1. INDUSTRIAL TRAINING
ON
POWER ENGINEER’S PVT. LTD.
W-24/25,MIDC, GOKUL
SHIRGOAN,KOLHAPUR
DEPARTMENT OF ELECTRICAL ENGINEERING
SHARAD INSTITUDE OF TECHNOLOGY COLLAGE OF ENGINEERING
PRESENTED BY:-
SHINDE NILESH
CLASS-BE EE
ROLL NO.67
2. Content’s
• Introduction
• Certification
• Layout
• Area of company
• Technical manpower , employees in that organization
• Important parts
• Service provide to consumer
• Testing
• Learning after training
• Conclusion
14 August 2017 SITCOE,YADRAV 2
3. Introduction
• Established in 1977 by a great visionary late Shree. M. D.
Kane,
• It is a small scale industry.
• Production -
• Power & Distribution Transformers up to 5 MVA, 33kV ,
Hermetically Sealed Transformer, Furnace
Transformers, upto10 MVA, 33 kV Class, Wind mill
Transformers, Booster Transformers, Rectifier Transformers
• Maintenance of transformer
14 August 2017 SITCOE,YADRAV 3
6. Area of company
• Total area of that company is 15,000 sq.ft
14 August 2017 SITCOE,YADRAV 6
7. Technical manpower, employees in that
organization
Sr.No Posts No. of employees
1 Electrical
engineer’s
2
2 Technical 12
3 Officer’s 3
4 Store keeper 2
5 Helper’s 4
6 Accountant 1
Total Employees 24
14 August 2017 SITCOE,YADRAV 7
8. Raw Materials
14 August 2017 SITCOE,YADRAV 8
Transformer Spacers Insulators &Terminals
Laminated Core
Impregnated paper
All raw material import from Gujarat
13. 14 August 2017 SITCOE,YADRAV 13
• Oil also include in the insulating medium its
viscosity is requir always less in transformer
synthetic and mineral oil is used
14. 14 August 2017 SITCOE,YADRAV 14
De-moisture
In that industry there are
two ovens
1.fully automatic-90c
2.semi automatic-60c
15. Service of company
• Manufacturing different type of transformers
• Maintenance of transformers
• Oil filtering
14 August 2017 SITCOE,YADRAV 15
16. • Maintenance of transformer(repair)
14 August 2017 SITCOE,YADRAV 16
Faulty Transformer
Check continuity of winding
Removing faulty winding
17. • Oil Filtering-
14 August 2017 SITCOE,YADRAV 17
In warranty period of
transformer
maintenance free of
cost
Check the condition
of the consumer
transformer after 2
months
18. • Testing of oil-
14 August 2017 SITCOE,YADRAV 18
Oil Tester for Transformer Oil Breakdown Voltage Testing
Remove oil
Oil before and after filtering
19. Fabrication
14 August 2017 SITCOE,YADRAV 19
It is a lesser cutter it is used for the
cutting a cast iron sheet in
different shape
In that section welding the
different parts of
transformer like air fins,
conservator, valves etc.
21. Testing
14 August 2017 SITCOE,YADRAV 21
• Measurement of insulation resistance of H.V.&
L.V. windings .
• Voltage ratio measurement & check of polarities.
(Phase relationship/vector group).
• Winding resistance measurement .
• Magnetic balance test.
• No load loss & No load current measurement .
• Short circuit impedance & load loss measurement
• Di-electric value of oil .
23. Learning after training
• How to make main connection of transformer
winding
• How to find the fault in transformer ,how to
overcome
• How to filtering the transformer oil
• How to make H.V. & L.V. winding
14 August 2017 SITCOE,YADRAV 23
24. Conclusion
• We done this 15 days training we learn the how to
core assemble, how to turn the winding, when faults
come in transformer how to solve this fault.
• How to make the connection of winding, filtering
process of transformer oil and testing of transformer
14 August 2017 SITCOE,YADRAV 24