Urban & Rural Wireline & Wireless Communication Infrastructure Developer & Service Provider
Safe and Smart City
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Vision
Mission
We strive to provide the most reliable and superb
communication solutions that exceed customer needs,
enabling us to be a preferred data solution partner.
We will be continues to be an independent company to
create, develop and maintain the specialised city based
Telecom Optic Fibre Cable Network and to be a part of our
nation requirement to enhance economical growth path.
We are a customer focused company that values our
customers as the foundation of our business. We facilitate
our customers to build remarkable values based on
information and communication services innovation.
We strive to give our lie t’s competitive edge in their
respective industries. Through the provision of market
leading communication products. We are dedicated to
enhancing their service levels, improving their workplace
efficiencies and increasing their productivity levels.
1000+ Km
of own OFC
Network
Enabling
Surat Safe
City Project
through
Own
Network
Provides
Infrastructure
to Telecoms,
Govt and
Enterprises
Own
Equipments
to lay OFC
& Dedicated
Team to
Maintain
Gujarat
Based OFC
Infra
Company
25000+
Subscribers
through
Airlink
Broadband
Company Overview
1992 2001 2008 2009 2010 2011 2012 2013
Lateral Growth from OFC Company to Complete Network Solutions Company
Started as
a CATV
Operator
Diversified
from CATV
business to
Infrastructure
business
Developed
own Under
Ground
OFC infra
in the
Surat City.
UG OFC
work at
Vapi,
Silvassa
and
Dadra
Expansion
of Network
at
Ankleshwar
Jhagadia
GIDC and
Ahmedabad
Ventured
into
internet
retail
broadband
business
with brand
name
“AIRLINK”
Network
Integrator
of the
India’s
First
Safe City
Project in
Surat on
Dedicated
Fiber
Complete
data solution
provider and
repositioned
to become
pioneer in
EDS
business
CATV
Operator
Telecom EPC
Player
EPC for Laying Optical
Fiber for Telcos
Enterprise Data
Solutions
Company
Urban
Infrastructure
Enabler
2014
Public
Offering
Clearance
from
SEBI / BSE /
NSE.
Applied NLD
and Class-A
ISP License
First Company in India to have
complete City based Underground
OFC Network in Surat
Preface
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Data Centre
City Wi-Fi
2015
Started south
Gujarat’s
First
Tier-III Data
Centre in
Surat City.
“City Wi-Fi”
Connectivity
in Surat City
R K I fratel Ltd. Group of Co pa ies Structure…
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Business Activities
• Owning, Installing, Commissioning and Maintaining OFC Network.
• Integrated Campus Solutions encompassing Network, Data Centre and Cameras
for Buildings, Universities, Office Campuses, Factories and SEZ's.
• CCTV Surveillance Projects, Network, IBMS and Systems.
• Network and System Integration.
• Enterprise Data Solutions | Essential Supplies.
• OFC Turnkey Project.
• Telecom OSP Project.
• OFC Network O&M for Intra-city and Intercity for Telecom Companies.
• Last Mile Customer link Delivery and In-building Solutions.
• Underground Infrastructure Solutions for Oil/Gas/Power Sector.
• Gas Distribution Infrastructure Projects in Cities.
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Internet Connectivity Wireless Connectivity
VPN Branch office Connectivity
Wired Connectivity
- Business Activities
• Broadband Internet services in Surat City
• Secured Internet Access for Enterprise/SME/Govt. and Individuals
• Citywide Wi-Fi Network for Surat City (Under Pilot Commissioning (network is ready))
• Wi-Fi Hotspot Solutions
• Voice Solutions-Landline & PRI Line
• Class-A Internet Service Provider (Applied for Class-A and Operating Class-B )
• National Long Distance (NLD) for MPLS VPN Services (Applied for NLD)
• Enterprise Data Solution
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
- Business Activities
IT Infra Services
• Data Space
• Rack Space
• Server Hosting
• Cloud Computing
• Managed Security Service
• Data Storage and Backup
• Remote Data Access
Web Based Services
• Business Application
• Bulk SMS Services
• Bulk Mail Services
• Mail Hosting
• Web Security
• Webcasting
• Webinar
• Web Hosting
• Virtual Classroom
• Virtualization
• Virtual Training
On Demand Services
• IP TV
• IP Phone
• VOIP
• Video Conferencing
• Gaming on demand
• Video on demand
• Music on demand
• Jokes on demand
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
- Business Activities
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
• Citywide Digital Advertisement.
• LED Display Boards at Railways Stations & Airports.
• Display Board to display daily gold, interest and foreign exchange rates.
• To display promotional schemes for FMCG / Corporate.
• LED Display systems at Shopping malls & retail stores.
• Display Boards at Clubs & multiplexes.
• Display Board at Trade Fairs & Exhibitions.
• Display Board to display information at Hotels, Hospitals, Institutions,
Schools and Bank’s ATMs etc.
• Display Board to display traffic information.
• Public Safety & Awareness Advertising
• Any Kind of LED Display Solution and Digital Advertising Solutions.
- Business Activities
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
• City-wide Wi-Fi Services
• Campus-wide Wi-Fi Solution
• Smart City Solution
• Safe City Solution
• Wi-Fi Internet Services
• Hotspot Wi-Fi Solution
• Secured Wi-Fi Services
• All Types of Wi-Fi Solution…
- Business Activities
• Office / Business Application
• Education Software
• Creative Learning, Teaching and assessment Solutions & Services
• Facility Management Service
• Database Management
• Software Implementation & Customization
• E-Mail Server
• Network Management
• All Types of Software Solution…
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Solution Comparison
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Points R K Infratel Telecom Operator
Dark Fiber Solution Provide Dedicated Dark Fiber Don't provide Dark fiber
Bandwidth
Restriction
No Restriction on Bandwidth Restricted Bandwidth in Terms of Mbps and Kbps.
End to End
Connectivity
Yes - on Underground Optical Fiber Cable No - Provide MPLS / DLC LINK
Data Security Yes - As dedicated Fiber is connected data
routed to secured path and in own Network
infrastructure
No - Data route to their Network/Server and comes
to your end.
One Roof Solution Yes - As RK Infratel have Skilled In-house Team
for Installation, O&M and Support.
No - As they outsource Manpower from contractor.
24X7 Monitoring &
Support
Yes - R K Infratel have own NOC/Datacentre
and is monitored 24x7x365 days
Yes - Telecom operators have own NOC and is
monitored 24x7x365 days
Scalability of
Network
Yes - Immediate with Minor Cost, because only
need to upgrade hardware devices, Fiber
network is capable for any limits
Yes - it's costly and time consuming process. As they
back on third party as well they have to upgrade
their network for your requirement.
Dedicated DATA
Center for Police /
Smart City
Yes - As R K Infratel provides Dedicated Dark
fiber solution so that easy to operate dedicated
Data Centre for Police / Smart City
No - Telco's provide monitoring from their end. Data
center required huge amount of bandwidth so not
getting proper throughput as required
Importance Of Dedicated OFC Network
Dedicated network
has no Bandwidth
Limitation, can carry
Terabytes, Petabytes
of Data in Seconds.
Conventional method
to provided
bandwidth arrest the
flexibility and
scalability of
bandwidth consuming
application.
Dedicated network is
required for real time
application and secure
data services like
surveillance.
Requires essential
frameworks on
which to build a
real-time software
application.
Plays critical role in
enabling quick,
sustainable
expandable
network.
Very essential to
maintain minimum
latency and jitter.
Capturing real time image
and to traverse through
network requires fine tune
network to maintain
clarity of image.
Requires multi protection
path to get high uptime.
Data security must be
maintained at network
level to meet
confidentiality of data
traverse from network.
Fiber Network
works like Veins
in human body
Dedicated
Network
City Based
Network
Planning
Camera and
Systems
Integrator
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Key Business Areas & Products/Services on UG OFC Network
OSP Project
OFC O&M Service
Trunkey Project
Duct on Lease
Dark Fiber on Lease
City Surveillance Project
Public Service
Internet Leased Line (ILL)
End to End Connectivity (P2P)
Wi-Fi Connectivity
Data Ce tre & Et …
Key Business Areas Products & Services
Telecom Sector
Internet Service Provider
Cable TV Service
Government Sector
Semi Government Sector
Municipal Corporation
Police Department
Corporate / SME Sector
Industrial Sector
Banking Sector
Broadband Users
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Benchmarks
• 850 Kms- OFC O&M of TCL at Jaipur-Delhi-
Mohali –Panipat -Punjab Route.
• Leasing more then 50 Kms duct to Idea Cellular
Ltd. in Surat.
• 210 Kms - OFC O&M of Airtel Intracity Route in
Surat.
• 520 Kms - OFC O&M of pipeline route of GAIL
India Ltd. in Gujarat.
• 1500 Kms - OFC O&M of Vodafone Haryana NLD
Route.
• Exclusivity of Underground OFC network in
Sachin SEZ.
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
• Provided 300+ km underground optical fiber
network for 100+ Locations connectivity to
surat police for “safe city” Surat CCTV
surveillance project for the period of 5 years.
• Provided 250 km optical fiber network for 78
locations connectivity to Ahmadabad Municipal
Corporation for CCTV surveillance project in
Ahmadabad for the period of 3 years.
• Started fully own subsidiary Broadband Internet
Services in Surat with brand name of ‘AIRLINK’ in
2011. Presently having more than 25000+ retail
broadband & 800+ enterprise customers.
• Having More than 1000Kms+ own Underground
OFC Network in Major cities of Gujarat.
• Covered entire Surat city by UG, OH, MPLS and
Wimax network.
• Leasing more then 300 Kms dark fiber to TATA
Teleservices Ltd. and TATA Communication Ltd.
in Surat.
• Completed In building & OSP work for more
than 1000 building in NCR for TCL in India.
• Redundant Fiber Ring Network.
• Multiple Connectivity on Fiber.
• Customize Solution according to Requirements.
• No bandwidth limitations.
• Highly Reliable & Secured Data Circuit.
• Centralized Control & Command Center.
• Technology Integration Service.
• Planning, Design and Implementation of Network (Active
and Passive).
• Physical Survey to identify cross junction and understand
criticality.
• Identification of hardware and systems to effectively fit the
budget of local governance authority.
• Directed and adviced the concerned committee for
technical aspects of the project.
• Complete execution of project in given timeline as System
and Network integrator.
• Maintaining the same network to serve the object of
project for long term.
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Solution Provided Our Technology
Core Strengths
• Ability to plan, design and build Optical Fiber Network with latest technology.
• Network integration capability scales our efficiency to work for active network.
• The dedicated maintenance team to maintain uptime of any size of network.
• Having own tools, machineries and skilled resource curb the dependencies.
• Expertise to develop smart, safe and secure infrastructure solutions.
• Fully operational NOC, Project, O&M Support, System and Network integration capability, Field team and portfolio of
complete enterprise data products define our path to become Enterprise Data Solution company.
USP
• RK Infratel is the unique Telecom Infrastructure Service Provider Organization in place with complete expertise.
• More than 21 years of rich experience comprising of various project execution and planning.
• Owned Machineries for OFC Infrastructure Roll-Out, Operation & Maintenance.
• Adopting industry best practices to continuously groom processes to get effective workflow.
• Customer satisfaction is on highest priority and continuously enhancing on technology front.
• Tied up with various outsource agencies to procure resources for mitigate critical issues and large scale project
execution.
• Central monitoring system for entire network in place with timely escalations to serve the Customers in better way.
• Building up NOC and customer relationship management to proactively support and Maintaining optimum network
uptime.
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
HDD Machine
OTDR
Particulars
Optical Power Meter
Laser Source Meter
Splicing Machine
Blowing Machine
Cable Locator
GEN Sets
Tunable Laser Source
Vehicles for transporting
4
25
Qty.
25
25
30
2
2
4
2
21
Apparatus
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Agriculture Department Education Department
Energy and Petro Chemicals
Department
Finance Department
Industries and Mines
Department Administrative DepartmentHome Department
Food and Civil
Supplies Department
Science & Technology
Department
Water Supply Department
Roads and Buildings
Department
Rural and Urban
Development
Forest Department
Women and Child
Development
Ports and Transport
Department
Collector Office
Jila PanchayatE-Telegram, Post OfficeIncome TaxVAT Office Service Tax Office
Application on Dedicated Fiber for Government
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Application on Dedicated Fiber for Municipal Corporation
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Video Conference &
IP Telephony Services
CCTV Surveillance
Fire Station
Centralized
Attendance System
Disaster Management
Announcement
System
Public Transport System
Project Monitoring
Traffic Signal
Private LAN/VPN
Centralized Data/
Document Storage
Street Light Management
Vehicle tracking system
Digital Display Board
Water Drainage System
Application on Dedicated Fiber for Police Department
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Video Conference &
IP Telephony Services
CCTV Surveillance
Disaster Management
Announcement
System
Traffic Signal
Centralized Data/
Document Storage
Online Criminal Record
Vehicle tracking system
Digital Display Board
Police Station
Public Helpline Service
Centralized
Attendance System
Online ComplaintsCourt Connectivity
Central Jail Monitoring
Application of Dedicated Fiber Networks for Industries
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Railway/Highway /City
Signaling Monitoring
LAN/MAN/WAN/CAN/
PAN Connectivity
Internet Service
Providers(ISPs)
CATV Operators
Secure Surveillance
Services
Military / Defense
Communications
OIL/GAS Pipeline System
Monitoring
DAM / Canal Water
Flow Management
Government and
Semi Government
Corporate/
Enterprises Solutions
Bank/Financial Institutions
Telecom Industries
RESERVE BANK
OF INDIA
Branch Office
Corporate Office
Regional Office
Manufacturing Unit
Centralized
Data Centre (HO)
Ring Network
Remote User
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Experience Multiple Services On Single Core Fiber Optic Cable
I dia’s First “afe City Project on PPP Mode.
Implemented on Dedicated Fiber provided by RK Infratel Ltd. in 4 months record time.
Solution encompasses 200+ Km dedicated network in phase-I and covering entire City in subsequent phases.
100% uptime since December, 2012, Commissioning month of operation of the Safe City Project.
Design and planning of network to protect in multicut scenario and maintain optimum latency and jitter.
Provision of end to end network on exclusive fiber terminated at Command & Control Centre.
320+ KM Dedicated OFC Network Provided by RK Infratel Ltd.
I dia’s First Pi ture I tellige e U it Fa e Re og itio , Vehi le “peed Violatio , Auto ati Nu er Plate
Re og itio I augrated y Ho ’ le Chief Mi ister of Gujarat “ t.A a di Be Patel.
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Safe City Surat | CCTV Surveillance Project
City Wide Wi-Fi System
Traffic Signal Management
Centralized monitoring & control all traffic signal point.
Enhanced work efficiency & control on traffic violation.
Minimize or reduce man power cost at all traffic signal point.
Digital Display System
Dynamic digital signage can grab a customer's attention and influence their
purchasing decision.
Digital signage is instant and offers the ability to change promotions
immediately for various products or particular customers.
Showing public message for social activity through Digital Display Board.
Target Specific Audience.
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Any where access of Internet and Intranet Application all over city.
More people who have a constant access to information.
More interactive tourism opportunities if visitors have access to free internet
The ability to add next generation city appliances to a massive smart grid.
Increased GDP.
Wi-Fi
City Wide
Live Video Streaming
Timely and direct executive communications.
Access to completion of regulatory and standards compliance training.
Keeping the sales force (direct and distribution partners) up to date on new products
and technologies.
Enabling frequent product announcements, updates and training.
BRTS Project & Metro Rail Management
Monitor all Station through CCTV Camera.
Can Monitor behavior of the people at station, which is really beneficiary to Cops to
identify suspect.
Can Monitor BUS and Metro Rail Speed.
Automation System can be operate from Central Control Room like we can Lock or
Open any stations.
Ongoing Project Monitoring
Instant view of the project status: anticipation to issues and decisions based on
relevant information.
Avoid budget overrun and delays: as a result of an effective monitoring of all the
important aspects of the Project.
Continuous improvement: anything that can be measured and analyzed can be
improved.
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Centralized Data Storage System
Pooled storage flexibility.
Increased support for server virtualization initiatives.
Increased utilization, with no stranded capacity.
Effective use of equipment, supplies and space.
All related data kept together, Reduces duplication.
Basic site infrastructure with expected availability.
Disaster Management Services
Water Drainage System
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Proactive action plan for public safety and protect against the major
damages or losses.
Can spread the message of disaster to the public.
IF fire found in area can immediately inform to Fire Brigade and
Ambulance.
IF found any robbery at area of city can be inform immediately to
Cops.
Real-time remote access and control of Sewage systems.
Connectivity with external sensors and devices.
Low impact implementation, long term system durability and professional
support.
Comprehensive and automated solution for accurate & remote municipal
water management.
Reduce cost and prompt action over any failure.
Vehicle Tracking & Control System
Centralized Attendance System
Video Conferencing & VoIP Services
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Monitoring of your drivers helps you vastly decrease employee cost and
time card abuse.
Improve customer service.
Vehicle tracking system allows users to track unsafe driving and personal
use of fleet vehicles.
Vehicle tracking allows managers to keep better control of their driver’s
activities.
Ongoing time savings & elimination of employee time rescue.
Automate employee time off & tracking.
Coordinate, monitor time for training & other work-related events.
Integrate employee time details with payroll.
Notification when employees forget to track time.
Increased Productivity across Dispersed Workforces and Teams.
Improved Hiring and Retention of Top Talent.
Reduced Travel Cost.
Increased knowledge transfer & Trainings.
Leveraging technical expertise across disparate locations.
Public Announcement System
Optimum use of available source of bandwidth with
redundancy.
Centralized process for security and legal compliance.
Integrate relative systems and database.
Load balancing amongst service provider peering.
Balance business needs and cost with security.
Faster & Efficient spread of important message
during disaster.
Breach communication gap.
Centralize control for authentication of
communication.
Flexibility & Safety.
Control on Spreading of rumors.
Central Bandwidth Distribution
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Ahmedabad
Bavla GIDC
Jhagadia
Ankleshwar
Kamrej
Surat
KadodaraHazira
Sachin
Valsad
Vapi
Silvassa
Bhilad
Talsari
Pipavav Port
Mundra Port
Rajkot
Kandla Port
Gandhidham
Panoli Gidc
Kim
Bharuch
Vadodara
Dahej
Navsari
Umargam
Daman
Morbi
GandhinagarBhuj
Corporate Office
Present Network
Proposed Planning
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
R K Infratel | OFC Network Presence - Gujarat
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Present & Proposed OFC UG Network - Surat
Daboli Mota Varachha
Variyav
Amroli
KatargamPalanpur Gam
Athwa
Piplod
Vesu Althan Pandesara
Varachha
Jhangirpura
Vanakala
Malgama
Ichhapur
BhatporeLimala
Damka
Reliance
Mora
L&t
Essar
Adani
Shell
Dumas
Airport
Sarsana
Gabheni
Sachin Indu
Sez
Parle Point
Text. Mkt
Parwat Patia
Dindoli
Adajan
Rander
Saroli
Selut
Ambheta
Sherdi
Kosad
Nana Varachha
Antroli
Kadodara
Khatodara
Kamrej
Kholwad
Abarma Check post
Kosmada
Valthan
Unbhel
Vareli
Chalthan
Bhatia
Palsana
Abhva
Limbayat
Mohini
Niyol
Bharthana
Magob
Dipli Gam
Sonari
Umbher
Bhagal
Pal
Existing Route
Proposed Route
Major Road
Railway Track
River / Nalla
Landmark
Legend
ONGC
GailONGC
Surat
NTPC
GSEG
GSPC
Apparel Park
Adajangam
Sayan Check Post
HOZIWALA
Olpad
Godadara
Simada Check Post
Surat Metro Ethernet Network
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Kim
Sayan
Olpad
Sachin GIDC
Mora
Jhangirpura
Adajan
Bhatar
Pal
Palanpur
Hanipark
Tarwadi
Vesu
Althan
Pandesara
Bhesthan
Udhna
Kadodara
Kamrej
Varachha
Katargam
Mota
Varachha
Bhagal
Bhatpore
Mota VarachhaAmroli
Variyav
Hazira
Dumas
Limbayat
Surat Wireless Network
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Vishalpur
Kamod Laxmipura
Narolgam
PiplajSingarva
Vishala
Vasana
Vatva
Ghodasar
Isanpur
Makarba
Prahladnagar Shyamal
Jodhpur
Satelite
Vastrapur
Paladi
Vejalpur
Thaltej
Naranpura
Ghatlodia
Sola Chandlodia
Gota
Sabarmati
Chandkheda
Bhadaj
Ognaj
Lapkaman
Ranip
Tragad
Zundal
Koteshwar Bhat
Airport
Chiloda
Sughad
Valad
Gidc Naroda
Nava Naroda
Kathwada
Nikol
Odhav
Bapunagar
Shahibagh
Meghaninagar
Vadaj
Usmanpura
Navrangpura
Behrampura
Kankaria
Maninagar
Ahmedabad Rakhial
Gidc Vatwa
Mahadev Nagar
Memadpur
Shastrinagar
VanchHathijan
Sarkhej
Badrabad
Bavla
Changodar
Hansol
Amraiwadi
Chandola Lake
Existing Route
Proposed Route
Railway Track
River
Major Road
Landmark
Legend
Present & Proposed OFC UG Network - Ahmedabad
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Arabian Sea
Valsad
Killa Pardi
Dhodhad Kuva
Nana Ponda
Kakadkopar Mota Ponda
Ozar
Tukwada
Bhandarwad
Udwada
Bhimpore
Tarakpardi
Daman
Devka Beach
Nani Daman
Pariyari
Rentlav
Tidhara
Morai
Salvav
Chala
Chharwada
Vapi
Chanod
Dungara
Dadara
LavachhaAmali
Silvassa
Naroli
Bhilad
Zaroli
Daheli
Nahuli
Umargam Ina
Khatalwada
Sanjan
Umargaon
Dahad
Samarwani
Alok Industrial
Rakholi
Khadoli
Hindusthan Unilever Ltd
Surangi
Khanvel
Anwir
Achhad
Varwade
Sawroli
TalasariUdhawa
Dolara
Dapada
Falandi
Kilwani
Galonda
Sayali
Karchond
Astol
Solsumda
Sovda
Bordi
Baradi
Vapi Gidc
Madhuban
Reservoir
Existing Route
Proposed Route
Railway Track
River
Major Road
Landmark
Legend
Present & Proposed OFC UG Network – Vapi and UT
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Ghodkhol Part
Andada
Lake
Miranagar
Sarangpur
Uchhali
Dadhal
Ankleshwar GIDC
Piraman
Ankleshwar
Rly Stn
Taibah Nagar
Ankleshwar
Hifazat Nagar
Mandva
Mulad
Mandavabuzarg
Nava Kansiya
Govali
Fulwadi
Birla Century
Sriram Alkali
UPL
Skumar
Jhagadia GIDC
Kholar
Anmol Plaza
Chapara
Bornhatha Bet
Bharuch
Abott
Rajpipla
Chowkdi
Existing Route
Proposed Route
Railway Track
River
Major Road
Landmark
Legend
Present OFC UG Network – Ankleshwar and Jhagadia
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
ISO 9001-
2008
Certified
ISO
9004:2000
NSIC-
SMERA
Certificate
License of
Infrastructur
e Provider
IP-1
Class B ISP
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Accreditation
License of
Infrastructur
e Provider
IP-1
Class B ISP
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Achievement & Appreciation
E a lei g “ art Cities i I dia i fa t The Pri e Mi ister refere ed Surat before when we were
talking privately , Surat using a city next framework working with local authorities to make data
analytics available for both The Municipal Corporation of Surat as well as Citizens of Surat so that they
can make faster decision as it relates to their education, business, energy, services and logistics.
Satya Nadella, CEO - Microsoft
Clients
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Clients
CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
Branch Office - Ahmedabad
A-613, Atma House, Opp. Old RBI,
Nr. Times of India, Ashram Road,
Ahmedabad - 380006
+91-9099974451
ahmedabad@rkinfratel.com
Branch Office - Vapi
M-36, Chandralok Building,
Chanod GIDC, Vapi - Silvassa Main Road,
Vapi - 396191
+91-260-6544454 / 9377331054
vapi@rkinfratel.com
Corporate Office – Surat
R. K. Infratel Ltd., 13 to 18, 2nd Floor, Annapurna Shopping Centre, Adajan Patia Circle, Surat - 395009
+91 99099 70099 | 261 6697722, 2780343, 2780403, 3067979 Fax: +91 261 2787879
info@rkinfratel.com | sales@rkinfratel.com
www.rkinfratel.com

Rkil group presentation

  • 1.
    Urban & RuralWireline & Wireless Communication Infrastructure Developer & Service Provider Safe and Smart City
  • 2.
    CLASS “B” ISPCity Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Vision Mission We strive to provide the most reliable and superb communication solutions that exceed customer needs, enabling us to be a preferred data solution partner. We will be continues to be an independent company to create, develop and maintain the specialised city based Telecom Optic Fibre Cable Network and to be a part of our nation requirement to enhance economical growth path. We are a customer focused company that values our customers as the foundation of our business. We facilitate our customers to build remarkable values based on information and communication services innovation. We strive to give our lie t’s competitive edge in their respective industries. Through the provision of market leading communication products. We are dedicated to enhancing their service levels, improving their workplace efficiencies and increasing their productivity levels. 1000+ Km of own OFC Network Enabling Surat Safe City Project through Own Network Provides Infrastructure to Telecoms, Govt and Enterprises Own Equipments to lay OFC & Dedicated Team to Maintain Gujarat Based OFC Infra Company 25000+ Subscribers through Airlink Broadband Company Overview
  • 3.
    1992 2001 20082009 2010 2011 2012 2013 Lateral Growth from OFC Company to Complete Network Solutions Company Started as a CATV Operator Diversified from CATV business to Infrastructure business Developed own Under Ground OFC infra in the Surat City. UG OFC work at Vapi, Silvassa and Dadra Expansion of Network at Ankleshwar Jhagadia GIDC and Ahmedabad Ventured into internet retail broadband business with brand name “AIRLINK” Network Integrator of the India’s First Safe City Project in Surat on Dedicated Fiber Complete data solution provider and repositioned to become pioneer in EDS business CATV Operator Telecom EPC Player EPC for Laying Optical Fiber for Telcos Enterprise Data Solutions Company Urban Infrastructure Enabler 2014 Public Offering Clearance from SEBI / BSE / NSE. Applied NLD and Class-A ISP License First Company in India to have complete City based Underground OFC Network in Surat Preface CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Data Centre City Wi-Fi 2015 Started south Gujarat’s First Tier-III Data Centre in Surat City. “City Wi-Fi” Connectivity in Surat City
  • 4.
    R K Ifratel Ltd. Group of Co pa ies Structure… CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 5.
    Business Activities • Owning,Installing, Commissioning and Maintaining OFC Network. • Integrated Campus Solutions encompassing Network, Data Centre and Cameras for Buildings, Universities, Office Campuses, Factories and SEZ's. • CCTV Surveillance Projects, Network, IBMS and Systems. • Network and System Integration. • Enterprise Data Solutions | Essential Supplies. • OFC Turnkey Project. • Telecom OSP Project. • OFC Network O&M for Intra-city and Intercity for Telecom Companies. • Last Mile Customer link Delivery and In-building Solutions. • Underground Infrastructure Solutions for Oil/Gas/Power Sector. • Gas Distribution Infrastructure Projects in Cities. CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Internet Connectivity Wireless Connectivity VPN Branch office Connectivity Wired Connectivity
  • 6.
    - Business Activities •Broadband Internet services in Surat City • Secured Internet Access for Enterprise/SME/Govt. and Individuals • Citywide Wi-Fi Network for Surat City (Under Pilot Commissioning (network is ready)) • Wi-Fi Hotspot Solutions • Voice Solutions-Landline & PRI Line • Class-A Internet Service Provider (Applied for Class-A and Operating Class-B ) • National Long Distance (NLD) for MPLS VPN Services (Applied for NLD) • Enterprise Data Solution CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 7.
    - Business Activities ITInfra Services • Data Space • Rack Space • Server Hosting • Cloud Computing • Managed Security Service • Data Storage and Backup • Remote Data Access Web Based Services • Business Application • Bulk SMS Services • Bulk Mail Services • Mail Hosting • Web Security • Webcasting • Webinar • Web Hosting • Virtual Classroom • Virtualization • Virtual Training On Demand Services • IP TV • IP Phone • VOIP • Video Conferencing • Gaming on demand • Video on demand • Music on demand • Jokes on demand CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 8.
    - Business Activities CLASS“B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power • Citywide Digital Advertisement. • LED Display Boards at Railways Stations & Airports. • Display Board to display daily gold, interest and foreign exchange rates. • To display promotional schemes for FMCG / Corporate. • LED Display systems at Shopping malls & retail stores. • Display Boards at Clubs & multiplexes. • Display Board at Trade Fairs & Exhibitions. • Display Board to display information at Hotels, Hospitals, Institutions, Schools and Bank’s ATMs etc. • Display Board to display traffic information. • Public Safety & Awareness Advertising • Any Kind of LED Display Solution and Digital Advertising Solutions.
  • 9.
    - Business Activities CLASS“B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power • City-wide Wi-Fi Services • Campus-wide Wi-Fi Solution • Smart City Solution • Safe City Solution • Wi-Fi Internet Services • Hotspot Wi-Fi Solution • Secured Wi-Fi Services • All Types of Wi-Fi Solution…
  • 10.
    - Business Activities •Office / Business Application • Education Software • Creative Learning, Teaching and assessment Solutions & Services • Facility Management Service • Database Management • Software Implementation & Customization • E-Mail Server • Network Management • All Types of Software Solution… CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 11.
    Solution Comparison CLASS “B”ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Points R K Infratel Telecom Operator Dark Fiber Solution Provide Dedicated Dark Fiber Don't provide Dark fiber Bandwidth Restriction No Restriction on Bandwidth Restricted Bandwidth in Terms of Mbps and Kbps. End to End Connectivity Yes - on Underground Optical Fiber Cable No - Provide MPLS / DLC LINK Data Security Yes - As dedicated Fiber is connected data routed to secured path and in own Network infrastructure No - Data route to their Network/Server and comes to your end. One Roof Solution Yes - As RK Infratel have Skilled In-house Team for Installation, O&M and Support. No - As they outsource Manpower from contractor. 24X7 Monitoring & Support Yes - R K Infratel have own NOC/Datacentre and is monitored 24x7x365 days Yes - Telecom operators have own NOC and is monitored 24x7x365 days Scalability of Network Yes - Immediate with Minor Cost, because only need to upgrade hardware devices, Fiber network is capable for any limits Yes - it's costly and time consuming process. As they back on third party as well they have to upgrade their network for your requirement. Dedicated DATA Center for Police / Smart City Yes - As R K Infratel provides Dedicated Dark fiber solution so that easy to operate dedicated Data Centre for Police / Smart City No - Telco's provide monitoring from their end. Data center required huge amount of bandwidth so not getting proper throughput as required
  • 12.
    Importance Of DedicatedOFC Network Dedicated network has no Bandwidth Limitation, can carry Terabytes, Petabytes of Data in Seconds. Conventional method to provided bandwidth arrest the flexibility and scalability of bandwidth consuming application. Dedicated network is required for real time application and secure data services like surveillance. Requires essential frameworks on which to build a real-time software application. Plays critical role in enabling quick, sustainable expandable network. Very essential to maintain minimum latency and jitter. Capturing real time image and to traverse through network requires fine tune network to maintain clarity of image. Requires multi protection path to get high uptime. Data security must be maintained at network level to meet confidentiality of data traverse from network. Fiber Network works like Veins in human body Dedicated Network City Based Network Planning Camera and Systems Integrator CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 13.
    Key Business Areas& Products/Services on UG OFC Network OSP Project OFC O&M Service Trunkey Project Duct on Lease Dark Fiber on Lease City Surveillance Project Public Service Internet Leased Line (ILL) End to End Connectivity (P2P) Wi-Fi Connectivity Data Ce tre & Et … Key Business Areas Products & Services Telecom Sector Internet Service Provider Cable TV Service Government Sector Semi Government Sector Municipal Corporation Police Department Corporate / SME Sector Industrial Sector Banking Sector Broadband Users CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 14.
    Benchmarks • 850 Kms-OFC O&M of TCL at Jaipur-Delhi- Mohali –Panipat -Punjab Route. • Leasing more then 50 Kms duct to Idea Cellular Ltd. in Surat. • 210 Kms - OFC O&M of Airtel Intracity Route in Surat. • 520 Kms - OFC O&M of pipeline route of GAIL India Ltd. in Gujarat. • 1500 Kms - OFC O&M of Vodafone Haryana NLD Route. • Exclusivity of Underground OFC network in Sachin SEZ. CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power • Provided 300+ km underground optical fiber network for 100+ Locations connectivity to surat police for “safe city” Surat CCTV surveillance project for the period of 5 years. • Provided 250 km optical fiber network for 78 locations connectivity to Ahmadabad Municipal Corporation for CCTV surveillance project in Ahmadabad for the period of 3 years. • Started fully own subsidiary Broadband Internet Services in Surat with brand name of ‘AIRLINK’ in 2011. Presently having more than 25000+ retail broadband & 800+ enterprise customers. • Having More than 1000Kms+ own Underground OFC Network in Major cities of Gujarat. • Covered entire Surat city by UG, OH, MPLS and Wimax network. • Leasing more then 300 Kms dark fiber to TATA Teleservices Ltd. and TATA Communication Ltd. in Surat. • Completed In building & OSP work for more than 1000 building in NCR for TCL in India.
  • 15.
    • Redundant FiberRing Network. • Multiple Connectivity on Fiber. • Customize Solution according to Requirements. • No bandwidth limitations. • Highly Reliable & Secured Data Circuit. • Centralized Control & Command Center. • Technology Integration Service. • Planning, Design and Implementation of Network (Active and Passive). • Physical Survey to identify cross junction and understand criticality. • Identification of hardware and systems to effectively fit the budget of local governance authority. • Directed and adviced the concerned committee for technical aspects of the project. • Complete execution of project in given timeline as System and Network integrator. • Maintaining the same network to serve the object of project for long term. CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Solution Provided Our Technology
  • 16.
    Core Strengths • Abilityto plan, design and build Optical Fiber Network with latest technology. • Network integration capability scales our efficiency to work for active network. • The dedicated maintenance team to maintain uptime of any size of network. • Having own tools, machineries and skilled resource curb the dependencies. • Expertise to develop smart, safe and secure infrastructure solutions. • Fully operational NOC, Project, O&M Support, System and Network integration capability, Field team and portfolio of complete enterprise data products define our path to become Enterprise Data Solution company. USP • RK Infratel is the unique Telecom Infrastructure Service Provider Organization in place with complete expertise. • More than 21 years of rich experience comprising of various project execution and planning. • Owned Machineries for OFC Infrastructure Roll-Out, Operation & Maintenance. • Adopting industry best practices to continuously groom processes to get effective workflow. • Customer satisfaction is on highest priority and continuously enhancing on technology front. • Tied up with various outsource agencies to procure resources for mitigate critical issues and large scale project execution. • Central monitoring system for entire network in place with timely escalations to serve the Customers in better way. • Building up NOC and customer relationship management to proactively support and Maintaining optimum network uptime. CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 17.
    HDD Machine OTDR Particulars Optical PowerMeter Laser Source Meter Splicing Machine Blowing Machine Cable Locator GEN Sets Tunable Laser Source Vehicles for transporting 4 25 Qty. 25 25 30 2 2 4 2 21 Apparatus CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 18.
    Agriculture Department EducationDepartment Energy and Petro Chemicals Department Finance Department Industries and Mines Department Administrative DepartmentHome Department Food and Civil Supplies Department Science & Technology Department Water Supply Department Roads and Buildings Department Rural and Urban Development Forest Department Women and Child Development Ports and Transport Department Collector Office Jila PanchayatE-Telegram, Post OfficeIncome TaxVAT Office Service Tax Office Application on Dedicated Fiber for Government CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 19.
    Application on DedicatedFiber for Municipal Corporation CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Video Conference & IP Telephony Services CCTV Surveillance Fire Station Centralized Attendance System Disaster Management Announcement System Public Transport System Project Monitoring Traffic Signal Private LAN/VPN Centralized Data/ Document Storage Street Light Management Vehicle tracking system Digital Display Board Water Drainage System
  • 20.
    Application on DedicatedFiber for Police Department CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Video Conference & IP Telephony Services CCTV Surveillance Disaster Management Announcement System Traffic Signal Centralized Data/ Document Storage Online Criminal Record Vehicle tracking system Digital Display Board Police Station Public Helpline Service Centralized Attendance System Online ComplaintsCourt Connectivity Central Jail Monitoring
  • 21.
    Application of DedicatedFiber Networks for Industries CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Railway/Highway /City Signaling Monitoring LAN/MAN/WAN/CAN/ PAN Connectivity Internet Service Providers(ISPs) CATV Operators Secure Surveillance Services Military / Defense Communications OIL/GAS Pipeline System Monitoring DAM / Canal Water Flow Management Government and Semi Government Corporate/ Enterprises Solutions Bank/Financial Institutions Telecom Industries RESERVE BANK OF INDIA
  • 22.
    Branch Office Corporate Office RegionalOffice Manufacturing Unit Centralized Data Centre (HO) Ring Network Remote User CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Experience Multiple Services On Single Core Fiber Optic Cable
  • 23.
    I dia’s First“afe City Project on PPP Mode. Implemented on Dedicated Fiber provided by RK Infratel Ltd. in 4 months record time. Solution encompasses 200+ Km dedicated network in phase-I and covering entire City in subsequent phases. 100% uptime since December, 2012, Commissioning month of operation of the Safe City Project. Design and planning of network to protect in multicut scenario and maintain optimum latency and jitter. Provision of end to end network on exclusive fiber terminated at Command & Control Centre. 320+ KM Dedicated OFC Network Provided by RK Infratel Ltd. I dia’s First Pi ture I tellige e U it Fa e Re og itio , Vehi le “peed Violatio , Auto ati Nu er Plate Re og itio I augrated y Ho ’ le Chief Mi ister of Gujarat “ t.A a di Be Patel. CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Safe City Surat | CCTV Surveillance Project
  • 24.
    City Wide Wi-FiSystem Traffic Signal Management Centralized monitoring & control all traffic signal point. Enhanced work efficiency & control on traffic violation. Minimize or reduce man power cost at all traffic signal point. Digital Display System Dynamic digital signage can grab a customer's attention and influence their purchasing decision. Digital signage is instant and offers the ability to change promotions immediately for various products or particular customers. Showing public message for social activity through Digital Display Board. Target Specific Audience. CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Any where access of Internet and Intranet Application all over city. More people who have a constant access to information. More interactive tourism opportunities if visitors have access to free internet The ability to add next generation city appliances to a massive smart grid. Increased GDP. Wi-Fi City Wide
  • 25.
    Live Video Streaming Timelyand direct executive communications. Access to completion of regulatory and standards compliance training. Keeping the sales force (direct and distribution partners) up to date on new products and technologies. Enabling frequent product announcements, updates and training. BRTS Project & Metro Rail Management Monitor all Station through CCTV Camera. Can Monitor behavior of the people at station, which is really beneficiary to Cops to identify suspect. Can Monitor BUS and Metro Rail Speed. Automation System can be operate from Central Control Room like we can Lock or Open any stations. Ongoing Project Monitoring Instant view of the project status: anticipation to issues and decisions based on relevant information. Avoid budget overrun and delays: as a result of an effective monitoring of all the important aspects of the Project. Continuous improvement: anything that can be measured and analyzed can be improved. CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 26.
    Centralized Data StorageSystem Pooled storage flexibility. Increased support for server virtualization initiatives. Increased utilization, with no stranded capacity. Effective use of equipment, supplies and space. All related data kept together, Reduces duplication. Basic site infrastructure with expected availability. Disaster Management Services Water Drainage System CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Proactive action plan for public safety and protect against the major damages or losses. Can spread the message of disaster to the public. IF fire found in area can immediately inform to Fire Brigade and Ambulance. IF found any robbery at area of city can be inform immediately to Cops. Real-time remote access and control of Sewage systems. Connectivity with external sensors and devices. Low impact implementation, long term system durability and professional support. Comprehensive and automated solution for accurate & remote municipal water management. Reduce cost and prompt action over any failure.
  • 27.
    Vehicle Tracking &Control System Centralized Attendance System Video Conferencing & VoIP Services CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Monitoring of your drivers helps you vastly decrease employee cost and time card abuse. Improve customer service. Vehicle tracking system allows users to track unsafe driving and personal use of fleet vehicles. Vehicle tracking allows managers to keep better control of their driver’s activities. Ongoing time savings & elimination of employee time rescue. Automate employee time off & tracking. Coordinate, monitor time for training & other work-related events. Integrate employee time details with payroll. Notification when employees forget to track time. Increased Productivity across Dispersed Workforces and Teams. Improved Hiring and Retention of Top Talent. Reduced Travel Cost. Increased knowledge transfer & Trainings. Leveraging technical expertise across disparate locations.
  • 28.
    Public Announcement System Optimumuse of available source of bandwidth with redundancy. Centralized process for security and legal compliance. Integrate relative systems and database. Load balancing amongst service provider peering. Balance business needs and cost with security. Faster & Efficient spread of important message during disaster. Breach communication gap. Centralize control for authentication of communication. Flexibility & Safety. Control on Spreading of rumors. Central Bandwidth Distribution CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 29.
    Ahmedabad Bavla GIDC Jhagadia Ankleshwar Kamrej Surat KadodaraHazira Sachin Valsad Vapi Silvassa Bhilad Talsari Pipavav Port MundraPort Rajkot Kandla Port Gandhidham Panoli Gidc Kim Bharuch Vadodara Dahej Navsari Umargam Daman Morbi GandhinagarBhuj Corporate Office Present Network Proposed Planning CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power R K Infratel | OFC Network Presence - Gujarat
  • 30.
    CLASS “B” ISPCity Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Present & Proposed OFC UG Network - Surat Daboli Mota Varachha Variyav Amroli KatargamPalanpur Gam Athwa Piplod Vesu Althan Pandesara Varachha Jhangirpura Vanakala Malgama Ichhapur BhatporeLimala Damka Reliance Mora L&t Essar Adani Shell Dumas Airport Sarsana Gabheni Sachin Indu Sez Parle Point Text. Mkt Parwat Patia Dindoli Adajan Rander Saroli Selut Ambheta Sherdi Kosad Nana Varachha Antroli Kadodara Khatodara Kamrej Kholwad Abarma Check post Kosmada Valthan Unbhel Vareli Chalthan Bhatia Palsana Abhva Limbayat Mohini Niyol Bharthana Magob Dipli Gam Sonari Umbher Bhagal Pal Existing Route Proposed Route Major Road Railway Track River / Nalla Landmark Legend ONGC GailONGC Surat NTPC GSEG GSPC Apparel Park Adajangam Sayan Check Post HOZIWALA Olpad Godadara Simada Check Post
  • 31.
    Surat Metro EthernetNetwork CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 32.
  • 33.
    Vishalpur Kamod Laxmipura Narolgam PiplajSingarva Vishala Vasana Vatva Ghodasar Isanpur Makarba Prahladnagar Shyamal Jodhpur Satelite Vastrapur Paladi Vejalpur Thaltej Naranpura Ghatlodia SolaChandlodia Gota Sabarmati Chandkheda Bhadaj Ognaj Lapkaman Ranip Tragad Zundal Koteshwar Bhat Airport Chiloda Sughad Valad Gidc Naroda Nava Naroda Kathwada Nikol Odhav Bapunagar Shahibagh Meghaninagar Vadaj Usmanpura Navrangpura Behrampura Kankaria Maninagar Ahmedabad Rakhial Gidc Vatwa Mahadev Nagar Memadpur Shastrinagar VanchHathijan Sarkhej Badrabad Bavla Changodar Hansol Amraiwadi Chandola Lake Existing Route Proposed Route Railway Track River Major Road Landmark Legend Present & Proposed OFC UG Network - Ahmedabad CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 34.
    Arabian Sea Valsad Killa Pardi DhodhadKuva Nana Ponda Kakadkopar Mota Ponda Ozar Tukwada Bhandarwad Udwada Bhimpore Tarakpardi Daman Devka Beach Nani Daman Pariyari Rentlav Tidhara Morai Salvav Chala Chharwada Vapi Chanod Dungara Dadara LavachhaAmali Silvassa Naroli Bhilad Zaroli Daheli Nahuli Umargam Ina Khatalwada Sanjan Umargaon Dahad Samarwani Alok Industrial Rakholi Khadoli Hindusthan Unilever Ltd Surangi Khanvel Anwir Achhad Varwade Sawroli TalasariUdhawa Dolara Dapada Falandi Kilwani Galonda Sayali Karchond Astol Solsumda Sovda Bordi Baradi Vapi Gidc Madhuban Reservoir Existing Route Proposed Route Railway Track River Major Road Landmark Legend Present & Proposed OFC UG Network – Vapi and UT CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 35.
    Ghodkhol Part Andada Lake Miranagar Sarangpur Uchhali Dadhal Ankleshwar GIDC Piraman Ankleshwar RlyStn Taibah Nagar Ankleshwar Hifazat Nagar Mandva Mulad Mandavabuzarg Nava Kansiya Govali Fulwadi Birla Century Sriram Alkali UPL Skumar Jhagadia GIDC Kholar Anmol Plaza Chapara Bornhatha Bet Bharuch Abott Rajpipla Chowkdi Existing Route Proposed Route Railway Track River Major Road Landmark Legend Present OFC UG Network – Ankleshwar and Jhagadia CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 36.
    ISO 9001- 2008 Certified ISO 9004:2000 NSIC- SMERA Certificate License of Infrastructur eProvider IP-1 Class B ISP CLASS “B” ISP City Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Accreditation License of Infrastructur e Provider IP-1 Class B ISP
  • 37.
    CLASS “B” ISPCity Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power Achievement & Appreciation E a lei g “ art Cities i I dia i fa t The Pri e Mi ister refere ed Surat before when we were talking privately , Surat using a city next framework working with local authorities to make data analytics available for both The Municipal Corporation of Surat as well as Citizens of Surat so that they can make faster decision as it relates to their education, business, energy, services and logistics. Satya Nadella, CEO - Microsoft
  • 38.
    Clients CLASS “B” ISPCity Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 39.
    Clients CLASS “B” ISPCity Surveillance SystemEnterprise Data solutions Turnkey Project of OFC OSP and O&M/Gas/Power
  • 40.
    Branch Office -Ahmedabad A-613, Atma House, Opp. Old RBI, Nr. Times of India, Ashram Road, Ahmedabad - 380006 +91-9099974451 ahmedabad@rkinfratel.com Branch Office - Vapi M-36, Chandralok Building, Chanod GIDC, Vapi - Silvassa Main Road, Vapi - 396191 +91-260-6544454 / 9377331054 vapi@rkinfratel.com Corporate Office – Surat R. K. Infratel Ltd., 13 to 18, 2nd Floor, Annapurna Shopping Centre, Adajan Patia Circle, Surat - 395009 +91 99099 70099 | 261 6697722, 2780343, 2780403, 3067979 Fax: +91 261 2787879 info@rkinfratel.com | sales@rkinfratel.com www.rkinfratel.com