INTRODUCTION
TODAY WE ARE WATER STRESSED, BUT
TOMORRROW WE WILL BE WATER
SCARCE.
WHY WILL BE INDIA WATER DEFICIT?
• Annual rainfall- 400 m.ha.m.
• Total utilizable surface and ground water
after full development of water resources-
114m.ha.m.
UTILIZATION:
• 1991- 58m.ha.m.
• 2001- 79m.ha.m
• 2025- 114m.ha.m
Thus the entire quantum of utilization water will
be exhausted by the year 2025.
Proposed solution
INTERLINKING OF RIVERS
NRLP
• The National River Linking Project
(NRLP) is designed to ease water
shortages in western and southern India
while mitigating the impacts of recurrent
floods in the eastern parts of the Ganga
basin.
• The NRLP, if and when implemented, will
be one of the biggest inter basin water
transfer projects in the world.
HISTORY OF INTERLINKING
• 1972-Ganga cauvery link proposed by Dr. K.L. Rao .
• 1974-“Garland canal” proposal by captain Dastur .
• 1980-Ministry of water resources frames the National perspective
plan(NPP) .
• 1982-The National water development agency (NWDA) set up to
carry out pre – feasibility studies .
• 1999-A National commission (NCIWRDP) set up to review NWDA
reports .
• Aug 15, 2002- President Abdul Kalam mentions the need for river
linking in his independence day speech .
• Oct 2002- Supreme court recommends that the government
formulate a plan to link the major Indian rivers by the year 2012.
• Dec 2002- Govt. appointed a task force on interlinking of 37
rivers led by Mr. Suresh Prabhu. The deadline was revised to
2016.
Contours of NRLP…
• Building 30 links, 3000 small and
large reservoirs, 12500 km of
canals to link 36 Himalayan and
Peninsular rivers to effect 178 km3
of inter-basin water transport.
• 35 million ha of new irrigated area;
35 GW of hydro-capacity;
navigation and flood control
benefits.
• Gestation Period: Proposed=2016;
Most Likely=2050
• Cost = Rs 560,000 cr. at 2002
prices (US $ 120 Billion); 1 - 1.5%
of India’s GDP for the next 3
decades.
The Inter-link consist of two parts, a Northern Himalayan River Development Component
and a Southern Peninsular River Development Component.
Himalayan Development
 The northern component would
consist of a series of dams built
along the Ganga and Brahmaputra
rivers in India, Nepal and Bhutan for
the purposes of storage.
 Canals would be built to transfer
surplus water from the eastern
tributaries of the Ganga to the west.
 The Brahmaputra and its tributaries
would be linked with the Ganga and
the Ganga with the Mahanadi river.
 This part of the project would
provide additional irrigation for
about 220,000 square kilometers
and generate about 30 gig watts of
electricity.
 It could also provide excess water
for the controversial Farakka
Barrage which could be used to
flush out the silt at the port of
Kolkata
Peninsular Development
 First, the Mahanadi, Godavari. Krishna
and Kaveri rivers would all be linked by
canals. The purpose of this would be to
transfer surplus water from the Mahanadi
and Godavari rivers to the south of India.
 Second, those rivers that flow west to the
north of Mumbai and the south of Tapi
would be linked. The water would be used
by the urban areas of Bombay and also to
provide irrigation in the coastal areas of
Maharashtra.
 Third the Ken and Chambal rivers would
be linked in order to provide better water
facilities for Madhya Pradesh and Uttar
Pradesh.
 Finally a number of west-flowing rivers
along the Western Ghats simply
discharge into the Arabian Sea.
 The Peninsular part of the project would
provide additional irrigation to 130,000
square kilometers and generation an
additional 4 gig watts of power.
Reasons & Motivation
Of
Inter Linking
Reasons And Motivation of Inter Linking
Regional rainfall variation: . The summer monsoon accounts for more than 85% of the precipitation.
Large parts of Haryana, Maharashtra, Andhra Pradesh, Rajasthan, Gujarat, Madhya Pradesh, Karnataka
and Tamil Nadu are not only in deficit in rainfall but also subject to large variations, resulting in frequent
droughts and causing immense hardship to the population and enormous loss to the nation.
Regional variations in the rainfall lead to a situations when some parts of the country do not have enough
water even for raising a single crop. On the other hand excess rainfall occurring in some parts of the
country create havoc due to floods.
Futuristic Demand for Irrigation: At present estimate the "ultimate" irrigation potential of the country
being stated as 113 million Ha. However, to feed the estimated 1.5 to 1.8 billion people in 2050 with 450
million tons of food grains, India needs to increase its irrigation potential to 160 million hectares.
Hence, strategies like inter-basin water transfer are looked upon.
Domestic Water Needs :The per capita availability of utilizable water has been reduced progressively
from 3450 cubic meters to 1250 cubic meters from 1951 to 2000 owing to the increasing population. In the
next 50 years, it is likely to come down to 760 cubic meters (for a projected population of 1.6 billion) (Gupta
2001).Thus, at the household level, the per-capita availability has been reducing progressively and more
than 25% of villages suffer from drinking water problems (Gupta 2001).
To Control Floods and Droughts: Floods are a recurring feature, particularly in Brahmaputra
and Ganga rivers, in which almost 60 % of the river flows of our country occur.
Flood damages, which were Rs. 52 crores in 1953, have gone up to Rs. 5,846 crore in 1998 with
annual average being .Rs 1,343 crore affecting the States of Assam, Bihar, West Bengal and Uttar
Pradesh along with untold human sufferings.
On the other hand large areas in the States of Rajasthan, Gujarat, Andhra Pradesh, Karnataka
and Tamil Nadu face recurring droughts. As much as 85 % of drought prone areas falls in these
States.
Stated Benefits
 Flood Control (40 million ha area and 260 million people saved
from floods that leads to damages of Rs 2400 crore/year)
 Drought proofing (86 million people in 14 states, 116 districts
saved)
 Relief of 1200 crore per year from floods/ drought damages
 Irrigation: 35 m ha & availability of drinking water.
 Hydropower generation 34 000 MW installed capacity
 Food grains production: 450 million tonnes by 2050
 Navigation
 Generation of employment
Flood/Drought
prevention
Rivers Average flood
discharge(cumecs)
Water to be diverted
through ILR
canal(cumecs)
Brahamputra 60,000 1,500 (2.5%)
Ganga 50,000 1,000 (2.0%)
 By creating network of rivers
flood & drought problem can be
greatly avoided by channeling
excess water to areas that are not
experiencing a flood or are dry.
This works similar to canal system
in Netherlands to channel excess
water from sea.
 Avoid the losses of the type that
occurred in 2002 to the extent of
$550 million by the loss of crops
because of extreme draught or
flood condition.
( ILR figures from official website: www.riverlinks.nic.in)
•ILR can clearly not help solve flood
/drought problems.
 According to President (speech on 110505) flood affects 8
major basins, 40 m ha and 260 m people; 86 m people, 14
states and 116 districts are affected by drought annually.
 ILR is to have Lined Canals with 1:3,000 to 1:5,000 slope or
0.33 to 0.20 m per km. Maximum flow velocity 2 m/s. A
100 m wide & 10 m deep lined canal can carry about
1,000 cumecs.
Can ILR solve flood “problem”?
Generation of electricity
Links will consume, and not generate power.
PUMPED LIFT OF WATER
 Ganga-Subarnarekha (G-S): 60m
 Subarnarekha-Mahanadi (S-M): 48 m
 Godavari-Krishna (G-K): 116m
Need for 3,400 MW of dedicated power generation.
[Source : http://riverlinks.nic.in/taskforce.asp ]
 Pumping water over the Vindhya Mountains
can transfer the Ganga-Brahmaputra water and
its tributaries to regions in the south.
 The Ganga-Brahmaputra floodplains are about
ten meters above mean sea level (MSL). The
Vindhya Mountains are about 300 m above
MSL, separating the floodplains of the north
from the Deccan Plateau, which is 250 m above
MSL (Vombatkere 2003).
 The electric power required to pump water to
such heights will be close to the current power
generation of the entire nation.
 One of the figures thrown
around by the proponents of
river links schemes is 30 000
MW which sometimes
becomes 34 000 MW as
power generation potential
of river link proposal.
ILR PRICE TAG
• The NWDA budgets the entire project at
Rs 5600 Billion ($112 B) at 2002 prices.
• The Himalayan component of this plan
would cost Rs 3750 Billion and the
peninsular part, Rs 1850 Billion.
• Where is the investible capital of this
magnitude available in the domestic
economy?
• The only option would be funds from
international sources.
• Apart from the fact that this would place
a debt of about $112 on every Indian
(where average annual income is $400-
$800), it also raises question about how
this loan is to be returned.
• Moreover, annual interest on this
amount would range between Rs 200
Billion and Rs 300 Billion. (NEWSTIME
271102, THE HINDU 020203)
ISSUES CAUSED BY INTERLINKING AND IT’S CONCERNS
1. Ecological issues – Major concern being the argument that rivers
change their course in 70–100 years and once they are linked, future
change of course can create huge practical problems for the project.
2. Aqua life – A number of leading environmentalists are of the opinion that
the project could be an ecological disaster. There would be a decrease in
downstream flows resulting in reduction of fresh water inflows into the
seas seriously jeopardizing aquatic life.
3. Deforestation –Creation of canals would need large areas of land
resulting large scale deforestation in certain area.
4. Areas getting submerged - Possibility of new dams comes with the
threat that habitable or reserved land getting submerged under water.
5. Displacement of people –As large strips of land might have to be
converted to canals, a considerable population living in this areas must
need to be rehabilitated to new areas.
6. Technical feasibility- The slope, altitude and other topographical aspects
have to be considered. (e.g. for Ganga, Patna is diversible surplus but for
raising water to Vindhya chain i.e. 2860 ft. high enormous amount of power
is required).
ALTERNATIVE TO INDIAN RIVER LINKING
1. Rainwater harvesting and conservation of water resources.
2. Recharging ground water reservoir.
3. Community participation: President of India visited Alwar to honour the
people of Bhavta Kolyali villages for their successful community work in harvesting water
and along with 72 other villages of Arvari river basin, make the river perennial .
4. Maintaining existing irrigation Infrastructure: The irrigation
efficiencies are notoriously low at around 35% at best. As mid term of review of 9th Plan
made it clear, even 10% increase in irrigation efficiency could lead to additional irrigation
potential of 14 M Ha. That would still be far from the optimum possible efficiency. Should
we not be attempting this on priority basis?
5. Virtual Water Trade : The virtual water trade concept suggest that water-rich
countries should produce and export water-intensive commodities to water-scarce
countries, thereby enabling the latter to divert their precious water resources to
alternative, higher-productivity uses. Analysis by Verma et al. (2008) shows that the amount
of virtual water traded between states is more or less equivalent to the water transfers of
178 Bm3 proposed in the NRLP. The concept of virtual water can be one of the alternatives
to river linking.
Current Status..
A Group on IntraState River links has been constituted by MoWR, RD & GR on 12.03. 2015.
The Group has reviewed all relevant issues on Intra – State River Links including the definition of
such link, consider and suggest about the funding of intrastate river link projects. The Group has
held various meetings and submitted its report on 28.05.2015 to the Ministry of Water Resource,
RD & GR.
Ken – Betwa Link Project
The various clearances for Ken – Betwa link project are in the advance stages and the
Government will start implementing this National Project as model link project of ILR
programme.
Damanganga – Pinjal Link Project
The DPR of Damanganga – Pinjal link was completed in March, 2014 and submitted to
Governments of Maharasthra and Gujarat. Govt. of Maharasthra has submitted the Detailed
Project Report of Damanganga – Pinjal link project to Central Water Commission during January,
2015 for appraisal.
Mahanadi – Godavari Link Project
Mahanadi Godavari link is the first and critical link of nine link system of MahanadiGodavari-
KrishnaPennarCauvery VaigaiGundar under Peninsular Component of NPP.
The Government of Odisha was not agreeable for the Mahanadi (Manibhadra) Godavari
(Dowlaiswaram) link due to large submergence involved in Manibhadra dam proposed under the
link project.
Based on the suggestions of WRD, Govt. of Odisha, NWDA has proposed a revised preliminary
proposal of Mahanadi Godavari link project with reduced submergence. A presentation on the
revised proposal of MahanadiGodavari link project has been made to the Hon’ble Chief Minister,
Govt. of Odisha on 29.05.2015 by the senior officers of MoWR, RD & GR.
Conclusion
• Considering the pragmatic view of all the issues raised it
can be concluded that implementation of this ambitious
scheme is not easily possible in foreseeable future. The
fundamental trouble with the idea of river linking plans,
then is that the idea has no studies or sound basis.
• Hence it can be a better option to concentrate on the
local resources and think upon the alternatives available.
• River interlinking will create a human disaster to rival
Mohammed Tughlak’s shifting of the capital from Delhi to
Daulatabad in the fourteenth century .
Reference
• Water Policy Research : By Upali Amarasinghe.
• South Asia Network On Dams, Rivers & People; SANDRP New
Delhi.
• River Linking -S. Kalyanaraman.
• INTER-LINKING OF INDIAN RIVERS-NEED AND IMPORTANCE:
R.K.Sivanappan Journal of Indian Water resources Society, Vol
32, No. 3-4, July-Oct, 2012.
• www.riverlinks.nic.in
• Anatomy of Interlinking Rivers in India: By A.C Shukla &
Vandana Asthana.
• INTERLINKING OF RIVERS IN INDIA: ISSUES & CHALLENGES
: By DHARMENDRA MEHTA, NAVEEN K. MEHTA.
• Ministry of Water Resources, Government of india.

More Related Content

What's hot

LINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIALINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIA
Narendrareddy123
 
Groundwater management strategy by Dr S K Jain, CGWB
Groundwater management strategy by Dr S K Jain, CGWBGroundwater management strategy by Dr S K Jain, CGWB
Groundwater management strategy by Dr S K Jain, CGWB
India Water Portal
 
Groundwater Experiences in Maharashtra -- GSDA
Groundwater Experiences in Maharashtra -- GSDAGroundwater Experiences in Maharashtra -- GSDA
Groundwater Experiences in Maharashtra -- GSDAIndia Water Portal
 
Advantages & Disadvantages of Multipurpose projects
Advantages & Disadvantages of Multipurpose projectsAdvantages & Disadvantages of Multipurpose projects
Advantages & Disadvantages of Multipurpose projects
Ebad Rahman
 
Surface Water Management Powerpoint Presentation Slides
Surface Water Management Powerpoint Presentation SlidesSurface Water Management Powerpoint Presentation Slides
Surface Water Management Powerpoint Presentation Slides
SlideTeam
 
Diversion head works
Diversion head worksDiversion head works
06 115 water resources management
06 115 water resources management06 115 water resources management
06 115 water resources management
AHMED NADIM JILANI
 
Introducing to JJM - Opportunities.pptx
Introducing to JJM - Opportunities.pptxIntroducing to JJM - Opportunities.pptx
Introducing to JJM - Opportunities.pptx
Mohithans5
 
Groundwater status in india review
Groundwater status in india reviewGroundwater status in india review
Groundwater status in india review
Tapesh Ajmera
 
Dams PPT
Dams PPTDams PPT
Dams PPT
Seminar Links
 
Water Resource Management Powerpoint Presentation Slides
Water Resource Management Powerpoint Presentation SlidesWater Resource Management Powerpoint Presentation Slides
Water Resource Management Powerpoint Presentation Slides
SlideTeam
 
Diversion Headwork in Canal
 Diversion Headwork in Canal  Diversion Headwork in Canal
Diversion Headwork in Canal
holegajendra
 
Rain Water Harvesting in Rural Area
Rain Water Harvesting in Rural AreaRain Water Harvesting in Rural Area
Rain Water Harvesting in Rural Area
Water Mangement Forum
 
The five biggest dams in india
The five biggest dams in indiaThe five biggest dams in india
The five biggest dams in india
Jayakrishnan kichu
 
river training work
river training workriver training work
river training work
Vishal Chaudhari
 
TYPES OF DAM & TOP 10 INDIAN DAMS
TYPES OF DAM & TOP 10 INDIAN DAMSTYPES OF DAM & TOP 10 INDIAN DAMS
TYPES OF DAM & TOP 10 INDIAN DAMS
Satyajit Behera
 
Introduction to IWRM
Introduction to IWRM Introduction to IWRM
India; Rain Water Harvesting and Artificial Recharge
India;  Rain Water Harvesting and Artificial RechargeIndia;  Rain Water Harvesting and Artificial Recharge
India; Rain Water Harvesting and Artificial Recharge
D5Z
 

What's hot (20)

LINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIALINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIA
 
INTERLINKING OF RIVERS
INTERLINKING OF             RIVERSINTERLINKING OF             RIVERS
INTERLINKING OF RIVERS
 
Groundwater management strategy by Dr S K Jain, CGWB
Groundwater management strategy by Dr S K Jain, CGWBGroundwater management strategy by Dr S K Jain, CGWB
Groundwater management strategy by Dr S K Jain, CGWB
 
Groundwater Experiences in Maharashtra -- GSDA
Groundwater Experiences in Maharashtra -- GSDAGroundwater Experiences in Maharashtra -- GSDA
Groundwater Experiences in Maharashtra -- GSDA
 
Advantages & Disadvantages of Multipurpose projects
Advantages & Disadvantages of Multipurpose projectsAdvantages & Disadvantages of Multipurpose projects
Advantages & Disadvantages of Multipurpose projects
 
Surface Water Management Powerpoint Presentation Slides
Surface Water Management Powerpoint Presentation SlidesSurface Water Management Powerpoint Presentation Slides
Surface Water Management Powerpoint Presentation Slides
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
06 115 water resources management
06 115 water resources management06 115 water resources management
06 115 water resources management
 
Introducing to JJM - Opportunities.pptx
Introducing to JJM - Opportunities.pptxIntroducing to JJM - Opportunities.pptx
Introducing to JJM - Opportunities.pptx
 
Groundwater status in india review
Groundwater status in india reviewGroundwater status in india review
Groundwater status in india review
 
Dams PPT
Dams PPTDams PPT
Dams PPT
 
Water Resource Management Powerpoint Presentation Slides
Water Resource Management Powerpoint Presentation SlidesWater Resource Management Powerpoint Presentation Slides
Water Resource Management Powerpoint Presentation Slides
 
TYPES OF RESERVOIR
TYPES OF RESERVOIRTYPES OF RESERVOIR
TYPES OF RESERVOIR
 
Diversion Headwork in Canal
 Diversion Headwork in Canal  Diversion Headwork in Canal
Diversion Headwork in Canal
 
Rain Water Harvesting in Rural Area
Rain Water Harvesting in Rural AreaRain Water Harvesting in Rural Area
Rain Water Harvesting in Rural Area
 
The five biggest dams in india
The five biggest dams in indiaThe five biggest dams in india
The five biggest dams in india
 
river training work
river training workriver training work
river training work
 
TYPES OF DAM & TOP 10 INDIAN DAMS
TYPES OF DAM & TOP 10 INDIAN DAMSTYPES OF DAM & TOP 10 INDIAN DAMS
TYPES OF DAM & TOP 10 INDIAN DAMS
 
Introduction to IWRM
Introduction to IWRM Introduction to IWRM
Introduction to IWRM
 
India; Rain Water Harvesting and Artificial Recharge
India;  Rain Water Harvesting and Artificial RechargeIndia;  Rain Water Harvesting and Artificial Recharge
India; Rain Water Harvesting and Artificial Recharge
 

Viewers also liked

Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of riversAshwath Sriram
 
river linking
river linking river linking
river linking
lmondal810
 
Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of riversAdarsh surana
 
Interlinking rivers 2 - Interlinking Indian Rivers - Short Presentation 1 - R...
Interlinking rivers 2 - Interlinking Indian Rivers - Short Presentation 1 - R...Interlinking rivers 2 - Interlinking Indian Rivers - Short Presentation 1 - R...
Interlinking rivers 2 - Interlinking Indian Rivers - Short Presentation 1 - R...
Shivu P
 
[Polity] inter linking of rivers in india benefits, problems, china dispute...
[Polity] inter linking of rivers in india   benefits, problems, china dispute...[Polity] inter linking of rivers in india   benefits, problems, china dispute...
[Polity] inter linking of rivers in india benefits, problems, china dispute...Ravi Naid Gorle
 
Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 - ...
Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  ...Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  ...
Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 - ...
Shivu P
 
Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014
Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014
Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014
India Water Portal
 
Me thesis effect of common salt (na cl) on behaviour of black cotton soil e...
Me  thesis effect of common salt (na cl) on behaviour of black cotton soil  e...Me  thesis effect of common salt (na cl) on behaviour of black cotton soil  e...
Me thesis effect of common salt (na cl) on behaviour of black cotton soil e...
RAJESH JAIN
 
Introduction to drr 2013
Introduction to drr 2013Introduction to drr 2013
Introduction to drr 2013
Francvien Paraphantakul
 
Year 2070 - A Presentation by Abdul Kalam
Year 2070 - A Presentation by Abdul KalamYear 2070 - A Presentation by Abdul Kalam
Year 2070 - A Presentation by Abdul Kalam
guest7e7534
 
Rural roads-india
Rural roads-indiaRural roads-india
Rural roads-india
Atiqur Rahman Barbhuiya
 
Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013
apndesai
 
Rural Road Safety
Rural Road SafetyRural Road Safety
Rural Road Safety
RPO America
 
Indo china relationship
Indo china relationshipIndo china relationship
Indo china relationship
Jenith Patel
 

Viewers also liked (16)

Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of rivers
 
river linking
river linking river linking
river linking
 
Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of rivers
 
Interlinking rivers 2 - Interlinking Indian Rivers - Short Presentation 1 - R...
Interlinking rivers 2 - Interlinking Indian Rivers - Short Presentation 1 - R...Interlinking rivers 2 - Interlinking Indian Rivers - Short Presentation 1 - R...
Interlinking rivers 2 - Interlinking Indian Rivers - Short Presentation 1 - R...
 
[Polity] inter linking of rivers in india benefits, problems, china dispute...
[Polity] inter linking of rivers in india   benefits, problems, china dispute...[Polity] inter linking of rivers in india   benefits, problems, china dispute...
[Polity] inter linking of rivers in india benefits, problems, china dispute...
 
PPT For P8
PPT For P8PPT For P8
PPT For P8
 
Indo china
Indo chinaIndo china
Indo china
 
Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 - ...
Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  ...Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  ...
Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 - ...
 
Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014
Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014
Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014
 
Me thesis effect of common salt (na cl) on behaviour of black cotton soil e...
Me  thesis effect of common salt (na cl) on behaviour of black cotton soil  e...Me  thesis effect of common salt (na cl) on behaviour of black cotton soil  e...
Me thesis effect of common salt (na cl) on behaviour of black cotton soil e...
 
Introduction to drr 2013
Introduction to drr 2013Introduction to drr 2013
Introduction to drr 2013
 
Year 2070 - A Presentation by Abdul Kalam
Year 2070 - A Presentation by Abdul KalamYear 2070 - A Presentation by Abdul Kalam
Year 2070 - A Presentation by Abdul Kalam
 
Rural roads-india
Rural roads-indiaRural roads-india
Rural roads-india
 
Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013
 
Rural Road Safety
Rural Road SafetyRural Road Safety
Rural Road Safety
 
Indo china relationship
Indo china relationshipIndo china relationship
Indo china relationship
 

Similar to River interlinking

Inter linking of river in india
Inter linking of river in indiaInter linking of river in india
Inter linking of river in indiaPuspendu Samanta
 
inter-linking of rivers in india
inter-linking of rivers in indiainter-linking of rivers in india
inter-linking of rivers in india
manishgalav
 
River Interlinking Projects for Socio Economic Transformation
River Interlinking Projects for Socio Economic TransformationRiver Interlinking Projects for Socio Economic Transformation
River Interlinking Projects for Socio Economic Transformation
Shailesh Herale
 
H04534853
H04534853H04534853
H04534853
IOSR-JEN
 
Hydro potential in pakistan wapda 2008
Hydro potential in pakistan   wapda 2008Hydro potential in pakistan   wapda 2008
Hydro potential in pakistan wapda 2008
zubeditufail
 
Hydro potential in pakistan wapda 2008
Hydro potential in pakistan   wapda 2008Hydro potential in pakistan   wapda 2008
Hydro potential in pakistan wapda 2008
zubeditufail
 
1_interlinking of rivers_22, 26.pptf
1_interlinking of rivers_22,     26.pptf1_interlinking of rivers_22,     26.pptf
1_interlinking of rivers_22, 26.pptf
AtharvaNaikMU
 
SAWAS_2_2_2011_p17_p36
SAWAS_2_2_2011_p17_p36SAWAS_2_2_2011_p17_p36
SAWAS_2_2_2011_p17_p36Nitin Kaushal
 
Flooding 5 Bangladesh Gcse Aqa A
Flooding 5  Bangladesh Gcse Aqa AFlooding 5  Bangladesh Gcse Aqa A
Flooding 5 Bangladesh Gcse Aqa Atudorgeog
 
Dams:Pros and Cons
Dams:Pros and ConsDams:Pros and Cons
Dams:Pros and Cons
Vatsal Srivastav
 
Water resource management and role of dams
Water resource management and role of damsWater resource management and role of dams
Water resource management and role of damsnibeditachakraborty
 
Narmada.ppt
Narmada.pptNarmada.ppt
Narmada.ppt
PapuKumarNaik1
 
S5c7 chapter 7-facts and figures related to floods in india.
S5c7 chapter 7-facts and figures related to floods in india.S5c7 chapter 7-facts and figures related to floods in india.
S5c7 chapter 7-facts and figures related to floods in india.
Shivu P
 
Water Resourses of Pakistan.pptx
Water Resourses of Pakistan.pptxWater Resourses of Pakistan.pptx
Water Resourses of Pakistan.pptx
MNasirMahmood1
 
narmada river scheme con
narmada river scheme connarmada river scheme con
narmada river scheme con
Niraj Chand
 
Displacement case study- three gorges, China
Displacement case study- three gorges, China Displacement case study- three gorges, China
Displacement case study- three gorges, China
Aneisha Samuels-Sanford
 
Essential resource of Life- WATER
Essential resource of Life- WATEREssential resource of Life- WATER
Essential resource of Life- WATER
Lovely Singla
 
Water situation in pakistan Water crisis in pakistan A presentation By Mr Al...
Water situation in pakistan Water crisis in pakistan  A presentation By Mr Al...Water situation in pakistan Water crisis in pakistan  A presentation By Mr Al...
Water situation in pakistan Water crisis in pakistan A presentation By Mr Al...
Mr.Allah Dad Khan
 

Similar to River interlinking (20)

Inter linking of river in india
Inter linking of river in indiaInter linking of river in india
Inter linking of river in india
 
inter-linking of rivers in india
inter-linking of rivers in indiainter-linking of rivers in india
inter-linking of rivers in india
 
Bangladesh floods
Bangladesh floodsBangladesh floods
Bangladesh floods
 
River Interlinking Projects for Socio Economic Transformation
River Interlinking Projects for Socio Economic TransformationRiver Interlinking Projects for Socio Economic Transformation
River Interlinking Projects for Socio Economic Transformation
 
H04534853
H04534853H04534853
H04534853
 
Hydro potential in pakistan wapda 2008
Hydro potential in pakistan   wapda 2008Hydro potential in pakistan   wapda 2008
Hydro potential in pakistan wapda 2008
 
Hydro potential in pakistan wapda 2008
Hydro potential in pakistan   wapda 2008Hydro potential in pakistan   wapda 2008
Hydro potential in pakistan wapda 2008
 
1_interlinking of rivers_22, 26.pptf
1_interlinking of rivers_22,     26.pptf1_interlinking of rivers_22,     26.pptf
1_interlinking of rivers_22, 26.pptf
 
SAWAS_2_2_2011_p17_p36
SAWAS_2_2_2011_p17_p36SAWAS_2_2_2011_p17_p36
SAWAS_2_2_2011_p17_p36
 
Flooding 5 Bangladesh Gcse Aqa A
Flooding 5  Bangladesh Gcse Aqa AFlooding 5  Bangladesh Gcse Aqa A
Flooding 5 Bangladesh Gcse Aqa A
 
Dams:Pros and Cons
Dams:Pros and ConsDams:Pros and Cons
Dams:Pros and Cons
 
Water resource management and role of dams
Water resource management and role of damsWater resource management and role of dams
Water resource management and role of dams
 
Narmada.ppt
Narmada.pptNarmada.ppt
Narmada.ppt
 
S5c7 chapter 7-facts and figures related to floods in india.
S5c7 chapter 7-facts and figures related to floods in india.S5c7 chapter 7-facts and figures related to floods in india.
S5c7 chapter 7-facts and figures related to floods in india.
 
Water Resourses of Pakistan.pptx
Water Resourses of Pakistan.pptxWater Resourses of Pakistan.pptx
Water Resourses of Pakistan.pptx
 
narmada river scheme con
narmada river scheme connarmada river scheme con
narmada river scheme con
 
Senators
SenatorsSenators
Senators
 
Displacement case study- three gorges, China
Displacement case study- three gorges, China Displacement case study- three gorges, China
Displacement case study- three gorges, China
 
Essential resource of Life- WATER
Essential resource of Life- WATEREssential resource of Life- WATER
Essential resource of Life- WATER
 
Water situation in pakistan Water crisis in pakistan A presentation By Mr Al...
Water situation in pakistan Water crisis in pakistan  A presentation By Mr Al...Water situation in pakistan Water crisis in pakistan  A presentation By Mr Al...
Water situation in pakistan Water crisis in pakistan A presentation By Mr Al...
 

Recently uploaded

Summary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of AustraliaSummary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of Australia
yasmindemoraes1
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
JulietMogola
 
Bhopal Gas Leak Tragedy - A Night of death
Bhopal Gas Leak Tragedy - A Night of deathBhopal Gas Leak Tragedy - A Night of death
Bhopal Gas Leak Tragedy - A Night of death
upasana742003
 
growbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdfgrowbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdf
yadavakashagra
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
AhmadKhan917612
 
ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
RaniJaiswal16
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
BanitaDsouza
 
DRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving togetherDRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving together
Robin Grant
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
sidjena70
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
Robin Grant
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
World Resources Institute (WRI)
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
CIFOR-ICRAF
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
a0966109726
 
Navigating the complex landscape of AI governance
Navigating the complex landscape of AI governanceNavigating the complex landscape of AI governance
Navigating the complex landscape of AI governance
Piermenotti Mauro
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Innovation and Technology for Development Centre
 
Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
Open Access Research Paper
 
Prevalence, biochemical and hematological study of diabetic patients
Prevalence, biochemical and hematological study of diabetic patientsPrevalence, biochemical and hematological study of diabetic patients
Prevalence, biochemical and hematological study of diabetic patients
Open Access Research Paper
 
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
Open Access Research Paper
 
Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
chaitaliambole
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
rohankumarsinghrore1
 

Recently uploaded (20)

Summary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of AustraliaSummary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of Australia
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
 
Bhopal Gas Leak Tragedy - A Night of death
Bhopal Gas Leak Tragedy - A Night of deathBhopal Gas Leak Tragedy - A Night of death
Bhopal Gas Leak Tragedy - A Night of death
 
growbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdfgrowbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdf
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
 
ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
 
DRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving togetherDRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving together
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
 
Navigating the complex landscape of AI governance
Navigating the complex landscape of AI governanceNavigating the complex landscape of AI governance
Navigating the complex landscape of AI governance
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
 
Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
 
Prevalence, biochemical and hematological study of diabetic patients
Prevalence, biochemical and hematological study of diabetic patientsPrevalence, biochemical and hematological study of diabetic patients
Prevalence, biochemical and hematological study of diabetic patients
 
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
 
Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
 

River interlinking

  • 1. INTER LINKING OF RIVERS IN INDIA: A SOLUTION FOR WATER CRISIS IN INDIA OR DESCISION IN DOUBT? PRESENTED BY – VIKAS KUMAR
  • 2. INTRODUCTION TODAY WE ARE WATER STRESSED, BUT TOMORRROW WE WILL BE WATER SCARCE. WHY WILL BE INDIA WATER DEFICIT? • Annual rainfall- 400 m.ha.m. • Total utilizable surface and ground water after full development of water resources- 114m.ha.m. UTILIZATION: • 1991- 58m.ha.m. • 2001- 79m.ha.m • 2025- 114m.ha.m Thus the entire quantum of utilization water will be exhausted by the year 2025.
  • 4. NRLP • The National River Linking Project (NRLP) is designed to ease water shortages in western and southern India while mitigating the impacts of recurrent floods in the eastern parts of the Ganga basin. • The NRLP, if and when implemented, will be one of the biggest inter basin water transfer projects in the world.
  • 5. HISTORY OF INTERLINKING • 1972-Ganga cauvery link proposed by Dr. K.L. Rao . • 1974-“Garland canal” proposal by captain Dastur . • 1980-Ministry of water resources frames the National perspective plan(NPP) . • 1982-The National water development agency (NWDA) set up to carry out pre – feasibility studies . • 1999-A National commission (NCIWRDP) set up to review NWDA reports . • Aug 15, 2002- President Abdul Kalam mentions the need for river linking in his independence day speech . • Oct 2002- Supreme court recommends that the government formulate a plan to link the major Indian rivers by the year 2012. • Dec 2002- Govt. appointed a task force on interlinking of 37 rivers led by Mr. Suresh Prabhu. The deadline was revised to 2016.
  • 6. Contours of NRLP… • Building 30 links, 3000 small and large reservoirs, 12500 km of canals to link 36 Himalayan and Peninsular rivers to effect 178 km3 of inter-basin water transport. • 35 million ha of new irrigated area; 35 GW of hydro-capacity; navigation and flood control benefits. • Gestation Period: Proposed=2016; Most Likely=2050 • Cost = Rs 560,000 cr. at 2002 prices (US $ 120 Billion); 1 - 1.5% of India’s GDP for the next 3 decades.
  • 7. The Inter-link consist of two parts, a Northern Himalayan River Development Component and a Southern Peninsular River Development Component.
  • 8. Himalayan Development  The northern component would consist of a series of dams built along the Ganga and Brahmaputra rivers in India, Nepal and Bhutan for the purposes of storage.  Canals would be built to transfer surplus water from the eastern tributaries of the Ganga to the west.  The Brahmaputra and its tributaries would be linked with the Ganga and the Ganga with the Mahanadi river.  This part of the project would provide additional irrigation for about 220,000 square kilometers and generate about 30 gig watts of electricity.  It could also provide excess water for the controversial Farakka Barrage which could be used to flush out the silt at the port of Kolkata
  • 9. Peninsular Development  First, the Mahanadi, Godavari. Krishna and Kaveri rivers would all be linked by canals. The purpose of this would be to transfer surplus water from the Mahanadi and Godavari rivers to the south of India.  Second, those rivers that flow west to the north of Mumbai and the south of Tapi would be linked. The water would be used by the urban areas of Bombay and also to provide irrigation in the coastal areas of Maharashtra.  Third the Ken and Chambal rivers would be linked in order to provide better water facilities for Madhya Pradesh and Uttar Pradesh.  Finally a number of west-flowing rivers along the Western Ghats simply discharge into the Arabian Sea.  The Peninsular part of the project would provide additional irrigation to 130,000 square kilometers and generation an additional 4 gig watts of power.
  • 11. Reasons And Motivation of Inter Linking Regional rainfall variation: . The summer monsoon accounts for more than 85% of the precipitation. Large parts of Haryana, Maharashtra, Andhra Pradesh, Rajasthan, Gujarat, Madhya Pradesh, Karnataka and Tamil Nadu are not only in deficit in rainfall but also subject to large variations, resulting in frequent droughts and causing immense hardship to the population and enormous loss to the nation. Regional variations in the rainfall lead to a situations when some parts of the country do not have enough water even for raising a single crop. On the other hand excess rainfall occurring in some parts of the country create havoc due to floods. Futuristic Demand for Irrigation: At present estimate the "ultimate" irrigation potential of the country being stated as 113 million Ha. However, to feed the estimated 1.5 to 1.8 billion people in 2050 with 450 million tons of food grains, India needs to increase its irrigation potential to 160 million hectares. Hence, strategies like inter-basin water transfer are looked upon. Domestic Water Needs :The per capita availability of utilizable water has been reduced progressively from 3450 cubic meters to 1250 cubic meters from 1951 to 2000 owing to the increasing population. In the next 50 years, it is likely to come down to 760 cubic meters (for a projected population of 1.6 billion) (Gupta 2001).Thus, at the household level, the per-capita availability has been reducing progressively and more than 25% of villages suffer from drinking water problems (Gupta 2001). To Control Floods and Droughts: Floods are a recurring feature, particularly in Brahmaputra and Ganga rivers, in which almost 60 % of the river flows of our country occur. Flood damages, which were Rs. 52 crores in 1953, have gone up to Rs. 5,846 crore in 1998 with annual average being .Rs 1,343 crore affecting the States of Assam, Bihar, West Bengal and Uttar Pradesh along with untold human sufferings. On the other hand large areas in the States of Rajasthan, Gujarat, Andhra Pradesh, Karnataka and Tamil Nadu face recurring droughts. As much as 85 % of drought prone areas falls in these States.
  • 12. Stated Benefits  Flood Control (40 million ha area and 260 million people saved from floods that leads to damages of Rs 2400 crore/year)  Drought proofing (86 million people in 14 states, 116 districts saved)  Relief of 1200 crore per year from floods/ drought damages  Irrigation: 35 m ha & availability of drinking water.  Hydropower generation 34 000 MW installed capacity  Food grains production: 450 million tonnes by 2050  Navigation  Generation of employment
  • 13. Flood/Drought prevention Rivers Average flood discharge(cumecs) Water to be diverted through ILR canal(cumecs) Brahamputra 60,000 1,500 (2.5%) Ganga 50,000 1,000 (2.0%)  By creating network of rivers flood & drought problem can be greatly avoided by channeling excess water to areas that are not experiencing a flood or are dry. This works similar to canal system in Netherlands to channel excess water from sea.  Avoid the losses of the type that occurred in 2002 to the extent of $550 million by the loss of crops because of extreme draught or flood condition. ( ILR figures from official website: www.riverlinks.nic.in) •ILR can clearly not help solve flood /drought problems.  According to President (speech on 110505) flood affects 8 major basins, 40 m ha and 260 m people; 86 m people, 14 states and 116 districts are affected by drought annually.  ILR is to have Lined Canals with 1:3,000 to 1:5,000 slope or 0.33 to 0.20 m per km. Maximum flow velocity 2 m/s. A 100 m wide & 10 m deep lined canal can carry about 1,000 cumecs. Can ILR solve flood “problem”?
  • 14. Generation of electricity Links will consume, and not generate power. PUMPED LIFT OF WATER  Ganga-Subarnarekha (G-S): 60m  Subarnarekha-Mahanadi (S-M): 48 m  Godavari-Krishna (G-K): 116m Need for 3,400 MW of dedicated power generation. [Source : http://riverlinks.nic.in/taskforce.asp ]  Pumping water over the Vindhya Mountains can transfer the Ganga-Brahmaputra water and its tributaries to regions in the south.  The Ganga-Brahmaputra floodplains are about ten meters above mean sea level (MSL). The Vindhya Mountains are about 300 m above MSL, separating the floodplains of the north from the Deccan Plateau, which is 250 m above MSL (Vombatkere 2003).  The electric power required to pump water to such heights will be close to the current power generation of the entire nation.  One of the figures thrown around by the proponents of river links schemes is 30 000 MW which sometimes becomes 34 000 MW as power generation potential of river link proposal.
  • 15. ILR PRICE TAG • The NWDA budgets the entire project at Rs 5600 Billion ($112 B) at 2002 prices. • The Himalayan component of this plan would cost Rs 3750 Billion and the peninsular part, Rs 1850 Billion. • Where is the investible capital of this magnitude available in the domestic economy? • The only option would be funds from international sources. • Apart from the fact that this would place a debt of about $112 on every Indian (where average annual income is $400- $800), it also raises question about how this loan is to be returned. • Moreover, annual interest on this amount would range between Rs 200 Billion and Rs 300 Billion. (NEWSTIME 271102, THE HINDU 020203)
  • 16. ISSUES CAUSED BY INTERLINKING AND IT’S CONCERNS 1. Ecological issues – Major concern being the argument that rivers change their course in 70–100 years and once they are linked, future change of course can create huge practical problems for the project. 2. Aqua life – A number of leading environmentalists are of the opinion that the project could be an ecological disaster. There would be a decrease in downstream flows resulting in reduction of fresh water inflows into the seas seriously jeopardizing aquatic life. 3. Deforestation –Creation of canals would need large areas of land resulting large scale deforestation in certain area. 4. Areas getting submerged - Possibility of new dams comes with the threat that habitable or reserved land getting submerged under water. 5. Displacement of people –As large strips of land might have to be converted to canals, a considerable population living in this areas must need to be rehabilitated to new areas. 6. Technical feasibility- The slope, altitude and other topographical aspects have to be considered. (e.g. for Ganga, Patna is diversible surplus but for raising water to Vindhya chain i.e. 2860 ft. high enormous amount of power is required).
  • 17. ALTERNATIVE TO INDIAN RIVER LINKING 1. Rainwater harvesting and conservation of water resources. 2. Recharging ground water reservoir. 3. Community participation: President of India visited Alwar to honour the people of Bhavta Kolyali villages for their successful community work in harvesting water and along with 72 other villages of Arvari river basin, make the river perennial . 4. Maintaining existing irrigation Infrastructure: The irrigation efficiencies are notoriously low at around 35% at best. As mid term of review of 9th Plan made it clear, even 10% increase in irrigation efficiency could lead to additional irrigation potential of 14 M Ha. That would still be far from the optimum possible efficiency. Should we not be attempting this on priority basis? 5. Virtual Water Trade : The virtual water trade concept suggest that water-rich countries should produce and export water-intensive commodities to water-scarce countries, thereby enabling the latter to divert their precious water resources to alternative, higher-productivity uses. Analysis by Verma et al. (2008) shows that the amount of virtual water traded between states is more or less equivalent to the water transfers of 178 Bm3 proposed in the NRLP. The concept of virtual water can be one of the alternatives to river linking.
  • 18. Current Status.. A Group on IntraState River links has been constituted by MoWR, RD & GR on 12.03. 2015. The Group has reviewed all relevant issues on Intra – State River Links including the definition of such link, consider and suggest about the funding of intrastate river link projects. The Group has held various meetings and submitted its report on 28.05.2015 to the Ministry of Water Resource, RD & GR. Ken – Betwa Link Project The various clearances for Ken – Betwa link project are in the advance stages and the Government will start implementing this National Project as model link project of ILR programme. Damanganga – Pinjal Link Project The DPR of Damanganga – Pinjal link was completed in March, 2014 and submitted to Governments of Maharasthra and Gujarat. Govt. of Maharasthra has submitted the Detailed Project Report of Damanganga – Pinjal link project to Central Water Commission during January, 2015 for appraisal. Mahanadi – Godavari Link Project Mahanadi Godavari link is the first and critical link of nine link system of MahanadiGodavari- KrishnaPennarCauvery VaigaiGundar under Peninsular Component of NPP. The Government of Odisha was not agreeable for the Mahanadi (Manibhadra) Godavari (Dowlaiswaram) link due to large submergence involved in Manibhadra dam proposed under the link project. Based on the suggestions of WRD, Govt. of Odisha, NWDA has proposed a revised preliminary proposal of Mahanadi Godavari link project with reduced submergence. A presentation on the revised proposal of MahanadiGodavari link project has been made to the Hon’ble Chief Minister, Govt. of Odisha on 29.05.2015 by the senior officers of MoWR, RD & GR.
  • 19. Conclusion • Considering the pragmatic view of all the issues raised it can be concluded that implementation of this ambitious scheme is not easily possible in foreseeable future. The fundamental trouble with the idea of river linking plans, then is that the idea has no studies or sound basis. • Hence it can be a better option to concentrate on the local resources and think upon the alternatives available. • River interlinking will create a human disaster to rival Mohammed Tughlak’s shifting of the capital from Delhi to Daulatabad in the fourteenth century .
  • 20. Reference • Water Policy Research : By Upali Amarasinghe. • South Asia Network On Dams, Rivers & People; SANDRP New Delhi. • River Linking -S. Kalyanaraman. • INTER-LINKING OF INDIAN RIVERS-NEED AND IMPORTANCE: R.K.Sivanappan Journal of Indian Water resources Society, Vol 32, No. 3-4, July-Oct, 2012. • www.riverlinks.nic.in • Anatomy of Interlinking Rivers in India: By A.C Shukla & Vandana Asthana. • INTERLINKING OF RIVERS IN INDIA: ISSUES & CHALLENGES : By DHARMENDRA MEHTA, NAVEEN K. MEHTA. • Ministry of Water Resources, Government of india.