Presented By: Pradipta Banik Dip
Student ID: 1204012
Roadway Condition Survey Study
Bangladesh University of Engineering & Technology
Department of Civil Engineering
CE 454
Transportation Engineering II: Pavement Design & Traffic Studies
Course Teachers: Dr. Md. Shamsul Hoque & Sanjana Hossain
PRESENTATION SYNOPSIS
Introduction
Objectives
Scope of the study
Methodology
Study Site
Condition of Site
Data & Photo Analysis
Recommendations
Limitations
Roadway condition is an important parameter in selecting things for
improving vehicular movement in a road or highway. Sometimes
roadside use pattern in our country affects the traffic stream and the
smoothness of their passing in the road.
The methodology used for preparation of Road Condition is
called Road Way Condition Survey.
A condition survey is the process of collecting data to
determine the structural integrity, distresses, skid resistance,
and overall riding quality of the pavement.
INTRODUCTION
OBJECTIVES
Observing:
Geometric Condition
Operating Condition
GEOMETRIC CONDITION
 Geometric layout of
roadway
 Geometric layout intersections
 Surface condition
OPERATING CONDITION
 Location and width of side roads
 Road side land-use pattern
 Loss of road width
 Pedestrian crossing facilities
 Locations and type of control devices
 Layout of street lighting system
SCOPE OF THE STUDY
METHODOLOGY
ROAD-WAY
CONDITION
MANUAL
WALKING
SURVEY
WINDSHIELD
SURVEY
WALKING +
WINDSHIELD
SURVEY
AUTOMATIC
VIDEO
CAMERA
DISTANCE
MEASURING
INSTRUMENT
GIS
METHOD
AUTOMATED
ROAD
ANALYZER
WALKING SURVEY
Done by a walks down the side of the pavement
WINDSHIELD SURVEY
Systematic observation made from a moving vehicle, time saving.
WALKING AND WINDSHIELD SURVEY
Better method than the single application, require both
technological and human activity.
MANUAL METHOD
AUTOMATIC METHOD
VIDEO CAMERA
Observe service condition.
Attached on the post in the street.
DISTANCE MEASURING INSTRUMENT
Electronic instruments that precisely measure distances ranging
from 10s of feet to thousands of miles.
They are easy to install.
GIS METHOD
GIS is a system designed to capture, store, manipulate, analyze,
manage and present all types of geographical data.
AUTOMATED ROAD ANALYZER
Study Site
Location: Panthapath-Russel Square Road(just opposite of Samorita
Hospital)
Date: 23/3/17
Day: Thursday
Status: Working Day
Time Schedule: 8am to 12pm
Weather condition: Sunny, partially overcast
Temperature: 32˚C
Equipment: Tape, Odometer, Skid Resistance Tester etc.
Method: Manual
Condition of Site
Data & Photo Analysis
HEAVY
TRAFFIC.
 TRAFFIC IS
CONTROL BY
THE POLICE
MAN.
PEOPLE ARE
MOVING
FREQUENTLY
VEHICLE IS
MOVING
Intersection
Traffic Signal:
All types signal are present here.
But they are not operative.
Again manual control is dominant.
Markings:
In several places has worn out.
Tiger marking, lateral and parallel markings were there.
Violation of markings are frequent.
Road surface:
Skid resistance in skid resistance tester 65.
Pothole, water blockage ,rutting, distress ,crack are present.
Street Lighting:
 Central
 Double arm
 Average 27.7’
 Several equipped with solar power
Pedestrian Behavior:
Unawareness and lack of facilities disrupting the roadway
condition
Recommendations
 A ‘windshield survey’ would also have generated better results, & led to a more
detailed conclusion.
 Removal of potholes for the free flowing vehicular movement is important for
increasing travel speed & decreasing travel time.
 Road surface, markings and signs should be well designed and maintained
 Law enforcement agency be more active in enforcing traffic.
 Raise awareness among pedestrians about road safety and encourage them to
use footpaths in a regular and orderly manner
Limitations
Resource Constraints
Unskilled surveyors
Manual method of walking
Inadequate funding to run the survey
Lack of modern instruments
Not having a professional photographer
Roadway condition survey pradipta banik 1204012

More Related Content

What's hot

Urban transportation systems redesigning main street
Urban transportation systems redesigning main streetUrban transportation systems redesigning main street
Urban transportation systems redesigning main streetJulianne Crawford
 
Analyzing cyclists’ behaviors and exploring the environments from cycling tracks
Analyzing cyclists’ behaviors and exploring the environments from cycling tracksAnalyzing cyclists’ behaviors and exploring the environments from cycling tracks
Analyzing cyclists’ behaviors and exploring the environments from cycling trackscdc2013workshop
 
Group Final Project (Revised-2)
Group Final Project (Revised-2)Group Final Project (Revised-2)
Group Final Project (Revised-2)Wuzzy13
 
Group Final Project (Revised)
Group Final Project (Revised)Group Final Project (Revised)
Group Final Project (Revised)Wuzzy13
 
Chapter 1 traffic characteristics
Chapter 1 traffic characteristicsChapter 1 traffic characteristics
Chapter 1 traffic characteristicsbrijesh raychanda
 
Effect of Traffic Calming Lane Reduction on Critical Gap Sizes At Stop-Sign C...
Effect of Traffic Calming Lane Reduction on Critical Gap Sizes At Stop-Sign C...Effect of Traffic Calming Lane Reduction on Critical Gap Sizes At Stop-Sign C...
Effect of Traffic Calming Lane Reduction on Critical Gap Sizes At Stop-Sign C...IRJESJOURNAL
 
Jp Research, Pune sres ppt
Jp Research, Pune sres pptJp Research, Pune sres ppt
Jp Research, Pune sres pptSuraj Puri
 
Group Final project
Group Final projectGroup Final project
Group Final projectWuzzy13
 
Determination of road profile using multiple passing vehicle measurements
Determination of road profile using multiple passing vehicle measurementsDetermination of road profile using multiple passing vehicle measurements
Determination of road profile using multiple passing vehicle measurementsJennifer Keenahan
 
Cc503 traffic managemant part1
Cc503   traffic managemant part1Cc503   traffic managemant part1
Cc503 traffic managemant part1Syafiqah Jamian
 
Vehicle and human vibration due to road condition - ROADEX IV
Vehicle and human vibration due to road condition - ROADEX IVVehicle and human vibration due to road condition - ROADEX IV
Vehicle and human vibration due to road condition - ROADEX IVJohan Granlund
 
IRJET- A Review Paper on Automatic Traffic Control System to Reduce Accidents...
IRJET- A Review Paper on Automatic Traffic Control System to Reduce Accidents...IRJET- A Review Paper on Automatic Traffic Control System to Reduce Accidents...
IRJET- A Review Paper on Automatic Traffic Control System to Reduce Accidents...IRJET Journal
 
Poster at SC conference 2016
Poster at SC conference 2016Poster at SC conference 2016
Poster at SC conference 2016Maysam Kiani
 
Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineeringJagadeesh Kumar
 
KAI - Modern Urban Roundabouts
KAI - Modern Urban RoundaboutsKAI - Modern Urban Roundabouts
KAI - Modern Urban RoundaboutsKittelson Slides
 
Evaluation of Pedestrian Walking Speed Change Patterns at Crosswalks in Pales...
Evaluation of Pedestrian Walking Speed Change Patterns at Crosswalks in Pales...Evaluation of Pedestrian Walking Speed Change Patterns at Crosswalks in Pales...
Evaluation of Pedestrian Walking Speed Change Patterns at Crosswalks in Pales...Fady M. A Hassouna
 
Safer Curves On Multiple Lane Roads Granlund
Safer Curves On Multiple Lane Roads GranlundSafer Curves On Multiple Lane Roads Granlund
Safer Curves On Multiple Lane Roads GranlundJohan Granlund
 

What's hot (20)

Urban transportation systems redesigning main street
Urban transportation systems redesigning main streetUrban transportation systems redesigning main street
Urban transportation systems redesigning main street
 
Analyzing cyclists’ behaviors and exploring the environments from cycling tracks
Analyzing cyclists’ behaviors and exploring the environments from cycling tracksAnalyzing cyclists’ behaviors and exploring the environments from cycling tracks
Analyzing cyclists’ behaviors and exploring the environments from cycling tracks
 
Group Final Project (Revised-2)
Group Final Project (Revised-2)Group Final Project (Revised-2)
Group Final Project (Revised-2)
 
Group Final Project (Revised)
Group Final Project (Revised)Group Final Project (Revised)
Group Final Project (Revised)
 
Chapter 1 traffic characteristics
Chapter 1 traffic characteristicsChapter 1 traffic characteristics
Chapter 1 traffic characteristics
 
Effect of Traffic Calming Lane Reduction on Critical Gap Sizes At Stop-Sign C...
Effect of Traffic Calming Lane Reduction on Critical Gap Sizes At Stop-Sign C...Effect of Traffic Calming Lane Reduction on Critical Gap Sizes At Stop-Sign C...
Effect of Traffic Calming Lane Reduction on Critical Gap Sizes At Stop-Sign C...
 
Jp Research, Pune sres ppt
Jp Research, Pune sres pptJp Research, Pune sres ppt
Jp Research, Pune sres ppt
 
Group Final project
Group Final projectGroup Final project
Group Final project
 
Vinayak Dixit
Vinayak DixitVinayak Dixit
Vinayak Dixit
 
Determination of road profile using multiple passing vehicle measurements
Determination of road profile using multiple passing vehicle measurementsDetermination of road profile using multiple passing vehicle measurements
Determination of road profile using multiple passing vehicle measurements
 
Cc503 traffic managemant part1
Cc503   traffic managemant part1Cc503   traffic managemant part1
Cc503 traffic managemant part1
 
Transportation Engineering 2
Transportation Engineering 2Transportation Engineering 2
Transportation Engineering 2
 
Vehicle and human vibration due to road condition - ROADEX IV
Vehicle and human vibration due to road condition - ROADEX IVVehicle and human vibration due to road condition - ROADEX IV
Vehicle and human vibration due to road condition - ROADEX IV
 
IRJET- A Review Paper on Automatic Traffic Control System to Reduce Accidents...
IRJET- A Review Paper on Automatic Traffic Control System to Reduce Accidents...IRJET- A Review Paper on Automatic Traffic Control System to Reduce Accidents...
IRJET- A Review Paper on Automatic Traffic Control System to Reduce Accidents...
 
Poster at SC conference 2016
Poster at SC conference 2016Poster at SC conference 2016
Poster at SC conference 2016
 
Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineering
 
KAI - Modern Urban Roundabouts
KAI - Modern Urban RoundaboutsKAI - Modern Urban Roundabouts
KAI - Modern Urban Roundabouts
 
CV
CVCV
CV
 
Evaluation of Pedestrian Walking Speed Change Patterns at Crosswalks in Pales...
Evaluation of Pedestrian Walking Speed Change Patterns at Crosswalks in Pales...Evaluation of Pedestrian Walking Speed Change Patterns at Crosswalks in Pales...
Evaluation of Pedestrian Walking Speed Change Patterns at Crosswalks in Pales...
 
Safer Curves On Multiple Lane Roads Granlund
Safer Curves On Multiple Lane Roads GranlundSafer Curves On Multiple Lane Roads Granlund
Safer Curves On Multiple Lane Roads Granlund
 

Similar to Roadway condition survey pradipta banik 1204012

Roadway condition survey
Roadway condition surveyRoadway condition survey
Roadway condition surveyStone Rayhan
 
Presentation on Roadway Condition Survey
Presentation on Roadway Condition Survey Presentation on Roadway Condition Survey
Presentation on Roadway Condition Survey Khaza Ahmed Palash
 
Presentation on Roadway Condition Survey for the course CE 454
Presentation on Roadway Condition Survey for the course CE 454Presentation on Roadway Condition Survey for the course CE 454
Presentation on Roadway Condition Survey for the course CE 454nazifa tabassum
 
Roadway condition presentation grp 04
Roadway condition presentation grp 04Roadway condition presentation grp 04
Roadway condition presentation grp 04Stone Rayhan
 
Roadway Condition Survey
Roadway Condition SurveyRoadway Condition Survey
Roadway Condition SurveyMd Tanvir Alam
 
Geometry condition study on panthapath to russel square by pronob ghosh buet ...
Geometry condition study on panthapath to russel square by pronob ghosh buet ...Geometry condition study on panthapath to russel square by pronob ghosh buet ...
Geometry condition study on panthapath to russel square by pronob ghosh buet ...Pronob Ghosh
 
Road condition survey by ahmed ferdous - 1004137-buet
Road condition survey by ahmed ferdous - 1004137-buetRoad condition survey by ahmed ferdous - 1004137-buet
Road condition survey by ahmed ferdous - 1004137-buetAhmed Ferdous Ankon
 
Speed study pradipta banik 1204012
Speed study pradipta banik 1204012Speed study pradipta banik 1204012
Speed study pradipta banik 1204012Pradipta Banik
 
roadway condition survey
roadway condition surveyroadway condition survey
roadway condition surveymruemran
 
road safety audit of Aurangabad
 road safety audit of Aurangabad road safety audit of Aurangabad
road safety audit of Aurangabadhemalatha821568
 
,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdfsandipanpaul16
 
Traffic Engineering And Drainage
Traffic Engineering And DrainageTraffic Engineering And Drainage
Traffic Engineering And DrainagePrashant Ranjan
 
Unit 3 i ppt
Unit 3 i pptUnit 3 i ppt
Unit 3 i pptUMASAI8
 
“ANALYSIS AND DESIGN OF MDR-34”
“ANALYSIS AND DESIGN OF MDR-34”“ANALYSIS AND DESIGN OF MDR-34”
“ANALYSIS AND DESIGN OF MDR-34”IRJET Journal
 
Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Pronob Ghosh
 
IDENTIFICATION OF BLACKSPOTS IN PALA-THODUPUZHA ROADAND RECOMMENDATION OF REM...
IDENTIFICATION OF BLACKSPOTS IN PALA-THODUPUZHA ROADAND RECOMMENDATION OF REM...IDENTIFICATION OF BLACKSPOTS IN PALA-THODUPUZHA ROADAND RECOMMENDATION OF REM...
IDENTIFICATION OF BLACKSPOTS IN PALA-THODUPUZHA ROADAND RECOMMENDATION OF REM...IRJET Journal
 
Accidents studies by ravindra c
Accidents studies by ravindra cAccidents studies by ravindra c
Accidents studies by ravindra cŔąvî Bøňđ
 

Similar to Roadway condition survey pradipta banik 1204012 (20)

Roadway condition survey
Roadway condition surveyRoadway condition survey
Roadway condition survey
 
Presentation on Roadway Condition Survey
Presentation on Roadway Condition Survey Presentation on Roadway Condition Survey
Presentation on Roadway Condition Survey
 
Presentation on Roadway Condition Survey for the course CE 454
Presentation on Roadway Condition Survey for the course CE 454Presentation on Roadway Condition Survey for the course CE 454
Presentation on Roadway Condition Survey for the course CE 454
 
Roadway condition presentation grp 04
Roadway condition presentation grp 04Roadway condition presentation grp 04
Roadway condition presentation grp 04
 
Roadway Condition Survey
Roadway Condition SurveyRoadway Condition Survey
Roadway Condition Survey
 
Traffic Volume Study
Traffic Volume StudyTraffic Volume Study
Traffic Volume Study
 
Geometry condition study on panthapath to russel square by pronob ghosh buet ...
Geometry condition study on panthapath to russel square by pronob ghosh buet ...Geometry condition study on panthapath to russel square by pronob ghosh buet ...
Geometry condition study on panthapath to russel square by pronob ghosh buet ...
 
Road condition survey by ahmed ferdous - 1004137-buet
Road condition survey by ahmed ferdous - 1004137-buetRoad condition survey by ahmed ferdous - 1004137-buet
Road condition survey by ahmed ferdous - 1004137-buet
 
Presentration 2
Presentration 2Presentration 2
Presentration 2
 
Speed study pradipta banik 1204012
Speed study pradipta banik 1204012Speed study pradipta banik 1204012
Speed study pradipta banik 1204012
 
roadway condition survey
roadway condition surveyroadway condition survey
roadway condition survey
 
road safety audit of Aurangabad
 road safety audit of Aurangabad road safety audit of Aurangabad
road safety audit of Aurangabad
 
,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf
 
Traffic Engineering And Drainage
Traffic Engineering And DrainageTraffic Engineering And Drainage
Traffic Engineering And Drainage
 
Unit 3 i ppt
Unit 3 i pptUnit 3 i ppt
Unit 3 i ppt
 
Unit 3 i ppt
Unit 3 i pptUnit 3 i ppt
Unit 3 i ppt
 
“ANALYSIS AND DESIGN OF MDR-34”
“ANALYSIS AND DESIGN OF MDR-34”“ANALYSIS AND DESIGN OF MDR-34”
“ANALYSIS AND DESIGN OF MDR-34”
 
Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...
 
IDENTIFICATION OF BLACKSPOTS IN PALA-THODUPUZHA ROADAND RECOMMENDATION OF REM...
IDENTIFICATION OF BLACKSPOTS IN PALA-THODUPUZHA ROADAND RECOMMENDATION OF REM...IDENTIFICATION OF BLACKSPOTS IN PALA-THODUPUZHA ROADAND RECOMMENDATION OF REM...
IDENTIFICATION OF BLACKSPOTS IN PALA-THODUPUZHA ROADAND RECOMMENDATION OF REM...
 
Accidents studies by ravindra c
Accidents studies by ravindra cAccidents studies by ravindra c
Accidents studies by ravindra c
 

Recently uploaded

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 

Recently uploaded (20)

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 

Roadway condition survey pradipta banik 1204012

  • 1. Presented By: Pradipta Banik Dip Student ID: 1204012 Roadway Condition Survey Study
  • 2. Bangladesh University of Engineering & Technology Department of Civil Engineering CE 454 Transportation Engineering II: Pavement Design & Traffic Studies Course Teachers: Dr. Md. Shamsul Hoque & Sanjana Hossain
  • 3. PRESENTATION SYNOPSIS Introduction Objectives Scope of the study Methodology Study Site Condition of Site Data & Photo Analysis Recommendations Limitations
  • 4. Roadway condition is an important parameter in selecting things for improving vehicular movement in a road or highway. Sometimes roadside use pattern in our country affects the traffic stream and the smoothness of their passing in the road. The methodology used for preparation of Road Condition is called Road Way Condition Survey. A condition survey is the process of collecting data to determine the structural integrity, distresses, skid resistance, and overall riding quality of the pavement. INTRODUCTION
  • 5. OBJECTIVES Observing: Geometric Condition Operating Condition GEOMETRIC CONDITION  Geometric layout of roadway  Geometric layout intersections  Surface condition OPERATING CONDITION  Location and width of side roads  Road side land-use pattern  Loss of road width  Pedestrian crossing facilities  Locations and type of control devices  Layout of street lighting system
  • 6. SCOPE OF THE STUDY
  • 8.
  • 9. WALKING SURVEY Done by a walks down the side of the pavement WINDSHIELD SURVEY Systematic observation made from a moving vehicle, time saving. WALKING AND WINDSHIELD SURVEY Better method than the single application, require both technological and human activity. MANUAL METHOD
  • 10.
  • 11. AUTOMATIC METHOD VIDEO CAMERA Observe service condition. Attached on the post in the street. DISTANCE MEASURING INSTRUMENT Electronic instruments that precisely measure distances ranging from 10s of feet to thousands of miles. They are easy to install. GIS METHOD GIS is a system designed to capture, store, manipulate, analyze, manage and present all types of geographical data.
  • 14. Location: Panthapath-Russel Square Road(just opposite of Samorita Hospital) Date: 23/3/17 Day: Thursday Status: Working Day Time Schedule: 8am to 12pm Weather condition: Sunny, partially overcast Temperature: 32˚C Equipment: Tape, Odometer, Skid Resistance Tester etc. Method: Manual Condition of Site
  • 15. Data & Photo Analysis HEAVY TRAFFIC.  TRAFFIC IS CONTROL BY THE POLICE MAN. PEOPLE ARE MOVING FREQUENTLY VEHICLE IS MOVING Intersection
  • 16.
  • 17. Traffic Signal: All types signal are present here. But they are not operative. Again manual control is dominant. Markings: In several places has worn out. Tiger marking, lateral and parallel markings were there. Violation of markings are frequent.
  • 18. Road surface: Skid resistance in skid resistance tester 65. Pothole, water blockage ,rutting, distress ,crack are present.
  • 19. Street Lighting:  Central  Double arm  Average 27.7’  Several equipped with solar power
  • 20.
  • 21. Pedestrian Behavior: Unawareness and lack of facilities disrupting the roadway condition
  • 22.
  • 23. Recommendations  A ‘windshield survey’ would also have generated better results, & led to a more detailed conclusion.  Removal of potholes for the free flowing vehicular movement is important for increasing travel speed & decreasing travel time.  Road surface, markings and signs should be well designed and maintained  Law enforcement agency be more active in enforcing traffic.  Raise awareness among pedestrians about road safety and encourage them to use footpaths in a regular and orderly manner
  • 24. Limitations Resource Constraints Unskilled surveyors Manual method of walking Inadequate funding to run the survey Lack of modern instruments Not having a professional photographer