This document presents structural calculations for hollowcore slabs in the construction of a pre-engineered aircraft hangar for Abu Dhabi Airports Company. It provides design criteria for the reinforced concrete slabs, including material properties, load assumptions, and span dimensions. Tables of hollowcore slab designs are included to specify the required slab thickness and reinforcement based on load values. The calculations were prepared by Burhan and checked by Giovanni in January 2014.
The Design Code Google Developer Student Club.pptx
Report
1. P.O. Box No.: 38605
AbuDhabi, United Arab Emirates.
Tel: + 971 2 5501033
Fax: +971 2 5501022
Web: www.abudhabiprecast.com
Client: Abu Dhabi Airports Company
Project No.: ADP-651
Made by: Burhan
Checked by: Giovanni
Date: January 13, 2014
OTHER AIRPORTS DESIGN & BUILD PRE-
ENGINEERED AIRCRAFT HANGAR
Structural Calculations
HOLLOWCORE SLABS
2. Project Other Airports Design & Build Pre-Engineerind Aircraft Hangar
Description Hollowcore Slabs Design Building ---
Made by Burhan Date 13-Jan-14
Checked by Giovanni Page No. 1 of 11
TABLE OF CONTENTS
Sections Title Page No.
A Design Criteria 2
B Hollowcore Design Tables 5
3. Project Other Airports Design & Build Pre-Engineerind Aircraft Hangar
Description Hollowcore Slabs Design Building ---
Made by Burhan Date 13-Jan-14
Checked by Giovanni Page No. 2 of 11
SECTION A: DESIGN CRITERIA
1. Description
This report comprises the structural calculations of hollowcore slabs at the first floor & roof of building. Slabs with
normal loadings are designed from in-house tables, attached in Section B of this report.
2. Material Data
Reinforced Concrete Properties
Precast Hollowcore Slabs fc’ = 40 N/mm2
Density of Concrete fc’ = 24 kN/m3
Nominal Concrete Covers
Precast Hollowcore Slabs = 35 mm
Pre-Tensioning Steel Properties
Ultimate Strength fpu = 1860 N/mm2
3. Loadings
Hollowcore Slab Selfweights
Hollowcore Slab (200mm THK) = 2.76 kN/m2
Hollowcore Slab (265mm THK) = 3.45 kN/m2
Superimposed Dead Loads
Structural Topping (60mm THK) = 1.44 kN/m2
Partitions = 3.00 kN/m2
Finishing (100mm THK) = 2.00 kN/m2
Live Loads
Live Load = 3.00 kN/m2
& 2.00 kN/m2
4. Project Other Airports Design & Build Pre-Engineerind Aircraft Hangar
Description Hollowcore Slabs Design Building ---
Made by Burhan Date 13-Jan-14
Checked by Giovanni Page No. 3 of 11
4. Loads for Design Tables
First Floor – Span = 7760mm (From Grid 1 to 19):
Structural Topping (60mm THK) = 1.44 kN/m2
Finishing (100mm THK) = 2.00 kN/m2
Live Load = 2.00 kN/m2
Total Load (Service) = 5.44 kN/m2
First Floor – Span = 7860mm (From Grid 22 to 26):
Structural Topping (60mm THK) = 1.44 kN/m2
Partitions = 3.00 kN/m2
Finishing (100mm THK) = 2.00 kN/m2
Live Load = 3.00 kN/m2
Total Load (Service) = 9.44 kN/m2
Roof Floor – Span = 7860mm (From Grid 22 to 26):
Structural Topping (60mm THK) = 1.44 kN/m2
Finishing (100mm THK) = 2.00 kN/m2
Live Load = 2.00 kN/m2
Total Load (Service) = 5.44 kN/m2
5. Project Other Airports Design & Build Pre-Engineerind Aircraft Hangar
Description Hollowcore Slabs Design Building ---
Made by Burhan Date 13-Jan-14
Checked by Giovanni Page No. 4 of 11
SECTION B: HOLLOWCORE DESIGN TABLES
6. Project Other Airports Design & Build Pre-Engineerind Aircraft Hangar
Description Hollowcore Slabs Design Building ---
Made by Burhan Date 13-Jan-14
Checked by Giovanni Page No. 5 of 11
7. Project Other Airports Design & Build Pre-Engineerind Aircraft Hangar
Description Hollowcore Slabs Design Building ---
Made by Burhan Date 13-Jan-14
Checked by Giovanni Page No. 6 of 11
8. Project Other Airports Design & Build Pre-Engineerind Aircraft Hangar
Description Hollowcore Slabs Design Building ---
Made by Burhan Date 13-Jan-14
Checked by Giovanni Page No. 7 of 11
9. Project Other Airports Design & Build Pre-Engineerind Aircraft Hangar
Description Hollowcore Slabs Design Building ---
Made by Burhan Date 13-Jan-14
Checked by Giovanni Page No. 8 of 11
10. Project Other Airports Design & Build Pre-Engineerind Aircraft Hangar
Description Hollowcore Slabs Design Building ---
Made by Burhan Date 13-Jan-14
Checked by Giovanni Page No. 9 of 11
11. Project Other Airports Design & Build Pre-Engineerind Aircraft Hangar
Description Hollowcore Slabs Design Building ---
Made by Burhan Date 13-Jan-14
Checked by Giovanni Page No. 10 of 11
12. Project Other Airports Design & Build Pre-Engineerind Aircraft Hangar
Description Hollowcore Slabs Design Building ---
Made by Burhan Date 13-Jan-14
Checked by Giovanni Page No. 11 of 11
--------------- END OF REPORT ---------------