THEME

                                       Risk Management in SMEs

                           R
                                   isk is omnipresent and      achieve performance targets,          many aspects pertaining to
                                   all pervasive in any        improve financial stability and        risk. All risk taking units must
                                   walk of life. It is more    ultimately, prevent loss/dam-         operate within approved pro-
                           so in the business sectors, par-    age to the entity.                    cedures, limits and controls.
                           ticularly in Small and Medi-            Business, more so in the          There is no specific definition
                           um Enterprises (SMEs). The          context of SMEs, is the art of        for SMEs, which normally
                           etymology of the word “Risk”        extracting money from other’s         cover closely held or unlisted
                           may be traced to the Latin          pocket, sans resorting to vio-        companies, partnership firms,
                           word Rescum, which means            lence and unethical means. But        proprietor concerns, etc.
                           Risk at Sea. In business, risk is   profiting in business without               There exists fundamental
                           always measured against capi-       taking risk is like trying to live    difference between the way
                           tal and therefore the Capital       without being born. Risk tak-         they function and the way they
                                                                                                     will be served in the financial
  R.S. Raghavan                  Risk management highlights the fact that the survival of            market, as the character and
The author is a member      a business entity depends heavily on its capabilities to antici-         integrity of the promoter/
   of the Institute and
  working as Sr. Man-
                            pate and prepare for the change rather than waiting for the              owner are the key and criti-
 ager, Vijaya Bank (Risk    change and then react to it. It should be clearly understood             cal credit indicator and hence
  Management Dept).
 He can be reached at
                            that the objective of risk management is not to prevent or               play a large role. In SME busi-
rsraghavan007@yahoo.        prohibit taking risk, but to ensure that the risks are conscious-        ness, the ‘gut feeling’, which is
           co.in
                            ly taken with complete knowledge and clear understanding so              subjective, is more relied upon
                            that it can be measured to help in mitigation. It is more so in          than the ‘pure analysis’ that
                            the case of SMEs.                                                        are more objective-oriented.
                                                                                                     Hence, both the business and
                                                                                                     professional relationships are
                           to Risk-weighted Assets Ratio       ing, as all of us know, is failure-   rolled into one. Therefore
                           (CRAR) is much in vogue.            prone as otherwise it would           credit rating or for that mat-
                                Risk is the potentiality       have been termed as sure tak-         ter risk rating may not make
                           that both expected and un-          ing. Every enterprise, be it          a material difference to SME
                           expected events may have an         small or medium, has its own          sectors. Certain misconcep-
                           adverse impact on the capital       objectives and mission. Risk          tions such as SMEs may get
                           and earnings. When we use           Management plays a key role           low rating, provide unreliable
                           the term “Risk”, we all mean        in protecting its assets and re-      information, may not afford
                           financial risk or uncertainty of     sources and ensuring that risks       the fees for getting them rated,
                           financial loss. If we consider       are reduced to an acceptable          etc. will have to be dispelled
                           risk in terms of occurrence         level. The essence of risk man-       first. However, rating agencies
                           frequency, we measure risk on       agement is to reduce the risks        with specialised teams with
                           a scale, with certainty of oc-      to a reasonable and manageable        analytical tools customised
                           currence at one and certainty       level, on an on-going basis.          to SME sector will go a long
                           of non-occurrence at the other                                            way in putting in place proper
                           end. When the probability of        Risks Specific To SMEs                mechanism in this regard.
                           occurrence or non-occurrence             No doubt any business en-             The SME sectors are ex-
                           is equal, risk is the greatest.     tity needs robust risk manage-        posed to some specific risks,
                                Risk can be broadly de-        ment systems but the SMEs             some of which are discussed
                           fined as any issue that can          need much more than that              below:
                           impact the objectives of a          as they may not have where-
                           business entity, be it financial     withal to manage and control          (a) Constitution of business
                           service or commercial. Risk         risks due to their very size and      entity
                           Management is an ongoing            several limitations. This is not          The business entities un-
                           process that can help improve       true in the case of large cor-        der SME sectors are mostly
                           operations, prioritise resources,   porate entities where profes-         proprietorship and partner-
                           ensure regulatory compliance,       sional personnel take care of         ship concerns. Few in the joint


 528 The Chartered Accountant October 2005
stock companies are private          (e) Incapacity to go for        erty and standard home loan
limited or closely held public       technological advancement       margins apply. Where SMEs
limited companies. Thus, the              With very little financial  are backed by other forms of
very constitution itself may         resources and poor ability for  collateral the margins do not
prove to be risky due to lack        leveraging the financial struc-  appear to be excessively above
of professionalism and over-         ture, the SME sectors may not   those available for large busi-
dependence on one or two key         have the wherewithal to go      ness. It may be noted that the    By virtue
persons for running the show.        for highly sophisticated tech-  two biggest problems faced by     of the fact
Lenders and other stakehold-         nological advancement which     the SMEs are relating to Reg-     that most
ers in SME sector cannot af-         would help them optimise        ulatory issues and unskilled      of the enti-
ford to forget this fact.            their available resources in theemployees, which collectively     ties in SME
                                     best way.                       constitute nearly 45 to 50 per    sector are
(b) Leverage on financial                                             cent of the problems encoun-      small play-
structure                            (f ) High employee turnover     tered by them. Access to fi-       ers in their
    The nature of constitution            As growth prospects are nance is at the bottom end of        field, they
of the business entity limits        very limited in SME sector, the problem list.                     may have to
the funds mobilisation ef-           it is prone to high degree of                                     encounter
forts and leveraging capacity.       employee turnover and this (g) Micro Finance                      tough com-
There is a limit up to which         may involve lot of wastage of       Micro Finance can be          petition from
a small and medium business          manpower and additional cost defined as providing credit,          the bigger
enterprise can raise capital and     in the form of training and thrift and financial related           players
borrow. This naturally affects       knowledge updation, affecting services and products of very
their capacity to leverage on        continuity besides lowering small amount so as to im-
the financial structure.              the productivity. Qualified and prove the standard of living.
                                     experienced personnel may In Indian context, loans up to
(c) Tough competition and            not stay long as they may gain Rs. 25,000/- are covered un-
Inadequate margin                    some experience and change der Micro Finance. Number
     By virtue of the fact that      employment.                     of small enterprises could be
most of the entities in SME               Majority of SME loans covered under these social-
sector are small players in          are backed by residential prop- oriented entrepreneurial ac-
their field, they may have to
encounter tough competition
                                       Lamiya Lokhandwala




from the bigger players. They
face the pressure on their mar-
gin as they can’t raise their
price but have to absorb the
high input cost.

(d) Low collection in Account
Receivables
     As is evidenced in the
increasing trend of outstand-
ing receivables in the SSI sec-
tors, there exists collection risk
in the receivable portfolio of
SME sectors for the reason that
SMEs cannot dictate terms to
their customers. As SME sec-
tor business entity is at the re-
ceiving end, this may put strain
on the liquidity position of the
business entity. However, the
track record of SMEs as bor-
rowers reveals that the default
rate is low. Very low rates of
bad debts may be the result of
banks restricting their exposure
to this sector.

 530 The Chartered Accountant October 2005
tivities. There can be no doubt     where the promoter of SME              ship with the bank as
              that lenders spread their risk      is willing to offer the family         reputation, character and
              when they lend to this par-         home as security against the           first-hand opinion is very
              ticular sector. It is under the     amount borrowed, it serves             important in lending de-
              premise that poor are bankable      as a catalyst to avoid default.        cision.
              and micro enterprise finance         That is to say the incentive
              through repayment incentive         to avoid the risk of default is    (i) Bank Lending To SMEs
              structure, streamlined admin-       likely to be stronger where the         SMEs are an important
SMEs are      istration and market based          family home is used to obtain      part of economic growth in the
an impor-     pricing adopting profit center       business finance.                   country and bank lending is
tant part of  approach is sustainable. This            Collateral is more impor-     the primary source of external
economic      approach leads to profound          tant in the following circum-      finance to them. Therefore, it
growth in the changes in a cumulative causa-      stances.                           is essential that banking sector
country and   tion triggered by credit to rural   a. The business is small,          responds not only effectively
bank lending mass, as well as SMEs.                    as larger firms gener-         but also efficiently to the just
is the pri-                                            ally have other attributes    needs of SMEs.
mary source   (h) Collateral Security                  such as credit rating, cash        When the business own-
of external        The existence of collat-            flows, track record, etc.      ers or managers know more
finance to     eral means that banks do not             that reduce the need for      about prospects of venture and
them          have to rely as much as they             collateral.                   risks facing their business than
              otherwise would on detailed         b. The business entity has         lenders, information asymme-
              investigation and analysis of            come into existence re-       try sets in. Where information
              borrower’s business. It serves           cently and the lenders        asymmetry exists, lenders may
              as insurance to lenders and for          have no track record to       respond by increasing lending
              the borrowers. It is a reflection         call upon for analysis.       margins to levels in excess of
              of credit-worthiness to lenders.    c. The borrower is yet to          that which the inherent risks
              Extending the logic further,             establish strong relation-    would require. Besides, banks




                                                                          October 2005 The Chartered Accountant 531
may also curtail the extent of     of risks viz Credit Risk, Mar-      the limitations associated with
lending and resort to what is      ket Risk and Operational Risk.      a simplistic and broad-brush
known as Credit Rationing,         While the credit risk is associ-    approach of classification of
notwithstanding the fact that      ated with the default of coun-      exposures into a good or bad
SMEs would be willing to pay       ter party, market risk relates      category. The rating models
a fair Risk Adjusted Cost of       to changes in the earnings as       must be fully documented and
Capital.                           well as capital on account of       minimum standards must be
     Investing in gathering and    changes in the market vari-         specified as hurdle points. The     Credit Risk
analysing information will         ables and the operational risk      models must be duly validated      is measured
be made only up to the point       is the residual risk which does     so as to ensure acceptability      through
where the benefits just offset      not directly relate to credit or    among the users of the models.     Probability of
the costs involved. Lenders are    market risk.                        The rating scale could consist     Default (PD)
now becoming risk intermedi-            Credit Risk is measured        of 9 strata with the first 5 or 6   and Loss
ary rather than a financial in-     through Probability of Default      representing acceptable credit     Given Default
termediary. Business grows         (PD) and Loss Given Default         risk and the rest 4 or 3 grades    (LGD). Bank
mainly by taking risks. Greater    (LGD). Bank would estimate          of unacceptable credit risk as-    would esti-
the risk, higher the profit and     the PD associated with bor-         sociated with an exposure. The     mate the PD
hence the business unit must       rowers in each of the risk rating   whole purpose of risk rating is    associated
strike a tradeoff between the      grades. Historically speaking,      that the exercise should ulti-     with borrow-
two.                               the default percentage is quite     mately reflect the underlying       ers in each of
     The prime functions of        high in SME sectors than in         credit risk for a prospective      the risk rating
risk management are to iden-       the large corporate or entity,      exposure.                          grades
tify, measure and more im-         though in absolute terms, it             When the risk grading
portantly monitor the risk.        may relatively be smaller. How-     system does not show desired
Risk management activity is a      ever, default probabilities do      ability to discriminate be-
pro-active action in present for   not capture the risk that a bank    tween good and bad risks—
securing the future. Managing      might experience an economic        implying lack of granularity,
risk is nothing but managing       loss through deterioration in       the outcome may lead to the
change, before the risk man-       the quality of the loan book        relationship between Risk
ages the persons concerned.        rather than outright default.       Rate and Pricing losing its
     As per the RBI guidelines,         Credit Risk Rating Frame-      predictive capability, thereby
there are basically three types    work is essential to overcome       causing losses to lender larger




 532 The Chartered Accountant October 2005
than the predicted/predict-             not regard it as its role to    foundation for identifying risks
able parameters. This may               fund start up ventures, for     as it would provide the frame-
result in tightening the credit         which venture capitalists       work to help identification of
terms or increase in price or           are expected to finance.         risk in the organisation.
both. The situation may lead            Banks may consider it to             There should be a risk
to overpricing good risk or             be a risky venture.             rating model for identifica-
under pricing bad risk. This            a. There is a miscon-           tion of risk and it is better to
may ultimately end up in the                  ception among the         evolve an exclusive/separate
bank building up poorer qual-                 banks that a high         model for SME sector, duly
ity loans on its books as better              proportion of small       capturing their peculiarities in
quality borrower may seek al-                 businesses fail within    the major parameters such as
ternative lending arrangement                 a few years of start-     Industry Risk, Business Risk,
elsewhere. Such a situation is                ing operations and it     Financial Risk, Management
known as adverse selection of                 may be safe to lend       Risk, Compliance Risk, etc.
borrower in banking parlance.                 to already working        The rating model used for
     Once loans are sanctioned                                          large corporate or large bor-
                                              and established one
for business activities, the                                            rower may not be suitable for
                                              than to run the risk
owners of the business may                                              rating the risk in a business
                                              of lending to new
have incentives to take high-                                           entity in the SME sector.
er risks than they otherwise                  ventures.
                                                                             The rating model should
would. This is because the              b. It is often seen as
                                                                        capture both systemic risk and
owner of the business entity                  difficult for start-ups
                                                                        unsystemic risk. The systemic
benefits fully from any addi-                  to satisfy bank re-       risk means the risk emanating
tional returns when the firm                   quirements, in terms      from general political envi-
is liquidated. This is known as               of     demonstrating      ronment, change in economic
                                              experience in indus-                                          Identification
moral hazard. When a busi-                                              policies, fiscal policies of the     of risk should
ness entity is a proprietorship               try, meeting mini-        government and infrastructur-       occur with
or partnership concern and                    mum equity stake          al changes whereas unsystemic       the people
the liability of the owner is                 and having in place       risk arises out of mainly inter-    and experts
unlimited, owners may be less                 contracts for sale to     nal factors such as machinery       where the
prone to moral hazard because                 support the business      breakdown, labour strike, new       domain
the owner may suffer loss in                  plans.                    competitors, etc.                   knowledge
the event of liquidation.               c. Personnel with spe-                                              resides
     Where information asym-                  cialised skill sets are   Enterprise Wide Risk
metry and moral hazards are                   some times neces-         Management
prevalent, business entities                  sary to understand             Enterprise Wide Risk
are likely to fund themselves                 the risks inherent        Management is the latest trend
primarily from retained earn-                 with particular new       and buzzword for an overall
ings and then only through                    ventures. The banks,      approach of the management
bank debt rather than through                 particularly the PSU      of risk as a whole in the busi-
public equity. Nevertheless,                  banks, do not neces-      ness. All business entities accu-
among the SMEs switching                      sarily have such staff    mulate resources viz. men, ma-
between banks is not a wide-                  strength.                 terial, money, technology, etc.
spread phenomenon.                      Consequently there is a         and invest them in activities
                                   distinct reluctance by banks to      which are uncertain and hence
(j) Reluctance of Lending To       lend to ventures not compre-         fraught with various kinds of
SMEs                               hended completely on tech-           risks. As whole is always big-
    The reluctance of lending      nical aspects and the exposed        ger than sum of its parts, en-
to SMEs may be on account          risks not fully understood by        terprise wide risk management
of the following.                  the bank employees.                  should be attempted instead
(i) Stemming from concerns                                              of adopting silo-approach and
     about risk and in turn, the   Risk Identification                  handling risk of one issue, in
     responsibilities of banks         Identification of risk            isolation and exclusion of other
     towards its stakehold-        should occur with the people         functions.
     ers such as sharehold-        and experts where the domain              EWRM is a process
     ers, deposit holders and      knowledge resides. Identifica-        through which a business en-
     regulators, the banks do      tion of business process is the      tity optimises the manner in


 534 The Chartered Accountant October 2005
which it takes risks. It is not    the perspective of SME sec-             The Business Contingen-
                 seeking or avoiding risk, but      tors, Basel II should be viewed     cy Plan and procedures should
                 optimising the risk. Hence         as a positive development, as it    be properly documented, cov-
                 putting in place an EWRM           promotes alignment of interest      ering the critical business pro-
                 makes good business sense.         rates with true economic cost.      cess, functions and procedures
                 Any successful implementa-                                             to be followed and the related
                 tion of EWRM framework             Business Contingency                database should be duly pro-
                 needs to take into consider-       Plan                                tected with a back up facility
                 ation the integration of En-            A study reveals that dur-      and kept in an offsite storage
                 terprise Resource Planning         ing the past two decades,           location. The LCMT shall
                 system (ERP) so as to effec-       nearly 80 per cent of the or-       evolve Resumption Strategy
                 tively manage the risk across                                          by which the resumption pro-
                                                    ganisations that lacked busi-
                 the organisation facilitating                                          cess either at the company’s
                                                    ness contingency plan and
                 the integration of the various                                         premises or at an alternative
                 roles to manage the same ef-       suffered catastrophic loss of
                                                    property, records, customer         location is ensured so that
                 ficiently.                                                              normal business operations
                      In the light of advance-      loyalty, skilled and trained
                                                    workforce, cash flow, etc. were      are carried out. The Resump-
                 ment in information technol-                                           tion Strategy may include
                 ogy, power of computation          gone within a couple of years
Every busi-                                         of the incident, despite many       work backlog, critical func-
                 and sophistication of risk                                             tions, work prioritisation and
ness entity,     analysis on interest rate, mar-    of them having had business
particularly                                        interruption coverage insur-        formation of communication
                 ket fluctuations, availability                                          center.
the SMEs,        of extensive database as well      ance policy.
needs to         as information flow, the scope           Every business entity,
have Busi-                                          particularly the SMEs, needs        Conclusion
                 for putting in place an enter-
ness Con-                                           to have Business Continu-               Functions of risk man-
                 prise wide risk management
tinuity and      framework has become more a        ity and Business Contin-            agement should actually be
Business         necessity than a luxury for all    gency Plan (BCBCP). It is           the entity specific, dictated
Contingency      the business enterprises.          a complex exercise involving        by the size and quality of the
                                                                                        balance sheet, complexity of
Plan (BCB-                                          a number of stages and dis-
                                                                                        functions, technical/profes-
CP). It is a     Basel II and SME Sector            crete activities. In this regard,
                                                                                        sional manpower and the
complex ex-          Under the new Capital          a Local Crises Management
                 Accord, popularly known as                                             status of Management Infor-
ercise involv-                                      Team (LCMT), a core group
                 Basel II, the regulatory capital                                       mation System in place. Any
ing a number                                        consisting of senior manage-
                 is more closely associated with                                        risk management model is as
of stages                                           ment personnel shall be con-
                 risk implying that lending to                                          good as the data input.
and discrete                                        stituted to formulate strate-
                 lower risk borrowers will at-                                              In the present scenario,
activities                                          gies and take decisions in the      where profits are derived
                 tract lower capital require-       event of business interrup-
                 ments. Those banks which                                               mainly from trading in the
                                                    tion. Further, a second line        market, one can no longer af-
                 are likely to employ IRB ap-       Departmental Representative
                 proach should be better placed                                         ford to avoid measuring risk
                                                    Group (DRG), comprising             and managing its implica-
                 to avoid over-pricing good         senior line management from
                 risks and under pricing bad                                            tions thereof. To the extent
                                                    across the business organi-         the SME entity takes risk
                 risks. By deduction, it means      sation, shall be constituted.
                 that there may be some mi-                                             consciously, anticipates ad-
                                                    Its role, besides assisting the     verse change and hedges ac-
                 gration of higher risk SME
                                                    Local Crises Management             cordingly, it becomes a source
                 loans to those banks which do
                 not adopt IRB approach and         Team, is to assess the busi-        of competitive advantage as
                 which the banks, by implica-       ness impact of the interrup-        it can offer its products at a
                 tion, rely on less sophisticated   tion on their client base and       better price than its com-
                 and more standardised mea-         business areas. In addition,        petitors. What can be mea-
                 sures of risk.                     a Contingency Plan Co-or-           sured can also be managed. It
                     Any enhanced sensitivity       dinator shall be appointed          should be clearly understood
                 of regulatory capital require-     with certain responsibilities       that risk mitigation efforts
                 ments to risk may be doing         and rights so that both the         are more important and vital
                 nothing more than aligning         LCMT & DRG meets regu-              than capital allocation against
                 the regulatory environment         larly and initiate the requisite    inadequate risk management
                 with current practice. From        action plan.                        system.


                                                                             October 2005 The Chartered Accountant 535

Risk mitigation strategies in SMEs (small and medium business)

  • 1.
    THEME Risk Management in SMEs R isk is omnipresent and achieve performance targets, many aspects pertaining to all pervasive in any improve financial stability and risk. All risk taking units must walk of life. It is more ultimately, prevent loss/dam- operate within approved pro- so in the business sectors, par- age to the entity. cedures, limits and controls. ticularly in Small and Medi- Business, more so in the There is no specific definition um Enterprises (SMEs). The context of SMEs, is the art of for SMEs, which normally etymology of the word “Risk” extracting money from other’s cover closely held or unlisted may be traced to the Latin pocket, sans resorting to vio- companies, partnership firms, word Rescum, which means lence and unethical means. But proprietor concerns, etc. Risk at Sea. In business, risk is profiting in business without There exists fundamental always measured against capi- taking risk is like trying to live difference between the way tal and therefore the Capital without being born. Risk tak- they function and the way they will be served in the financial R.S. Raghavan Risk management highlights the fact that the survival of market, as the character and The author is a member a business entity depends heavily on its capabilities to antici- integrity of the promoter/ of the Institute and working as Sr. Man- pate and prepare for the change rather than waiting for the owner are the key and criti- ager, Vijaya Bank (Risk change and then react to it. It should be clearly understood cal credit indicator and hence Management Dept). He can be reached at that the objective of risk management is not to prevent or play a large role. In SME busi- rsraghavan007@yahoo. prohibit taking risk, but to ensure that the risks are conscious- ness, the ‘gut feeling’, which is co.in ly taken with complete knowledge and clear understanding so subjective, is more relied upon that it can be measured to help in mitigation. It is more so in than the ‘pure analysis’ that the case of SMEs. are more objective-oriented. Hence, both the business and professional relationships are to Risk-weighted Assets Ratio ing, as all of us know, is failure- rolled into one. Therefore (CRAR) is much in vogue. prone as otherwise it would credit rating or for that mat- Risk is the potentiality have been termed as sure tak- ter risk rating may not make that both expected and un- ing. Every enterprise, be it a material difference to SME expected events may have an small or medium, has its own sectors. Certain misconcep- adverse impact on the capital objectives and mission. Risk tions such as SMEs may get and earnings. When we use Management plays a key role low rating, provide unreliable the term “Risk”, we all mean in protecting its assets and re- information, may not afford financial risk or uncertainty of sources and ensuring that risks the fees for getting them rated, financial loss. If we consider are reduced to an acceptable etc. will have to be dispelled risk in terms of occurrence level. The essence of risk man- first. However, rating agencies frequency, we measure risk on agement is to reduce the risks with specialised teams with a scale, with certainty of oc- to a reasonable and manageable analytical tools customised currence at one and certainty level, on an on-going basis. to SME sector will go a long of non-occurrence at the other way in putting in place proper end. When the probability of Risks Specific To SMEs mechanism in this regard. occurrence or non-occurrence No doubt any business en- The SME sectors are ex- is equal, risk is the greatest. tity needs robust risk manage- posed to some specific risks, Risk can be broadly de- ment systems but the SMEs some of which are discussed fined as any issue that can need much more than that below: impact the objectives of a as they may not have where- business entity, be it financial withal to manage and control (a) Constitution of business service or commercial. Risk risks due to their very size and entity Management is an ongoing several limitations. This is not The business entities un- process that can help improve true in the case of large cor- der SME sectors are mostly operations, prioritise resources, porate entities where profes- proprietorship and partner- ensure regulatory compliance, sional personnel take care of ship concerns. Few in the joint 528 The Chartered Accountant October 2005
  • 2.
    stock companies areprivate (e) Incapacity to go for erty and standard home loan limited or closely held public technological advancement margins apply. Where SMEs limited companies. Thus, the With very little financial are backed by other forms of very constitution itself may resources and poor ability for collateral the margins do not prove to be risky due to lack leveraging the financial struc- appear to be excessively above of professionalism and over- ture, the SME sectors may not those available for large busi- dependence on one or two key have the wherewithal to go ness. It may be noted that the By virtue persons for running the show. for highly sophisticated tech- two biggest problems faced by of the fact Lenders and other stakehold- nological advancement which the SMEs are relating to Reg- that most ers in SME sector cannot af- would help them optimise ulatory issues and unskilled of the enti- ford to forget this fact. their available resources in theemployees, which collectively ties in SME best way. constitute nearly 45 to 50 per sector are (b) Leverage on financial cent of the problems encoun- small play- structure (f ) High employee turnover tered by them. Access to fi- ers in their The nature of constitution As growth prospects are nance is at the bottom end of field, they of the business entity limits very limited in SME sector, the problem list. may have to the funds mobilisation ef- it is prone to high degree of encounter forts and leveraging capacity. employee turnover and this (g) Micro Finance tough com- There is a limit up to which may involve lot of wastage of Micro Finance can be petition from a small and medium business manpower and additional cost defined as providing credit, the bigger enterprise can raise capital and in the form of training and thrift and financial related players borrow. This naturally affects knowledge updation, affecting services and products of very their capacity to leverage on continuity besides lowering small amount so as to im- the financial structure. the productivity. Qualified and prove the standard of living. experienced personnel may In Indian context, loans up to (c) Tough competition and not stay long as they may gain Rs. 25,000/- are covered un- Inadequate margin some experience and change der Micro Finance. Number By virtue of the fact that employment. of small enterprises could be most of the entities in SME Majority of SME loans covered under these social- sector are small players in are backed by residential prop- oriented entrepreneurial ac- their field, they may have to encounter tough competition Lamiya Lokhandwala from the bigger players. They face the pressure on their mar- gin as they can’t raise their price but have to absorb the high input cost. (d) Low collection in Account Receivables As is evidenced in the increasing trend of outstand- ing receivables in the SSI sec- tors, there exists collection risk in the receivable portfolio of SME sectors for the reason that SMEs cannot dictate terms to their customers. As SME sec- tor business entity is at the re- ceiving end, this may put strain on the liquidity position of the business entity. However, the track record of SMEs as bor- rowers reveals that the default rate is low. Very low rates of bad debts may be the result of banks restricting their exposure to this sector. 530 The Chartered Accountant October 2005
  • 3.
    tivities. There canbe no doubt where the promoter of SME ship with the bank as that lenders spread their risk is willing to offer the family reputation, character and when they lend to this par- home as security against the first-hand opinion is very ticular sector. It is under the amount borrowed, it serves important in lending de- premise that poor are bankable as a catalyst to avoid default. cision. and micro enterprise finance That is to say the incentive through repayment incentive to avoid the risk of default is (i) Bank Lending To SMEs structure, streamlined admin- likely to be stronger where the SMEs are an important SMEs are istration and market based family home is used to obtain part of economic growth in the an impor- pricing adopting profit center business finance. country and bank lending is tant part of approach is sustainable. This Collateral is more impor- the primary source of external economic approach leads to profound tant in the following circum- finance to them. Therefore, it growth in the changes in a cumulative causa- stances. is essential that banking sector country and tion triggered by credit to rural a. The business is small, responds not only effectively bank lending mass, as well as SMEs. as larger firms gener- but also efficiently to the just is the pri- ally have other attributes needs of SMEs. mary source (h) Collateral Security such as credit rating, cash When the business own- of external The existence of collat- flows, track record, etc. ers or managers know more finance to eral means that banks do not that reduce the need for about prospects of venture and them have to rely as much as they collateral. risks facing their business than otherwise would on detailed b. The business entity has lenders, information asymme- investigation and analysis of come into existence re- try sets in. Where information borrower’s business. It serves cently and the lenders asymmetry exists, lenders may as insurance to lenders and for have no track record to respond by increasing lending the borrowers. It is a reflection call upon for analysis. margins to levels in excess of of credit-worthiness to lenders. c. The borrower is yet to that which the inherent risks Extending the logic further, establish strong relation- would require. Besides, banks October 2005 The Chartered Accountant 531
  • 4.
    may also curtailthe extent of of risks viz Credit Risk, Mar- the limitations associated with lending and resort to what is ket Risk and Operational Risk. a simplistic and broad-brush known as Credit Rationing, While the credit risk is associ- approach of classification of notwithstanding the fact that ated with the default of coun- exposures into a good or bad SMEs would be willing to pay ter party, market risk relates category. The rating models a fair Risk Adjusted Cost of to changes in the earnings as must be fully documented and Capital. well as capital on account of minimum standards must be Investing in gathering and changes in the market vari- specified as hurdle points. The Credit Risk analysing information will ables and the operational risk models must be duly validated is measured be made only up to the point is the residual risk which does so as to ensure acceptability through where the benefits just offset not directly relate to credit or among the users of the models. Probability of the costs involved. Lenders are market risk. The rating scale could consist Default (PD) now becoming risk intermedi- Credit Risk is measured of 9 strata with the first 5 or 6 and Loss ary rather than a financial in- through Probability of Default representing acceptable credit Given Default termediary. Business grows (PD) and Loss Given Default risk and the rest 4 or 3 grades (LGD). Bank mainly by taking risks. Greater (LGD). Bank would estimate of unacceptable credit risk as- would esti- the risk, higher the profit and the PD associated with bor- sociated with an exposure. The mate the PD hence the business unit must rowers in each of the risk rating whole purpose of risk rating is associated strike a tradeoff between the grades. Historically speaking, that the exercise should ulti- with borrow- two. the default percentage is quite mately reflect the underlying ers in each of The prime functions of high in SME sectors than in credit risk for a prospective the risk rating risk management are to iden- the large corporate or entity, exposure. grades tify, measure and more im- though in absolute terms, it When the risk grading portantly monitor the risk. may relatively be smaller. How- system does not show desired Risk management activity is a ever, default probabilities do ability to discriminate be- pro-active action in present for not capture the risk that a bank tween good and bad risks— securing the future. Managing might experience an economic implying lack of granularity, risk is nothing but managing loss through deterioration in the outcome may lead to the change, before the risk man- the quality of the loan book relationship between Risk ages the persons concerned. rather than outright default. Rate and Pricing losing its As per the RBI guidelines, Credit Risk Rating Frame- predictive capability, thereby there are basically three types work is essential to overcome causing losses to lender larger 532 The Chartered Accountant October 2005
  • 5.
    than the predicted/predict- not regard it as its role to foundation for identifying risks able parameters. This may fund start up ventures, for as it would provide the frame- result in tightening the credit which venture capitalists work to help identification of terms or increase in price or are expected to finance. risk in the organisation. both. The situation may lead Banks may consider it to There should be a risk to overpricing good risk or be a risky venture. rating model for identifica- under pricing bad risk. This a. There is a miscon- tion of risk and it is better to may ultimately end up in the ception among the evolve an exclusive/separate bank building up poorer qual- banks that a high model for SME sector, duly ity loans on its books as better proportion of small capturing their peculiarities in quality borrower may seek al- businesses fail within the major parameters such as ternative lending arrangement a few years of start- Industry Risk, Business Risk, elsewhere. Such a situation is ing operations and it Financial Risk, Management known as adverse selection of may be safe to lend Risk, Compliance Risk, etc. borrower in banking parlance. to already working The rating model used for Once loans are sanctioned large corporate or large bor- and established one for business activities, the rower may not be suitable for than to run the risk owners of the business may rating the risk in a business of lending to new have incentives to take high- entity in the SME sector. er risks than they otherwise ventures. The rating model should would. This is because the b. It is often seen as capture both systemic risk and owner of the business entity difficult for start-ups unsystemic risk. The systemic benefits fully from any addi- to satisfy bank re- risk means the risk emanating tional returns when the firm quirements, in terms from general political envi- is liquidated. This is known as of demonstrating ronment, change in economic experience in indus- Identification moral hazard. When a busi- policies, fiscal policies of the of risk should ness entity is a proprietorship try, meeting mini- government and infrastructur- occur with or partnership concern and mum equity stake al changes whereas unsystemic the people the liability of the owner is and having in place risk arises out of mainly inter- and experts unlimited, owners may be less contracts for sale to nal factors such as machinery where the prone to moral hazard because support the business breakdown, labour strike, new domain the owner may suffer loss in plans. competitors, etc. knowledge the event of liquidation. c. Personnel with spe- resides Where information asym- cialised skill sets are Enterprise Wide Risk metry and moral hazards are some times neces- Management prevalent, business entities sary to understand Enterprise Wide Risk are likely to fund themselves the risks inherent Management is the latest trend primarily from retained earn- with particular new and buzzword for an overall ings and then only through ventures. The banks, approach of the management bank debt rather than through particularly the PSU of risk as a whole in the busi- public equity. Nevertheless, banks, do not neces- ness. All business entities accu- among the SMEs switching sarily have such staff mulate resources viz. men, ma- between banks is not a wide- strength. terial, money, technology, etc. spread phenomenon. Consequently there is a and invest them in activities distinct reluctance by banks to which are uncertain and hence (j) Reluctance of Lending To lend to ventures not compre- fraught with various kinds of SMEs hended completely on tech- risks. As whole is always big- The reluctance of lending nical aspects and the exposed ger than sum of its parts, en- to SMEs may be on account risks not fully understood by terprise wide risk management of the following. the bank employees. should be attempted instead (i) Stemming from concerns of adopting silo-approach and about risk and in turn, the Risk Identification handling risk of one issue, in responsibilities of banks Identification of risk isolation and exclusion of other towards its stakehold- should occur with the people functions. ers such as sharehold- and experts where the domain EWRM is a process ers, deposit holders and knowledge resides. Identifica- through which a business en- regulators, the banks do tion of business process is the tity optimises the manner in 534 The Chartered Accountant October 2005
  • 6.
    which it takesrisks. It is not the perspective of SME sec- The Business Contingen- seeking or avoiding risk, but tors, Basel II should be viewed cy Plan and procedures should optimising the risk. Hence as a positive development, as it be properly documented, cov- putting in place an EWRM promotes alignment of interest ering the critical business pro- makes good business sense. rates with true economic cost. cess, functions and procedures Any successful implementa- to be followed and the related tion of EWRM framework Business Contingency database should be duly pro- needs to take into consider- Plan tected with a back up facility ation the integration of En- A study reveals that dur- and kept in an offsite storage terprise Resource Planning ing the past two decades, location. The LCMT shall system (ERP) so as to effec- nearly 80 per cent of the or- evolve Resumption Strategy tively manage the risk across by which the resumption pro- ganisations that lacked busi- the organisation facilitating cess either at the company’s ness contingency plan and the integration of the various premises or at an alternative roles to manage the same ef- suffered catastrophic loss of property, records, customer location is ensured so that ficiently. normal business operations In the light of advance- loyalty, skilled and trained workforce, cash flow, etc. were are carried out. The Resump- ment in information technol- tion Strategy may include ogy, power of computation gone within a couple of years Every busi- of the incident, despite many work backlog, critical func- and sophistication of risk tions, work prioritisation and ness entity, analysis on interest rate, mar- of them having had business particularly interruption coverage insur- formation of communication ket fluctuations, availability center. the SMEs, of extensive database as well ance policy. needs to as information flow, the scope Every business entity, have Busi- particularly the SMEs, needs Conclusion for putting in place an enter- ness Con- to have Business Continu- Functions of risk man- prise wide risk management tinuity and framework has become more a ity and Business Contin- agement should actually be Business necessity than a luxury for all gency Plan (BCBCP). It is the entity specific, dictated Contingency the business enterprises. a complex exercise involving by the size and quality of the balance sheet, complexity of Plan (BCB- a number of stages and dis- functions, technical/profes- CP). It is a Basel II and SME Sector crete activities. In this regard, sional manpower and the complex ex- Under the new Capital a Local Crises Management Accord, popularly known as status of Management Infor- ercise involv- Team (LCMT), a core group Basel II, the regulatory capital mation System in place. Any ing a number consisting of senior manage- is more closely associated with risk management model is as of stages ment personnel shall be con- risk implying that lending to good as the data input. and discrete stituted to formulate strate- lower risk borrowers will at- In the present scenario, activities gies and take decisions in the where profits are derived tract lower capital require- event of business interrup- ments. Those banks which mainly from trading in the tion. Further, a second line market, one can no longer af- are likely to employ IRB ap- Departmental Representative proach should be better placed ford to avoid measuring risk Group (DRG), comprising and managing its implica- to avoid over-pricing good senior line management from risks and under pricing bad tions thereof. To the extent across the business organi- the SME entity takes risk risks. By deduction, it means sation, shall be constituted. that there may be some mi- consciously, anticipates ad- Its role, besides assisting the verse change and hedges ac- gration of higher risk SME Local Crises Management cordingly, it becomes a source loans to those banks which do not adopt IRB approach and Team, is to assess the busi- of competitive advantage as which the banks, by implica- ness impact of the interrup- it can offer its products at a tion, rely on less sophisticated tion on their client base and better price than its com- and more standardised mea- business areas. In addition, petitors. What can be mea- sures of risk. a Contingency Plan Co-or- sured can also be managed. It Any enhanced sensitivity dinator shall be appointed should be clearly understood of regulatory capital require- with certain responsibilities that risk mitigation efforts ments to risk may be doing and rights so that both the are more important and vital nothing more than aligning LCMT & DRG meets regu- than capital allocation against the regulatory environment larly and initiate the requisite inadequate risk management with current practice. From action plan. system. October 2005 The Chartered Accountant 535