REQUIREMENTS FOR BUILDING PLAN APPROVAL
RESIDENTIAL BUILDING
Bungalow Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦25/M3
iv. Ratification Fee= ₦10/M2
v. Land use clearance = ₦1,000
vi. Perimeter Fencing = (Perimeter) x ₦50
vii. Location plan must be sealed by a Registered Town Planner.
Bungalow Building in Other Local Government Headquarters
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦22.5/M3
iv. Ratification Fee= ₦5/M2
v. Land use clearance = ₦1,000
vi. Perimeter Fencing = (Perimeter) x ₦50
vii. Location plan must be sealed by a Registered Town Planner.
Bungalow Building in Other Towns
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦20/M3
iv. Ratification Fee= ₦5/M2
v. Land use clearance = ₦1,000
vi. Perimeter Fencing = (Perimeter) x ₦50
vii. Location plan must be sealed by a Registered Town Planner.
Storey Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦25/M3
vi. Ratification Fee= ₦10/M2
vii. Land use clearance = ₦1,000
viii. Perimeter Fencing = (Perimeter) x ₦50
ix. Location plan must be sealed by a Registered Town Planner.
Storey Building in Other Local Government Headquarters.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦22.5/M3
vi. Ratification Fee= ₦5/M2
vii. Land use clearance = ₦1,000
viii. Perimeter Fencing = (Perimeter) x ₦50
ix. Location plan must be sealed by a Registered Town Planner.
Storey Building in Other Towns.
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦20/M3
vi. Ratification Fee= ₦5/M2
vii. Land use clearance = ₦1,000
viii. Perimeter Fencing = (Perimeter) x ₦50
ix. Location plan must be sealed by a Registered Town Planner.
COMMERCIAL BUILDING
Bungalow/ Storey Building in Ado Ekiti.
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Environmental Impact Assessment.
iv. Letter of supervision by the Structural Engineer.
v. Approved survey plan by surveyor General.
vi. Assessment Fee = ₦40/M3
vii. Ratification Fee= ₦15/M2
viii. Land use clearance = ₦5,000
ix. Perimeter Fencing = (Perimeter) x ₦100
x. Location plan must be sealed by a Registered Town Planner.
Bungalow/ Storey Building in Other Towns.
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Environmental Impact Assessment.
iv. Letter of supervision by the Structural Engineer.
v. Approved survey plan by surveyor General.
vi. Assessment Fee = ₦40/M3
vii. Ratification Fee= ₦10/M2
viii. Land use clearance = ₦5,000
ix. Perimeter Fencing = (Perimeter) x ₦100
x. Location plan must be sealed by a Registered Town Planner.
BANK BUILDING
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Environmental Impact Assessment.
iv. Letter of supervision by the Structural Engineer.
v. Approved survey plan by surveyor General.
vi. Assessment Fee = ₦400/M3
vii. Ratification Fee= ₦15/M2
viii. Land use clearance = ₦5,000
ix. Perimeter Fencing = (Perimeter) x ₦100
x. Location plan must be sealed by a Registered Town Planner.
PETROL FILLING STATION
Filling Station in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer.
iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer
v. Environmental Impact Assessment.
vi. Fire Service Clearance.
vii. Police Traffic Clearance.
viii. Letter of suitability/feasibility Approval from DPR.
ix. Land use clearance Approval.
x. Current 3 years tax clearance and 3 years Development levy.
xi. Letter of supervision by the Structural Engineer.
xii. Approved survey plan by surveyor General.
xiii. Assessment Fee = ₦200,000/pump
xiv. Ratification Fee= ₦15/M2
xv. Land use clearance = ₦5,000
xvi. Perimeter Fencing = (Perimeter) x ₦100
xvii. Location plan must be sealed by a Registered Town Planner.
Filling Station in Other Local Government Area.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer.
iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer
v. Environmental Impact Assessment.
vi. Fire Service Clearance.
vii. Police Traffic Clearance.
viii. Land use clearance Approval.
ix. Letter of suitability/feasibility Approval from DPR.
x. Current 3 years tax clearance and 3 years Development levy.
xi. Letter of supervision by the Structural Engineer.
xii. Approved survey plan by surveyor General.
xiii. Assessment Fee = ₦150,000/pump
xiv. Ratification Fee= ₦15/M2
xv. Land use clearance = ₦5,000
xvi. Perimeter Fencing = (Perimeter) x ₦100
xvii. Location plan must be sealed by a Registered Town Planner.
Filling Station in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer.
iii. Four (4) sets of Electrical drawings sealed by a Registered Engineer
iv. Environmental Impact Assessment.
v. Fire Service Clearance.
vi. Police Traffic Clearance.
vii. Land use clearance Approval.
viii. Letter of suitability/feasibility Clearance from DPR.
ix. Current 3 years tax clearance and 3 years Development Levy.
x. Letter of supervision by the Structural Engineer.
xi. Approved survey plan by surveyor General.
xii. Assessment Fee = ₦100,000/pump
xiii. Ratification Fee= ₦15/M2
xiv. Land use clearance = ₦5,000
xv. Perimeter Fencing = (Perimeter) x ₦100
xvi. Location plan must be sealed by a Registered Town Planner.
GAS STATION.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer.
iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer
v. Environmental Impact Assessment.
vi. Fire Service Clearance.
vii. Police Traffic Clearance.
viii. Land use clearance Approval.
ix. Letter of suitability/feasibility from DPR.
x. Current 3 years tax clearance and 3 years Development Levy.
xi. Letter of supervision by the Structural Engineer.
xii. Approved survey plan by surveyor General.
xiii. Assessment Fee = ₦500,000
xiv. Ratification Fee= ₦15/M2
xv. Land use clearance = ₦5,000
xvi. Perimeter Fencing = (Perimeter) x ₦100
xvii. Location plan must be sealed by a Registered Town Planner.
HOSTEL.
Bungalow Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦35/M3
iv. Ratification Fee= ₦15/M2
v. Land use clearance = ₦5,000
vi. Perimeter Fencing = (Perimeter) x ₦100
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦35/M3
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Bungalow Building in Other Local Government.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦35/M3
iv. Ratification Fee= ₦10/M2
v. Land use clearance = ₦5,000
vi. Perimeter Fencing = (Perimeter) x ₦100
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦35/M3
vi. Ratification Fee= ₦10/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
SAWMILL.
Saw Mill in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦250,000/Mill
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Saw Mill in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦150,000/Mill
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
HOTEL/EATERY/RESTAURANTS
Bungalow Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦50/M3
iv. Ratification Fee= ₦15/M2
v. Land use clearance = ₦5,000
vi. Perimeter Fencing = (Perimeter) x ₦100
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦50/M3
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Bungalow Building in Other Local Government.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦50/M3
iv. Ratification Fee= ₦10/M2
v. Land use clearance = ₦5,000
vi. Perimeter Fencing = (Perimeter) x ₦100
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦50/M3
vi. Ratification Fee= ₦10/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
LIGHT INDUSTRY
Block Making Industry
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦25,000
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Concrete Industry
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦40,000
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Stone crushing Industry (Mechanical)
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦500,000
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Stone crushing Industry with Asphalt
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦800,000
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
AGRICULTURAL DEVELOPMENT
Mechanized Farming
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦5,000/Ha
iv. Ratification Fee= ₦15/M2
v. Land use clearance = ₦5,000
vi. Perimeter Fencing = (Perimeter) x ₦100
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
POULTRY FARMING
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦10,000 for (100-200) Birds
iv. Assessment Fee = ₦20,000 for (201-500) Birds
v. Ratification Fee= ₦15/M2
vi. Land use clearance = ₦5,000
vii. Perimeter Fencing = (Perimeter) x ₦100
viii. Location plan must be sealed by a Registered Town Planner.
ix. Environmental Impact Assessment.
FISHERY FARMING
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee (commercial)= ₦20,000
iv. Assessment Fee (Domestic)= ₦5,000
v. Ratification Fee= ₦15/M2
vi. Land use clearance = ₦5,000
vii. Perimeter Fencing = (Perimeter) x ₦100
viii. Location plan must be sealed by a Registered Town Planner.
ix. Environmental Impact Assessment.
PIGGERY FARMING
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee (commercial)= ₦25,000
iv. Assessment Fee (Domestic)= ₦10,000
v. Ratification Fee= ₦15/M2
vi. Land use clearance = ₦5,000
vii. Perimeter Fencing = (Perimeter) x ₦100
viii. Location plan must be sealed by a Registered Town Planner.
ix. Environmental Impact Assessment.
RELIGION CAMP GROUND
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦25/M3
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
PLACE OF WORSHIP
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦20/M3
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
EDUCATION INSTITUTION
Nursery/Primary school/Secondary school/post-Secondary school
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦30/M3
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
CHANGE OF SITE OF AN APPROVED PLAN
Residential
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = 25% of current charge
vi. Location plan must be sealed by a Registered Town Planner.
Commercial/Petrol Station/ Sawmill
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = 25% of current charge
vi. Location plan must be sealed by a Registered Town Planner.
vii. Environmental Impact Assessment.
RENEWAL OF BUILDING PLAN
Residential/Commercial/Industrial
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = 20% of current charge
vi. Location plan must be sealed by a Registered Town Planner.
vii. Environmental Impact Assessment. (Commercial/Industrial)
LAYOUT PLAN
i. Six (6) sets of layout plan with locational plan prepared by a Registered
Town Planner.
ii. Approved survey plan by surveyor General.
iii. Land Use Clearance =₦5,000
iv. Assessment Fee 0.5 Ha- 2.5Ha = ₦10,000
2.5Ha - 5.0Ha = ₦20,000
5.1Ha - 10Ha = ₦40,000
Above 10Ha = ₦100,000
v. Location plan must be sealed by a Registered Town Planner.
vi. Environmental Impact Assessment.
ROAD CONSTRUCTION YARD PROJECT SITE
i. Four (4) sets of working drawings with architectural seal
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦50,000
iv. Location plan must be sealed by a Registered Town Planner.
v. Environmental Impact Assessment.
PENALTY IN RESPECT OF UNAPPROVED EXISTING BUILDING PLAN
i. Assessment Fee = The present Assessment + 50% of the assessment
Stanchion 5
S/N Category Purpose
Amount
N
ANALYSIS
Form
fee
LUC
Registration
Construction
Permit fee
EIA
Registration
Site
inspection/
Supervision
1. Commercial 850,000 50,000 100,000 400,000 150,000 150,000
2. Corporate Bodies 200,000 20,000 25,000 100,000 30,000 25,000
3. Individual/Private 75,000 5,000 10,000 35,000 15,000 10,000
4.
Payment of Optic
Fibre
2,500 Per linear metre.
5. Caution fee 1,500 Per linear metre.
Note: Penalty for contravenor is double of the assessment fee above and other
condition determined by the ministry.

More Related Content

What's hot

Airport Road Land Use Concept Plan Arabic | Amman Institute
Airport Road Land Use Concept Plan Arabic | Amman InstituteAirport Road Land Use Concept Plan Arabic | Amman Institute
Airport Road Land Use Concept Plan Arabic | Amman Institute
Amman Institute
 
Photogrammetry- Surveying
Photogrammetry- SurveyingPhotogrammetry- Surveying
Photogrammetry- Surveying
Gokul Saud
 

What's hot (20)

CCTV Building, A Structural Design Overview
CCTV Building, A Structural Design OverviewCCTV Building, A Structural Design Overview
CCTV Building, A Structural Design Overview
 
Urban redevelopment in Addis ababa
Urban redevelopment  in Addis ababaUrban redevelopment  in Addis ababa
Urban redevelopment in Addis ababa
 
Dissertation BIM
Dissertation BIMDissertation BIM
Dissertation BIM
 
BIM
BIM BIM
BIM
 
World one (Lodha Tower)
World one (Lodha Tower)World one (Lodha Tower)
World one (Lodha Tower)
 
Professional practice for students of Architcture
Professional practice  for students of ArchitctureProfessional practice  for students of Architcture
Professional practice for students of Architcture
 
Hot Topics: Transit Oriented Development
Hot Topics: Transit Oriented DevelopmentHot Topics: Transit Oriented Development
Hot Topics: Transit Oriented Development
 
Floor space index fsi in indian cities
Floor space index  fsi in indian citiesFloor space index  fsi in indian cities
Floor space index fsi in indian cities
 
Airport Road Land Use Concept Plan Arabic | Amman Institute
Airport Road Land Use Concept Plan Arabic | Amman InstituteAirport Road Land Use Concept Plan Arabic | Amman Institute
Airport Road Land Use Concept Plan Arabic | Amman Institute
 
Airport Corridor Plan
Airport Corridor PlanAirport Corridor Plan
Airport Corridor Plan
 
TRANSIT ORIENTED DEVELOPMENT
TRANSIT ORIENTED DEVELOPMENTTRANSIT ORIENTED DEVELOPMENT
TRANSIT ORIENTED DEVELOPMENT
 
Valuation (REAL ESTATE) B.ARCHITECTURE
Valuation (REAL ESTATE) B.ARCHITECTUREValuation (REAL ESTATE) B.ARCHITECTURE
Valuation (REAL ESTATE) B.ARCHITECTURE
 
Introduction to Building Information Modeling
Introduction to Building Information Modeling Introduction to Building Information Modeling
Introduction to Building Information Modeling
 
Urban design analysis, Circulation, Architecture, London, Redevelopment studies
Urban design analysis, Circulation, Architecture, London, Redevelopment  studiesUrban design analysis, Circulation, Architecture, London, Redevelopment  studies
Urban design analysis, Circulation, Architecture, London, Redevelopment studies
 
Study of a city dubai.
Study of a  city   dubai.Study of a  city   dubai.
Study of a city dubai.
 
Urban design
Urban designUrban design
Urban design
 
Photogrammetry- Surveying
Photogrammetry- SurveyingPhotogrammetry- Surveying
Photogrammetry- Surveying
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remedies
 
Classification of Buildings as per National Building Code of India (NBC) 2016
Classification of Buildings as per National Building Code of India (NBC) 2016Classification of Buildings as per National Building Code of India (NBC) 2016
Classification of Buildings as per National Building Code of India (NBC) 2016
 

Similar to REQUIREMENTS FOR BUILDING PLAN APPROVAL (7)

CAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdfCAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdf
 
ICI/ITD P1
ICI/ITD P1ICI/ITD P1
ICI/ITD P1
 
ICI_P1_PLANNER
ICI_P1_PLANNERICI_P1_PLANNER
ICI_P1_PLANNER
 
ITD/ICI Project 1
ITD/ICI Project 1ITD/ICI Project 1
ITD/ICI Project 1
 
ITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWINGITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWING
 
ICI Project 1- Urban Planner
ICI Project 1- Urban PlannerICI Project 1- Urban Planner
ICI Project 1- Urban Planner
 
Accounting assignment help
Accounting assignment helpAccounting assignment help
Accounting assignment help
 

More from Government of Ekiti State, Nigeria

More from Government of Ekiti State, Nigeria (20)

An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
 
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
 
COVID-19 VACCINATION SITES (EKITI STATE)
COVID-19  VACCINATION SITES (EKITI STATE)COVID-19  VACCINATION SITES (EKITI STATE)
COVID-19 VACCINATION SITES (EKITI STATE)
 
Re-Imagining Health Service Delivery 2020-2021 Annual Report
Re-Imagining Health Service Delivery  2020-2021 Annual ReportRe-Imagining Health Service Delivery  2020-2021 Annual Report
Re-Imagining Health Service Delivery 2020-2021 Annual Report
 
Ekiti State Mental Health Law 2021
Ekiti State Mental Health Law 2021Ekiti State Mental Health Law 2021
Ekiti State Mental Health Law 2021
 
Ekiti State Drugs and Health Supplies Management Agency Law 2021
Ekiti State Drugs and Health Supplies Management Agency Law 2021Ekiti State Drugs and Health Supplies Management Agency Law 2021
Ekiti State Drugs and Health Supplies Management Agency Law 2021
 
State Address on the Occasion of 25th Anniversary of Ekiti State.
State Address on the Occasion of 25th Anniversary of Ekiti State.State Address on the Occasion of 25th Anniversary of Ekiti State.
State Address on the Occasion of 25th Anniversary of Ekiti State.
 
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
 
ENTITLED: TOWARDS A MORE PERFECT UNION
ENTITLED: TOWARDS A MORE PERFECT UNIONENTITLED: TOWARDS A MORE PERFECT UNION
ENTITLED: TOWARDS A MORE PERFECT UNION
 
2021 WORLD HUMANITARIAN DAY
2021 WORLD HUMANITARIAN DAY2021 WORLD HUMANITARIAN DAY
2021 WORLD HUMANITARIAN DAY
 
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
 
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
 
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
 
Ekiti State Audit Service Commission Law, 2021
Ekiti State Audit Service Commission Law, 2021Ekiti State Audit Service Commission Law, 2021
Ekiti State Audit Service Commission Law, 2021
 
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
 
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF) MEDIUM TERM SECTORAL STRA...
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF)  MEDIUM TERM SECTORAL STRA...2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF)  MEDIUM TERM SECTORAL STRA...
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF) MEDIUM TERM SECTORAL STRA...
 
RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019
RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019
RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019
 
Keep Girls In School
Keep Girls In SchoolKeep Girls In School
Keep Girls In School
 
A Communique issued at the end of the 30th teleconference meeting of the Nige...
A Communique issued at the end of the 30th teleconference meeting of the Nige...A Communique issued at the end of the 30th teleconference meeting of the Nige...
A Communique issued at the end of the 30th teleconference meeting of the Nige...
 
FLAGGING OFF 0F EKITI RICE PYRAMID PROJECT
FLAGGING OFF 0F EKITI RICE PYRAMID PROJECTFLAGGING OFF 0F EKITI RICE PYRAMID PROJECT
FLAGGING OFF 0F EKITI RICE PYRAMID PROJECT
 

Recently uploaded

Program Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptxProgram Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptx
ScottMeyers35
 
Program Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptxProgram Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptx
ScottMeyers35
 

Recently uploaded (20)

WhenWomenTakeControl.pdf Yale Historical Review
WhenWomenTakeControl.pdf Yale Historical ReviewWhenWomenTakeControl.pdf Yale Historical Review
WhenWomenTakeControl.pdf Yale Historical Review
 
Finland's mental health policy and its implementation: a CSO perspective
Finland's mental health policy and its implementation: a CSO perspectiveFinland's mental health policy and its implementation: a CSO perspective
Finland's mental health policy and its implementation: a CSO perspective
 
Inflation scarring: How has the cost-of-living crisis changed Britain?
Inflation scarring: How has the cost-of-living crisis changed Britain?Inflation scarring: How has the cost-of-living crisis changed Britain?
Inflation scarring: How has the cost-of-living crisis changed Britain?
 
07/03/2024 Publiekdomeindag - namiddag
07/03/2024 Publiekdomeindag - namiddag07/03/2024 Publiekdomeindag - namiddag
07/03/2024 Publiekdomeindag - namiddag
 
Vip ℂall Girls Naraina Phone No 9999965857 High Profile ℂall Girl Delhi No Ad...
Vip ℂall Girls Naraina Phone No 9999965857 High Profile ℂall Girl Delhi No Ad...Vip ℂall Girls Naraina Phone No 9999965857 High Profile ℂall Girl Delhi No Ad...
Vip ℂall Girls Naraina Phone No 9999965857 High Profile ℂall Girl Delhi No Ad...
 
Program Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptxProgram Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptx
 
How to Save a Place: Get the Word Out Far And Wide
How to Save a Place: Get the Word Out Far And WideHow to Save a Place: Get the Word Out Far And Wide
How to Save a Place: Get the Word Out Far And Wide
 
IEA Global Critical Minerals Outlook2024
IEA Global Critical Minerals Outlook2024IEA Global Critical Minerals Outlook2024
IEA Global Critical Minerals Outlook2024
 
2024: The FAR - Federal Acquisition Regulations, Part 33
2024: The FAR - Federal Acquisition Regulations, Part 332024: The FAR - Federal Acquisition Regulations, Part 33
2024: The FAR - Federal Acquisition Regulations, Part 33
 
Ghana High Commission on list of diplomats including US & China who owe £143m...
Ghana High Commission on list of diplomats including US & China who owe £143m...Ghana High Commission on list of diplomats including US & China who owe £143m...
Ghana High Commission on list of diplomats including US & China who owe £143m...
 
Vip ℂall Girls AK Market Phone No 9999965857 High Profile ℂall Girl Delhi No ...
Vip ℂall Girls AK Market Phone No 9999965857 High Profile ℂall Girl Delhi No ...Vip ℂall Girls AK Market Phone No 9999965857 High Profile ℂall Girl Delhi No ...
Vip ℂall Girls AK Market Phone No 9999965857 High Profile ℂall Girl Delhi No ...
 
International Day of Families - 15 May 2024 - UNDESA.
International Day of Families - 15 May 2024 - UNDESA.International Day of Families - 15 May 2024 - UNDESA.
International Day of Families - 15 May 2024 - UNDESA.
 
Building a better Britain: How cities like Bradford can help to end economic ...
Building a better Britain: How cities like Bradford can help to end economic ...Building a better Britain: How cities like Bradford can help to end economic ...
Building a better Britain: How cities like Bradford can help to end economic ...
 
OilChange: Big Oil Reality Check May 2024
OilChange: Big Oil Reality Check May 2024OilChange: Big Oil Reality Check May 2024
OilChange: Big Oil Reality Check May 2024
 
Program Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptxProgram Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptx
 
Vip ℂall Girls New Delhi Phone No 9999965857 High Profile ℂall Girl Delhi No ...
Vip ℂall Girls New Delhi Phone No 9999965857 High Profile ℂall Girl Delhi No ...Vip ℂall Girls New Delhi Phone No 9999965857 High Profile ℂall Girl Delhi No ...
Vip ℂall Girls New Delhi Phone No 9999965857 High Profile ℂall Girl Delhi No ...
 
bee engaged with youth - World Bee Day 2024
bee engaged with youth - World Bee Day 2024bee engaged with youth - World Bee Day 2024
bee engaged with youth - World Bee Day 2024
 
Vip ℂall Girls IGI Airport Phone No 9999965857 High Profile ℂall Girl Delhi N...
Vip ℂall Girls IGI Airport Phone No 9999965857 High Profile ℂall Girl Delhi N...Vip ℂall Girls IGI Airport Phone No 9999965857 High Profile ℂall Girl Delhi N...
Vip ℂall Girls IGI Airport Phone No 9999965857 High Profile ℂall Girl Delhi N...
 
A House is not a Home Yale Historical Reivew
A House is not a Home Yale Historical ReivewA House is not a Home Yale Historical Reivew
A House is not a Home Yale Historical Reivew
 
Families and Climate Change - iyf30 - IDF.2024 AGENDA PROGRAMME.
Families and Climate Change - iyf30 - IDF.2024 AGENDA PROGRAMME.Families and Climate Change - iyf30 - IDF.2024 AGENDA PROGRAMME.
Families and Climate Change - iyf30 - IDF.2024 AGENDA PROGRAMME.
 

REQUIREMENTS FOR BUILDING PLAN APPROVAL

  • 1. REQUIREMENTS FOR BUILDING PLAN APPROVAL RESIDENTIAL BUILDING Bungalow Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦25/M3 iv. Ratification Fee= ₦10/M2 v. Land use clearance = ₦1,000 vi. Perimeter Fencing = (Perimeter) x ₦50 vii. Location plan must be sealed by a Registered Town Planner. Bungalow Building in Other Local Government Headquarters i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦22.5/M3 iv. Ratification Fee= ₦5/M2 v. Land use clearance = ₦1,000 vi. Perimeter Fencing = (Perimeter) x ₦50 vii. Location plan must be sealed by a Registered Town Planner. Bungalow Building in Other Towns i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦20/M3 iv. Ratification Fee= ₦5/M2 v. Land use clearance = ₦1,000 vi. Perimeter Fencing = (Perimeter) x ₦50 vii. Location plan must be sealed by a Registered Town Planner.
  • 2. Storey Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦25/M3 vi. Ratification Fee= ₦10/M2 vii. Land use clearance = ₦1,000 viii. Perimeter Fencing = (Perimeter) x ₦50 ix. Location plan must be sealed by a Registered Town Planner. Storey Building in Other Local Government Headquarters. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦22.5/M3 vi. Ratification Fee= ₦5/M2 vii. Land use clearance = ₦1,000 viii. Perimeter Fencing = (Perimeter) x ₦50 ix. Location plan must be sealed by a Registered Town Planner. Storey Building in Other Towns. I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦20/M3 vi. Ratification Fee= ₦5/M2 vii. Land use clearance = ₦1,000 viii. Perimeter Fencing = (Perimeter) x ₦50 ix. Location plan must be sealed by a Registered Town Planner.
  • 3. COMMERCIAL BUILDING Bungalow/ Storey Building in Ado Ekiti. I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Environmental Impact Assessment. iv. Letter of supervision by the Structural Engineer. v. Approved survey plan by surveyor General. vi. Assessment Fee = ₦40/M3 vii. Ratification Fee= ₦15/M2 viii. Land use clearance = ₦5,000 ix. Perimeter Fencing = (Perimeter) x ₦100 x. Location plan must be sealed by a Registered Town Planner. Bungalow/ Storey Building in Other Towns. I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Environmental Impact Assessment. iv. Letter of supervision by the Structural Engineer. v. Approved survey plan by surveyor General. vi. Assessment Fee = ₦40/M3 vii. Ratification Fee= ₦10/M2 viii. Land use clearance = ₦5,000 ix. Perimeter Fencing = (Perimeter) x ₦100 x. Location plan must be sealed by a Registered Town Planner. BANK BUILDING I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Environmental Impact Assessment. iv. Letter of supervision by the Structural Engineer. v. Approved survey plan by surveyor General.
  • 4. vi. Assessment Fee = ₦400/M3 vii. Ratification Fee= ₦15/M2 viii. Land use clearance = ₦5,000 ix. Perimeter Fencing = (Perimeter) x ₦100 x. Location plan must be sealed by a Registered Town Planner. PETROL FILLING STATION Filling Station in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer v. Environmental Impact Assessment. vi. Fire Service Clearance. vii. Police Traffic Clearance. viii. Letter of suitability/feasibility Approval from DPR. ix. Land use clearance Approval. x. Current 3 years tax clearance and 3 years Development levy. xi. Letter of supervision by the Structural Engineer. xii. Approved survey plan by surveyor General. xiii. Assessment Fee = ₦200,000/pump xiv. Ratification Fee= ₦15/M2 xv. Land use clearance = ₦5,000 xvi. Perimeter Fencing = (Perimeter) x ₦100 xvii. Location plan must be sealed by a Registered Town Planner. Filling Station in Other Local Government Area. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer v. Environmental Impact Assessment.
  • 5. vi. Fire Service Clearance. vii. Police Traffic Clearance. viii. Land use clearance Approval. ix. Letter of suitability/feasibility Approval from DPR. x. Current 3 years tax clearance and 3 years Development levy. xi. Letter of supervision by the Structural Engineer. xii. Approved survey plan by surveyor General. xiii. Assessment Fee = ₦150,000/pump xiv. Ratification Fee= ₦15/M2 xv. Land use clearance = ₦5,000 xvi. Perimeter Fencing = (Perimeter) x ₦100 xvii. Location plan must be sealed by a Registered Town Planner. Filling Station in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iii. Four (4) sets of Electrical drawings sealed by a Registered Engineer iv. Environmental Impact Assessment. v. Fire Service Clearance. vi. Police Traffic Clearance. vii. Land use clearance Approval. viii. Letter of suitability/feasibility Clearance from DPR. ix. Current 3 years tax clearance and 3 years Development Levy. x. Letter of supervision by the Structural Engineer. xi. Approved survey plan by surveyor General. xii. Assessment Fee = ₦100,000/pump xiii. Ratification Fee= ₦15/M2 xiv. Land use clearance = ₦5,000 xv. Perimeter Fencing = (Perimeter) x ₦100 xvi. Location plan must be sealed by a Registered Town Planner.
  • 6. GAS STATION. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer v. Environmental Impact Assessment. vi. Fire Service Clearance. vii. Police Traffic Clearance. viii. Land use clearance Approval. ix. Letter of suitability/feasibility from DPR. x. Current 3 years tax clearance and 3 years Development Levy. xi. Letter of supervision by the Structural Engineer. xii. Approved survey plan by surveyor General. xiii. Assessment Fee = ₦500,000 xiv. Ratification Fee= ₦15/M2 xv. Land use clearance = ₦5,000 xvi. Perimeter Fencing = (Perimeter) x ₦100 xvii. Location plan must be sealed by a Registered Town Planner. HOSTEL. Bungalow Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦35/M3 iv. Ratification Fee= ₦15/M2 v. Land use clearance = ₦5,000 vi. Perimeter Fencing = (Perimeter) x ₦100 vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment.
  • 7. Storey Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦35/M3 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Bungalow Building in Other Local Government. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦35/M3 iv. Ratification Fee= ₦10/M2 v. Land use clearance = ₦5,000 vi. Perimeter Fencing = (Perimeter) x ₦100 vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦35/M3 vi. Ratification Fee= ₦10/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment.
  • 8. SAWMILL. Saw Mill in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦250,000/Mill vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Saw Mill in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦150,000/Mill vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. HOTEL/EATERY/RESTAURANTS Bungalow Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦50/M3 iv. Ratification Fee= ₦15/M2 v. Land use clearance = ₦5,000 vi. Perimeter Fencing = (Perimeter) x ₦100
  • 9. vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦50/M3 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Bungalow Building in Other Local Government. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦50/M3 iv. Ratification Fee= ₦10/M2 v. Land use clearance = ₦5,000 vi. Perimeter Fencing = (Perimeter) x ₦100 vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦50/M3 vi. Ratification Fee= ₦10/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100
  • 10. ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. LIGHT INDUSTRY Block Making Industry i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦25,000 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Concrete Industry i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦40,000 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Stone crushing Industry (Mechanical) i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
  • 11. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦500,000 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Stone crushing Industry with Asphalt i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦800,000 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. AGRICULTURAL DEVELOPMENT Mechanized Farming i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦5,000/Ha iv. Ratification Fee= ₦15/M2 v. Land use clearance = ₦5,000 vi. Perimeter Fencing = (Perimeter) x ₦100 vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment.
  • 12. POULTRY FARMING i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦10,000 for (100-200) Birds iv. Assessment Fee = ₦20,000 for (201-500) Birds v. Ratification Fee= ₦15/M2 vi. Land use clearance = ₦5,000 vii. Perimeter Fencing = (Perimeter) x ₦100 viii. Location plan must be sealed by a Registered Town Planner. ix. Environmental Impact Assessment. FISHERY FARMING i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee (commercial)= ₦20,000 iv. Assessment Fee (Domestic)= ₦5,000 v. Ratification Fee= ₦15/M2 vi. Land use clearance = ₦5,000 vii. Perimeter Fencing = (Perimeter) x ₦100 viii. Location plan must be sealed by a Registered Town Planner. ix. Environmental Impact Assessment. PIGGERY FARMING i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee (commercial)= ₦25,000 iv. Assessment Fee (Domestic)= ₦10,000 v. Ratification Fee= ₦15/M2 vi. Land use clearance = ₦5,000 vii. Perimeter Fencing = (Perimeter) x ₦100 viii. Location plan must be sealed by a Registered Town Planner. ix. Environmental Impact Assessment.
  • 13. RELIGION CAMP GROUND i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦25/M3 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. PLACE OF WORSHIP i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦20/M3 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. EDUCATION INSTITUTION Nursery/Primary school/Secondary school/post-Secondary school i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦30/M3 vi. Ratification Fee= ₦15/M2
  • 14. vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. CHANGE OF SITE OF AN APPROVED PLAN Residential i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = 25% of current charge vi. Location plan must be sealed by a Registered Town Planner. Commercial/Petrol Station/ Sawmill i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = 25% of current charge vi. Location plan must be sealed by a Registered Town Planner. vii. Environmental Impact Assessment. RENEWAL OF BUILDING PLAN Residential/Commercial/Industrial i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = 20% of current charge vi. Location plan must be sealed by a Registered Town Planner. vii. Environmental Impact Assessment. (Commercial/Industrial)
  • 15. LAYOUT PLAN i. Six (6) sets of layout plan with locational plan prepared by a Registered Town Planner. ii. Approved survey plan by surveyor General. iii. Land Use Clearance =₦5,000 iv. Assessment Fee 0.5 Ha- 2.5Ha = ₦10,000 2.5Ha - 5.0Ha = ₦20,000 5.1Ha - 10Ha = ₦40,000 Above 10Ha = ₦100,000 v. Location plan must be sealed by a Registered Town Planner. vi. Environmental Impact Assessment. ROAD CONSTRUCTION YARD PROJECT SITE i. Four (4) sets of working drawings with architectural seal ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦50,000 iv. Location plan must be sealed by a Registered Town Planner. v. Environmental Impact Assessment. PENALTY IN RESPECT OF UNAPPROVED EXISTING BUILDING PLAN i. Assessment Fee = The present Assessment + 50% of the assessment Stanchion 5 S/N Category Purpose Amount N ANALYSIS Form fee LUC Registration Construction Permit fee EIA Registration Site inspection/ Supervision 1. Commercial 850,000 50,000 100,000 400,000 150,000 150,000
  • 16. 2. Corporate Bodies 200,000 20,000 25,000 100,000 30,000 25,000 3. Individual/Private 75,000 5,000 10,000 35,000 15,000 10,000 4. Payment of Optic Fibre 2,500 Per linear metre. 5. Caution fee 1,500 Per linear metre. Note: Penalty for contravenor is double of the assessment fee above and other condition determined by the ministry.