This document appears to be a research project report on diabetes mellitus and its treatment trends submitted by a student, Rutuja Deepak Chudnaik, to the University of Mumbai. The report includes an acknowledgement section thanking those who assisted with the project, a declaration by the student, and a table of contents outlining the various sections of the report such as an introduction on diabetes, prevention, methodology, data collection and analysis procedures, findings on perceived blood glucose control, diet and medication, and conclusions. The student conducted the research under the guidance of a professor for a degree program in research methodology.