Chandan Ray has over 6 years of experience as a Senior Engineer at Praj Industries Limited. He has extensive experience in project engineering, electrical and instrumentation, erection and commissioning of plants in various industries. Some of his responsibilities include project execution, PLC/DCS programming and commissioning, site acceptance testing, and providing on-site support. He has international experience working on projects in Africa, Asia, South America, and the Middle East.
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
20 years of Extensive experience in design, Specification preparation, P&ID layout, Testing, installation and commissioning of Electrical and Instrumentation system for offshore/onshore in renewable Ocean energy and desalination applications.
Experienced in onshore and offshore operations and maintenance in addition to the data collection and performance analysis. Projects in which I have experience are listed in CV.
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
20 years of Extensive experience in design, Specification preparation, P&ID layout, Testing, installation and commissioning of Electrical and Instrumentation system for offshore/onshore in renewable Ocean energy and desalination applications.
Experienced in onshore and offshore operations and maintenance in addition to the data collection and performance analysis. Projects in which I have experience are listed in CV.
I possess over 24 years of rich experience in Project Management, Detail Engineering, Planning, Construction, Pre-commissioning, Commissioning, Operations and Maintenance of HVAC System, Oil & Gas /Power Plant / Refinery / Gas Power Plant / GIS / Transmission and Distribution Line from 11 KV to 400 KV /Process Plants, Upgrading of Electrical HV/MV/LV & HVAC Systems. I have successfully completed B.Tech. (Electrical Engineering) and Diploma in Electrical & Instrumentation Engineering.
Since last 13.7 years, I have been working electrical fields of industrial experience with GASCO UAE, Shell Pearl GTL Qatar. Aramco KSA, SEWA Sharjah, such 11KV to 400 KV substations, (GIS 33 KV to 220 KV) 5 KVA Upto120 MVA Transformer Erection installation, switch gears & Circuit breaker, as, LV, MV, HV, VCB, ACB, OCB, SF6, to 11 KV, 33 KV, 132 KV, 220 KV, installation Erection. Power & Control Cables termination, Grounding system, pre-commissioning & commissioning testing done other project
I possess over 24 years of rich experience in Project Management, Detail Engineering, Planning, Construction, Pre-commissioning, Commissioning, Operations and Maintenance of HVAC System, Oil & Gas /Power Plant / Refinery / Gas Power Plant / GIS / Transmission and Distribution Line from 11 KV to 400 KV /Process Plants, Upgrading of Electrical HV/MV/LV & HVAC Systems. I have successfully completed B.Tech. (Electrical Engineering) and Diploma in Electrical & Instrumentation Engineering.
Since last 13.7 years, I have been working electrical fields of industrial experience with GASCO UAE, Shell Pearl GTL Qatar. Aramco KSA, SEWA Sharjah, such 11KV to 400 KV substations, (GIS 33 KV to 220 KV) 5 KVA Upto120 MVA Transformer Erection installation, switch gears & Circuit breaker, as, LV, MV, HV, VCB, ACB, OCB, SF6, to 11 KV, 33 KV, 132 KV, 220 KV, installation Erection. Power & Control Cables termination, Grounding system, pre-commissioning & commissioning testing done other project
1. RESUME
Chandan Ray.
F/17,Astvinayak Colony
Ashoknagar,Satpur,
Nashik,
Maharashtra, India-422 012
Mobile No: +91 7767808802
Email:chandanray007@gmail.com
Skype ID:chandan00749
CAREER OBJECTIVE
To become an outstanding professional capable of constantly upgrading the skills and
capabilities by making valuable contribution in an organization.
PERSONAL EXPERIENCE
Designation: “SENIOR ENGINEER”
Employer Name: PRAJ INDUSTRIES LIMITED.
EXPERIENCE: From 6th July 2010 to Present.
A dynamic professional with 6 Year of rich and valuable experience in Project
Engineering, Electrical & Instrumentation,Erection and Commissioning of Electrical &
Instrumentation for Brewery,Ethanol,Distillery and Caustic Soda Plants,PLC
Troubleshooting, SCADA Troubleshooting,AC/DC and Servo Drive Programming &
Commissioning etc.
Project Execution from Enquiries handling till commissioning.
HMI, PLC application software commissioning and customer support.
Plant Site Acceptance Test and PGRT.
On Site Support for Electrical and Instrumentation Commissioning of various types of
Process (Batch and Continuous).
Calibration and Wiring connections of Instruments like Magnetic Flow Meters, temp
Transmitters, Actuated valves and Various Types of field instruments of all make.
Good Command Over different types of Engineering drawings like Control panel GA,
control system wiring diagram,MCC Wiring Drawings,Power Wiring Drawings etc.
Proficiency at grasping new technical concepts quickly and utilizing the same in a
productive manner.
“PRAJ INDUSTRIES LIMITED” A Public limited, Process technology & EPC company
strongly focus on Project of Ethanol, Distillery and Brewery and allied waste water
treatment and supplier of turnkey projects for automated- world class plants having
more than 300 references in 30 countries.
OCCUPATIONAL SCAN
Field Experience:-Hardware and Software.
Hands on Experience in Erection and Commissioning of Instrumentation and Electrical
of Distillery, Brewery and Ethanol Plants for International Projects.
Project coordination (E&I) and Pre commissioning,Start Up and Commissioning.
Loop check with respect of PLC/DCS/SCADA,Field Instrumentation and Electrical
panels.
Troubleshooting of control system and field instrumentation.
Hands On Programming and troubleshooting on Siemens Step 7,WinCC and Allen
Bradley control systems.
Root Cause Analysis of Site issue and troubleshooting,in Coordination with Engineering
Team If required.
2. Commissioning of Plant.
Plant start up,Plant stabilization.Operator training,Site Customer Meetings.
Plant handover.
Proficiency at grasping new technical concepts quickly and utilizing the same in a
productive manner.
Study of the Erection guidelines,Construction guidelines,different standards as per
project requirements.
Ability to handle team of 40 peoples in order to meet the Project deadlines and timely
completion.
KNOWLEDGE PREVIEW
Field Instrumentation:-Calibration of flow transmitter, calibration of level transmitter,
calibration of temperature transmitter, calibration of control valves, and calibration of
magnetic flow meters, concentration Analyzer, Gas detectors, Thermal mass flow meters of
all makes.
Instrumentation:-Cable lying, Cable routine, termination of field instruments,Wiring
Drawing, and JB schedule, Loop schedule, Loop checking, Interlock Checking.
Electrical:-MCC,PCC,VFD,Wiring Drawings,Electrical Cable schedule,Motor
Testing,Transformer Installations,HV and LV Installation and Testing.
Interfaces - Communication Network and Protocols: Profibus, Ethernet,HART,FF.
PLC:-Modicon,Siemens,Allen Bradley.
Programming Languages:-Ladder and FBD .
Troubleshooting and installation of electrical control panels.
Troubleshooting, customer supports, service,Erection & Commissioning
Customers include different industries such as Food & Breweries,Ethanol,Bio-
Ethanol,Distillery.
Good understanding of all Engineering document and drawings.
PROFESSIONAL PROJECTS CHRONOLOGY -INTERNATIONAL EXECUTIONS
Project 120HCL Brewery Plant on EPC Basis.
End User SAB Miller,Namibia.
Client: SAB Miller,Namibia.
System Details Supply on EPC basis including Electrical,Instrumentation and
Control System (S7-300,Step 7 ,WinCC,S88 Structure)
Project Process Malt handling Section,Brew House,Liquid Adjunct,Yeast
Section,Brew House CIP,Cellar CIP,Fermentation,Storage,Bright
BBT Section,Caustic Handling,Spent Grain Section.
Responsibilities Erection Of Instrumentation for all the sections,Erection Of MCC
and Electrical including HV and LV,Power Up for E&I,Loop
Check,Interlock Checks,Start Up,Commissioning,PGTR,Hand
Over,Troubleshooting,Client Meetings.
3. Project 220HCL Brewery Plant on EPC Basis.
End User Asia Pacific Breweries,Myanmar.
Client: Asia Pacific Breweries,Myanmar.
System Details Supply on EPC basis including Electrical,Instrumentation and
Control System (S7-300,Step 7 ,WinCC).
Project Process Malt handling Section,Brew House,Liquid Adjunct,Yeast
Section,Brew House CIP,Cellar CIP,Fermentation,Storage,Bright
BBT Section,Caustic Handling,Spent Grain Section.
Responsibilities Erection Of Instrumentation for all the sections,Erection Of MCC
and Electrical including HV and LV,Power Up for E&I,Loop
Check,Interlock Checks,Start Up,Commissioning,PGTR,Hand
Over,Troubleshooting,Client Meetings.
Project 40000 LPD Portable Grade Ethanol Plant.
End User SYN Japan Beverages Corporation Limited,Thailand.
Client: SYN Japan Beverages Corporation Limited,Thailand.
System Details Supply on EPC basis including Electrical,Instrumentation and
Control System (PCS7,Siemens).
Project Process Fermentation Section,Molases handling,Distillation
Section,Alcohol Storage Section.
Responsibilities Erection Of Instrumentation for all the sections,Erection Of MCC
and Electrical including HV and LV,Downloading Of Programs
and Testing of all the instruments from PLC ,Power Up for
E&I,Loop Check,Interlock Checks,Start
Up,Commissioning,PGTR,Hand Over,Troubleshooting,Client
Meetings.
Project 32% Commercial HCL Generation Plant.
End User NCP Chlorchem,South Africa.
Client: NCP Chlorchem,South Africa.
System Details Supply on Turnkey basis including Electrical,Instrumentation
and Control System (S7-300,Step 7 and WinCC).
Project Process HCL Handling Unit,HCL Burning Unit,HCL Absorption and HCL
Scrubbing Unit.
Responsibilities Erection Of Instrumentation for all the sections,Erection Of MCC
and Electrical,Power Up for E&I,Downloading Of Programs and
Testing of all the instruments from PLC (S7-300 Series,Step 7
and Win CC),Loop Check,Interlock Checks,Start
Up,Commissioning,PGTR,Hand Over.
4. Project Burner Management System.
End User Fluoder Paraguay,South America.
Client: Fluoder Paraguay,South America.
System Details Supply on Turnkey basis including Electrical,Instrumentation
and Control System (S7-300,Step 7 and WinCC)
Project Process Burner Management System For HCL Generation Unit.
Responsibilities Erection Of Instrumentation for all the sections,Erection Of MCC
and Electrical,Power Up for E&I,Downloading Of Programs and
Testing of all the instruments from PLC (S7-300 Series,Step 7
and Win CC),Loop Check,Interlock Checks,Start
Up,Commissioning,Performance Trial,Hand Over.
Project 32% Commercial HCL Generation Plant With Steam Generation.
End User PT Sulphindo,Indonesia.
Client: PT Sulphindo,Indonesia.
System Details Supply on Turnkey basis including Electrical,Instrumentation
and Control System (S7-300,Step 7 and WinCC)
Project Process HCL Handling Unit,HCL Burning Unit,HCL Absorption and HCL
Scrubbing Unit,Steam Generation Unit,Hot Water Unit.
Responsibilities Erection Of Instrumentation for all the sections,Erection Of MCC
and Electrical,Power Up for E&I,Downloading Of Programs and
Testing of all the instruments from PLC (S7-300 Series,Step 7
and Win CC),Loop Check,Interlock Checks,Start
Up,Commissioning,PGTR,Hand Over.
Project 32% Commercial HCL Generation Plant.
End User ASM Chemicals,Bangladesh.
Client: ASM Chemicals,Bangladesh.
System Details Supply on Turnkey basis including Electrical,Instrumentation
and Control System (S7-300,Step 7 and WinCC)
Project Process HCL Handling Unit,HCL Burning Unit,HCL Absorption and HCL
Scrubbing Unit,Steam Generation Unit,Hot Water Unit.
Responsibilities Erection Of Instrumentation for all the sections,Erection Of MCC
and Electrical,Power Up for E&I,Downloading Of Programs and
Testing of all the instruments from PLC (S7-300 Series,Step 7
and Win CC),Loop Check,Interlock Checks,Start
Up,Commissioning,PGTR,Hand Over.
5. Project 32% Commercial HCL Generation Plant.
End User Aditya Birla Chemicals,Thailand.
Client Aditya Birla Chemicals,Thailand.
System Details Supply on Turnkey basis including Electrical,Instrumentation
and Control System (Compact Logix,Panel View).
Project Process HCL Handling Unit,HCL Burning Unit,HCL Absorption and HCL
Scrubbing Unit.
Responsibilities Erection Of Instrumentation for all the sections,Erection Of MCC
and Electrical,Power Up for E&I,Downloading Of Programs and
Testing of all the instruments from PLC (S7-300 Series,Step 7
and Win CC),Loop Check,Interlock Checks,Start
Up,Commissioning,PGTR,Hand Over.
PROFESSIONAL PROJECTS CHRONOLOGY -DOMESTIC EXECUTIONS
Project 32% Commercial HCL Generation Plant.
End User Jayshree Chemicals,Orrisa.
Client Jayshree Chemicals,Orrisa.
System Details Supply on Turnkey basis including Electrical,Instrumentation
and Control System (S7-300,Step 7 and WinCC).
Project Process HCL Handling Unit,HCL Burning Unit,HCL Absorption and HCL
Scrubbing Unit.
Responsibilities Erection Of Instrumentation for all the sections,Erection Of MCC
and Electrical,Power Up for E&I,Downloading Of Programs and
Testing of all the instruments from PLC (S7-300 Series,Step 7
and Win CC),Loop Check,Interlock Checks,Start
Up,Commissioning,Hand Over.
Project H2SO4 Dilution and Cooling Unit.
End User Paradeep Phosphate,Orrisa.
Client: Paradeep Phosphate,Orrisa.
System Details Supply on Turnkey basis including Electrical,Instrumentation
and Control System (S7-300,Step 7 and WinCC).
Project Process H2SO4 Handling Unit,H2SO4 Dilution Unit,H2SO4 Cooling Unit.
Responsibilities Erection Of Instrumentation for all the sections,Erection Of MCC
and Electrical,Power Up for E&I,Downloading Of Programs and
Testing of all the instruments from PLC (S7-300 Series,Step 7
and Win CC),Loop Check,Interlock Checks,Start
6. Up,Commissioning,Hand Over.
EDUCATIONAL QUALIFICATIONS
COURSE INSTITUTION YEAR OF PASSING PERCENTAGE
B.E(I&C) PDVVP COE,Pravranagar. 2010 74.2%
10+2 Bhonsala Military College. 2006 72%
SSC Bidhan School 2004 70%
PERSONAL INFORMATION
Father’s name : Kamlesh Ray.
Date of Birth : 09 OCTOBER 1987.
Pass port Number &Validity : P2700847(DOE:20/06/2026).
Sex & Marital status : Male & Married.
Languages Known : English, Hindi,Bengali,Marathi.
Nationality & Religion : Indian & Hindu.
DECLARATION
I hereby declare that the above mentioned information is correct up to my knowledge and
I bear the responsibility for the correctness of the mentioned particulars.
PLACE: PUNE
DATE:11-09-2016 Chandan Ray.
Project Dry Gas Generation Unit.
End User Lanxess India Limited.
Client Lanxess India Limited,Gujarat.
System Details Supply on Turnkey basis including Electrical,Instrumentation
and Control System (S7-300,Step 7 and WinCC).
Project Process Distillation Section,CaCl2 Handling,Cacl2 Heating,HCL
generation,HCL Liquid Handling.
Responsibilities Erection Of Instrumentation for all the sections,Erection Of MCC
and Electrical,Power Up for E&I,Downloading Of Programs and
Testing of all the instruments from PLC (S7-300 Series,Step 7
and Win CC),Loop Check,Interlock Checks,Start
Up,Commissioning,Hand Over.