Introduction
This system is basically concerned with the
reservation of railway tickets to the passengers.
In this we are going discuss that how the
reservation is done.
What are the rules and regulations and
procedure for reservation?
In this project we will discuss…………..
Objective of Project
All the manual work should be converted into
computerized so that the load of employees should
decrease.
The database should be stored in computer rather
than in register/manually.
Easy to store information and fast accessing of
information.
Centralized management reporting & decision support.
Accurate and timely control program.
To make it easy for fast processing and modification.
List of accounts of all customers is available.
To make the Railway system is interactive.
Quick feedback.
Concept Stage
A. Problem identification:-
Information about the route, cancellation of tickets,
departure time, arrival time, number of trains
available and other such information.
Store and retrieve information about the various
transactions related to Rail travel.
Keep track of all its passengers and thus schedule
their journey accordingly.
Maintains records of passengers travelling in the
different trains on different dates reaching different
destinations in the system.
User friendly interface to administrator and customer
B. Expectation:-
Login and Logout
Train Enquiry
Book Ticket
Payment
Check PNR Status
Cancel Ticket
Get Passenger List
C. Project Need:-
In this part we are covering all the details
related to customer required for reservation.
Customer name
Customer id
Address
Age
Gender
Phone no
D. Aim & objective:-
E. Resources:-
Hardware Requirements:
Processor : Pentium IV 2GHz and Above
RAM : 1GB
Monitor : VGA Color Monitor
Printer
CPU -Intel Core 2 Duo E7300
Hard disk -160 GB
Software Requirements:
Operating System : Windows XP onwards
Developing Tool : VB (front end)
Database : MS-ACCESS (back end)
USER INTERFACE : KEYBOARD, MOUSE
A. Planning Phase:-
The early and most critical step in completing
development, acquisition, and maintenance
projects
Project manager refine the information and
coordinate discussions between user, audit,
security, design, development, and network
Requirements Analysis Phase:-
The requirements are defined in this phase to a
level of detail sufficient for systems design to
proceed
The purposes of this phase are to:
Further define and refine the functional and
data requirements and document them in the
Requirements.
Complete business process reengineering of the
functions
Develop detailed data and process models
Develop the test and evaluation requirements
that will be used to determine acceptable
system performance.
B. Design Phase:-
Using a top-down & bottom-up approach,
designers first identify and link major
program components and interfaces.
Contemporary design techniques often use
prototyping tools that build mock-up designs of
items such as application screens, database
layouts, and system architectures.
Audit, security, and quality assurance
personnel should be involved in the review and
approval process.
B.1 Development Phase:-
The development phase involves converting
design specifications into executable programs
The large transaction-oriented programs
associated with financial institutions have
traditionally been developed
B.1 Integration and Test Phase:-
Subsystem integration, system, security, and
user acceptance testing was conducted during
test phase.
C. Implementation Phase:-
This phase is initiated after the system has
been tested and accepted by the user.
This phase continues until the system is
operating in production in accordance with the
defined user requirements.
The purpose of this phase is to:
Operate, maintain, and enhance the system.
Certify that the system can process sensitive
information.
Conduct periodic assessments of the system to
ensure the functional requirements continue to
be satisfied.
Determine when the system needs to be
modernized, replaced, or retired.
Conclusion
The passenger reservation is a complex activity
because of sheer volume and types of coaches
etc. Also transaction have a good variety. So
the CRIS and CMS have developed impress/
concert based on 3 tier server client
architecture. It has a mesh type topology with
five server system in five cities of India. Overall
it has proved to be a boon not only for
passenger but also for railways functioning
since, it generates all the report necessary for
optimization and decision making. It is an on-
line real time passenger reservation system

More Related Content

What's hot

Transit Insight,V0.3
Transit Insight,V0.3Transit Insight,V0.3
Transit Insight,V0.3tamtaskin
 
Bank Management System
Bank Management SystemBank Management System
Bank Management SystemSM. Aurnob
 
Cmms a basic guide
Cmms a basic guideCmms a basic guide
Cmms a basic guidenoahweeks17
 
Hotel management system project
Hotel management system projectHotel management system project
Hotel management system projectMohammed Al Babeli
 
Hari Krishna Basis resume 12.12.2016
Hari Krishna Basis resume 12.12.2016Hari Krishna Basis resume 12.12.2016
Hari Krishna Basis resume 12.12.2016harikrishna u
 
Railway reservation system
Railway reservation systemRailway reservation system
Railway reservation systemDoplooo
 

What's hot (7)

Transit Insight,V0.3
Transit Insight,V0.3Transit Insight,V0.3
Transit Insight,V0.3
 
Bank Management System
Bank Management SystemBank Management System
Bank Management System
 
Cmms a basic guide
Cmms a basic guideCmms a basic guide
Cmms a basic guide
 
Hotel management system project
Hotel management system projectHotel management system project
Hotel management system project
 
Amadeus sph
Amadeus sphAmadeus sph
Amadeus sph
 
Hari Krishna Basis resume 12.12.2016
Hari Krishna Basis resume 12.12.2016Hari Krishna Basis resume 12.12.2016
Hari Krishna Basis resume 12.12.2016
 
Railway reservation system
Railway reservation systemRailway reservation system
Railway reservation system
 

Viewers also liked

Adaptation of beaks
Adaptation of beaksAdaptation of beaks
Adaptation of beaksHITESH LADVA
 
Storyboard
StoryboardStoryboard
Storyboardemmgree
 
Leif blomqvist 16 sept 2016 nääs fabriker rektorer borås stad
Leif blomqvist 16 sept 2016 nääs fabriker rektorer borås stadLeif blomqvist 16 sept 2016 nääs fabriker rektorer borås stad
Leif blomqvist 16 sept 2016 nääs fabriker rektorer borås stadLeif Blomqvist
 
3 9-2016 unitron online overview
3 9-2016 unitron online overview3 9-2016 unitron online overview
3 9-2016 unitron online overviewDagmar Veenhoven
 
2013 TWNIC-Soapremake幸福製皂 決賽結案簡報
2013 TWNIC-Soapremake幸福製皂  決賽結案簡報2013 TWNIC-Soapremake幸福製皂  決賽結案簡報
2013 TWNIC-Soapremake幸福製皂 決賽結案簡報Lilan00
 
Tutorial screencastcamstudio 1
Tutorial screencastcamstudio 1Tutorial screencastcamstudio 1
Tutorial screencastcamstudio 1Sigit Kusmaryanto
 
Custom security effective implementation
Custom security   effective implementationCustom security   effective implementation
Custom security effective implementationlog2srini
 
IQBAL KHAN_Automation_Resume
IQBAL KHAN_Automation_ResumeIQBAL KHAN_Automation_Resume
IQBAL KHAN_Automation_ResumeIqbal Khan
 
Internship Report (VTOL) (2)
Internship Report (VTOL) (2)Internship Report (VTOL) (2)
Internship Report (VTOL) (2)Rishabh Prakash
 
Leif blomqvist 27 okt 2016 göteborgs universitet slides
Leif blomqvist 27 okt 2016 göteborgs universitet slidesLeif blomqvist 27 okt 2016 göteborgs universitet slides
Leif blomqvist 27 okt 2016 göteborgs universitet slidesLeif Blomqvist
 
Leif blomqvist 13 dec 2016 göteborgs universitet
Leif blomqvist 13 dec 2016 göteborgs universitetLeif blomqvist 13 dec 2016 göteborgs universitet
Leif blomqvist 13 dec 2016 göteborgs universitetLeif Blomqvist
 

Viewers also liked (15)

Adaptation of beaks
Adaptation of beaksAdaptation of beaks
Adaptation of beaks
 
Storyboard
StoryboardStoryboard
Storyboard
 
Leif blomqvist 16 sept 2016 nääs fabriker rektorer borås stad
Leif blomqvist 16 sept 2016 nääs fabriker rektorer borås stadLeif blomqvist 16 sept 2016 nääs fabriker rektorer borås stad
Leif blomqvist 16 sept 2016 nääs fabriker rektorer borås stad
 
3 9-2016 unitron online overview
3 9-2016 unitron online overview3 9-2016 unitron online overview
3 9-2016 unitron online overview
 
2013 TWNIC-Soapremake幸福製皂 決賽結案簡報
2013 TWNIC-Soapremake幸福製皂  決賽結案簡報2013 TWNIC-Soapremake幸福製皂  決賽結案簡報
2013 TWNIC-Soapremake幸福製皂 決賽結案簡報
 
Report Final
Report FinalReport Final
Report Final
 
Tutorial screencastcamstudio 1
Tutorial screencastcamstudio 1Tutorial screencastcamstudio 1
Tutorial screencastcamstudio 1
 
Custom security effective implementation
Custom security   effective implementationCustom security   effective implementation
Custom security effective implementation
 
IQBAL KHAN_Automation_Resume
IQBAL KHAN_Automation_ResumeIQBAL KHAN_Automation_Resume
IQBAL KHAN_Automation_Resume
 
VTOL Presentation
VTOL PresentationVTOL Presentation
VTOL Presentation
 
Internship Report (VTOL) (2)
Internship Report (VTOL) (2)Internship Report (VTOL) (2)
Internship Report (VTOL) (2)
 
Merqum
MerqumMerqum
Merqum
 
Leif blomqvist 27 okt 2016 göteborgs universitet slides
Leif blomqvist 27 okt 2016 göteborgs universitet slidesLeif blomqvist 27 okt 2016 göteborgs universitet slides
Leif blomqvist 27 okt 2016 göteborgs universitet slides
 
Historia de la neurociencia
Historia de la neurocienciaHistoria de la neurociencia
Historia de la neurociencia
 
Leif blomqvist 13 dec 2016 göteborgs universitet
Leif blomqvist 13 dec 2016 göteborgs universitetLeif blomqvist 13 dec 2016 göteborgs universitet
Leif blomqvist 13 dec 2016 göteborgs universitet
 

Similar to Rrs

Similar to Rrs (20)

NiranjanTMS.pptx
NiranjanTMS.pptxNiranjanTMS.pptx
NiranjanTMS.pptx
 
Project synopsis.
Project synopsis.Project synopsis.
Project synopsis.
 
Onlinemovieticketbooking 120215060739-phpapp02
Onlinemovieticketbooking 120215060739-phpapp02Onlinemovieticketbooking 120215060739-phpapp02
Onlinemovieticketbooking 120215060739-phpapp02
 
A CASE Lab Report - Project File on "ATM - Banking System"
A CASE Lab Report - Project File on  "ATM - Banking System"A CASE Lab Report - Project File on  "ATM - Banking System"
A CASE Lab Report - Project File on "ATM - Banking System"
 
new ASE GROUPWORK.docx
new ASE GROUPWORK.docxnew ASE GROUPWORK.docx
new ASE GROUPWORK.docx
 
Presentation of Turbo C++ || Railway Reservation System project || B.Sc. student
Presentation of Turbo C++ || Railway Reservation System project || B.Sc. studentPresentation of Turbo C++ || Railway Reservation System project || B.Sc. student
Presentation of Turbo C++ || Railway Reservation System project || B.Sc. student
 
Implementation of Public Transport Sytem with Journey Planner
Implementation of Public Transport Sytem with Journey PlannerImplementation of Public Transport Sytem with Journey Planner
Implementation of Public Transport Sytem with Journey Planner
 
Software Engineering ppt
Software Engineering pptSoftware Engineering ppt
Software Engineering ppt
 
Documentation
DocumentationDocumentation
Documentation
 
Mca titles
Mca titlesMca titles
Mca titles
 
Mca titles
Mca titlesMca titles
Mca titles
 
Mca titles
Mca titlesMca titles
Mca titles
 
Mca titles
Mca titlesMca titles
Mca titles
 
Mca titles
Mca titlesMca titles
Mca titles
 
Mca titles
Mca titlesMca titles
Mca titles
 
Mca titles
Mca titlesMca titles
Mca titles
 
Mca titles
Mca titlesMca titles
Mca titles
 
Mca titles
Mca titlesMca titles
Mca titles
 
Mca titles
Mca titlesMca titles
Mca titles
 
VEHICLE MANAGEMENT SYSTEM
VEHICLE MANAGEMENT SYSTEMVEHICLE MANAGEMENT SYSTEM
VEHICLE MANAGEMENT SYSTEM
 

Rrs

  • 1.
  • 2. Introduction This system is basically concerned with the reservation of railway tickets to the passengers. In this we are going discuss that how the reservation is done. What are the rules and regulations and procedure for reservation? In this project we will discuss…………..
  • 3. Objective of Project All the manual work should be converted into computerized so that the load of employees should decrease. The database should be stored in computer rather than in register/manually. Easy to store information and fast accessing of information. Centralized management reporting & decision support. Accurate and timely control program. To make it easy for fast processing and modification. List of accounts of all customers is available. To make the Railway system is interactive. Quick feedback.
  • 4.
  • 5. Concept Stage A. Problem identification:- Information about the route, cancellation of tickets, departure time, arrival time, number of trains available and other such information. Store and retrieve information about the various transactions related to Rail travel. Keep track of all its passengers and thus schedule their journey accordingly. Maintains records of passengers travelling in the different trains on different dates reaching different destinations in the system. User friendly interface to administrator and customer
  • 6. B. Expectation:- Login and Logout Train Enquiry Book Ticket Payment Check PNR Status Cancel Ticket Get Passenger List
  • 7. C. Project Need:- In this part we are covering all the details related to customer required for reservation. Customer name Customer id Address Age Gender Phone no
  • 8. D. Aim & objective:- E. Resources:- Hardware Requirements: Processor : Pentium IV 2GHz and Above RAM : 1GB Monitor : VGA Color Monitor Printer CPU -Intel Core 2 Duo E7300 Hard disk -160 GB Software Requirements: Operating System : Windows XP onwards Developing Tool : VB (front end) Database : MS-ACCESS (back end) USER INTERFACE : KEYBOARD, MOUSE
  • 9. A. Planning Phase:- The early and most critical step in completing development, acquisition, and maintenance projects Project manager refine the information and coordinate discussions between user, audit, security, design, development, and network
  • 10. Requirements Analysis Phase:- The requirements are defined in this phase to a level of detail sufficient for systems design to proceed The purposes of this phase are to: Further define and refine the functional and data requirements and document them in the Requirements. Complete business process reengineering of the functions Develop detailed data and process models Develop the test and evaluation requirements that will be used to determine acceptable system performance.
  • 11. B. Design Phase:- Using a top-down & bottom-up approach, designers first identify and link major program components and interfaces. Contemporary design techniques often use prototyping tools that build mock-up designs of items such as application screens, database layouts, and system architectures. Audit, security, and quality assurance personnel should be involved in the review and approval process.
  • 12. B.1 Development Phase:- The development phase involves converting design specifications into executable programs The large transaction-oriented programs associated with financial institutions have traditionally been developed B.1 Integration and Test Phase:- Subsystem integration, system, security, and user acceptance testing was conducted during test phase.
  • 13. C. Implementation Phase:- This phase is initiated after the system has been tested and accepted by the user. This phase continues until the system is operating in production in accordance with the defined user requirements. The purpose of this phase is to: Operate, maintain, and enhance the system. Certify that the system can process sensitive information. Conduct periodic assessments of the system to ensure the functional requirements continue to be satisfied. Determine when the system needs to be modernized, replaced, or retired.
  • 14. Conclusion The passenger reservation is a complex activity because of sheer volume and types of coaches etc. Also transaction have a good variety. So the CRIS and CMS have developed impress/ concert based on 3 tier server client architecture. It has a mesh type topology with five server system in five cities of India. Overall it has proved to be a boon not only for passenger but also for railways functioning since, it generates all the report necessary for optimization and decision making. It is an on- line real time passenger reservation system