SlideShare a Scribd company logo
RESUME
HARSH KUMAR
MECHANICAL ENGINEER
+91 8349995677
beingharsh14@gmail.com
Raigarh(C.G)
PROFESSIONAL OBJECTIVE
To work in highly professional, competitive and challenging work environment, while
contributing to the best of my abilities towards achieving the target given and
creating new bench marks for the positive growth and successful development of both
self & company.
Cherish to create and work along a dedicated team with pride dignity and honor.
sNAPSHOT
Power Professional with more than 5 years of cross-functional experience;
varying from Constructions, Procurement, commissioning and Project Management of
Power Plant capacity of 300MW.
CURRENT FUNCTIONAL AREA
Co-ordination, Management, Planning and Execution of Power Projects from inception to
Commissioning and its subsequent Operation and Maintenance.
EXPERIENCE
CETHAR LIMITED
Cethar, a 15000 MINR company, is one of the India’s leading manufacturer of Steam Generators &
Auxiliaries, Balance of Plant Equipment/System, EPC Contracting Company, having 7 nos. of state of
the art manufacturing facilities at Tiruchirapalli, Tamil Nadu, India, having successfully supplied about
1250 Boilers in India and Abroad.
CL is engaged into design, engineering, manufacturing, supply and installation of Steam Generators
(Boilers) upto Subcritical parameters and EPC Contracting of Power Plants up to unit Capacity of
350MW. Having certifications of ASME “S”, “U”, “PP” & NBBI – R Stamps.
Sr. Engineer
Nov 2012 – Till Date
@ 2 x 300MW SKS Power Generation (C.G) Ltd, Raigarh
 Execution, Planning & Co-ordination of site erection and
commission activity
 Supervised the commissioning activity of Water Treatment Plant &
Fire Fighting System.
 Supervised the various commissioning activity like Air-In-Leakage
test & Gas Distribution test of ESP, Trail run of Pumps, Primary Air
Fan, Induced Draft Fan, Forced Draft Fan & Chemical Cleaning of
Boiler.
 Coordinating between site, client & Cethar H.O regarding
procurement and engineering issues.
 Actively involved in site de-mobilization and handing over activity
of site to client.
 Involved in Scrap management.
 Involved in planning, Fabrication & erection activity of Water
system like DM Tank, water Treatment structure and its inter
connecting piping, gantry and pipe rack.
 Analyzing Technical Details of Drawing & Specifications of various
Erection equipments, Material Inspection and Material Handling,
Erection and Commissioning.
 Supervision of all fabrication & erection work under Safety
(OHSAS 18001) and Quality (ISO 9001) Standards.
 Actively involved in providing technical inputs for site procured
materials.
 Maintaining and resolving customer end issued NCR (Non
Conformance Record)
 Preparing NFA (Note for Approval), LOI (Letter of Intent) & Debit
Note.
 Maintaining records & requirement of Tools & Tackles.
 Preparing daily shift report including Manpower, Material planning,
Erection planning & updating the completion status to
management.
 Attending Technical discussion and Preparing MOM for weekly &
monthly review meetings plan and develop new methods to
improve the station Working Method for efficiency and reliability.
 Verifying erection and machinery bills.
 Good knowledge of operating of ERP.
GET
July 2011 - Oct 2012
@ 2 x 300MW SKS Power Generation (C.G) Ltd, Raigarh
 Planning for Plant Machineries required for the project.
 Plant & Machinery Maintenance - Planning and executing all
maintenance activities ,Scheduling Preventive Maintenance,
Periodical Maintenance, Routine Maintenance, Shut Down
Maintenance, Planned Maintenance, Break down Maintenance,
Breakdown analysis MTBR, MTTR.
 Planning for the Spare Parts Inventory management.
 Preparing and Analysis of Plant and Machinery and their Parts
History.
 Hiring of plant and Machineries-Finding Vendors, Inquiring,
finalizing vendor for hiring equipments and monitoring for effective
utilization, Billing, finalizing payment.
 De-hiring with prior notice.
 Manpower management.
 Installation & commissioning of machinery and plants (If required).
 Maintaining all plant & Machineries condition as per the safety
standards prescribed by client.
EDUCATION
Bachelor of Technology in Mechanical Engineering (2007-2011)
Bharath University, Chennai (T.N)
7.82 CGPA
PGDC in Auto CAD-Pro (2010)
CADDAM Technologies, Chennai
A-Grade
Pre University (2007)
St. Xavier’s High School, Muzaffarpur (Bihar)
60.66%
High School (2004)
St. Xavier’s High School, Muzaffarpur (Bihar)
60.66%
TRAININGS
 Undergone inplant training at CIPET,Chennai, India.
 Undergone inplant training at Bharat Wagon, Muzaffarpur, Bihar
IT FORTE
 Well versed with Operating systems like Windows XP, Vista, 2007, 08, 10 and MS Office.
CONTACT DETAILS
Father’s Name : Bibhuti Prasad
Date of Birth : 15th
August 1989
Linguistic Abilities : English and Hindi
Nationality : Indian
Sex : Male
Marital status : Married
Passport : K0633039
Permanent Address : Bank Colony (Near Hanuman Mandir)
Nazirpur, Akharaghat,
Muzaffarpur, Bihar- 842 002
Present Address : House No. 11, Park Avenue, Near Mahindra showroom
Jindal Road, Raigarh (C.G) 496 001
PRESENT REMUNERATION: 32,000/- per month + Perks (Like: Local Conveyance, Mobile
& Medical etc.) on CTC Basis.
EXPECTED REMUNERATION: Negotiable
NOTICE PERIOD: One Month (Minimum)
SELF DECLARATION
I hereby certify that the details furnished above are correct to the best of my knowledge
and belief.
Date: 12.10.2016 (HARSH KUMAR)

More Related Content

What's hot

ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
GOPALAKRISHNAN K
 
Employee Training and Development: How to Measure Effectiveness and Impact | ...
Employee Training and Development: How to Measure Effectiveness and Impact | ...Employee Training and Development: How to Measure Effectiveness and Impact | ...
Employee Training and Development: How to Measure Effectiveness and Impact | ...
BizLibrary
 
CV Site Engineer Civil
CV Site Engineer CivilCV Site Engineer Civil
CV Site Engineer Civil
Sajjad Khan Niazi
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP Engineer
Baneshwar Pai
 
Nizami_CV
Nizami_CVNizami_CV
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
shaikh haroon
 
Ravishankar-CV
Ravishankar-CVRavishankar-CV
CV Abdul Rehman Document Controller
CV Abdul Rehman Document ControllerCV Abdul Rehman Document Controller
CV Abdul Rehman Document Controller
Abdul Rehman
 
MEP Engineer Resume
MEP Engineer ResumeMEP Engineer Resume
MEP Engineer Resume
Mohamed Aboobakkar Sidiq
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
Ravindra Singh
 
B.tech electrical engineer cv
B.tech electrical engineer cvB.tech electrical engineer cv
B.tech electrical engineer cv
Mohammed Fazaluddin
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
Abdul Rahiman
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Upendra Kumar Yadav
 
Rabeesh CV 2014
Rabeesh CV  2014Rabeesh CV  2014
Rabeesh CV 2014
Rabeesh Malappuravan
 
Imran Resume HVAC Engineer
Imran Resume HVAC EngineerImran Resume HVAC Engineer
Imran Resume HVAC Engineer
imran ahmed
 
VISIT VISA RESUME
VISIT VISA RESUMEVISIT VISA RESUME
VISIT VISA RESUME
bhavesh parmar
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
Mohammed Akbar
 
Sales Executive CV
Sales Executive CVSales Executive CV
Sales Executive CV
MUHAMMAD KASHIF
 
E&I QC ENGINEER
E&I QC ENGINEERE&I QC ENGINEER
E&I QC ENGINEER
muhammad shoaib khan
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
Mohammed Shaker
 

What's hot (20)

ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
Employee Training and Development: How to Measure Effectiveness and Impact | ...
Employee Training and Development: How to Measure Effectiveness and Impact | ...Employee Training and Development: How to Measure Effectiveness and Impact | ...
Employee Training and Development: How to Measure Effectiveness and Impact | ...
 
CV Site Engineer Civil
CV Site Engineer CivilCV Site Engineer Civil
CV Site Engineer Civil
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP Engineer
 
Nizami_CV
Nizami_CVNizami_CV
Nizami_CV
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
 
Ravishankar-CV
Ravishankar-CVRavishankar-CV
Ravishankar-CV
 
CV Abdul Rehman Document Controller
CV Abdul Rehman Document ControllerCV Abdul Rehman Document Controller
CV Abdul Rehman Document Controller
 
MEP Engineer Resume
MEP Engineer ResumeMEP Engineer Resume
MEP Engineer Resume
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
 
B.tech electrical engineer cv
B.tech electrical engineer cvB.tech electrical engineer cv
B.tech electrical engineer cv
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
Rabeesh CV 2014
Rabeesh CV  2014Rabeesh CV  2014
Rabeesh CV 2014
 
Imran Resume HVAC Engineer
Imran Resume HVAC EngineerImran Resume HVAC Engineer
Imran Resume HVAC Engineer
 
VISIT VISA RESUME
VISIT VISA RESUMEVISIT VISA RESUME
VISIT VISA RESUME
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
 
Sales Executive CV
Sales Executive CVSales Executive CV
Sales Executive CV
 
E&I QC ENGINEER
E&I QC ENGINEERE&I QC ENGINEER
E&I QC ENGINEER
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 

Viewers also liked

Study Of LANCO 2*600 MW Udupi Thermal Power Plant
Study Of LANCO 2*600 MW Udupi Thermal Power PlantStudy Of LANCO 2*600 MW Udupi Thermal Power Plant
Study Of LANCO 2*600 MW Udupi Thermal Power Plant
SUDHEER KUMAR KALYANAM
 
Procesador de texto (1)
Procesador de texto (1)Procesador de texto (1)
Procesador de texto (1)
Kathia Chiquita
 
Trabajando la convivencia
Trabajando la convivenciaTrabajando la convivencia
Trabajando la convivencia
MoniHdz04
 
How to Setup a Market Cooperation
How to Setup a Market CooperationHow to Setup a Market Cooperation
How to Setup a Market Cooperation
Mikael Balte
 
Analisis sinyal syarifudin
Analisis sinyal syarifudinAnalisis sinyal syarifudin
Analisis sinyal syarifudin
Syarifudin86
 
leaf thickness paper
leaf thickness paperleaf thickness paper
leaf thickness paper
Jasmine Ware
 
Стариган з крилами
Стариган з криламиСтариган з крилами
Стариган з крилами
MarinaFrosty16
 
Bibliography
BibliographyBibliography
Bibliography
Methembedarikwa5
 
DH Pedagogy at LINHD, UNED
DH Pedagogy at LINHD, UNEDDH Pedagogy at LINHD, UNED
Risk assessment 2
Risk assessment 2Risk assessment 2
Risk assessment 2
Methembedarikwa5
 
Branding & Corporate Identity Design for PLYTEC by Buzzworks
Branding & Corporate Identity Design for PLYTEC by BuzzworksBranding & Corporate Identity Design for PLYTEC by Buzzworks
Branding & Corporate Identity Design for PLYTEC by Buzzworks
Patrick Liew
 
Mb0051 legal aspects of business
Mb0051 legal aspects of businessMb0051 legal aspects of business
Mb0051 legal aspects of business
consult4solutions
 
Trabajo de investigacion unidad 3
Trabajo de investigacion unidad 3Trabajo de investigacion unidad 3
Trabajo de investigacion unidad 3
Valeria Damian
 
Emerging Markets Club IU-Brazil Event 2015
Emerging Markets Club IU-Brazil Event 2015Emerging Markets Club IU-Brazil Event 2015
Emerging Markets Club IU-Brazil Event 2015
Ryan Van Slyke
 
Alternative_Development_Report_EURAD_2015
Alternative_Development_Report_EURAD_2015Alternative_Development_Report_EURAD_2015
Alternative_Development_Report_EURAD_2015
Jack Grounds
 
Summary of Learning
Summary of Learning Summary of Learning
Summary of Learning
Sheri Schlosser
 
Om0017 advanced production and planning control
Om0017 advanced production and planning controlOm0017 advanced production and planning control
Om0017 advanced production and planning control
consult4solutions
 

Viewers also liked (17)

Study Of LANCO 2*600 MW Udupi Thermal Power Plant
Study Of LANCO 2*600 MW Udupi Thermal Power PlantStudy Of LANCO 2*600 MW Udupi Thermal Power Plant
Study Of LANCO 2*600 MW Udupi Thermal Power Plant
 
Procesador de texto (1)
Procesador de texto (1)Procesador de texto (1)
Procesador de texto (1)
 
Trabajando la convivencia
Trabajando la convivenciaTrabajando la convivencia
Trabajando la convivencia
 
How to Setup a Market Cooperation
How to Setup a Market CooperationHow to Setup a Market Cooperation
How to Setup a Market Cooperation
 
Analisis sinyal syarifudin
Analisis sinyal syarifudinAnalisis sinyal syarifudin
Analisis sinyal syarifudin
 
leaf thickness paper
leaf thickness paperleaf thickness paper
leaf thickness paper
 
Стариган з крилами
Стариган з криламиСтариган з крилами
Стариган з крилами
 
Bibliography
BibliographyBibliography
Bibliography
 
DH Pedagogy at LINHD, UNED
DH Pedagogy at LINHD, UNEDDH Pedagogy at LINHD, UNED
DH Pedagogy at LINHD, UNED
 
Risk assessment 2
Risk assessment 2Risk assessment 2
Risk assessment 2
 
Branding & Corporate Identity Design for PLYTEC by Buzzworks
Branding & Corporate Identity Design for PLYTEC by BuzzworksBranding & Corporate Identity Design for PLYTEC by Buzzworks
Branding & Corporate Identity Design for PLYTEC by Buzzworks
 
Mb0051 legal aspects of business
Mb0051 legal aspects of businessMb0051 legal aspects of business
Mb0051 legal aspects of business
 
Trabajo de investigacion unidad 3
Trabajo de investigacion unidad 3Trabajo de investigacion unidad 3
Trabajo de investigacion unidad 3
 
Emerging Markets Club IU-Brazil Event 2015
Emerging Markets Club IU-Brazil Event 2015Emerging Markets Club IU-Brazil Event 2015
Emerging Markets Club IU-Brazil Event 2015
 
Alternative_Development_Report_EURAD_2015
Alternative_Development_Report_EURAD_2015Alternative_Development_Report_EURAD_2015
Alternative_Development_Report_EURAD_2015
 
Summary of Learning
Summary of Learning Summary of Learning
Summary of Learning
 
Om0017 advanced production and planning control
Om0017 advanced production and planning controlOm0017 advanced production and planning control
Om0017 advanced production and planning control
 

Similar to RESUME FORMAT 2016 signed

Nikhil resume (1)
Nikhil resume (1)Nikhil resume (1)
Nikhil resume (1)
Nikhil Mehta
 
Resume
ResumeResume
Hardik avaiya Resume
Hardik avaiya ResumeHardik avaiya Resume
Hardik avaiya Resume
Hardik Avaiya
 
Resume - Joshi Nivas
Resume - Joshi NivasResume - Joshi Nivas
Resume - Joshi Nivas
JOSHI NIVAS NIMAL
 
RAJESH ROUSHAN
RAJESH ROUSHANRAJESH ROUSHAN
RAJESH ROUSHAN
RAJESH ROUSHAN
 
Resume MG
Resume MGResume MG
Resume MG
manish gajjar
 
NAIK CV(AM)
NAIK CV(AM)NAIK CV(AM)
NAIK CV(AM)
Venkatesh Naik
 
RAJESH ROUSHAN .
RAJESH ROUSHAN .RAJESH ROUSHAN .
RAJESH ROUSHAN .
RAJESH ROUSHAN
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
Manoj Patidar
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
Anil kumar
 
FB-CV-2016
FB-CV-2016FB-CV-2016
FB-CV-2016
FANINDRA BEHERA
 
vivek kashyap.2
vivek kashyap.2vivek kashyap.2
vivek kashyap.2
Vivek Kumar
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
barun kumar ...
 
Tushar dhone new
Tushar dhone newTushar dhone new
Tushar dhone new
TUSHAR DHONE
 
Maintenance Engineer having 9 years experience
Maintenance  Engineer having 9 years experienceMaintenance  Engineer having 9 years experience
Maintenance Engineer having 9 years experience
devarakonda mallikarjunarao
 
NIKET SONI RESUME UPDATED
NIKET SONI RESUME UPDATEDNIKET SONI RESUME UPDATED
NIKET SONI RESUME UPDATED
Niket Soni
 
Ashish Resume.doc
Ashish Resume.docAshish Resume.doc
Ashish Resume.doc
ashish shrivastava
 
MECHANICAL ENGINEER updated
MECHANICAL ENGINEER updatedMECHANICAL ENGINEER updated
MECHANICAL ENGINEER updated
mohammad ibrahim shaikh
 
resume 23
resume 23resume 23
resume 23
tapas mitra
 
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer Resume
Suresh Selvaraju
 

Similar to RESUME FORMAT 2016 signed (20)

Nikhil resume (1)
Nikhil resume (1)Nikhil resume (1)
Nikhil resume (1)
 
Resume
ResumeResume
Resume
 
Hardik avaiya Resume
Hardik avaiya ResumeHardik avaiya Resume
Hardik avaiya Resume
 
Resume - Joshi Nivas
Resume - Joshi NivasResume - Joshi Nivas
Resume - Joshi Nivas
 
RAJESH ROUSHAN
RAJESH ROUSHANRAJESH ROUSHAN
RAJESH ROUSHAN
 
Resume MG
Resume MGResume MG
Resume MG
 
NAIK CV(AM)
NAIK CV(AM)NAIK CV(AM)
NAIK CV(AM)
 
RAJESH ROUSHAN .
RAJESH ROUSHAN .RAJESH ROUSHAN .
RAJESH ROUSHAN .
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
FB-CV-2016
FB-CV-2016FB-CV-2016
FB-CV-2016
 
vivek kashyap.2
vivek kashyap.2vivek kashyap.2
vivek kashyap.2
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
Tushar dhone new
Tushar dhone newTushar dhone new
Tushar dhone new
 
Maintenance Engineer having 9 years experience
Maintenance  Engineer having 9 years experienceMaintenance  Engineer having 9 years experience
Maintenance Engineer having 9 years experience
 
NIKET SONI RESUME UPDATED
NIKET SONI RESUME UPDATEDNIKET SONI RESUME UPDATED
NIKET SONI RESUME UPDATED
 
Ashish Resume.doc
Ashish Resume.docAshish Resume.doc
Ashish Resume.doc
 
MECHANICAL ENGINEER updated
MECHANICAL ENGINEER updatedMECHANICAL ENGINEER updated
MECHANICAL ENGINEER updated
 
resume 23
resume 23resume 23
resume 23
 
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer Resume
 

RESUME FORMAT 2016 signed

  • 1. RESUME HARSH KUMAR MECHANICAL ENGINEER +91 8349995677 beingharsh14@gmail.com Raigarh(C.G) PROFESSIONAL OBJECTIVE To work in highly professional, competitive and challenging work environment, while contributing to the best of my abilities towards achieving the target given and creating new bench marks for the positive growth and successful development of both self & company. Cherish to create and work along a dedicated team with pride dignity and honor. sNAPSHOT Power Professional with more than 5 years of cross-functional experience; varying from Constructions, Procurement, commissioning and Project Management of Power Plant capacity of 300MW. CURRENT FUNCTIONAL AREA Co-ordination, Management, Planning and Execution of Power Projects from inception to Commissioning and its subsequent Operation and Maintenance. EXPERIENCE CETHAR LIMITED Cethar, a 15000 MINR company, is one of the India’s leading manufacturer of Steam Generators & Auxiliaries, Balance of Plant Equipment/System, EPC Contracting Company, having 7 nos. of state of the art manufacturing facilities at Tiruchirapalli, Tamil Nadu, India, having successfully supplied about 1250 Boilers in India and Abroad. CL is engaged into design, engineering, manufacturing, supply and installation of Steam Generators (Boilers) upto Subcritical parameters and EPC Contracting of Power Plants up to unit Capacity of 350MW. Having certifications of ASME “S”, “U”, “PP” & NBBI – R Stamps. Sr. Engineer Nov 2012 – Till Date @ 2 x 300MW SKS Power Generation (C.G) Ltd, Raigarh  Execution, Planning & Co-ordination of site erection and commission activity  Supervised the commissioning activity of Water Treatment Plant & Fire Fighting System.  Supervised the various commissioning activity like Air-In-Leakage test & Gas Distribution test of ESP, Trail run of Pumps, Primary Air Fan, Induced Draft Fan, Forced Draft Fan & Chemical Cleaning of Boiler.  Coordinating between site, client & Cethar H.O regarding procurement and engineering issues.  Actively involved in site de-mobilization and handing over activity of site to client.  Involved in Scrap management.  Involved in planning, Fabrication & erection activity of Water system like DM Tank, water Treatment structure and its inter connecting piping, gantry and pipe rack.
  • 2.  Analyzing Technical Details of Drawing & Specifications of various Erection equipments, Material Inspection and Material Handling, Erection and Commissioning.  Supervision of all fabrication & erection work under Safety (OHSAS 18001) and Quality (ISO 9001) Standards.  Actively involved in providing technical inputs for site procured materials.  Maintaining and resolving customer end issued NCR (Non Conformance Record)  Preparing NFA (Note for Approval), LOI (Letter of Intent) & Debit Note.  Maintaining records & requirement of Tools & Tackles.  Preparing daily shift report including Manpower, Material planning, Erection planning & updating the completion status to management.  Attending Technical discussion and Preparing MOM for weekly & monthly review meetings plan and develop new methods to improve the station Working Method for efficiency and reliability.  Verifying erection and machinery bills.  Good knowledge of operating of ERP. GET July 2011 - Oct 2012 @ 2 x 300MW SKS Power Generation (C.G) Ltd, Raigarh  Planning for Plant Machineries required for the project.  Plant & Machinery Maintenance - Planning and executing all maintenance activities ,Scheduling Preventive Maintenance, Periodical Maintenance, Routine Maintenance, Shut Down Maintenance, Planned Maintenance, Break down Maintenance, Breakdown analysis MTBR, MTTR.  Planning for the Spare Parts Inventory management.  Preparing and Analysis of Plant and Machinery and their Parts History.  Hiring of plant and Machineries-Finding Vendors, Inquiring, finalizing vendor for hiring equipments and monitoring for effective utilization, Billing, finalizing payment.  De-hiring with prior notice.  Manpower management.  Installation & commissioning of machinery and plants (If required).  Maintaining all plant & Machineries condition as per the safety standards prescribed by client. EDUCATION Bachelor of Technology in Mechanical Engineering (2007-2011) Bharath University, Chennai (T.N) 7.82 CGPA PGDC in Auto CAD-Pro (2010) CADDAM Technologies, Chennai A-Grade Pre University (2007) St. Xavier’s High School, Muzaffarpur (Bihar) 60.66% High School (2004) St. Xavier’s High School, Muzaffarpur (Bihar) 60.66%
  • 3. TRAININGS  Undergone inplant training at CIPET,Chennai, India.  Undergone inplant training at Bharat Wagon, Muzaffarpur, Bihar IT FORTE  Well versed with Operating systems like Windows XP, Vista, 2007, 08, 10 and MS Office. CONTACT DETAILS Father’s Name : Bibhuti Prasad Date of Birth : 15th August 1989 Linguistic Abilities : English and Hindi Nationality : Indian Sex : Male Marital status : Married Passport : K0633039 Permanent Address : Bank Colony (Near Hanuman Mandir) Nazirpur, Akharaghat, Muzaffarpur, Bihar- 842 002 Present Address : House No. 11, Park Avenue, Near Mahindra showroom Jindal Road, Raigarh (C.G) 496 001 PRESENT REMUNERATION: 32,000/- per month + Perks (Like: Local Conveyance, Mobile & Medical etc.) on CTC Basis. EXPECTED REMUNERATION: Negotiable NOTICE PERIOD: One Month (Minimum) SELF DECLARATION I hereby certify that the details furnished above are correct to the best of my knowledge and belief. Date: 12.10.2016 (HARSH KUMAR)