SAGAR SINGHSAGAR SINGH
Mobile: +91 8476873864Mobile: +91 8476873864
Email:Email: sagarnegi8@gmail.com
Seeking Managerial assignments in Store Management / Materials Management
with a growth oriented organisation.
PROFESSIONAL SYNOPSIS
 A dynamic professional with over 4 years of experience in materials management,
Inventory control, logistics operations, stores/warehouse management.
 Presently working with Luxor Nano Technology Pvt.Ltd.
 Expertise in managing a diverse range of activities for Store operations including storage,
receipt & issue of items.
 Expertise at handling the inventory function, to curtail inventory-holding expenses and
adherence to the minimum inventory level to minimize wastage.
COMPANY PROFILE
Luxor Nano Technology Pvt Ltd is the group of Luxor Group, which is into Household Cleaner &
Protectors business based on Nano Technology. Luxor group is one of the largest Manufacturers of
writing instruments in India with brands like Luxor Parker, Pilot & Waterman.
CORE FUNCTION
Stores & Inventory Management:
• Over all control on Inward and outwards Materials.
• Maintain proper stock levels of materials (minimum, maximum, average, danger, re-
order level.)
• Unloading and Stacking of materials and spares at proper locations with material
Identification tags.
• Ensure store is prepared for Inventory audits.
• Documentation of inward materials like Material receipt notes for accepted materials.
• Documentation of Rejected materials and other outward (RGP/NRGP) items.
• Maintaining the stock of material without any variance by conducting stock verification
and documentation; Receipts, Issues, Accounting and monitoring the inventory of the
raw materials.
• Dispose off scrap and return the rejected material to suppliers & moving the raw material
from the place of storage to the place of manufacture.
• Implementing usage of best inventory procedures to improve storage conditions and
preparing all types of Store related documents such as GE, GRN, Rejection, INV.
• ABC analysis, Non-moving, slow moving fast moving, report to management.
• Proper Inspection and Stocking of Materials. Ensure proper stocking materials and spares
for safety and easy identification by providing location codes.
• Preparation of various consumption reports for cost analysis.
• Monthly Reconciliation of Major Materials and Verification of Physical stock with book
stock to avoid variations.
• Over all control on Materials issue and consumption.
• Preparing MIS on Inventory Movement.
• Reconciliation of materials on monthly basis with Sub contractor.
WAREHOUSE OPERATION.
• Responsible for all type store transaction (Inward,outward,issue etc) in Tally ERP.9 & ERP
Maintain Daily Stock Register, Goods Receipt Note, Inward Register, Requisition Book,
and Total Responsible of Goods Received from Parties, issue to Required Dpt.and All
related works of store Department.
• Receives and inspects all incoming materials and reconciles with purchase orders, and
distributes documentation.
• Planning and monitoring of daily activities of group and system development.
• Co-ordinate with departments for stock availability.
• Material timely issues.
• Inspection of all receipts from suppliers.
• Material Storage and preservation.
• Materials Handling.
• Maintenance of Stock Records.
• Follow-up for Materials from Purchase/Vendors.
• Maintains a safe and clean store.
• Maintain FIFO (all materials will be issued on First-in-First-Out basis.)
• Making MIS, Stock taking.
• Stock maintain on daily basis as well as physical.
• Daily reporting to top management about day wise activity.
• Submitting of all bills’ and tallied to the accountant.
• Prepare the Inventory Turnover ratio.
• Maintaining Perpetual Inventory.
• Understand all information in the daily reporting of store operations.
ABILITY TO
 Perform store in charge duties: maintain manual & computer records, perform physically
management and proper upkeep of stock materials stores and Have to spend long hours
standing and stocking shelves. Maintain cooperative working and respect for, a diverse
population.
ORGANISATIONAL EXPERIENCE
Organization : Windals Auto Pvt. Ltd.
Designation : Store & Dispatch Executive
Duration : Since Jan. 2012 to Feb.’2015
• Responsible for all type store transaction (Inward,outward,issue etc) in Tally ERP.9
• Maintain Daily Stock Register, Goods Receipt Note, Inward Register, Requisition Book,
and Total Responsible of Goods Received from Parties, issue to Required Dpt.and All
related works of store Department.
• Planning and monitoring of daily activities of group and system development.
• Co-ordinate with departments for stock availability.
• Preparation of cost books of stock inventory.
DUTIES AND TASKS FOR: “DISPATCHER”
• Schedule and dispatch workers, work crews, equipment, or service vehicles to appropriate
locations according to customer requests, specifications, or needs, using radios or
telephones. Preparation of cost books of stock inventory.
• Scheduling Work and Activities -- Scheduling events, programs, and activities, as well as
the work of others.
• Prepare daily work and run schedules.
• Record and maintain files and records of customer requests, work or services performed,
charges, expenses, inventory, and other dispatch information.
• Critical Thinking -- Using logic and reasoning to identify the strengths and weaknesses of
alternative solutions, conclusions or approaches to problems.
• Time Management -- Managing one's own time and the time of others.
ACADEMIC QUALIFICATIONS
 Graduation ( B.A.) From University of HNB Garhwal in 2012.
 Secondary ( XII th ) From Board of Uttrakhand in 2008.
 High School (X th ) From Board of Uttrakhand, in 2006.
 Computer basic knowledge & Internet surfing.
 Knowledge Tally.ERP 9.0 & ERP
 One month Training at Pune for ERP (KPIT)
Profile At A Glace
A store exe. responsible for materials as per required of production by material requisition as
per order of material under P.O. Arrange the good ware house, handling
equipment good staff, store keeper, care the proper and damaged/shortage material and
maintain the higher stock level/ maximum stock level/reorder stock level and maintain
the ware house good and clean, daily verifying incoming/outgoing and daily stock on hand,
follow the delivery schedule as per purchase order, arrange the inventory of stock every
three month. Use the material FIFO. Prepared the list of fast moving/slow moving and not
useable material. Maintain the proper document receipt/issue.
Leadership Criteria
• Able to work with minimum direction and supervision.
• Responsibility, innovation and team work.
PERSONAL DETAILS
Date of Birth : 08Th
August, 1991
Father’s Name : Late Sh. Laxman Singh
Present Address : Village- Bansoli, Post – Barmoli, Tehsil – Karanprayag, Via-
Dist – Chamoli (Uttrakhand)
Languages known : Hindi & English.
Hobbies : Listening to Music and watching TV,
Playing Cricket, Reading Magazine.
Strength : Punctual, patience, Hardworking,
Current Salary : 2.30 lakh/annum
I hereby declare that the above given information are true and correct to the best of my
knowledge.
Date :01-09-2016
Place :Haridwar (Sagar Singh)

SAGAR SINGH

  • 1.
    SAGAR SINGHSAGAR SINGH Mobile:+91 8476873864Mobile: +91 8476873864 Email:Email: sagarnegi8@gmail.com Seeking Managerial assignments in Store Management / Materials Management with a growth oriented organisation. PROFESSIONAL SYNOPSIS  A dynamic professional with over 4 years of experience in materials management, Inventory control, logistics operations, stores/warehouse management.  Presently working with Luxor Nano Technology Pvt.Ltd.  Expertise in managing a diverse range of activities for Store operations including storage, receipt & issue of items.  Expertise at handling the inventory function, to curtail inventory-holding expenses and adherence to the minimum inventory level to minimize wastage. COMPANY PROFILE Luxor Nano Technology Pvt Ltd is the group of Luxor Group, which is into Household Cleaner & Protectors business based on Nano Technology. Luxor group is one of the largest Manufacturers of writing instruments in India with brands like Luxor Parker, Pilot & Waterman. CORE FUNCTION Stores & Inventory Management: • Over all control on Inward and outwards Materials. • Maintain proper stock levels of materials (minimum, maximum, average, danger, re- order level.) • Unloading and Stacking of materials and spares at proper locations with material Identification tags. • Ensure store is prepared for Inventory audits. • Documentation of inward materials like Material receipt notes for accepted materials. • Documentation of Rejected materials and other outward (RGP/NRGP) items. • Maintaining the stock of material without any variance by conducting stock verification and documentation; Receipts, Issues, Accounting and monitoring the inventory of the raw materials. • Dispose off scrap and return the rejected material to suppliers & moving the raw material from the place of storage to the place of manufacture. • Implementing usage of best inventory procedures to improve storage conditions and preparing all types of Store related documents such as GE, GRN, Rejection, INV. • ABC analysis, Non-moving, slow moving fast moving, report to management. • Proper Inspection and Stocking of Materials. Ensure proper stocking materials and spares for safety and easy identification by providing location codes. • Preparation of various consumption reports for cost analysis. • Monthly Reconciliation of Major Materials and Verification of Physical stock with book stock to avoid variations. • Over all control on Materials issue and consumption. • Preparing MIS on Inventory Movement. • Reconciliation of materials on monthly basis with Sub contractor.
  • 2.
    WAREHOUSE OPERATION. • Responsiblefor all type store transaction (Inward,outward,issue etc) in Tally ERP.9 & ERP Maintain Daily Stock Register, Goods Receipt Note, Inward Register, Requisition Book, and Total Responsible of Goods Received from Parties, issue to Required Dpt.and All related works of store Department. • Receives and inspects all incoming materials and reconciles with purchase orders, and distributes documentation. • Planning and monitoring of daily activities of group and system development. • Co-ordinate with departments for stock availability. • Material timely issues. • Inspection of all receipts from suppliers. • Material Storage and preservation. • Materials Handling. • Maintenance of Stock Records. • Follow-up for Materials from Purchase/Vendors. • Maintains a safe and clean store. • Maintain FIFO (all materials will be issued on First-in-First-Out basis.) • Making MIS, Stock taking. • Stock maintain on daily basis as well as physical. • Daily reporting to top management about day wise activity. • Submitting of all bills’ and tallied to the accountant. • Prepare the Inventory Turnover ratio. • Maintaining Perpetual Inventory. • Understand all information in the daily reporting of store operations. ABILITY TO  Perform store in charge duties: maintain manual & computer records, perform physically management and proper upkeep of stock materials stores and Have to spend long hours standing and stocking shelves. Maintain cooperative working and respect for, a diverse population. ORGANISATIONAL EXPERIENCE Organization : Windals Auto Pvt. Ltd. Designation : Store & Dispatch Executive Duration : Since Jan. 2012 to Feb.’2015 • Responsible for all type store transaction (Inward,outward,issue etc) in Tally ERP.9 • Maintain Daily Stock Register, Goods Receipt Note, Inward Register, Requisition Book, and Total Responsible of Goods Received from Parties, issue to Required Dpt.and All related works of store Department. • Planning and monitoring of daily activities of group and system development. • Co-ordinate with departments for stock availability. • Preparation of cost books of stock inventory. DUTIES AND TASKS FOR: “DISPATCHER” • Schedule and dispatch workers, work crews, equipment, or service vehicles to appropriate locations according to customer requests, specifications, or needs, using radios or telephones. Preparation of cost books of stock inventory.
  • 3.
    • Scheduling Workand Activities -- Scheduling events, programs, and activities, as well as the work of others. • Prepare daily work and run schedules. • Record and maintain files and records of customer requests, work or services performed, charges, expenses, inventory, and other dispatch information. • Critical Thinking -- Using logic and reasoning to identify the strengths and weaknesses of alternative solutions, conclusions or approaches to problems. • Time Management -- Managing one's own time and the time of others. ACADEMIC QUALIFICATIONS  Graduation ( B.A.) From University of HNB Garhwal in 2012.  Secondary ( XII th ) From Board of Uttrakhand in 2008.  High School (X th ) From Board of Uttrakhand, in 2006.  Computer basic knowledge & Internet surfing.  Knowledge Tally.ERP 9.0 & ERP  One month Training at Pune for ERP (KPIT) Profile At A Glace A store exe. responsible for materials as per required of production by material requisition as per order of material under P.O. Arrange the good ware house, handling equipment good staff, store keeper, care the proper and damaged/shortage material and maintain the higher stock level/ maximum stock level/reorder stock level and maintain the ware house good and clean, daily verifying incoming/outgoing and daily stock on hand, follow the delivery schedule as per purchase order, arrange the inventory of stock every three month. Use the material FIFO. Prepared the list of fast moving/slow moving and not useable material. Maintain the proper document receipt/issue. Leadership Criteria • Able to work with minimum direction and supervision. • Responsibility, innovation and team work. PERSONAL DETAILS Date of Birth : 08Th August, 1991 Father’s Name : Late Sh. Laxman Singh Present Address : Village- Bansoli, Post – Barmoli, Tehsil – Karanprayag, Via- Dist – Chamoli (Uttrakhand) Languages known : Hindi & English. Hobbies : Listening to Music and watching TV, Playing Cricket, Reading Magazine. Strength : Punctual, patience, Hardworking, Current Salary : 2.30 lakh/annum I hereby declare that the above given information are true and correct to the best of my knowledge.
  • 4.