Planning Considerations for the HR Project
Introduction
A centralized Human Resources model of delivering HR services will be efficient in functions like hiring and firing employees, training, pay and benefits and other functions that may arise. The HR function is changing from the traditional hiring and firing to a more advanced role that ensures business continuity. These roles also include being involved in the organization’s strategic planning as it aligns its talent hiring and firing strategy to the overall vision and direction of the organization. Centralized HR function is able to align its HR plan and strategies and align them with that of the vision and goals of the organization.
Project implementation of the HR project will ensure and cost efficient and consistent model of delivering HR services in the organization through the centralized model of delivering HR services. The project manager will have to define the statement of importance to the project team and define the scope of work for each team member in the project team. The project budget is important as it outlines the resources allocated including monetary allocation for the success of the project. The budget provides estimates approved towards achieving the goals of the project and team members need to understand all the budgetary estimates. The breakdown of the budget by the project manager to the team is important in order to maintain he costs within the approved estimates.
Body
Statement of Importance
The statement of importance is an important document that outlines everything relevant in the project. It is the most important document in the project that outlines and defines the scope of the whole project including timelines and budgetary estimates. The current project will have the following elements in its statement of importance; the purpose which is implementation of a centralized HR model for the organization, the scope, the due dates, the due dates of the project, list of what is due and when it is due, the expected outcomes, all the resources that are needed for the project and the costs including the payments and their deadlines.
The relevance of each task in the statement of importance should be well explained to the team in order to keep everyone involved in the project on the same page. The document is relevant shows all the tasks which the project manager should use in allocating tasks and the milestones that are used to see if the project is going according to plan. The scope shows what is to be done in the project including the process that will be used in completion of the work. It also shows what will be used to complete the tasks including software and any equipment. The schedule in the document is a list of when deliverables should be done including vendors that will be used in completing the project. The phases in the project including development, testing and implementation are .
Assignment 1 Organizing HR ProjectsIn order to effect a more ce.docxfelicitytaft14745
Assignment 1: Organizing HR Projects
In order to effect a more centralized model of delivering Human Resources services, there are core project functions that must be undertaken to ensure success as well as ascertaining that all parties are motivated to working with the new model. Establishing a new project team requires orientation to the overall goals and objectives in a bid to ensure that every team member is well aware of both intermediate and final goals. This will act as a guidance to the team making processes and functions easier. On the other hand, successful implementation requires strategic planning which is about allocation of resources, planning, and scheduling in a manner that optimizes the available resources and performing within the budget and the timeline (Neluheni, Pretorius & Ukpere, 2014). In this respect, it is the duty of the project manager or leader to guide and oversee the various processes and activities in a bid to ensure that the desired goals and objectives are being achieved.
The Statement of Overall Importance
When implementing the project, the overall steps of strategic planning are important to start, progress, and finish of the project. There are distinct steps such as vision where the overall goals and desired outcomes are communicated to the parties involved in the accomplishment of the task. Other steps such as planning also highlights the importance of laying down the strategy for attaining various tasks where resources are allocated optimally in a manner that avoids wastage. As a project leader, it is highly important that strategic planning is undertaken. In the field of project management, studies have shown that failure to effectively plan is one of the major contributors to failure especially when it comes to performing within the deadline and budget (Kerzner, 2013). A project manager must be able to put in place a plan that has goals and objectives that must be communicated to the concerned parties such as the team members. Actually, it is deemed best practice when a leader involves other parties such as team members in formulating a plan which improves the diversity of the decisions made.
The steps provided in the texts is highly important to the project. It is imperative to note that project management is nowadays strategic meaning that it must align with overall strategic direction of the organization. Majority of organizations are currently funding projects that are seen to have a direct influence on the strategic direction of the organization. For instance, in this case, it can be seen that the goal is to ensure easier and more efficient management of human resources which have become a strategic tool as opposed to a supporting function it has been over the previous decades. In essence, the strategic planning process will help outline goals, communicate the plans, and strategize on how various tasks and processes will be accomplished in line with desired goals.
Vision and Mission Statements
.
Running Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docxtodd581
Running Head: PROJECT MANAGEMENT METHODOLOGIES & TOOLS 1
PROJECT MANAGEMENT METHODOLOGIES & TOOLS 5
PROJECT MANAGEMENT METHODOLOGIES & TOOLS
Mekdes Asaminew
Rasmussen College
05/16/2020
FAQ document
What are project management tools?
These are the instruments which project managers use to plan, execute as well as manage plans in one centralized virtual location. These tools vary from team to team depending on the tasks to be performed in the project. The project management tools include; project management software, real-time instant messaging tool, knowledge base tool and file sharing tool.
What is project management software?
This is computer software which helps the project team members to collaborate during the project, plan all their activities as well as to record all the collected data.
What is a real-time instant messaging tool?
It is a tool that allows team members of a particular project to talk and video call with colleagues in real time. This tool helps improve collaboration of the team members and allows all people to collectively provide their opinions on different matters during carrying out the project.
What is knowledge base tool?
It involves a search database that allows individual to store the combined wisdom of the team members and ensures that the information is accessible to all members
What is a file sharing tool?
It is a tool which allows people to save sync and share files. It ensures that all the documents provided by team members are well stored and easily retrievable for future reference. (Bilal.et.al, 2017)
What are project management methodologies?
Project management methodologies are basically the different techniques which are used to approach a given project; every methodology of project management has its unique process and workflow. They are classified into “traditional or sequential methodologies, agile methodologies, the change management methodologies and process-based methodologies.”
What are the traditional or sequential methodologies?
These are the methods of managing a project which involve a sequence of tasks which lead to the final deliverables and project managers are required to ensure that the tasks are worked on them in a given order. The methodologies classified under this category include;
· Waterfall project management methodology; involves completing a certain task before beginning another task in a linked sequence of objects which adds up to the general goal. It is used in projects that create physical objects like building a computer.
· Critical path method; it involves prioritizing and allocating available raw materials to ensure the most crucial task is done as well as rescheduling lower priority task.
· Critical chain project management; involves a technique for putting main concentration on the needed materials.
What are agile methodologies?
These are project management methodologies which prioritize on shorter iterative cycles and flexibility. They are categorized .
Scheduling and Cost ControlChristopher MihunPM620-1801B-01.docxanhlodge
Scheduling and Cost Control
Christopher Mihun
PM620-1801B-01
Professor Borodin
Introduction
Project differ from one organization to another.
There are periods when an organization uses a project for special functions.
There are those which use projects as part of an integrated business platform and architecture.
Therefore, for a successful implementation of a project:
Human resources
Equipment and materials
Financial resources and facilities
2
Why are scheduling and cost control important for project success?
These are a closely related concept for project management.
The importance of scheduling and cost control include:
Efficiency in project management (Kerzner, 2015).
Profitability through ensuring good resources allocation and utilization
Satisfying consumer needs and meeting delivery timelines (Rosli, Haziq, 2017).
They are core aspect of project planning to meet project costs.
Scheduling and cost control are essential for project success.
Based on Rosli, Haziq (2017), project budgeting helps in determining the necessary and needed resources to effectively manage a project. It is important to consider the process and affiliation in consideration to performance issues and resources. It is also important to effectively improve and coordinate the different processes of budgeting such as constraints of costs to a project. Rosli, Haziq (2017), further argues the process of managing cost and budgets will either influence the success and failure of a project. Therefore, for a successful project, a timely performance of a project team will determine the ability to meet the set timelines and quantifiably improve and meet the necessary demands of a project. All these imply to the concept of a project success measurement in terms delivery of the needed and necessary deliverables. Covering all the necessary deliverables at the right time and within the needed framework, helps to improve and meet the necessary demands of the project stakeholders.
It is also important to understand the necessary project lifecycles and how each lifecycle impacts a project development differently. Therefore, it is important for project managers to understand the process of project management and how to effectively develop the necessary process implementation to ensure successful implementation of a project. As a manager, one should always possess good communication skills to improve and increase communication plans for the project team and overall communication with the stakeholders. Good communication plans will help the project team to identify the necessary project goals, deliverables, timelines, and resource allocation, keep track of project changes and project progress. The importance of project scheduling is to ensure there is a control for project success and meeting the needed successful projections based on evaluations and plans. It is also ideally a complete concept to ensure there is a considerable performance to help, develop and increase.
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docxtodd581
Running head: PLANNING CONSIDERATIONS FOR THE HR PROJECT 1
PLANNING CONSIDERATIONS FOR THE HR PROJECT 2
Planning Considerations for The HR Project
Student`s Name
Institutional Affiliation
PLANNING CONSIDERATIONS FOR THE HR PROJECT
In the quest to plan and ensure that a project has served its purpose, it is important to evaluate the conduct of certain facets. Project scheduling and scope are two fundamental concepts that play an integral role in project planning. In essence, each of the two is applicable diversely and serve a different purpose. Scheduling is one of the critical processes and part of the plan which ensures that the project is delivered on time. It gives the project manager the consideration of the duration to be used in accomplishing defined tasks within a project. A well-formulated schedule gives practical guidance throughout the project lifecycle (Al Wahshi et al. 2013). It greatly helps in ensuring that the team stays on track until the project is accomplished. On the other hand, the scope goes hand in hand with the scheduling. It is executed with all the stakeholders in consideration. The scope depicts and assesses the intended or the expects results of the project. It also helps to outline the requirements that are relevant in bringing the project into completion.
While the scope seeks to identify the intended results, scheduling helps to assess the expected period that it will take to complete a given project. Therefore, when considering the scope, it is also good to see the relevance of duration or time, and that is where scheduling comes in handy. A project will incorporate the planning of other minor processes (Al Wahshi et al. 2013). In essence, the processes will then need a defined timeframe under which each should be accomplished. Therefore, when tabling them, it is good to understand the importance of a fixed period under which they should be performed. Scheduling is fundamental in the execution of the scope since it helps to guide the team members on the importance of being time conscious (Demilliere, 2014). Scheduling also helps to ensure that time wastage is minimal in carrying out the tasks and duties that are needed to ensure that the scope is met. In essence, while the scope breaks the tasks down to make them deliverables, scheduling helps to define how when the same will be delivered. Figuratively, the statement of purpose in a defined project would be to changing the channels of message delivery and communication in a given organization.
Project resourcing is essential, and in order to understand the dynamics under which it works, it is fundamental to consider other underlying drivers. Essentially these enhancements help to ensure that this part of the project is effective and yields the maximum results. It is therefore vital to consider the most effective behavioral skills. They include team-building, communication, problem-solving and decision-making skills (Marzagão & Carvalho, 2016). Team.
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docxglendar3
Running head: PLANNING CONSIDERATIONS FOR THE HR PROJECT 1
PLANNING CONSIDERATIONS FOR THE HR PROJECT 2
Planning Considerations for The HR Project
Student`s Name
Institutional Affiliation
PLANNING CONSIDERATIONS FOR THE HR PROJECT
In the quest to plan and ensure that a project has served its purpose, it is important to evaluate the conduct of certain facets. Project scheduling and scope are two fundamental concepts that play an integral role in project planning. In essence, each of the two is applicable diversely and serve a different purpose. Scheduling is one of the critical processes and part of the plan which ensures that the project is delivered on time. It gives the project manager the consideration of the duration to be used in accomplishing defined tasks within a project. A well-formulated schedule gives practical guidance throughout the project lifecycle (Al Wahshi et al. 2013). It greatly helps in ensuring that the team stays on track until the project is accomplished. On the other hand, the scope goes hand in hand with the scheduling. It is executed with all the stakeholders in consideration. The scope depicts and assesses the intended or the expects results of the project. It also helps to outline the requirements that are relevant in bringing the project into completion.
While the scope seeks to identify the intended results, scheduling helps to assess the expected period that it will take to complete a given project. Therefore, when considering the scope, it is also good to see the relevance of duration or time, and that is where scheduling comes in handy. A project will incorporate the planning of other minor processes (Al Wahshi et al. 2013). In essence, the processes will then need a defined timeframe under which each should be accomplished. Therefore, when tabling them, it is good to understand the importance of a fixed period under which they should be performed. Scheduling is fundamental in the execution of the scope since it helps to guide the team members on the importance of being time conscious (Demilliere, 2014). Scheduling also helps to ensure that time wastage is minimal in carrying out the tasks and duties that are needed to ensure that the scope is met. In essence, while the scope breaks the tasks down to make them deliverables, scheduling helps to define how when the same will be delivered. Figuratively, the statement of purpose in a defined project would be to changing the channels of message delivery and communication in a given organization.
Project resourcing is essential, and in order to understand the dynamics under which it works, it is fundamental to consider other underlying drivers. Essentially these enhancements help to ensure that this part of the project is effective and yields the maximum results. It is therefore vital to consider the most effective behavioral skills. They include team-building, communication, problem-solving and decision-making skills (Marzagão & Carvalho, 2016). Team.
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docxcowinhelen
Running head: IMPLEMENTATION STRATEGIES
IMPLEMENTATION STRATEGIES 4
Implementation Strategies
Michael Boddie
Application Implementation
CMGT/445
Michael Goyden
December 11, 2017
Introduction
Project communication is very critical to the success of any project. It is also critical to key project management soft-skill. As a project manager, project communication is one deliverable that they are personally responsible for and it was of the largest influence over the failure or project success. There are main elements of project communications examples are project sponsors, customers, project team members, project manager, and project management office.
Project communication plan
The major objectives of a communication plan are; to encourage the use of project management best practices, ensure a consistent, give accurate and timely information about the project, and to promote and gain support for the project management improvements.
Table 1 below shows the target audience
Project stakeholders
Message
Delivery method
Delivery Frequency
Communicator
Project Sponsor
Project plans and status report
Meeting
Report sent via mail to project sponsor
Weekly
Project manager
Project core team
Project plans
Meeting
Weekly
Project manager
Executive management
Project briefing
Oral briefing and presentation of slides
Monthly
Biweekly
Project manager
Programmers
Project briefing
Oral briefing
Daily
Project manager
Users
Project status
Meeting and presentation slides
Weekly
Project manager
Communication message contents
A project plan shoes a guide of project execution and project control. Then document also shows approved scope of the project, the cost, and schedule. Project plans shows the current and future plans. The documents also shows project problems and issues. Project plan also shows planned project deliverables for the next period. The status report, keeps the key project stakeholders informed. It is shows status summary, status budget, status scope, accomplishment, issues, and project team members. Project briefing shows project issues and problems, it also shows goals of project management improvement, and project checklist (Project Management Institute, 2017).
Documentation Required
There are eight essential documents required for this project. First is a project charter. This document formally recognizes the project creation and the formal contract between project sponsors, project stakeholders, and commercial agreement. Project charter documents gathers aspects related to the contracting and the contacted example is the project name, the goals of the project and the needs that the project it serves. Project charter also shows a brief description of the project, feasibility study, the project products i.e. training manuals, supporting, and monitoring post release of the project. A project charter also shows the intermediate products whic ...
Assignment 1 Organizing HR ProjectsIn order to effect a more ce.docxfelicitytaft14745
Assignment 1: Organizing HR Projects
In order to effect a more centralized model of delivering Human Resources services, there are core project functions that must be undertaken to ensure success as well as ascertaining that all parties are motivated to working with the new model. Establishing a new project team requires orientation to the overall goals and objectives in a bid to ensure that every team member is well aware of both intermediate and final goals. This will act as a guidance to the team making processes and functions easier. On the other hand, successful implementation requires strategic planning which is about allocation of resources, planning, and scheduling in a manner that optimizes the available resources and performing within the budget and the timeline (Neluheni, Pretorius & Ukpere, 2014). In this respect, it is the duty of the project manager or leader to guide and oversee the various processes and activities in a bid to ensure that the desired goals and objectives are being achieved.
The Statement of Overall Importance
When implementing the project, the overall steps of strategic planning are important to start, progress, and finish of the project. There are distinct steps such as vision where the overall goals and desired outcomes are communicated to the parties involved in the accomplishment of the task. Other steps such as planning also highlights the importance of laying down the strategy for attaining various tasks where resources are allocated optimally in a manner that avoids wastage. As a project leader, it is highly important that strategic planning is undertaken. In the field of project management, studies have shown that failure to effectively plan is one of the major contributors to failure especially when it comes to performing within the deadline and budget (Kerzner, 2013). A project manager must be able to put in place a plan that has goals and objectives that must be communicated to the concerned parties such as the team members. Actually, it is deemed best practice when a leader involves other parties such as team members in formulating a plan which improves the diversity of the decisions made.
The steps provided in the texts is highly important to the project. It is imperative to note that project management is nowadays strategic meaning that it must align with overall strategic direction of the organization. Majority of organizations are currently funding projects that are seen to have a direct influence on the strategic direction of the organization. For instance, in this case, it can be seen that the goal is to ensure easier and more efficient management of human resources which have become a strategic tool as opposed to a supporting function it has been over the previous decades. In essence, the strategic planning process will help outline goals, communicate the plans, and strategize on how various tasks and processes will be accomplished in line with desired goals.
Vision and Mission Statements
.
Running Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docxtodd581
Running Head: PROJECT MANAGEMENT METHODOLOGIES & TOOLS 1
PROJECT MANAGEMENT METHODOLOGIES & TOOLS 5
PROJECT MANAGEMENT METHODOLOGIES & TOOLS
Mekdes Asaminew
Rasmussen College
05/16/2020
FAQ document
What are project management tools?
These are the instruments which project managers use to plan, execute as well as manage plans in one centralized virtual location. These tools vary from team to team depending on the tasks to be performed in the project. The project management tools include; project management software, real-time instant messaging tool, knowledge base tool and file sharing tool.
What is project management software?
This is computer software which helps the project team members to collaborate during the project, plan all their activities as well as to record all the collected data.
What is a real-time instant messaging tool?
It is a tool that allows team members of a particular project to talk and video call with colleagues in real time. This tool helps improve collaboration of the team members and allows all people to collectively provide their opinions on different matters during carrying out the project.
What is knowledge base tool?
It involves a search database that allows individual to store the combined wisdom of the team members and ensures that the information is accessible to all members
What is a file sharing tool?
It is a tool which allows people to save sync and share files. It ensures that all the documents provided by team members are well stored and easily retrievable for future reference. (Bilal.et.al, 2017)
What are project management methodologies?
Project management methodologies are basically the different techniques which are used to approach a given project; every methodology of project management has its unique process and workflow. They are classified into “traditional or sequential methodologies, agile methodologies, the change management methodologies and process-based methodologies.”
What are the traditional or sequential methodologies?
These are the methods of managing a project which involve a sequence of tasks which lead to the final deliverables and project managers are required to ensure that the tasks are worked on them in a given order. The methodologies classified under this category include;
· Waterfall project management methodology; involves completing a certain task before beginning another task in a linked sequence of objects which adds up to the general goal. It is used in projects that create physical objects like building a computer.
· Critical path method; it involves prioritizing and allocating available raw materials to ensure the most crucial task is done as well as rescheduling lower priority task.
· Critical chain project management; involves a technique for putting main concentration on the needed materials.
What are agile methodologies?
These are project management methodologies which prioritize on shorter iterative cycles and flexibility. They are categorized .
Scheduling and Cost ControlChristopher MihunPM620-1801B-01.docxanhlodge
Scheduling and Cost Control
Christopher Mihun
PM620-1801B-01
Professor Borodin
Introduction
Project differ from one organization to another.
There are periods when an organization uses a project for special functions.
There are those which use projects as part of an integrated business platform and architecture.
Therefore, for a successful implementation of a project:
Human resources
Equipment and materials
Financial resources and facilities
2
Why are scheduling and cost control important for project success?
These are a closely related concept for project management.
The importance of scheduling and cost control include:
Efficiency in project management (Kerzner, 2015).
Profitability through ensuring good resources allocation and utilization
Satisfying consumer needs and meeting delivery timelines (Rosli, Haziq, 2017).
They are core aspect of project planning to meet project costs.
Scheduling and cost control are essential for project success.
Based on Rosli, Haziq (2017), project budgeting helps in determining the necessary and needed resources to effectively manage a project. It is important to consider the process and affiliation in consideration to performance issues and resources. It is also important to effectively improve and coordinate the different processes of budgeting such as constraints of costs to a project. Rosli, Haziq (2017), further argues the process of managing cost and budgets will either influence the success and failure of a project. Therefore, for a successful project, a timely performance of a project team will determine the ability to meet the set timelines and quantifiably improve and meet the necessary demands of a project. All these imply to the concept of a project success measurement in terms delivery of the needed and necessary deliverables. Covering all the necessary deliverables at the right time and within the needed framework, helps to improve and meet the necessary demands of the project stakeholders.
It is also important to understand the necessary project lifecycles and how each lifecycle impacts a project development differently. Therefore, it is important for project managers to understand the process of project management and how to effectively develop the necessary process implementation to ensure successful implementation of a project. As a manager, one should always possess good communication skills to improve and increase communication plans for the project team and overall communication with the stakeholders. Good communication plans will help the project team to identify the necessary project goals, deliverables, timelines, and resource allocation, keep track of project changes and project progress. The importance of project scheduling is to ensure there is a control for project success and meeting the needed successful projections based on evaluations and plans. It is also ideally a complete concept to ensure there is a considerable performance to help, develop and increase.
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docxtodd581
Running head: PLANNING CONSIDERATIONS FOR THE HR PROJECT 1
PLANNING CONSIDERATIONS FOR THE HR PROJECT 2
Planning Considerations for The HR Project
Student`s Name
Institutional Affiliation
PLANNING CONSIDERATIONS FOR THE HR PROJECT
In the quest to plan and ensure that a project has served its purpose, it is important to evaluate the conduct of certain facets. Project scheduling and scope are two fundamental concepts that play an integral role in project planning. In essence, each of the two is applicable diversely and serve a different purpose. Scheduling is one of the critical processes and part of the plan which ensures that the project is delivered on time. It gives the project manager the consideration of the duration to be used in accomplishing defined tasks within a project. A well-formulated schedule gives practical guidance throughout the project lifecycle (Al Wahshi et al. 2013). It greatly helps in ensuring that the team stays on track until the project is accomplished. On the other hand, the scope goes hand in hand with the scheduling. It is executed with all the stakeholders in consideration. The scope depicts and assesses the intended or the expects results of the project. It also helps to outline the requirements that are relevant in bringing the project into completion.
While the scope seeks to identify the intended results, scheduling helps to assess the expected period that it will take to complete a given project. Therefore, when considering the scope, it is also good to see the relevance of duration or time, and that is where scheduling comes in handy. A project will incorporate the planning of other minor processes (Al Wahshi et al. 2013). In essence, the processes will then need a defined timeframe under which each should be accomplished. Therefore, when tabling them, it is good to understand the importance of a fixed period under which they should be performed. Scheduling is fundamental in the execution of the scope since it helps to guide the team members on the importance of being time conscious (Demilliere, 2014). Scheduling also helps to ensure that time wastage is minimal in carrying out the tasks and duties that are needed to ensure that the scope is met. In essence, while the scope breaks the tasks down to make them deliverables, scheduling helps to define how when the same will be delivered. Figuratively, the statement of purpose in a defined project would be to changing the channels of message delivery and communication in a given organization.
Project resourcing is essential, and in order to understand the dynamics under which it works, it is fundamental to consider other underlying drivers. Essentially these enhancements help to ensure that this part of the project is effective and yields the maximum results. It is therefore vital to consider the most effective behavioral skills. They include team-building, communication, problem-solving and decision-making skills (Marzagão & Carvalho, 2016). Team.
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docxglendar3
Running head: PLANNING CONSIDERATIONS FOR THE HR PROJECT 1
PLANNING CONSIDERATIONS FOR THE HR PROJECT 2
Planning Considerations for The HR Project
Student`s Name
Institutional Affiliation
PLANNING CONSIDERATIONS FOR THE HR PROJECT
In the quest to plan and ensure that a project has served its purpose, it is important to evaluate the conduct of certain facets. Project scheduling and scope are two fundamental concepts that play an integral role in project planning. In essence, each of the two is applicable diversely and serve a different purpose. Scheduling is one of the critical processes and part of the plan which ensures that the project is delivered on time. It gives the project manager the consideration of the duration to be used in accomplishing defined tasks within a project. A well-formulated schedule gives practical guidance throughout the project lifecycle (Al Wahshi et al. 2013). It greatly helps in ensuring that the team stays on track until the project is accomplished. On the other hand, the scope goes hand in hand with the scheduling. It is executed with all the stakeholders in consideration. The scope depicts and assesses the intended or the expects results of the project. It also helps to outline the requirements that are relevant in bringing the project into completion.
While the scope seeks to identify the intended results, scheduling helps to assess the expected period that it will take to complete a given project. Therefore, when considering the scope, it is also good to see the relevance of duration or time, and that is where scheduling comes in handy. A project will incorporate the planning of other minor processes (Al Wahshi et al. 2013). In essence, the processes will then need a defined timeframe under which each should be accomplished. Therefore, when tabling them, it is good to understand the importance of a fixed period under which they should be performed. Scheduling is fundamental in the execution of the scope since it helps to guide the team members on the importance of being time conscious (Demilliere, 2014). Scheduling also helps to ensure that time wastage is minimal in carrying out the tasks and duties that are needed to ensure that the scope is met. In essence, while the scope breaks the tasks down to make them deliverables, scheduling helps to define how when the same will be delivered. Figuratively, the statement of purpose in a defined project would be to changing the channels of message delivery and communication in a given organization.
Project resourcing is essential, and in order to understand the dynamics under which it works, it is fundamental to consider other underlying drivers. Essentially these enhancements help to ensure that this part of the project is effective and yields the maximum results. It is therefore vital to consider the most effective behavioral skills. They include team-building, communication, problem-solving and decision-making skills (Marzagão & Carvalho, 2016). Team.
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docxcowinhelen
Running head: IMPLEMENTATION STRATEGIES
IMPLEMENTATION STRATEGIES 4
Implementation Strategies
Michael Boddie
Application Implementation
CMGT/445
Michael Goyden
December 11, 2017
Introduction
Project communication is very critical to the success of any project. It is also critical to key project management soft-skill. As a project manager, project communication is one deliverable that they are personally responsible for and it was of the largest influence over the failure or project success. There are main elements of project communications examples are project sponsors, customers, project team members, project manager, and project management office.
Project communication plan
The major objectives of a communication plan are; to encourage the use of project management best practices, ensure a consistent, give accurate and timely information about the project, and to promote and gain support for the project management improvements.
Table 1 below shows the target audience
Project stakeholders
Message
Delivery method
Delivery Frequency
Communicator
Project Sponsor
Project plans and status report
Meeting
Report sent via mail to project sponsor
Weekly
Project manager
Project core team
Project plans
Meeting
Weekly
Project manager
Executive management
Project briefing
Oral briefing and presentation of slides
Monthly
Biweekly
Project manager
Programmers
Project briefing
Oral briefing
Daily
Project manager
Users
Project status
Meeting and presentation slides
Weekly
Project manager
Communication message contents
A project plan shoes a guide of project execution and project control. Then document also shows approved scope of the project, the cost, and schedule. Project plans shows the current and future plans. The documents also shows project problems and issues. Project plan also shows planned project deliverables for the next period. The status report, keeps the key project stakeholders informed. It is shows status summary, status budget, status scope, accomplishment, issues, and project team members. Project briefing shows project issues and problems, it also shows goals of project management improvement, and project checklist (Project Management Institute, 2017).
Documentation Required
There are eight essential documents required for this project. First is a project charter. This document formally recognizes the project creation and the formal contract between project sponsors, project stakeholders, and commercial agreement. Project charter documents gathers aspects related to the contracting and the contacted example is the project name, the goals of the project and the needs that the project it serves. Project charter also shows a brief description of the project, feasibility study, the project products i.e. training manuals, supporting, and monitoring post release of the project. A project charter also shows the intermediate products whic ...
This document comprises of topics based on The Project Management, the project manager and project lifecycle.
The concepts being tackled include:
-definition of project manager
-responsibilities of a project manager
-stages in the project management lifecycle
-organizational strategy
-Main functions of PMO
Project Management Strategy and Tactics 1 Course Learning .docxpauline234567
Project Management Strategy and Tactics 1
Course Learning Outcomes for Unit III
Upon completion of this unit, students should be able to:
3. Summarize the project management process groups.
3.1 Summarize the initiation phase of a project.
3.2 Assess the 5Ws and 1H of team formation in the initiation phase of a project.
Course/Unit
Learning Outcomes
Learning Activity
3.1
Unit Lesson
Part 1: Chapter 13
Part 2: Chapter 2
Unit III Scholarly Activity
3.2
Unit Lesson
Part 1: Chapter 9, pp. 99-103
Part 1: Chapter 13
Part 2: Chapter 2
Blog: “#NowIUnderstand Glossary: The 5W1H Method”
Unit III Scholarly Activity
Required Unit Resources
Part 1: Chapter 9: Project Resource Management, pp. 99-103
Part 1: Chapter 13: Project Stakeholder Management
Part 2: Chapter 2: Initiating Process Group
In order to access the following resource, click the link below.
Humanperf Software. (2018, May 3). #NowIUnderstand glossary: The 5W1H method. Humanperf Blog.
https://www.humanperf.com/en/blog/nowiunderstand-glossary/articles/5W1H-method
Unit Lesson
Introduction
Welcome to Unit III. In this unit, we focus on the project management phase of initiating. The initiation phase
is essential because it is here that the vision is established for what will be accomplished. If you recall from
Unit I, we explored how projects are aligned to the strategic objectives and goals of the organization. During
the initiation phase, business benefits from the project are discovered. Based on the business benefits that
the project may be able to deliver, the project stakeholders will determine if the time, money, and risk of the
project are worth the potential benefits or the return on investment (ROI). The stakeholders are important
throughout the entire project, but they are especially important in the initiation phase. The stakeholders play a
pivotal role in ensuring that the project scope and end results are aligned with the strategic objectives of the
organization. If this task is not completed, the company will have projects being completed that have no real
goal and are not tied to the strategic goals. This would mean a loss in ROI. Let’s explore the other key tasks
completed in this phase of the project management process.
UNIT III STUDY GUIDE
Initiating
https://www.humanperf.com/en/blog/nowiunderstand-glossary/articles/5W1H-method
Project Management Strategy and Tactics 2
UNIT x STUDY GUIDE
Title
The Role of the Project Stakeholders
As tempting as it might be to jump into the project, the project stakeholders benefit from taking their time and
ensuring that the project is set in the right direction. So, who are these stakeholders? The project
stakeholders usually play one or two roles in the project. First, they are the ones who will benefit from the
project and will use the end-result deliverables. For example, if the project is to create a new timesheet for the
human resources staff to track the number of.
Running Head Compensation and Benefit Package Planning1.docxtodd271
Running Head: Compensation and Benefit Package Planning
1
Compensation and Benefit Package Planning
2
Compensation and Benefit Package Planning
Introduction
Recently, I have been appointed to manage the Human Resource and to manage a small team. The company's next project is revamping the compensation and benefits package and assists in designing a working plan for the human resource project. As a result of this, I have decided to establish a project charter to help revamp the package and create a communication plan to be used during the project implementation process. By so doing, I would initiate a scope definition of the project and come up with a breakdown structure which includes very ell numbered elements.
The Project Charter
To revamp the compensation and benefits package, one should first establish the strategy and objectives of compensation. He or she should also ensure that the description of the job is correct and up to date followed by developing the structure of payment and finally communicate the plan (Kloppenborg, Tesch & Manolis, 2014). Compensation and benefits are a vital element in an organization. This package helps in attracting potential employees to the organization as well as helping to retain current employees to assist with the company's productivity. Previously, this organization had failed in its pursuit to keep its employees and to offer competitive packages to the same workers.
Where competitive packages lack especially in an organization, there is possibly a lack of employees’ motivation towards performing their jobs. Lack of motivation in a firm is unhealthy since it hampers the company from achieving its desired goals due to low or no productivity at all (Kloppenborg et al., 2014). A compensation and benefits package include the combination of rewards which are given to the employees by a company to boost their trust and hope in the firm and to increase their job-related functions and quality of production within the organization. As the head of human resource management, construction of a project charter is of greatest importance in restructuring the previously ineffective compensation and benefits package in this company.
A project charter will serve as an informal contact tool linking the project sponsors to the project team which is involved in the implementation of the actual project. The project charter, in this case, will, therefore, make sure that the resulting plan is competitive and successful (Marnewick, 2018). It will define the types of requirements which should be accomplished and make a decision on how the project will be carried out right from the beginning to the end. Moreover, the charter will issue the organization with an understanding commitment as well as authorization. To strengthen the package which was previously used by this company, the table below is used as the most appropriate charter.
Project tittle
Employees’ compensation and benefit
Situational analysis
AmeriCorps ha.
The term ‘project management’ initiated its journey in the early 1950s. By definition, project management is the practice of planning and organizing an organization’s resources in order to move a specific task to completion. Before acquiring knowledge in project management, it is significant to know what a ‘project’ is. For this, you can avail our project management assignment help
BPP Training on Project Management - Day 1Imoh Etuk
This training was about exposing the employees of the Lagos State Public Service to the Contemporary Project Management Practices they can adopt to Enhance Project Delivery in the Pandemic Era for the Lagos State Public Service.
Upon successful completion of the training, participants s were to apply the generally recognized practices of project management acknowledged by the Project Management Institute (PMI) to successfully manage projects by:
• Getting started with project management fundamentals.
• Identifying organizational influences and project life cycle.
• Working with project management processes.
• Initiating a project.
• Planning a project.
• Planning for project time management.
• Planning project budget, quality, and communications.
• Planning for risk, procurements, and stakeholder management.
• Executing a project.
• Managing project work, scope, schedules, and cost.
• Controlling a project.
• Closing a project.
Software Project Management | An Overview of the Software Project ManagementAhsan Rahim
Management is the process of getting things done through others, it is the process of coordinating people & other resources to achieve the goals of the organization. A project is a set of related tasks that are coordinated to achieve a specific objective in a given time limit. A project is well-defined task, which is a collection of several operations done in order to achieve a goal. Software is the program & all associated documentation & configuration data which is needed to make these programs operate correctly.
A Software Project is the complete procedure of software development from requirement gathering to testing & maintenance, carried out according to the execution methodologies, in a specified period of time to achieve intended software product.
Running head CCCU SIGNAGE1CCCU SIGNAGE2Project manage.docxsusanschei
Running head: CCCU SIGNAGE 1
CCCU SIGNAGE 2
Project management process is a crucial tool in the development of any organization. This is because the projects that the organization deploys determine the business clientele. Critical analysis of the project management process is paramount to the successful execution of these elements within an organization. In the case of introducing the California Coast Credit Union into the San Diego State University, there are five crucial processes that should be adhered to in order to ensure the project’s success.
Initiation
During the initiation process, the eligibility of any relevant projects available is checked so as to validate the feasibility of the project plan. Once the project plans have been presented and the feasibility checked, the selection process is then initiated based on the requirements that each individual project would require. The project manager and the project management team then sign off on the requirements of the specific project selected.
In this case, the DBSI team was selected for the implementation of data signage procedures that are to be introduced within the student’s hub of the San Diego State University. It is during this stage that the appropriate team members of the project are identified as well as the project leaders. Selection of the project leaders is crucial to the next stage of the project management process, which is the planning process. Furthermore, the ideal environment for the execution of the project is also identified so as to propagate an approximate orientation as to the next stage of the project plan (True Story: California Coast Credit Union, 2014).
Planning
The next stage of the project management process is the planning process. The planning process is crucial in the intricate addressing of the project requirements so as to effectively kick-start the project. Once all the project requirements are identified, the project planning can then be able to cultivate procedural steps in the implementation of the project. The project requirements are aligned with the project objectives or the elements that the project hopes to achieve. The specific objectives of the California Coast Credit Union by introducing data signage in the San Diego State University is to create an interactive forum where the students would be able to relate to the credit union, create a specific brand that would advocate for reliability and accessibility, and finally create and more engaging foot traffic among the thirty thousand students operating the campus (5 Basic Phases of Project Management, 2016).
The planning process also involves the scope of the project in terms of its relativity to the actual services that the project hopes to provide. The scope would entail prospects such as open-air digital designs, using the ideal equipment so as to utilize the available technology and presentation of the right content in an entertaining forum. Moreover, the planning process also has ...
Running head Multi-actor modelling system 1Multi-actor mod.docxglendar3
Running head: Multi-actor modelling system 1
Multi-actor modelling system3
Multi-actor modelling system
Yogesh Dagwale
University of the Cumberland’s
Ligtenberg, A., Wachowicz, M., Bregt, A. K., Beulens, A., & Kettenis, D. L. (2004). A design and application of a multi-agent system for simulation of multi-actor spatial planning. Journal of environmental management, 72(1-2), 43-55.
They talk about the potential and restrictions of the MAS to manufacture models that empower spatial organizers to incorporate the 'actor factor' in their examination. Their structure system contemplates actors who assume a functioning job in the spatial planning. They included actors who can watch and see a spatial domain. Using these perceptions and discernment they produce an inclination for a preferred spatial situation. Actors at that point present and discuss their inclinations amid their exchanges with different actors.
The inclinations of the actor fill in as inputs for an official choice making. Finally, ultimate conclusions are actualized in the spatial framework. They found that MAS can produce space utilization designs in light of a portrayal of a multi-actor planning process. It additionally can clear up the impacts of actors under the administration of various planning styles on the space utilization and prove how the relations between actors change amid a planning process and under different orders of coming up with decisions. Unlike the work by Parker, Manson, Janssen, Hoffman & Deadman,2003, cited below, this paper did not include the various challenges associated with the use of MAS.
Parker, D. C., Manson, S. M., Janssen, M. A., Hoffmann, M. J., & Deadman, P. (2003). Multi-agent systems for the simulation of land-use and land-cover change: a review. Annals of the association of American Geographers, 93(2), 314-337.
In this paper, they studied different models. These models, however, were not thorough enough and therefore they took into account the multi-actor system, dynamic spatial Simulation, which has two components, that is, a cellular model that speaks to biogeophysical and biological parts of a demonstrated framework and an actor-based model to speak to human conclusion making. Because of its nature and ability to model complex situations, they highlighted some of the areas that MAS can be applied where other models cannot be able to deliver. Such areas are modeling of emergent phenomena whereby MAS can model landscape plans, due to its flexibility, MAS can represent complex land use/ cover systems, and they can be used to model dynamic paths. They also outlined the various challenges to Multi-actor systems. Such challenges include an understanding of complexity, individual decision making, empirical parameterization and model validation, and communication.
Faber, N. R., & Jorna, R. J. (2011, June). The use of multi-actor systems for studying social sustainability: Theoretical backgrounds and pseudo-specifications. In Com.
Running head: MY MOTHER MY HERO 1
MY MOTHER MY HERO 4
My Mother My hero
Institution Affiliation
Students’ Name
Date of Submission
My Mother My hero
Once I think of a hero, there are specific qualities that surround my imagination, being courageous, hardworking, truthful, strong, resilient, and generous have been the qualities I taught about. I also think a hero is someone protective, caring, and so concerned to change the life of the others and make them happy in their life. My Mother has all these qualities and recognizes her as my hero. Otherwise, she grew up on the support of two great parents who had a good life where she grew up and become a teacher in her life. Almost every individual has had some achievements in their life, and there must be a factor behind those achievements, especially someone who had a significant impact on their life. My mother appears to be my hero, who had a substantial impact on my life.
She is currently 54 years old. She was a teacher by profession, and she did her best as a teacher, where she influenced the lives of many students positively; up to now, some still call her and pass their appreciation to her. She was blessed and gave birth to seven kids; the first three are daughters, then a boy and a girl, and then the last two are boys. All of them have been significantly raised, everyone has something to do for a living, my big brother is a doctor, and three of my sisters are teachers, (like Mother like daughters). Our last born is an engineer interior designer and all of us are married with happy family. All these were not for granted but because of the love of God and the efforts, commitment, and great concern of our beloved parents, especially our Mother.
Even though she did not make a complete journey in her teaching profession, but up to where she stopped, she did a lot. They have been in a relationship with my father for thirty-six years of marriage, and when they had their third kid, my dad suggested that she stop teaching and remain at home to take care of the children. Throughout my entire life, my Mother had been supportive of me, a center of inspiration, and she has always been telling me to have self-confidence and believe in myself that I can make it. In case I face a problem, and I have to make a concrete decision towards it, my Mother always had behind me because I seek for her consultation before I move on to the next step.
It feels so great knowing that there is someone who will support you despite the intensity of the problem you face. It relieves much of the stress that comes along with making decisions. My Mother is beautiful inside and out, but most importantly, she has the biggest heart. She's a hard-working person and can play both parent roles. Everyon.
More Related Content
Similar to Running head PLANNING FOR HR PROJECT1PLANNING FOR HR PROJEC.docx
This document comprises of topics based on The Project Management, the project manager and project lifecycle.
The concepts being tackled include:
-definition of project manager
-responsibilities of a project manager
-stages in the project management lifecycle
-organizational strategy
-Main functions of PMO
Project Management Strategy and Tactics 1 Course Learning .docxpauline234567
Project Management Strategy and Tactics 1
Course Learning Outcomes for Unit III
Upon completion of this unit, students should be able to:
3. Summarize the project management process groups.
3.1 Summarize the initiation phase of a project.
3.2 Assess the 5Ws and 1H of team formation in the initiation phase of a project.
Course/Unit
Learning Outcomes
Learning Activity
3.1
Unit Lesson
Part 1: Chapter 13
Part 2: Chapter 2
Unit III Scholarly Activity
3.2
Unit Lesson
Part 1: Chapter 9, pp. 99-103
Part 1: Chapter 13
Part 2: Chapter 2
Blog: “#NowIUnderstand Glossary: The 5W1H Method”
Unit III Scholarly Activity
Required Unit Resources
Part 1: Chapter 9: Project Resource Management, pp. 99-103
Part 1: Chapter 13: Project Stakeholder Management
Part 2: Chapter 2: Initiating Process Group
In order to access the following resource, click the link below.
Humanperf Software. (2018, May 3). #NowIUnderstand glossary: The 5W1H method. Humanperf Blog.
https://www.humanperf.com/en/blog/nowiunderstand-glossary/articles/5W1H-method
Unit Lesson
Introduction
Welcome to Unit III. In this unit, we focus on the project management phase of initiating. The initiation phase
is essential because it is here that the vision is established for what will be accomplished. If you recall from
Unit I, we explored how projects are aligned to the strategic objectives and goals of the organization. During
the initiation phase, business benefits from the project are discovered. Based on the business benefits that
the project may be able to deliver, the project stakeholders will determine if the time, money, and risk of the
project are worth the potential benefits or the return on investment (ROI). The stakeholders are important
throughout the entire project, but they are especially important in the initiation phase. The stakeholders play a
pivotal role in ensuring that the project scope and end results are aligned with the strategic objectives of the
organization. If this task is not completed, the company will have projects being completed that have no real
goal and are not tied to the strategic goals. This would mean a loss in ROI. Let’s explore the other key tasks
completed in this phase of the project management process.
UNIT III STUDY GUIDE
Initiating
https://www.humanperf.com/en/blog/nowiunderstand-glossary/articles/5W1H-method
Project Management Strategy and Tactics 2
UNIT x STUDY GUIDE
Title
The Role of the Project Stakeholders
As tempting as it might be to jump into the project, the project stakeholders benefit from taking their time and
ensuring that the project is set in the right direction. So, who are these stakeholders? The project
stakeholders usually play one or two roles in the project. First, they are the ones who will benefit from the
project and will use the end-result deliverables. For example, if the project is to create a new timesheet for the
human resources staff to track the number of.
Running Head Compensation and Benefit Package Planning1.docxtodd271
Running Head: Compensation and Benefit Package Planning
1
Compensation and Benefit Package Planning
2
Compensation and Benefit Package Planning
Introduction
Recently, I have been appointed to manage the Human Resource and to manage a small team. The company's next project is revamping the compensation and benefits package and assists in designing a working plan for the human resource project. As a result of this, I have decided to establish a project charter to help revamp the package and create a communication plan to be used during the project implementation process. By so doing, I would initiate a scope definition of the project and come up with a breakdown structure which includes very ell numbered elements.
The Project Charter
To revamp the compensation and benefits package, one should first establish the strategy and objectives of compensation. He or she should also ensure that the description of the job is correct and up to date followed by developing the structure of payment and finally communicate the plan (Kloppenborg, Tesch & Manolis, 2014). Compensation and benefits are a vital element in an organization. This package helps in attracting potential employees to the organization as well as helping to retain current employees to assist with the company's productivity. Previously, this organization had failed in its pursuit to keep its employees and to offer competitive packages to the same workers.
Where competitive packages lack especially in an organization, there is possibly a lack of employees’ motivation towards performing their jobs. Lack of motivation in a firm is unhealthy since it hampers the company from achieving its desired goals due to low or no productivity at all (Kloppenborg et al., 2014). A compensation and benefits package include the combination of rewards which are given to the employees by a company to boost their trust and hope in the firm and to increase their job-related functions and quality of production within the organization. As the head of human resource management, construction of a project charter is of greatest importance in restructuring the previously ineffective compensation and benefits package in this company.
A project charter will serve as an informal contact tool linking the project sponsors to the project team which is involved in the implementation of the actual project. The project charter, in this case, will, therefore, make sure that the resulting plan is competitive and successful (Marnewick, 2018). It will define the types of requirements which should be accomplished and make a decision on how the project will be carried out right from the beginning to the end. Moreover, the charter will issue the organization with an understanding commitment as well as authorization. To strengthen the package which was previously used by this company, the table below is used as the most appropriate charter.
Project tittle
Employees’ compensation and benefit
Situational analysis
AmeriCorps ha.
The term ‘project management’ initiated its journey in the early 1950s. By definition, project management is the practice of planning and organizing an organization’s resources in order to move a specific task to completion. Before acquiring knowledge in project management, it is significant to know what a ‘project’ is. For this, you can avail our project management assignment help
BPP Training on Project Management - Day 1Imoh Etuk
This training was about exposing the employees of the Lagos State Public Service to the Contemporary Project Management Practices they can adopt to Enhance Project Delivery in the Pandemic Era for the Lagos State Public Service.
Upon successful completion of the training, participants s were to apply the generally recognized practices of project management acknowledged by the Project Management Institute (PMI) to successfully manage projects by:
• Getting started with project management fundamentals.
• Identifying organizational influences and project life cycle.
• Working with project management processes.
• Initiating a project.
• Planning a project.
• Planning for project time management.
• Planning project budget, quality, and communications.
• Planning for risk, procurements, and stakeholder management.
• Executing a project.
• Managing project work, scope, schedules, and cost.
• Controlling a project.
• Closing a project.
Software Project Management | An Overview of the Software Project ManagementAhsan Rahim
Management is the process of getting things done through others, it is the process of coordinating people & other resources to achieve the goals of the organization. A project is a set of related tasks that are coordinated to achieve a specific objective in a given time limit. A project is well-defined task, which is a collection of several operations done in order to achieve a goal. Software is the program & all associated documentation & configuration data which is needed to make these programs operate correctly.
A Software Project is the complete procedure of software development from requirement gathering to testing & maintenance, carried out according to the execution methodologies, in a specified period of time to achieve intended software product.
Running head CCCU SIGNAGE1CCCU SIGNAGE2Project manage.docxsusanschei
Running head: CCCU SIGNAGE 1
CCCU SIGNAGE 2
Project management process is a crucial tool in the development of any organization. This is because the projects that the organization deploys determine the business clientele. Critical analysis of the project management process is paramount to the successful execution of these elements within an organization. In the case of introducing the California Coast Credit Union into the San Diego State University, there are five crucial processes that should be adhered to in order to ensure the project’s success.
Initiation
During the initiation process, the eligibility of any relevant projects available is checked so as to validate the feasibility of the project plan. Once the project plans have been presented and the feasibility checked, the selection process is then initiated based on the requirements that each individual project would require. The project manager and the project management team then sign off on the requirements of the specific project selected.
In this case, the DBSI team was selected for the implementation of data signage procedures that are to be introduced within the student’s hub of the San Diego State University. It is during this stage that the appropriate team members of the project are identified as well as the project leaders. Selection of the project leaders is crucial to the next stage of the project management process, which is the planning process. Furthermore, the ideal environment for the execution of the project is also identified so as to propagate an approximate orientation as to the next stage of the project plan (True Story: California Coast Credit Union, 2014).
Planning
The next stage of the project management process is the planning process. The planning process is crucial in the intricate addressing of the project requirements so as to effectively kick-start the project. Once all the project requirements are identified, the project planning can then be able to cultivate procedural steps in the implementation of the project. The project requirements are aligned with the project objectives or the elements that the project hopes to achieve. The specific objectives of the California Coast Credit Union by introducing data signage in the San Diego State University is to create an interactive forum where the students would be able to relate to the credit union, create a specific brand that would advocate for reliability and accessibility, and finally create and more engaging foot traffic among the thirty thousand students operating the campus (5 Basic Phases of Project Management, 2016).
The planning process also involves the scope of the project in terms of its relativity to the actual services that the project hopes to provide. The scope would entail prospects such as open-air digital designs, using the ideal equipment so as to utilize the available technology and presentation of the right content in an entertaining forum. Moreover, the planning process also has ...
Running head Multi-actor modelling system 1Multi-actor mod.docxglendar3
Running head: Multi-actor modelling system 1
Multi-actor modelling system3
Multi-actor modelling system
Yogesh Dagwale
University of the Cumberland’s
Ligtenberg, A., Wachowicz, M., Bregt, A. K., Beulens, A., & Kettenis, D. L. (2004). A design and application of a multi-agent system for simulation of multi-actor spatial planning. Journal of environmental management, 72(1-2), 43-55.
They talk about the potential and restrictions of the MAS to manufacture models that empower spatial organizers to incorporate the 'actor factor' in their examination. Their structure system contemplates actors who assume a functioning job in the spatial planning. They included actors who can watch and see a spatial domain. Using these perceptions and discernment they produce an inclination for a preferred spatial situation. Actors at that point present and discuss their inclinations amid their exchanges with different actors.
The inclinations of the actor fill in as inputs for an official choice making. Finally, ultimate conclusions are actualized in the spatial framework. They found that MAS can produce space utilization designs in light of a portrayal of a multi-actor planning process. It additionally can clear up the impacts of actors under the administration of various planning styles on the space utilization and prove how the relations between actors change amid a planning process and under different orders of coming up with decisions. Unlike the work by Parker, Manson, Janssen, Hoffman & Deadman,2003, cited below, this paper did not include the various challenges associated with the use of MAS.
Parker, D. C., Manson, S. M., Janssen, M. A., Hoffmann, M. J., & Deadman, P. (2003). Multi-agent systems for the simulation of land-use and land-cover change: a review. Annals of the association of American Geographers, 93(2), 314-337.
In this paper, they studied different models. These models, however, were not thorough enough and therefore they took into account the multi-actor system, dynamic spatial Simulation, which has two components, that is, a cellular model that speaks to biogeophysical and biological parts of a demonstrated framework and an actor-based model to speak to human conclusion making. Because of its nature and ability to model complex situations, they highlighted some of the areas that MAS can be applied where other models cannot be able to deliver. Such areas are modeling of emergent phenomena whereby MAS can model landscape plans, due to its flexibility, MAS can represent complex land use/ cover systems, and they can be used to model dynamic paths. They also outlined the various challenges to Multi-actor systems. Such challenges include an understanding of complexity, individual decision making, empirical parameterization and model validation, and communication.
Faber, N. R., & Jorna, R. J. (2011, June). The use of multi-actor systems for studying social sustainability: Theoretical backgrounds and pseudo-specifications. In Com.
Running head: MY MOTHER MY HERO 1
MY MOTHER MY HERO 4
My Mother My hero
Institution Affiliation
Students’ Name
Date of Submission
My Mother My hero
Once I think of a hero, there are specific qualities that surround my imagination, being courageous, hardworking, truthful, strong, resilient, and generous have been the qualities I taught about. I also think a hero is someone protective, caring, and so concerned to change the life of the others and make them happy in their life. My Mother has all these qualities and recognizes her as my hero. Otherwise, she grew up on the support of two great parents who had a good life where she grew up and become a teacher in her life. Almost every individual has had some achievements in their life, and there must be a factor behind those achievements, especially someone who had a significant impact on their life. My mother appears to be my hero, who had a substantial impact on my life.
She is currently 54 years old. She was a teacher by profession, and she did her best as a teacher, where she influenced the lives of many students positively; up to now, some still call her and pass their appreciation to her. She was blessed and gave birth to seven kids; the first three are daughters, then a boy and a girl, and then the last two are boys. All of them have been significantly raised, everyone has something to do for a living, my big brother is a doctor, and three of my sisters are teachers, (like Mother like daughters). Our last born is an engineer interior designer and all of us are married with happy family. All these were not for granted but because of the love of God and the efforts, commitment, and great concern of our beloved parents, especially our Mother.
Even though she did not make a complete journey in her teaching profession, but up to where she stopped, she did a lot. They have been in a relationship with my father for thirty-six years of marriage, and when they had their third kid, my dad suggested that she stop teaching and remain at home to take care of the children. Throughout my entire life, my Mother had been supportive of me, a center of inspiration, and she has always been telling me to have self-confidence and believe in myself that I can make it. In case I face a problem, and I have to make a concrete decision towards it, my Mother always had behind me because I seek for her consultation before I move on to the next step.
It feels so great knowing that there is someone who will support you despite the intensity of the problem you face. It relieves much of the stress that comes along with making decisions. My Mother is beautiful inside and out, but most importantly, she has the biggest heart. She's a hard-working person and can play both parent roles. Everyon.
Running head PROGRAM EVALUATION PLAN1PROGRAM EVALUATION PLAN.docxglendar3
Running head: PROGRAM EVALUATION PLAN 1
PROGRAM EVALUATION PLAN 10
Program Evaluation Plan
Name:
Tanisha Hannah
Institution:
Strayer University
Professor:
Dr. Jacob
Course:
Edu 571
Date:
March 2, 2020
Program Evaluation Plan (Part 3)
Goals of Evaluation
Evaluation refers to the act of checking various things thoroughly in order to characterize their worth or value, with reference to a certain context. In the field of education, the amount of success in a person’s aims can only be determined through evaluation. Therefore, there is a very close relationship between various aims and evaluation. The main goals of evaluation in schools are as discussed below. The first goal of evaluation in the field of education is to create an educational program ("Evaluation in Teaching and Learning Process | Education", 2020). Through evaluation, evaluators and the school management can build a given program of learning among the students. This is after gathering and checking various factors in order to find what program will fit and make a positive impact in the school. This involves consulting all the stakeholders of the program and developing strategies that will ensure the development of a good program.
The second goal of evaluation is assessing the effectiveness of the program. Evaluation ensures that the developed program is up to standards and serves the purpose that it was intended to. It helps the evaluators to check if the teaching strategies and techniques are being applied properly. The third goal of evaluation is to ensure improvement of the program. Through evaluation, evaluators can gauge the impact of the program on the school and learners. They can also identify various things that can make the program more effective. It acts as an in-built monitor in the program in order to review the progress of the program from time to time. It also gives feedback regarding the design and the implementation of a given program. Through such assessments, the school management can know where to work on, and what they need in order to enhance effective programs in teaching and learning.
For instance, in our case, evaluators can comfortably tell whether or not the program is helping girls become more superior in math. If not they can suggest better or other strategies that will make positive impact.
Cultural Issues Affecting the Program
Culture can influence how different people view things. An individual’s culture and upbringing can affect their way of processing information. Among the cultural issues that might be faced in the evaluation plan include cultural stereotypes. Some students believe that they cannot perform as expected in school or in a particular subject due to lack of preparation from their home environment. This makes them believe they do not have enough potential to do well in a given subject when they get to school. For instance, some students may not have calculat.
Running head Project 21Project 22Projec.docxglendar3
Running head: Project 2 1
Project 2 2
Project 2: Historical Context and Introduction
Your Name
Southern New Hampshire University
Research Plan
Research Question: [Revised research question from Topic Exploration Worksheet.]
Introduction
[Three- to five-sentence discussion of background information about your historical event to capture the interest of your audience.] [Two- to three-sentence thesis statement based on your research question that addresses your historical event and explains how your event has been influenced by historical context.] [Two- to three-sentence explanation of how you will use the primary and secondary sources you listed in the Research Plan in your hypothetical research paper.]
Historical Context: [Three- to five-sentence explanation of your event’s historical context, citing sources one and two.]
Impact of Historical Context: [Three- to five-sentence discussion of how historical context impacted your event, citing sources one and two.]
Resources
HIS 100 Project 2: Historical Context and Introduction Guidelines and Rubric
Overview
“If you want to understand today, you have to search yesterday.”
—Pearl Buck
Your second project in this course is to complete a historical context and introduction project. The work you did on the Topic Exploration Worksheet in Theme 1
will directly support your work on this project as well as your third longer term project—the multimedia presentation—due in Theme 4.
One of the prime benefits of studying history is that it allows us to learn about who we are and where we came from. The people and events of the past can
often shed light on the conditions and social norms of the present. Having historical awareness can inform various aspects of your life as well as future
aspirations. Learning from past failures and successes can shape ideals and values for years to come.
This is your second longer-term project designed to help you understand the fundamental processes and value of studying history. In the first project, you
completed the Topic Exploration Worksheet on one of the topics or themes from the library guide. You investigated the types of research you might need to do
to learn more about the topic and developed research questions. In Project 2, you will use your completed Topic Exploration Worksheet to explore the
historical context and develop an introduction. You will choose one of your research questions and do some secondary source research, speculate on primary
source needs, and use the information to write the introduction and thesis statement for a possible research paper. (You will not write the entire paper—
only the introduction.) In the third project, you will create a multimedia presentation that explores both major developments in historical inquiry and the value
of examining history.
This research plan and introduction assignment will assess the following course outcome, which you focused on throughou.
Running head: MILESTONE ONE 2
2
Milestone One Final Project
John Doe
Southern New Hampshire University
I. Executive Summary
In this section, you should accurately highlight the essential elements of the intelligence report for quick reference by the agency receiving the report. You should include the name of referring agent (your name), the name of the agency that you are imagining you work for, the current date, dates of the activities being covered in the intelligence report, and a brief summary (two to three sentences) on the adversary, scope, and nature of the potential threat. Although this is the opening section of the report, you may wish to complete it last in order to accurately capture the analysis of the body of your report. (This section is the summary so be sure this section is brief. Additional relevant details should be written in their respective sections of the report.)
II. Adversary, Motivation, and Jurisdiction
Summary
Accurately summarize the intelligence collected from the SARs to date, focusing on the “who, what, when, where, why, and how” of the threat situation. Information should be annotated with dates and times from relevant SARs, and information from each date should be provided in a separate paragraph, from inception to most recent. Your summary should focus on connecting the dots, with as much detail as needed to present all the relevant intelligence. It should highlight information that would be of particular relevance for the law enforcement agency doing follow-up in understanding the potential threat. (If it makes it easier, you can format your first section as follows:
A. Who
B. What
C. When
D. Where
E. Why
F. How
Adversary
Determine who the adversary is for this potential threat. It may be an individual or a group. You should identify the names of suspects (if known) and also the type of adversary. For example, is the adversary an international terrorist group, a domestic terrorist group, an organized crime, a local or international gang, drug traffickers, an extremist or militia group, a hacker, or a white-collar criminal? Support your answer using relevant information from the SARs.
Range
Analyze the range of the adversary’s operations. Are their activities focused within one city or state or across multiple states? Support your answer with relevant information from the SARs.
Motivation
Analyze what is known about the adversary’s motivation and how that might affect their choice of target (individual or location). Might it affect whether they choose one target or many, the type of target they select, or the location of the attack? Support your answer with relevant information from the SARs.
Jurisdiction
Based on your analyses in Parts A–C above, determine which agency has jurisdiction in following up on the potential threat. For example, should local or state law enforcement follow up? Should federa.
Running Head PROJECT 31DISCUSSION5Project 3.docxglendar3
Running Head: PROJECT 3 1
DISCUSSION 5
Project 3
Problem statement:
The specific problem to be addressed is how McDonald's is going to deal with a decrease in demand in the wake of COVID-19 pandemic. The general problem to be addressed is how fast-food chains and food outlets are changing their operations during the pandemic of Corona Virus in the world, especially in the United States (Daniel, 2016).
You must always list your general problem statement first. Provide context for that statement. Then present your specific problem statement and provide context for that statement. Per the assignment instructions you should list your research questions following your problem statements.
The method selected for research:
To conduct research on the above-stated problem stated, the right methodThe research method that will be adopted in conducting the proposed research will be the mixed method approach a combination approach withwhich includes both quantitative and qualitative methodologies. A quantitative approach will help understand the insights into what is triggering a certain behavior in participants. While on the other hand, quantitative study is important to figure out the proportion of customers who is are not availing their previous interest in fast food and epically McDonald's (Apuke, 2017). But dueDue to the lockdown and social distancing, going in the market and conducting research is out of option. The suitable technique is to develop a flexible approach where both primary and secondary sources are sued. For secondary resources, the reports by McDonald's' Company and other institutions regarding the change in the food industry will be a suitable option. For primary data collection, developing an online survey is the safest option. For the qualitative study, online interviews can be scheduled. Both structured and unstructured interviews can be planned. Similarly, panel discussion over video calls is also a safe option. Through a mixed approach data for both quantitative and qualitative questions can be gathered (Yoshikawa & Kalil, 2008). Comment by Terrance Woods: What does this mean? Poor word choice. Consider rephrasing Comment by Terrance Woods: Word choice
Per the assignment instructions you were required to “include the justification as to why other methods would not be appropriate”. You failed to do that here.
Research question
Qualitative Research Question:
1. How the fast-food business of McDonald's in the United States is getting affected by the pandemic of COVID-19? Comment by Terrance Woods: I provided you with feedback in your Project 2 submission regarding this research question. My exact feedback was - This questions is not well-articulated. Reword for clarity. You failed to address the feedback received and merely presented the same question in this submission.
Quantitative research question:
2. How many Americans have stopped buying McDonald's because of coronavirus threat in the United States? Comment by.
Running head: PROBLEM STATEMENT 1
PROBLEM STATEMENT 3
Problem statement
Name:
Institution:
Date:
There is a critical need for a good instructional design because it is a multipurpose learning tools that not only serves instructional designers but also learners of all ages. According to Clark (2016), e-learning courses need to be integrated with instructional methods which align with high-quality research.” The implication is that the process of designing instructional designs should involve careful planning, preparing and researching in order to achieve high quality learning outcomes. In this regard, those responsible for designing must identify their strategic purpose as it predetermines the goals, objectives, expected outcomes, and resource allocation of the entire instruction model.
The main approach involves studying the critical elements in the design phases of an instructional model which enhances the learning experience of learners based on evidence-based literature. This is because humans apply appropriate cognitive processes to learn and thus instruction must adopt similar cognitive processing (Clark, 2016).The main purpose is therefore to emphasize the importance of good instructional design in enhancing the quality of education among instructors and learners. The objective involves highlighting the goals of an instructional program, the instructional objectives, relevant instructional materials and design assessment which rationalize the need for a good instructional design with the goal of engaging both learners and instructors. After all, learning is a process that requires the active participation of the learners (Reigeluth, 1987). This research study seeks to identify answers to two questions: a) What are the critical elements that build up a strong foundation for a good instructional design and b) what value do these elements offer to the learners and instructor who are the main consumers of learning instructional designs.
References
Clark, R.C. (2016). E-learning and the science of instruction: proven guideline for consumers and designers of multimedia. Walden University Library.
Regeiluth, C.M. (1987). Instructional Theories in Action: Lessons Illustrating Selected Theories and Models. Walden University Library.
Running head: PROBLEM STATEMENT 1
PROBLEM STATEMENT 6
Need working title
Problem statement
Tangela Jones
Walden University
11/10/18
Need section heading
There is a critical need for a good instructional design because it is a multipurpose learning tools that not only serves instructional designers but also learners of.
Running head MUSIC AND GENDER WOMEN PORTRAYAL IN RAP 1.docxglendar3
Running head: MUSIC AND GENDER: WOMEN PORTRAYAL IN RAP 1
MUSIC AND GENDER: WOMEN PORTRAYAL IN RAP 15
Music and Gender: Women Portrayal in Rap Music
Student’s Name:
Course:
Music and Gender: Women Portrayal in Rap Music
The introduction of rap music in the 1980s was welcomed with a lot positivity. However, this genre of music has on many occasions been considered as being controversial. Rap music has been accused of advancing messages and themes that deal with sexism, violence, gender stereotyping and materialism. Previous studies on rap music have indicated the content found in rap music promotes negative behavior. Moreover, research has shown that rap music videos generally differ in their portrayals of men and women in music videos. Males are often cast in positive light compared to females who are depicted in positions that portray them as a submissive gender to males.
The scope of this research narrows down on rap music produced from the years 2016 to 2018.The songs selected for this research are songs with lyrics that have misogynistic themes on women. Rap songs are observed in normalizing, objectifying, glorifying, victimizing and even exploiting women. Moreover, the rap songs are observed in defaming women through using innuendos and stereotypical language which portray misogynistic and sexist perspectives. The main area of focus for this paper is on the kind of nouns that are used in rap music to refer to the concept of woman and ways in which these nouns depict women. It is critical for this project to investigate the lyrics and its representations, as rap music has in the past years been under criticism for increasingly presenting a negative and controversial image of women in the society. A theological perspective on these issues is undertaken at understanding and criticizing the misogynistic and sexist culture of rap music generally.
Men in rap music have a higher probability of perpetuating violence on women. A review done on the common rap images found out that women were more likely to be dressed in images which portrayed them in provocative ways, especially in videos that had sexual content. Research has suggested that the perpetuation of gender in the media is a theme which has been occurring for eons of time[footnoteRef:1]. Specifically, music and gender and the portrayal of women in rap music has not been extensively studied previously. It is essential to consider the differences of gender in rap music and the portrayal of women in this genre of music. [1: Ronald Weitzer and Charis E Kubrin, “Articles Misogyny in Rap Music A Content Analysis of Prevalence and Meanings,” accessed October 23, 2018, https://doi.org/10.1177/1097184X08327696.]
Although scholars have attempted examining the interactions between rap music and religion, there has been a gap in regard to how artists frame religious messages within their lyrics. However, this lack of sufficient research does not reflect on the continued .
Running head Museum Focus1Museum Focus.docxglendar3
Running head: Museum Focus
1
Museum Focus
4
Museum Focus
Linda Dotson
Walden University
Interdisciplinary Experience: Sustaining Quality of Life in the City
Professor Paige Parker
September 15, 2018
Question 1
Brief introduction of Ohio City
Ohio is a great city named after the Ohio River in the 18th century. The area was disputed by the France and Great Britain. After the dispute, it established its own territories. This territory included the land where west of Pennsylvania in United States and the northwest of the Ohio River. The area covered more than 260,000 square miles (Turner, & Bogue 2010).
The History of Ohio City that has led to construction of Museums.
The area remained as a hunting ground by the Iroquois after the dispute. Later, some American groups began to migrate to the area. Later there was a seven years war between the Europeans, British and France. They all wanted to colonize the area. Unfortunately, the British worn and after the win, they ordered French settlers to leave the area. It is evident that the war brought about the breakdown of ethnicities.
How museum focus has been of great importance to the citizens of the city
The area is known for its landscape, mountains, rivers and minerals. This makes Ohio City to be a great city suitable for great museums. It is evident that, Ohio City creates the best environment for a museum with the theme of History and Natural History to be built. For instance, Miami River is known to be a great river. Many people admire visiting the area just to see the river. This creates the best conditions to build a museum. People within the city can also visit the museum and get to enjoy the benefits of the museums.
How people from outside the city benefit from the construction of the museums.
People outside Ohio City can also visit the museums. These museums will offer the history of the river to its visitors. They will also address an increasing array of issues in the dynamic environment (Edson, 2017).
Question 2
Permanent Exhibition.
Modern museum are designed to have a permanent exhibit, in this case the museum must have enough collections and classification of a field of knowledge for research and for display purposes. This will enlighten the visits about the history of Ohio City. The history stored in this museum will also be of great use to students as they will learn a lot in these museums,
References
Edson, G. (2017). Museum management. In Encyclopedia of Library and Information Sciences(pp. 3185-3198). CRC Press.
Turner, F. J., & Bogue, A. G. (2010). The frontier in American history. Courier Corporation.
If you can do it send confirmation at [email protected]
If you can do it send confirmation at [email protected]
Assessment Details and Submission Guidelines
Trimester
T2 2018
Unit Code
MN603
Unit Title
Wireless Networks and Security
Assessment
Individual
Type
Assessment
Design and implementation of secure enterprise wireless network
Tit.
Running head: MODULE 3 - SLP 1
MODULE 3 – SLP 2
Module 3 – SLP
Elizabeth Davis
Trident International University
Dr. Sharlene Gozalians
13 May 2019
Module 3 – SLP
In a bid to control the prevalence of diabetes among the African Americans, it is important to examine a number of attributes of culture that can empower a person towards changing a behavior. The factors may be positive, existential, and negative. Existential factors may be not harmful but need to be acknowledged. The importance of a family cannot be ignored especially because of the support they provide to diabetic patients. Family is therefore a positive cultural value which will assist in managing diabetes disease. This paper therefore seeks to address how each of the PEN-3 model’s three factors within the dimension of cultural empowerment applies to the African American group.
It is important to explore by identifying several cultural beliefs and practices that are positive, existential and negative. Positive factors are likely to lead to an improvement by reducing the prevalence of diabetes among the African Americans. Existential factors are existing cultural values and beliefs that may have no harmful health consequences. Cultural practices that may act as barriers in controlling the prevalence of diabetes among the African Americans are the negative factors. Example of these negative practices includes poor nutrition leading to obesity.
Positive Factors
The positive factors which will influence management and control of diabetes among the African Americans include spirituality and family. For example, talking about a family affair with diabetes will make a great impact in controlling diabetes among the African Americans. This is because it will create awareness of how to handle and deal with diabetes. Spirituality will have a positive impact in controlling the prevalence of diabetes among the African Americans. African Americans who have spiritual faith are likely to engage in activities which will reduce the prevalence of the disease.
Existential Factors
Existential factors include faith healing. A belief in faith healing is a factor which is likely to reduction in prevalence of diabetes among the African Americans. Individuals who are religious are likely to visit religious leaders to seek healing and intervention. Many individuals confess that they got healed after being prayed for by the Pastors and other religious leaders. This is attributed to believing in faith healing.
Negative Factors
Consumption of “comfort foods” is common in the diet of the African Americans. These foods contain high fat, sugar, and calorie contents. Example of negative cultural factors includes unhealthy traditional foods. Poor nutrition among the African Americans is more l.
Running Head PROGRAM EVALUATION PLAN1PROGRAM EVALUATION.docxglendar3
Running Head: PROGRAM EVALUATION PLAN 1
PROGRAM EVALUATION PLAN 2
PROGRAM EVALUATION PLAN
Name:
Tanisha Hannah
Institution:
Strayer University
Class:
EDU 571 Evaluating School Programs
Professor:
Antony Jacob
Date of Submission:
February 19, 2020
Program evaluation plan (part 2)
In order to ensure that the “gender equity for girls in math” education program which applies to master’s level students is efficient in fulfilling the outlaid goals, the goal based approach of evaluation should be applied in evaluating the effectiveness of the program. The major objective of this education program is to empower the girl child and to ensure that there are increase female students taking courses in mathematics at higher education levels (Markovits & Forgasz, 2017). In this case therefore, the evaluators has to establish if the establishment of this program will promote the positivity and capability of girls to take courses in Mathematics and to increasingly love the subject even in the lower classes so as to portray an increased number in the number of girls pursing this course in the masters level.
The goal based approach of evaluation will help the school evaluator to be able to determine how they can ensure that all the institutions are able to empower the girl child and encourage them to increasingly perfect their skills in mathematics in order to see a reflection of changes in the higher education levels (Sarouphim & Chartouny, 2017). This evaluation technique will help the education program creators to determine if the program is efficient in attaining the set objects through checking the outcomes of the implementation of the program over certain period of time.
The gender equality for girls in Math is a program that is anticipated to help the girl children be able to resolve their issues that result from fear and insecurities which cause them to undermine their power and be left behind by the boy child in regard to prosperity in Mathematics (Ganley.et.al, 2018). Therefore, the evaluators will have a role of determining the broader impacts of this approach as well as investigate what greater good is served as a result of this program. This will include identify the consequences that the program will have on other courses which most female students major in and how the male students will be affected by the program. The goals based evaluation method will help establish the objectives which can be added in the program to make it have optimal results to both girls and boys as well as ensure that other courses that are male dominated portray gender equality (Stoehr.et.al, 2017).
The major areas where the evaluators will assess include; the goals of the program, the outcomes of the program as well as the consequences. The main questions concerning these areas will be; what are the objectives of the program? How will the program be able to meet these goals? How do the goals of the program align with the activities involved.
Running head: PROGRAM EVALUATION 1
PROGRAM EVALUATION 5
Program Evaluation
Student’s Name
Institution
Program Evaluation
Application of Social Cognitive Theory in Information Science and Education
Social cognitive theory first started as a social learning theory by Albert Bandura for application in psychology. Jenkins, Hall, and Raeside (2018) asserted that, regarding the deployment of social cognitive theory in understanding information seeking behavior and use, the social cognitive theory had been used to explore significant areas. Such areas like consumption of social media content, information retrieval skills in the academic field, information retrieval skills at the workplace, information literacy in the educational field and day to day life information seeking. For instance, Kim (2010) used the theory to explore expectation differences in students of different genders when using university library website resources. With regards to knowledge sharing, Jenkins et al. (2018) found that social cognitive theory has been used to explore various fields like blogging and knowledge management systems.
In the field of education, Erlich and Russ-Eft (2011) reviewed the application of social cognitive theory to academic advising for assessment of student learning. Specifically, the researchers applied the social cognitive theory concepts of self-regulated learning as well as self-efficacy for the study. This medium is because these concepts have been successfully applied to education. The idea that learners should be able to recognize, create as well as choose their career plans for successful navigation through their college life contains the elements of self-efficacy concept and self-regulated learning. For instance, Erlich and Russ-Eft (2011) indicated that the confidence in achieving academic plans at a given level could be an indication of a student’s ability to perform academic planning activities at a complex level, which is a demonstration of increased efficacy. Learner’s self-regulated learning skills may help in understanding the learning mechanisms by which a learner acquired the strategies and tactics for performing academic planning activities with independence and sophistication.
Program Timeline
Project Goal
Related Objective
Activity
Duration
To promote awareness about breast cancer prevention
By 2020, increase to 75% proportion of African American women who understand the importance of annual clinical breast exams
Identify the population who underutilize clinical breast exams
January 1, 2020-January 31, 2020
Develop a media campaign to educate African American women about the benefits of early breast cancer detection
February 1,2020-March 30, 2020
Train faith-based organization members on how to educate their congregations about the.
Running Head MUNCHAUSEN SYNDROMEMunchausen SyndromeKr.docxglendar3
Running Head: MUNCHAUSEN SYNDROME
Munchausen Syndrome
Krystina Joseph
Columbia College
Munchausen Syndrome Article Review
Introduction
The Munchausen Syndrome Article explains about the Munchausen Syndrome, which is a rare fictitious disorder which involves the frequent hospitalization together with an intentional display of signs of sickness and pathological lying. In this regards, the management needs the security history taking with collaboration with the sound clinical processes which entails organicity exclusion in addressing the psychological problems. It is worth noting that a case which is presented having unusual symptoms of same dimensions are as well discussed. The case in this regards brings the finer nuances in the assessment of the entity (Prakash., et al 2014).
Research Question
Based on the abstract of the article, it can be denoted that the research question of the article is the need to understand more on the Munchausen Syndrome as well as the symptoms and therefore the need to ensure that such issues are solved by having a sound clinical process to handle the problem. The problem for the case as well was to find out what caused the 19-year-old housewife to vomit pink substance.
Findings
The findings depict that the 19-year-old housewife was suffering from a factitious disorder, also termed as the Munchausen syndrome. The psychometry performed also showed that there is an elevation of scales of anxiety together with hysteria. Consequently, being managed in an empathetic as well as non-confrontational manner, the psychotherapy was intended to improve the positive coping abilities while at the same time improving the interpersonal relationships which had been imparted (Prakash., et al 2014).
Research Methods Used
The methods used involved observations and clinical assessments. Observations were done by checking regularly the presence of the bloodstained vomits as well as the asthenia and any forms of skin allergy. This was carried out to ensure that the patient had no issues. The observations, as well as little conversation, showed that there were no cases of psychiatric illnesses for the patient in the past. Further, the assessment entails involves the systematic examinations which were performed within the normal limit. The psychiatric evaluation was performed together with ward observations which were intended at revealing the comfortability of the patient while in the hospital (Prakash., et al 2014).
The credibility of the Source of Information
To know the credibility of sources, the authors are scrutinized where their qualifications and their areas of experience assessed to understand whether the information provided is related to the topic at hand. For this article, it can be denoted that all the information provided is credible. This is because all the four authors who contributed to the article have sufficient skills and knowledge pertaining to health-related disorders, and thus, their pieces of information.
Running head PROGRAM EVALUATION 6PROGRAM EVALUATIONPr.docxglendar3
Running head: PROGRAM EVALUATION
6
PROGRAM EVALUATION
Program Evaluation
Insert Your First & Last Name
Capella University
COUN 5280 – Introduction to School Counseling
Professor: Dr. Erin Berry
Month, Year
Setting up the format for an APA style paper
· Begin by setting your cursor at the first, beginning space of the first page of your paper and creating all of your margins at 1”. You do this by going to File>Page Set Up>Margin Tab and set at 1 inch for all 4 sides, Top, Bottom, Right, and Left.
· To set spacing to true Double: First, highlight the entire document text, or choose Select All. Then go to Format>Paragraph>Indents and Spacing Tab and in the box that says Line Spacing: select Double from the pull down menu. Make sure the ‘before’ and ‘after’ boxes are set at 0 pt, and not at Auto. Double Spacethroughout the document and see rules in APA Publication Manual, 6th Edition. APA is about saving space… no gaps or quadruple spacing, so the document is consistent and easy to read.
· The font is Times New Roman, 12 pt. Use the same size and typeface throughout, including the paging and Running heads.
(REMOVE THIS INSTRUCTION PAGE WHEN SUBMITTING PAPER)
Start your introduction here. APA 6th edition does not use a heading title for the introduction because its position in the paper identifies it as the introduction. Open your paper with a nice foreword to introduce your response to the unit 7 discussion. You also want to set the reader up about the four general topic areas you will present . At this point, you may respond to the assignment in an outline fashion or take a narrative approach. An example of an outline form is provided. Please review the rubric carefully! There is still an expectation to support your ideas with the literature.
I. School specific needs
In this section you will examine your understanding of identified gaps or specific needs for Model Middle School.
· Included in this section should be an analysis that addresses academic career, personal-social and developmental needs. A strong analysis is demonstrated when the ideas presented in this section are supported by specific examples and scholarly literature.
· A strong program analysis takes into consideration the ways in which student development is fostered through stakeholder collaboration (e.g., school, family and community). Additionally, the measures used to demonstrate accountability are reviewed. Be sure these two ideas clearly addressed in your outline.
II. Program outline
Strong action plans demonstrate critical thinking through the discussion of reasonable assumptions, drawing inferences or making predictions while exploring the potential risks and benefits of the plan. Make sure specific examples are provided! For example, the plan may include group counseling for an academic issues because intervention is supported in the literature.
· In this section, you will describe the specific program of services you plan to provide to .
Running head PROGRAM DESIGN 1PROGRAM DESIGN 2.docxglendar3
Running head: PROGRAM DESIGN 1
PROGRAM DESIGN 2
Program Design to Promote Social Goals in American K12 Schools
January 15th,2018
Program Design to Promote Social Goals in American K12 Schools
Explanation of Each Initiative
The three main initiatives of promoting social goals in school will include: promoting moral and character education, improving children’s health and nutrition, and creating school communities through extracurricular activities, after school programs, and school spirits (Rissanen et al. 2018). Comment by Evelyn Young: The 3 initiatives are clearly stated. Although did Rissanen et al. propose these 3 initiatives to promote social goals in schools? If these are your arguments, take credit for them. No need to give credit to Rissanen et al. for formulating the thesis for your paper.
I think that your paper could have used an introduction followed by the thesis statement.
Explanation of Each Initiative
Moral education is meant to promote good conduct among school-going children, not just within their immediate social relationships, but also in their dealings with their fellow citizens. This initiative is premised on the need for students to possess clear ideals and judgments on what action are right and what are wrong, including the determination of students’ conduct through a constant reference to those ideals. Moral education will be offered as a social goal to enlighten students on a system of rules and norms that regulate the social interactions of people on concepts of welfare, such as harm, trust, justice, and rights. For some students, issues related to values, personal feelings, and societal norms are constructs for discussions and are as such viewed as being influenced by the manner in which morality taught or experienced in schools, churches, and social institution settings. Moral education will be meant to reduce criminal and deviant behaviors among students. Moral character is required in schools because many parents do not teach their children morality issues.
The health and nutrition initiative is meant to improve the physical and mental well being of students. This initiative has the potential to improve the quality of students’ urban life, strengthen the ability of poor children to excel in their studies, and to compensate them for the substandard home and school environments spawned by competitive, inequitable social order. Health and nutritional initiatives will be strengthened through planning and introducing curriculum on nutrition with educational activities. These will include physical activities, which are combined with the farm to school programs that motivate students to consume healthy diets. Indeed, the hybrid school-based nutritional programs have major influence on attitudes, beliefs, and behaviors associated with fruits and vegetable consumption diffused throughout a bigger urban community (Dudley Cotton & Peralta, 2015). This hybrid intervention includes combining district stra.
Running head PROFICIENCY LEVEL ANALYSIS1PROFICIENCY LEVEL AN.docxglendar3
Running head: PROFICIENCY LEVEL ANALYSIS 1
PROFICIENCY LEVEL ANALYSIS 4
Proficiency Level Analysis
ESL-433
6/16/19
Proficiency Level Analysis
Grouping Strategy for Ms. Jensen
The arrangement of the student in the class should be based on their proficiency level while factoring the different capabilities of each student. The teacher should ensure that the both fast learners and slow learners are catered in terms of understanding how to handle their comprehension capabilities. The class has three categories of student, basic, intermediate and proficient.
Cooperative Learning
Cooperative grouping is based on the differences among the children in terms of their learning abilities. Li & Lam (2013) states that cooperative grouping is best suited for situations where students have learning abilities which are differing. The grouping technique is implemented following the analysis of the heterogeneous factors such that students should be grouped depending gender, economic background, culture, race and ethnicities. The ranking of students should follow the descending order starting with the highest to the lowest. To make a ranking legend, the teacher should use L for low achiever, M for medium achievers and H for highest achievers. The grouping should include at least one student from each category for the purposes of achieving diversity. The grouping system should however be done without involving the students as such could encourage discrimination. The issues of gender should be defined effectively to avoid the majority of gender in any of the group.
Rationale for Placement
The strategy is important and useful for the given case because students have different abilities and proficiency. The grouping strategy also promotes involvement of all students since the group is designed in manner which facilitates individual contribution. Tsay & Brady (2012) states that the cooperative grouping is important since it allows for the development of critical thinking skills and communication skills.
Conclusion
Ms. Jensen’s class has students with different abilities and varying English proficiency. Cooperative grouping is effective for 7th grade children since it allow them to exchange information amongst themselves while encouraging collaborative learning. Students are more likely to improve their self-esteem and moralization to study English tasks since group composition allows individual contribution and peer discussions.
References
Li, M. P., & Lam, B. H. (2013). Cooperative learning. 2015-01-20]. http://www. ied. edu. hk/aclass/l'heories/cooperative learning course writing_LBH% 2024June, pdf.
Tsay, M., & Brady, M. (2012). A case study of cooperative learning and communication pedagogy: Does working in teams make a difference?. Journal of the Scholarship of Teaching and Learning, 10(2), 78-89.
Ms. Jensen's 7th Grade Class AZELLA Scores
Student Name
Reading Label
Writing Label
Listening Label
Speaking Label
Aryanna
P.
Running head PROFESSIONAL CAPSTONE AND PRACTICUM1PROFESSIONA.docxglendar3
Running head: PROFESSIONAL CAPSTONE AND PRACTICUM 1
PROFESSIONAL CAPSTONE AND PRACTICUM 5
Falls and Related Injuries
Nanah Kamara Comment by Nelson, Emily Jeanette: Please see my comments in your previous assignment about how to format your title page.
GCU
Falls and Related Injuries
Nurses, being the initial contacts for patients in any most health facilities and the fact they interact or engage with patients more when compared to other providers of care constitute a critical component of the healthcare system. Consequently, nurses play a much huge role in making sure that the healthcare system provides not only safe care but also and care of high standard or quality (Sato, Hase, Osaka, Sairyo & Katoh, 2018). However one of the major healthcare or nursing issue over the years is the fall and associated injuries which have proved not only difficult for healthcare providers and facility to manage. The purpose of this essay is to… Comment by Nelson, Emily Jeanette: Reference needed
For instance, and according to DuPree, Fritz-Campiz & Musheno, (2014), Unintentional falls constitute the highest cause of non-fatal injuries among people over 65 years in the US. Moreover, one in every three individuals above 65 years falls at least one time in a given year. In addition, injuries from falls cause the highest number of accidental deaths among people 65-year-old and above (Tricco, Thomas, Veroniki, Hamid, Cogo, Strifler & Riva, 2017). Such statistics coupled with the extent of the costs associated with fall call for proper intervention to reduce falls and their associated injuries. For instance, the government spends billions of dollars on fall and their associated injuries on treating falls. The prevention of fall would provide increased funds for investment in other social programs aimed at improving both healthcare and addressing social or communal problems (Zakrajsek, Schuster, Wells, Williams & Silverchanz, 2018).
In addition, falls and their related injuries are responsible for almost 15% of the recorded hospitalization. This increases the burden of healthcare providers especially given the numerous stressors like staff shortage, huge workloads, leadership problems and personal factors among others. An increase in falls and associated injury, therefore, is detrimental to the provision of quality care as captured under the healthy 2020 program goal of reducing deaths that result from falls. Comment by Nelson, Emily Jeanette: Reference needed Comment by Nelson, Emily Jeanette: Reference needed
Despite this, falls are very complex and difficult to manage or prevent. Given the implications that falls bear on the patients, the healthcare providers and the healthcare system as a whole (Joseph, Henriksen & Malone, 2018), there has been increased There has been an increased research focus towards fall prevention and reduction strategies. As a result, there exist a significant amount of literature regarding the reduction and prevention of falls..
Running head PROFESSIONAL DEVELOPMENT PROPOSAL PROGRAM .docxglendar3
Running head: PROFESSIONAL DEVELOPMENT PROPOSAL PROGRAM 1
PROFESSIONAL DEVELOPMENT PROPOSAL PROGRAM 3
Professional Development Proposal Program
BUS520
Strayer University
November 9, 2018
Executive Summary
Professional Development Proposal Program
The need for organizational efficiency is driving the need for understanding the competency of individuals that generate effectiveness. The emotional intelligence capabilities help explain considerable as well as significant variances in accepting and predicting performance in capability studies. Emotional intelligence is the ability to monitor personal feelings and emotions visa vie other people’s feelings and emotions and use the information to guide personal thinking and actions. Management can rely on employees’ emotional building blocks to not only enhance their performance, but also their job satisfaction levels. The most important emotional intelligence building blocks that enhance employee performance and job satisfaction are social skills, self-awareness, self regulation, self motivation and empathy. Managers will use emotional intelligence to identify the positive and negative reinforcement of motivation to enhance employee morale within the organization. Positive reinforcement motivation tools are the rewards given to employees for exemplary performance while negative reinforcement is the penalty or punishment for poor performance.
Leaders can use the concept of emotional intelligence to enhance their social skills and decision-making skills in management. Emotional intelligence plays a critical role in helping persons requiring social skills to help them deal with social situations. Given that building strong relationship is one aspect of effective leadership, there is need for organizational leaders to build capacity in social skills for better organizational performance. Leaders can also utilize the concept of emotional intelligence to enhance their decision-making skills. Emotionally intelligent decision makers rely on self-awareness and self-management to determine their appropriate duties in decision making process. Decision makers use these skills to determine whether they have the necessary orientation to a problem.
Emotionally intelligent leaders strive for the establishment of effective teams to help realize organizational and team goals. Effective teams have clear purpose and goals, engage in consensus decision making, shared leadership and embrace open communication. To develop effective teams, departmental managers must define the team’s purpose and goals, define the roles for each group member and quickly identify and resolve conflicts. Finally, there is need to develop both extrinsic and intrinsic reward systems for employee motivation and improved performance.
Professional Development Proposal Program
Introduction
The need for organizatio.
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
The Indian economy is classified into different sectors to simplify the analysis and understanding of economic activities. For Class 10, it's essential to grasp the sectors of the Indian economy, understand their characteristics, and recognize their importance. This guide will provide detailed notes on the Sectors of the Indian Economy Class 10, using specific long-tail keywords to enhance comprehension.
For more information, visit-www.vavaclasses.com
We all have good and bad thoughts from time to time and situation to situation. We are bombarded daily with spiraling thoughts(both negative and positive) creating all-consuming feel , making us difficult to manage with associated suffering. Good thoughts are like our Mob Signal (Positive thought) amidst noise(negative thought) in the atmosphere. Negative thoughts like noise outweigh positive thoughts. These thoughts often create unwanted confusion, trouble, stress and frustration in our mind as well as chaos in our physical world. Negative thoughts are also known as “distorted thinking”.
Operation “Blue Star” is the only event in the history of Independent India where the state went into war with its own people. Even after about 40 years it is not clear if it was culmination of states anger over people of the region, a political game of power or start of dictatorial chapter in the democratic setup.
The people of Punjab felt alienated from main stream due to denial of their just demands during a long democratic struggle since independence. As it happen all over the word, it led to militant struggle with great loss of lives of military, police and civilian personnel. Killing of Indira Gandhi and massacre of innocent Sikhs in Delhi and other India cities was also associated with this movement.
Palestine last event orientationfvgnh .pptxRaedMohamed3
An EFL lesson about the current events in Palestine. It is intended to be for intermediate students who wish to increase their listening skills through a short lesson in power point.
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
Instructions for Submissions thorugh G- Classroom.pptxJheel Barad
This presentation provides a briefing on how to upload submissions and documents in Google Classroom. It was prepared as part of an orientation for new Sainik School in-service teacher trainees. As a training officer, my goal is to ensure that you are comfortable and proficient with this essential tool for managing assignments and fostering student engagement.
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxEduSkills OECD
Andreas Schleicher presents at the OECD webinar ‘Digital devices in schools: detrimental distraction or secret to success?’ on 27 May 2024. The presentation was based on findings from PISA 2022 results and the webinar helped launch the PISA in Focus ‘Managing screen time: How to protect and equip students against distraction’ https://www.oecd-ilibrary.org/education/managing-screen-time_7c225af4-en and the OECD Education Policy Perspective ‘Students, digital devices and success’ can be found here - https://oe.cd/il/5yV
How to Create Map Views in the Odoo 17 ERPCeline George
The map views are useful for providing a geographical representation of data. They allow users to visualize and analyze the data in a more intuitive manner.
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdfTechSoup
In this webinar you will learn how your organization can access TechSoup's wide variety of product discount and donation programs. From hardware to software, we'll give you a tour of the tools available to help your nonprofit with productivity, collaboration, financial management, donor tracking, security, and more.
How to Make a Field invisible in Odoo 17Celine George
It is possible to hide or invisible some fields in odoo. Commonly using “invisible” attribute in the field definition to invisible the fields. This slide will show how to make a field invisible in odoo 17.
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
2024.06.01 Introducing a competency framework for languag learning materials ...
Running head PLANNING FOR HR PROJECT1PLANNING FOR HR PROJEC.docx
1. Running head: PLANNING FOR HR PROJECT
1
PLANNING FOR HR PROJECT
5
Planning Considerations for the HR Project
Introduction
A centralized Human Resources model of delivering HR
services will be efficient in functions like hiring and firing
employees, training, pay and benefits and other functions that
may arise. The HR function is changing from the traditional
hiring and firing to a more advanced role that ensures business
continuity. These roles also include being involved in the
organization’s strategic planning as it aligns its talent hiring
and firing strategy to the overall vision and direction of the
organization. Centralized HR function is able to align its HR
plan and strategies and align them with that of the vision and
goals of the organization.
Project implementation of the HR project will ensure and cost
efficient and consistent model of delivering HR services in the
organization through the centralized model of delivering HR
services. The project manager will have to define the statement
of importance to the project team and define the scope of work
for each team member in the project team. The project budget is
important as it outlines the resources allocated including
monetary allocation for the success of the project. The budget
provides estimates approved towards achieving the goals of the
project and team members need to understand all the budgetary
estimates. The breakdown of the budget by the project manager
to the team is important in order to maintain he costs within the
approved estimates.
2. Body
Statement of Importance
The statement of importance is an important document that
outlines everything relevant in the project. It is the most
important document in the project that outlines and defines the
scope of the whole project including timelines and budgetary
estimates. The current project will have the following elements
in its statement of importance; the purpose which is
implementation of a centralized HR model for the organization,
the scope, the due dates, the due dates of the project, list of
what is due and when it is due, the expected outcomes, all the
resources that are needed for the project and the costs including
the payments and their deadlines.
The relevance of each task in the statement of importance
should be well explained to the team in order to keep everyone
involved in the project on the same page. The document is
relevant shows all the tasks which the project manager should
use in allocating tasks and the milestones that are used to see if
the project is going according to plan. The scope shows what is
to be done in the project including the process that will be used
in completion of the work. It also shows what will be used to
complete the tasks including software and any equipment. The
schedule in the document is a list of when deliverables should
be done including vendors that will be used in completing the
project. The phases in the project including development,
testing and implementation are well stated including their
timelines.
Behavioral Skills
During the project there are a set of behavioral skills and
technical skills that are considered relevant. These behavioral
skills and technical skills are related with the success of the
project especially when the project manager portrays some that
may be relevant with the project. The current project requires
behavioral skills like leadership skills, accountability, decision
3. making and problem solving skills. The project requires a leader
who is able to make the tough decisions that are required and be
able to delegate duties. The leader should able to inspire the
team into following the vision of the project. A project needs
accountability in order for the relevant resources to be provided
when needed for the success of the project. The decisions made
during the project process should be relevant for the success of
the project. The decisions made during the project process
affect all the relevant stakeholders and the project team.
Problem solving skills require one to be a good communicator,
team builder, dependable and creative which are some of the
relevant traits required for the current project.
Project Budget
The project budget is an estimate of all the relevant costs
estimates of activities towards the success of the project. The
project manager should be able to explain to the management
and project team the relevant costs that are associated with the
project. An analogous method of estimating will be used in
determining the relevant costs due to limited information on the
upcoming project. This requires similar projects to be used in
estimating the relevant costs and updating the old budget for
additional costs. The costs are aggregated through summing the
cost of individual work package in order to control the financial
account up to the project level. The cost control accounts are
used to calculate the cost aggregation
The project cash flow shows the net cash flow of the current
project. It is derived from the sources of cash for the project
less the uses of the cash. The cash flow is able to show the cash
from operating activities and keep track of actual cash at hand.
All the activities in the project that will require actual cash will
be reflected in the cash flow including separate activities.
Project Risks
Project risks are unplanned events that will occur and have a
negative effect on the project. The current project manager will
able to determine project risks in the current project as;
4. budgetary risk, resource risk and resistance to change. The
project budget is based on estimates which involve certain
uncertainties and chances of cost overrun may occur. This
creates budgetary risk due to the overrun costs. The
management may not provide the relevant requirements for the
success of the project like monetary resources and skill needed
for the success of the project leading to resource risk. The
current staff and management may be resistant to the
organization implementing a central HR model. This affects the
activities of the project team in delivering a successful project.
Conclusion
The statement of importance is the most important document in
the project process as it will outline everything relevant to the
project. The document will outline the scope of the project
including financial estimates for the various vendors and show
the timelines. The project manager should be able to present the
management with a comprehensive budget and explain the
various cost estimates. The project manager should also be able
to determine the risks to his project and offer solutions.
References
Murdick, R. G. (1976). Managing human resources in project
management. Project Management Quarterly, 7(2), 21–25.
Kevin Callahan., Gary Stetz & Lynne Brooks. (2007). Project
Management Accounting. Budgeting, Tracking and Reporting
Costs and Profitability. Published by John Wiley & Sons, Inc.
Veraart, S. (2009). Merging project and corporate accounting: is
it impossible? Maybe. Paper presented at PMI® Global
Congress 2009—North America, Orlando, FL. Newtown Square,
PA: Project Management Institute.
Running head: Organizing HR Projects
5. 1
Organizing HR Projects
4
Organizing HR Projects
Strategic planning for this project will require the team to
create a long term vision for the organization to have a
centralized model of delivering HR services. The five steps of
strategic planning for the current project include; project
charter, identify and meet stakeholders, identify risks,
performing qualitative risk analysis and planning risk response.
Project charter is the first step that defines the roles and the
duties of the project team. It is also used to highlight the vision
and goals of the project and how the team intends to achieve the
goals. The second step involves identifying and meeting the
stakeholders and these are the people who have an interest in
the project including the sponsors, project team members,
employees, customers and project managers. The current
stakeholders for the project include project team members,
project manager, the leadership of the organization and
employees. Identification of risks is the third step where project
manager will try and identify possible project risks and
document sources of the risks, the category of the risk and
6. responses. Risks may include lack of support from the
management, stakeholders having a negative attitude towards
the project and changes in management. The fourth step will
require the project team to perform qualitative risk analysis
which is the procedure of ranking risks for additional analysis
or assessing their impact on the project. Planning risk response
involves initiating a plan that will mitigate the risks to the
project objective. This involves identifying the ranked risks and
allocating resources and activities to mitigate the risks.
A project vision is used to give the project team a reason for
contributing towards the project. It is used to explain the aim of
the project, unite the team members, erase confusion and act as
an inspiration to the team. A vision and vision statement are
isolated but linked concepts. The vision statement is more of a
linguistic presentation of the vision. The vision statement for
this project is “To establish a centralized model of delivering
HR services that will improve service delivery.” The mission
statement for the project should be “To implement a cost
effective centralized model of delivering HR services that will
be able to improve employer- employee relations and best
delivery of HR services.”
The project charter is a declaration of scope, objectives and the
people who will be partaking the project. The project charter
defines the roles and the duties of the project team and also
outlines the project goals and objectives. The role of the project
manager is also defined and the various stakeholders involved
are identified. The charter document will be used as a reference
document throughout the project and should summarize points
like; the goals and objectives of the project, the roles of each
stakeholder in the project and it also acts as a contract between
the project sponsor, the project team and key stakeholders. The
project charter document is used a selling point to the various
stakeholders, it is a reference point throughout the entire period
of the project and stakeholders are able to see the return on
their investment.
A statement of emphasis for the current project should cover the
7. costs and deadlines, the process for the project, resources
needed which will include any facilities that will be used during
the project, assignment of tasks and the purpose of the project
which is to evaluate a centralized model of delivering HR
services.
References
Kelsey John., Winch Graham., Penn A. (2001). Understanding
the Project Planning Process: Requirements Capture for the
Virtual Construction Site. Kelsey, J. and Winch, G.M. and Penn,
A. (2001) Understanding the project planning process:
requirements capture for the virtual construction site. Research
report. Bartlett Research Papers (15). The Bartlett School of
Graduate Studies, University College London, London, UK.
Running head: Organizing HR Projects
1
Organizing HR Projects
2
Leading and Managing the HR Project
8. Strategic planning for this project will require the team to
create a long-term vision for the organization to have a
centralized model of delivering HR services. The five steps of
strategic planning for the current project include project
charter, identify and meet stakeholders, identify risks,
performing qualitative risk analysis, and planning risk response.
The project charter is the first step that defines the roles and
duties of the project team. It also gets used to highlight the
vision and goals of the project and how the group intends to
achieve the goals.
The second step involves identifying and meeting the
stakeholders, and these are the people who have an interest in
the project, including the sponsors, project team members,
employees, customers, and project managers. The current
stakeholders for the project include project team members,
project manager, the leadership of the organization, and
employees. Identification of risks is the third step where the
project manager will try and identify possible project risks and
document sources of the dangers, the category of the risk, and
responses. Risks may include a lack of support from the
management, stakeholders having a negative attitude towards
the project, and changes in management.
The fourth step will require the project team to perform a
qualitative risk analysis, which is the procedure of ranking risks
for additional analysis or assessing their impact on the project.
Planning risk response involves initiating a plan that will
mitigate the risks to the project objective. Also, this means
identifying the ranked risks and allocating resources and
activities to minimize the risks.
A project vision gets used to giving the project team a reason
for contributing to the project. It gets used to explain the aim of
the project, unite the team members, erase confusion, and act as
an inspiration to the team. A vision and vision statement are
isolated but linked concepts. The vision statement is more of a
linguistic presentation of the vision. The vision statement for
9. this project is “To establish a centralized model of delivering
HR services that will improve service delivery." The mission
statement for the project should be "To implement a cost-
effective centralized model of delivering HR services that will
be able to improve employer-employee relations and best
delivery of HR services."
The project charter is a declaration of scope, objectives, and the
people who will be partaking the project. The project charter
defines the roles and duties of the project team and also outlines
the project goals and objectives. The purpose of the project
manager is also limited, and the various stakeholders involved
get identified. The charter document will be used as a reference
document throughout the project and should summarize points
like; the goals and objectives of the project, the roles of each
stakeholder in the project, and it also acts as a contract between
the project sponsor, the project team and key stakeholders. The
project charter document gets used as a selling point to the
various stakeholders; it is a reference point throughout the
entire period of the project, and stakeholders can see the return
on their investment.
A statement of emphasis for the current project should cover the
costs and deadlines and the process for the project. Also, it
covers resources needed, which will include any facilities that
will get used during the project, assignment of tasks, and the
purpose of the project, which is to evaluate a centralized model
of delivering HR services.
Types of Project Manager Power
Legitimate power
Legitimate power stems from the conviction that an individual
has an official right to make mandates. For example, a CFO has
lawful authority over an intern since they are at higher levels
(Anantatmula, 2010).
10. Reward power
The power to repayment comes from the ability to repay
someone. Besides, this can happen, for instance, if an individual
has the necessary resources by a project team. Therefore
(Anantatmula, 2010), in the past, a person usually had no
questions to ask about money, but when "thank you" is said by
the project team, the person would answer with a word, "no
problem."
Expert power
Expert power gets based on the supreme competence or
expertise of an individual in a particular field of knowledge.
Therefore (Anantatmula, 2010), should a person know about the
areas in which he or she is an expert? If a person can't
recognize this, he or she should think about what people are
most often asking for assistance. Perhaps it can aid in drafting a
deal or carrying out a risk assessment.
Referent power
Referent power is concerned with addressing the likability
factor of an individual. For instance, if an individual thinks it's
a waste of time to go out with his colleagues for lunch and
attend company-sponsored events, he should reflect. Real power
can result in the relationships and links that an individual builds
with employees (Anantatmula, 2010).
Coercive power
Coercive power comes from the belief that you can punish
others for complying with them. Usually, this gets connected
with legitimate authority. A boss has, for example, the right to
reprove an employee for not fulfilling an application.
11. Outcomes resulting from Managing Projects and how to resolve
them
Lack of Visibility of all Projects
Visibility is a common reason why projects fail. The right level
of information needs to get accessed in time for all the three
phases of the project team (Anantatmula, 2010), the
management, the project managers, and the team members. The
best options are methods, procedures, and improvements based
on people. The easiest way to exchange project plans is by
having project files placed in a networking folder, and folder
permissions get determined by the Windows folder and group
access permissions.
Unclear Project Objectives
More than they ever would expect, most companies have more
opportunities and programs. Many firms undertake more efforts
than they should likely, leading to working and often
unsatisfied participants of their team. The management's task is
to define the long-term goals and approaches to accomplish
specific priorities of the company. When these objectives get
established, project initiatives can get measured against these
objectives.
No Visibility into Resource Workload
Besides, resources are overwhelmed with the lack of urgency
for the project. Also, this becomes a circular problem. Because
managers have no visibility on all the projects and tasks the
team carries out (Anantatmula, 2010), they often believe that
the organization's workload can do more than it is capable of.
For example, if a worker has an eight-hour working day, then no
more than six hours should be allotted for the job. It helps the
employee to work for two hours on his or her legal issues.
12. Gaps in Communication
When a project is fully developed (Kerzner, 2017),
communication is a common problem. There is no clear view of
the project context when a new resource joins the project. The
connection should get shown at a central location, at the very
least. The organization network appears to be the lowest
common denominator.
Increased challenges a Project Manager may face when leading
virtual or global project teams
Communication
In any workplace, communication is a key (Kerzner, 2017),
especially where most interactions happen via email, chat, or
phone calls. The hiring process is an excellent way to learn how
well people interact. Communication skills of project manager's
employees' are a significant factor in virtual teams ' progress.
Trust
In any relationship, belief is a crucial issue. When workers
believe in their executives (Kerzner, 2017), they naturally
collaborate and engage in a shared vision. A project manager
should, in a few sentences, document why the company does
what it does. Ideally, the greater good of humanity should be
stipulated y this, but connected somehow with business.
Productivity
When workers work outside of a traditional office (Kerzner,
2017), low productivity becomes an obvious risk. Several team
members may not use their time wisely in an atmosphere
without daily monitoring. The best way to ensure that everyone
does their job without intruding in privacy is to set precise
desires for every function and to check for advancement
13. regularly.
Plan for Communication Management during the Project
The preparation of the communications includes defining
partners' needs for information and communication.
Communication planning involves identifying which technique
and how often to communicate to whom (Kerzner, 2017), whom,
and when. Therefore, this strategy is very constructive, as there
is no exception to correspondence. The project manager must
consider the climate of the organization, values, and
expectations to do it correctly. The procedures and strategies of
the organization for functioning and collaborating (Kerzner,
2017), historical records of past projects, lessons learned, and
information stored also have to get taken into account.
References
Kelsey John., Winch Graham., Penn A. (2001). Understanding
the Project Planning Process: Requirements Capture for the
Virtual Construction Site.
Kelsey, J. and Winch, G.M. and Penn, A. (2001) Understanding
the project planning process: requirements capture for the
virtual construction site. Research report. Bartlett Research
Papers (15). The Bartlett School of Graduate Studies,
University College London, London, UK.
Anantatmula, V. S. (2010). Project manager leadership role in
improving project performance. Engineering Management
Journal, 22(1), 13-22.
Kerzner, H. (2017). Project management: a systems approach to
planning, scheduling, and controlling. John Wiley & Sons.