SAP PP
(PRODUCTION PLANNING)
© 2020 by Ricardo Naya
Sapyst.com
Introduction
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. What is an ERP?
2. What is SAP?
3. What is SAP PP?
© 2020 by Ricardo NayaSapyst.com
1. What is an ERP?
• ERP = Enterprise Resource Planning
ERP
- INTEGRATED Information System
- It covers all the company processes
- It shares data across the different deparments
- UNIQUE Database
- REAL TIME Data
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. What is an ERP?
2. What is SAP?
3. What is SAP PP?
© 2020 by Ricardo NayaSapyst.com
2. What is SAP?
• SAP AG = Systemanalyse und Programmentwicklung
Systems Analysis and Programs Development
SAP
ECC
MM
Materials
Management
PP
Production
PlanningSD
Sales &
Distribution
HR
Human
Resources
CO
Controlling
FI
Finance
© 2020 by Ricardo NayaSapyst.com
2. What is SAP?
SAP
Server
SAP GUI
SAP GUI
SAP GUI
SAP GUISAP GUI
SAP GUI
SAP GUI
SAP GUI
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. What is an ERP?
2. What is SAP?
3. What is SAP PP?
© 2020 by Ricardo NayaSapyst.com
1. What is SAP PP?
• SAP PP = SAP Production Planning
SAP
PP
- Production Master Data (Materials, BOMs, Routings, Work Centers)
- Demand Management
- Planning (MPS, MRP, Consumption-based Planning)
- Production Control (Production Order related processes)
© 2020 by Ricardo NayaSapyst.com
2. What is SAP?
SAP
Server
SAP GUI
SAP GUI
SAP GUI
SAP GUISAP GUI
SAP GUI
SAP GUI
SAP GUI
SAP
PP
SAP
MM
SAP
SD
SAP
FISAP
CO
SAP PP
(PRODUCTION PLANNING)
© 2020 by Ricardo Naya
Sapyst.com
SAP PP Overview
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Complete PP process
3. Master Data
4. Demand Management
5. Planning
6. Production Control
© 2020 by Ricardo NayaSapyst.com
1. Goals of this session
• See the big picture
• Introduce SAP PP Concepts
(Each topic will be explained further in next lectures)
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Complete PP process
3. Master Data
4. Demand Management
5. Planning
6. Production Control
© 2020 by Ricardo NayaSapyst.com
2. Complete PP Process
SOP
Sales &
Operations
Planning
MPS
Master
Production
Schedule
Scheduling
&
Capacity
Planning
Demand
Mgmt.
Long
Term
Planning
MRP
Materials
Requirements
Planning
Production
Control
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Complete PP process
3. Master Data
4. Demand Management
5. Planning
6. Production Control
© 2020 by Ricardo NayaSapyst.com
3. Master Data – Organizational Structure
Company
Code
Plant 1 Plant 2 Plant 3
Storage
Location 1
Storage
Location 2
Storage
Location 1
© 2020 by Ricardo NayaSapyst.com
3. Master Data – PP Objects
• Material Master Views
MRP (4)
Work Scheduling
Forecasting
• Bills of Materials
• Work Centers
• Routings
• Production Versions
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Complete PP process
3. Master Data
4. Demand Management
5. Planning
6. Production Control
© 2020 by Ricardo NayaSapyst.com
4. Demand Management
Finished
Product
Semi-finished
Packing
Material
Raw Material
Raw Material Raw Material
Sales OrdersIndependent Requirements
IRs
CustomerForecast
SOP
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Complete PP process
3. Master Data
4. Demand Management
5. Planning
6. Production Control
© 2020 by Ricardo NayaSapyst.com
MRP
5. Planning
Finished
Product
Semi-finished
Packing
Material
Raw Material
Raw Material Raw Material
Sales OrdersForecast
SOP
Independent Requirements
IRs
Customer
MPS
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Complete PP process
3. Master Data
4. Demand Management
5. Planning
6. Production Control
© 2020 by Ricardo NayaSapyst.com
6. Production Control
MPS
MRP
Purchase
Requistion
Planned
Order
Goods
Issue
Goods
Receipt
Liquidation
&
Close
Production
Order
Released
Production
Order
Confirmed
Production
Order
Created
Purchase
Order
Goods
Issue
Goods
Receipt
Production
Order
SAP PP
(PRODUCTION PLANNING)
© 2020 by Ricardo Naya
Sapyst.com
Materials Overview
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Materials Overview
3. Organizational Structure
4. Master Data
5. Main Views – Fields
© 2020 by Ricardo NayaSapyst.com
1. Goals of this session
• To introduce the Material Master
• To show which are the PP Views
• To see main PP fields and their functionality
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Materials Overview
3. Organizational Structure
4. Master Data
5. Main Views - Fields
© 2020 by Ricardo NayaSapyst.com
2. Materials Overview (1)
• Each different raw material, component, commodity,
semi-finished or finished product must have an entry in
the Material Master
• For each material we can create different views
• Each view groups data related to a funcionality
© 2020 by Ricardo NayaSapyst.com
2. Materials Overview (2)
MATERIAL
Basic Data
Classification
Sales
Purchasing
MRP
Forecasting
Work Scheduling
General Plant
Data/Storage
Warehouse Mngt
Quality Mngt
Accounting
Costing
Stock
Forecasting
MRP
Work Scheduling
Depending
of
Material Type
Different views
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Materials Overview
3. Organizational Structure
4. Master Data
5. Main Views - Fields
© 2020 by Ricardo NayaSapyst.com
3. Organizational Structure
• Each field can be defined at 4 different levels:
− Global
Valid for all the plants
− Plant
Only valid for the plant where it is defined
− MRP Area
For performing a different MRP (can include various Storage Locations)
− Storage Location
Only valid for each Storage Location
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Materials Overview
3. Organizational Structure
4. Master Data
5. Main Views - Fields
© 2020 by Ricardo NayaSapyst.com
4. Master Data
• Material Master is a basic Master Data
− It does not need previous Master Data for its maintenance
• Some of the PP fields should be maintained
previously in configuration
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Materials Overview
3. Organizational Structure
4. Master Data
5. Main Views - Fields
© 2020 by Ricardo NayaSapyst.com
General
Data
5. Main Views – Fields
MRP 1 (1)
Material
Number
Material
Description
Plant
MRP
Procedure
How the Material
is going to be
planned
(MRP, reorder
point, with time
fence…)
© 2020 by Ricardo NayaSapyst.com
MRP Areas
In case we want to
run different MRPs
inside the same
plant
5. Main Views – Fields
MRP 1 (2)
Lot size data
How the lot size of
Planned and
Purchase
Requisitions is
going to be
calculated
© 2020 by Ricardo NayaSapyst.com
Scheduling
Different times to
take into account in
the MRP run
5. Main Views – Fields
MRP 2
Procurement
How the MRP will
work with materials
that are supplied
(not manufactured
in-house)
Net requirements
calculation
Safety stocks – MRP will
planned in excess to
build some stock
© 2020 by Ricardo NayaSapyst.com
Planning
Where we can
define the different
Planning Strategies
(like with/without
assembly) and the
way the Indepent
Requirements are
consumed
5. Main Views – Fields
MRP 3
Forecast
Requirements
How the MRP
manages
Independent
Requirements
Availability check
Which entries the MRP
will take into account
when calculating
availability
Configuration
For configurable
materials
© 2020 by Ricardo NayaSapyst.com
5. Main Views – Fields
MRP 4
BOM
explosion
How to select the
BOM to use in the
MRP runs and how
much scrap to planDiscontinued
parts
In case we want to
initiate the
discontinuation process
in the MRP
Repetitive
Manufacturing /
assembly /
deployment
strategy
Further data used in
Repetitive environments
and special situations
Storage Location
Data in this view is
Storage Location
dependent
Storage Location
MRP
For excluding a Storage
Location from the MRP
© 2020 by Ricardo NayaSapyst.com
5. Main Views – Fields
Forecasting
General data
Forecast model
(constant, trend,
seasonal, …)
Number of
periods required
Required periods for the
calculation
Control data
Futher factors for the
calculation
© 2020 by Ricardo NayaSapyst.com
5. Main Views – Fields
Forecasting
General data
Production related data,
it will be fetched to the
Production Orders
In-house
production time
Parameters for the time
calculation
Tolerance data
SAP PP
(PRODUCTION PLANNING)
© 2020 by Ricardo Naya
Sapyst.com
BOMs Overview
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. BOMs Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
1. Goals of this session
• To introduce the Bill of Materials
• To know Organizational Levels and Master Data
involved in BOMs
• To see main BOM fields and their functionality
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. BOMs Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
2. BOMs Overview (1)
• In the Bill of Materials we specify the Components or Raw
Materials needed for the manufacture of a Product
• When we create a Production Order, the BOM will be
automatically copied to it
• We can create alternative BOMs for the same product
• BOMs can be created for different uses (not only Production)
© 2020 by Ricardo NayaSapyst.com
2. BOMs Overview (2)
• BOMs are structured in
− Header => Finished or Semi-finished Good to produce
− Items => Raws, Components or Semi-finished goods that form the Header
− Subitems => Assembly places inside each Ítem
Header
Item Item Item
Subitem Subitem
Subitem
Item
Subitem
Subitem
© 2020 by Ricardo NayaSapyst.com
2. BOMs Overview (3)
• At each of the levels different data is required
Header:
- Alternative - Usage
- Status - Base quantity
-Texts
…
Item 1
Item 2
Item 3
- Category - Quantity
- % Scrap - MRP data
- Texts - Cost relevancy
…
Subitem 1
Subitem 2
- Installation Point - Text
Different Item Categories
L – Stock Item
N – Non Stock Item
D – Document Item
T – Text Item
© 2020 by Ricardo NayaSapyst.com
2. BOMs Overview (4)
• BOMs will be also created for Semi-finished goods building up
complex structures
Finished Good
Package Semi-finished Component Component
Semi-finishedComponent
Component
Component
Semi-finished
Component
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. BOMs Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
3. Organizational Structure
• Each BOM can be defined for each Plant:
− If manufactured in different plants BOMs the same one can be used
− In this way, They might have different values in different Plants
• BOM usage: Limits use to different processes
− Production => To use in MRP and Production Orders
− Cost => To use only for costing
− Engineering => To use only for design
− Sales => To use only in Sales Orders
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. BOMs Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
4. Master Data
• All Materials must exist in the Plant where BOM is created
− Some data, as Unit of measure, will be retrieved from MM
• No other Master Data involved
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. BOMs Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
Header Texts
5. Main Screens – Fields
Header (1)
Header
Material
Number
Material
Description
Plant
Base Quantity
Alternative Usage
Status:
1. Active
2. Inactive
© 2020 by Ricardo NayaSapyst.com
Quantity
Data
5. Main Screens – Fields
Item (1)
Item Number
Component
Material
Number
General
Data
Item
Category
MRP Data
© 2020 by Ricardo NayaSapyst.com
Item
Texts
5. Main Screens – Fields
Item (2)
Item
Status
Other Data
© 2020 by Ricardo NayaSapyst.com
Item data
5. Main Screens – Fields
Subitems
BOM
Subitems
© 2020 by Ricardo NayaSapyst.com
5. Main Screens – Fields
Overview
Header
data
Items
Data
SAP PP
(PRODUCTION PLANNING)
© 2020 by Ricardo Naya
Sapyst.com
Work Centers Overview
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Work Centers Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
1. Goals of this session
• To introduce Work Centers
• To know Organizational Levels and Master Data
involved in Work Centers
• To see main Work Center fields and their
functionality
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Work Centers Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
2. Work Centers Overview (1)
• Each Production Operation must be made in one and only
one Work Center
• Depending on the Production Process, Work Centers can be
modelled in different ways. Each one can represent:
− A machine or group of various machines
− A Production Line
− An assembly or Packaging Workplace
− An employee or group of various employees
− …
© 2020 by Ricardo NayaSapyst.com
2. Work Centers Overview (2)
• Work Center Data are used mainly for:
− Capacity => To define available capacity for Production
Formula
Timetable
Nº of employees or machines
…
− Scheduling => To define how employed time is going to be calculated
Formula
Set up times
…
− Costing => To define how Manufacturing Cost is going to be calculated
Formulas
Cost Center
Activity Types – For which a rate will be entered
© 2020 by Ricardo NayaSapyst.com
2. Work Centers Overview (3)
• They will also define:
− Parameters to measure during Production Execution
− Some Default values which will be copied to the Routing/Production Order
© 2020 by Ricardo NayaSapyst.com
2. Work Centers Overview (4)
Work Center:
Parameters FormulasActivity TypeActivity Rate
Routing / Operation:
Standard Values
20 USD/h
5 USD/h
30 USD/h
Act1
Act2
Act3
Setup Time
Machine Time
Labor Time
Setup Time
Op.Qty x Mach.Time
Op.Qty x Labor.Time
2 h
5 h
3 h
COSTS CALCULATION
Setup => 2h x 20 USD/h = 40 USD
Machine => 5h x 5 USD/h = 25 USD
Labor => 3h x 30 USD/h = 90 USD
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Work Centers Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
3. Organizational Structure
• Work Center Category
− Depending on the use it allows the mainentance of different data
• Each Work Center must be defined for only one Plant
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Work Centers Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
4. Master Data
• No previous Master Data is required for the creation of a
Work Center
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Work Centers Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
5. Main Screens – Fields
Basic Data
Plant/Work
Center Number
and Description
Standard
Values
Work Center
Category
Person
Responsible
© 2020 by Ricardo NayaSapyst.com
5. Main Screens – Fields
Default Values
Control Key
Units of
Measure of
Standard
Values
© 2020 by Ricardo NayaSapyst.com
Capacity
Category
5. Main Screens – Fields
Capacities
Capacity
Formulas
© 2020 by Ricardo NayaSapyst.com
Capacity
Category for
Scheduling
5. Main Screens – Fields
Scheduling
Formulas
© 2020 by Ricardo NayaSapyst.com
5. Main Screens – Fields
Costing
Cost
Center
Activity Types and
Formulas
Assignment
SAP PP
(PRODUCTION PLANNING)
© 2020 by Ricardo Naya
Sapyst.com
Routings Overview
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Routings Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
1. Goals of this session
• To introduce Routings
• To know Organizational Levels and Master Data
involved in Routings
• To see main Routing fields and their functionality
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Routings Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
2. Routings Overview (1)
• In the Routings we specify the different steps or operations that
must be taken for manufacturing a producto or semifinished
material
• When we create a Production Order, the Routing will be
automatically copied to it.
• We can create differents Routings for manufacturing the same
Material and they can be created for different usages
© 2020 by Ricardo NayaSapyst.com
Work Center 4Work Center 3Work Center 2Work Center 1
2. Routings Overview (2)
• Routings are structured in
− Header => Finished or Semi-finished Good to produce
− Operations => Different steps to manufacture it
Operation1 Operation2 Operation3 Operation4
© 2020 by Ricardo NayaSapyst.com
2. Routings Overview (3)
• Components and Raw Materials can be consumed in different Operations
• Operations can be:
− Internal => Inhouse Manufacture
− External => Subcontracted
© 2020 by Ricardo NayaSapyst.com
2. Routings Overview (4)
• In Internal Operations we must enter a Work Center and its Standard Values
− They will allow:
To calculate Planned Costs
To schedule the Production Order
• In External Operations we can enter Vendor, Delivery Time and Price
− They will allow:
To calculate Planned Costs
To schedule the Productioin Order
To create transfer requirements to Vendor if necessary
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Routings Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
3. Organizational Structure
• Each Routing must be defined for each Plant
• Routing usage: Limits use to different processes
− Production => To use in MRP and Production Orders
− Cost => To use only for costing
− Engineering => To use only for design
− Sales => To use only in Sales Orders
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Routings Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
4. Master Data
• The header Material must exist for the creation of the
Routing
• If we want to assign components to different operations,
the BOM must have been created previously
• Work Centers for Internal Operations must also have been
created previously
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Routings Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
5. Main Screens – Fields
Header Details(1)
Header
Material
Number
Status
Usage
Lot Size
© 2020 by Ricardo NayaSapyst.com
Work
Centers
5. Main Screens – Fields
Operation Overview (1)
Header
Material
Operation
Description
Operation
Number
Control
Key
© 2020 by Ricardo NayaSapyst.com
5. Main Screens – Fields
Operation Details (1) – Internal Operation Fields
Standard
Values
© 2020 by Ricardo NayaSapyst.com
Vendor
5. Main Screens – Fields
Operations Details (2) – External Operation
Price
Delivery
Time
SAP PP
(PRODUCTION PLANNING)
© 2020 by Ricardo Naya
Sapyst.com
Demand Planning Overview
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Demand Management Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
1. Goals of this session
• To introduce Demand Management in SAP
• To know Organizational Levels and Master Data
involved in Planned Independent Requirements
maintenance
• To see main Planned Independent Requirements
maintenance screen and fields
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Demand Management Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
2. Demand Management Overview (1)
• There are two possible Demand types:
− Customer Demand (Sales Orders)
− Forecast (Planned Independent Requirements)
• Both of them will be taken into account by MRP in order to
calculate the net requirement
• Different Planning Strategies can be defined for each Material
© 2020 by Ricardo NayaSapyst.com
2. Demand Management Overview (2)
Finished Good
Semifinished Component Component Component
Component Component
40 – Planning with Final Assembly Planned
Independent
Requirements
+ Sales Orders
Requirements
Explosion
(MRP)
Dependent
Requirements
© 2020 by Ricardo NayaSapyst.com
2. Demand Management Overview (2)
Finished Good
Semifinished Component Component Component
Component Component
40 – Planning without Final Assembly at Semifinished Level
Sales Orders
Planned
Independent
Requirements
Requirements
Explosion
(MRP)
Dependent
Requirements
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Demand Management Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
3. Organizational Structure
• Planned Independent Requirements must be defined for
each Plant
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Demand Management Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
4. Master Data
• Strategy is defined in Material Master (View MRP3):
Strategy
Group
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Demand Management Overview
3. Organizational Structure
4. Master Data
5. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
5. Main Screens – Fields
Planning Table
Depending on the chosen Planning Period, quantities can
be distributed:
- Daily
-Weekly
-Monthly
SAP PP
(PRODUCTION PLANNING)
© 2020 by Ricardo Naya
Sapyst.com
MRP Overview
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Procurement Types
3. MRP Types
4. Reorder Point
5. MRP Overview
6. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
1. Goals of this session
• To introduce how MRP works in SAP
• To see the main available options
• To see main screens / fields for using this
functionality
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Procurement Types
3. MRP Types
4. Reorder Point
5. MRP Overview
6. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
2. Procurement Types (1)
• Each Material can be procured:
− Internally (Inhouse Production) – MRP generates Planned Orders
− Externally (Purchased) – MRP generates Purchase Requisitions
− Both – MRP generates Planned Orders
That will be able to be converted in Production or Purchase Orders
• Subcontracting
− Special Procurement Type
Components and Raw Materials are sent to Vendor for the manufacture
− Two types:
Subcontracting Purchase Order
External Operation (one operation inside an inhouse Production Order)
© 2020 by Ricardo NayaSapyst.com
2. Procurement Types (2)
External
Procurement
Transfer
Procurement Types
Inhouse Production
SubcontractingIn own Plant In other Plant
Procurement Types
Special Procurement Types
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Procurement Types
3. MRP Types
4. Reorder Point
5. MRP Overview
6. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
3. MRP Types (1)
• Main Planning Methods:
− PUSH:
From Finished Good requirement date (customer or forecast), dates are
calculated for lower BOM levels requirements
Used for valuable Materials or difficult to obtain
For that MRP is used
− PULL
Procurement is triggered when stock decreases below a thresold
Used for cheap Materials (Stock levels value are not relevant)
For that Reorder Point or Kanban are used
© 2020 by Ricardo NayaSapyst.com
3. MRP Types (2)
• ABC Analysis:
− Materials are classified by cost. Example:
A: 20% with higher cost
B: Next 30%
C: Rest of Materials
− Depending on classification:
A: Planned by MRP
C: Planned by Reorder Point or Kanban
B: To study case by case
− Also take into account.
Obsolescence
Storage Costs
Delivery time
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Procurement Types
3. MRP Types
4. Reorder Point
5. MRP Overview
6. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
4. Reorder Point (1)
• A replenishment proposal will be created once stock level is below a
predetermined level
• Two ways of implementing it:
− Visual Control or Kanban cards
User enters manually a Purchase Order in the system when he sees level is down the thresold
Using kanban cards, when a container is depleted the kanban card is taken to the Procurement
Department to ask for a replenishment
− SAP Control
MRP Type VB (Reorder Point) entered in Material Master (View MRP1)
Reorder Point (thresold stock level) also entered in MM View MRP1
When MRP is run, if stock is below Reorder Point a Purchase Requisition is automatically created
© 2020 by Ricardo NayaSapyst.com
4. Reorder Point (2)
Stock
level
Time
Reorder
Point
Safety
Stock
Delivery Time
Lot Size
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Procurement Types
3. MRP Types
4. Reorder Point
5. MRP Overview
6. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
5. MRP Overview (1)
• MRP (Materials Requirement Planning) allows the explosion of
requirements from BOM upper levels to the lowest
• MRP calculates for each Material the Net Requirements:
− Outputs
Demand (Sales Order or Planned Independent Requirements)
Dependent Requirements (required quantities to fulfill Upper Level Orders)
− Inputs
Stock in hand
Planned or Production Orders
Purchase Requisitions or Purchase Orders (for Externally Procured Materials)
© 2020 by Ricardo NayaSapyst.com
5. MRP Overview (2)
• MRP proposals will be later converted:
− Planned Orders => Production Orders (Internally Procured Materials)
− Purchase Requisitions => Purchase Orders (Externally Procured Materials)
• MPS (Master Production Schedule) runs MRP only to the next level
− It is used to Plan at the first level and adjust before exploding down
requirements to lower levels
• Simulation Mode allows to run MRP and check result before saving it
© 2020 by Ricardo NayaSapyst.com
Planned Order
5. MRP Overview (3)
Downward Requirements Explosion
BOM
level
Time
Delivery Time
Sales Order
Planned Order
Planned Order
Purchase Requisition
Purchase Requisition
Finished
Good
Semi1
Semi2
Raw1
Raw2
Delivery Time
Dates calculated based in Delivery
and Scheduling times
© 2020 by Ricardo NayaSapyst.com
5. MRP Overview (4)
Net Requirement calculation and Proposals in each BOM level
Net Requirements
Calculation
Lot Size
Calculation
Procurement
Type
Scheduling
Requirement Explosion to
Lower levels
+ Stock
+ Planned Orders
+ Prod. Orders
+ Purch. Req.
+ Purch. Orders
-Sales Orders
-- Independent Req.
-- Dependent Req.
-= Net Requirements
o Exact
o Fixed
o Minimum
o Autom. Calculated
o…
Internal
External…
Taking into account
Lead times it calculates
Input/Output date
Planned Orders: Dependent Req
Prod. Orders: Reservations
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. Procurement Types
3. MRP Types
4. Reorder Point
5. MRP Overview
6. Main Screens – Fields
© 2020 by Ricardo NayaSapyst.com
6. Main Screens - Fields
MRP Parameters
-Processing Key: Net change or Regenerative
-- Create Pur.Req: Create directly Pur.Req or Planned Orders
-- Delivery Schedules: Only for Open Purchase Orders
-- Create MRP list: Save snapshot of status after MRP
-- Planning mode: Reexplode BOM or adapt changes
-- Scheduling: Use times in Routings or Material Master ones
Process control parameters
SAP PP
(PRODUCTION PLANNING)
© 2020 by Ricardo Naya
Sapyst.com
AFS Apparel and Footwear
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. SAP AFS Overview
3. Material Master
4. Bills of Materials
5. Routings
6. Planned Independent Requirements
7. Materials Requirements Planning
8. Planned Orders & Production Orders
© 2020 by Ricardo NayaSapyst.com
1. Goals of this Session
• Introduce the Industry Solution AFS
• See main AFS special functionality in the Production
Planning module
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. SAP AFS Overview
3. Material Master
4. Bills of Materials
5. Routings
6. Planned Independent Requirements
7. Materials Requirements Planning
8. Planned Orders & Production Orders
© 2020 by Ricardo NayaSapyst.com
2. SAP AFS Overview (1)
• SAP AFS: Special functionality for covering special
requirements of Apparel and Footwear Industry
• Main features => For each Material it is possible to define:
− Different SKUs – Master Grid
Used for dealing with different sizes, colours, styles
It would be possible to explode requirements (presizing) based in Distribution Profiles
− Different Categories
Used for dealing with different customer segments, quality levels or country of origin
− Different Seasons
Different prices or processes might be required depending in the Material Season
© 2020 by Ricardo NayaSapyst.com
2. SAP AFS Overview (2)
• BOMs take into account grid data and can activate/deactivate components based
in dimensions
• AFS Special BOMs Types: Assortments and Pre-packs
• Possibility of multiple Routings based on different categories
• MRP exploded from Material to its SKUs
• Production Orders
− Production Order Bundles for keep maintenance of colour shades
− Markers for indicating optimal way of cutting
− Combined Production Orders
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. SAP AFS Overview
3. Material Master
4. Bills of Materials
5. Routings
6. Planned Independent Requirements
7. Materials Requirements Planning
8. Planned Orders & Production Orders
© 2020 by Ricardo NayaSapyst.com
3. Material Master (1)
➢ It Reduces considerably the number of Materials to manage
MASTER GRID – SKUs (size, colour, style, …)
➢ It allows planning and operate at Material Level and then disaggregate (Presizing & Distribution Profiles)
Trouser
Size
Colour
Material:
Characteristics: Grid:
© 2020 by Ricardo NayaSapyst.com
3. Material Master (2)
➢ It allows using same Material for very similar products (different quality level, country of origin, …)
CATEGORY STRUCTURE & COVERAGE STRUCTURE
➢ It will be possible to define different Routings based in the Category
➢ Coverage Strategy => It defines method by which Requirement Categories match Stock Categories
Requirement
Category
Customer A
Customer C
Customer B
Stock
Category
Cust. Segment A
Cust. Segment C
Cust. Segment B
Coverage
Strategy
Sales Orders
PIRs
Pur. Requisitions
Planned Orders
Purchase Orders
Production Orders
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. SAP AFS Overview
3. Material Master
4. Bills of Materials
5. Routings
6. Planned Independent Requirements
7. Materials Requirements Planning
8. Planned Orders & Production Orders
© 2020 by Ricardo NayaSapyst.com
XS S M L XL
BL X X X X X
WH X X X X X
4. Bills of Materials
➢ Standard BOM
TWO TYPES:
➢ Assortments
=> They can include Pre-packs
They can contain Standard Materials but these ones cannot have AFS Materials below
Jeans
(AFS Material)
Fabric
(AFS Material)
Lining
(AFS Material)
Buttons
(Standard Material)
XS S M L XL
BL X X X X X
WH X X X X X
XS S M L XL
X X X X X
➢ Dimension Dependent Consumption
➢ Dimension Dependent Components
➢ Dimension Dependent Dimensions
It is also possible to activate/deactivate some components based in the Category
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. SAP AFS Overview
3. Material Master
4. Bills of Materials
5. Routings
6. Planned Independent Requirements
7. Materials Requirements Planning
8. Planned Orders & Production Orders
© 2020 by Ricardo NayaSapyst.com
5. Routings
DEPENDING ON CATEGORY IT IS POSSIBLE TO DEFINE DIFFERENT ROUTINGS
Category Quality 1
Operation1 Operation2 Operation3 Operation4
Category Quality 2
Operation1 Operation2 Operation4
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. SAP AFS Overview
3. Material Master
4. Bills of Materials
5. Routings
6. Planned Independent Requirements
7. Materials Requirements Planning
8. Planned Orders & Production Orders
© 2020 by Ricardo NayaSapyst.com
6. Planned Independent Requirements
• Possible to enter different PIRs by Category
• Rest of functionality equal to Standard
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. SAP AFS Overview
3. Material Master
4. Bills of Materials
5. Routings
6. Planned Independent Requirements
7. Materials Requirements Planning
8. Planned Orders & Production Orders
© 2020 by Ricardo NayaSapyst.com
7. Materials Requirements Planning
• Always at SKU Level
− It takes into account
Grid Values
Categories (based in Coverage Strategy)
• Some MRP Parameters defined at Material Level while others at SKU
• It is possible to group all SKUs required quantities in same Planned
Order or disaggregate them
• At SKU level:
− Safety Stock
− Rounding Value
− SKU Group
− Discontinuation
© 2020 by Ricardo NayaSapyst.com
Table of contents
1. Goals of this session
2. SAP AFS Overview
3. Material Master
4. Bills of Materials
5. Routings
6. Planned Independent Requirements
7. Materials Requirements Planning
8. Planned Orders & Production Orders
© 2020 by Ricardo NayaSapyst.com
8. Planned Orders & Production Orders
• Only 1 Category per Order but Several Grid Values
• Information taken from BOM & Routing
• Bundle data may be entered for cutting
• Combined orders allow to treat as one a group of existing Production
Orders
− Shared Material or work process (to optimize cutting capacities)
SAP PP
(PRODUCTION PLANNING)
© 2020 by Ricardo Naya
Sapyst.com
Production Order
Overview
© 2020 by Ricardo NayaSapyst.com
Index
1. What is a Production Order?
2. Process Flow
© 2020 by Ricardo NayaSapyst.com
1. What is a Production Order?
• Document that controls Manufacturing and its associated Costs
• It indicates:
− WHAT => Which Material is going to be manufactured (only 1 in each PO)
− HOW MANY => How many units are going to be manufactured
− WHEN => Date / Time in which the process is going to be initated and ended
− WHERE => Work Centers that are going to be used
− WITH WHAT => Needed Components for the manufacturing
− COST => How much is it planed to cost and how much actually costed
© 2020 by Ricardo NayaSapyst.com
Index
1. What is a Production Order?
2. Process Flow
© 2020 by Ricardo NayaSapyst.com
2. Process Flow
Planned
Order
Order
Creation
Mat.
Availability
Check
Release Printing
Mat.
Consumption
Confirmation
Goods
Receipt
Settlement
&
Closing
MRP
Manually
P
r
o
c
e
s
s
© 2020 by Ricardo NayaSapyst.com
More Information
http://bizanalyst.academy
Click:

SAP PP Course Documentation

  • 1.
    SAP PP (PRODUCTION PLANNING) ©2020 by Ricardo Naya Sapyst.com Introduction
  • 2.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. What is an ERP? 2. What is SAP? 3. What is SAP PP?
  • 3.
    © 2020 byRicardo NayaSapyst.com 1. What is an ERP? • ERP = Enterprise Resource Planning ERP - INTEGRATED Information System - It covers all the company processes - It shares data across the different deparments - UNIQUE Database - REAL TIME Data
  • 4.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. What is an ERP? 2. What is SAP? 3. What is SAP PP?
  • 5.
    © 2020 byRicardo NayaSapyst.com 2. What is SAP? • SAP AG = Systemanalyse und Programmentwicklung Systems Analysis and Programs Development SAP ECC MM Materials Management PP Production PlanningSD Sales & Distribution HR Human Resources CO Controlling FI Finance
  • 6.
    © 2020 byRicardo NayaSapyst.com 2. What is SAP? SAP Server SAP GUI SAP GUI SAP GUI SAP GUISAP GUI SAP GUI SAP GUI SAP GUI
  • 7.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. What is an ERP? 2. What is SAP? 3. What is SAP PP?
  • 8.
    © 2020 byRicardo NayaSapyst.com 1. What is SAP PP? • SAP PP = SAP Production Planning SAP PP - Production Master Data (Materials, BOMs, Routings, Work Centers) - Demand Management - Planning (MPS, MRP, Consumption-based Planning) - Production Control (Production Order related processes)
  • 9.
    © 2020 byRicardo NayaSapyst.com 2. What is SAP? SAP Server SAP GUI SAP GUI SAP GUI SAP GUISAP GUI SAP GUI SAP GUI SAP GUI SAP PP SAP MM SAP SD SAP FISAP CO
  • 10.
    SAP PP (PRODUCTION PLANNING) ©2020 by Ricardo Naya Sapyst.com SAP PP Overview
  • 11.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Complete PP process 3. Master Data 4. Demand Management 5. Planning 6. Production Control
  • 12.
    © 2020 byRicardo NayaSapyst.com 1. Goals of this session • See the big picture • Introduce SAP PP Concepts (Each topic will be explained further in next lectures)
  • 13.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Complete PP process 3. Master Data 4. Demand Management 5. Planning 6. Production Control
  • 14.
    © 2020 byRicardo NayaSapyst.com 2. Complete PP Process SOP Sales & Operations Planning MPS Master Production Schedule Scheduling & Capacity Planning Demand Mgmt. Long Term Planning MRP Materials Requirements Planning Production Control
  • 15.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Complete PP process 3. Master Data 4. Demand Management 5. Planning 6. Production Control
  • 16.
    © 2020 byRicardo NayaSapyst.com 3. Master Data – Organizational Structure Company Code Plant 1 Plant 2 Plant 3 Storage Location 1 Storage Location 2 Storage Location 1
  • 17.
    © 2020 byRicardo NayaSapyst.com 3. Master Data – PP Objects • Material Master Views MRP (4) Work Scheduling Forecasting • Bills of Materials • Work Centers • Routings • Production Versions
  • 18.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Complete PP process 3. Master Data 4. Demand Management 5. Planning 6. Production Control
  • 19.
    © 2020 byRicardo NayaSapyst.com 4. Demand Management Finished Product Semi-finished Packing Material Raw Material Raw Material Raw Material Sales OrdersIndependent Requirements IRs CustomerForecast SOP
  • 20.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Complete PP process 3. Master Data 4. Demand Management 5. Planning 6. Production Control
  • 21.
    © 2020 byRicardo NayaSapyst.com MRP 5. Planning Finished Product Semi-finished Packing Material Raw Material Raw Material Raw Material Sales OrdersForecast SOP Independent Requirements IRs Customer MPS
  • 22.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Complete PP process 3. Master Data 4. Demand Management 5. Planning 6. Production Control
  • 23.
    © 2020 byRicardo NayaSapyst.com 6. Production Control MPS MRP Purchase Requistion Planned Order Goods Issue Goods Receipt Liquidation & Close Production Order Released Production Order Confirmed Production Order Created Purchase Order Goods Issue Goods Receipt Production Order
  • 24.
    SAP PP (PRODUCTION PLANNING) ©2020 by Ricardo Naya Sapyst.com Materials Overview
  • 25.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Materials Overview 3. Organizational Structure 4. Master Data 5. Main Views – Fields
  • 26.
    © 2020 byRicardo NayaSapyst.com 1. Goals of this session • To introduce the Material Master • To show which are the PP Views • To see main PP fields and their functionality
  • 27.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Materials Overview 3. Organizational Structure 4. Master Data 5. Main Views - Fields
  • 28.
    © 2020 byRicardo NayaSapyst.com 2. Materials Overview (1) • Each different raw material, component, commodity, semi-finished or finished product must have an entry in the Material Master • For each material we can create different views • Each view groups data related to a funcionality
  • 29.
    © 2020 byRicardo NayaSapyst.com 2. Materials Overview (2) MATERIAL Basic Data Classification Sales Purchasing MRP Forecasting Work Scheduling General Plant Data/Storage Warehouse Mngt Quality Mngt Accounting Costing Stock Forecasting MRP Work Scheduling Depending of Material Type Different views
  • 30.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Materials Overview 3. Organizational Structure 4. Master Data 5. Main Views - Fields
  • 31.
    © 2020 byRicardo NayaSapyst.com 3. Organizational Structure • Each field can be defined at 4 different levels: − Global Valid for all the plants − Plant Only valid for the plant where it is defined − MRP Area For performing a different MRP (can include various Storage Locations) − Storage Location Only valid for each Storage Location
  • 32.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Materials Overview 3. Organizational Structure 4. Master Data 5. Main Views - Fields
  • 33.
    © 2020 byRicardo NayaSapyst.com 4. Master Data • Material Master is a basic Master Data − It does not need previous Master Data for its maintenance • Some of the PP fields should be maintained previously in configuration
  • 34.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Materials Overview 3. Organizational Structure 4. Master Data 5. Main Views - Fields
  • 35.
    © 2020 byRicardo NayaSapyst.com General Data 5. Main Views – Fields MRP 1 (1) Material Number Material Description Plant MRP Procedure How the Material is going to be planned (MRP, reorder point, with time fence…)
  • 36.
    © 2020 byRicardo NayaSapyst.com MRP Areas In case we want to run different MRPs inside the same plant 5. Main Views – Fields MRP 1 (2) Lot size data How the lot size of Planned and Purchase Requisitions is going to be calculated
  • 37.
    © 2020 byRicardo NayaSapyst.com Scheduling Different times to take into account in the MRP run 5. Main Views – Fields MRP 2 Procurement How the MRP will work with materials that are supplied (not manufactured in-house) Net requirements calculation Safety stocks – MRP will planned in excess to build some stock
  • 38.
    © 2020 byRicardo NayaSapyst.com Planning Where we can define the different Planning Strategies (like with/without assembly) and the way the Indepent Requirements are consumed 5. Main Views – Fields MRP 3 Forecast Requirements How the MRP manages Independent Requirements Availability check Which entries the MRP will take into account when calculating availability Configuration For configurable materials
  • 39.
    © 2020 byRicardo NayaSapyst.com 5. Main Views – Fields MRP 4 BOM explosion How to select the BOM to use in the MRP runs and how much scrap to planDiscontinued parts In case we want to initiate the discontinuation process in the MRP Repetitive Manufacturing / assembly / deployment strategy Further data used in Repetitive environments and special situations Storage Location Data in this view is Storage Location dependent Storage Location MRP For excluding a Storage Location from the MRP
  • 40.
    © 2020 byRicardo NayaSapyst.com 5. Main Views – Fields Forecasting General data Forecast model (constant, trend, seasonal, …) Number of periods required Required periods for the calculation Control data Futher factors for the calculation
  • 41.
    © 2020 byRicardo NayaSapyst.com 5. Main Views – Fields Forecasting General data Production related data, it will be fetched to the Production Orders In-house production time Parameters for the time calculation Tolerance data
  • 42.
    SAP PP (PRODUCTION PLANNING) ©2020 by Ricardo Naya Sapyst.com BOMs Overview
  • 43.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. BOMs Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 44.
    © 2020 byRicardo NayaSapyst.com 1. Goals of this session • To introduce the Bill of Materials • To know Organizational Levels and Master Data involved in BOMs • To see main BOM fields and their functionality
  • 45.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. BOMs Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 46.
    © 2020 byRicardo NayaSapyst.com 2. BOMs Overview (1) • In the Bill of Materials we specify the Components or Raw Materials needed for the manufacture of a Product • When we create a Production Order, the BOM will be automatically copied to it • We can create alternative BOMs for the same product • BOMs can be created for different uses (not only Production)
  • 47.
    © 2020 byRicardo NayaSapyst.com 2. BOMs Overview (2) • BOMs are structured in − Header => Finished or Semi-finished Good to produce − Items => Raws, Components or Semi-finished goods that form the Header − Subitems => Assembly places inside each Ítem Header Item Item Item Subitem Subitem Subitem Item Subitem Subitem
  • 48.
    © 2020 byRicardo NayaSapyst.com 2. BOMs Overview (3) • At each of the levels different data is required Header: - Alternative - Usage - Status - Base quantity -Texts … Item 1 Item 2 Item 3 - Category - Quantity - % Scrap - MRP data - Texts - Cost relevancy … Subitem 1 Subitem 2 - Installation Point - Text Different Item Categories L – Stock Item N – Non Stock Item D – Document Item T – Text Item
  • 49.
    © 2020 byRicardo NayaSapyst.com 2. BOMs Overview (4) • BOMs will be also created for Semi-finished goods building up complex structures Finished Good Package Semi-finished Component Component Semi-finishedComponent Component Component Semi-finished Component
  • 50.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. BOMs Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 51.
    © 2020 byRicardo NayaSapyst.com 3. Organizational Structure • Each BOM can be defined for each Plant: − If manufactured in different plants BOMs the same one can be used − In this way, They might have different values in different Plants • BOM usage: Limits use to different processes − Production => To use in MRP and Production Orders − Cost => To use only for costing − Engineering => To use only for design − Sales => To use only in Sales Orders
  • 52.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. BOMs Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 53.
    © 2020 byRicardo NayaSapyst.com 4. Master Data • All Materials must exist in the Plant where BOM is created − Some data, as Unit of measure, will be retrieved from MM • No other Master Data involved
  • 54.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. BOMs Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 55.
    © 2020 byRicardo NayaSapyst.com Header Texts 5. Main Screens – Fields Header (1) Header Material Number Material Description Plant Base Quantity Alternative Usage Status: 1. Active 2. Inactive
  • 56.
    © 2020 byRicardo NayaSapyst.com Quantity Data 5. Main Screens – Fields Item (1) Item Number Component Material Number General Data Item Category MRP Data
  • 57.
    © 2020 byRicardo NayaSapyst.com Item Texts 5. Main Screens – Fields Item (2) Item Status Other Data
  • 58.
    © 2020 byRicardo NayaSapyst.com Item data 5. Main Screens – Fields Subitems BOM Subitems
  • 59.
    © 2020 byRicardo NayaSapyst.com 5. Main Screens – Fields Overview Header data Items Data
  • 60.
    SAP PP (PRODUCTION PLANNING) ©2020 by Ricardo Naya Sapyst.com Work Centers Overview
  • 61.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Work Centers Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 62.
    © 2020 byRicardo NayaSapyst.com 1. Goals of this session • To introduce Work Centers • To know Organizational Levels and Master Data involved in Work Centers • To see main Work Center fields and their functionality
  • 63.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Work Centers Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 64.
    © 2020 byRicardo NayaSapyst.com 2. Work Centers Overview (1) • Each Production Operation must be made in one and only one Work Center • Depending on the Production Process, Work Centers can be modelled in different ways. Each one can represent: − A machine or group of various machines − A Production Line − An assembly or Packaging Workplace − An employee or group of various employees − …
  • 65.
    © 2020 byRicardo NayaSapyst.com 2. Work Centers Overview (2) • Work Center Data are used mainly for: − Capacity => To define available capacity for Production Formula Timetable Nº of employees or machines … − Scheduling => To define how employed time is going to be calculated Formula Set up times … − Costing => To define how Manufacturing Cost is going to be calculated Formulas Cost Center Activity Types – For which a rate will be entered
  • 66.
    © 2020 byRicardo NayaSapyst.com 2. Work Centers Overview (3) • They will also define: − Parameters to measure during Production Execution − Some Default values which will be copied to the Routing/Production Order
  • 67.
    © 2020 byRicardo NayaSapyst.com 2. Work Centers Overview (4) Work Center: Parameters FormulasActivity TypeActivity Rate Routing / Operation: Standard Values 20 USD/h 5 USD/h 30 USD/h Act1 Act2 Act3 Setup Time Machine Time Labor Time Setup Time Op.Qty x Mach.Time Op.Qty x Labor.Time 2 h 5 h 3 h COSTS CALCULATION Setup => 2h x 20 USD/h = 40 USD Machine => 5h x 5 USD/h = 25 USD Labor => 3h x 30 USD/h = 90 USD
  • 68.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Work Centers Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 69.
    © 2020 byRicardo NayaSapyst.com 3. Organizational Structure • Work Center Category − Depending on the use it allows the mainentance of different data • Each Work Center must be defined for only one Plant
  • 70.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Work Centers Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 71.
    © 2020 byRicardo NayaSapyst.com 4. Master Data • No previous Master Data is required for the creation of a Work Center
  • 72.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Work Centers Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 73.
    © 2020 byRicardo NayaSapyst.com 5. Main Screens – Fields Basic Data Plant/Work Center Number and Description Standard Values Work Center Category Person Responsible
  • 74.
    © 2020 byRicardo NayaSapyst.com 5. Main Screens – Fields Default Values Control Key Units of Measure of Standard Values
  • 75.
    © 2020 byRicardo NayaSapyst.com Capacity Category 5. Main Screens – Fields Capacities Capacity Formulas
  • 76.
    © 2020 byRicardo NayaSapyst.com Capacity Category for Scheduling 5. Main Screens – Fields Scheduling Formulas
  • 77.
    © 2020 byRicardo NayaSapyst.com 5. Main Screens – Fields Costing Cost Center Activity Types and Formulas Assignment
  • 78.
    SAP PP (PRODUCTION PLANNING) ©2020 by Ricardo Naya Sapyst.com Routings Overview
  • 79.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Routings Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 80.
    © 2020 byRicardo NayaSapyst.com 1. Goals of this session • To introduce Routings • To know Organizational Levels and Master Data involved in Routings • To see main Routing fields and their functionality
  • 81.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Routings Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 82.
    © 2020 byRicardo NayaSapyst.com 2. Routings Overview (1) • In the Routings we specify the different steps or operations that must be taken for manufacturing a producto or semifinished material • When we create a Production Order, the Routing will be automatically copied to it. • We can create differents Routings for manufacturing the same Material and they can be created for different usages
  • 83.
    © 2020 byRicardo NayaSapyst.com Work Center 4Work Center 3Work Center 2Work Center 1 2. Routings Overview (2) • Routings are structured in − Header => Finished or Semi-finished Good to produce − Operations => Different steps to manufacture it Operation1 Operation2 Operation3 Operation4
  • 84.
    © 2020 byRicardo NayaSapyst.com 2. Routings Overview (3) • Components and Raw Materials can be consumed in different Operations • Operations can be: − Internal => Inhouse Manufacture − External => Subcontracted
  • 85.
    © 2020 byRicardo NayaSapyst.com 2. Routings Overview (4) • In Internal Operations we must enter a Work Center and its Standard Values − They will allow: To calculate Planned Costs To schedule the Production Order • In External Operations we can enter Vendor, Delivery Time and Price − They will allow: To calculate Planned Costs To schedule the Productioin Order To create transfer requirements to Vendor if necessary
  • 86.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Routings Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 87.
    © 2020 byRicardo NayaSapyst.com 3. Organizational Structure • Each Routing must be defined for each Plant • Routing usage: Limits use to different processes − Production => To use in MRP and Production Orders − Cost => To use only for costing − Engineering => To use only for design − Sales => To use only in Sales Orders
  • 88.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Routings Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 89.
    © 2020 byRicardo NayaSapyst.com 4. Master Data • The header Material must exist for the creation of the Routing • If we want to assign components to different operations, the BOM must have been created previously • Work Centers for Internal Operations must also have been created previously
  • 90.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Routings Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 91.
    © 2020 byRicardo NayaSapyst.com 5. Main Screens – Fields Header Details(1) Header Material Number Status Usage Lot Size
  • 92.
    © 2020 byRicardo NayaSapyst.com Work Centers 5. Main Screens – Fields Operation Overview (1) Header Material Operation Description Operation Number Control Key
  • 93.
    © 2020 byRicardo NayaSapyst.com 5. Main Screens – Fields Operation Details (1) – Internal Operation Fields Standard Values
  • 94.
    © 2020 byRicardo NayaSapyst.com Vendor 5. Main Screens – Fields Operations Details (2) – External Operation Price Delivery Time
  • 95.
    SAP PP (PRODUCTION PLANNING) ©2020 by Ricardo Naya Sapyst.com Demand Planning Overview
  • 96.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Demand Management Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 97.
    © 2020 byRicardo NayaSapyst.com 1. Goals of this session • To introduce Demand Management in SAP • To know Organizational Levels and Master Data involved in Planned Independent Requirements maintenance • To see main Planned Independent Requirements maintenance screen and fields
  • 98.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Demand Management Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 99.
    © 2020 byRicardo NayaSapyst.com 2. Demand Management Overview (1) • There are two possible Demand types: − Customer Demand (Sales Orders) − Forecast (Planned Independent Requirements) • Both of them will be taken into account by MRP in order to calculate the net requirement • Different Planning Strategies can be defined for each Material
  • 100.
    © 2020 byRicardo NayaSapyst.com 2. Demand Management Overview (2) Finished Good Semifinished Component Component Component Component Component 40 – Planning with Final Assembly Planned Independent Requirements + Sales Orders Requirements Explosion (MRP) Dependent Requirements
  • 101.
    © 2020 byRicardo NayaSapyst.com 2. Demand Management Overview (2) Finished Good Semifinished Component Component Component Component Component 40 – Planning without Final Assembly at Semifinished Level Sales Orders Planned Independent Requirements Requirements Explosion (MRP) Dependent Requirements
  • 102.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Demand Management Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 103.
    © 2020 byRicardo NayaSapyst.com 3. Organizational Structure • Planned Independent Requirements must be defined for each Plant
  • 104.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Demand Management Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 105.
    © 2020 byRicardo NayaSapyst.com 4. Master Data • Strategy is defined in Material Master (View MRP3): Strategy Group
  • 106.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Demand Management Overview 3. Organizational Structure 4. Master Data 5. Main Screens – Fields
  • 107.
    © 2020 byRicardo NayaSapyst.com 5. Main Screens – Fields Planning Table Depending on the chosen Planning Period, quantities can be distributed: - Daily -Weekly -Monthly
  • 108.
    SAP PP (PRODUCTION PLANNING) ©2020 by Ricardo Naya Sapyst.com MRP Overview
  • 109.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Procurement Types 3. MRP Types 4. Reorder Point 5. MRP Overview 6. Main Screens – Fields
  • 110.
    © 2020 byRicardo NayaSapyst.com 1. Goals of this session • To introduce how MRP works in SAP • To see the main available options • To see main screens / fields for using this functionality
  • 111.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Procurement Types 3. MRP Types 4. Reorder Point 5. MRP Overview 6. Main Screens – Fields
  • 112.
    © 2020 byRicardo NayaSapyst.com 2. Procurement Types (1) • Each Material can be procured: − Internally (Inhouse Production) – MRP generates Planned Orders − Externally (Purchased) – MRP generates Purchase Requisitions − Both – MRP generates Planned Orders That will be able to be converted in Production or Purchase Orders • Subcontracting − Special Procurement Type Components and Raw Materials are sent to Vendor for the manufacture − Two types: Subcontracting Purchase Order External Operation (one operation inside an inhouse Production Order)
  • 113.
    © 2020 byRicardo NayaSapyst.com 2. Procurement Types (2) External Procurement Transfer Procurement Types Inhouse Production SubcontractingIn own Plant In other Plant Procurement Types Special Procurement Types
  • 114.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Procurement Types 3. MRP Types 4. Reorder Point 5. MRP Overview 6. Main Screens – Fields
  • 115.
    © 2020 byRicardo NayaSapyst.com 3. MRP Types (1) • Main Planning Methods: − PUSH: From Finished Good requirement date (customer or forecast), dates are calculated for lower BOM levels requirements Used for valuable Materials or difficult to obtain For that MRP is used − PULL Procurement is triggered when stock decreases below a thresold Used for cheap Materials (Stock levels value are not relevant) For that Reorder Point or Kanban are used
  • 116.
    © 2020 byRicardo NayaSapyst.com 3. MRP Types (2) • ABC Analysis: − Materials are classified by cost. Example: A: 20% with higher cost B: Next 30% C: Rest of Materials − Depending on classification: A: Planned by MRP C: Planned by Reorder Point or Kanban B: To study case by case − Also take into account. Obsolescence Storage Costs Delivery time
  • 117.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Procurement Types 3. MRP Types 4. Reorder Point 5. MRP Overview 6. Main Screens – Fields
  • 118.
    © 2020 byRicardo NayaSapyst.com 4. Reorder Point (1) • A replenishment proposal will be created once stock level is below a predetermined level • Two ways of implementing it: − Visual Control or Kanban cards User enters manually a Purchase Order in the system when he sees level is down the thresold Using kanban cards, when a container is depleted the kanban card is taken to the Procurement Department to ask for a replenishment − SAP Control MRP Type VB (Reorder Point) entered in Material Master (View MRP1) Reorder Point (thresold stock level) also entered in MM View MRP1 When MRP is run, if stock is below Reorder Point a Purchase Requisition is automatically created
  • 119.
    © 2020 byRicardo NayaSapyst.com 4. Reorder Point (2) Stock level Time Reorder Point Safety Stock Delivery Time Lot Size
  • 120.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Procurement Types 3. MRP Types 4. Reorder Point 5. MRP Overview 6. Main Screens – Fields
  • 121.
    © 2020 byRicardo NayaSapyst.com 5. MRP Overview (1) • MRP (Materials Requirement Planning) allows the explosion of requirements from BOM upper levels to the lowest • MRP calculates for each Material the Net Requirements: − Outputs Demand (Sales Order or Planned Independent Requirements) Dependent Requirements (required quantities to fulfill Upper Level Orders) − Inputs Stock in hand Planned or Production Orders Purchase Requisitions or Purchase Orders (for Externally Procured Materials)
  • 122.
    © 2020 byRicardo NayaSapyst.com 5. MRP Overview (2) • MRP proposals will be later converted: − Planned Orders => Production Orders (Internally Procured Materials) − Purchase Requisitions => Purchase Orders (Externally Procured Materials) • MPS (Master Production Schedule) runs MRP only to the next level − It is used to Plan at the first level and adjust before exploding down requirements to lower levels • Simulation Mode allows to run MRP and check result before saving it
  • 123.
    © 2020 byRicardo NayaSapyst.com Planned Order 5. MRP Overview (3) Downward Requirements Explosion BOM level Time Delivery Time Sales Order Planned Order Planned Order Purchase Requisition Purchase Requisition Finished Good Semi1 Semi2 Raw1 Raw2 Delivery Time Dates calculated based in Delivery and Scheduling times
  • 124.
    © 2020 byRicardo NayaSapyst.com 5. MRP Overview (4) Net Requirement calculation and Proposals in each BOM level Net Requirements Calculation Lot Size Calculation Procurement Type Scheduling Requirement Explosion to Lower levels + Stock + Planned Orders + Prod. Orders + Purch. Req. + Purch. Orders -Sales Orders -- Independent Req. -- Dependent Req. -= Net Requirements o Exact o Fixed o Minimum o Autom. Calculated o… Internal External… Taking into account Lead times it calculates Input/Output date Planned Orders: Dependent Req Prod. Orders: Reservations
  • 125.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. Procurement Types 3. MRP Types 4. Reorder Point 5. MRP Overview 6. Main Screens – Fields
  • 126.
    © 2020 byRicardo NayaSapyst.com 6. Main Screens - Fields MRP Parameters -Processing Key: Net change or Regenerative -- Create Pur.Req: Create directly Pur.Req or Planned Orders -- Delivery Schedules: Only for Open Purchase Orders -- Create MRP list: Save snapshot of status after MRP -- Planning mode: Reexplode BOM or adapt changes -- Scheduling: Use times in Routings or Material Master ones Process control parameters
  • 127.
    SAP PP (PRODUCTION PLANNING) ©2020 by Ricardo Naya Sapyst.com AFS Apparel and Footwear
  • 128.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. SAP AFS Overview 3. Material Master 4. Bills of Materials 5. Routings 6. Planned Independent Requirements 7. Materials Requirements Planning 8. Planned Orders & Production Orders
  • 129.
    © 2020 byRicardo NayaSapyst.com 1. Goals of this Session • Introduce the Industry Solution AFS • See main AFS special functionality in the Production Planning module
  • 130.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. SAP AFS Overview 3. Material Master 4. Bills of Materials 5. Routings 6. Planned Independent Requirements 7. Materials Requirements Planning 8. Planned Orders & Production Orders
  • 131.
    © 2020 byRicardo NayaSapyst.com 2. SAP AFS Overview (1) • SAP AFS: Special functionality for covering special requirements of Apparel and Footwear Industry • Main features => For each Material it is possible to define: − Different SKUs – Master Grid Used for dealing with different sizes, colours, styles It would be possible to explode requirements (presizing) based in Distribution Profiles − Different Categories Used for dealing with different customer segments, quality levels or country of origin − Different Seasons Different prices or processes might be required depending in the Material Season
  • 132.
    © 2020 byRicardo NayaSapyst.com 2. SAP AFS Overview (2) • BOMs take into account grid data and can activate/deactivate components based in dimensions • AFS Special BOMs Types: Assortments and Pre-packs • Possibility of multiple Routings based on different categories • MRP exploded from Material to its SKUs • Production Orders − Production Order Bundles for keep maintenance of colour shades − Markers for indicating optimal way of cutting − Combined Production Orders
  • 133.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. SAP AFS Overview 3. Material Master 4. Bills of Materials 5. Routings 6. Planned Independent Requirements 7. Materials Requirements Planning 8. Planned Orders & Production Orders
  • 134.
    © 2020 byRicardo NayaSapyst.com 3. Material Master (1) ➢ It Reduces considerably the number of Materials to manage MASTER GRID – SKUs (size, colour, style, …) ➢ It allows planning and operate at Material Level and then disaggregate (Presizing & Distribution Profiles) Trouser Size Colour Material: Characteristics: Grid:
  • 135.
    © 2020 byRicardo NayaSapyst.com 3. Material Master (2) ➢ It allows using same Material for very similar products (different quality level, country of origin, …) CATEGORY STRUCTURE & COVERAGE STRUCTURE ➢ It will be possible to define different Routings based in the Category ➢ Coverage Strategy => It defines method by which Requirement Categories match Stock Categories Requirement Category Customer A Customer C Customer B Stock Category Cust. Segment A Cust. Segment C Cust. Segment B Coverage Strategy Sales Orders PIRs Pur. Requisitions Planned Orders Purchase Orders Production Orders
  • 136.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. SAP AFS Overview 3. Material Master 4. Bills of Materials 5. Routings 6. Planned Independent Requirements 7. Materials Requirements Planning 8. Planned Orders & Production Orders
  • 137.
    © 2020 byRicardo NayaSapyst.com XS S M L XL BL X X X X X WH X X X X X 4. Bills of Materials ➢ Standard BOM TWO TYPES: ➢ Assortments => They can include Pre-packs They can contain Standard Materials but these ones cannot have AFS Materials below Jeans (AFS Material) Fabric (AFS Material) Lining (AFS Material) Buttons (Standard Material) XS S M L XL BL X X X X X WH X X X X X XS S M L XL X X X X X ➢ Dimension Dependent Consumption ➢ Dimension Dependent Components ➢ Dimension Dependent Dimensions It is also possible to activate/deactivate some components based in the Category
  • 138.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. SAP AFS Overview 3. Material Master 4. Bills of Materials 5. Routings 6. Planned Independent Requirements 7. Materials Requirements Planning 8. Planned Orders & Production Orders
  • 139.
    © 2020 byRicardo NayaSapyst.com 5. Routings DEPENDING ON CATEGORY IT IS POSSIBLE TO DEFINE DIFFERENT ROUTINGS Category Quality 1 Operation1 Operation2 Operation3 Operation4 Category Quality 2 Operation1 Operation2 Operation4
  • 140.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. SAP AFS Overview 3. Material Master 4. Bills of Materials 5. Routings 6. Planned Independent Requirements 7. Materials Requirements Planning 8. Planned Orders & Production Orders
  • 141.
    © 2020 byRicardo NayaSapyst.com 6. Planned Independent Requirements • Possible to enter different PIRs by Category • Rest of functionality equal to Standard
  • 142.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. SAP AFS Overview 3. Material Master 4. Bills of Materials 5. Routings 6. Planned Independent Requirements 7. Materials Requirements Planning 8. Planned Orders & Production Orders
  • 143.
    © 2020 byRicardo NayaSapyst.com 7. Materials Requirements Planning • Always at SKU Level − It takes into account Grid Values Categories (based in Coverage Strategy) • Some MRP Parameters defined at Material Level while others at SKU • It is possible to group all SKUs required quantities in same Planned Order or disaggregate them • At SKU level: − Safety Stock − Rounding Value − SKU Group − Discontinuation
  • 144.
    © 2020 byRicardo NayaSapyst.com Table of contents 1. Goals of this session 2. SAP AFS Overview 3. Material Master 4. Bills of Materials 5. Routings 6. Planned Independent Requirements 7. Materials Requirements Planning 8. Planned Orders & Production Orders
  • 145.
    © 2020 byRicardo NayaSapyst.com 8. Planned Orders & Production Orders • Only 1 Category per Order but Several Grid Values • Information taken from BOM & Routing • Bundle data may be entered for cutting • Combined orders allow to treat as one a group of existing Production Orders − Shared Material or work process (to optimize cutting capacities)
  • 146.
    SAP PP (PRODUCTION PLANNING) ©2020 by Ricardo Naya Sapyst.com Production Order Overview
  • 147.
    © 2020 byRicardo NayaSapyst.com Index 1. What is a Production Order? 2. Process Flow
  • 148.
    © 2020 byRicardo NayaSapyst.com 1. What is a Production Order? • Document that controls Manufacturing and its associated Costs • It indicates: − WHAT => Which Material is going to be manufactured (only 1 in each PO) − HOW MANY => How many units are going to be manufactured − WHEN => Date / Time in which the process is going to be initated and ended − WHERE => Work Centers that are going to be used − WITH WHAT => Needed Components for the manufacturing − COST => How much is it planed to cost and how much actually costed
  • 149.
    © 2020 byRicardo NayaSapyst.com Index 1. What is a Production Order? 2. Process Flow
  • 150.
    © 2020 byRicardo NayaSapyst.com 2. Process Flow Planned Order Order Creation Mat. Availability Check Release Printing Mat. Consumption Confirmation Goods Receipt Settlement & Closing MRP Manually P r o c e s s
  • 151.