SlideShare a Scribd company logo
Instrumentation Engineer with 9 years 6 Months’ experience 
as Maintenance, Project & Design Engineer 
Personal Data 
Name : Sachin Kumar 
Permanent Address : Sachin Kumar S/O Jai Singh, Vill:- Fazalpur Sundar Nagar 
Dist :- Baghpat Uttar Pradesh Pin:-250345 
Mobile : +971528172950 
E-mail private : Sachin1509@gmail.com 
Date of Birth : 15.09.1982 
Civil Status : Married 
Languages : English (Fluent both spoken and written), Hindi 
Passport : F1620095 valid till 2015. 
Education 
Year Degree/ Diploma/ Examination Subject Institute/ University 
2005 Bachelor of Engineering Electronics SVNIT Surat Gujarat 
Work Experience 
Total Experience : 9 Years & 6 Months 
Role : Instrument Engineer 
Engineering: 
1. Detailed Engineering activities of preparation of data sheets, Instrument Index, orifice sizing 
calculations, Control Valve sizing and selection, hook up drawings, layout drawings, MTO 
preparation. 
2. Sizing standards known ISA 75.01, API 520 Part 1, ISO 5167 
Projects: 
1. Inspection/ Witnessing/ Reviewing of Calibration, Installation, Pre commissioning and 
commissioning activities in Unit: FCCU, CCR/NHT, ISOM/HRU, Blending Station. 
2. Design review, installation, commissioning activities. 
3. Control system DCS/ESD/F&G (Pre Commissining and Commissioning activities). 
4. Cost estimation, manhour / manpower planning, progress/ schedule monitoring. 
Units Commissioned as Instrument Engineer: 
1. CCR/NHT 
2. ISOM/HRU. 
3. FCC. 
Systems: 
1. Yokogawa Centum VP/ Prosafe RS. 
2. ABB AC 800 
3. Intools 
Field instruments Handled: 
1. Control Valves, On/Off valves (Make- Fisher, Tyco, Dembla, Masoneilan, Metso). 
2. Level transmitters like - DP type, Displacer type, Remote seal type, Radar type level sensor, 
Nucleonic. 
3. Flow meters like- Mass Flow meter, Magnetic Flow meters, Turbine flow meters, Rotameters, 
Vortex flow meter, ultrasonic (Make- ABB, Rosemount, Micro motion, Panametrics)
Training Attended: 
1. Yokogawa Centum VP and Prosafe-RS. 
2. Machine Monitoring System. 
Software: 
1. Design Tool: SPI (Smart Plant Instrumentation), AutoCAD. 
2. ERP: SAP. 
3. Application: MS Excel, Outlook, Powerpoint, Word 
June 2014 till date 
Company : Target Engineering LLC 
Project : Engineering (PNT Project ADGAS) 
Location : ABU Dhabi, UAE 
Position : Engineer 
Role : Instrument Engineer (Design Engineer) 
TARGET Engineering is a leading Oil & Gas Contractor with single source inhouse specialities for 
Engineering, Procurement and Construction of Mechanical - Steel Structures & Piping, Electrical - Power, 
Instrumentation & Controls, Civil - Industrial and Building Works and Marine Structures in both onshore 
and offshore areas. 
Job Profile: (Engineering) 
1. Offer evaluation of various field instrument (Radar Level Transmitter, Temperature Transmitter, Orifice 
Plate, On/Off Valve etc) preparation of TBE, Discussion with vendor and finalize technical 
requirements. 
2. FDS review with Honeywell for CTS custody transfer metering skid 
3. Instrument index & loop drawing preparation & review 
4. Tender scope study preparation of technical query, site visit, attending technical clarifiaction meeting 
with client, preparation of MTO, vendor offer review for technical and commercial estimation of tender. 
5. Presently working on tender of M/s ADGAS, M/s TAKREER & Saudi Aramko for various system & 
field up-gradation work. 
6. Tender MTO includes of various control system (DCS system, Vibration monitoring system & Fire 
Alarm System). 
. 
May 2011 – May-2014 
Company : HMEL (HPCL – Mittal Energy Limited) 
Project : GGSRL Project 
Location : Bhatinda, Punjab, India 
Position : Assitant Manager 
Role : Instrument Engineer (Projects Department) 
HPCL-Mittal Energy Limited (HMEL) is a joint venture between Hindustan Petroleum Corporation Limited (HPCL) and 
Mittal Energy Investment Pte Ltd, Singapore - a Lakshmi N Mittal Group Company. Both the JV partners hold a stake 
of 49% each in the company, the rest 2% is held by financial institutions. HMEL is building a Grassroot oil refinery of 9 
MMTPA at Bathinda in Punjab, called Guru Gobind Singh Refinery Project. The project is expected to be completed 
in 2011.
Job Profile: (Construction, Commissioning & Projects) 
1. Commissioning of MS Block (CCR/NHT, ISOM & HRU, MS & HSD Blending) unit 
2. Responsible for System handover activities of FCCU Unit. 
3. Manhour/ Manpower monitoring, progress/ schedule monitoring and necessary expediting activities. 
4. Ensuring quality related activities from calibration activities to instrumentation related NDT activities. 
5. Review of Engineering and report of deficiencies. Implementation of necessary modifications at site. 
6. Performing engineering work related to the instrument design, procurement and construction aspects 
for modification projects of revenue nature & capital projects handled by the refinery. 
7. Studies and implements corrective measures and solutions to engineering problems. 
8. Attended FAT of Chemtrol Analyzer System for HSD Blending. 
9. Attended training at YIL, Bangalore on Centum VP. 
10. Handling Engineering, Procurement & Execution of various MOC (Management of Change) 
throughout the refinery in the running plant with full safety. 
11. Preparation of construction materials Basic Rate Difference for adjustment in R.A. Bills. 
12. To study B.O.Q and technical specifications for proper execution of contract specified items. 
13. Handling sub-contractors working on project, for proper execution of work so as to meet the deadline 
for on-time completion. Giving necessary Support and Training to sub-ordinates 
14. Identifying the necessity of extra and deviated items and accordingly working on projected cost of 
project. Preparation & verification of contractors R.A. Bill quantities as per mode of measurements 
15. Keeping track on material status and raising material indent as per contract specification for on time 
delivery of required material. 
16. Reconciliation of construction materials (Fittings, cables, glands, etc.) 
17. Preparation of Weekly & Monthly Progress Report (MIS Report). 
18. Ensuring receipt of right quality and quantity of material and testing of same as per standards. 
19. Monitoring safe working condition and safety activities on site. Capable of handling multiple 
construction sites 
Systems: YOKOGAWA Centum VP/ ProSafe RS 
May 2008 – May2011 
Company : Fluor Denial India Pvt Ltd 
Location : Gurgaon Haryana India 
Position : Engineer 
Role : Instrument Design Engineer 
Engineer (Instrumentation): Engineering Procurement & Construction (EPC) Div. Fluor Denial 
India Private LTD Gurgaon New Delhi 
1. Worked on deliverable of Instrument Index population of basic data & Index updates based on 
FDCNs. 
2. Preparation of PO Data Sheets for various instrument, involved in checking Model no. assigned 
to instrument with respect of process & piping requirement & corrective action taken if required. 
3. Studied Project Specification thoroughly, understanding various GOST standards to prepare 
Instrument Data Sheets. 
4. Involved in Preparing Various Instrument Data Sheet in Smart Plant Instrumentation like 
Pressure Instrument:- Gauge & Transmitter ,Temperature:-Gauge , Transmitter, well & Element, 
Level Instrument:- Transmitter (Guided Wave Radar & Cone) level Gauge, 
Flow instrument:- Orifice Plate, Transmitter & Restriction Orifice, Venturi Tube & Annnubar Meter. 
5. Preparation of Level Sketch, Control Valve, On-Off Valve Data Sheet.
6. Involve in EDEN Activity preparing data base of inline instrument from Vendor Cut-Sheet & 
Catalogue for piping model in Ultra-Edit Software. 
7. Sizing done of Instrument like Orifice Plate, Control Valve, Thermowell Wake Frequency 
Calculation. 
8. Technical bid evaluation done of various Instruments & prepare technical query. 
9. Piping ISOs Checking for Inline Instrument & Signoff. 
10. Preparation of JB loading, Main cable schedule & Instrument cable schedule. 
11. 6 Week Site Survey of Qatar Gas & Ras Gas refinery division at Ras Laffan City Doha 
Qatar. Survey including following agenda:- 
i) Safety training of Ras Gas & Qatar Gas. 
ii) Survey Instrument Technical Room (ITR) for space to installed new cabinets, console. 
Transit window & Cable laying under floor. 
iii) Survey of Field Junction boxes, Cable Trench, Instrument Air header & Area for 
installation of new instrument. 
iv) Preparation of survey report & mark-ups on as-built drawings. 
Oct’07 - May08 
Company : GE India Pvt Ltd 
Location : Bangalore, Karnataka India 
Position : Engineer 
Profile : Design & Engineering 
General Electrical (GE): in Bangalore Centre worked with a team Handling Reciprocating Compressor 
(RC), 
Worked on:- 
1. Involved in reviewing the design/engineering documents preparation of Specifications. 
2. Studying the Detail Engineering Customer’s specifications and diagrams. 
3. Involved in reviewing the design/engineering documents preparation of Specifications, BOM 
Activity. 
4. General Specification preparation for instrumentation considering NP (GE) Standard & customers 
specs requirement. 
5. Standardization Activity done for various instrument to improve the quality of work & reducing 
Man Hour for Projects. 
6. Preparation, Review & Modification of various document like, P&ID, Primary& Pneumatic hook-ups 
7. Electrical Hook-up, Electrical Plant Layout, Pneumatic Plant Layouts, Field Instrument List. 
8. Instrument selection for various service like (process gas, lube oil service, cooling water , steam) 
June 2005 – Oct 2007 
Company : Essar Oil Ltd 
Location : Jamnagar, Gujarat, India 
Position : Assistant Manager 
Profile : Project & Maintenance. 
ESSAR OIL LTD is a 14.0 MMTPA Refinery in Jamnagar, Gujarat a company of the ESSAR GROUP. 
ESSAR GROUP is a multinational conglomerate and a leading player in the sectors of Steel, Oil & Gas, 
Power, Communications, Shipping Ports & Logistics, Construction and Minerals. With operations in more 
than 20 countries across five continents, the group employs 60,000 people, with revenues of about USD 
15 billion.
Installation & Calibration 
1. Installation and calibration for: 
Control Valves Pressure Transmitters Thermocouples 
Pressure Gauge Temperature Gauge Pressure Safety Valve 
Pressure Switch Pressure Regulating Valve Other Instrument 
2. Evaluation of Instrument Data Sheets, Process Data Sheets, Adequacy Check Reports and Sizing 
Sheets. Preparing list of instrument, detailed instrument specific. 
4. Played a stellar role in identifying missing links and discrepancies between the various 
instrumentation documents: P&ID’s, Instrument Index, Alarm and Trip setting lists etc. 
5. Overseen Technical Bid Evaluation of vendor quotations. 
Site Management 
1. Coordinating with others for preparation of Receipt of Instruments at site for Erection, Loop 
checking, checking various Flame Detectors (UV, IR & Ionization Rod used in Heaters) 
2. Undertaking Maintenance of various instruments: Fisher Make Control Valve Shut of valve used in 
Heaters, Pressure TX, and Flow TX. 
3. Modification done in Installation some of instrument to get better efficiency in Hazardous Location 
4. Handled a team of GET, DET & skilled Man Power ( No.- 25) very efficiently & getting done all 
activity on time. 
Logic Interlock Checking & Implementation 
1. NP make Compressors one Stage & Two Stage 
2. Borsig Make Turbine running compressor 
3. York make Chiller Package Compressors 
4. LHT Heaters 
5. Plant ESD For CCR/NHT AREA 
6. Sequence Checking for NAT AREA 
Instrument Handled (Installation, Testing, Commissioning and Maintenance): 
ESD: ABB DCS: ABB Analyzers: Chemptrols 
Governors: Woodward Level: Nucleonic 
Reference: 
Arjun Singh Shekhawat | Manager-Projects | HPCL-Mittal Energy Ltd | 
Village Phullokhari, Taluka:- Talwandi Saboo, Bhatinda - 151301| Punjab | INDIA | 
( +91 1655-272923 (Office) |M +91 9988881660 | 
arjun.shekhawat@hmel.in|" www.hmel.in | 
Digvijay Dhama | Design Engineer | KENTZ Engineering & Construction 
Dubai UAE 
M| +971562630855
Installation & Calibration 
1. Installation and calibration for: 
Control Valves Pressure Transmitters Thermocouples 
Pressure Gauge Temperature Gauge Pressure Safety Valve 
Pressure Switch Pressure Regulating Valve Other Instrument 
2. Evaluation of Instrument Data Sheets, Process Data Sheets, Adequacy Check Reports and Sizing 
Sheets. Preparing list of instrument, detailed instrument specific. 
4. Played a stellar role in identifying missing links and discrepancies between the various 
instrumentation documents: P&ID’s, Instrument Index, Alarm and Trip setting lists etc. 
5. Overseen Technical Bid Evaluation of vendor quotations. 
Site Management 
1. Coordinating with others for preparation of Receipt of Instruments at site for Erection, Loop 
checking, checking various Flame Detectors (UV, IR & Ionization Rod used in Heaters) 
2. Undertaking Maintenance of various instruments: Fisher Make Control Valve Shut of valve used in 
Heaters, Pressure TX, and Flow TX. 
3. Modification done in Installation some of instrument to get better efficiency in Hazardous Location 
4. Handled a team of GET, DET & skilled Man Power ( No.- 25) very efficiently & getting done all 
activity on time. 
Logic Interlock Checking & Implementation 
1. NP make Compressors one Stage & Two Stage 
2. Borsig Make Turbine running compressor 
3. York make Chiller Package Compressors 
4. LHT Heaters 
5. Plant ESD For CCR/NHT AREA 
6. Sequence Checking for NAT AREA 
Instrument Handled (Installation, Testing, Commissioning and Maintenance): 
ESD: ABB DCS: ABB Analyzers: Chemptrols 
Governors: Woodward Level: Nucleonic 
Reference: 
Arjun Singh Shekhawat | Manager-Projects | HPCL-Mittal Energy Ltd | 
Village Phullokhari, Taluka:- Talwandi Saboo, Bhatinda - 151301| Punjab | INDIA | 
( +91 1655-272923 (Office) |M +91 9988881660 | 
arjun.shekhawat@hmel.in|" www.hmel.in | 
Digvijay Dhama | Design Engineer | KENTZ Engineering & Construction 
Dubai UAE 
M| +971562630855

More Related Content

What's hot

Resume-Manish Gupta (Static Equipment)
Resume-Manish Gupta (Static Equipment)Resume-Manish Gupta (Static Equipment)
Resume-Manish Gupta (Static Equipment)
Manish Gupta
 
CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)
Puneet Dogra
 
VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7
Vipul Vichare
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
VEERAKAMU C
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
Ponraj Ramaswamy
 
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale
 
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
Madhava Rao V
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Nirav Mistry
 
KARTHICK-DESIGN RESUME
KARTHICK-DESIGN RESUMEKARTHICK-DESIGN RESUME
KARTHICK-DESIGN RESUME
karthikeyan radhakrishnan
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Nirav Mistry
 
ANILCV R
ANILCV RANILCV R
ANILCV R
Anil Dange
 
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experienceResume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
Sachin Patil
 
RESUME - AMB- N
RESUME - AMB- NRESUME - AMB- N
RESUME - AMB- N
Ananda Bandyopadhyay
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
arie hidayati jumari marjono
 
CV_S.Athan_2017_01
CV_S.Athan_2017_01CV_S.Athan_2017_01
CV_S.Athan_2017_01
Steve Athan
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineer
Karan Vinayak
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
Padmanabh Dhobale
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
Popovici Adrian
 

What's hot (20)

Resume-Manish Gupta (Static Equipment)
Resume-Manish Gupta (Static Equipment)Resume-Manish Gupta (Static Equipment)
Resume-Manish Gupta (Static Equipment)
 
CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)
 
VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
 
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
KARTHICK-DESIGN RESUME
KARTHICK-DESIGN RESUMEKARTHICK-DESIGN RESUME
KARTHICK-DESIGN RESUME
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
ANILCV R
ANILCV RANILCV R
ANILCV R
 
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experienceResume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
 
RESUME - AMB- N
RESUME - AMB- NRESUME - AMB- N
RESUME - AMB- N
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
CV_S.Athan_2017_01
CV_S.Athan_2017_01CV_S.Athan_2017_01
CV_S.Athan_2017_01
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineer
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
 

Viewers also liked

Raval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_barodaRaval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_baroda
Rajesh Raval
 
Thermowell installation
Thermowell installationThermowell installation
Thermowell installation
Accurate Pool & Spa Services, llc
 
Thermowells & Accessories
Thermowells & AccessoriesThermowells & Accessories
Thermowells & Accessories
Tempsens Instruments
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control ppt
sudhir pawar
 
Piping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedurePiping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning Procedure
Gerard B. Hawkins
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guide
ram111eg
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
Laxmikant Deshmukh
 

Viewers also liked (8)

Raval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_barodaRaval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_baroda
 
Thermowell installation
Thermowell installationThermowell installation
Thermowell installation
 
Thermowell installation
Thermowell installationThermowell installation
Thermowell installation
 
Thermowells & Accessories
Thermowells & AccessoriesThermowells & Accessories
Thermowells & Accessories
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control ppt
 
Piping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedurePiping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning Procedure
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guide
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 

Similar to Sachin_Kumar_CV_Instrument

Instrumentation & Control Engineer
Instrumentation &  Control EngineerInstrumentation &  Control Engineer
Instrumentation & Control Engineer
Kailas Patil
 
Ramanuja Sharma_CV
Ramanuja Sharma_CVRamanuja Sharma_CV
Ramanuja Sharma_CV
Ramanuja Sharma MK
 
Raju Thamke_CV
Raju Thamke_CVRaju Thamke_CV
Raju Thamke_CV
Raju Thamke
 
Instrument_Engg_Sharat
Instrument_Engg_SharatInstrument_Engg_Sharat
Instrument_Engg_Sharat
SHARAT CHANDRA PATHAK
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
Poornima Tandur
 
Harshit Resume-Instrumentation
Harshit Resume-InstrumentationHarshit Resume-Instrumentation
Harshit Resume-Instrumentation
Mamtora Harshit
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
Dileep Kumar
 
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer Resume
Suresh Selvaraju
 
SUSHIL (2)
SUSHIL (2)SUSHIL (2)
SUSHIL (2)
sushil khanduri
 
AK+CV
AK+CVAK+CV
Sougata Chatterjee_Resume
Sougata Chatterjee_ResumeSougata Chatterjee_Resume
Sougata Chatterjee_Resume
Sougata Chatterjee
 
PankajKPrajapati
PankajKPrajapatiPankajKPrajapati
PankajKPrajapati
Pankaj Kumar Prajapati
 
SUYOG_2015
SUYOG_2015SUYOG_2015
SUYOG_2015
Suyog Kajavadekar
 
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Aniket Dalvi
 
Resume of Sukanya Sarkar-WT new
Resume of Sukanya Sarkar-WT newResume of Sukanya Sarkar-WT new
Resume of Sukanya Sarkar-WT new
sukanya sarkar
 
Ajit Singh_CV
Ajit Singh_CVAjit Singh_CV
Ajit Singh_CV
Ajit Singh
 
Pankaj_Prajapati
Pankaj_PrajapatiPankaj_Prajapati
Pankaj_Prajapati
Pankaj Kumar Prajapati
 
Resume_Sanket Dalvi
Resume_Sanket DalviResume_Sanket Dalvi
Resume_Sanket Dalvi
sanket dalvi
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
VEMPARALA SRINIVASA RAO
 
Janakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman.M _Process Designer & SPP&ID Co-ordinatorJanakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman muthu
 

Similar to Sachin_Kumar_CV_Instrument (20)

Instrumentation & Control Engineer
Instrumentation &  Control EngineerInstrumentation &  Control Engineer
Instrumentation & Control Engineer
 
Ramanuja Sharma_CV
Ramanuja Sharma_CVRamanuja Sharma_CV
Ramanuja Sharma_CV
 
Raju Thamke_CV
Raju Thamke_CVRaju Thamke_CV
Raju Thamke_CV
 
Instrument_Engg_Sharat
Instrument_Engg_SharatInstrument_Engg_Sharat
Instrument_Engg_Sharat
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
 
Harshit Resume-Instrumentation
Harshit Resume-InstrumentationHarshit Resume-Instrumentation
Harshit Resume-Instrumentation
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer Resume
 
SUSHIL (2)
SUSHIL (2)SUSHIL (2)
SUSHIL (2)
 
AK+CV
AK+CVAK+CV
AK+CV
 
Sougata Chatterjee_Resume
Sougata Chatterjee_ResumeSougata Chatterjee_Resume
Sougata Chatterjee_Resume
 
PankajKPrajapati
PankajKPrajapatiPankajKPrajapati
PankajKPrajapati
 
SUYOG_2015
SUYOG_2015SUYOG_2015
SUYOG_2015
 
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
 
Resume of Sukanya Sarkar-WT new
Resume of Sukanya Sarkar-WT newResume of Sukanya Sarkar-WT new
Resume of Sukanya Sarkar-WT new
 
Ajit Singh_CV
Ajit Singh_CVAjit Singh_CV
Ajit Singh_CV
 
Pankaj_Prajapati
Pankaj_PrajapatiPankaj_Prajapati
Pankaj_Prajapati
 
Resume_Sanket Dalvi
Resume_Sanket DalviResume_Sanket Dalvi
Resume_Sanket Dalvi
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
Janakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman.M _Process Designer & SPP&ID Co-ordinatorJanakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman.M _Process Designer & SPP&ID Co-ordinator
 

Sachin_Kumar_CV_Instrument

  • 1. Instrumentation Engineer with 9 years 6 Months’ experience as Maintenance, Project & Design Engineer Personal Data Name : Sachin Kumar Permanent Address : Sachin Kumar S/O Jai Singh, Vill:- Fazalpur Sundar Nagar Dist :- Baghpat Uttar Pradesh Pin:-250345 Mobile : +971528172950 E-mail private : Sachin1509@gmail.com Date of Birth : 15.09.1982 Civil Status : Married Languages : English (Fluent both spoken and written), Hindi Passport : F1620095 valid till 2015. Education Year Degree/ Diploma/ Examination Subject Institute/ University 2005 Bachelor of Engineering Electronics SVNIT Surat Gujarat Work Experience Total Experience : 9 Years & 6 Months Role : Instrument Engineer Engineering: 1. Detailed Engineering activities of preparation of data sheets, Instrument Index, orifice sizing calculations, Control Valve sizing and selection, hook up drawings, layout drawings, MTO preparation. 2. Sizing standards known ISA 75.01, API 520 Part 1, ISO 5167 Projects: 1. Inspection/ Witnessing/ Reviewing of Calibration, Installation, Pre commissioning and commissioning activities in Unit: FCCU, CCR/NHT, ISOM/HRU, Blending Station. 2. Design review, installation, commissioning activities. 3. Control system DCS/ESD/F&G (Pre Commissining and Commissioning activities). 4. Cost estimation, manhour / manpower planning, progress/ schedule monitoring. Units Commissioned as Instrument Engineer: 1. CCR/NHT 2. ISOM/HRU. 3. FCC. Systems: 1. Yokogawa Centum VP/ Prosafe RS. 2. ABB AC 800 3. Intools Field instruments Handled: 1. Control Valves, On/Off valves (Make- Fisher, Tyco, Dembla, Masoneilan, Metso). 2. Level transmitters like - DP type, Displacer type, Remote seal type, Radar type level sensor, Nucleonic. 3. Flow meters like- Mass Flow meter, Magnetic Flow meters, Turbine flow meters, Rotameters, Vortex flow meter, ultrasonic (Make- ABB, Rosemount, Micro motion, Panametrics)
  • 2. Training Attended: 1. Yokogawa Centum VP and Prosafe-RS. 2. Machine Monitoring System. Software: 1. Design Tool: SPI (Smart Plant Instrumentation), AutoCAD. 2. ERP: SAP. 3. Application: MS Excel, Outlook, Powerpoint, Word June 2014 till date Company : Target Engineering LLC Project : Engineering (PNT Project ADGAS) Location : ABU Dhabi, UAE Position : Engineer Role : Instrument Engineer (Design Engineer) TARGET Engineering is a leading Oil & Gas Contractor with single source inhouse specialities for Engineering, Procurement and Construction of Mechanical - Steel Structures & Piping, Electrical - Power, Instrumentation & Controls, Civil - Industrial and Building Works and Marine Structures in both onshore and offshore areas. Job Profile: (Engineering) 1. Offer evaluation of various field instrument (Radar Level Transmitter, Temperature Transmitter, Orifice Plate, On/Off Valve etc) preparation of TBE, Discussion with vendor and finalize technical requirements. 2. FDS review with Honeywell for CTS custody transfer metering skid 3. Instrument index & loop drawing preparation & review 4. Tender scope study preparation of technical query, site visit, attending technical clarifiaction meeting with client, preparation of MTO, vendor offer review for technical and commercial estimation of tender. 5. Presently working on tender of M/s ADGAS, M/s TAKREER & Saudi Aramko for various system & field up-gradation work. 6. Tender MTO includes of various control system (DCS system, Vibration monitoring system & Fire Alarm System). . May 2011 – May-2014 Company : HMEL (HPCL – Mittal Energy Limited) Project : GGSRL Project Location : Bhatinda, Punjab, India Position : Assitant Manager Role : Instrument Engineer (Projects Department) HPCL-Mittal Energy Limited (HMEL) is a joint venture between Hindustan Petroleum Corporation Limited (HPCL) and Mittal Energy Investment Pte Ltd, Singapore - a Lakshmi N Mittal Group Company. Both the JV partners hold a stake of 49% each in the company, the rest 2% is held by financial institutions. HMEL is building a Grassroot oil refinery of 9 MMTPA at Bathinda in Punjab, called Guru Gobind Singh Refinery Project. The project is expected to be completed in 2011.
  • 3. Job Profile: (Construction, Commissioning & Projects) 1. Commissioning of MS Block (CCR/NHT, ISOM & HRU, MS & HSD Blending) unit 2. Responsible for System handover activities of FCCU Unit. 3. Manhour/ Manpower monitoring, progress/ schedule monitoring and necessary expediting activities. 4. Ensuring quality related activities from calibration activities to instrumentation related NDT activities. 5. Review of Engineering and report of deficiencies. Implementation of necessary modifications at site. 6. Performing engineering work related to the instrument design, procurement and construction aspects for modification projects of revenue nature & capital projects handled by the refinery. 7. Studies and implements corrective measures and solutions to engineering problems. 8. Attended FAT of Chemtrol Analyzer System for HSD Blending. 9. Attended training at YIL, Bangalore on Centum VP. 10. Handling Engineering, Procurement & Execution of various MOC (Management of Change) throughout the refinery in the running plant with full safety. 11. Preparation of construction materials Basic Rate Difference for adjustment in R.A. Bills. 12. To study B.O.Q and technical specifications for proper execution of contract specified items. 13. Handling sub-contractors working on project, for proper execution of work so as to meet the deadline for on-time completion. Giving necessary Support and Training to sub-ordinates 14. Identifying the necessity of extra and deviated items and accordingly working on projected cost of project. Preparation & verification of contractors R.A. Bill quantities as per mode of measurements 15. Keeping track on material status and raising material indent as per contract specification for on time delivery of required material. 16. Reconciliation of construction materials (Fittings, cables, glands, etc.) 17. Preparation of Weekly & Monthly Progress Report (MIS Report). 18. Ensuring receipt of right quality and quantity of material and testing of same as per standards. 19. Monitoring safe working condition and safety activities on site. Capable of handling multiple construction sites Systems: YOKOGAWA Centum VP/ ProSafe RS May 2008 – May2011 Company : Fluor Denial India Pvt Ltd Location : Gurgaon Haryana India Position : Engineer Role : Instrument Design Engineer Engineer (Instrumentation): Engineering Procurement & Construction (EPC) Div. Fluor Denial India Private LTD Gurgaon New Delhi 1. Worked on deliverable of Instrument Index population of basic data & Index updates based on FDCNs. 2. Preparation of PO Data Sheets for various instrument, involved in checking Model no. assigned to instrument with respect of process & piping requirement & corrective action taken if required. 3. Studied Project Specification thoroughly, understanding various GOST standards to prepare Instrument Data Sheets. 4. Involved in Preparing Various Instrument Data Sheet in Smart Plant Instrumentation like Pressure Instrument:- Gauge & Transmitter ,Temperature:-Gauge , Transmitter, well & Element, Level Instrument:- Transmitter (Guided Wave Radar & Cone) level Gauge, Flow instrument:- Orifice Plate, Transmitter & Restriction Orifice, Venturi Tube & Annnubar Meter. 5. Preparation of Level Sketch, Control Valve, On-Off Valve Data Sheet.
  • 4. 6. Involve in EDEN Activity preparing data base of inline instrument from Vendor Cut-Sheet & Catalogue for piping model in Ultra-Edit Software. 7. Sizing done of Instrument like Orifice Plate, Control Valve, Thermowell Wake Frequency Calculation. 8. Technical bid evaluation done of various Instruments & prepare technical query. 9. Piping ISOs Checking for Inline Instrument & Signoff. 10. Preparation of JB loading, Main cable schedule & Instrument cable schedule. 11. 6 Week Site Survey of Qatar Gas & Ras Gas refinery division at Ras Laffan City Doha Qatar. Survey including following agenda:- i) Safety training of Ras Gas & Qatar Gas. ii) Survey Instrument Technical Room (ITR) for space to installed new cabinets, console. Transit window & Cable laying under floor. iii) Survey of Field Junction boxes, Cable Trench, Instrument Air header & Area for installation of new instrument. iv) Preparation of survey report & mark-ups on as-built drawings. Oct’07 - May08 Company : GE India Pvt Ltd Location : Bangalore, Karnataka India Position : Engineer Profile : Design & Engineering General Electrical (GE): in Bangalore Centre worked with a team Handling Reciprocating Compressor (RC), Worked on:- 1. Involved in reviewing the design/engineering documents preparation of Specifications. 2. Studying the Detail Engineering Customer’s specifications and diagrams. 3. Involved in reviewing the design/engineering documents preparation of Specifications, BOM Activity. 4. General Specification preparation for instrumentation considering NP (GE) Standard & customers specs requirement. 5. Standardization Activity done for various instrument to improve the quality of work & reducing Man Hour for Projects. 6. Preparation, Review & Modification of various document like, P&ID, Primary& Pneumatic hook-ups 7. Electrical Hook-up, Electrical Plant Layout, Pneumatic Plant Layouts, Field Instrument List. 8. Instrument selection for various service like (process gas, lube oil service, cooling water , steam) June 2005 – Oct 2007 Company : Essar Oil Ltd Location : Jamnagar, Gujarat, India Position : Assistant Manager Profile : Project & Maintenance. ESSAR OIL LTD is a 14.0 MMTPA Refinery in Jamnagar, Gujarat a company of the ESSAR GROUP. ESSAR GROUP is a multinational conglomerate and a leading player in the sectors of Steel, Oil & Gas, Power, Communications, Shipping Ports & Logistics, Construction and Minerals. With operations in more than 20 countries across five continents, the group employs 60,000 people, with revenues of about USD 15 billion.
  • 5. Installation & Calibration 1. Installation and calibration for: Control Valves Pressure Transmitters Thermocouples Pressure Gauge Temperature Gauge Pressure Safety Valve Pressure Switch Pressure Regulating Valve Other Instrument 2. Evaluation of Instrument Data Sheets, Process Data Sheets, Adequacy Check Reports and Sizing Sheets. Preparing list of instrument, detailed instrument specific. 4. Played a stellar role in identifying missing links and discrepancies between the various instrumentation documents: P&ID’s, Instrument Index, Alarm and Trip setting lists etc. 5. Overseen Technical Bid Evaluation of vendor quotations. Site Management 1. Coordinating with others for preparation of Receipt of Instruments at site for Erection, Loop checking, checking various Flame Detectors (UV, IR & Ionization Rod used in Heaters) 2. Undertaking Maintenance of various instruments: Fisher Make Control Valve Shut of valve used in Heaters, Pressure TX, and Flow TX. 3. Modification done in Installation some of instrument to get better efficiency in Hazardous Location 4. Handled a team of GET, DET & skilled Man Power ( No.- 25) very efficiently & getting done all activity on time. Logic Interlock Checking & Implementation 1. NP make Compressors one Stage & Two Stage 2. Borsig Make Turbine running compressor 3. York make Chiller Package Compressors 4. LHT Heaters 5. Plant ESD For CCR/NHT AREA 6. Sequence Checking for NAT AREA Instrument Handled (Installation, Testing, Commissioning and Maintenance): ESD: ABB DCS: ABB Analyzers: Chemptrols Governors: Woodward Level: Nucleonic Reference: Arjun Singh Shekhawat | Manager-Projects | HPCL-Mittal Energy Ltd | Village Phullokhari, Taluka:- Talwandi Saboo, Bhatinda - 151301| Punjab | INDIA | ( +91 1655-272923 (Office) |M +91 9988881660 | arjun.shekhawat@hmel.in|" www.hmel.in | Digvijay Dhama | Design Engineer | KENTZ Engineering & Construction Dubai UAE M| +971562630855
  • 6. Installation & Calibration 1. Installation and calibration for: Control Valves Pressure Transmitters Thermocouples Pressure Gauge Temperature Gauge Pressure Safety Valve Pressure Switch Pressure Regulating Valve Other Instrument 2. Evaluation of Instrument Data Sheets, Process Data Sheets, Adequacy Check Reports and Sizing Sheets. Preparing list of instrument, detailed instrument specific. 4. Played a stellar role in identifying missing links and discrepancies between the various instrumentation documents: P&ID’s, Instrument Index, Alarm and Trip setting lists etc. 5. Overseen Technical Bid Evaluation of vendor quotations. Site Management 1. Coordinating with others for preparation of Receipt of Instruments at site for Erection, Loop checking, checking various Flame Detectors (UV, IR & Ionization Rod used in Heaters) 2. Undertaking Maintenance of various instruments: Fisher Make Control Valve Shut of valve used in Heaters, Pressure TX, and Flow TX. 3. Modification done in Installation some of instrument to get better efficiency in Hazardous Location 4. Handled a team of GET, DET & skilled Man Power ( No.- 25) very efficiently & getting done all activity on time. Logic Interlock Checking & Implementation 1. NP make Compressors one Stage & Two Stage 2. Borsig Make Turbine running compressor 3. York make Chiller Package Compressors 4. LHT Heaters 5. Plant ESD For CCR/NHT AREA 6. Sequence Checking for NAT AREA Instrument Handled (Installation, Testing, Commissioning and Maintenance): ESD: ABB DCS: ABB Analyzers: Chemptrols Governors: Woodward Level: Nucleonic Reference: Arjun Singh Shekhawat | Manager-Projects | HPCL-Mittal Energy Ltd | Village Phullokhari, Taluka:- Talwandi Saboo, Bhatinda - 151301| Punjab | INDIA | ( +91 1655-272923 (Office) |M +91 9988881660 | arjun.shekhawat@hmel.in|" www.hmel.in | Digvijay Dhama | Design Engineer | KENTZ Engineering & Construction Dubai UAE M| +971562630855