Finance, Government of Nepal(Nepal)Joint Secretary of Ministry of Finance, Government of Nepal(Nepal)
Joint Secretary of Ministry of Finance, Government of Nepal(Nepal)
 
Disaster management
Disaster managementDisaster management
Disaster management
 
Kerala housing policy
Kerala housing policyKerala housing policy
Kerala housing policy
 
2012 team 6
2012 team 62012 team 6
2012 team 6
 
Krishna Yadav, MCH2023, India
Krishna Yadav, MCH2023, IndiaKrishna Yadav, MCH2023, India
Krishna Yadav, MCH2023, India
 
New annual research session(ars) 2011
New  annual research session(ars) 2011New  annual research session(ars) 2011
New annual research session(ars) 2011
 
Livelihood security
Livelihood securityLivelihood security
Livelihood security
 
Disaster Management in Andhra Pradesh....pptx
Disaster Management in Andhra Pradesh....pptxDisaster Management in Andhra Pradesh....pptx
Disaster Management in Andhra Pradesh....pptx
 
Earthquake
EarthquakeEarthquake
Earthquake
 
HOUSING & HOUSING POLICY ,HABITAT III PAPER
HOUSING & HOUSING POLICY ,HABITAT III PAPERHOUSING & HOUSING POLICY ,HABITAT III PAPER
HOUSING & HOUSING POLICY ,HABITAT III PAPER
 
CURRENT SCENARIO OF AFFORDABLE HOUSING SCHEMES IN KERALA
CURRENT SCENARIO OF AFFORDABLE HOUSING SCHEMES IN KERALACURRENT SCENARIO OF AFFORDABLE HOUSING SCHEMES IN KERALA
CURRENT SCENARIO OF AFFORDABLE HOUSING SCHEMES IN KERALA
 
Disastermgmtfinal 111204073413-phpapp01
Disastermgmtfinal 111204073413-phpapp01Disastermgmtfinal 111204073413-phpapp01
Disastermgmtfinal 111204073413-phpapp01
 
Paradigm Shift In Disaster Management
Paradigm Shift In Disaster ManagementParadigm Shift In Disaster Management
Paradigm Shift In Disaster Management
 
Masters degree, royal roads university, final field research thesis 2007 k.ru...
Masters degree, royal roads university, final field research thesis 2007 k.ru...Masters degree, royal roads university, final field research thesis 2007 k.ru...
Masters degree, royal roads university, final field research thesis 2007 k.ru...
 
Disaster
DisasterDisaster
Disaster
 
Disaster management (2)
Disaster management (2)Disaster management (2)
Disaster management (2)
 
Disaster mgmt final_
Disaster mgmt final_Disaster mgmt final_
Disaster mgmt final_
 

More from SCHOOL OF PLANNINNG AND ARCHITECTURE ,VIJAYAWADA (6)

Land Information System -Savitri Kumari
Land Information System -Savitri KumariLand Information System -Savitri Kumari
Land Information System -Savitri Kumari
 
IMPACT OF BRTS ON CITIES
IMPACT OF BRTS ON CITIESIMPACT OF BRTS ON CITIES
IMPACT OF BRTS ON CITIES
 
IMPACT OF BRTS ON CITIES
IMPACT OF BRTS ON CITIESIMPACT OF BRTS ON CITIES
IMPACT OF BRTS ON CITIES
 
Doing business literature review
Doing business literature reviewDoing business literature review
Doing business literature review
 
rome urban fabric
rome urban fabricrome urban fabric
rome urban fabric
 
CITY PROFILE OF VARANASI -CASE STUDY by Savitri kumari
CITY PROFILE OF VARANASI -CASE STUDY by Savitri kumariCITY PROFILE OF VARANASI -CASE STUDY by Savitri kumari
CITY PROFILE OF VARANASI -CASE STUDY by Savitri kumari
 

Recently uploaded

Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerSuhani Kapoor
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...Amil baba
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130Suhani Kapoor
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 

Recently uploaded (20)

Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
 
Green Banking
Green Banking Green Banking
Green Banking
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 

Urban Risk and Disaster Rehabilitation

  • 1. URBAN RISK AND DISASTER MANAGEMENT School of Planning and Architecture, New Delhi ASSIGNMENT-1 BEST REHABILITATION PRACTICE- National-Bhuj ,Gujarat(India) International-Colombia Savitri Kumari SPA/NS/UP/1272 Semester –III Batch -2016-18 Dept. of Urban Planning Submitted by-
  • 2.  INTRODUCTION Definition :Rehabilitation Sectors of Rehabilitation Scale  GLOBAL SCENARIO Disaster Displaced People  CASE STUDIES National-Bhuj International-Colombia  CHALLENGES  CONCLUSION STRUCTURE OF PRESENTATION
  • 3. DIVERSITY IN RESPONSES  Shelter programme design varies across countries and types of crisis, with phase of response, or amongst different organizations within the same response. SCALE VERSUS IMPACT  Disasters and displacements vary significantly in scale, and as a result so responses.  In many cases, there is simply not sufficient funding or capacity for organizations to provide the support that is needed. INTRODUCTION  Rehabilitation refers to the actions taken in the aftermath of a disaster to enable basic services to resume functioning, assist victims’ self-help efforts to repair physical damage and community facilities, revive economic activities and provide support for the psychological and social well being of the survivors.  It focuses on enabling the affected population to resume more-or-less normal (pre-disaster) patterns of life. It may be considered as transitional phase between immediate relief and more major, long-term development. REHABILITATION  Buildings  Infrastructure  Economic assets (including formal and formal commercial sectors, industrial and agricultural activities etc.)  Administrative and political  Psychological  Cultural Sectors vulnerable to disaster impact, and which, therefore, will require rehabilitation and reconstruction inputs.
  • 4. GLOBAL SHELTER SCENARIO Total number of refugees and IDPs was higher than any other year in the 2015, with a total of approximately 50 million displaced people around the world. In 2015, there were 371 reported natural disasters (the highest value in the previous five years), affecting over 108 million people (more than 2013 but less than 2014). However, the numbers of people affected is not the same as those with shelter needs. People affected by Natural Disaster Source: World Bank(Shelter Projects 2015 – 2016)
  • 5. NATURAL DISASTERS Asian countries are the worst affected. In terms of displacement, India, China and Nepal accounted for the highest numbers of internally displaced people caused by natural disasters during 2015 (3.7 million, 3.6 million and 2.6 million respectively), mainly due to two floods and storms, three typhoons and a flood, and two earthquakes respectively. RECONSTRUCTION OF HOUSES DAMAGED / DESTROYED APPROACHES • Owner Driven Reconstruction • Public Private Partnership Program (PPPP) • Under the PPPP the houses are reconstructed by the NGOs for the beneficiaries to be registered in the joint names of the husband and wife. • All the houses should be insured. • Financial, technical and material assistance provided by the government. • The designs for seismic reconstruction of houses provided by the government. • The material assistance provided through material banks at subsidized rates. • Design of model houses provided to the public to choose from with an option to have one‟s own design.
  • 6. EARTHQUAKE INFORMATION CASE STUDY– BHUJ EARTHQUAKE 2001,GUJARAT INDIA Source: The UNDP/DMT Response to the Gujarat Earthquake: Some of its Good Practices Magnitude: 6.9 on the Richter scale with epicentre at 20 K.M. North East of Bhuj No of districts affected 21 out of 25 districts Most affected areas Kachchh, Ahmedabad, Jamnagar, Rajkot and Surendranagar. Death toll 20,000 approx. Affected villages 7904 villages affected in 182 talukas in 21 districts Affected population 15.9 million (42.06%) affected out of total population of 37.8 million Damage  Houses Fully Destroyed 1.87 lakh (Pucca), 1.67 lakh (Kachcha) & 0.16 lakh (huts)  Houses Partially Destroyed 5.01 lakh (Pucca), 3.87 lakh (Kachcha) & 0.34 lakh (huts)  Total estimated loss of damage Rs. 21262 crore Date and time of Occurrence of Earthquake: 26 January 2001 at 8:46 am
  • 7. RECONSTRUCTION & REHABILITATION To co-ordinate the massive effort, a nodal agency was created – Gujarat State Disaster Management Authority GSDMA Emergency response Guidance & Monitoring Reconstruction Planning and Program Management Mitigation Planning, Monitoring, Implementing …which effectively co-ordinates with all the entities associated with disaster management REHABILITATION POLICY Short and Medium term Rehabilitation Policy... 28Reconstruction and Rehabilitation packages  Housing  Rehabilitation of orphans and women  Packages for rural artisans  Packages for capacity building  Packages for handicraft artisans  Packages for agriculture  Packages for industry, trade and services  Package for tourism
  • 8. RESPONSE ACTIVITIESGovernment of Gujarat (GoG) Set up Gujarat State Disaster Management Authority (GSDMA) Implement the reconstruction and rehabilitation US $1 billion Government of Gujarat (GoG) FUNDING Economic rehabilitation 300,000 families. US$2.5 million Small, medium and cottage industries. Details Rs. in Crores National Calamity Contingency Fund (NCCF) 500.00 Water supply (Rural and Urban) 100.00 Prompt Electricity Development (Restoration) Programme (Rs.96 crore for Kachchh) 109.63 Indira Avas Yojna 49.00 Prime Minister Gramodaya Yojna 21.05 Slum Development 19.07 Prime Minister Gram Sadak Yojna 53.86 Operation Black Board Yojna 30.00 Total Rs. 882.61 Central Assistance received for emergency relief, rescue and rehabilitation European Union (EU)  Department for International Development (DFID)  United States Agency for International Development (USAID)  Canadian International Development Agency (CIDA), Bilateral Agencies Source: High Commission of India, London, Press Release January 30, 2001, Gujarat Earthquake Relief Update Public sector industries provided huge donations for rehabilitation. Housing and Urban Development Corporation (HUDCO) and the National Housing Bank (NHB), offered to provide financial assistance of US$400 million.
  • 9. No. of houses damaged: 180,536 completely destroyed 913,297 partially damaged Project target population: 23,000 Households STATUS OF DAMAGE SHELTER SIZE Approximately 4m x 2½m An international NGO worked in partnership with a network of 22 local NGOs to rapidly implement a non-food items distribution programme 80 Temporary Houses on land bought near Al-Mahdi Colony. The houses will have steel frames so they can be converted to permanent homes later. UNIT COST varies BHUJ, 2001- EARTHQUAKE A low-cost shelter design was developed using low 1m walls and a bamboo-framed and grass-thatched roof. With time it was recognised that there was a need to preserve the grass for animal fodder, so the roofing material was replaced with locally produced Mangalore clay tiles. Many of the materials distributed to build shelters could be reused at a later stage. The criteria and procedures for the selection of beneficiaries for relief distribution in the communities were not always clearly defined. They were commonly left to the subjective interpretation of the village-level workers and the communities. SOCIAL ISSUES CONSTRUCTION The dimensions of the shelters built were approximately 4m x 2½m. Although this provided a covered area of only 10m2 for a family, these dimensions were carefully selected to focus on earthquake safety. Cement, Bamboo, Woven mats, Wooden spacers, Wooden rafter Wooden purlin, Roof tile, Roof ridge, Iron wire, Mild steel rod were used for the construction. LOCATION On site, in the remaining open spaces. Eg. On the campus of religious places Source: IASC Emergency Shelter Cluster, 2008
  • 10. PUBLIC PRIVATE PARTNERSHIP PROGRAM  (50% cost by NGOs & 50% by government)  Number of villages adopted: 289  Number of houses to be constructed: 37,673  Houses completed: 27,432 (73%)  Houses under construction: 10,241  Villages adopted for infrastructure creation RELOCATION OF VILLAGES Full Relocation  Number of villages: 24  Houses to be relocated: 5,225  Houses already relocated: 3,936 (75%) Partial Relocation  Number of villages: 37  Houses to be relocated: 10,299  Houses already relocated: 6,614 (64%) Owner driven housing construction facilitated by financial, material and technical assistance by government . INSTITUTIONAL MECHANISM APPROACH ADOPTED  Institute of Seismological Research (ISR)  Gujarat Institute for Disaster Management  3 regional centres for Emergency Response planned in the cities of Ahmedabad, Surat & Rajkot of Gujarat  22 Observatories centres established and upgraded  Revision of State Relief Manual
  • 11. WHAT HAS CHANGED? Indicator Before the Earthquake (%) After Earthquake( %) Number of Pucca houses 66 100 Beneficiaries living in homes with separate toilets 32 53 Insurance of reconstructed houses 6 49 People knowing what to do before, during and after a disaster 0 80 Employment level among women 42 92 Water supply through pipelines at home 30 34 Quality of life index 1.00 1.143  39% beneficiaries in the four towns (Bhuj, Bhacau, Anjar and Rapar) are living in larger houses today as compared to 15% in other towns  The proportion of beneficiaries surveyed receiving sweet water has increased by 10% in Kutch District.  23% more BPL families live in pucca houses as compared to 14% more APL families  More than 90% students who dropped out in both primary and secondary schools have rejoined  72% women surveyed have more income now compared to pre-earthquake levels. Source:V. Thiruppugazh (43 pre.pdf) What has changed after Gujarat earthquake 2001 ? http://www.jst.go.jp/astf/document/43abst.pdf
  • 12. DISASTER MANAGEMENT-A PARADIGM SHIFT  The Gujarat earthquake resulted in a paradigm shift in the policy from relief and humanitarian assistance oriented post-disaster intervention to a pro-active prevention, mitigation and pre-disaster preparedness  Comprehensive Gujarat State Disaster Management Policy(GSDMP) was declared in November, 2002  For legal and regulatory requirement Gujarat State Disaster Management Act was enacted in March, 2003 GSDMA POLICY  The policy resulted in a shift of focus from relief oriented approach to proactive disaster mitigation and risk reduction.  The policy identified hazard mitigation, vulnerability reduction, capacity building, integration of development planning with disaster management and emergency preparedness.  Defined roles and responsibilities of all stakeholders in various phases of disaster management WHAT GSDMA HAS DONE  Formulation of Policies  Preparation of DM Plans  Preparedness Initiatives  Capacity Building  Mitigation Measures  Community Preparedness
  • 13. WHY BEST PRACTICE? Gujarat Earthquake Reconstruction as a role model for reconstruction by  Earthquake reconstruction program in Bam, Iran  Tsunami reconstruction programs in Srilanka and Indonesia  Tsunami rehabilitation and reconstruction programs of India INTERNATIONAL RECOGNITIONS  GSDMA was awarded the UN Sasakawa Award for Disaster Reduction for the year 2003  GSDMA awarded CAPAM award for Innovations in Governance  GEERP awarded Green Award by World Bank for successfully integrating environmental concerns in the emergency reconstruction program.
  • 14. MITIGATION MEASURES -GUIDELINES  Multi hazards resistant construction has been provided  Local materials in hazard-resistant construction  Guidelines specifically for low cost reconstruction and retrofitting  General Development Control Regulation has been revised  ‘Revision of Building Codes’ is being taken up as a separate study that will enquire into the suitability of the existing building codes w.r.t. specific requirement of the region of Gujarat CONCLUSION  DM Shifted to Home Ministry in Government of India from Agriculture Ministry.  Based on Gujarat Experience, a National level disaster management authority on the lines of GSDMA is being worked out at the central government level  The planning commission has recommended for utilizing 10% of the plan funds for pre-disaster mitigation and planning activities  Draft bill on National Disaster Management has been prepared  Gujarat Experience resulted in a major change in the way reconstruction programs are being done in India and the neighboring countries. Source:V. Thiruppugazh (43 pre.pdf) What has changed after Gujarat earthquake 2001 ? http://www.jst.go.jp/astf/document/43abst.pdf
  • 15. Disaster risk profile Colombia has the 10th highest economic risk to three or more hazards in the world, according to the Natural Disaster Hotspot study by the World Bank.  Colombia is located in the north-west corner of South America  Colombia's total area is 2,070,408 km 2 (1,141,748 km 2 of mainland and 926,660 km 2 of territorial waters)  Colombia ´s population is aprox. 48 million people(2011)  Equatorial country which climate is determined by trade winds, humidity and altitude – the temperature drops as the altitude increases. 90% of the emergencies are related to hydro climatological phenomena Total emergencies arranged by type Source: Ministry of Environment and Sustainable Development Climate Change Division Source:https://ipad.fas.usda.gov/highlights/2012/03/Colombia%20R ain/images/Image1_000.png CASE STUDY–FLOOD 2011 ,COLOMBIA
  • 16. Disaster risk management framework  Colombia has built a National System for Disaster Management and Prevention, articulated around a comprehensive National Disaster Prevention and Attention Plan.  Since the early 2000s, Colombia has decentralized disaster risk management responsibilities and made disaster risk management a national development priority.  Investments in disaster risk management,  including risk reduction, are done at three levels in Colombia involving the national government, departmental governments, and municipal governments. Activities under the HYOGO framework for action(HFA) It has strengthened information collection and analytic capacity for early warning and risk mapping related to hydrological, seismic and volcano events. Source: UN Habitat Shelter Projects, 2011
  • 17. COLOMBIA, 2011- FLOODS Project description  The entire community of Doña Ana to voluntarily resettle to a new location, due to severe annual flooding.  The project was implemented by a consortium which included a private foundation, public bodies and aid organisations.
  • 18. Project Timeline  Strong engagement of national authorities in both project planning and resolution of land-tenure issues.  Social and community mobilisation established a sense of belonging as well as facilitating construction.  Environmentally-friendly development: introduction of new ecological water treatment plant.  A holistic approach to the project included socioeconomic support, psycho-social support, capacity building of woman’s groups along with infrastructure and education components. Technical aspects of the project included:  Land surveys to ensure a safe relocation site.  The design and construction of durable housing, based on minimum space standards and disaster- resistant features.  Water pumping with filtering beds to clean waste-water before it returned to the lagoon.  Rainwater harvesting.
  • 19.  The project is unique in Colombia in its combination of funding from private foundations and civil society, and implementation by a well established national humanitarian organisation, with the support of the community and local government.  The funding requirements of this multi-phased project may be difficult for other communities to replicate, but the modalities and mechanisms of implementation of this programme demonstrate a model that could be replicated in other areas of Colombia or other parts of the world.  This project is an example of a success story for a community struggling with the adverse effects of flooding, a situation many remote communities around the world find themselves in.  The story of the project has been disseminated at a number of high-level conferences including the World Urban Forum in Medellin. WHY BEST PRACTICE?
  • 20. Limited funding, limited time frames, the urgency of life-threatening situations, the flexibility of donors and issues in relinquishing control, based on concerns over structural safety . CHALLENGES Affected people are the first responders after a disaster, and most projects identify how to support them in finding temporary shelter solutions, or in their self-recovery. There is a difference for what this means for those in protracted displacement, compared to those who are able to rebuild where they have access to land to do so. PEOPLE AS FIRST RESPONDERS CONCLUSION  Shelter is “more than just a roof”,  It is not just the structure that protects from the elements, but is the series of activities that a household undertakes to save and construct, adapt and expand a dwelling, as well as the range of continuing actions and livelihoods that people do in and around their home. SHELTER AS A PROCESS
  • 21. REFERENCES  V. Thiruppugazh (43 pre.pdf) What has changed after Gujarat earthquake 2001 ? http://www.jst.go.jp/astf/document/43abst.pdf  https://www.google.co.in/search?q=gujarat+earthquake  “Gujarat: A Devastating Earthquake, published by the Directorate of Information, Gujarat State.  http://shelterprojects.org/shelterprojects2013-2014/SP13-14_A02-Colombia-2011.pdf  World Bank(2008) Disaster Risk Management in Latin America and the Caribbean Region:GFDRR Country Notes