RUSAJ OMAR
(BE-Electronics and communication Engineering)
SITE ENGINEER – 132/11Kv DEWA SUBSTATIONS
To be an efficient and capable professional in the field of electronics and communication engineering, where my
knowledge of the principles and methods for problem solving, technical issues, installing, maintenance, project
commissioning, supervising will be employed. I look to grow in a robust environment to further my career that will
provide benefits and compensation proportionate to my abilities
O B J E C T I V E
Personal Details
DOB: 30 Aug 1985
Status: Male /Married
Passport No: F8408551
Visa: Transferable
Address
Rusaj K C
SPIDER AUTO PARTS
AL NASR SQUARE
DEIRA
DUBAI
Mobile No.
0567005736.
E-Mail
rusajkc@gmail.com
Strengths
 Hard working, punctual,
sincere and an excellent
team
Career Graph
Centaur Electromechanical Contg , Dubai
Period : 2011 May – Present
Position held : Site Engineer – 132/11kV Substation
JOB PROFILE
Site Engineer – 132/11kV Substation
 Responsible for Carrying out Electrical Works inside the substation
 Understanding drawings and assisting the workers to execute the
works as per the drawings
 Carrying out cable pulling as per the schedule and cable route

Performing cable Glanding and termination /verifying according to the
DEWA approved Termination schedule
 Carrying out the earthing works
 Transformer erection (Auxillary and IDT)
 11kV Cable pulling and Termination as per the schedule
 SMDB, DB, Installation and Termination as per the SLD
 Control Panel, BBP Panel, LVAC, Battery Room Installation
 Communicating with Main contractor and Client for Drawing and
Execution Clarification
 ABB GIS , LCC Panel erection and termination of the cables as per
the schedule

Earthing of GIS Room with Copper tapes as per the diagram

Tray installation in the 132kV , 11kV basements as per the schedule
 Inter personal and
analytical skills
 Ability to work as a part of
a team
 High adaptability
 Perseverance and
Integrity to Work
 Optimistic
and diagrams

Brazing and Tinning of Earthing copper tapes

Capacitor bank installation

11kV, Control Cables termination in the switchgear and Transformer
PROJECTS INVOLVED
 DEWA 132/11kV RESORTS SUBSTAION
Main Contractor : ABB Industries LLC , Dubai
Duration : 2014 November to Present
Designation : Electrical Site Engineer
 DEWA 132/11kV PEARL JUMEIRAH SUBSTAION (Completed)
. Main Contractor : ABB Industries LLC , Dubai
Duration : 2013 May to 2014 October
Designation : Electrical Site Engineer
 DP World 11/400 kV Pocket Substation (12 Nos)
. Main Contractor : Kinden Corporation
Duration : 2012 May to Present
Designation : Electrical Site Engineer
Areas of Interest
 Cable Glanding and Termination
 Earthing and Control Panels
 GIS
 Transformer
Technical Skills
Languages C, C++, MATLAB, MS OFFICE
Operating System DOS, Windows 98/2000/, XP, VISTA.
Education
QUALIFICATION INSTITUTION
BOARD /
UNIVERSITY
PERCENTAGE
B.E
(Electronics and
communication
engineering)
S.S.M College of
Engineering,
komarapalayam
Anna University
Chennai , INDIA 61%
+2
MAMBARAM
H.S.S
H.S.E - KERALA 67.5%
10th M.E.S BAVA
Residential School
C.B.S.E New
Delhi
70.6%
Personal Details
Father’s Name OMAR KC
Sex MALE
Nationality INDIAN
Religion ISLAM
Languages Known ENGLISH, HINDI, MALAYALAM & TAMIL.
UAE Driving License Yes
DECLARATION
I hereby declare that all the statements made above are true to the best of my knowledge and belief.
Yours faithfully,
PLACE: DUBAI
DATE: 02/02/2015
(RUSAJ.K.C)
R e f e r e n c e s a n d D o c u m e n t s a v a i l a b l e u p o n r e q u e s t .
Personal Details
Father’s Name OMAR KC
Sex MALE
Nationality INDIAN
Religion ISLAM
Languages Known ENGLISH, HINDI, MALAYALAM & TAMIL.
UAE Driving License Yes
DECLARATION
I hereby declare that all the statements made above are true to the best of my knowledge and belief.
Yours faithfully,
PLACE: DUBAI
DATE: 02/02/2015
(RUSAJ.K.C)
R e f e r e n c e s a n d D o c u m e n t s a v a i l a b l e u p o n r e q u e s t .

RUSAJ CV

  • 1.
    RUSAJ OMAR (BE-Electronics andcommunication Engineering) SITE ENGINEER – 132/11Kv DEWA SUBSTATIONS To be an efficient and capable professional in the field of electronics and communication engineering, where my knowledge of the principles and methods for problem solving, technical issues, installing, maintenance, project commissioning, supervising will be employed. I look to grow in a robust environment to further my career that will provide benefits and compensation proportionate to my abilities O B J E C T I V E
  • 2.
    Personal Details DOB: 30Aug 1985 Status: Male /Married Passport No: F8408551 Visa: Transferable Address Rusaj K C SPIDER AUTO PARTS AL NASR SQUARE DEIRA DUBAI Mobile No. 0567005736. E-Mail rusajkc@gmail.com Strengths  Hard working, punctual, sincere and an excellent team Career Graph Centaur Electromechanical Contg , Dubai Period : 2011 May – Present Position held : Site Engineer – 132/11kV Substation JOB PROFILE Site Engineer – 132/11kV Substation  Responsible for Carrying out Electrical Works inside the substation  Understanding drawings and assisting the workers to execute the works as per the drawings  Carrying out cable pulling as per the schedule and cable route  Performing cable Glanding and termination /verifying according to the DEWA approved Termination schedule  Carrying out the earthing works  Transformer erection (Auxillary and IDT)  11kV Cable pulling and Termination as per the schedule  SMDB, DB, Installation and Termination as per the SLD  Control Panel, BBP Panel, LVAC, Battery Room Installation  Communicating with Main contractor and Client for Drawing and Execution Clarification  ABB GIS , LCC Panel erection and termination of the cables as per the schedule  Earthing of GIS Room with Copper tapes as per the diagram  Tray installation in the 132kV , 11kV basements as per the schedule
  • 3.
     Inter personaland analytical skills  Ability to work as a part of a team  High adaptability  Perseverance and Integrity to Work  Optimistic and diagrams  Brazing and Tinning of Earthing copper tapes  Capacitor bank installation  11kV, Control Cables termination in the switchgear and Transformer PROJECTS INVOLVED  DEWA 132/11kV RESORTS SUBSTAION Main Contractor : ABB Industries LLC , Dubai Duration : 2014 November to Present Designation : Electrical Site Engineer  DEWA 132/11kV PEARL JUMEIRAH SUBSTAION (Completed) . Main Contractor : ABB Industries LLC , Dubai Duration : 2013 May to 2014 October Designation : Electrical Site Engineer  DP World 11/400 kV Pocket Substation (12 Nos) . Main Contractor : Kinden Corporation Duration : 2012 May to Present Designation : Electrical Site Engineer Areas of Interest  Cable Glanding and Termination  Earthing and Control Panels
  • 4.
     GIS  Transformer TechnicalSkills Languages C, C++, MATLAB, MS OFFICE Operating System DOS, Windows 98/2000/, XP, VISTA. Education QUALIFICATION INSTITUTION BOARD / UNIVERSITY PERCENTAGE B.E (Electronics and communication engineering) S.S.M College of Engineering, komarapalayam Anna University Chennai , INDIA 61% +2 MAMBARAM H.S.S H.S.E - KERALA 67.5% 10th M.E.S BAVA Residential School C.B.S.E New Delhi 70.6%
  • 5.
    Personal Details Father’s NameOMAR KC Sex MALE Nationality INDIAN Religion ISLAM Languages Known ENGLISH, HINDI, MALAYALAM & TAMIL. UAE Driving License Yes DECLARATION I hereby declare that all the statements made above are true to the best of my knowledge and belief. Yours faithfully, PLACE: DUBAI DATE: 02/02/2015 (RUSAJ.K.C) R e f e r e n c e s a n d D o c u m e n t s a v a i l a b l e u p o n r e q u e s t .
  • 6.
    Personal Details Father’s NameOMAR KC Sex MALE Nationality INDIAN Religion ISLAM Languages Known ENGLISH, HINDI, MALAYALAM & TAMIL. UAE Driving License Yes DECLARATION I hereby declare that all the statements made above are true to the best of my knowledge and belief. Yours faithfully, PLACE: DUBAI DATE: 02/02/2015 (RUSAJ.K.C) R e f e r e n c e s a n d D o c u m e n t s a v a i l a b l e u p o n r e q u e s t .