1. Vijay Kumar Mishra
Mobile : 7766903245 Email : vijay_elect@yahoo.com
CAREER PROFILE (2001 – till Date)
ATC Telecom Infrastructure Private Limited (formerly Viom Networks)
(August 2012 to Till Date)
Profile : Sr. Asset Manager – (Bihar) Designation : Deputy Manager
Location : Muzaffarpur Cluster – Bihar Circle (May 2014 to Till Date)
Bhagalpur Cluster – Bihar Circle (March 2013 to April 2014)
Purnea Cluster – Bihar Circle (August 2012 to February 2013)
Responsibilities:
• As a Cluster Head maintain Infra Network up time as per SLA.
• Vendor performance evaluation and monitor their Performance.
• Reduce Outage penalty and Minimize Customer Escalation.
• Reduction of P&F Cost(Diesel Consumption/EB Penalty).
• EMG Escalation & EMG related penalty reduction.
• Follow up for Timely EB Bill collection and Bill payment till not paid.
• Cost Saving after any Energy Initiative (New BB/ EB Conversion etc).
• Timely request for Infra upgradation/replacement to circle infra team.
• Ensure 100% Preventive Maintenance at Sites.
• Diesel Beat Plan Preparation with Proper backup and reduction as compared
with Last.
• Support for new EB Work and rectification to make Green Cluster.
• Monthly Asset tracker sign-off with CI and ensure for every new Asset
Installation/Deviation reporting through HHD.
• Support for New Site Acquisition, RFI & RFS.
• Provide support to additional OPCO sharing for getting high tenancy ratio.
• Make sure for Proper Site Hygiene with availability of all required documents
at Site.
• Monthly Load Sign-off with all opco & Outage Sign-off with BSNL.
• Weekly review meeting with Customer and Third party Infra equipment
provider to reduce outages and make action plan to improve KPI.
• Preparing Weekly and Monthly reports to Customer and Circle for overall
Cluster KPI performance and action plan.
Achievement :
• Outage reduction of aprox 50,000 minutes in Muzaffarpur Cluster .
• Per site Diesel cost reduce from 950 ltr to 658 Ltr in Muzaffarpur Cluster.
• 65 Site EB Electrified in Muzaffarpur Cluster(2014-2016).
• 182 Sites converted into NEFT/RTGS payment mode(2014-2016).
Award:
• .
• Awarded for Best Improved Cluster (Muzaffarpur).
• Awarded with Star Employee.
• Awarded with Best CH Award.
• Awarded with CEO Club Membership.
Page 1
2. ZTE Telecom India Pvt. Ltd.(Sept.2010 to May 2012)
O&M Manager (MTS MS Operation)– Maharashtra & Goa Circle(Jan2012 to July
2012)
Responsibilities:
• As a O&M Manager maintain all KPI (RF-HOSR,TCH/SDCCH
Drop,TCH/SDCCH Blocking/BSS-Network Availability/Switch-ASR,CCR,PSR).
• Spare & Vehicle Management for smooth field operation in Circle.
• Vendor performance evaluation and monitor their SLA.
• Vendor/Outsource payments and tracking their IPR & PO through P6 tool.
• Maintain Network Availability up to 99.98 %.
• Weekly review meeting with Customer and IP provider/Third party
equipment provider to reduce outages and make action plan to improve
KPI.
• Prepare Weekly and Monthly reports to Customer and Corporate for overall
circle KPI performance and action plan.
BSS Manager (S-Tel Project) – Assam Circle(Sept. 2010 t0 Dec 2012)
BSS Operation for S-Tel MS Operation in Assam & NE Circle.
Responsibilities:
• As a BSS Manager Assam Circle looking S-Tel MS Operation for 500 sites.
• Maintain Network availability up to 99.9% and other KPI as per SLA.
• Weekly Meeting with Customer, IP & Lease Line Vendor for outage
reconciliation & planned for better Network Availability.
• Sending all MIS reports to corporate on weekly & monthly basis.
• Looking R&R process for smooth field operation.
• Weekly & Monthly analysis of Outages and make Action plan accordingly.
• Control on Vehicle utilization & other resources in field for costing purpose.
• Monthly analysis of Bandwidth utilization, NMS visibility, External Alarm,
Site Fluctuation, Infra Status etc.
• O & M of BSS & Transmission Equipment i.e.ZTE (BSC & BTS), Fibcom Mux,
NEC & Ceragon M/W Equip.(SDH & PDH) ,Radwin UBR Equip & Celtro
compressed Equipment.
Tata Teleservices Ltd.(March 2007 – August 2010)
Deputy Manager- Bihar Circle
Responsibilities:
• As a Bihar Tx Deputy Manager working in Patna and looking after
Transmission and EBS operation which includes bandwidth feasibility and
provisioning through Alcatel RM/NM for our CDMA project roll-out and Other
Lease line Customer (Unitech/MTS/AIRCEL/VODAFONE/IDEA/S-
Tel/Sify/Tulip etc.) and their operation.
• O& M of Transmission Equipment i.e. Alcatel Equip.(Especially SDH-Alcatel
Mux-1660,1662,1642.),NEC M/W Equip.(SDH & PDH) & BTS (Motorola &
ZTE).
• Maintaining bandwidth availability of 99.9 % for our CDMA/Lease line
customer.
3. • Involvement in POI switch A/T and Co-ordination with local BSNL for POI
augmentation, New POI, and POI fault.
• Bandwidth up gradation of live N/W, Changes in Live N/W Configuration
according to need in the N/W.
Achievements:
• Successful completion of all Backbone nodes into ring protection.
• Successful Completion of all M/W links connected through NMS.
• 100% protection for CDMA & Lease Line bandwidth.
• Successfully completed UNINOR project roll-out within very less timeline.
Awards:
• Received Super star of the Month award for successfully completion of
2-STM connectivity with Airtel NLD.
• Received Spot light award for successfully completion of Uninor E1
delivery.
LG Electronics System India Pvt. Ltd (BSNL CDMA WLL Project)
LG Electronics India is one of the leader in CDMA technology and one of the big suppliers of WLL
systems to Bharat Sanchar Nigam Ltd., more than 7 lakhs lines are working in all over India. At
present we are in the process of manufacturing, Installation and commissioning of this product.
The system is based on R2/SSNO7 and V5.2 interface.
Sr. Engineer -Technical Support Group (Feb 2001 to Feb 2007)
Responsibilities:
• Network implementation, Installation and A/T of BSS and BSC Sub
Systems.
• Report generation before site Installation and supervising installation
teams.
• Network performance analyzing & Co-ordination with the RF Teams for
network drives and optimisation.
• Testing and trouble shooting of various cards at PCB and system level.
Identification of fault causes of BSC and BTS through GUI.
• Customer support for technical problem in the system. O & M of CDMA WLL
Sub System BSC and BTS.
• Corrective and Preventive Maintenance of BTS sites @ every three month in
Bihar & Jharkhand.
• Testing and verification of sites environment alarms and Battery backup,
VSWR etc.
• Hardware expansion in BSC and BTS sites as per requirement.
• Software up gradation/Correction patches implementation.
EDUCATION:
⇒ M.Sc.(Electronics Science with specialization in Telecommunication), from Baba
Saheb Bhimrao Ambedkar Bihar University (2000) with 73% Marks.
⇒ B.SC.(Electronics) from B.R.A.B.U.,Muzaffarpur(1997) with 71% Marks.
⇒ Intermediate (PCM), from Board of Intermediate Examination (1993) with 77%
Marks.
⇒ S.S.C., from Board of Secondary Education (1991) with 61% Marks.
4. PERSONAL DETAILS
• Father’s Name : Late Sri Ram Bhajan Mishra
• Date of birth : 01-March-1977
• Marital Status : Married.
• Languages known : English, Hindi
CTC : 9 lakh per Annum.
Permanent Address:
Vijay Kumar Mishra
Mishra Sadan,
Damu Chowk Road,
Muzaffarpur-842001