ELECTRICAL ENGINEER WITH 5+ YEARS OF EXPERIENCE
VENKATESH.R Email Id : venkat.rk24@gmail.com
New No: 262, Old No: 1, Mobile No : 09043249105
Bajanai Kovil Street,
Kosavanpalayam,
Thiruninravur,
Chennai – 602024,
Tamil Nadu, India.
CAREER GOAL :
To seek a challenging position for dedicating my service and to expose my talents and skills to a
reputed organization and in the process to develop and enrich my career growth.
CAREER SUMMARY :
• 5+ years of Professional Experience in Design & Detailing of Electrical Equipment for Thermal
Power Plant Projects.
• Basic knowledge in SMS & DRI Plant Electrical Equipment.
• Capable to handle the projects individually.
• Familiar in Auto Cad, MS Office, MS Project.
WORK EXPERIENCE :
Name of the Company : M/s. EICS Technology Pvt. Ltd, Bilaspur.
Designation : Sr. Engineer – Electrical
Tenure : From September, 2009 to till date.
Company Profile : M/s. EICS Technology Pvt Ltd is one of the renowned firm
providing Consultancy Services and EPC Contractor for
setting up of SMS, DRI & Thermal Power Projects in India
and Abroad.
KEY RESPONSIBILITIES :
• Preparation of Specifications / Datasheets for HT Switchboard, LT PCC and MCC Panel,
Transformer, Cable, Earthing, Lighting, Tray, Bus Duct, Capacitor Panel etc.,
• SC Calculations, Equipment Sizing like Transformer & DG Set, Cable sizing, UPS, Earthing &
Lighting Calculations.
• Preparation of SLD & Generating Bill of Materials from SLD.
• Preparation of Power & Control Cable Schedules.
• Float the Enquiries for Power Plant Electrical equipment and get the offers.
• Preparation of Technical Bid Evaluations and Draft PO’s for the Electrical Equipment.
• Involving in procurement activities with the Purchase Department for Electrical Equipment.
• Preparation of Design Basis Report and Cost Estimation for the Proposal Projects
• Review of Supplier Drawings/Documents with Technical Acceptability & Contractual Scope
ensuring Standard Safety Operational aspects with Sound Engineering Practice.
• Pre-Shipment Inspection at Vendor works for Key Electrical Equipment.
• Providing electrical support to Site engineers on technical query' issues.
PROJECTS PROFILE :
Project 1 : 1 x 12 MW Thermal Power Plant.
Client : M/s. Padmavati Ferrous Ltd, Bellary (Dt), Karnataka.
Role : Project Engineer – Electrical (EPC).
Project 2 : 3 x 12 MW Thermal Power Plant.
Client : M/s.Boseto Power Station, Botswana, Africa
Role : Project Engineer – Electrical (Consultancy Services).
Project 3 : 1 x 15 MW Thermal Power Plant.
Client : M/s.Cauvery Iron & Steel (P) Ltd, Medak (Dt), Andra Pradesh
Role : Project Engineer – Electrical (Consultancy Services).
Project 4 : 2 x 15 MW Thermal Power Plant.
Client : M/s.Impex Ferro Tech Ltd, Burdwan (Dt), West Bengal.
Role : Project Engineer – Electrical (EPC).
ADEMIC PROFILE :
CERTIFICATIONS / TRAININGS:
• Auto CAD
• MS Project
STRENGTH:
• Fast learning and initiative with problem-solving skills.
• Good communication skills.
• Team leading.
• Positive attitude.
• Punctuality.
Course/Degree Institution Board
Year of
Passing
Percentage
(%)
B.E (EEE)
Prathyusha Institute of
Technology &
Management,Tiruvallur
Anna
University
2009 71.5
D.EEE
(Electrical &
Electronics )
Sri Ram Polytechnic
College, Veppampattu
D O T E
Tamil Nadu 2006 79.12
SSLC
Dhasar High
School, Thiruninravur State Board 2001 58.60
SOFTWARE KNOWLEDGE:
Windows Operating System : Win98, Win XP, VISTA & Win 7
Application Software : MS-OFFICE & MS Project
Engineering Software : Auto Cad
PERSONAL PROFILE :
Name : R.Venkatesh.
Father’s Name : S.Ramakrishnan.
Date of Birth : 24th July 1985.
Nationality : Indian.
Marital status : Single.
Languages Known : English, Tamil, Telugu, & Hindi.
Passport Number : K2241878.
I hereby declare that all the above details given are true to the best of my knowledge and belief.
Place: Bilaspur. Yours Sincerely,
Date : (R.VENKATESH)
SOFTWARE KNOWLEDGE:
Windows Operating System : Win98, Win XP, VISTA & Win 7
Application Software : MS-OFFICE & MS Project
Engineering Software : Auto Cad
PERSONAL PROFILE :
Name : R.Venkatesh.
Father’s Name : S.Ramakrishnan.
Date of Birth : 24th July 1985.
Nationality : Indian.
Marital status : Single.
Languages Known : English, Tamil, Telugu, & Hindi.
Passport Number : K2241878.
I hereby declare that all the above details given are true to the best of my knowledge and belief.
Place: Bilaspur. Yours Sincerely,
Date : (R.VENKATESH)

Resume

  • 1.
    ELECTRICAL ENGINEER WITH5+ YEARS OF EXPERIENCE VENKATESH.R Email Id : venkat.rk24@gmail.com New No: 262, Old No: 1, Mobile No : 09043249105 Bajanai Kovil Street, Kosavanpalayam, Thiruninravur, Chennai – 602024, Tamil Nadu, India. CAREER GOAL : To seek a challenging position for dedicating my service and to expose my talents and skills to a reputed organization and in the process to develop and enrich my career growth. CAREER SUMMARY : • 5+ years of Professional Experience in Design & Detailing of Electrical Equipment for Thermal Power Plant Projects. • Basic knowledge in SMS & DRI Plant Electrical Equipment. • Capable to handle the projects individually. • Familiar in Auto Cad, MS Office, MS Project. WORK EXPERIENCE :
  • 2.
    Name of theCompany : M/s. EICS Technology Pvt. Ltd, Bilaspur. Designation : Sr. Engineer – Electrical Tenure : From September, 2009 to till date. Company Profile : M/s. EICS Technology Pvt Ltd is one of the renowned firm providing Consultancy Services and EPC Contractor for setting up of SMS, DRI & Thermal Power Projects in India and Abroad. KEY RESPONSIBILITIES : • Preparation of Specifications / Datasheets for HT Switchboard, LT PCC and MCC Panel, Transformer, Cable, Earthing, Lighting, Tray, Bus Duct, Capacitor Panel etc., • SC Calculations, Equipment Sizing like Transformer & DG Set, Cable sizing, UPS, Earthing & Lighting Calculations. • Preparation of SLD & Generating Bill of Materials from SLD. • Preparation of Power & Control Cable Schedules. • Float the Enquiries for Power Plant Electrical equipment and get the offers. • Preparation of Technical Bid Evaluations and Draft PO’s for the Electrical Equipment. • Involving in procurement activities with the Purchase Department for Electrical Equipment. • Preparation of Design Basis Report and Cost Estimation for the Proposal Projects • Review of Supplier Drawings/Documents with Technical Acceptability & Contractual Scope ensuring Standard Safety Operational aspects with Sound Engineering Practice. • Pre-Shipment Inspection at Vendor works for Key Electrical Equipment. • Providing electrical support to Site engineers on technical query' issues. PROJECTS PROFILE :
  • 3.
    Project 1 :1 x 12 MW Thermal Power Plant. Client : M/s. Padmavati Ferrous Ltd, Bellary (Dt), Karnataka. Role : Project Engineer – Electrical (EPC). Project 2 : 3 x 12 MW Thermal Power Plant. Client : M/s.Boseto Power Station, Botswana, Africa Role : Project Engineer – Electrical (Consultancy Services). Project 3 : 1 x 15 MW Thermal Power Plant. Client : M/s.Cauvery Iron & Steel (P) Ltd, Medak (Dt), Andra Pradesh Role : Project Engineer – Electrical (Consultancy Services). Project 4 : 2 x 15 MW Thermal Power Plant. Client : M/s.Impex Ferro Tech Ltd, Burdwan (Dt), West Bengal. Role : Project Engineer – Electrical (EPC). ADEMIC PROFILE :
  • 4.
    CERTIFICATIONS / TRAININGS: •Auto CAD • MS Project STRENGTH: • Fast learning and initiative with problem-solving skills. • Good communication skills. • Team leading. • Positive attitude. • Punctuality. Course/Degree Institution Board Year of Passing Percentage (%) B.E (EEE) Prathyusha Institute of Technology & Management,Tiruvallur Anna University 2009 71.5 D.EEE (Electrical & Electronics ) Sri Ram Polytechnic College, Veppampattu D O T E Tamil Nadu 2006 79.12 SSLC Dhasar High School, Thiruninravur State Board 2001 58.60
  • 5.
    SOFTWARE KNOWLEDGE: Windows OperatingSystem : Win98, Win XP, VISTA & Win 7 Application Software : MS-OFFICE & MS Project Engineering Software : Auto Cad PERSONAL PROFILE : Name : R.Venkatesh. Father’s Name : S.Ramakrishnan. Date of Birth : 24th July 1985. Nationality : Indian. Marital status : Single. Languages Known : English, Tamil, Telugu, & Hindi. Passport Number : K2241878. I hereby declare that all the above details given are true to the best of my knowledge and belief. Place: Bilaspur. Yours Sincerely, Date : (R.VENKATESH)
  • 6.
    SOFTWARE KNOWLEDGE: Windows OperatingSystem : Win98, Win XP, VISTA & Win 7 Application Software : MS-OFFICE & MS Project Engineering Software : Auto Cad PERSONAL PROFILE : Name : R.Venkatesh. Father’s Name : S.Ramakrishnan. Date of Birth : 24th July 1985. Nationality : Indian. Marital status : Single. Languages Known : English, Tamil, Telugu, & Hindi. Passport Number : K2241878. I hereby declare that all the above details given are true to the best of my knowledge and belief. Place: Bilaspur. Yours Sincerely, Date : (R.VENKATESH)