SlideShare a Scribd company logo
1 of 4
Applied Position Electrical Engineer (E&I)
Notice period Immediate
Personal Data
Name : Chan Mye Tun
NRIC (Singapore PR) : S7366531J
Date of Birth : 18, June, 1973
Sex / Marital Status : Male / Single
Nationality / Religion : Myanmar / Buddhist
E-mail : chanmyetun.mm@gmail.com
Mobile phone No : 91800370
Address : Blk 979 Jurong west St 93, #03-337
Singapore 640979
Education
(1) Bachelor of Engineering (Honours) (Electrical & Electronics)
University of Hertfordshire (UK) 2009-2010
(2) Advanced Diploma in Process Control and Instrumentation
Singapore Polytechnic (Singapore) 2006-2007
(3) Bachelor of Science (Physics) of Undergraduate of Third Year
University of Distance Education, Yangon (Myanmar) 1997-2001
(4) Diploma in Electronics and Communication Engineering
Mandalay Government Technical Institute (Myanmar) 1993-1995
Work Experience
(1) Feb/2013- May/2014
Position : Assistant Service Engineer
Employer : Junma Services Pte Ltd (Singapore)
Business : Instrumentation & Control Equipment Sale & Service
Experience
 Installation, Maintenance, Troubleshooting, Repairing and Servicing of
Marine Automation System.
(2) Feb/2011- Dec/2012
 Assist to run family trading business in Myanmar.
(3) Aug/2001- February/2011
Position : E&I Supervisor / E&I Technician / E&I Electrician
Employer : Wartsila Pte Ltd (Singapore) & Total Automation (S) Pte Ltd
Business : Electrical, Instrumentation & Control Equipment Sale & Service
Experience
 Calibration and Servicing of Instruments such as Gauge, Indicator, Switch,
Transmitter, Converter for( Pressure, Temperature, Level, Flow), Control Valves,
Actuators, Motor, Pump and E&I equipments…etc.
 E&I Installation according to P&ID, Cable Schedule, Single line diagram, Inter
connection diagrams, Electrical control diagrams, As-built drawing, Instrument
hook-up drawing and other E&I engineering drawing including Pneumatic &
Hydraulic Systems, Control and Instrumentation with Fitting, Accessories,
Components and Estimate of Materials.
 Paper work for Calibration Certificate, QA/QC Inspection Test Record, Daily
Report, Service Report, Progress Analysis, Check sheets, Drawing Update and
High-lighting areas of concern etc.
 Pre-Commissioning (loop Check) and Commissioning of Marine and Offshore
Automation System of Power Generation, HV/MV/LV Switchgears, LP/LVS,
CCTV, LAN, PAGA, PABX, F&G, AMS, GDS, ESD, HIFOG, ICCP, HVAC, VMS,
ODME, OWS, IGS, DCS, WTDS, DP, Azimuth, Bow& Stern Thrusters Control,
Bow Loading Systems and Other system on following projects.
Name Type Duration
- White Tiger Platform (Offshore Module) (6 months project)
- MV Acapulco (Kongsberg-D.P Tanker) (3 months project)
- MV Cartola (Kongsberg-D.P Tanker) (3 months project)
- Saipem 3000 (Kongsberg-D.P Heavy Lift Vessel)(11 months project)
- Balal Platform (Offshore Module) (2 months project)
- Power Seraya (Power Process plant) (Shut down maintained)
- Half Dan Platform (Offshore Module) (4 months project)
- NUTEK (PLC Conveyor Manufacturer) ( 6 months )
- Dan-FG Platform (Offshore Module) (12 months project)
- Oxy Platform (Offshore Module) ( 2 months project)
- Bon Kong Platform (Offshore Module) ( 8 months project)
- Alvin (D.P FPSO) ( 3 months project)
- Neptune Discoverer (Drilling Ship) ( 2 months project)
- Star Cruise (D.P Passenger Ship) (1 months maintained)
- Patogoyo (FPSO) ( 8 months project)
- BW NASA (Tanker Ship) ( 3 months project)
- Sanofi Aventis (Pharmacy Process plant) ( Shut down maintained)
- BW Enterprise (FPSO) ( 3 months project)
- Polvo (FPSO) ( 2 months project)
- Frontier Discoverer (Drilling Ship) (10 months project)
- Frontier Phoenix (Kongsberg-DP Drilling Ship) (10 months project)
- Bully-1 (Kongsberg-DP Drilling Ship) (11 months project)
- Bully-2 (Kongsberg-DP Drilling Ship) ( 3 months project)
Actually I had been staying in Singapore for about 10 years (Aug 2001 to Feb 2011)
continuously working in one company. My ex-employer, Total automation Pte Ltd
was bought over by Wartsila Pte Ltd and we were under Wartsila. So I can say
that above mentioned carrier item 3 are in a company.
Reference:
Mr. Fun Hua Group Manager Wartsila
Mr. Soh hee Yeow Manager Total Automation / Wartsila
(4) Oct/1997- May/2001
Position : Project & Service Engineer
Employer : Standard Electrical Neon Service (S) Pte Ltd
Business : Electrical Neon Service
Experience
 Design, Estimate of Materials and Cost for Electrical Installation and Neon Bill
Board.
 Electrical Installation including of Insulation Earth Continuity, Expose/ Conceal
G.I/ PVC conduct / Main Power Supply/ Magnetic Relay Breaker / Timer /
Control Circuit/ High Voltage transformer / Neon tubes…etc.
 Troubleshooting and attend to Breakdown.
Reference:
Mr. Richard Tan Director
Mr. David Chong Manager
(5) April/1996- Sep/1997
Position : Service Engineer
Employer : Main Point Copier Service (Myanmar)
Business : Copier Electronic Control Circuits Service
Experience
 Troubleshooting of Error Code and Fault Finding.
 Troubleshooting and Repairing of Electronics Circuits Board (PCB). (Such as
AC~DC power supply, motor controller, high voltage generator, lamp
regulator, Panel Display& other electronic PCB.
 Overhaul Servicing of Mechanical and Electrical Parts of Whole Copier
Machine.
Reference
Mr. Pyi Soe Managing Director
Skill Course Summary
Computer Course
1. Basic Computer Course
2. MS Windows & Office Application Course
3. MS Office (Adv Excel) Application Course
4. Engineering Drawing Course (Auto CAD –Release 13)
5. Engineering Drawing Course (Auto CAD –2006)(S’pore Polytechnic)
HSE Course
1. Gas Carrier, Fire Watch, Fire Prevention & Control Course (SS ,S’pore)
2. Rigging/Material Handling Course (ITE, Singapore)
3. Signaling /Rigger Course (Tat Hong, Singapore)
4. Signaling /Rigger Course ( NTUC, Singapore)
5. Basic Safety Training (Personal Survival Techniques)(S’pore Polytechnic)
6. Shipyard Safety Supervisor Course (NTUC, S‘pore)
E & I Course
1. Electrical Control Technology Course
2. Pneumatics & Electro-Pneumatics Course
3. Programmable Logic Control (Omron)
4. Programmable Logic Control (SIEMANS S7)
5. Programmable Logic Control (AB, Delta)
6. Advanced PLC(HMI) & SCASA Course
Chan Mye Tun -CV

More Related Content

Viewers also liked (11)

INTERNET EN LA EDUCACION
INTERNET EN LA EDUCACIONINTERNET EN LA EDUCACION
INTERNET EN LA EDUCACION
 
гарбар максим
гарбар максимгарбар максим
гарбар максим
 
Partial ORACLE TREASURY
Partial ORACLE TREASURYPartial ORACLE TREASURY
Partial ORACLE TREASURY
 
CatalogoA.Moschi
CatalogoA.MoschiCatalogoA.Moschi
CatalogoA.Moschi
 
Bienvenida al año escolar 2016
Bienvenida al año escolar 2016Bienvenida al año escolar 2016
Bienvenida al año escolar 2016
 
Basic Training Raj Sons
Basic Training Raj SonsBasic Training Raj Sons
Basic Training Raj Sons
 
Opioid analgesics
Opioid analgesicsOpioid analgesics
Opioid analgesics
 
DB Healthcare IT - Client Presentation
DB Healthcare IT - Client PresentationDB Healthcare IT - Client Presentation
DB Healthcare IT - Client Presentation
 
Leslie resume
Leslie resume Leslie resume
Leslie resume
 
coal handling plant
coal handling plantcoal handling plant
coal handling plant
 
Compartments of the head and neck /certified fixed orthodontic courses by I...
Compartments of the head and neck   /certified fixed orthodontic courses by I...Compartments of the head and neck   /certified fixed orthodontic courses by I...
Compartments of the head and neck /certified fixed orthodontic courses by I...
 

Similar to Chan Mye Tun -CV (20)

Somchai J.(2015)r8
Somchai J.(2015)r8Somchai J.(2015)r8
Somchai J.(2015)r8
 
Marlon Maisog CV GE 1
Marlon Maisog CV GE 1Marlon Maisog CV GE 1
Marlon Maisog CV GE 1
 
Somchai J.'s CV_2016
Somchai J.'s CV_2016Somchai J.'s CV_2016
Somchai J.'s CV_2016
 
Somchai J.'s CV_2016 ++
Somchai J.'s CV_2016 ++Somchai J.'s CV_2016 ++
Somchai J.'s CV_2016 ++
 
Cv pisalsart and attach file
Cv pisalsart and attach fileCv pisalsart and attach file
Cv pisalsart and attach file
 
CV AJ Seager 29 Sept 16
CV AJ Seager 29 Sept 16CV AJ Seager 29 Sept 16
CV AJ Seager 29 Sept 16
 
CV AJ Seager 29 Sept 16
CV AJ Seager 29 Sept 16CV AJ Seager 29 Sept 16
CV AJ Seager 29 Sept 16
 
ELE_Barba, Cristino January 23 2016
ELE_Barba, Cristino January 23 2016ELE_Barba, Cristino January 23 2016
ELE_Barba, Cristino January 23 2016
 
RESUME Phoonsak Rieamrat_2016
RESUME Phoonsak Rieamrat_2016RESUME Phoonsak Rieamrat_2016
RESUME Phoonsak Rieamrat_2016
 
MY CV feb 2016
MY CV feb 2016MY CV feb 2016
MY CV feb 2016
 
Craig Sharples - CV - Stonus Ltd
Craig Sharples - CV - Stonus LtdCraig Sharples - CV - Stonus Ltd
Craig Sharples - CV - Stonus Ltd
 
jragojo CV
jragojo CVjragojo CV
jragojo CV
 
Ferdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CVFerdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CV
 
BAB PENTECOSTES(RESUME)
BAB PENTECOSTES(RESUME)BAB PENTECOSTES(RESUME)
BAB PENTECOSTES(RESUME)
 
Ekachai_ResumeRev05
Ekachai_ResumeRev05Ekachai_ResumeRev05
Ekachai_ResumeRev05
 
Sr.Planning Engineer - Tarek Abdelaziz's C.V.
Sr.Planning Engineer - Tarek Abdelaziz's C.V.Sr.Planning Engineer - Tarek Abdelaziz's C.V.
Sr.Planning Engineer - Tarek Abdelaziz's C.V.
 
Cv noor ali syarifudin
Cv noor ali syarifudinCv noor ali syarifudin
Cv noor ali syarifudin
 
cv_Abadi (Update)
cv_Abadi (Update)cv_Abadi (Update)
cv_Abadi (Update)
 
jey new resume
jey new resumejey new resume
jey new resume
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineer
 

Chan Mye Tun -CV

  • 1. Applied Position Electrical Engineer (E&I) Notice period Immediate Personal Data Name : Chan Mye Tun NRIC (Singapore PR) : S7366531J Date of Birth : 18, June, 1973 Sex / Marital Status : Male / Single Nationality / Religion : Myanmar / Buddhist E-mail : chanmyetun.mm@gmail.com Mobile phone No : 91800370 Address : Blk 979 Jurong west St 93, #03-337 Singapore 640979 Education (1) Bachelor of Engineering (Honours) (Electrical & Electronics) University of Hertfordshire (UK) 2009-2010 (2) Advanced Diploma in Process Control and Instrumentation Singapore Polytechnic (Singapore) 2006-2007 (3) Bachelor of Science (Physics) of Undergraduate of Third Year University of Distance Education, Yangon (Myanmar) 1997-2001 (4) Diploma in Electronics and Communication Engineering Mandalay Government Technical Institute (Myanmar) 1993-1995 Work Experience (1) Feb/2013- May/2014 Position : Assistant Service Engineer Employer : Junma Services Pte Ltd (Singapore) Business : Instrumentation & Control Equipment Sale & Service Experience  Installation, Maintenance, Troubleshooting, Repairing and Servicing of Marine Automation System. (2) Feb/2011- Dec/2012  Assist to run family trading business in Myanmar. (3) Aug/2001- February/2011 Position : E&I Supervisor / E&I Technician / E&I Electrician Employer : Wartsila Pte Ltd (Singapore) & Total Automation (S) Pte Ltd Business : Electrical, Instrumentation & Control Equipment Sale & Service Experience  Calibration and Servicing of Instruments such as Gauge, Indicator, Switch, Transmitter, Converter for( Pressure, Temperature, Level, Flow), Control Valves, Actuators, Motor, Pump and E&I equipments…etc.  E&I Installation according to P&ID, Cable Schedule, Single line diagram, Inter connection diagrams, Electrical control diagrams, As-built drawing, Instrument hook-up drawing and other E&I engineering drawing including Pneumatic &
  • 2. Hydraulic Systems, Control and Instrumentation with Fitting, Accessories, Components and Estimate of Materials.  Paper work for Calibration Certificate, QA/QC Inspection Test Record, Daily Report, Service Report, Progress Analysis, Check sheets, Drawing Update and High-lighting areas of concern etc.  Pre-Commissioning (loop Check) and Commissioning of Marine and Offshore Automation System of Power Generation, HV/MV/LV Switchgears, LP/LVS, CCTV, LAN, PAGA, PABX, F&G, AMS, GDS, ESD, HIFOG, ICCP, HVAC, VMS, ODME, OWS, IGS, DCS, WTDS, DP, Azimuth, Bow& Stern Thrusters Control, Bow Loading Systems and Other system on following projects. Name Type Duration - White Tiger Platform (Offshore Module) (6 months project) - MV Acapulco (Kongsberg-D.P Tanker) (3 months project) - MV Cartola (Kongsberg-D.P Tanker) (3 months project) - Saipem 3000 (Kongsberg-D.P Heavy Lift Vessel)(11 months project) - Balal Platform (Offshore Module) (2 months project) - Power Seraya (Power Process plant) (Shut down maintained) - Half Dan Platform (Offshore Module) (4 months project) - NUTEK (PLC Conveyor Manufacturer) ( 6 months ) - Dan-FG Platform (Offshore Module) (12 months project) - Oxy Platform (Offshore Module) ( 2 months project) - Bon Kong Platform (Offshore Module) ( 8 months project) - Alvin (D.P FPSO) ( 3 months project) - Neptune Discoverer (Drilling Ship) ( 2 months project) - Star Cruise (D.P Passenger Ship) (1 months maintained) - Patogoyo (FPSO) ( 8 months project) - BW NASA (Tanker Ship) ( 3 months project) - Sanofi Aventis (Pharmacy Process plant) ( Shut down maintained) - BW Enterprise (FPSO) ( 3 months project) - Polvo (FPSO) ( 2 months project) - Frontier Discoverer (Drilling Ship) (10 months project) - Frontier Phoenix (Kongsberg-DP Drilling Ship) (10 months project) - Bully-1 (Kongsberg-DP Drilling Ship) (11 months project) - Bully-2 (Kongsberg-DP Drilling Ship) ( 3 months project) Actually I had been staying in Singapore for about 10 years (Aug 2001 to Feb 2011) continuously working in one company. My ex-employer, Total automation Pte Ltd was bought over by Wartsila Pte Ltd and we were under Wartsila. So I can say that above mentioned carrier item 3 are in a company. Reference: Mr. Fun Hua Group Manager Wartsila Mr. Soh hee Yeow Manager Total Automation / Wartsila (4) Oct/1997- May/2001 Position : Project & Service Engineer Employer : Standard Electrical Neon Service (S) Pte Ltd Business : Electrical Neon Service Experience
  • 3.  Design, Estimate of Materials and Cost for Electrical Installation and Neon Bill Board.  Electrical Installation including of Insulation Earth Continuity, Expose/ Conceal G.I/ PVC conduct / Main Power Supply/ Magnetic Relay Breaker / Timer / Control Circuit/ High Voltage transformer / Neon tubes…etc.  Troubleshooting and attend to Breakdown. Reference: Mr. Richard Tan Director Mr. David Chong Manager (5) April/1996- Sep/1997 Position : Service Engineer Employer : Main Point Copier Service (Myanmar) Business : Copier Electronic Control Circuits Service Experience  Troubleshooting of Error Code and Fault Finding.  Troubleshooting and Repairing of Electronics Circuits Board (PCB). (Such as AC~DC power supply, motor controller, high voltage generator, lamp regulator, Panel Display& other electronic PCB.  Overhaul Servicing of Mechanical and Electrical Parts of Whole Copier Machine. Reference Mr. Pyi Soe Managing Director Skill Course Summary Computer Course 1. Basic Computer Course 2. MS Windows & Office Application Course 3. MS Office (Adv Excel) Application Course 4. Engineering Drawing Course (Auto CAD –Release 13) 5. Engineering Drawing Course (Auto CAD –2006)(S’pore Polytechnic) HSE Course 1. Gas Carrier, Fire Watch, Fire Prevention & Control Course (SS ,S’pore) 2. Rigging/Material Handling Course (ITE, Singapore) 3. Signaling /Rigger Course (Tat Hong, Singapore) 4. Signaling /Rigger Course ( NTUC, Singapore) 5. Basic Safety Training (Personal Survival Techniques)(S’pore Polytechnic) 6. Shipyard Safety Supervisor Course (NTUC, S‘pore) E & I Course 1. Electrical Control Technology Course 2. Pneumatics & Electro-Pneumatics Course 3. Programmable Logic Control (Omron) 4. Programmable Logic Control (SIEMANS S7) 5. Programmable Logic Control (AB, Delta) 6. Advanced PLC(HMI) & SCASA Course