SlideShare a Scribd company logo
1 of 11
RESUME
POSITION APPLIED FOR :
1. PERSONAL PARTICULARS
Name Goh Teng wei
IC Number (Malaysia) 821229-07-5739
Age 33
Date of Birth 29-12-1982
Sex Male
Weight 87 kg
Height 179 cm
Marital Status Single
Race Chinese
Religion None
Nationality Malaysia
Permanent Address 25, Jalan Kenanga 5/6, Taman Desa Cemerlang, 81800 Ulu Tiram,
Johor
Current Address C-4-5, Block C, Lebuh Damar Merah, Taman Pendamar Indah 2,
Pandamaran, 42000 Pelabuhan Klang, Selangor
Tel (Mobil) +6012-3207065
Email goh_teng_wei@yahoo.co.uk
Hobbies Reading historical book , Economic , Quantum Energy
Dream Adventure World
Driving License
Categories
B2 , D
Health Everyday climb all Plant and Tank
2. EDUCATION
Date Name & Place of School
/College Attended
Qualifications Obtained/ Courses
AttendedFrom To
25.5.2001 24.5.2003 Tunku Abdul Rahman College
( Penang Branch Campus )
 Diploma In Electronic Engineering
( with Merit ) CGPA : 2.9693
1.1.1995 31.12.2000 SMJK Hua Lian Taiping, Perak.
( Secondary School )
 Sijil Pelajaran Malaysia ( SPM )
 Penilaian Menengah Rendah ( PMR )
1.1.1989 26.10.1994 S.R.J.K (C ) Pokok Assam, Perak.
( Primary School )
 Ujian Peperiksaan Sekolah Rendah, (
UPSR )
3. EMPLOYMENT RECORD
Date August 2012
Company Cargill Palm Products
Company Forum Palm Oil Refinery , Specialty Fat
Position Senior AEI Engineer for Project & Maintenance ( Automation , Electrical &
Instrument )
Duties been
Carryout
( Accomplishment )
 Process
- Liaise with Operator to understand any improvement/changes needed
- Checking the Production result
- Tuning PID-Control
- Run back abandoned control System
 Control System
- Design PLC System
- Programming PLC & SCADA
- Design Process Interlocking & Control Method
- System FAT & perform commissioning
- Maintain PLC System & Computer
- Update Panel Drawing
 Instrumentation
- Select suitable Instrument to meet the process
- Design the Installation & Cabling
- Coordinate & distribute works to Contractor
- Setting & testing
- Help Maintenance Team troubleshoot problem
 Electrical
- Design the MCC Panel & Cable Sizing
- Panel FAT & perform commissioning
- Coordinate & distribute works to Electrical Contractor
- Setting & testing
- Help Maintenance Team troubleshoot problem
 Office Work
- Issue TENDER and summarize BQ
- Order Items
- Setup Automation System to give Training
Experiences • Commissioning 3 different Process Plant ( Neutralization ; CIE ; Waste Water
Treatment )
• Design and Install Tank Gauging System for Tank Farm
• Improve Automation for : Multistock Refinery Plant ; Hydrogenation Plant ;
& etc
• Modify existing Motor Starter to have control by PLC
• Restore abandoned System & Control.
• Help Maintenance troubleshooting Plant down problem.
Monthly Income Basic Salary : RM 8000
Meal Allowance : RM 20
Mobile Phone : RM 70
EPF (Employer) : RM 1065
Total Amount : RM 9155
Reason to Leave
Date August 2008  August 2012
Company IOI Loders Croklaan & IOI Lipid Enzymtec
Company Forum Palm Oil Refinery , Specialty Fat , Oleo Chemical , Enzymatic Nutrition
Position Project Engineer ( E&I and Control )
Duties been
Carryout
( Accomplishment )
 Process
- Design P&ID
- Mass & Energy Balance Checking
- Pipe routing and Pressure Drop checking
 Control System
- Design DCS System
- Design Process Interlocking & Control Method
- System FAT & perform commissioning
 Instrumentation
- Design the Installation & Cabling
- Coordinate & distribute works to Contractor
 Electrical
- Liaise with Consultant to design the MCC Panel & Cable Sizing
- Panel FAT & perform commissioning
- Coordinate & distribute works to Electrical Contractor
 Telecommunication System
- Liaise with Consultant to design the System
- Coordinate & distribute works to Contractor
 Office Work
- Project coordination & schedules
- Issue TENDER and summarize BQ
- Order Items
Experiences • 7 different Process Plant + Tank Farm ( 64 Tanks ) + Utilities
Monthly Income Basic Salary : RM 3935
Meal Allowance : RM 90
Mobile Phone : RM 80
Accommodation Allowance : RM 350
Transport Allowance : RM 250
EPF (Employer) : RM 473
Travelling Claim : RM 630++
Entertainment Claim :
Total Amount : RM 5808++
Reason to Leave - Project completed, but world economy earthquake …. No new project.
- Called by Job Hunter to offer opportunity work in CARGILL.
CARGILL have new Mega Project.
Date June 2006  July 2008
Company SysNet Controls Sdn. Bhd.
Company Forum Industry’s Automation Solution Provider
Position Senior Project Engineer
Duties been
Carryout
( Accomplishment )
 Control System
- Discuss the process & suggest idea to customer
- Design Control Panel
- Programming PLC & SCADA
- Design Process Interlocking & Control Method
- FAT & perform commissioning
 Electrical
- Design MCC Panel
- Panel FAT & perform commissioning
 Office Work
- Project coordination & schedules
- Study and Order Items
Experiences • Palm Oil Refinery’s Process
• Margarine’s Process
• Coin Vending Machine (can send SMS)
• And other Machines & Systems.
• Total 16 projects completed
Monthly Income Basic Salary : RM 2800
Car Allowance : RM 350
Petrol Claim : RM 250
Mobile Phone : RM 90
EPF (Employer) : RM 291
Travelling Claim : RM 750++
Total Amount : RM 4531++
Reason to Leave - Company loses direction.
- Get opportunity to join IOI for Mega Project.
Date June 2004  May 2006
Company Control Systems Integrator Sdn. Bhd.
Company Forum Palm Oil Mill Industry’s Automation Solution Provider
Position Service Engineer ( Commissioning )
Duties been
Carryout
( Accomplishment )
 Site Servicing & Troubleshooting.
 Design Control Panel.
 Site Installation.
 Project coordination.
 Site Commissioning.
Experiences • Palm Oil Mill’s Process
Monthly Income Basic Salary : RM 1980
Car Allowance : RM 250
Mobile Phone : RM 90
EPF (Employer) : RM 216
Travelling Claim : RM 900++
Total Amount : RM 3436++
Reason to Leave - Company unstable after complete Indonesia’s Mega Project, and face financial
problem. ( fail supervision and cheated by contractor )
- Invited by Ex-Senior to join Ambitious Company.
Date June 2003  May 2004
Company Top Range Holding Sdn. Bhd.
Company Forum Industry’s Automation Solution Provider
Position Application Engineer
Duties been
Carryout
 Control System
- Discuss the process & suggest idea to customer
- Design Control Panel
- Programming PLC & SCADA
- Design Process Interlocking & Control Method
- FAT & perform commissioning
 Electrical
- Design MCC Panel
- Panel FAT & perform commissioning
 Office Work
- Project coordination & schedules
 Study and Order Items
Experiences • Oyster Sauce ‘s Process
• Drypers ‘s Production Process
• Site Cabling
• Total 5 projects completed.
Monthly Income Basic Salary : RM 1400
Mobile Phone : RM 90
EPF (Employer) : RM 150
Travelling Claim : RM 700++
Total Amount : RM 2340
Reason to Leave - Each Project has limited time and budget, not allow spend to perfect the works.
- Want to join specialist company, which concentrate in only industry.
4. Skills
 Process
- Design : P&ID Drawing
- Design : Process Control Logic
- HAZOP Study
- Mass & Energy Balance
- Tuning PID-Control
- Process Analysis and Troubleshooting
 Automation
- Design : PLC and DCS System
- Programming : PLC and HMI
- Design : Tank Gauging System
- Design : Networking System ( Ethernet , Fiber Optic , Profibus , RS485 , TRL/2 )
 Electrical
- Design : SLD Drawing and Motor Starter Circuit
- Design : MCC Panel , SSB Panel , DB Panel
- Design : Hydraulic Control Panel
- Panel FAT and SAT Test
- Design : UPS System
- Design : CCTV System
- Design : PABX System
- Sizing Power Cable
- Sizing Motor
- Motor Installation and Troubleshooting
 Machine
- Design : Motor Positioning Control
 PLC Programming
- Siemens
- GE Fanuc
- Nais
- Omron
- Mitsubishi
 DCS Programming
- Yokogawa
 Process Control Software
( SCADA system ) : Wonderware Intouch ; Cimplicity HMI
( Touch Screen ) : Siemens Protool ; Proface ; Easy View ; Omron
( Remote Control Module ) : Siemens OP7.
 Instrumentation
- Instrument Installation and Calibration ( sensor , Valve , Radar , Analyzer , …… )
- setting Inverter
- setting SoftStarter
- setting Servo
 Mechanical Work
- Making Control Panel
- On-Site Panel Modification
- Site’s Electrical work
- Repairing Instrument
- Install Pump and Instrument
- connect Cable to Motor and Instrument
 Other
- Tank Farm Level Dipping and Calculation
 Special Skills :
- Fast Trouble Shooting & Problem Solving
( Programming, Setting, Rewiring )
- Fast On-Site Modification to suit System’s Changes
( Re-Design, Programming, Rewiring, 3rd
Party Panel Modification )
- Restore abandoned System & Control
5. Documentation Software
 MS Excel
 MS Word
 AutoCAD
 PDMS View
6. STRENGHTS
 Good stamina. ( train from daily climb in Plant & Tank Farm )
 Was trained work Independent and share by others department
 Willing to train others
 Well self-awareness and responsible
 Would take any possibilities to solve “Bottom Neck” situation.
Language Proficiency : Spoken – Malay; English; Mandarin; Cantonese & Hokkien.
Written – Malay; English; Chinese.
Oversea work’s Experiences : Thailand; Kalimantan; Maldives
Major Projects Completed :
LEE KUM KEE OYSTER SAUCE ( Food Industry , Shah Alam )
= Automate New Process Line
- Design & Supply PLC Panel
- Programming Process Control
??? ( Cement Plant , Ipoh )
= Cabling and Installation
- Design Cabling Routing and Termination Drawing
- Site Installation
DRYPERS ( Diaper Plant , Shah Alam )
= Upgrade PLC and Run-back Machine Line that newly transfer from BAZIL to MALAYSIA
- Upgrade PLC , modify PLC Program and Touchscreen
- Site Installation and Commissioning
SELANGOR WATER TREATMENT PLANT ( Kuala Selangor )
= Upgrade from Electronic Card become PLC
= Install Antenna to receive Plant status that 40km far from Office
- Install PLC , Programming PLC and HMI
- Install Send/Receive Antenna
- Site Installation and Commissioning
??? ( Zinc Roofing Manufacturing Plant , Shah Alam )
= Control Roofing Cutting
- Install PLC Panel , Inverter Panel , Encoder Sensor
- Programming PLC and Touchscreen
- Site Installation and Commissioning
TOSHIBA ELECTRONICS ( Electronic IC Plant , Banting )
= Supply IC leg soldering dipping Machine
- Install PLC Panel , Servo Controller and Motor
- Programming PLC and Touchscreen
- Site Installation and Commissioning
Willing to travel :
Willing to Relocate :
Expect Income
( Negotiable )
Yes
Yes
RM 8,000 Commence Date : After notice period of 1 month or less
APM ( Car Seat , Bukit Beruntung )
= Supply Car Seat Bearing Insert Machine
- Install PLC Panel , Servo Controller and Motor
- Programming PLC and Touchscreen
- Site Installation and Commissioning
YTL ( Concrete Premix Station , Johor )
= Automate Concrete Mixing Process and Data Reporting
- Install PLC Panel , Computer
- Programming PLC and HMI
- Sensor and Instrument Installation
- Site Installation and Commissioning
??? ( Dobi shop , Petaling and Brickfields )
= Supply Coin Vending Machine
- Install Machine
- Programming PLC and Touchscreen
- Site Installation and Commissioning
JTOP PALM OIL MILL ( Palm Oil Mill , Johor )
= Automate Sterilizer Process and etc
- Install PLC Panel , Computer
- Programming PLC and HMI
- Modify Existing Motor/Hydraulic Starter, become able control by PLC
- Sensor and Instrument Installation
- Cabling and termination
- Site Installation and Commissioning
SELANGAU PALM OIL MILL ( Palm Oil Mill , Sarawak )
= Automate Sterilizer Process and etc
- Install PLC Panel , Computer
- Programming PLC and HMI
- Sensor and Instrument Installation
- Cabling and termination
- Site Installation and Commissioning
PT CAKUNG PALM OIL MILL ( Palm Oil Mill , Kalimantan )
= Whole Plant and Boiler Automation Control
- Install PLC Panel , MCC Panel , Computer
- Programming PLC and HMI
- Sensor and Instrument Installation
- Motor Installation
- Cabling and termination
- Site Installation and Commissioning
NATURAL PALM OIL REFINERY ( Palm Oil Refinery , Thailand )
= Automation Control
- Install PLC Panel , MCC Panel , Computer
- Programming PLC and HMI
- Sensor and Instrument Installation
- Motor Installation
- Cabling and termination
- Site Installation and Commissioning
IOI LIPID ENZYMTEC ( Palm Oil Specialty Fat , Pasir Gudang )
= Solvent Fractionation Plant ( new )
= Enzymatic Plant ( new )
= Fatty Acid Distillation Plant ( new )
= Hydrogenation Plant ( new )
= Multistock Refinery Plant ( new )
= Tank Farm ( new )
= Utilities ( new )
- Install DCS Panel , MCC Panel , SSB Panel , DB Panel ,Computer
- Install UPS System
- Install PABX System
- Install CCTV
- Programming PLC and HMI
- Sensor and Instrument Installation
- Motor Installation
- Cabling and termination
- Site Installation and Commissioning
CARGILL PALM PRODUCTS ( Palm Oil Specialty Fat , Port Klang )
= CIE Plant ( new )
= Neutralization Plant ( new )
= Waste Water Treatment Plant ( new )
= Oil Blending System ( new )
= Ingredient Mixing ( new )
= Tank Farm ( new and existing )
= Condensate Recovery System ( new )
= Multistock Refinery Plant – Auto Stock Change
= Packaging Line1ABC Plant – Upgrade PLC System
= Packaging Line1E Plant – Upgrade PLC System
= Packaging Plant – Hot Water System
= New and Existing Bleaching Earth Silo – Auto Transfer
= 8 Plants – Improvement
= Nitrogen Generator and Compressed Air - Improvement
- Install PLC Panel , MCC Panel , SSB Panel , DB Panel ,Computer
- Install UPS System
- Programming PLC and HMI
- Sensor and Instrument Installation
- Motor Installation
- Cabling and termination
- Site Installation and Commissioning

More Related Content

What's hot (16)

CV Vishal
CV VishalCV Vishal
CV Vishal
 
ajayuikey
ajayuikeyajayuikey
ajayuikey
 
Ajay Uikey
Ajay UikeyAjay Uikey
Ajay Uikey
 
social profile.
social profile.social profile.
social profile.
 
vidhyadaran_updated_resume__1_
vidhyadaran_updated_resume__1_vidhyadaran_updated_resume__1_
vidhyadaran_updated_resume__1_
 
New Resume JPSD
New Resume JPSDNew Resume JPSD
New Resume JPSD
 
Internship Presentation - Siemens Malaysia
Internship Presentation - Siemens MalaysiaInternship Presentation - Siemens Malaysia
Internship Presentation - Siemens Malaysia
 
Resume
ResumeResume
Resume
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11
 
CV PornprasertS_201510
CV PornprasertS_201510CV PornprasertS_201510
CV PornprasertS_201510
 
PEL Report
PEL ReportPEL Report
PEL Report
 
Milan
MilanMilan
Milan
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
PRANTIK_Resume_latest
PRANTIK_Resume_latestPRANTIK_Resume_latest
PRANTIK_Resume_latest
 
Resume Vijay Kumar Mishra_updated
Resume Vijay Kumar Mishra_updatedResume Vijay Kumar Mishra_updated
Resume Vijay Kumar Mishra_updated
 

Viewers also liked

Ring rail delhi
Ring rail delhiRing rail delhi
Ring rail delhiDelhi2050
 
Mokaná: Vestigios de un grupo étnico amerindio
Mokaná: Vestigios de un grupo étnico amerindioMokaná: Vestigios de un grupo étnico amerindio
Mokaná: Vestigios de un grupo étnico amerindioJuan Saavedra
 
Aperçu mandat d'achat d'espace publicitaire
Aperçu mandat d'achat d'espace publicitaireAperçu mandat d'achat d'espace publicitaire
Aperçu mandat d'achat d'espace publicitaireSophie Roy
 
Jones Lang La Salle - Desk Private Equity
Jones Lang La Salle - Desk Private EquityJones Lang La Salle - Desk Private Equity
Jones Lang La Salle - Desk Private Equityguisavard
 
financial statement analysis. trishit
financial statement analysis. trishitfinancial statement analysis. trishit
financial statement analysis. trishitTrishit Dutta
 
Health IT & Smart Hospitals (October 19, 2016)
Health IT & Smart Hospitals (October 19, 2016)Health IT & Smart Hospitals (October 19, 2016)
Health IT & Smart Hospitals (October 19, 2016)Nawanan Theera-Ampornpunt
 
final project ubi
final project ubifinal project ubi
final project ubiJHINUK ROY
 

Viewers also liked (11)

Ring rail delhi
Ring rail delhiRing rail delhi
Ring rail delhi
 
Mokaná: Vestigios de un grupo étnico amerindio
Mokaná: Vestigios de un grupo étnico amerindioMokaná: Vestigios de un grupo étnico amerindio
Mokaná: Vestigios de un grupo étnico amerindio
 
Aperçu mandat d'achat d'espace publicitaire
Aperçu mandat d'achat d'espace publicitaireAperçu mandat d'achat d'espace publicitaire
Aperçu mandat d'achat d'espace publicitaire
 
Jones Lang La Salle - Desk Private Equity
Jones Lang La Salle - Desk Private EquityJones Lang La Salle - Desk Private Equity
Jones Lang La Salle - Desk Private Equity
 
NFED Paper Presentation(2)
NFED Paper Presentation(2)NFED Paper Presentation(2)
NFED Paper Presentation(2)
 
Aide embauche PME - 2016 01
Aide embauche PME - 2016 01Aide embauche PME - 2016 01
Aide embauche PME - 2016 01
 
Change management agile
Change management agileChange management agile
Change management agile
 
financial statement analysis. trishit
financial statement analysis. trishitfinancial statement analysis. trishit
financial statement analysis. trishit
 
Organising, chairing and facilitating meetings
Organising, chairing and facilitating meetingsOrganising, chairing and facilitating meetings
Organising, chairing and facilitating meetings
 
Health IT & Smart Hospitals (October 19, 2016)
Health IT & Smart Hospitals (October 19, 2016)Health IT & Smart Hospitals (October 19, 2016)
Health IT & Smart Hospitals (October 19, 2016)
 
final project ubi
final project ubifinal project ubi
final project ubi
 

Similar to RESUME TITLE

J Tarkeshwar Resume Electrical & Automation
J Tarkeshwar Resume Electrical & AutomationJ Tarkeshwar Resume Electrical & Automation
J Tarkeshwar Resume Electrical & AutomationTarkeshwar Jayanti
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit KumarLALIT KUMAR
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit KumarLALIT KUMAR
 
Shehjad_Ahmed_Resume
Shehjad_Ahmed_ResumeShehjad_Ahmed_Resume
Shehjad_Ahmed_ResumeShehzad Ahmed
 
Shyam_CV_24.06.15 (1)
Shyam_CV_24.06.15 (1)Shyam_CV_24.06.15 (1)
Shyam_CV_24.06.15 (1)Sunny Kumar
 
S.Manikandan_Resume.doc
S.Manikandan_Resume.docS.Manikandan_Resume.doc
S.Manikandan_Resume.docmanikandan .
 
Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...
Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...
Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...Rahul D Sharma
 
AI Automation report
AI Automation reportAI Automation report
AI Automation reportGaurav Singh
 
PAUL_OWEN_CV
PAUL_OWEN_CVPAUL_OWEN_CV
PAUL_OWEN_CVPaul Owen
 
ELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEERELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEERGopi s
 

Similar to RESUME TITLE (20)

J Tarkeshwar Resume Electrical & Automation
J Tarkeshwar Resume Electrical & AutomationJ Tarkeshwar Resume Electrical & Automation
J Tarkeshwar Resume Electrical & Automation
 
arvind_resume_new (1)
arvind_resume_new (1)arvind_resume_new (1)
arvind_resume_new (1)
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit Kumar
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit Kumar
 
Shehjad_Ahmed_Resume
Shehjad_Ahmed_ResumeShehjad_Ahmed_Resume
Shehjad_Ahmed_Resume
 
Shyam_CV_24.06.15 (1)
Shyam_CV_24.06.15 (1)Shyam_CV_24.06.15 (1)
Shyam_CV_24.06.15 (1)
 
S.Manikandan_Resume.doc
S.Manikandan_Resume.docS.Manikandan_Resume.doc
S.Manikandan_Resume.doc
 
CEDRICK LUZAO MOST RECENT CV
CEDRICK LUZAO MOST RECENT CV CEDRICK LUZAO MOST RECENT CV
CEDRICK LUZAO MOST RECENT CV
 
Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...
Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...
Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...
 
Vijayaraghavan.K-CV
Vijayaraghavan.K-CVVijayaraghavan.K-CV
Vijayaraghavan.K-CV
 
RESUME_PRAKASH
RESUME_PRAKASHRESUME_PRAKASH
RESUME_PRAKASH
 
AI Automation report
AI Automation reportAI Automation report
AI Automation report
 
PAUL_OWEN_CV
PAUL_OWEN_CVPAUL_OWEN_CV
PAUL_OWEN_CV
 
SELVAPRIYAN-RESUME
SELVAPRIYAN-RESUMESELVAPRIYAN-RESUME
SELVAPRIYAN-RESUME
 
HATIM_HASSAN_ALI--CV (1)
HATIM_HASSAN_ALI--CV (1)HATIM_HASSAN_ALI--CV (1)
HATIM_HASSAN_ALI--CV (1)
 
Baldev CV
Baldev CVBaldev CV
Baldev CV
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Abdelrhman CV
Abdelrhman CVAbdelrhman CV
Abdelrhman CV
 
ELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEERELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEER
 
Resume
ResumeResume
Resume
 

RESUME TITLE

  • 1. RESUME POSITION APPLIED FOR : 1. PERSONAL PARTICULARS Name Goh Teng wei IC Number (Malaysia) 821229-07-5739 Age 33 Date of Birth 29-12-1982 Sex Male Weight 87 kg Height 179 cm Marital Status Single Race Chinese Religion None Nationality Malaysia Permanent Address 25, Jalan Kenanga 5/6, Taman Desa Cemerlang, 81800 Ulu Tiram, Johor Current Address C-4-5, Block C, Lebuh Damar Merah, Taman Pendamar Indah 2, Pandamaran, 42000 Pelabuhan Klang, Selangor Tel (Mobil) +6012-3207065 Email goh_teng_wei@yahoo.co.uk Hobbies Reading historical book , Economic , Quantum Energy Dream Adventure World Driving License Categories B2 , D Health Everyday climb all Plant and Tank 2. EDUCATION Date Name & Place of School /College Attended Qualifications Obtained/ Courses AttendedFrom To 25.5.2001 24.5.2003 Tunku Abdul Rahman College ( Penang Branch Campus )  Diploma In Electronic Engineering ( with Merit ) CGPA : 2.9693 1.1.1995 31.12.2000 SMJK Hua Lian Taiping, Perak. ( Secondary School )  Sijil Pelajaran Malaysia ( SPM )  Penilaian Menengah Rendah ( PMR ) 1.1.1989 26.10.1994 S.R.J.K (C ) Pokok Assam, Perak. ( Primary School )  Ujian Peperiksaan Sekolah Rendah, ( UPSR )
  • 2. 3. EMPLOYMENT RECORD Date August 2012 Company Cargill Palm Products Company Forum Palm Oil Refinery , Specialty Fat Position Senior AEI Engineer for Project & Maintenance ( Automation , Electrical & Instrument ) Duties been Carryout ( Accomplishment )  Process - Liaise with Operator to understand any improvement/changes needed - Checking the Production result - Tuning PID-Control - Run back abandoned control System  Control System - Design PLC System - Programming PLC & SCADA - Design Process Interlocking & Control Method - System FAT & perform commissioning - Maintain PLC System & Computer - Update Panel Drawing  Instrumentation - Select suitable Instrument to meet the process - Design the Installation & Cabling - Coordinate & distribute works to Contractor - Setting & testing - Help Maintenance Team troubleshoot problem  Electrical - Design the MCC Panel & Cable Sizing - Panel FAT & perform commissioning - Coordinate & distribute works to Electrical Contractor - Setting & testing - Help Maintenance Team troubleshoot problem  Office Work - Issue TENDER and summarize BQ - Order Items - Setup Automation System to give Training Experiences • Commissioning 3 different Process Plant ( Neutralization ; CIE ; Waste Water Treatment ) • Design and Install Tank Gauging System for Tank Farm • Improve Automation for : Multistock Refinery Plant ; Hydrogenation Plant ; & etc • Modify existing Motor Starter to have control by PLC • Restore abandoned System & Control. • Help Maintenance troubleshooting Plant down problem. Monthly Income Basic Salary : RM 8000
  • 3. Meal Allowance : RM 20 Mobile Phone : RM 70 EPF (Employer) : RM 1065 Total Amount : RM 9155 Reason to Leave Date August 2008  August 2012 Company IOI Loders Croklaan & IOI Lipid Enzymtec Company Forum Palm Oil Refinery , Specialty Fat , Oleo Chemical , Enzymatic Nutrition Position Project Engineer ( E&I and Control ) Duties been Carryout ( Accomplishment )  Process - Design P&ID - Mass & Energy Balance Checking - Pipe routing and Pressure Drop checking  Control System - Design DCS System - Design Process Interlocking & Control Method - System FAT & perform commissioning  Instrumentation - Design the Installation & Cabling - Coordinate & distribute works to Contractor  Electrical - Liaise with Consultant to design the MCC Panel & Cable Sizing - Panel FAT & perform commissioning - Coordinate & distribute works to Electrical Contractor  Telecommunication System - Liaise with Consultant to design the System - Coordinate & distribute works to Contractor  Office Work - Project coordination & schedules - Issue TENDER and summarize BQ - Order Items Experiences • 7 different Process Plant + Tank Farm ( 64 Tanks ) + Utilities Monthly Income Basic Salary : RM 3935 Meal Allowance : RM 90 Mobile Phone : RM 80 Accommodation Allowance : RM 350 Transport Allowance : RM 250 EPF (Employer) : RM 473 Travelling Claim : RM 630++ Entertainment Claim : Total Amount : RM 5808++ Reason to Leave - Project completed, but world economy earthquake …. No new project.
  • 4. - Called by Job Hunter to offer opportunity work in CARGILL. CARGILL have new Mega Project. Date June 2006  July 2008 Company SysNet Controls Sdn. Bhd. Company Forum Industry’s Automation Solution Provider Position Senior Project Engineer Duties been Carryout ( Accomplishment )  Control System - Discuss the process & suggest idea to customer - Design Control Panel - Programming PLC & SCADA - Design Process Interlocking & Control Method - FAT & perform commissioning  Electrical - Design MCC Panel - Panel FAT & perform commissioning  Office Work - Project coordination & schedules - Study and Order Items Experiences • Palm Oil Refinery’s Process • Margarine’s Process • Coin Vending Machine (can send SMS) • And other Machines & Systems. • Total 16 projects completed Monthly Income Basic Salary : RM 2800 Car Allowance : RM 350 Petrol Claim : RM 250 Mobile Phone : RM 90 EPF (Employer) : RM 291 Travelling Claim : RM 750++ Total Amount : RM 4531++ Reason to Leave - Company loses direction. - Get opportunity to join IOI for Mega Project. Date June 2004  May 2006 Company Control Systems Integrator Sdn. Bhd. Company Forum Palm Oil Mill Industry’s Automation Solution Provider Position Service Engineer ( Commissioning ) Duties been Carryout ( Accomplishment )  Site Servicing & Troubleshooting.  Design Control Panel.  Site Installation.  Project coordination.
  • 5.  Site Commissioning. Experiences • Palm Oil Mill’s Process Monthly Income Basic Salary : RM 1980 Car Allowance : RM 250 Mobile Phone : RM 90 EPF (Employer) : RM 216 Travelling Claim : RM 900++ Total Amount : RM 3436++ Reason to Leave - Company unstable after complete Indonesia’s Mega Project, and face financial problem. ( fail supervision and cheated by contractor ) - Invited by Ex-Senior to join Ambitious Company. Date June 2003  May 2004 Company Top Range Holding Sdn. Bhd. Company Forum Industry’s Automation Solution Provider Position Application Engineer Duties been Carryout  Control System - Discuss the process & suggest idea to customer - Design Control Panel - Programming PLC & SCADA - Design Process Interlocking & Control Method - FAT & perform commissioning  Electrical - Design MCC Panel - Panel FAT & perform commissioning  Office Work - Project coordination & schedules  Study and Order Items Experiences • Oyster Sauce ‘s Process • Drypers ‘s Production Process • Site Cabling • Total 5 projects completed. Monthly Income Basic Salary : RM 1400 Mobile Phone : RM 90 EPF (Employer) : RM 150 Travelling Claim : RM 700++ Total Amount : RM 2340 Reason to Leave - Each Project has limited time and budget, not allow spend to perfect the works. - Want to join specialist company, which concentrate in only industry.
  • 6. 4. Skills  Process - Design : P&ID Drawing - Design : Process Control Logic - HAZOP Study - Mass & Energy Balance - Tuning PID-Control - Process Analysis and Troubleshooting  Automation - Design : PLC and DCS System - Programming : PLC and HMI - Design : Tank Gauging System - Design : Networking System ( Ethernet , Fiber Optic , Profibus , RS485 , TRL/2 )  Electrical - Design : SLD Drawing and Motor Starter Circuit - Design : MCC Panel , SSB Panel , DB Panel - Design : Hydraulic Control Panel - Panel FAT and SAT Test - Design : UPS System - Design : CCTV System - Design : PABX System - Sizing Power Cable - Sizing Motor - Motor Installation and Troubleshooting  Machine - Design : Motor Positioning Control  PLC Programming - Siemens - GE Fanuc - Nais - Omron - Mitsubishi  DCS Programming - Yokogawa  Process Control Software ( SCADA system ) : Wonderware Intouch ; Cimplicity HMI
  • 7. ( Touch Screen ) : Siemens Protool ; Proface ; Easy View ; Omron ( Remote Control Module ) : Siemens OP7.  Instrumentation - Instrument Installation and Calibration ( sensor , Valve , Radar , Analyzer , …… ) - setting Inverter - setting SoftStarter - setting Servo  Mechanical Work - Making Control Panel - On-Site Panel Modification - Site’s Electrical work - Repairing Instrument - Install Pump and Instrument - connect Cable to Motor and Instrument  Other - Tank Farm Level Dipping and Calculation  Special Skills : - Fast Trouble Shooting & Problem Solving ( Programming, Setting, Rewiring ) - Fast On-Site Modification to suit System’s Changes ( Re-Design, Programming, Rewiring, 3rd Party Panel Modification ) - Restore abandoned System & Control 5. Documentation Software  MS Excel  MS Word  AutoCAD  PDMS View 6. STRENGHTS  Good stamina. ( train from daily climb in Plant & Tank Farm )  Was trained work Independent and share by others department  Willing to train others  Well self-awareness and responsible  Would take any possibilities to solve “Bottom Neck” situation. Language Proficiency : Spoken – Malay; English; Mandarin; Cantonese & Hokkien. Written – Malay; English; Chinese. Oversea work’s Experiences : Thailand; Kalimantan; Maldives
  • 8. Major Projects Completed : LEE KUM KEE OYSTER SAUCE ( Food Industry , Shah Alam ) = Automate New Process Line - Design & Supply PLC Panel - Programming Process Control ??? ( Cement Plant , Ipoh ) = Cabling and Installation - Design Cabling Routing and Termination Drawing - Site Installation DRYPERS ( Diaper Plant , Shah Alam ) = Upgrade PLC and Run-back Machine Line that newly transfer from BAZIL to MALAYSIA - Upgrade PLC , modify PLC Program and Touchscreen - Site Installation and Commissioning SELANGOR WATER TREATMENT PLANT ( Kuala Selangor ) = Upgrade from Electronic Card become PLC = Install Antenna to receive Plant status that 40km far from Office - Install PLC , Programming PLC and HMI - Install Send/Receive Antenna - Site Installation and Commissioning ??? ( Zinc Roofing Manufacturing Plant , Shah Alam ) = Control Roofing Cutting - Install PLC Panel , Inverter Panel , Encoder Sensor - Programming PLC and Touchscreen - Site Installation and Commissioning TOSHIBA ELECTRONICS ( Electronic IC Plant , Banting ) = Supply IC leg soldering dipping Machine - Install PLC Panel , Servo Controller and Motor - Programming PLC and Touchscreen - Site Installation and Commissioning Willing to travel : Willing to Relocate : Expect Income ( Negotiable ) Yes Yes RM 8,000 Commence Date : After notice period of 1 month or less
  • 9. APM ( Car Seat , Bukit Beruntung ) = Supply Car Seat Bearing Insert Machine - Install PLC Panel , Servo Controller and Motor - Programming PLC and Touchscreen - Site Installation and Commissioning YTL ( Concrete Premix Station , Johor ) = Automate Concrete Mixing Process and Data Reporting - Install PLC Panel , Computer - Programming PLC and HMI - Sensor and Instrument Installation - Site Installation and Commissioning ??? ( Dobi shop , Petaling and Brickfields ) = Supply Coin Vending Machine - Install Machine - Programming PLC and Touchscreen - Site Installation and Commissioning JTOP PALM OIL MILL ( Palm Oil Mill , Johor ) = Automate Sterilizer Process and etc - Install PLC Panel , Computer - Programming PLC and HMI - Modify Existing Motor/Hydraulic Starter, become able control by PLC - Sensor and Instrument Installation - Cabling and termination - Site Installation and Commissioning SELANGAU PALM OIL MILL ( Palm Oil Mill , Sarawak ) = Automate Sterilizer Process and etc - Install PLC Panel , Computer - Programming PLC and HMI - Sensor and Instrument Installation - Cabling and termination - Site Installation and Commissioning PT CAKUNG PALM OIL MILL ( Palm Oil Mill , Kalimantan ) = Whole Plant and Boiler Automation Control - Install PLC Panel , MCC Panel , Computer
  • 10. - Programming PLC and HMI - Sensor and Instrument Installation - Motor Installation - Cabling and termination - Site Installation and Commissioning NATURAL PALM OIL REFINERY ( Palm Oil Refinery , Thailand ) = Automation Control - Install PLC Panel , MCC Panel , Computer - Programming PLC and HMI - Sensor and Instrument Installation - Motor Installation - Cabling and termination - Site Installation and Commissioning IOI LIPID ENZYMTEC ( Palm Oil Specialty Fat , Pasir Gudang ) = Solvent Fractionation Plant ( new ) = Enzymatic Plant ( new ) = Fatty Acid Distillation Plant ( new ) = Hydrogenation Plant ( new ) = Multistock Refinery Plant ( new ) = Tank Farm ( new ) = Utilities ( new ) - Install DCS Panel , MCC Panel , SSB Panel , DB Panel ,Computer - Install UPS System - Install PABX System - Install CCTV - Programming PLC and HMI - Sensor and Instrument Installation - Motor Installation - Cabling and termination - Site Installation and Commissioning CARGILL PALM PRODUCTS ( Palm Oil Specialty Fat , Port Klang ) = CIE Plant ( new ) = Neutralization Plant ( new ) = Waste Water Treatment Plant ( new ) = Oil Blending System ( new ) = Ingredient Mixing ( new ) = Tank Farm ( new and existing ) = Condensate Recovery System ( new ) = Multistock Refinery Plant – Auto Stock Change = Packaging Line1ABC Plant – Upgrade PLC System
  • 11. = Packaging Line1E Plant – Upgrade PLC System = Packaging Plant – Hot Water System = New and Existing Bleaching Earth Silo – Auto Transfer = 8 Plants – Improvement = Nitrogen Generator and Compressed Air - Improvement - Install PLC Panel , MCC Panel , SSB Panel , DB Panel ,Computer - Install UPS System - Programming PLC and HMI - Sensor and Instrument Installation - Motor Installation - Cabling and termination - Site Installation and Commissioning