SlideShare a Scribd company logo
1 of 3
Download to read offline
SADAF HUSAIN
Postal Address
. Ruwais housing complex Flat #1590807 Ruwais Abu Dhabi UAE
. Email: tahir_02706@yahoo.com
Sadafhusain523r@yahoo.com
Mob: 00971567164552 Resident:00923462146660
OBJECTIVE:
Seeking a challenging & dynamic role to contribute to the successful achievement and completion of
all tasks and objectives.
Experience
Fauji Fertilizer Bin Qasim Limited, Karachi Pakistan
(Jan 2006 to Feb 2012)
Fujairah Asia power company F2 O&M (UAE)
(Feb 2012 to Aug 2013)
Takreer oil refinery (Adnoc) Ruwais UAE
(Sep 2013 to date)
Gas Turbine
 Complete over hauling(GE MS 5001)
 First stage nozzle Replacement
 Second stage bucket replacement
 Fuel nozzle ,Rotor and bearing replacement
 Generator rotor removal &installation
Centrifugal Compressors
 Centrifugal compressor preventive maintenance, complete overhauling.
 (Elliot ebara, Dresser rand, cooper bessemer,nouvo pig-none )
 Installation of dry gas seal ,oil floating seal .
 Diaphragm & centring and leveling.
 Replacement of bearing
Commissioning
I have been commissioned the takreer oil refinery (Adnoc) I have involved all the
commissioning Activity
 Modification in the slurry pumps
 Plug valve failure problem at RFCC Plant
 Main Air blower tripping issue
 Power expander start up
 Catalyst cooler pump failure problem
 Pumps mechanical seal failure
 Initiate the punch point
 Make the report for the effected equipment
Centrifugal pumps
 Centrifugal pumps preventive maintenance and complete overhauling single stage and multi stage.( Elliot
ebara ,flow serve,gould, KSB,sundyne pump)
 Installation of mechanical seal.(single and double arrangement )
 Trouble shooting of seal failure issues
Positive Displacement compressor
 Over hauling of different kind of compressor.
 Reciprocating compressor ,change the piston & rider ring ,replacement of seal assembly(Nuovo
pignone,mitsui compressor).
 over hauling of rotory compreesor (howden compressor)
Steam Turbine
 Overhauling & Preventive maintenance of steam turbines by( Dresser Rand, Terry, Elliot, Coopus).
 Replacement and inspection of bearings/pads
 Replacement and inspection of rotor, diaphragm & nozzle replacement
Positive Displacement pumps
 Troubleshooting, Preventive maintenance & Overhauling of P.D pumps)
 Worked on Rotary and reciprocating pumps
Power Transmission Machines
 Over hauled the different kind of gearboxes.(Lufkin,amarillo ,ferral, maag)
 Overhauling fluid coupling.
Desalination plant
 Complete inspection of desalination plant
 Preventive maintenance of single and multi effect desalination
 Passivation of cells
 Spray nozzle inspection
Valve & heat exchanger
 Maintenance on different valves gate, glob, plug &MOV valves .lapping and gland packing replacement
 Maintenance of different type of heat exchanger ,hydro test, bundle removal ,tube inspection
Other Experience
 Preventive/Corrective maintenance of equipment as per schedule
 Segregate the job and perform safely
 Diagnose the rout cause and modification as per requirement
 Removal and installation of different seal (mechanical seal oil flouting seal )
 Awareness of different alignment (revere alignment,rim&face,laser alignment).
Training and Skill Improvement
 Maximo
 Fire fighting
 Wet gas compressor
 Man air blower
 Compressor
 Hydraulic governor
 Gas turbine
Safety
 I have attended various QHSE training courses at plant site. Due to this contributing factor, I have vast
exposure to Personal Protective Equipment along with additional accessories e.g. Gas Masks, SCBA &
fire extinguishers.
QUALIFICATION:
 D.A.E (Mechanical)
 P.B.T.E, Lahore 2005
 Matriculation
 B.I.S.E 2002
PERSONAL INFORMATION:
 Father’s Name Talib Husain
 Date of Birth 07-03-1986
 Passport # LS 6890872
 Marital Status married
 N .I.C # 35302-3144087-5

More Related Content

What's hot

IRJET- Structural Analysis of Wobble Plate Engine Configuration
IRJET- Structural Analysis of Wobble Plate Engine ConfigurationIRJET- Structural Analysis of Wobble Plate Engine Configuration
IRJET- Structural Analysis of Wobble Plate Engine ConfigurationIRJET Journal
 
Renold Products and Services
Renold Products and ServicesRenold Products and Services
Renold Products and ServicesMichael Allen
 
Ppt on hydra assembly by pushpendra bansi
Ppt on hydra assembly by pushpendra bansiPpt on hydra assembly by pushpendra bansi
Ppt on hydra assembly by pushpendra bansiPushpendra Bansi
 
ET 2004 seminar presentation front loading
ET 2004 seminar presentation front loadingET 2004 seminar presentation front loading
ET 2004 seminar presentation front loadingJosep Barceló Ungé
 
CTS Company Presentation 1016
CTS Company Presentation 1016CTS Company Presentation 1016
CTS Company Presentation 1016Oscar Velazquez
 
Shaft mounted gearbox from Kavitsu
Shaft mounted gearbox from KavitsuShaft mounted gearbox from Kavitsu
Shaft mounted gearbox from KavitsuKaustubh Phadtare
 
100 tpd active lime production line(rotary kiln)
100 tpd active lime production line(rotary kiln)100 tpd active lime production line(rotary kiln)
100 tpd active lime production line(rotary kiln)Evita Lee
 
Vacumme pump-rotary
Vacumme pump-rotaryVacumme pump-rotary
Vacumme pump-rotaryacmasindia
 
Effective decisions for the complicated well market on the basis of submersib...
Effective decisions for the complicated well market on the basis of submersib...Effective decisions for the complicated well market on the basis of submersib...
Effective decisions for the complicated well market on the basis of submersib...Dmitry Kuraev
 
CASING_SOLUTIONS_OGBAINBIRI_FIELD_
CASING_SOLUTIONS_OGBAINBIRI_FIELD_CASING_SOLUTIONS_OGBAINBIRI_FIELD_
CASING_SOLUTIONS_OGBAINBIRI_FIELD_Victor Momoh
 
Transformer manufacturing3 1
Transformer manufacturing3 1Transformer manufacturing3 1
Transformer manufacturing3 1nil7769984348
 

What's hot (14)

MTI Equipment
MTI EquipmentMTI Equipment
MTI Equipment
 
L1.09.09.02
L1.09.09.02L1.09.09.02
L1.09.09.02
 
L1.09.09.01
L1.09.09.01L1.09.09.01
L1.09.09.01
 
IRJET- Structural Analysis of Wobble Plate Engine Configuration
IRJET- Structural Analysis of Wobble Plate Engine ConfigurationIRJET- Structural Analysis of Wobble Plate Engine Configuration
IRJET- Structural Analysis of Wobble Plate Engine Configuration
 
Renold Products and Services
Renold Products and ServicesRenold Products and Services
Renold Products and Services
 
Ppt on hydra assembly by pushpendra bansi
Ppt on hydra assembly by pushpendra bansiPpt on hydra assembly by pushpendra bansi
Ppt on hydra assembly by pushpendra bansi
 
ET 2004 seminar presentation front loading
ET 2004 seminar presentation front loadingET 2004 seminar presentation front loading
ET 2004 seminar presentation front loading
 
CTS Company Presentation 1016
CTS Company Presentation 1016CTS Company Presentation 1016
CTS Company Presentation 1016
 
Shaft mounted gearbox from Kavitsu
Shaft mounted gearbox from KavitsuShaft mounted gearbox from Kavitsu
Shaft mounted gearbox from Kavitsu
 
100 tpd active lime production line(rotary kiln)
100 tpd active lime production line(rotary kiln)100 tpd active lime production line(rotary kiln)
100 tpd active lime production line(rotary kiln)
 
Vacumme pump-rotary
Vacumme pump-rotaryVacumme pump-rotary
Vacumme pump-rotary
 
Effective decisions for the complicated well market on the basis of submersib...
Effective decisions for the complicated well market on the basis of submersib...Effective decisions for the complicated well market on the basis of submersib...
Effective decisions for the complicated well market on the basis of submersib...
 
CASING_SOLUTIONS_OGBAINBIRI_FIELD_
CASING_SOLUTIONS_OGBAINBIRI_FIELD_CASING_SOLUTIONS_OGBAINBIRI_FIELD_
CASING_SOLUTIONS_OGBAINBIRI_FIELD_
 
Transformer manufacturing3 1
Transformer manufacturing3 1Transformer manufacturing3 1
Transformer manufacturing3 1
 

Similar to sadaf husain cv (20)

Resume technician
Resume technicianResume technician
Resume technician
 
Mechanical resume (1)
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)
 
NANIK COMMISSIONING
NANIK COMMISSIONINGNANIK COMMISSIONING
NANIK COMMISSIONING
 
Cruz Mech Tech
Cruz Mech TechCruz Mech Tech
Cruz Mech Tech
 
Resume- N1 M Mokal New
Resume- N1 M Mokal NewResume- N1 M Mokal New
Resume- N1 M Mokal New
 
SENTHIL.BIODATA.1 - Copy
SENTHIL.BIODATA.1 - CopySENTHIL.BIODATA.1 - Copy
SENTHIL.BIODATA.1 - Copy
 
my_resume-1
my_resume-1my_resume-1
my_resume-1
 
CV LIJO updated
CV LIJO updatedCV LIJO updated
CV LIJO updated
 
krish cv 1
krish cv 1krish cv 1
krish cv 1
 
AJI CV
AJI CVAJI CV
AJI CV
 
Chidambaram_cv
Chidambaram_cvChidambaram_cv
Chidambaram_cv
 
Asirvatharavi Mech
Asirvatharavi MechAsirvatharavi Mech
Asirvatharavi Mech
 
C V of Roopesh
C V of RoopeshC V of Roopesh
C V of Roopesh
 
jerin resume
jerin resumejerin resume
jerin resume
 
Document1
Document1Document1
Document1
 
Sudhakar Debarki
Sudhakar DebarkiSudhakar Debarki
Sudhakar Debarki
 
CV JUNE 2015
CV JUNE 2015CV JUNE 2015
CV JUNE 2015
 
Taj Resume
Taj ResumeTaj Resume
Taj Resume
 
Chidambaram_cv sr,mech
Chidambaram_cv sr,mechChidambaram_cv sr,mech
Chidambaram_cv sr,mech
 
Resume Hanif Shaikh Update (7)
Resume Hanif Shaikh Update (7)Resume Hanif Shaikh Update (7)
Resume Hanif Shaikh Update (7)
 

sadaf husain cv

  • 1. SADAF HUSAIN Postal Address . Ruwais housing complex Flat #1590807 Ruwais Abu Dhabi UAE . Email: tahir_02706@yahoo.com Sadafhusain523r@yahoo.com Mob: 00971567164552 Resident:00923462146660 OBJECTIVE: Seeking a challenging & dynamic role to contribute to the successful achievement and completion of all tasks and objectives. Experience Fauji Fertilizer Bin Qasim Limited, Karachi Pakistan (Jan 2006 to Feb 2012) Fujairah Asia power company F2 O&M (UAE) (Feb 2012 to Aug 2013) Takreer oil refinery (Adnoc) Ruwais UAE (Sep 2013 to date) Gas Turbine  Complete over hauling(GE MS 5001)  First stage nozzle Replacement  Second stage bucket replacement  Fuel nozzle ,Rotor and bearing replacement  Generator rotor removal &installation Centrifugal Compressors  Centrifugal compressor preventive maintenance, complete overhauling.  (Elliot ebara, Dresser rand, cooper bessemer,nouvo pig-none )  Installation of dry gas seal ,oil floating seal .  Diaphragm & centring and leveling.  Replacement of bearing Commissioning I have been commissioned the takreer oil refinery (Adnoc) I have involved all the commissioning Activity  Modification in the slurry pumps  Plug valve failure problem at RFCC Plant  Main Air blower tripping issue  Power expander start up  Catalyst cooler pump failure problem  Pumps mechanical seal failure  Initiate the punch point  Make the report for the effected equipment
  • 2. Centrifugal pumps  Centrifugal pumps preventive maintenance and complete overhauling single stage and multi stage.( Elliot ebara ,flow serve,gould, KSB,sundyne pump)  Installation of mechanical seal.(single and double arrangement )  Trouble shooting of seal failure issues Positive Displacement compressor  Over hauling of different kind of compressor.  Reciprocating compressor ,change the piston & rider ring ,replacement of seal assembly(Nuovo pignone,mitsui compressor).  over hauling of rotory compreesor (howden compressor) Steam Turbine  Overhauling & Preventive maintenance of steam turbines by( Dresser Rand, Terry, Elliot, Coopus).  Replacement and inspection of bearings/pads  Replacement and inspection of rotor, diaphragm & nozzle replacement Positive Displacement pumps  Troubleshooting, Preventive maintenance & Overhauling of P.D pumps)  Worked on Rotary and reciprocating pumps Power Transmission Machines  Over hauled the different kind of gearboxes.(Lufkin,amarillo ,ferral, maag)  Overhauling fluid coupling. Desalination plant  Complete inspection of desalination plant  Preventive maintenance of single and multi effect desalination  Passivation of cells  Spray nozzle inspection Valve & heat exchanger  Maintenance on different valves gate, glob, plug &MOV valves .lapping and gland packing replacement  Maintenance of different type of heat exchanger ,hydro test, bundle removal ,tube inspection Other Experience  Preventive/Corrective maintenance of equipment as per schedule  Segregate the job and perform safely  Diagnose the rout cause and modification as per requirement  Removal and installation of different seal (mechanical seal oil flouting seal )  Awareness of different alignment (revere alignment,rim&face,laser alignment).
  • 3. Training and Skill Improvement  Maximo  Fire fighting  Wet gas compressor  Man air blower  Compressor  Hydraulic governor  Gas turbine Safety  I have attended various QHSE training courses at plant site. Due to this contributing factor, I have vast exposure to Personal Protective Equipment along with additional accessories e.g. Gas Masks, SCBA & fire extinguishers. QUALIFICATION:  D.A.E (Mechanical)  P.B.T.E, Lahore 2005  Matriculation  B.I.S.E 2002 PERSONAL INFORMATION:  Father’s Name Talib Husain  Date of Birth 07-03-1986  Passport # LS 6890872  Marital Status married  N .I.C # 35302-3144087-5