1. Resume
(C.V).
Name:YasserAbdul RahmanSayrafi
my NationalityisSaudi
Date of Birth:1969
UniversityQualification:Bachelorof electro-mechanical engineering
Languages:Arabic- English
Marital status:Married
Presentaddress:Medina
WorkingCurrent:ZuhairFayezOffice &AssociatesConsultingEngineers
Contact 966505363612
Email yazamaza@yahoo.com
Practical experiencesare summarizedin:
From the date 11/01/2001 to date
1-Work withZuhairFayez& CompanyConsultingEngineersMedina(ConsultantOfficeof
the Executive Committee forthe developmentof the cityof Medina) central region.
Employment:areviewof plansformechanical andelectrical work,aswell asthe
Departmentof MonitoringandAdvisoryCommittee office.
A - the studyof electrical drawingsforapproval fromthe Office of the Commissionforthe
implementationof projectsinthe central area.
B - the supervisionof some of the publicfacilitiesof the central areaof electrical worksin
termsof the establishmentof infrastructure forthe distributionnetworksandnetworksof
private roadsand lightingdetectionontheirownbusiness.
C - overseeingthe establishmentof anetworkof some specificphrasesthe central areaof
the electrical workandhandwork testsandtestsfor networklightingandElectrical Power
ferrybusiness.
D - overseeingthe implementationof some of the automaticcontrol of the phrasesinthe
central area networkbusinessafterstudyingthe chartsand putthe notesand work
schedulestocreate the network.
E - supervisionandfollow-upof the residential buildingsinthe central areaof electrical
worksand itscompatibilitywiththe operational plans,aswell asthe workof testsnecessary
to give a preliminarypermitforthe launchof the pilotandlasting power.
And- Coordinate withspecialistsSaudi ElectricityCompanywiththe supervisionand
managementof the projectinrespectof relatedbusinesses,aswell asthe supervisionof the
special extendedelectriccable tests.
2. Secondly,twoelementsof workingwithinaprojectsupervisionemirate buildingMedina
supervisionof the Departmentof Electrical Worksprojectteamworth$ 300 millionandis
to:
*Overseeingthe implementationof electrical worktothe projectintermsof the studyof
the approved plans,aswell asfollow-upworkandthe workof the testsand theirconformity
withthe specificationsof the project.
*Oversee the establishmentof the publicelectricitygridandgridlightingandelectrical
power.
*Follow-upandsupervisionof the networktocreate asystemanda fire alarmsystemfor
the studyof charts and studythe submissionsof the companiessuppliedtothe systemand
compliance withprojectspecifications.
*Supervisionandfollow-uponthe establishmentof anetworkof Central Telephone and
studythe submissionsmade andcompliancewiththe specificationsof the projectand
coordinationwiththe relevantauthorities.
*Supervisionandfollow-uptoestablishacomputernetworkandfollow-upactionswiththe
competentcontractorand workcoordinationwiththe relevantafterstudyingthe plansand
specificationsandadoption.
*Supervisionandfollow-uptocreate a systemanda networkof publicSalutation(Paging
System) aswell asthe surveillance networksystemacrossdistributedthroughoutthe
buildingbeamscirclesandstudyingthe submissionsfromthe relevantcompaniesandtheir
conformitywiththe specificationsof the projectandapproval.
*Supervisingthe establishmentof infrastructure forthe systemof antennasforwireless
devicesandthe workof theirownplansand coordinate withrelevantandstudythe
appropriate solutionsforthe implementationof the network.
*Follow-upelectrical workforthe establishmentandimplementationof fire suppression
systembycarbon dioxide .CO2rooms,electricity,telecommunicationsandequipment
roomsby studyingchartsand presentationsfromthe relevantcompaniesandthe system
workedexaminationsandtestsof the effectivenessof the system.
*Supervisionandfollow-uponthe establishmentof the implementationof the building
managementsystemandstudyschemesandbenefitsof implementingthe corporate
system, adoptionandworktestsnecessaryexaminationsandattendmeetingsand
coordinationwiththe relevant supervision andfollow-uponthe establishmentof unitsof
backuppower(generators),aswell asoverseeingthe creationandimplementationof the
elevatorsforthe projectmechanism.
*Supervisingthe groundingsystemandlightningprotectionandfollow upthe
implementationprocessandanalyze the results.
*Supervisionandfollow-uponthe establishmentof airconditioningunitsandcooling
project,as well asoverseeingthe implementationandinstallationof maindistribution
boardsand sub-workteststhe necessarytestsandalsothe processof connectingthe special
3. feedingprojectonACpowerand coordinationwiththe relevantauthoritiesthe main
transformers.
*Work dailyandmonthlyreportsonthe statusof the projectintermsof implementation
and measure the progressof workon schedule.
*Reviewthe CASownelectricityworkwiththe contractor,aswell asattendingmeetings
withthe kingand the contractor to discussthe progressmade bythe work.
*Reviewthe final plansforthe workof electrical networksand make sure theyconformto
reality,accordingtogeneral specificationsforthe project.
3-to work withinthe elementsof the projectsupervisionteamDardirectionhoteltrade
Madinahcentral area of supervisionof the Departmentof Electrical Worksprojectisworth
850 millionriyalsandare:
*Overseeingthe implementationof electrical worktothe projectintermsof studyingthe
charts and adoptionaswell asthe follow-upworkandthe workof examinationsandtests
and compliance withthe specificationsof the project
*Oversee the establishmentof the publicelectricitygridandgridlightingandelectrical
power.
*Follow-upandsupervisionof the networktocreate asystemanda fire alarmsystemfor
the studyof charts and studythe submissions of the companiessuppliedtothe systemand
compliance withprojectspecifications.
*Supervisionandfollow-uponthe establishmentof anetworkof Central Telephone and
studythe submissionsmade andcompliancewiththe specificationsof the projectand
coordinationwiththe relevantauthorities.
*Supervisionandfollow-uptoestablishacomputernetworkandinformationsystemsand
follow-upactionswiththe competentcontractorandworkcoordinationwiththe relevant
afterstudyingthe plansandspecificationsandadoption.
*Supervisionandfollow-uptocreate a systemanda networkof publicSalutation(Paging
System) aswell asthe surveillance networksystemacrossdistributedthroughoutthe
buildingbeamscirclesandstudyingthe submissionsfromthe relevantcompaniesandtheir
conformitywiththe specificationsof the projectandapproval.
*Follow-upelectrical workforthe establishmentandimplementationof fire suppression
systembyFM200 gas and CO2 rooms,electricity,telecommunicationsandequipmentrooms
by studyingchartsandpresentationsfromthe relevantcompaniesandthe systemworked
examinationsandtestsof the effectivenessof the system.
*Supervisionandfollow-uponthe implementationof the establishmentof BMSbuilding
managementsystemandstudyschemesandbenefitsof implementingthe corporate
system, adoptionandthe worknecessarytestsandexaminationsandattendmeetingsand
coordinationwiththe relevant
*supervistion andfollow-uponthe establishmentof abackuppower supplyunits
(generators)
4. *Supervisingthe groundingsystemandlightningprotectionandfollow upthe
implementationprocessandanalyze the results.
*Supervisionandfollow-uponthe establishmentof airconditioningunitsandcooling
project,as well as
*Overseeingthe implementationandinstallationof maindistributionboardsandsub-work
necessarytestsandexaminationsandalsolinkingthe maintransformerforfeedingthe
processof electrical energyandcoordinationwiththe relevantauthorities of the project.
*Work dailyandmonthlyreportsonthe statusof the projectintermsof implementation
and measure the progressof workon schedule.
*Reviewthe CASownelectricityworkwiththe contractor,aswell asattendingmeetings
withthe kingand the contractor to discussthe progressmade bythe work.
*Reviewthe final plansforthe workof electrical networksandmake sure theyconformto
reality,accordingtogeneral specificationsforthe project
4-workwithinthe elementsof the projectsupervisionteamtoDar neighboringresidential
social and leisure clubinknowledge Medinasupervisionof electrical worksdepartment
valuedthe projectamountedto200 millionriyals,andare:
*Overseeingthe implementationof electrical worktothe projectintermsof the studyof
the approvedplans,aswell asfollow-upworkandthe workof the testsand theirconformity
withthe specificationsof the project.
*Oversee the establishmentof the publicelectricitygridandgridlightingandelectrical
power.
*Follow-upandsupervisionof the establishmentof anetworksystemHOME SMART
SYSTEM.
*Supervisionandfollow-uponthe establishmentof airconditioningunitsandcooling
project,
worknecessarytestsandexaminations
*Work dailyandmonthlyreportsonthe statusof the projectintermsof implementation
and measure the progressof workon schedule.
*Reviewthe CASownelectricityworkwiththe contractor,aswell asattendingmeetings
withthe kingand the contractor to discussthe progressmade bythe work.
*Reviewthe final plansforthe workof electrical networksandmake sure theyconformto
reality,accordingtogeneral specificationsforthe project
5.workwithinthe elementsof the projectteamoverseeingthe establishmentof Housing
goodfacultymembersatthe Universityof supervisionof electrical worksdepartmentvalued
the projectamountedto850 millionriyals,andare:
5. *Overseeingthe implementationof electrical worktothe projectin termsof the studyof
the approvedplans,aswell asfollow-upworkandthe workof the testsand theirconformity
withthe specificationsof the project.
*Oversee the establishmentof the publicelectricitygridandgridlightingandpower
Alkahrbah.lkamilsite andbuildingsandvillas
*Follow-upandsupervisionof the networktocreate asystemanda fire alarmsystemfor
the studyof charts and studythe submissionsof the companiessuppliedtothe systemand
compliance withprojectspecifications.
*Supervisionandfollow-uponpublic communicationsandinformationsystemsforthe
entire campuswithstudysubmissionssubmittedincompliancewiththe specificationsof the
projectand coordinationwiththe relevantauthorities.
*Supervisionandfollow-uptoestablishacomputernetworkforthe grovesandvillasand
follow-upactionswiththe competentcontractorandworkcoordinationwiththe relevant
afterstudyingthe plansandspecificationsandadoption.
*Follow-upelectrical workforthe establishmentandimplementationof fire suppression
systembyFM200 gas and carbon dioxidegas.CO2roomselectrical equipmentbystudying
charts and presentationsbythe competentcorporate systemandthe workof the
examinationsandtestsof the effectivenessof the system.
*Supervisionandfollow-uponthe establishmentof the implementationof the building
managementsystemandstudyschemesandbenefitsof implementingthe corporate
system, adoptionandworktestsnecessaryexaminationsandattendmeetingsand
coordinationwiththe relevant andfollow-uponthe establishmentof unitsof backuppower
(generators),aswell asoverseeingthe creationandimplementationof the elevatorsforthe
projectmechanism.
*Supervisingthe groundingsystemandlightning protectionandfollow upthe
implementationprocessandanalyze the results.
*Supervisionandfollow-uponthe establishmentof airconditioningunitsandcooling
project,as well asoverseeingthe implementationandinstallationof maindistribution
boardsand sub-workteststhe necessarytestsandalsothe processof connectingthe special
feedingprojectonACpowerand coordinationwiththe relevantauthoritiesthe main
transformers.
*Work dailyandmonthlyreportsonthe statusof the projectintermsof implementation
and measure the progressof workon schedule.
*Reviewthe CASownelectricityworkwiththe contractor,aswell asattendingmeetings
withthe kingand the contractor to discussthe progressmade bythe work.
*
Reviewthe final plansforthe businesssystemsandelectrical networksandmake sure they
conformto reality,accordingtogeneral specificationsforthe project
From the date of 25/7/1995 to date 31/10/2001
Work ArabianIndustrial FibersTelevision(IbnRushd),YanbuIndustrial
6. Employment:Workinthe fieldof maintenance of the plantinthe electricitydepartmentand
the businessisasfollows:
A - runand findoutfaultsand repaircontrollersandoperationof electrical equipmentwhich
are poweredbythe electroniccontrol devices(MMC) primarycontrol circuit.
B - operationandtroubleshootingandmaintenance of cuttingelectrical circuitsthatare
poweredby(SF6devices) andworkinghard(43.5 / 13.8 / 3.3; KV) kV.
C - operationandmaintenance of units(UPS) backuppower unitscontrolledfeeding
systems.
D - operationandmaintenance of systemunitsforgeneratorsspare capacityof 6 MW effort
(3.3) kV.
E - operation,maintenance andtroubleshootingairconditioningunitsandcoolingmostof
the stingsand types.
And- official workof the initial andfinal forthe constructionof manufacturingunitsof raw
materialsforthe factorytestteam.
G - Memberof the Committee primarydeliverytofactoriesforthe manufacture of raw
materialsforthe productin the electrical departmentandmake the necessarytests.
H - detectmalfunctions,maintenance andrepairof both:
1-networkdevicesandautomatedtelephone exchange.
2-improvingthe electrical powerfactordevices
3-Lightingand Electrical Powerplant-specificsystems.
4-control the playbackof differentspeedscontrol equipment(MOTORINVERT.)
5-unitsand cranes,whichare poweredbyelectricity.
6-Private convertselectrical loadsautomaticallydevices.
7-PublicSpeakinganddevicestotalk(paging.)
8-fire detectionsystem
From the date 06/06/1995 to date 07/22/1995 AD
Workingfor Al-Gosaibicompanyformaintenanceandoperationof industrial Yanbu
Employmentinthe following:
1-general supervisorof the maintenance of airconditioningunitsandbusiness affiliate and
the work of the special preventive andgeneralmaintenance schedules.
2-the architectof a teamof maintenance andoperationof publicutilitiesforthe Royal
CommissioninYanbuIndustrial Cityandworkeddailyreportsandoperationalstep and
expense of operatinghoursandthe expenseof the workforce anddistributionassistant.
7. 3-general maintenance of airconditioningunitsbyicedwaterandthe subsequentair
handlingunits
Maintenance of air conditionersandequipmentshopsinthe central liabilityof the Royal
CommissioninYanbuIndustrial City.
From the date 08/04/1988 to date 01/07/1995 AD
Workingat a factory Medical Solutions(PSI)inJeddahprovince
Employmentinthe following:
1-faultdetectionandmaintenance unitsicingwaterforair-cooled.
2-maintenance of all electromechanical works.
3-Create storesand warehousesrefrigeratedandinsulatedtosave medical solutions
inside.
4-disclosure of all breakdownsandmaintenance of machinesforcompletingthe medical
plasticsmanufacturingsolutions.
5-general maintenance of all plant-specificstorage,electrical works.
trainingcourses:
1-house centerof expertise fromthe date of 15/08/1415 AH-to-date 05/12/1415 e
Course incomputerand software forthe computer torun.
2-syntheticfibersplant(IbnRushd) fromthe date of 17.03.1999 AD-to-date 31/04/1999 m.
Course inthe SecurityandSafetySectionforthe factory forcedcontrol plan.
3-ArabianIndustrial FibersCompanyinthe historyof 05.02.1996 AD
Nazimlogical course inElectrical Control Circuits
(Programlogiccontrol PLC)
4-ArabianIndustrial FibersCompany(IbnRushd)inthe historyof 08.01.1995 AD
5-Ama traininginthe historyof 08.25.1999 AD
Course inthe general maintenance of the electricity.
6-Ama traininginthe historyof 05.12.2000 AD
Course inthe maintenance andrepairof electrical transformers
7-ITC (ATC) control systemsandbuildingmanagementinthe historyof 23.08.2003 AD
Course inbuildingmanagementsystembyelectroniccircuits.
8-initial medical instituteinthe historyof 15.07.2001 AD
8. A firstaidcourse.
9-Abu company'sintentioninthe historyof 01.16.2004 AD
Course inelectricityfeedingsystembyinsulatedcopperbars(Malaysia)
11-Englishlanguage course TOEFLeighthstage level Advanceddated10/10/1995 AD
11-a course in electrical control,maintenanceandrepairdepartments.
12-A trainingcourse inelectrical engineeringandindustrialtechnologyforthe application
of modernelectricityfields.
13-A trainingcourse intheirownelectrical motordrivenmaintenance andoperating
speedschanging.
14-A trainingcourse inthe operationandmaintenance of motors,whichare poweredby
the ongoingelectricity.
15-A trainingcourse inthe operation, maintenance andrepairof electrical generators.
16-A trainingcourse inplantandoperatingprinciplesengineering.
17-a course in drivingforkliftsandlighttrucks.
18-a course in security,safetyandfire fightingbythe fire extinguishersandalternatives.
19-a course in security,safetyandfire control appliedandthe use of control means.
21-a course in securityandsafetyandthe typesof burningmaterialsandtoxicgases.
21-a course in security,safetyandevacuationplancollective Site