REQUIREMENTS FOR BUILDING PLAN APPROVAL
RESIDENTIAL BUILDING
Bungalow Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦25/M3
iv. Ratification Fee= ₦10/M2
v. Land use clearance = ₦1,000
vi. Perimeter Fencing = (Perimeter) x ₦50
vii. Location plan must be sealed by a Registered Town Planner.
Bungalow Building in Other Local Government Headquarters
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦22.5/M3
iv. Ratification Fee= ₦5/M2
v. Land use clearance = ₦1,000
vi. Perimeter Fencing = (Perimeter) x ₦50
vii. Location plan must be sealed by a Registered Town Planner.
Bungalow Building in Other Towns
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦20/M3
iv. Ratification Fee= ₦5/M2
v. Land use clearance = ₦1,000
vi. Perimeter Fencing = (Perimeter) x ₦50
vii. Location plan must be sealed by a Registered Town Planner.
Storey Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦25/M3
vi. Ratification Fee= ₦10/M2
vii. Land use clearance = ₦1,000
viii. Perimeter Fencing = (Perimeter) x ₦50
ix. Location plan must be sealed by a Registered Town Planner.
Storey Building in Other Local Government Headquarters.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦22.5/M3
vi. Ratification Fee= ₦5/M2
vii. Land use clearance = ₦1,000
viii. Perimeter Fencing = (Perimeter) x ₦50
ix. Location plan must be sealed by a Registered Town Planner.
Storey Building in Other Towns.
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦20/M3
vi. Ratification Fee= ₦5/M2
vii. Land use clearance = ₦1,000
viii. Perimeter Fencing = (Perimeter) x ₦50
ix. Location plan must be sealed by a Registered Town Planner.
COMMERCIAL BUILDING
Bungalow/ Storey Building in Ado Ekiti.
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Environmental Impact Assessment.
iv. Letter of supervision by the Structural Engineer.
v. Approved survey plan by surveyor General.
vi. Assessment Fee = ₦40/M3
vii. Ratification Fee= ₦15/M2
viii. Land use clearance = ₦5,000
ix. Perimeter Fencing = (Perimeter) x ₦100
x. Location plan must be sealed by a Registered Town Planner.
Bungalow/ Storey Building in Other Towns.
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Environmental Impact Assessment.
iv. Letter of supervision by the Structural Engineer.
v. Approved survey plan by surveyor General.
vi. Assessment Fee = ₦40/M3
vii. Ratification Fee= ₦10/M2
viii. Land use clearance = ₦5,000
ix. Perimeter Fencing = (Perimeter) x ₦100
x. Location plan must be sealed by a Registered Town Planner.
BANK BUILDING
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Environmental Impact Assessment.
iv. Letter of supervision by the Structural Engineer.
v. Approved survey plan by surveyor General.
vi. Assessment Fee = ₦400/M3
vii. Ratification Fee= ₦15/M2
viii. Land use clearance = ₦5,000
ix. Perimeter Fencing = (Perimeter) x ₦100
x. Location plan must be sealed by a Registered Town Planner.
PETROL FILLING STATION
Filling Station in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer.
iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer
v. Environmental Impact Assessment.
vi. Fire Service Clearance.
vii. Police Traffic Clearance.
viii. Letter of suitability/feasibility Approval from DPR.
ix. Land use clearance Approval.
x. Current 3 years tax clearance and 3 years Development levy.
xi. Letter of supervision by the Structural Engineer.
xii. Approved survey plan by surveyor General.
xiii. Assessment Fee = ₦200,000/pump
xiv. Ratification Fee= ₦15/M2
xv. Land use clearance = ₦5,000
xvi. Perimeter Fencing = (Perimeter) x ₦100
xvii. Location plan must be sealed by a Registered Town Planner.
Filling Station in Other Local Government Area.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer.
iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer
v. Environmental Impact Assessment.
vi. Fire Service Clearance.
vii. Police Traffic Clearance.
viii. Land use clearance Approval.
ix. Letter of suitability/feasibility Approval from DPR.
x. Current 3 years tax clearance and 3 years Development levy.
xi. Letter of supervision by the Structural Engineer.
xii. Approved survey plan by surveyor General.
xiii. Assessment Fee = ₦150,000/pump
xiv. Ratification Fee= ₦15/M2
xv. Land use clearance = ₦5,000
xvi. Perimeter Fencing = (Perimeter) x ₦100
xvii. Location plan must be sealed by a Registered Town Planner.
Filling Station in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer.
iii. Four (4) sets of Electrical drawings sealed by a Registered Engineer
iv. Environmental Impact Assessment.
v. Fire Service Clearance.
vi. Police Traffic Clearance.
vii. Land use clearance Approval.
viii. Letter of suitability/feasibility Clearance from DPR.
ix. Current 3 years tax clearance and 3 years Development Levy.
x. Letter of supervision by the Structural Engineer.
xi. Approved survey plan by surveyor General.
xii. Assessment Fee = ₦100,000/pump
xiii. Ratification Fee= ₦15/M2
xiv. Land use clearance = ₦5,000
xv. Perimeter Fencing = (Perimeter) x ₦100
xvi. Location plan must be sealed by a Registered Town Planner.
GAS STATION.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer.
iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer
v. Environmental Impact Assessment.
vi. Fire Service Clearance.
vii. Police Traffic Clearance.
viii. Land use clearance Approval.
ix. Letter of suitability/feasibility from DPR.
x. Current 3 years tax clearance and 3 years Development Levy.
xi. Letter of supervision by the Structural Engineer.
xii. Approved survey plan by surveyor General.
xiii. Assessment Fee = ₦500,000
xiv. Ratification Fee= ₦15/M2
xv. Land use clearance = ₦5,000
xvi. Perimeter Fencing = (Perimeter) x ₦100
xvii. Location plan must be sealed by a Registered Town Planner.
HOSTEL.
Bungalow Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦35/M3
iv. Ratification Fee= ₦15/M2
v. Land use clearance = ₦5,000
vi. Perimeter Fencing = (Perimeter) x ₦100
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦35/M3
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Bungalow Building in Other Local Government.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦35/M3
iv. Ratification Fee= ₦10/M2
v. Land use clearance = ₦5,000
vi. Perimeter Fencing = (Perimeter) x ₦100
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦35/M3
vi. Ratification Fee= ₦10/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
SAWMILL.
Saw Mill in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦250,000/Mill
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Saw Mill in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦150,000/Mill
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
HOTEL/EATERY/RESTAURANTS
Bungalow Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦50/M3
iv. Ratification Fee= ₦15/M2
v. Land use clearance = ₦5,000
vi. Perimeter Fencing = (Perimeter) x ₦100
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦50/M3
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Bungalow Building in Other Local Government.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦50/M3
iv. Ratification Fee= ₦10/M2
v. Land use clearance = ₦5,000
vi. Perimeter Fencing = (Perimeter) x ₦100
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦50/M3
vi. Ratification Fee= ₦10/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
LIGHT INDUSTRY
Block Making Industry
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦25,000
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Concrete Industry
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦40,000
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Stone crushing Industry (Mechanical)
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦500,000
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Stone crushing Industry with Asphalt
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦800,000
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
AGRICULTURAL DEVELOPMENT
Mechanized Farming
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦5,000/Ha
iv. Ratification Fee= ₦15/M2
v. Land use clearance = ₦5,000
vi. Perimeter Fencing = (Perimeter) x ₦100
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
POULTRY FARMING
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦10,000 for (100-200) Birds
iv. Assessment Fee = ₦20,000 for (201-500) Birds
v. Ratification Fee= ₦15/M2
vi. Land use clearance = ₦5,000
vii. Perimeter Fencing = (Perimeter) x ₦100
viii. Location plan must be sealed by a Registered Town Planner.
ix. Environmental Impact Assessment.
FISHERY FARMING
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee (commercial)= ₦20,000
iv. Assessment Fee (Domestic)= ₦5,000
v. Ratification Fee= ₦15/M2
vi. Land use clearance = ₦5,000
vii. Perimeter Fencing = (Perimeter) x ₦100
viii. Location plan must be sealed by a Registered Town Planner.
ix. Environmental Impact Assessment.
PIGGERY FARMING
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee (commercial)= ₦25,000
iv. Assessment Fee (Domestic)= ₦10,000
v. Ratification Fee= ₦15/M2
vi. Land use clearance = ₦5,000
vii. Perimeter Fencing = (Perimeter) x ₦100
viii. Location plan must be sealed by a Registered Town Planner.
ix. Environmental Impact Assessment.
RELIGION CAMP GROUND
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦25/M3
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
PLACE OF WORSHIP
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦20/M3
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
EDUCATION INSTITUTION
Nursery/Primary school/Secondary school/post-Secondary school
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦30/M3
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
CHANGE OF SITE OF AN APPROVED PLAN
Residential
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = 25% of current charge
vi. Location plan must be sealed by a Registered Town Planner.
Commercial/Petrol Station/ Sawmill
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = 25% of current charge
vi. Location plan must be sealed by a Registered Town Planner.
vii. Environmental Impact Assessment.
RENEWAL OF BUILDING PLAN
Residential/Commercial/Industrial
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = 20% of current charge
vi. Location plan must be sealed by a Registered Town Planner.
vii. Environmental Impact Assessment. (Commercial/Industrial)
LAYOUT PLAN
i. Six (6) sets of layout plan with locational plan prepared by a Registered
Town Planner.
ii. Approved survey plan by surveyor General.
iii. Land Use Clearance =₦5,000
iv. Assessment Fee 0.5 Ha- 2.5Ha = ₦10,000
2.5Ha - 5.0Ha = ₦20,000
5.1Ha - 10Ha = ₦40,000
Above 10Ha = ₦100,000
v. Location plan must be sealed by a Registered Town Planner.
vi. Environmental Impact Assessment.
ROAD CONSTRUCTION YARD PROJECT SITE
i. Four (4) sets of working drawings with architectural seal
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦50,000
iv. Location plan must be sealed by a Registered Town Planner.
v. Environmental Impact Assessment.
PENALTY IN RESPECT OF UNAPPROVED EXISTING BUILDING PLAN
i. Assessment Fee = The present Assessment + 50% of the assessment
Stanchion 5
S/N Category Purpose
Amount
N
ANALYSIS
Form
fee
LUC
Registration
Construction
Permit fee
EIA
Registration
Site
inspection/
Supervision
1. Commercial 850,000 50,000 100,000 400,000 150,000 150,000
2. Corporate Bodies 200,000 20,000 25,000 100,000 30,000 25,000
3. Individual/Private 75,000 5,000 10,000 35,000 15,000 10,000
4.
Payment of Optic
Fibre
2,500 Per linear metre.
5. Caution fee 1,500 Per linear metre.
Note: Penalty for contravenor is double of the assessment fee above and other
condition determined by the ministry.

More Related Content

What's hot

Beijing daxing international airport world's first airport with single terminal
Beijing daxing international airport world's first airport with single terminalBeijing daxing international airport world's first airport with single terminal
Beijing daxing international airport world's first airport with single terminal
architecturesideas
 
Präsentation Prof. Dr. Manfred Hegger, Deutsche Gesellschaft für nachhaltiges...
Präsentation Prof. Dr. Manfred Hegger, Deutsche Gesellschaft für nachhaltiges...Präsentation Prof. Dr. Manfred Hegger, Deutsche Gesellschaft für nachhaltiges...
Präsentation Prof. Dr. Manfred Hegger, Deutsche Gesellschaft für nachhaltiges...GCB German Convention Bureau e.V.
 
ECA presentation
ECA presentationECA presentation
ECA presentation
Shze Hwa Lee
 
Valuation - Estimation, Costing and Valuation Engineering
Valuation - Estimation, Costing and Valuation EngineeringValuation - Estimation, Costing and Valuation Engineering
Valuation - Estimation, Costing and Valuation Engineering
Shanmugasundaram N
 
STUDY ON SCOPE OF PARAMETRIC SOFTWARES IN ARCHITECTURE
STUDY ON SCOPE OF PARAMETRIC SOFTWARES IN ARCHITECTURESTUDY ON SCOPE OF PARAMETRIC SOFTWARES IN ARCHITECTURE
STUDY ON SCOPE OF PARAMETRIC SOFTWARES IN ARCHITECTURE
Anganam
 
Museum of the future..pptx
Museum of the future..pptxMuseum of the future..pptx
Museum of the future..pptx
SyedTousif10
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing
Vijay325
 
EQS - RATE ANALYSIS.pdf
EQS -  RATE ANALYSIS.pdfEQS -  RATE ANALYSIS.pdf
EQS - RATE ANALYSIS.pdf
GovindarajuluBadana
 
Cpm ch 2tender
Cpm ch 2tenderCpm ch 2tender
Cpm ch 2tender
neharajpl
 
Dilip Deshmukh (1)
Dilip Deshmukh (1)Dilip Deshmukh (1)
Dilip Deshmukh (1)
Dilip Deshmukh
 
Valuation
ValuationValuation
Valuation
gayu pandian
 
Estimation introduction - Estimation, Costing and Valuation (ECV)
Estimation introduction - Estimation, Costing and Valuation (ECV)Estimation introduction - Estimation, Costing and Valuation (ECV)
Estimation introduction - Estimation, Costing and Valuation (ECV)
Shanmugasundaram N
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentation
cynfang Fong
 
Cost Control Process for Construction
Cost Control Process for ConstructionCost Control Process for Construction
Cost Control Process for Construction
yasser abouzeid,MD,CCE
 
Anti termite treatment in foundation
Anti termite treatment in foundationAnti termite treatment in foundation
Types of contract
Types of contractTypes of contract
Types of contract
HarshalNarkhede7
 
Tender
TenderTender
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
ahmong4
 
District schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWDDistrict schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWD
AshwiniChaudhari13
 
Environmental Considerations in Construction
Environmental Considerations in ConstructionEnvironmental Considerations in Construction
Environmental Considerations in Construction
SJMIT,now NMAMIT NITTE
 

What's hot (20)

Beijing daxing international airport world's first airport with single terminal
Beijing daxing international airport world's first airport with single terminalBeijing daxing international airport world's first airport with single terminal
Beijing daxing international airport world's first airport with single terminal
 
Präsentation Prof. Dr. Manfred Hegger, Deutsche Gesellschaft für nachhaltiges...
Präsentation Prof. Dr. Manfred Hegger, Deutsche Gesellschaft für nachhaltiges...Präsentation Prof. Dr. Manfred Hegger, Deutsche Gesellschaft für nachhaltiges...
Präsentation Prof. Dr. Manfred Hegger, Deutsche Gesellschaft für nachhaltiges...
 
ECA presentation
ECA presentationECA presentation
ECA presentation
 
Valuation - Estimation, Costing and Valuation Engineering
Valuation - Estimation, Costing and Valuation EngineeringValuation - Estimation, Costing and Valuation Engineering
Valuation - Estimation, Costing and Valuation Engineering
 
STUDY ON SCOPE OF PARAMETRIC SOFTWARES IN ARCHITECTURE
STUDY ON SCOPE OF PARAMETRIC SOFTWARES IN ARCHITECTURESTUDY ON SCOPE OF PARAMETRIC SOFTWARES IN ARCHITECTURE
STUDY ON SCOPE OF PARAMETRIC SOFTWARES IN ARCHITECTURE
 
Museum of the future..pptx
Museum of the future..pptxMuseum of the future..pptx
Museum of the future..pptx
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing
 
EQS - RATE ANALYSIS.pdf
EQS -  RATE ANALYSIS.pdfEQS -  RATE ANALYSIS.pdf
EQS - RATE ANALYSIS.pdf
 
Cpm ch 2tender
Cpm ch 2tenderCpm ch 2tender
Cpm ch 2tender
 
Dilip Deshmukh (1)
Dilip Deshmukh (1)Dilip Deshmukh (1)
Dilip Deshmukh (1)
 
Valuation
ValuationValuation
Valuation
 
Estimation introduction - Estimation, Costing and Valuation (ECV)
Estimation introduction - Estimation, Costing and Valuation (ECV)Estimation introduction - Estimation, Costing and Valuation (ECV)
Estimation introduction - Estimation, Costing and Valuation (ECV)
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentation
 
Cost Control Process for Construction
Cost Control Process for ConstructionCost Control Process for Construction
Cost Control Process for Construction
 
Anti termite treatment in foundation
Anti termite treatment in foundationAnti termite treatment in foundation
Anti termite treatment in foundation
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Tender
TenderTender
Tender
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
District schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWDDistrict schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWD
 
Environmental Considerations in Construction
Environmental Considerations in ConstructionEnvironmental Considerations in Construction
Environmental Considerations in Construction
 

Similar to REQUIREMENTS FOR BUILDING PLAN APPROVAL

CAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdfCAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdf
HuynhVu29
 
ICI_P1_PLANNER
ICI_P1_PLANNERICI_P1_PLANNER
ICI_P1_PLANNER
Mao Hua
 
ITD/ICI Project 1
ITD/ICI Project 1ITD/ICI Project 1
ITD/ICI Project 1
TeoViVien
 
ICI/ITD P1
ICI/ITD P1ICI/ITD P1
ICI/ITD P1
Mao Hua
 
ITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWINGITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWING
Mao Hua
 
ICI Project 1- Urban Planner
ICI Project 1- Urban PlannerICI Project 1- Urban Planner
ICI Project 1- Urban Planner
EricaGloriaChin
 
Accounting assignment help
Accounting assignment helpAccounting assignment help
Accounting assignment help
Tutor Help Desk
 

Similar to REQUIREMENTS FOR BUILDING PLAN APPROVAL (7)

CAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdfCAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdf
 
ICI_P1_PLANNER
ICI_P1_PLANNERICI_P1_PLANNER
ICI_P1_PLANNER
 
ITD/ICI Project 1
ITD/ICI Project 1ITD/ICI Project 1
ITD/ICI Project 1
 
ICI/ITD P1
ICI/ITD P1ICI/ITD P1
ICI/ITD P1
 
ITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWINGITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWING
 
ICI Project 1- Urban Planner
ICI Project 1- Urban PlannerICI Project 1- Urban Planner
ICI Project 1- Urban Planner
 
Accounting assignment help
Accounting assignment helpAccounting assignment help
Accounting assignment help
 

More from Government of Ekiti State, Nigeria

An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
Government of Ekiti State, Nigeria
 
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
Government of Ekiti State, Nigeria
 
COVID-19 VACCINATION SITES (EKITI STATE)
COVID-19  VACCINATION SITES (EKITI STATE)COVID-19  VACCINATION SITES (EKITI STATE)
COVID-19 VACCINATION SITES (EKITI STATE)
Government of Ekiti State, Nigeria
 
Re-Imagining Health Service Delivery 2020-2021 Annual Report
Re-Imagining Health Service Delivery  2020-2021 Annual ReportRe-Imagining Health Service Delivery  2020-2021 Annual Report
Re-Imagining Health Service Delivery 2020-2021 Annual Report
Government of Ekiti State, Nigeria
 
Ekiti State Mental Health Law 2021
Ekiti State Mental Health Law 2021Ekiti State Mental Health Law 2021
Ekiti State Mental Health Law 2021
Government of Ekiti State, Nigeria
 
Ekiti State Drugs and Health Supplies Management Agency Law 2021
Ekiti State Drugs and Health Supplies Management Agency Law 2021Ekiti State Drugs and Health Supplies Management Agency Law 2021
Ekiti State Drugs and Health Supplies Management Agency Law 2021
Government of Ekiti State, Nigeria
 
State Address on the Occasion of 25th Anniversary of Ekiti State.
State Address on the Occasion of 25th Anniversary of Ekiti State.State Address on the Occasion of 25th Anniversary of Ekiti State.
State Address on the Occasion of 25th Anniversary of Ekiti State.
Government of Ekiti State, Nigeria
 
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
Government of Ekiti State, Nigeria
 
ENTITLED: TOWARDS A MORE PERFECT UNION
ENTITLED: TOWARDS A MORE PERFECT UNIONENTITLED: TOWARDS A MORE PERFECT UNION
ENTITLED: TOWARDS A MORE PERFECT UNION
Government of Ekiti State, Nigeria
 
2021 WORLD HUMANITARIAN DAY
2021 WORLD HUMANITARIAN DAY2021 WORLD HUMANITARIAN DAY
2021 WORLD HUMANITARIAN DAY
Government of Ekiti State, Nigeria
 
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
Government of Ekiti State, Nigeria
 
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
Government of Ekiti State, Nigeria
 
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
Government of Ekiti State, Nigeria
 
Ekiti State Audit Service Commission Law, 2021
Ekiti State Audit Service Commission Law, 2021Ekiti State Audit Service Commission Law, 2021
Ekiti State Audit Service Commission Law, 2021
Government of Ekiti State, Nigeria
 
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
Government of Ekiti State, Nigeria
 
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF) MEDIUM TERM SECTORAL STRA...
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF)  MEDIUM TERM SECTORAL STRA...2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF)  MEDIUM TERM SECTORAL STRA...
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF) MEDIUM TERM SECTORAL STRA...
Government of Ekiti State, Nigeria
 
RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019
RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019
RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019
Government of Ekiti State, Nigeria
 
Keep Girls In School
Keep Girls In SchoolKeep Girls In School
A Communique issued at the end of the 30th teleconference meeting of the Nige...
A Communique issued at the end of the 30th teleconference meeting of the Nige...A Communique issued at the end of the 30th teleconference meeting of the Nige...
A Communique issued at the end of the 30th teleconference meeting of the Nige...
Government of Ekiti State, Nigeria
 
FLAGGING OFF 0F EKITI RICE PYRAMID PROJECT
FLAGGING OFF 0F EKITI RICE PYRAMID PROJECTFLAGGING OFF 0F EKITI RICE PYRAMID PROJECT
FLAGGING OFF 0F EKITI RICE PYRAMID PROJECT
Government of Ekiti State, Nigeria
 

More from Government of Ekiti State, Nigeria (20)

An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
 
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
 
COVID-19 VACCINATION SITES (EKITI STATE)
COVID-19  VACCINATION SITES (EKITI STATE)COVID-19  VACCINATION SITES (EKITI STATE)
COVID-19 VACCINATION SITES (EKITI STATE)
 
Re-Imagining Health Service Delivery 2020-2021 Annual Report
Re-Imagining Health Service Delivery  2020-2021 Annual ReportRe-Imagining Health Service Delivery  2020-2021 Annual Report
Re-Imagining Health Service Delivery 2020-2021 Annual Report
 
Ekiti State Mental Health Law 2021
Ekiti State Mental Health Law 2021Ekiti State Mental Health Law 2021
Ekiti State Mental Health Law 2021
 
Ekiti State Drugs and Health Supplies Management Agency Law 2021
Ekiti State Drugs and Health Supplies Management Agency Law 2021Ekiti State Drugs and Health Supplies Management Agency Law 2021
Ekiti State Drugs and Health Supplies Management Agency Law 2021
 
State Address on the Occasion of 25th Anniversary of Ekiti State.
State Address on the Occasion of 25th Anniversary of Ekiti State.State Address on the Occasion of 25th Anniversary of Ekiti State.
State Address on the Occasion of 25th Anniversary of Ekiti State.
 
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
 
ENTITLED: TOWARDS A MORE PERFECT UNION
ENTITLED: TOWARDS A MORE PERFECT UNIONENTITLED: TOWARDS A MORE PERFECT UNION
ENTITLED: TOWARDS A MORE PERFECT UNION
 
2021 WORLD HUMANITARIAN DAY
2021 WORLD HUMANITARIAN DAY2021 WORLD HUMANITARIAN DAY
2021 WORLD HUMANITARIAN DAY
 
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
 
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
 
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
 
Ekiti State Audit Service Commission Law, 2021
Ekiti State Audit Service Commission Law, 2021Ekiti State Audit Service Commission Law, 2021
Ekiti State Audit Service Commission Law, 2021
 
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
 
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF) MEDIUM TERM SECTORAL STRA...
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF)  MEDIUM TERM SECTORAL STRA...2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF)  MEDIUM TERM SECTORAL STRA...
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF) MEDIUM TERM SECTORAL STRA...
 
RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019
RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019
RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019
 
Keep Girls In School
Keep Girls In SchoolKeep Girls In School
Keep Girls In School
 
A Communique issued at the end of the 30th teleconference meeting of the Nige...
A Communique issued at the end of the 30th teleconference meeting of the Nige...A Communique issued at the end of the 30th teleconference meeting of the Nige...
A Communique issued at the end of the 30th teleconference meeting of the Nige...
 
FLAGGING OFF 0F EKITI RICE PYRAMID PROJECT
FLAGGING OFF 0F EKITI RICE PYRAMID PROJECTFLAGGING OFF 0F EKITI RICE PYRAMID PROJECT
FLAGGING OFF 0F EKITI RICE PYRAMID PROJECT
 

Recently uploaded

G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
Energy for One World
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
narinav14
 
History Of Balochistan amazing .pptx / HOB
History Of Balochistan amazing .pptx      / HOBHistory Of Balochistan amazing .pptx      / HOB
History Of Balochistan amazing .pptx / HOB
uzma baloch
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
JuanFelipeHerrera4
 
UN SDSN Sustainable Development Report 2024
UN SDSN Sustainable Development Report 2024UN SDSN Sustainable Development Report 2024
UN SDSN Sustainable Development Report 2024
Energy for One World
 
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
vfefek
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
JSchaus & Associates
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
odmqk
 
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdfLecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
tshree896
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
Energy for One World
 
在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样
在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样
在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样
zvpwjpty
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
JSchaus & Associates
 
Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034
Congressional Budget Office
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
narinav14
 
CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
Congressional Budget Office
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
Cheong Man Keong
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
fundraising4
 
How To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity JourneyHow To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity Journey
Aggregage
 
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
Scribe
 
Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
Congressional Budget Office
 

Recently uploaded (20)

G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
 
History Of Balochistan amazing .pptx / HOB
History Of Balochistan amazing .pptx      / HOBHistory Of Balochistan amazing .pptx      / HOB
History Of Balochistan amazing .pptx / HOB
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
 
UN SDSN Sustainable Development Report 2024
UN SDSN Sustainable Development Report 2024UN SDSN Sustainable Development Report 2024
UN SDSN Sustainable Development Report 2024
 
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
 
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdfLecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
 
在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样
在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样
在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
 
Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
 
CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
 
How To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity JourneyHow To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity Journey
 
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
 
Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
 

REQUIREMENTS FOR BUILDING PLAN APPROVAL

  • 1. REQUIREMENTS FOR BUILDING PLAN APPROVAL RESIDENTIAL BUILDING Bungalow Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦25/M3 iv. Ratification Fee= ₦10/M2 v. Land use clearance = ₦1,000 vi. Perimeter Fencing = (Perimeter) x ₦50 vii. Location plan must be sealed by a Registered Town Planner. Bungalow Building in Other Local Government Headquarters i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦22.5/M3 iv. Ratification Fee= ₦5/M2 v. Land use clearance = ₦1,000 vi. Perimeter Fencing = (Perimeter) x ₦50 vii. Location plan must be sealed by a Registered Town Planner. Bungalow Building in Other Towns i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦20/M3 iv. Ratification Fee= ₦5/M2 v. Land use clearance = ₦1,000 vi. Perimeter Fencing = (Perimeter) x ₦50 vii. Location plan must be sealed by a Registered Town Planner.
  • 2. Storey Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦25/M3 vi. Ratification Fee= ₦10/M2 vii. Land use clearance = ₦1,000 viii. Perimeter Fencing = (Perimeter) x ₦50 ix. Location plan must be sealed by a Registered Town Planner. Storey Building in Other Local Government Headquarters. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦22.5/M3 vi. Ratification Fee= ₦5/M2 vii. Land use clearance = ₦1,000 viii. Perimeter Fencing = (Perimeter) x ₦50 ix. Location plan must be sealed by a Registered Town Planner. Storey Building in Other Towns. I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦20/M3 vi. Ratification Fee= ₦5/M2 vii. Land use clearance = ₦1,000 viii. Perimeter Fencing = (Perimeter) x ₦50 ix. Location plan must be sealed by a Registered Town Planner.
  • 3. COMMERCIAL BUILDING Bungalow/ Storey Building in Ado Ekiti. I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Environmental Impact Assessment. iv. Letter of supervision by the Structural Engineer. v. Approved survey plan by surveyor General. vi. Assessment Fee = ₦40/M3 vii. Ratification Fee= ₦15/M2 viii. Land use clearance = ₦5,000 ix. Perimeter Fencing = (Perimeter) x ₦100 x. Location plan must be sealed by a Registered Town Planner. Bungalow/ Storey Building in Other Towns. I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Environmental Impact Assessment. iv. Letter of supervision by the Structural Engineer. v. Approved survey plan by surveyor General. vi. Assessment Fee = ₦40/M3 vii. Ratification Fee= ₦10/M2 viii. Land use clearance = ₦5,000 ix. Perimeter Fencing = (Perimeter) x ₦100 x. Location plan must be sealed by a Registered Town Planner. BANK BUILDING I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Environmental Impact Assessment. iv. Letter of supervision by the Structural Engineer. v. Approved survey plan by surveyor General.
  • 4. vi. Assessment Fee = ₦400/M3 vii. Ratification Fee= ₦15/M2 viii. Land use clearance = ₦5,000 ix. Perimeter Fencing = (Perimeter) x ₦100 x. Location plan must be sealed by a Registered Town Planner. PETROL FILLING STATION Filling Station in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer v. Environmental Impact Assessment. vi. Fire Service Clearance. vii. Police Traffic Clearance. viii. Letter of suitability/feasibility Approval from DPR. ix. Land use clearance Approval. x. Current 3 years tax clearance and 3 years Development levy. xi. Letter of supervision by the Structural Engineer. xii. Approved survey plan by surveyor General. xiii. Assessment Fee = ₦200,000/pump xiv. Ratification Fee= ₦15/M2 xv. Land use clearance = ₦5,000 xvi. Perimeter Fencing = (Perimeter) x ₦100 xvii. Location plan must be sealed by a Registered Town Planner. Filling Station in Other Local Government Area. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer v. Environmental Impact Assessment.
  • 5. vi. Fire Service Clearance. vii. Police Traffic Clearance. viii. Land use clearance Approval. ix. Letter of suitability/feasibility Approval from DPR. x. Current 3 years tax clearance and 3 years Development levy. xi. Letter of supervision by the Structural Engineer. xii. Approved survey plan by surveyor General. xiii. Assessment Fee = ₦150,000/pump xiv. Ratification Fee= ₦15/M2 xv. Land use clearance = ₦5,000 xvi. Perimeter Fencing = (Perimeter) x ₦100 xvii. Location plan must be sealed by a Registered Town Planner. Filling Station in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iii. Four (4) sets of Electrical drawings sealed by a Registered Engineer iv. Environmental Impact Assessment. v. Fire Service Clearance. vi. Police Traffic Clearance. vii. Land use clearance Approval. viii. Letter of suitability/feasibility Clearance from DPR. ix. Current 3 years tax clearance and 3 years Development Levy. x. Letter of supervision by the Structural Engineer. xi. Approved survey plan by surveyor General. xii. Assessment Fee = ₦100,000/pump xiii. Ratification Fee= ₦15/M2 xiv. Land use clearance = ₦5,000 xv. Perimeter Fencing = (Perimeter) x ₦100 xvi. Location plan must be sealed by a Registered Town Planner.
  • 6. GAS STATION. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer v. Environmental Impact Assessment. vi. Fire Service Clearance. vii. Police Traffic Clearance. viii. Land use clearance Approval. ix. Letter of suitability/feasibility from DPR. x. Current 3 years tax clearance and 3 years Development Levy. xi. Letter of supervision by the Structural Engineer. xii. Approved survey plan by surveyor General. xiii. Assessment Fee = ₦500,000 xiv. Ratification Fee= ₦15/M2 xv. Land use clearance = ₦5,000 xvi. Perimeter Fencing = (Perimeter) x ₦100 xvii. Location plan must be sealed by a Registered Town Planner. HOSTEL. Bungalow Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦35/M3 iv. Ratification Fee= ₦15/M2 v. Land use clearance = ₦5,000 vi. Perimeter Fencing = (Perimeter) x ₦100 vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment.
  • 7. Storey Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦35/M3 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Bungalow Building in Other Local Government. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦35/M3 iv. Ratification Fee= ₦10/M2 v. Land use clearance = ₦5,000 vi. Perimeter Fencing = (Perimeter) x ₦100 vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦35/M3 vi. Ratification Fee= ₦10/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment.
  • 8. SAWMILL. Saw Mill in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦250,000/Mill vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Saw Mill in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦150,000/Mill vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. HOTEL/EATERY/RESTAURANTS Bungalow Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦50/M3 iv. Ratification Fee= ₦15/M2 v. Land use clearance = ₦5,000 vi. Perimeter Fencing = (Perimeter) x ₦100
  • 9. vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦50/M3 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Bungalow Building in Other Local Government. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦50/M3 iv. Ratification Fee= ₦10/M2 v. Land use clearance = ₦5,000 vi. Perimeter Fencing = (Perimeter) x ₦100 vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦50/M3 vi. Ratification Fee= ₦10/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100
  • 10. ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. LIGHT INDUSTRY Block Making Industry i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦25,000 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Concrete Industry i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦40,000 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Stone crushing Industry (Mechanical) i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
  • 11. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦500,000 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Stone crushing Industry with Asphalt i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦800,000 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. AGRICULTURAL DEVELOPMENT Mechanized Farming i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦5,000/Ha iv. Ratification Fee= ₦15/M2 v. Land use clearance = ₦5,000 vi. Perimeter Fencing = (Perimeter) x ₦100 vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment.
  • 12. POULTRY FARMING i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦10,000 for (100-200) Birds iv. Assessment Fee = ₦20,000 for (201-500) Birds v. Ratification Fee= ₦15/M2 vi. Land use clearance = ₦5,000 vii. Perimeter Fencing = (Perimeter) x ₦100 viii. Location plan must be sealed by a Registered Town Planner. ix. Environmental Impact Assessment. FISHERY FARMING i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee (commercial)= ₦20,000 iv. Assessment Fee (Domestic)= ₦5,000 v. Ratification Fee= ₦15/M2 vi. Land use clearance = ₦5,000 vii. Perimeter Fencing = (Perimeter) x ₦100 viii. Location plan must be sealed by a Registered Town Planner. ix. Environmental Impact Assessment. PIGGERY FARMING i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee (commercial)= ₦25,000 iv. Assessment Fee (Domestic)= ₦10,000 v. Ratification Fee= ₦15/M2 vi. Land use clearance = ₦5,000 vii. Perimeter Fencing = (Perimeter) x ₦100 viii. Location plan must be sealed by a Registered Town Planner. ix. Environmental Impact Assessment.
  • 13. RELIGION CAMP GROUND i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦25/M3 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. PLACE OF WORSHIP i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦20/M3 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. EDUCATION INSTITUTION Nursery/Primary school/Secondary school/post-Secondary school i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦30/M3 vi. Ratification Fee= ₦15/M2
  • 14. vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. CHANGE OF SITE OF AN APPROVED PLAN Residential i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = 25% of current charge vi. Location plan must be sealed by a Registered Town Planner. Commercial/Petrol Station/ Sawmill i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = 25% of current charge vi. Location plan must be sealed by a Registered Town Planner. vii. Environmental Impact Assessment. RENEWAL OF BUILDING PLAN Residential/Commercial/Industrial i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = 20% of current charge vi. Location plan must be sealed by a Registered Town Planner. vii. Environmental Impact Assessment. (Commercial/Industrial)
  • 15. LAYOUT PLAN i. Six (6) sets of layout plan with locational plan prepared by a Registered Town Planner. ii. Approved survey plan by surveyor General. iii. Land Use Clearance =₦5,000 iv. Assessment Fee 0.5 Ha- 2.5Ha = ₦10,000 2.5Ha - 5.0Ha = ₦20,000 5.1Ha - 10Ha = ₦40,000 Above 10Ha = ₦100,000 v. Location plan must be sealed by a Registered Town Planner. vi. Environmental Impact Assessment. ROAD CONSTRUCTION YARD PROJECT SITE i. Four (4) sets of working drawings with architectural seal ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦50,000 iv. Location plan must be sealed by a Registered Town Planner. v. Environmental Impact Assessment. PENALTY IN RESPECT OF UNAPPROVED EXISTING BUILDING PLAN i. Assessment Fee = The present Assessment + 50% of the assessment Stanchion 5 S/N Category Purpose Amount N ANALYSIS Form fee LUC Registration Construction Permit fee EIA Registration Site inspection/ Supervision 1. Commercial 850,000 50,000 100,000 400,000 150,000 150,000
  • 16. 2. Corporate Bodies 200,000 20,000 25,000 100,000 30,000 25,000 3. Individual/Private 75,000 5,000 10,000 35,000 15,000 10,000 4. Payment of Optic Fibre 2,500 Per linear metre. 5. Caution fee 1,500 Per linear metre. Note: Penalty for contravenor is double of the assessment fee above and other condition determined by the ministry.