RENOVATION AGREEMENT FORMAT
FREE LEGAL AND ACCOUNTANT FORMATS
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
This rental agreement is between an owner and tenant for a period of 11 months beginning April 1st, 2013. The tenant paid a security deposit of Rs. 50,000 and agrees to pay a monthly rent of Rs. 7,500 by the 5th of each month. The agreement outlines policies regarding notice for vacating, rent payments, utilities, repairs, and termination of the lease.
Real Estate (Regulation and Development) Act 2016Keyur Shah
The document discusses key aspects of the Real Estate (Regulation and Development) Act, 2016 in India. It outlines the history of the legislation, its main objectives to regulate the real estate sector and protect consumer interests, basic features including project registration requirements, and details on obtaining project registration and maintaining the required website information. Only 13 states have so far notified rules to establish regulatory authorities to oversee implementation of the Act.
Conveyance deed is conveyance of right of ownership of the flat/ property to the Purchaser, after the payment and the documents are received from the Allottee/ Seller and possession is taken over by Purchaser.
1. Valuable consideration - Deed T1 and Deed G1 both establish valuable consideration on their face
2. Subsequent instrument - Deed T1, registering Sukitha and Samitha's transfer, was subsequent to Deed G1, registering their gift
3. Adverse interests - Deed T1's transfer and Deed G1's gift create adverse interests in the property
4. Same source - Both deeds derive from the same source, being 1/2 of Jayantha's undivided share of the 'Naduwaththa' land
However, Deed T1 will not be given priority because it was registered in the wrong fol
There are several types of construction contracts:
1. Separated contracts involve separate entities for design and construction, resulting in delays. Lump-sum and measurement contracts fall under this category.
2. Integrated contracts assign design and construction responsibilities to a single entity to streamline the process. Design-build, turnkey, and build-operate-transfer contracts integrate the roles.
3. Management contracts appoint a single contractor to plan, manage, and coordinate subcontractors for design and construction. Construction management contracts focus on coordination. Design-build-manage contracts assign all three roles.
4. Discretionary contracts like partnering and joint ventures involve collaboration between client and contractor or between multiple contractors to share
Consulting Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...GLC
This document is a 7-page consulting service agreement between a client (PT company) and a consultant (individual) to provide detailed engineering design services for equipment foundations for a chip mill plant project. Key details:
- The consultant will provide detailed engineering design services for RC foundations for equipment and conveyor belt structures.
- The agreement is effective for 3 months from the signing date.
- The consultant's fee for services is Rp [amount] and will be paid in two stages - 25% initially and 75% after submission of the final report.
- The consultant is responsible for confidentiality of project information and copyright of documents prepared.
- The client will provide necessary data and assistance for
This seminar was part of the Bar Council practical construction law series presented by the Construction Law Committee to practitioners. It covers the topic of payments and common issues arising in the construction industry.
This rental agreement is between an owner and tenant for a period of 11 months beginning April 1st, 2013. The tenant paid a security deposit of Rs. 50,000 and agrees to pay a monthly rent of Rs. 7,500 by the 5th of each month. The agreement outlines policies regarding notice for vacating, rent payments, utilities, repairs, and termination of the lease.
Real Estate (Regulation and Development) Act 2016Keyur Shah
The document discusses key aspects of the Real Estate (Regulation and Development) Act, 2016 in India. It outlines the history of the legislation, its main objectives to regulate the real estate sector and protect consumer interests, basic features including project registration requirements, and details on obtaining project registration and maintaining the required website information. Only 13 states have so far notified rules to establish regulatory authorities to oversee implementation of the Act.
Conveyance deed is conveyance of right of ownership of the flat/ property to the Purchaser, after the payment and the documents are received from the Allottee/ Seller and possession is taken over by Purchaser.
1. Valuable consideration - Deed T1 and Deed G1 both establish valuable consideration on their face
2. Subsequent instrument - Deed T1, registering Sukitha and Samitha's transfer, was subsequent to Deed G1, registering their gift
3. Adverse interests - Deed T1's transfer and Deed G1's gift create adverse interests in the property
4. Same source - Both deeds derive from the same source, being 1/2 of Jayantha's undivided share of the 'Naduwaththa' land
However, Deed T1 will not be given priority because it was registered in the wrong fol
There are several types of construction contracts:
1. Separated contracts involve separate entities for design and construction, resulting in delays. Lump-sum and measurement contracts fall under this category.
2. Integrated contracts assign design and construction responsibilities to a single entity to streamline the process. Design-build, turnkey, and build-operate-transfer contracts integrate the roles.
3. Management contracts appoint a single contractor to plan, manage, and coordinate subcontractors for design and construction. Construction management contracts focus on coordination. Design-build-manage contracts assign all three roles.
4. Discretionary contracts like partnering and joint ventures involve collaboration between client and contractor or between multiple contractors to share
Consulting Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...GLC
This document is a 7-page consulting service agreement between a client (PT company) and a consultant (individual) to provide detailed engineering design services for equipment foundations for a chip mill plant project. Key details:
- The consultant will provide detailed engineering design services for RC foundations for equipment and conveyor belt structures.
- The agreement is effective for 3 months from the signing date.
- The consultant's fee for services is Rp [amount] and will be paid in two stages - 25% initially and 75% after submission of the final report.
- The consultant is responsible for confidentiality of project information and copyright of documents prepared.
- The client will provide necessary data and assistance for
This seminar was part of the Bar Council practical construction law series presented by the Construction Law Committee to practitioners. It covers the topic of payments and common issues arising in the construction industry.
This document provides a project proposal for developing a RM600 million hotel and shopping complex in Kuala Lumpur. It recommends using a management contracting procurement strategy, two-stage selective tendering method, and a cost plus with GMP contract arrangement. Management contracting is proposed because it allows client control over design, deals with fewer parties, and enables time savings through overlapping design and construction. Two-stage selective tendering provides a transparent process for pre-qualifying and selecting contractors based on their skills and experience. The cost plus with GMP contract arrangement allocates cost risk to the client and quality/time risks to the contractor.
This document outlines the details of a group assignment for a construction law course. It includes the group member names and student IDs, submission date, table of contents, and introduction. The group was appointed by a client to propose a standard form of construction contract and provide advice on pre-contract and post-contract issues for a proposed university accommodation and recreation center project costing RM500 million. The report will analyze and compare the PAM 2006 and FIDIC forms of contract and make recommendations on key contractual issues such as payment, extensions of time, variations, programs, termination and dispute resolution.
Rancangan peraturan daerah ini membahas penyusunan rencana pembangunan dan pengembangan perumahan serta kawasan permukiman di Provinsi Bali untuk periode 20 tahun ke depan, mencakup aspek-aspek perencanaan, pengawasan, dan kerangka hukum yang diperlukan.
Este contrato de locação residencial define os termos e condições entre o Locador e o Locatário, incluindo o endereço do imóvel, prazo de locação, valor do aluguel mensal, reajustes anuais pelo IGP-M, responsabilidades do Locatário como pagamento de contas e proibição de sublocação sem permissão.
The document provides an analysis of using the FIDIC Red Book form of contract for a RM150 million construction project by Taylor's University. Key points discussed include:
1. Proposing the FIDIC Red Book as it allows the employer (Taylor's) full control over design while adopting the traditional procurement system of employer-designed works.
2. Highlighting payment conditions such as interim payments, retention amounts, and delayed payment interest according to the Red Book clauses.
3. Comparing contractual programming requirements between the Red Book and Malaysian PAM form, noting the Red Book's more detailed programming obligations for the contractor.
4. Identifying dispute resolution methods like the Dispute Adjudication
This construction contract is between Montrose County, Colorado and a contractor for a construction project. The contractor will complete all work specified in the scope of work and RFP documents. The work must be completed by a specified date. The county will pay the contractor $________ for satisfactory completion of the work. The contract documents define the roles and responsibilities of the contractor and county, including requirements for bonds, payments, disputes, safety, and indemnification.
1) The document discusses the Real Estate (Regulation and Development) Act, 2016 which aims to establish a regulatory authority for the real estate sector in India and protect consumer interests.
2) Key objectives of the Act include regulating real estate projects, promoting transparency, and providing dispute resolution mechanisms.
3) The Act mandates registration of real estate projects with the regulatory authority and compliance with regulations regarding disclosures, funds usage, completion timelines, and more. It also requires registration of real estate agents.
O documento é uma autorização para divulgar fotos e dados de um imóvel à venda no site www.comprenaplanta.net. O proprietário declara que o imóvel está livre de ônus e em boas condições, e autoriza a empresa COMPRENAPLANTA.NET a vender o imóvel sem exclusividade, pagando honorários de ___ por cento sobre o valor da transação no ato de assinatura.
This document discusses construction delays and extensions of time under standard construction contracts. It defines different categories of delays including those caused by the contractor, employer, and third parties. For contractor-caused delays, the contractor is not entitled to an extension of time or reimbursement for losses. For employer-caused delays, the contractor can claim an extension of time and reimbursement for losses. The document outlines the procedure for applying for an extension of time and the principles for granting one. It also discusses implications of granting or not granting extensions of time, such as liquidated damages and time becoming at large.
O documento apresenta dois modelos de contratos: um contrato de arrendamento rural que define as condições de aluguel de uma gleba de terra por um período de anos, e um contrato de comodato que estabelece os termos do empréstimo de obras de arte por um período determinado.
The document outlines various procurement strategies and contract forms for construction projects. It discusses traditional procurement, management contracting, and design-build procurement methods. For each method, it describes the process, advantages, and disadvantages. It also examines standard contract forms used in Malaysia, including the PAM 2006, JKR 203A, and FIDIC contracts. Based on the project details of developing a 20-storey condominium, the document recommends using a traditional procurement method with a PAM 2006 contract form due to its common use for private sector building projects in Malaysia.
Este contrato de locação estabelece os termos e condições para a locação de um ponto comercial em Jequié-BA pelo período de 12 meses. O aluguel mensal é de R$ 1.100,00 e deve ser pago até o dia 05 de cada mês. Eventuais atrasos no pagamento implicarão em multas e juros. O imóvel só poderá ser usado para fins comerciais e a locatária é responsável por sua manutenção e despesas durante o contrato.
QUESTION :
Taylor’s University is intending to build a branch campus in Kota Kinabalu, Sabah. Based on Taylor’s University plan they require the branch campus to be operational in mid-2019. Your quantity surveying firm, Innovative Cost Consultant Sdn. Bhd., of which you are a director, has been appointed to provide advice on the procurement system and the tendering methods that are to be adopted in carrying out the project.
The management of the University has informed you that the following requirements are of priority:
i) Cost to completion to be within the budget fixed.
ii) Timely delivery of the facility in order to commence operation in mid- 2019.
You are required to prepare a report to Taylor’s University recommending the procurement system and the tendering method to be adopted.
In your report you shall consider the procurement systems commonly used. You shall list out and explain the advantages and disadvantages of each system before making your recommendation.
As for the tendering methods, you shall consider all the three methods; i.e. open, selective and direct negotiation methods. Similarly you are to describe the advantages and disadvantages of each method before arriving at your recommendation.
Your report shall clearly explain your reasons for your recommendations.
Based on the above recommendations you are also required to prepare a simple programme or schedule in a form of bar chart showing the various activities commencing from the confirmation of the procurement system until completion of the project.
This document discusses different procurement methods for a proposed 200-unit semi-detached residential housing project with sustainable features. It recommends the traditional procurement method, assessing the suitability of traditional, management contracting, and design-build approaches. It suggests using a lump sum contract with quantities and the PAM Contract 2006 standard form. Design-build is also described, outlining its potential benefits like single point responsibility but noting developers in Malaysia commonly prefer traditional procurement.
Este contrato descreve a venda de um imóvel pelo VENDEDOR para o COMPRADOR. O imóvel será vendido pelo valor total de R$[valor] a ser pago em três parcelas, sendo uma no ato da assinatura e as outras duas em datas futuras. O contrato especifica os documentos que o VENDEDOR deve fornecer e as consequências em caso de inadimplência do COMPRADOR.
A Case Study based on FIDIC and PAM Form 2006Melvin Lim
The document discusses the essential requirements for formation of a contract based on a question regarding whether Jolly and Can-do concluded a binding contract. It provides details on tenders as offers, qualifications in tenders, acceptance of tenders, letters of intent, essential terms, and letters of award. It also discusses a relevant case law supporting the position that a contract can be formed when a contractor begins work even if no formal contract is signed.
Contract to perform a specified task engConsuldimo
The document is a contract to perform a specified task in Poland between a limited liability company and an author. It outlines the following key points in 3 sentences:
The author agrees to perform a specified task within a certain period of time. In return, the company will pay the author a gross remuneration of EUR [amount] after accepting the completed work. The contract also specifies penalties if either party fails to meet their obligations and outlines how disputes will be resolved.
This contract is between an owner and Zimarc Architectural Drafter for drafting services related to converting an 8-unit multi-family residential building to a 4-unit building. The contractor will provide measured drawings of the existing building, a layout of a new bedroom addition, and a preliminary review set. Services include site visits, code research, and one revision if needed. The owner agrees to pay $XXX, with a retainer due upon signing and the remainder due upon completion. Additional revisions will be charged hourly.
This document provides a project proposal for developing a RM600 million hotel and shopping complex in Kuala Lumpur. It recommends using a management contracting procurement strategy, two-stage selective tendering method, and a cost plus with GMP contract arrangement. Management contracting is proposed because it allows client control over design, deals with fewer parties, and enables time savings through overlapping design and construction. Two-stage selective tendering provides a transparent process for pre-qualifying and selecting contractors based on their skills and experience. The cost plus with GMP contract arrangement allocates cost risk to the client and quality/time risks to the contractor.
This document outlines the details of a group assignment for a construction law course. It includes the group member names and student IDs, submission date, table of contents, and introduction. The group was appointed by a client to propose a standard form of construction contract and provide advice on pre-contract and post-contract issues for a proposed university accommodation and recreation center project costing RM500 million. The report will analyze and compare the PAM 2006 and FIDIC forms of contract and make recommendations on key contractual issues such as payment, extensions of time, variations, programs, termination and dispute resolution.
Rancangan peraturan daerah ini membahas penyusunan rencana pembangunan dan pengembangan perumahan serta kawasan permukiman di Provinsi Bali untuk periode 20 tahun ke depan, mencakup aspek-aspek perencanaan, pengawasan, dan kerangka hukum yang diperlukan.
Este contrato de locação residencial define os termos e condições entre o Locador e o Locatário, incluindo o endereço do imóvel, prazo de locação, valor do aluguel mensal, reajustes anuais pelo IGP-M, responsabilidades do Locatário como pagamento de contas e proibição de sublocação sem permissão.
The document provides an analysis of using the FIDIC Red Book form of contract for a RM150 million construction project by Taylor's University. Key points discussed include:
1. Proposing the FIDIC Red Book as it allows the employer (Taylor's) full control over design while adopting the traditional procurement system of employer-designed works.
2. Highlighting payment conditions such as interim payments, retention amounts, and delayed payment interest according to the Red Book clauses.
3. Comparing contractual programming requirements between the Red Book and Malaysian PAM form, noting the Red Book's more detailed programming obligations for the contractor.
4. Identifying dispute resolution methods like the Dispute Adjudication
This construction contract is between Montrose County, Colorado and a contractor for a construction project. The contractor will complete all work specified in the scope of work and RFP documents. The work must be completed by a specified date. The county will pay the contractor $________ for satisfactory completion of the work. The contract documents define the roles and responsibilities of the contractor and county, including requirements for bonds, payments, disputes, safety, and indemnification.
1) The document discusses the Real Estate (Regulation and Development) Act, 2016 which aims to establish a regulatory authority for the real estate sector in India and protect consumer interests.
2) Key objectives of the Act include regulating real estate projects, promoting transparency, and providing dispute resolution mechanisms.
3) The Act mandates registration of real estate projects with the regulatory authority and compliance with regulations regarding disclosures, funds usage, completion timelines, and more. It also requires registration of real estate agents.
O documento é uma autorização para divulgar fotos e dados de um imóvel à venda no site www.comprenaplanta.net. O proprietário declara que o imóvel está livre de ônus e em boas condições, e autoriza a empresa COMPRENAPLANTA.NET a vender o imóvel sem exclusividade, pagando honorários de ___ por cento sobre o valor da transação no ato de assinatura.
This document discusses construction delays and extensions of time under standard construction contracts. It defines different categories of delays including those caused by the contractor, employer, and third parties. For contractor-caused delays, the contractor is not entitled to an extension of time or reimbursement for losses. For employer-caused delays, the contractor can claim an extension of time and reimbursement for losses. The document outlines the procedure for applying for an extension of time and the principles for granting one. It also discusses implications of granting or not granting extensions of time, such as liquidated damages and time becoming at large.
O documento apresenta dois modelos de contratos: um contrato de arrendamento rural que define as condições de aluguel de uma gleba de terra por um período de anos, e um contrato de comodato que estabelece os termos do empréstimo de obras de arte por um período determinado.
The document outlines various procurement strategies and contract forms for construction projects. It discusses traditional procurement, management contracting, and design-build procurement methods. For each method, it describes the process, advantages, and disadvantages. It also examines standard contract forms used in Malaysia, including the PAM 2006, JKR 203A, and FIDIC contracts. Based on the project details of developing a 20-storey condominium, the document recommends using a traditional procurement method with a PAM 2006 contract form due to its common use for private sector building projects in Malaysia.
Este contrato de locação estabelece os termos e condições para a locação de um ponto comercial em Jequié-BA pelo período de 12 meses. O aluguel mensal é de R$ 1.100,00 e deve ser pago até o dia 05 de cada mês. Eventuais atrasos no pagamento implicarão em multas e juros. O imóvel só poderá ser usado para fins comerciais e a locatária é responsável por sua manutenção e despesas durante o contrato.
QUESTION :
Taylor’s University is intending to build a branch campus in Kota Kinabalu, Sabah. Based on Taylor’s University plan they require the branch campus to be operational in mid-2019. Your quantity surveying firm, Innovative Cost Consultant Sdn. Bhd., of which you are a director, has been appointed to provide advice on the procurement system and the tendering methods that are to be adopted in carrying out the project.
The management of the University has informed you that the following requirements are of priority:
i) Cost to completion to be within the budget fixed.
ii) Timely delivery of the facility in order to commence operation in mid- 2019.
You are required to prepare a report to Taylor’s University recommending the procurement system and the tendering method to be adopted.
In your report you shall consider the procurement systems commonly used. You shall list out and explain the advantages and disadvantages of each system before making your recommendation.
As for the tendering methods, you shall consider all the three methods; i.e. open, selective and direct negotiation methods. Similarly you are to describe the advantages and disadvantages of each method before arriving at your recommendation.
Your report shall clearly explain your reasons for your recommendations.
Based on the above recommendations you are also required to prepare a simple programme or schedule in a form of bar chart showing the various activities commencing from the confirmation of the procurement system until completion of the project.
This document discusses different procurement methods for a proposed 200-unit semi-detached residential housing project with sustainable features. It recommends the traditional procurement method, assessing the suitability of traditional, management contracting, and design-build approaches. It suggests using a lump sum contract with quantities and the PAM Contract 2006 standard form. Design-build is also described, outlining its potential benefits like single point responsibility but noting developers in Malaysia commonly prefer traditional procurement.
Este contrato descreve a venda de um imóvel pelo VENDEDOR para o COMPRADOR. O imóvel será vendido pelo valor total de R$[valor] a ser pago em três parcelas, sendo uma no ato da assinatura e as outras duas em datas futuras. O contrato especifica os documentos que o VENDEDOR deve fornecer e as consequências em caso de inadimplência do COMPRADOR.
A Case Study based on FIDIC and PAM Form 2006Melvin Lim
The document discusses the essential requirements for formation of a contract based on a question regarding whether Jolly and Can-do concluded a binding contract. It provides details on tenders as offers, qualifications in tenders, acceptance of tenders, letters of intent, essential terms, and letters of award. It also discusses a relevant case law supporting the position that a contract can be formed when a contractor begins work even if no formal contract is signed.
Contract to perform a specified task engConsuldimo
The document is a contract to perform a specified task in Poland between a limited liability company and an author. It outlines the following key points in 3 sentences:
The author agrees to perform a specified task within a certain period of time. In return, the company will pay the author a gross remuneration of EUR [amount] after accepting the completed work. The contract also specifies penalties if either party fails to meet their obligations and outlines how disputes will be resolved.
This contract is between an owner and Zimarc Architectural Drafter for drafting services related to converting an 8-unit multi-family residential building to a 4-unit building. The contractor will provide measured drawings of the existing building, a layout of a new bedroom addition, and a preliminary review set. Services include site visits, code research, and one revision if needed. The owner agrees to pay $XXX, with a retainer due upon signing and the remainder due upon completion. Additional revisions will be charged hourly.
This document discusses various types of engineering contracts and their key terms and conditions. It begins by outlining the four main functions of engineering contracts: scope of work, period of performance, payment, and termination. It then describes different types of civil engineering contracts such as item rate, percentage rate, and lump sum contracts. Finally, it lists important contract terms and conditions like security deposits, compensation for delays, extensions, completion certificates, and measurements and payments.
This document outlines an agreement for project management services for projects of indefinite scope and quantity. It includes 18 sections covering the scope of services, compensation, schedules, notices to proceed, and dispute resolution. Costs are addressed in exhibits detailing fee schedules and budgets for tasks like design, construction, and project controls. Schedules are managed through the fee schedule and service provider's schedule. Disputes are governed by Texas state law and both parties can terminate for cause or convenience with 10 days notice, with compensation for services performed to date in the event of non-fault termination.
This construction contract is between Montrose County and a contractor for a construction project. The contractor will complete all work specified in the scope of work and RFP attachments by the completion date. The owner will pay the contractor $_________ for satisfactory work, retaining 10% of each payment until final payment. The contract documents include the construction contract, plans, specifications, permits, bonds and other documents defining the project and terms of payment.
Subcontract Agreement to Perform Building Work (Purchase this doc, Text: 0811...GLC
This document is a subcontract agreement between PT. __________ and PT. __________ for plumbing and electrical work on a construction project. Key details include:
- The subcontractor will perform plumbing and electrical work within 5 months for a fixed price of IDR __________.
- Payment terms include a 20% advance payment, 80% monthly payments based on progress, and a 5% retention until the defect liability period ends.
- The subcontractor is responsible for taxes, permits, insurance, safety, and quality control. Liquidated damages may be charged for delays. Warranties and defect liability last 12 months.
This document is a subcontract agreement between PT. __________ and PT. __________ for plumbing and electrical work on a construction project. Key details include:
- The subcontractor will perform plumbing and electrical work within 5 months of signing for a fixed price of IDR __________.
- Payment terms include a 20% advance payment, 80% monthly payments based on progress, and 5% retention until the end of the 12-month defect liability period.
- The subcontractor is responsible for taxes, permits, insurance, safety, and quality control in accordance with Indonesian laws. Liquidated damages may be charged for delays.
This document is a development agreement between an owner and developer. It gives the developer the rights to develop a piece of land described in the schedule by demolishing existing structures and constructing new buildings. In exchange, the developer agrees to pay the owner a sum of money. Upon completion, the developer will transfer ownership of the developed land and new buildings to a housing cooperative formed by flat purchasers. The agreement outlines various terms regarding permissions, construction responsibilities, payments, and liability between the owner and developer.
This document outlines the terms of an agreement between an owner and contractor for a construction project. It specifies that the contractor will execute the work shown in the drawings and described in the specifications and schedule of quantities, in exchange for payment from the owner. The architect's decisions will be final in matters of disputes regarding materials, workmanship, or contract interpretation. The agreement also defines the scope of work, security deposit, responsibilities of both parties, and jurisdiction in case of legal disputes.
This document outlines a website design agreement between a client and designer. It specifies that the designer will create a website for the client based on requirements provided. It establishes schedules, payment terms including an upfront fee, copyright notices, confidentiality of shared information, ownership rights over proprietary content and templates, severability of contract terms, and limitations of liability for damages. The signatures at the end demonstrate agreement to the terms.
This document is a construction contract between Al Noor Consultants and Zulifiqar Ahmed Architectural and Engineering Private Limited for the construction of a residential development project in Lahore, Pakistan. Key details include:
- The contractor will complete construction of 150 plots of land with houses, a mosque, school, park and infrastructure over 4 years.
- As a security, the client will sign over ownership of 8 plots to the contractor initially valued at Rs. 1200 per square foot for structures and Rs. 1000 per square foot for finishes.
- The contractor must complete the project by June 2021. Liquidated damages of 0.5% per day will be charged for delays beyond this date, up to
The International Construction Contract governs the relations between a company (Contractor) and its client (Employer), located in different countries, for the undertaking of a works project. Construction Contract.
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docxGLC
This 7-page document is a sub-contract agreement between two companies, PT. XXX and PT. YYY, for soil investigation works on a biomass power plant and chipmill project.
The key points are:
1) PT. XXX hires PT. YYY to perform soil testing including CPT, boreholes, sampling, and reporting.
2) The scope of work, schedule, and payment terms are defined, with PT. YYY to be paid Rp294 million in three installments tied to milestones.
3) Standard terms are included regarding changes, governing law, termination, force majeure, taxes, notices, and general provisions.
The document
ARTIST AGENT AGREEMENT FORMAT
FREE LEGAL AND ACCOUNTANT FORMATS
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
The document discusses various legal aspects of property transactions in India. It covers topics like agreement of sale, payment schedules, stamp duty, registration, possession, defects, society formation, penalties for builders, and differences between a lease and license. Key points include that an agreement of sale must be registered within 4 months, builders are liable for construction defects for 3 years, and they must form a society within 4 months of selling 60% of flats.
This document is a 44-page contract between PT._____________ (the Owner) and Consortium [Consortium Name] (the Contractor) for an LPG Terminal project in Indonesia. Key details include:
- The Contractor will be responsible for engineering, procurement, construction, installation, testing, commissioning and rectification of works for the LPG Terminal project on a turn-key basis.
- The contract outlines the scope of work for both the Owner and Contractor, timelines for commencement and completion, payment terms, bonds, insurance requirements, definitions of key terms, and procedures for changes, suspension, and termination of the contract.
- Appendices provide further details on the scope
The architect as contract administrator a legal perspective - presentation ...Zainab Zainordin
This document provides an overview of the architect's role as contract administrator from a legal perspective. It discusses the architect's scope of work under the building contract, their duty to act independently and impartially when certifying payments. The document analyzes specific clauses in the PAM 2006 building contract form regarding practical completion, defects liability, damages for non-completion, and emphasizes the importance of the architect exercising proper judgment when issuing certificates that can financially impact the contractor and employer. Key sources of construction law are also outlined.
The real estate sector of India is perhaps one of the fastest-growing sectors, creating several opportunities for every stakeholder and professionals. The country has witnessed the successfull impact of rera implementation. The efficiency of RERA revolves around the prominent role plays by each
professional whose service is of utmost importance. The article brings you such a goldmine of opportunities available for professionals, stakeholders, who can utilize their expertise and contribute to the growing economy of the world.
CA NOTES ON TRANSFER PRICING
FREE AFFIDAVITS AND NOTICES FORMATS
FREE AGREEMENTS AND CONTRACTS FORMATS
FREE LLB LAW NOTES
FREE CA ICWA NOTES
FREE LLB LAW FIRST SEM NOTES
FREE LLB LAW SECOND SEM NOTES
FREE LLB LAW THIRD SEM NOTES
FREE LLB LAW FOURTH SEM NOTES
FREE LLB LAW FIFTH SEM NOTES
FREE LLB LAW SIXTH SEM NOTES
FREE CA ICWA FOUNDATION NOTES
FREE CA ICWA INTERMEDIATE NOTES
FREE CA ICWA FINAL NOTES
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
CA NOTES ON THEORY OF PRODUCTION AND COST IN BUSINESS ECONOMICS
FREE AFFIDAVITS AND NOTICES FORMATS
FREE AGREEMENTS AND CONTRACTS FORMATS
FREE LLB LAW NOTES
FREE CA ICWA NOTES
FREE LLB LAW FIRST SEM NOTES
FREE LLB LAW SECOND SEM NOTES
FREE LLB LAW THIRD SEM NOTES
FREE LLB LAW FOURTH SEM NOTES
FREE LLB LAW FIFTH SEM NOTES
FREE LLB LAW SIXTH SEM NOTES
FREE CA ICWA FOUNDATION NOTES
FREE CA ICWA INTERMEDIATE NOTES
FREE CA ICWA FINAL NOTES
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
1) The document provides information on the theory of production and cost, including definitions and concepts related to production, factors of production, and capital formation.
2) It defines production as the transformation of inputs or resources into finished goods and services, and outlines the different types of utility created through production.
3) The main factors of production are identified as land, labor, capital, and entrepreneurship, and their key features are described.
4) Capital formation is defined as the increased production of capital goods like machinery and infrastructure that are used for further production.
CA NOTES ON THEORY OF DEMAND AND SUPPLY
FREE AFFIDAVITS AND NOTICES FORMATS
FREE AGREEMENTS AND CONTRACTS FORMATS
FREE LLB LAW NOTES
FREE CA ICWA NOTES
FREE LLB LAW FIRST SEM NOTES
FREE LLB LAW SECOND SEM NOTES
FREE LLB LAW THIRD SEM NOTES
FREE LLB LAW FOURTH SEM NOTES
FREE LLB LAW FIFTH SEM NOTES
FREE LLB LAW SIXTH SEM NOTES
FREE CA ICWA FOUNDATION NOTES
FREE CA ICWA INTERMEDIATE NOTES
FREE CA ICWA FINAL NOTES
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
This document discusses the theory of demand and supply, specifically the law of demand and elasticity of demand. It defines demand as the quantity of a good consumers are willing and able to purchase at various prices. The law of demand states that, all else equal, quantity demanded varies inversely with price - as price increases, quantity demanded decreases, and vice versa. This is shown through individual and market demand schedules and curves. The document discusses factors influencing demand and provides rationales for the downward sloping demand curve. It also notes some exceptions to the law of demand and defines expansion and contraction of demand.
CA NOTES ON THE SALES OF GOODS ACT 1930
FREE AFFIDAVITS AND NOTICES FORMATS
FREE AGREEMENTS AND CONTRACTS FORMATS
FREE LLB LAW NOTES
FREE CA ICWA NOTES
FREE LLB LAW FIRST SEM NOTES
FREE LLB LAW SECOND SEM NOTES
FREE LLB LAW THIRD SEM NOTES
FREE LLB LAW FOURTH SEM NOTES
FREE LLB LAW FIFTH SEM NOTES
FREE LLB LAW SIXTH SEM NOTES
FREE CA ICWA FOUNDATION NOTES
FREE CA ICWA INTERMEDIATE NOTES
FREE CA ICWA FINAL NOTES
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
CA NOTES ON THE LIMITED LIABILITY PARTNERSHIP ACT 2008
FREE AFFIDAVITS AND NOTICES FORMATS
FREE AGREEMENTS AND CONTRACTS FORMATS
FREE LLB LAW NOTES
FREE CA ICWA NOTES
FREE LLB LAW FIRST SEM NOTES
FREE LLB LAW SECOND SEM NOTES
FREE LLB LAW THIRD SEM NOTES
FREE LLB LAW FOURTH SEM NOTES
FREE LLB LAW FIFTH SEM NOTES
FREE LLB LAW SIXTH SEM NOTES
FREE CA ICWA FOUNDATION NOTES
FREE CA ICWA INTERMEDIATE NOTES
FREE CA ICWA FINAL NOTES
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
CA NOTES ON THE INDIAN PARTNERSHIP ACT 1932
FREE AFFIDAVITS AND NOTICES FORMATS
FREE AGREEMENTS AND CONTRACTS FORMATS
FREE LLB LAW NOTES
FREE CA ICWA NOTES
FREE LLB LAW FIRST SEM NOTES
FREE LLB LAW SECOND SEM NOTES
FREE LLB LAW THIRD SEM NOTES
FREE LLB LAW FOURTH SEM NOTES
FREE LLB LAW FIFTH SEM NOTES
FREE LLB LAW SIXTH SEM NOTES
FREE CA ICWA FOUNDATION NOTES
FREE CA ICWA INTERMEDIATE NOTES
FREE CA ICWA FINAL NOTES
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
CA NOTES ON THE INDIAN CONTRACT ACT 1872
FREE AFFIDAVITS AND NOTICES FORMATS
FREE AGREEMENTS AND CONTRACTS FORMATS
FREE LLB LAW NOTES
FREE CA ICWA NOTES
FREE LLB LAW FIRST SEM NOTES
FREE LLB LAW SECOND SEM NOTES
FREE LLB LAW THIRD SEM NOTES
FREE LLB LAW FOURTH SEM NOTES
FREE LLB LAW FIFTH SEM NOTES
FREE LLB LAW SIXTH SEM NOTES
FREE CA ICWA FOUNDATION NOTES
FREE CA ICWA INTERMEDIATE NOTES
FREE CA ICWA FINAL NOTES
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
This document provides information about CA coaching classes and study materials offered by AVJ Institute in Delhi, India. It includes contact details for the institute, names and subjects of various CA course instructors like CA Sanchit Grover and CA Sahil Grover, along with fees and contents of pen drive classes and online video lectures/notes on YouTube and Telegram. The last pages contain teaching materials on Chapter 4 (The Companies Act, 2013) of the CA Foundation syllabus, covering topics like nature, definition, characteristics and features of a company, as well as the concept of separate legal entity.
CA NOTES ON RISK, RETURN AND PORTFOLIO PRACTICALS OF STRATEGIC FINANCIAL MODE...Kanoon Ke Rakhwale India
CA NOTES ON RISK, RETURN AND PORTFOLIO PRACTICALS OF STRATEGIC FINANCIAL MODELING
FREE AFFIDAVITS AND NOTICES FORMATS
FREE AGREEMENTS AND CONTRACTS FORMATS
FREE LLB LAW NOTES
FREE CA ICWA NOTES
FREE LLB LAW FIRST SEM NOTES
FREE LLB LAW SECOND SEM NOTES
FREE LLB LAW THIRD SEM NOTES
FREE LLB LAW FOURTH SEM NOTES
FREE LLB LAW FIFTH SEM NOTES
FREE LLB LAW SIXTH SEM NOTES
FREE CA ICWA FOUNDATION NOTES
FREE CA ICWA INTERMEDIATE NOTES
FREE CA ICWA FINAL NOTES
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
CA NOTES ON PRINCIPLES AND PRACTICES OF ACCOUNTING
FREE AFFIDAVITS AND NOTICES FORMATS
FREE AGREEMENTS AND CONTRACTS FORMATS
FREE LLB LAW NOTES
FREE CA ICWA NOTES
FREE LLB LAW FIRST SEM NOTES
FREE LLB LAW SECOND SEM NOTES
FREE LLB LAW THIRD SEM NOTES
FREE LLB LAW FOURTH SEM NOTES
FREE LLB LAW FIFTH SEM NOTES
FREE LLB LAW SIXTH SEM NOTES
FREE CA ICWA FOUNDATION NOTES
FREE CA ICWA INTERMEDIATE NOTES
FREE CA ICWA FINAL NOTES
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
CA NOTES ON PRICING DECISION
FREE AFFIDAVITS AND NOTICES FORMATS
FREE AGREEMENTS AND CONTRACTS FORMATS
FREE LLB LAW NOTES
FREE CA ICWA NOTES
FREE LLB LAW FIRST SEM NOTES
FREE LLB LAW SECOND SEM NOTES
FREE LLB LAW THIRD SEM NOTES
FREE LLB LAW FOURTH SEM NOTES
FREE LLB LAW FIFTH SEM NOTES
FREE LLB LAW SIXTH SEM NOTES
FREE CA ICWA FOUNDATION NOTES
FREE CA ICWA INTERMEDIATE NOTES
FREE CA ICWA FINAL NOTES
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
CA NOTES ON PRICE DETERMINATION
FREE AFFIDAVITS AND NOTICES FORMATS
FREE AGREEMENTS AND CONTRACTS FORMATS
FREE LLB LAW NOTES
FREE CA ICWA NOTES
FREE LLB LAW FIRST SEM NOTES
FREE LLB LAW SECOND SEM NOTES
FREE LLB LAW THIRD SEM NOTES
FREE LLB LAW FOURTH SEM NOTES
FREE LLB LAW FIFTH SEM NOTES
FREE LLB LAW SIXTH SEM NOTES
FREE CA ICWA FOUNDATION NOTES
FREE CA ICWA INTERMEDIATE NOTES
FREE CA ICWA FINAL NOTES
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
CA NOTES ON PARTNERSHIP ACCOUNTS
FREE AFFIDAVITS AND NOTICES FORMATS
FREE AGREEMENTS AND CONTRACTS FORMATS
FREE LLB LAW NOTES
FREE CA ICWA NOTES
FREE LLB LAW FIRST SEM NOTES
FREE LLB LAW SECOND SEM NOTES
FREE LLB LAW THIRD SEM NOTES
FREE LLB LAW FOURTH SEM NOTES
FREE LLB LAW FIFTH SEM NOTES
FREE LLB LAW SIXTH SEM NOTES
FREE CA ICWA FOUNDATION NOTES
FREE CA ICWA INTERMEDIATE NOTES
FREE CA ICWA FINAL NOTES
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
Business economics helps managers make decisions by applying economic principles and analysis tools. It draws from microeconomics, using concepts like demand analysis, production and cost analysis, and inventory management to address operational issues. It also considers macroeconomic factors and how they influence the business environment. Business economics aims to provide practical recommendations, making it a normative rather than purely positive discipline. It has a wide scope, covering issues from choosing a business and products to setting prices, managing costs and investments, and forecasting demand.
Business Economics concerns the application of economic theory and tools to business decision making. It helps managers address issues like choosing optimal production levels and input mixes, determining appropriate pricing strategies given market conditions, managing inventories, assessing risks and uncertainties, and allocating scarce resources. While based largely in microeconomics, Business Economics also incorporates some macroeconomic analysis to help understand the broader economic environment. Its scope encompasses using economic theories and analysis to address both internal operational issues for businesses, as well as external environmental factors that impact firms.
CA NOTES ON MARKETS IN BUSINESS ECONOMICS
FREE AFFIDAVITS AND NOTICES FORMATS
FREE AGREEMENTS AND CONTRACTS FORMATS
FREE LLB LAW NOTES
FREE CA ICWA NOTES
FREE LLB LAW FIRST SEM NOTES
FREE LLB LAW SECOND SEM NOTES
FREE LLB LAW THIRD SEM NOTES
FREE LLB LAW FOURTH SEM NOTES
FREE LLB LAW FIFTH SEM NOTES
FREE LLB LAW SIXTH SEM NOTES
FREE CA ICWA FOUNDATION NOTES
FREE CA ICWA INTERMEDIATE NOTES
FREE CA ICWA FINAL NOTES
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
CA NOTES ON LEVY OF CUSTOMS
FREE AFFIDAVITS AND NOTICES FORMATS
FREE AGREEMENTS AND CONTRACTS FORMATS
FREE LLB LAW NOTES
FREE CA ICWA NOTES
FREE LLB LAW FIRST SEM NOTES
FREE LLB LAW SECOND SEM NOTES
FREE LLB LAW THIRD SEM NOTES
FREE LLB LAW FOURTH SEM NOTES
FREE LLB LAW FIFTH SEM NOTES
FREE LLB LAW SIXTH SEM NOTES
FREE CA ICWA FOUNDATION NOTES
FREE CA ICWA INTERMEDIATE NOTES
FREE CA ICWA FINAL NOTES
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
CA NOTES ON INVENTORIES
FREE AFFIDAVITS AND NOTICES FORMATS
FREE AGREEMENTS AND CONTRACTS FORMATS
FREE LLB LAW NOTES
FREE CA ICWA NOTES
FREE LLB LAW FIRST SEM NOTES
FREE LLB LAW SECOND SEM NOTES
FREE LLB LAW THIRD SEM NOTES
FREE LLB LAW FOURTH SEM NOTES
FREE LLB LAW FIFTH SEM NOTES
FREE LLB LAW SIXTH SEM NOTES
FREE CA ICWA FOUNDATION NOTES
FREE CA ICWA INTERMEDIATE NOTES
FREE CA ICWA FINAL NOTES
KANOON KE RAKHWALE INDIA
HIRE LAWYER ONLINE
LAW FIRMS IN DELHI
CA FIRM DELHI
VISIT : https://www.kanoonkerakhwale.com/
VISIT : https://hirelawyeronline.com/
What are the common challenges faced by women lawyers working in the legal pr...lawyersonia
The legal profession, which has historically been male-dominated, has experienced a significant increase in the number of women entering the field over the past few decades. Despite this progress, women lawyers continue to encounter various challenges as they strive for top positions.
This document briefly explains the June compliance calendar 2024 with income tax returns, PF, ESI, and important due dates, forms to be filled out, periods, and who should file them?.
सुप्रीम कोर्ट ने यह भी माना था कि मजिस्ट्रेट का यह कर्तव्य है कि वह सुनिश्चित करे कि अधिकारी पीएमएलए के तहत निर्धारित प्रक्रिया के साथ-साथ संवैधानिक सुरक्षा उपायों का भी उचित रूप से पालन करें।
Lifting the Corporate Veil. Power Point Presentationseri bangash
"Lifting the Corporate Veil" is a legal concept that refers to the judicial act of disregarding the separate legal personality of a corporation or limited liability company (LLC). Normally, a corporation is considered a legal entity separate from its shareholders or members, meaning that the personal assets of shareholders or members are protected from the liabilities of the corporation. However, there are certain situations where courts may decide to "pierce" or "lift" the corporate veil, holding shareholders or members personally liable for the debts or actions of the corporation.
Here are some common scenarios in which courts might lift the corporate veil:
Fraud or Illegality: If shareholders or members use the corporate structure to perpetrate fraud, evade legal obligations, or engage in illegal activities, courts may disregard the corporate entity and hold those individuals personally liable.
Undercapitalization: If a corporation is formed with insufficient capital to conduct its intended business and meet its foreseeable liabilities, and this lack of capitalization results in harm to creditors or other parties, courts may lift the corporate veil to hold shareholders or members liable.
Failure to Observe Corporate Formalities: Corporations and LLCs are required to observe certain formalities, such as holding regular meetings, maintaining separate financial records, and avoiding commingling of personal and corporate assets. If these formalities are not observed and the corporate structure is used as a mere façade, courts may disregard the corporate entity.
Alter Ego: If there is such a unity of interest and ownership between the corporation and its shareholders or members that the separate personalities of the corporation and the individuals no longer exist, courts may treat the corporation as the alter ego of its owners and hold them personally liable.
Group Enterprises: In some cases, where multiple corporations are closely related or form part of a single economic unit, courts may pierce the corporate veil to achieve equity, particularly if one corporation's actions harm creditors or other stakeholders and the corporate structure is being used to shield culpable parties from liability.
Sangyun Lee, 'Why Korea's Merger Control Occasionally Fails: A Public Choice ...Sangyun Lee
Presentation slides for a session held on June 4, 2024, at Kyoto University. This presentation is based on the presenter’s recent paper, coauthored with Hwang Lee, Professor, Korea University, with the same title, published in the Journal of Business Administration & Law, Volume 34, No. 2 (April 2024). The paper, written in Korean, is available at <https://shorturl.at/GCWcI>.
Guide on the use of Artificial Intelligence-based tools by lawyers and law fi...Massimo Talia
This guide aims to provide information on how lawyers will be able to use the opportunities provided by AI tools and how such tools could help the business processes of small firms. Its objective is to provide lawyers with some background to understand what they can and cannot realistically expect from these products. This guide aims to give a reference point for small law practices in the EU
against which they can evaluate those classes of AI applications that are probably the most relevant for them.
Matthew Professional CV experienced Government LiaisonMattGardner52
As an experienced Government Liaison, I have demonstrated expertise in Corporate Governance. My skill set includes senior-level management in Contract Management, Legal Support, and Diplomatic Relations. I have also gained proficiency as a Corporate Liaison, utilizing my strong background in accounting, finance, and legal, with a Bachelor's degree (B.A.) from California State University. My Administrative Skills further strengthen my ability to contribute to the growth and success of any organization.
Synopsis On Annual General Meeting/Extra Ordinary General Meeting With Ordinary And Special Businesses And Ordinary And Special Resolutions with Companies (Postal Ballot) Regulations, 2018
Defending Weapons Offence Charges: Role of Mississauga Criminal Defence LawyersHarpreetSaini48
Discover how Mississauga criminal defence lawyers defend clients facing weapon offence charges with expert legal guidance and courtroom representation.
To know more visit: https://www.saini-law.com/
Genocide in International Criminal Law.pptxMasoudZamani13
Excited to share insights from my recent presentation on genocide! 💡 In light of ongoing debates, it's crucial to delve into the nuances of this grave crime.
1. RENOVATION AGREEMENT
This AGREEMENT is made effective on the [____] day of [______] in the year
[______].
BETWEEN the Owner:
[Owner Name], an ______________ resident, founder of [____________ Cafe], a
_____________ business, with registered business address at
[_________Address__________________]
and the Architect:
[Architect Name], an interior architect, representing the architectural firm,
[_______________ Architecture Group], with registered business address at
[_________Address__________________]
for the following Project:
[_______________ Interior Renovation] at [_________Address__________________]
for aesthetic and space improvement purposes.
The Contractor:
[Contractor Name], a construction business, represented by its general
contractor, [________________], with registered business address at
[_________Address__________________].
The Owner and Architect agree as follows:
2. ARTICLE 1. AGREEMENT DOCUMENTS
The documents legally binding the Owner and Architect are these Articles of
Agreement and the rest of the documents, listed as follows:
1.1. Renovation Proposal;
1.2. Renovation Project Plan;
1.3. Renovation Work Contract;
1.4. Renovation Service Agreement of the Architect;
1.5. Project Blueprints provided by the Architect;
1.6. Approved list of Construction Materials;
1.7. Notice to Proceed;
1.8. Change Orders, if applicable; and
1.9. Design Modifications, if applicable.
ARTICLE 2. WORK
2.1. The Owner engages the Architect to plan, design, and supervise the
renovation project. Upon signing this agreement, the Architect agrees not to
accept any other projects from other parties during its execution of the work.
2.2. The Architect must comply with the conditions provided in the Agreement
Documents stated in Article 1, hereof.
2.3. The Architect must complete all work necessary on the 19th of July 2020 as
specified in the Renovation Service Agreement. The Architect will only assess and
design the designated area within such allotted time as specified by the Owner.
ARTICLE 3. DATE OF COMMENCEMENT AND COMPLETION
3.1 The work to be performed by the Architect under this Agreement must
commence during the effective date of ______________, upon the issue of the
Notice to Proceed and completed by __________________.
3.2. Unless otherwise required, for the safety of the persons or the property or
adjacent entities thereto, all work at the site must be done between the hours of
8 AM and 5 PM from Monday to Friday.
ARTICLE 4. LOCATION
Completion of all work will be executed at _____________________________________,
the designated location of the Project as specified by the Owner.
3. ARTICLE 5. MATERIALS
5.1. The Architect is responsible for the provision of all materials, equipment,
and supplies required to perform the design and renovation services for the
Project. Unless otherwise specified in this Agreement, all materials and supplies
to be used in the completion of the Project must be new and in good condition.
5.2. The Architect must not use any of the materials, equipment, and supplies
provided for purposes not related to the completion of the Project stated in this
Agreement.
ARTICLE 6. PAYMENTS
The Owner will pay the Architect a total amount of _______________ for the
completion and satisfactory performance of the needed work on the Project. The
Owner may still increase or decrease the specified payment, depending on how
the Architect executed its responsibilities under this Agreement.
6.1 Progress Payments
The Owner agrees to pay the Architect weekly progress payments equal to 25%
of the total cost due to the Architect, provided that the Architect submits a weekly
progress report and payment request, subject to the approval of the Owner.
Remittance for the progress payments will be done every Thursday of the week.
6.2 Final Payment
6.2.1. Upon the completion of work, the Owner will process a Notice of Final
Settlement at least fourteen (14) days prior to the date of the final settlement.
6.2.2. The Owner must fulfill remittance of the entire payment due to the
Architect upon the date of the final settlement. Failure of the Owner to remit full
payment to the Architect during the designated date requires the Owner to pay
interest. The Architect is entitled to receive an 8% interest on the total payment
if the Owner incurs monthly payment delays during the final settlement.
4. 6.3. Payment in the Event of Termination
In the event of the termination of this Agreement, the Owner must pay the
Architect the amount it is entitled to receive based on the extent of work the
Architect has executed as stipulated. Such amount is lawfully due and payable
within the 7-day allotted termination payment period.
ARTICLE 7. OWNER
7.1 The Owner will secure all the necessary documents to commence the
execution of the Project on the designated property.
7.2. The Owner will provide all the necessary payment to the Architect for the
completion of the Project.
7.3 The Owner will personally supervise and check the performance and output
of the Architect, visiting the site twice a week, and mandate the appropriate
changes on the Project.
ARTICLE 8. ARCHITECT
8.1. The Architect will be responsible for planning, designing, and supervising
the work, particularly on the interior renovation of the cafe.
8.2. The Architect will secure all the necessary documents, materials, and
equipment for the completion of the Project.
8.3. The Architect will duly perform the work assigned and stated in this
Agreement.
8.4. The Architect must abide by the laws in performing its required work on the
Project.
8.5. The Architect must coordinate with the Contractor and Subcontractors
during the process of completing the Project.
ARTICLE 9. CONTRACTOR
9.1. The Contractor will duly perform the work assigned and stated in this
Agreement.
9.2. The Contractor will secure a copy of the blueprints on the Project.
5. 9.3. The Contractor will secure all the necessary documents, materials, and
equipment for the completion of the Project.
9.4. The Contractor will coordinate with the Architect and Subcontractors during
the process of completing the Project.
ARTICLE 10. SUBCONTRACTORS
10.1. The Subcontractors, under a binding contract with the Contractor, will
perform any work for the Project on the site.
10.2. The Subcontractors will duly perform the work as agreed with the
Contractor.
10.3 The Subcontractors will coordinate with the Contractor and Architect
during the process of completing the Project.
ARTICLE 11. NATURE OF RELATIONSHIP
The Owner and the Architect acknowledges a commercial relationship
hereunder. Upon signing this agreement, the Architect concedes and recognizes
the Owner’s full right and authority to mandate necessary changes and approve
all suggestions or decisions from the Architect and the Contractor to complete
the Project.
ARTICLE 12. COMPLIANCE WITH LAWS
In compliance with applicable local, state, and federal laws, the Architect will
secure all the necessary documents, permits, and certifications to proceed with
its work for the Project.
ARTICLE 13. MODIFICATIONS
No modifications or amendments will take effect on this Agreement without the
consent and written authorization of all Parties hereto.
ARTICLE 14. DISPUTE RESOLUTION
In the event when a dispute arises, a third party, hereafter referred to as the
Representative, will serve as a mediator and initial interpreter between both
disputing parties. The Representative will remain impartial in resolving the
dispute between the Architect and the Owner, and will not be held liable for any
decisions rendered in connection with the situation.
6. 14.1 Initial Decision Maker
The Owner will act as the Initial Decision Maker in case a dispute arises. The
Representative will only provide unbiased views and assistance to both disputing
parties in the settlement process.
14.2 Binding Resolution
14.1. All parties agree to follow a non-binding arbitration process in resolving
disputes arising out of or relating to any terms or conditions stated in this
Agreement.
14.2. The Representative will facilitate any claims, disputes, and other matters
between the parties on the acceptability of work relating to performance,
changes, and output.
14.3. To resolve the disputed matter duly, the Representative will not participate
in any decision making and will only mediate both parties until a conclusion is
attained.
ARTICLE 15. INSURANCE
15.1. The Architect, under applicable laws, indemnifies and protects the Owner
from and against all claims and liabilities on any forms of injuries, accidents,
loss, or damage that occurs in or to the property during the execution of work
as stated in this Agreement.
15.2. The Architect will provide, without limiting its obligations or liabilities to
the Owner, a minimum insurance amount of ______________ in case of damages
caused by natural disasters and accidents during its execution of work.
ARTICLE 16. TERMINATION
16.1. The Owner has the right to terminate this Agreement upon failure of the
Architect to complete the work as stated herein, by giving a notice of termination
to the Architect.
16.2. In case the Owner decides to terminate this Agreement, the Owner will
abide by the payment terms stated in Article 6 of this Agreement. No termination
fees will be delivered to the Architect if the cause of termination is its failure or
non-compliance thereof to execute the work stipulated on this Agreement.
7.
8. This Agreement is executed on the date first set forth above.
Owner Name Architect
Name
OWNER ARCHITECT
WITNESSES:
Witness 1 _____________
Witness 2 _____________