Introduction
This last academic year I have been working for Network  Rail  based in their Manchester  Office. I decided I wanted to do a Placement when I was in my first year of University, not only because I 
saw is as an invaluable experience for my career development, but I also wanted to see what Civil Engineering was all about in real life situation, I wanted to put what I was leaning in the classroom in 
to practice. 
Network Rail is a state owned company limited by guarantee, which means that they do not have shareholders, the money they earn goes back in to the company. In 2011 the rail network was 
simplified and split in to ten routes, with each route having specific policies, processes and plans detailing the expected future demand of the route, their projected spending and their maintenance 
and investment needs.  
I was working with the London North Western (LNW) route placed within the Route Asset Management (RAM) Structures team, see figure 1 for organogram of the teams structure. The route 
runs from Euston to the Scottish borders, which incorporates Watford Junction, Milton Keynes, Birmingham, Manchester and Liverpool. It consists of 4,500 miles of track and is the busiest mixed‐
use (freight & passenger) railway in Europe. The route is the largest route in the UK and forms 24% of the overall business. 
Activities
Network Rail is a great company to progress both in your career and also personally. During my time at Network Rail, I was fortunate to be involved in a wide range of activities, both office and 
site based, such as major  development  projects, new  departments  and national  campaigns. Throughout the year, the mini‐projects that I have worked on have evolved  into standards  and 
practices that have been rolled out within the LNW RAM team in Manchester and Birmingham. Below is a summary of a few of my highlights whilst at Network Rail this year: 
Photo 1: My workspace  Photo 4: Tapping away at High Level Neck  Photo 5: What happens when it goes wrong, Falkirk Photo 2:  Visiting Severfield Offices in Lostock  Photo 3: Tamping machine at Holme Chapel Viaduct 
Route Asset Management (Structures)
7th September 2015—16th September 2016 Square One, Manchester
Figure 1: Network Rail Organisation Chart showing the Route Asset Management Civils & Buildings Department for 
London North Western Route, with a particular focus on Structures. 
Annabel Kate Downing MEng Architectural Engineering School of Civil Engineering
Renew. & 
Enhance. 
Tunnels 
Assess‐
ments 
South Central 
Lancs & 
Cumbria 
Support 
Route Asset Management 
London North Western 
Network Rail 
Structures Buildings 
Drainage 
Off‐Track 
Track  Signalling  E & P 
The Chord
Through contacts within Network Rail, I was able to gain some experience at a conserva‐
tional architects firm, BB Architects, in Manchester. They are working collaborative‐
ly with Network Rail on the Northern Hub, a development that will create better connec‐
tions in the North by joining Manchester Piccadilly to Victoria for the first time in history. 
I attended onsite  meetings  to understand the role of a Conservational Architect. This 
was a fantastic  opportunity  for me as it allowed me to understand  how  Architects 
and Engineers interact with one another. 
I was also fortunate to visit Severfield (UK) Ltd who have been commissioned to manu‐
facture  all of the steel  works  for the project. Severfield (UK) Ltd are considered as ex‐
perts in high volume structural steel production with specialist design engineer‐
ing expertise. 
It’s a (bridge) strike
Bridge Strikes are of growing concern for the railway industry, it is where a vehicle comes 
into  contact  with  a  bridge  that  carries  the  railway.  In  2015/16  there  were  423  bridge 
strikes, down from 448 in 2014/15 and up from 438 in 2013/14. 
LNW Bridge Strike Campion, Mark Wheel, set a task for the Placement students to as‐
sess the top 108 bridges and to think of mitigating measures that could be easily car‐
ried out for each asset. I looked at all of the highlighted bridges in the North of England 
(49). The task involved going to sites and carrying out an audit of the location, con‐
tacting  local  authority's for their support and presenting  the  findings  to a panel to 
determine if the mitigation measures are worth while. 
During my time at the company, we managed to implement mitigation to a number of 
sites to reduce the risks of it being repeatedly struck. 
Tunnels Team
I moved to the Tunnels department after Christmas as I wanted to experience a different team and broaden my knowledge of the 
railway in general. My new Line Manager, Ian Crossland, set me various tasks to standardise the way they examine Tunnels 
as well as increase efficiency in reviewing the history and condition of the Tunnel database. 
You must be STE 6 Competent to examine the condition of Tunnels, this means you must have adequate knowledge and 
experience  working with Tunnels.  All this information was provided by Head Office based in Milton Keynes, however it was 
presented in various documents repeating information with the specific competency process not being properly defined. 
My first challenge was to extract the relevant information from the various documents and create a set of handbooks with 
information about the becoming a Tunnel Examiner. 
In the early 2000’s, LNW commissioned Donaldson's to produce a report containing background information for each of 
their Tunnels. The findings were presented in various  folders  stowed at the Manchester office which was not  user‐friendly. I 
digitalised the documents and stored them on a cloud based system making the documents easily accessible for reference. 
Scottish
Borders
London
Euston
Placement Submission.dpp
Plans & permits Right equipment Competency Drugs & alcohol Mobile devices Speed limit Test earths Test equipment Safety harness Exclusion zones

More Related Content

What's hot

SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016
Norma Nun
 
Transport System in Pakistan - (( Rail Transport))
Transport System in Pakistan  - (( Rail Transport))Transport System in Pakistan  - (( Rail Transport))
Transport System in Pakistan - (( Rail Transport))
Nabeel Ahmed Khan
 
Bangladesh Road Transport corporation-BRTC
Bangladesh Road Transport corporation-BRTCBangladesh Road Transport corporation-BRTC
Bangladesh Road Transport corporation-BRTC
Tushar Mojumdar
 
Indian Railways And Cag Audit
Indian Railways And Cag AuditIndian Railways And Cag Audit
Indian Railways And Cag Audit
Shantanu Basu
 
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011   Loay GhazalehME Roads & Railway Projects & Consortiums, Feb., 2011   Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay Ghazaleh
Loay Ghazaleh MBA, BSc Civil Eng.
 
Metro bus
Metro busMetro bus
Metro bus
Ahsan Saeed
 
Pakistan railways پاکستان ریلویز ‎(final)
Pakistan railways پاکستان ریلویز ‎(final)Pakistan railways پاکستان ریلویز ‎(final)
Pakistan railways پاکستان ریلویز ‎(final)
Jinnah University for Women
 
asian high speed rail (HSR): changing economic geographiesn.ppt
asian high speed rail (HSR): changing economic geographiesn.pptasian high speed rail (HSR): changing economic geographiesn.ppt
asian high speed rail (HSR): changing economic geographiesn.ppt
Australian National University
 

What's hot (8)

SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016
 
Transport System in Pakistan - (( Rail Transport))
Transport System in Pakistan  - (( Rail Transport))Transport System in Pakistan  - (( Rail Transport))
Transport System in Pakistan - (( Rail Transport))
 
Bangladesh Road Transport corporation-BRTC
Bangladesh Road Transport corporation-BRTCBangladesh Road Transport corporation-BRTC
Bangladesh Road Transport corporation-BRTC
 
Indian Railways And Cag Audit
Indian Railways And Cag AuditIndian Railways And Cag Audit
Indian Railways And Cag Audit
 
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011   Loay GhazalehME Roads & Railway Projects & Consortiums, Feb., 2011   Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay Ghazaleh
 
Metro bus
Metro busMetro bus
Metro bus
 
Pakistan railways پاکستان ریلویز ‎(final)
Pakistan railways پاکستان ریلویز ‎(final)Pakistan railways پاکستان ریلویز ‎(final)
Pakistan railways پاکستان ریلویز ‎(final)
 
asian high speed rail (HSR): changing economic geographiesn.ppt
asian high speed rail (HSR): changing economic geographiesn.pptasian high speed rail (HSR): changing economic geographiesn.ppt
asian high speed rail (HSR): changing economic geographiesn.ppt
 

Viewers also liked

CHSRA presentation
CHSRA  presentationCHSRA  presentation
CHSRA presentation
Peter Haas
 
Global Rail _interactive_(c) Arup
Global Rail _interactive_(c) ArupGlobal Rail _interactive_(c) Arup
Global Rail _interactive_(c) Arup
Heather Ceney
 
China high speed rail (general distribution)
China high speed rail (general distribution)China high speed rail (general distribution)
China high speed rail (general distribution)
Dinah Saw
 
Asset management services
Asset management servicesAsset management services
Asset management services
Mohamed Salem
 
Itec 1301 webpage
Itec 1301 webpageItec 1301 webpage
Itec 1301 webpage
Josephine Daih
 
Atkins global rail opportunities 6th March 2014
Atkins global rail opportunities 6th March 2014Atkins global rail opportunities 6th March 2014
Atkins global rail opportunities 6th March 2014
Matt Cody
 
Jullian Valverde - the promotion and coordination of consortia for the provis...
Jullian Valverde - the promotion and coordination of consortia for the provis...Jullian Valverde - the promotion and coordination of consortia for the provis...
Jullian Valverde - the promotion and coordination of consortia for the provis...
imadhammoud
 
The New Era: BIM for High Speed Rail
The New Era: BIM for High Speed RailThe New Era: BIM for High Speed Rail
The New Era: BIM for High Speed Rail
Autodesk Global Services
 
California High Speed Rail Project Overview
California High Speed Rail Project OverviewCalifornia High Speed Rail Project Overview
California High Speed Rail Project Overview
Voice Malaysia
 
Asset Management for Rail,Metro and Monorail
Asset Management for Rail,Metro and MonorailAsset Management for Rail,Metro and Monorail
Asset Management for Rail,Metro and Monorail
Pravir Kumar Dwivedi
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
Rajesh Prasad
 
seminar presentation on high speed train
 seminar presentation on high speed train seminar presentation on high speed train
seminar presentation on high speed train
mechanical Singh
 
Hyperloop
HyperloopHyperloop
Hyperloop
Niranjan Reddy
 
The Hyperloop - Fancy Commute at 800 MPH?
The Hyperloop - Fancy Commute at 800 MPH?The Hyperloop - Fancy Commute at 800 MPH?
The Hyperloop - Fancy Commute at 800 MPH?
Stinson
 

Viewers also liked (14)

CHSRA presentation
CHSRA  presentationCHSRA  presentation
CHSRA presentation
 
Global Rail _interactive_(c) Arup
Global Rail _interactive_(c) ArupGlobal Rail _interactive_(c) Arup
Global Rail _interactive_(c) Arup
 
China high speed rail (general distribution)
China high speed rail (general distribution)China high speed rail (general distribution)
China high speed rail (general distribution)
 
Asset management services
Asset management servicesAsset management services
Asset management services
 
Itec 1301 webpage
Itec 1301 webpageItec 1301 webpage
Itec 1301 webpage
 
Atkins global rail opportunities 6th March 2014
Atkins global rail opportunities 6th March 2014Atkins global rail opportunities 6th March 2014
Atkins global rail opportunities 6th March 2014
 
Jullian Valverde - the promotion and coordination of consortia for the provis...
Jullian Valverde - the promotion and coordination of consortia for the provis...Jullian Valverde - the promotion and coordination of consortia for the provis...
Jullian Valverde - the promotion and coordination of consortia for the provis...
 
The New Era: BIM for High Speed Rail
The New Era: BIM for High Speed RailThe New Era: BIM for High Speed Rail
The New Era: BIM for High Speed Rail
 
California High Speed Rail Project Overview
California High Speed Rail Project OverviewCalifornia High Speed Rail Project Overview
California High Speed Rail Project Overview
 
Asset Management for Rail,Metro and Monorail
Asset Management for Rail,Metro and MonorailAsset Management for Rail,Metro and Monorail
Asset Management for Rail,Metro and Monorail
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
 
seminar presentation on high speed train
 seminar presentation on high speed train seminar presentation on high speed train
seminar presentation on high speed train
 
Hyperloop
HyperloopHyperloop
Hyperloop
 
The Hyperloop - Fancy Commute at 800 MPH?
The Hyperloop - Fancy Commute at 800 MPH?The Hyperloop - Fancy Commute at 800 MPH?
The Hyperloop - Fancy Commute at 800 MPH?
 

Similar to RAM Poster

UIC standardisation
UIC standardisation UIC standardisation
UIC standardisation
Maguelonne de Cossart, UIC
 
Submission to the NSW Parliamentary Inquiry into the utilisation of rail and ...
Submission to the NSW Parliamentary Inquiry into the utilisation of rail and ...Submission to the NSW Parliamentary Inquiry into the utilisation of rail and ...
Submission to the NSW Parliamentary Inquiry into the utilisation of rail and ...
SMART Infrastructure Facility
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
Prabjeet Singh
 
IRJET- Problem of Indian Railway Management System
IRJET-  	  Problem of Indian Railway Management SystemIRJET-  	  Problem of Indian Railway Management System
IRJET- Problem of Indian Railway Management System
IRJET Journal
 
Ieeepro techno solutions 2013 ieee embedded project - emergency management ...
Ieeepro techno solutions   2013 ieee embedded project - emergency management ...Ieeepro techno solutions   2013 ieee embedded project - emergency management ...
Ieeepro techno solutions 2013 ieee embedded project - emergency management ...
srinivasanece7
 
Associate Professor Shixing Cheng - Connecting the Belt and Road by Rail: Boo...
Associate Professor Shixing Cheng - Connecting the Belt and Road by Rail: Boo...Associate Professor Shixing Cheng - Connecting the Belt and Road by Rail: Boo...
Associate Professor Shixing Cheng - Connecting the Belt and Road by Rail: Boo...
MelindaFischer1
 
IRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted StructureIRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted Structure
IRJET Journal
 
RDSO CHAHAT.pdf
RDSO CHAHAT.pdfRDSO CHAHAT.pdf
RDSO CHAHAT.pdf
AbhishekChauhan510107
 
Scarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of ReferenceScarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of Reference
Toronto Public Consultation Unit
 
Managing Operations And Service Quality-SMRT trains case study
Managing Operations And Service Quality-SMRT trains case study Managing Operations And Service Quality-SMRT trains case study
Managing Operations And Service Quality-SMRT trains case study
Md.Masudur Rahaman
 
UK Rail_(c) Arup
UK Rail_(c) ArupUK Rail_(c) Arup
UK Rail_(c) Arup
Heather Ceney
 
Indian railway turnaround story
Indian railway turnaround storyIndian railway turnaround story
Indian railway turnaround story
Keerthi Hewavithana
 
Advancing Rail Transit Excellence in OBOR Countries
Advancing Rail Transit Excellence in OBOR CountriesAdvancing Rail Transit Excellence in OBOR Countries
Advancing Rail Transit Excellence in OBOR Countries
Chartered Institute of Logistics and Transport (International)
 
Samoilov G.K. THE TYNE AND WEAR METRO DEVELOPED NETWORK AS THE BASIS OF THE ...
Samoilov G.K. THE TYNE AND WEAR METRO DEVELOPED NETWORK  AS THE BASIS OF THE ...Samoilov G.K. THE TYNE AND WEAR METRO DEVELOPED NETWORK  AS THE BASIS OF THE ...
Samoilov G.K. THE TYNE AND WEAR METRO DEVELOPED NETWORK AS THE BASIS OF THE ...
Gleb Konstantin Samoilov
 
South East Route - Sussex Area Route Study FINAL
South East Route - Sussex Area Route Study FINALSouth East Route - Sussex Area Route Study FINAL
South East Route - Sussex Area Route Study FINAL
Steve Knight
 
Matt Dutton CV
Matt Dutton CVMatt Dutton CV
Matt Dutton CV
Matt Dutton
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor
Joseph Jincy
 
Maintenance strategy ltu dt-0754-se
Maintenance strategy ltu dt-0754-seMaintenance strategy ltu dt-0754-se
Maintenance strategy ltu dt-0754-se
Ngoc Dep
 
6th Annual Modern Railways (Railway Pro)
6th Annual Modern Railways (Railway Pro)6th Annual Modern Railways (Railway Pro)
6th Annual Modern Railways (Railway Pro)
marcus evans
 
Kalindee Rail Nirman Engineers
Kalindee Rail Nirman EngineersKalindee Rail Nirman Engineers
Kalindee Rail Nirman Engineers
Amalist Client Services
 

Similar to RAM Poster (20)

UIC standardisation
UIC standardisation UIC standardisation
UIC standardisation
 
Submission to the NSW Parliamentary Inquiry into the utilisation of rail and ...
Submission to the NSW Parliamentary Inquiry into the utilisation of rail and ...Submission to the NSW Parliamentary Inquiry into the utilisation of rail and ...
Submission to the NSW Parliamentary Inquiry into the utilisation of rail and ...
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 
IRJET- Problem of Indian Railway Management System
IRJET-  	  Problem of Indian Railway Management SystemIRJET-  	  Problem of Indian Railway Management System
IRJET- Problem of Indian Railway Management System
 
Ieeepro techno solutions 2013 ieee embedded project - emergency management ...
Ieeepro techno solutions   2013 ieee embedded project - emergency management ...Ieeepro techno solutions   2013 ieee embedded project - emergency management ...
Ieeepro techno solutions 2013 ieee embedded project - emergency management ...
 
Associate Professor Shixing Cheng - Connecting the Belt and Road by Rail: Boo...
Associate Professor Shixing Cheng - Connecting the Belt and Road by Rail: Boo...Associate Professor Shixing Cheng - Connecting the Belt and Road by Rail: Boo...
Associate Professor Shixing Cheng - Connecting the Belt and Road by Rail: Boo...
 
IRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted StructureIRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted Structure
 
RDSO CHAHAT.pdf
RDSO CHAHAT.pdfRDSO CHAHAT.pdf
RDSO CHAHAT.pdf
 
Scarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of ReferenceScarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of Reference
 
Managing Operations And Service Quality-SMRT trains case study
Managing Operations And Service Quality-SMRT trains case study Managing Operations And Service Quality-SMRT trains case study
Managing Operations And Service Quality-SMRT trains case study
 
UK Rail_(c) Arup
UK Rail_(c) ArupUK Rail_(c) Arup
UK Rail_(c) Arup
 
Indian railway turnaround story
Indian railway turnaround storyIndian railway turnaround story
Indian railway turnaround story
 
Advancing Rail Transit Excellence in OBOR Countries
Advancing Rail Transit Excellence in OBOR CountriesAdvancing Rail Transit Excellence in OBOR Countries
Advancing Rail Transit Excellence in OBOR Countries
 
Samoilov G.K. THE TYNE AND WEAR METRO DEVELOPED NETWORK AS THE BASIS OF THE ...
Samoilov G.K. THE TYNE AND WEAR METRO DEVELOPED NETWORK  AS THE BASIS OF THE ...Samoilov G.K. THE TYNE AND WEAR METRO DEVELOPED NETWORK  AS THE BASIS OF THE ...
Samoilov G.K. THE TYNE AND WEAR METRO DEVELOPED NETWORK AS THE BASIS OF THE ...
 
South East Route - Sussex Area Route Study FINAL
South East Route - Sussex Area Route Study FINALSouth East Route - Sussex Area Route Study FINAL
South East Route - Sussex Area Route Study FINAL
 
Matt Dutton CV
Matt Dutton CVMatt Dutton CV
Matt Dutton CV
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor
 
Maintenance strategy ltu dt-0754-se
Maintenance strategy ltu dt-0754-seMaintenance strategy ltu dt-0754-se
Maintenance strategy ltu dt-0754-se
 
6th Annual Modern Railways (Railway Pro)
6th Annual Modern Railways (Railway Pro)6th Annual Modern Railways (Railway Pro)
6th Annual Modern Railways (Railway Pro)
 
Kalindee Rail Nirman Engineers
Kalindee Rail Nirman EngineersKalindee Rail Nirman Engineers
Kalindee Rail Nirman Engineers
 

RAM Poster

  • 1. 4,500 Track 4,341 Retaining Walls 52 Sea Defences 4,398 Culverts 233 Tunnels 13,953 Bridges Introduction This last academic year I have been working for Network  Rail  based in their Manchester  Office. I decided I wanted to do a Placement when I was in my first year of University, not only because I  saw is as an invaluable experience for my career development, but I also wanted to see what Civil Engineering was all about in real life situation, I wanted to put what I was leaning in the classroom in  to practice.  Network Rail is a state owned company limited by guarantee, which means that they do not have shareholders, the money they earn goes back in to the company. In 2011 the rail network was  simplified and split in to ten routes, with each route having specific policies, processes and plans detailing the expected future demand of the route, their projected spending and their maintenance  and investment needs.   I was working with the London North Western (LNW) route placed within the Route Asset Management (RAM) Structures team, see figure 1 for organogram of the teams structure. The route  runs from Euston to the Scottish borders, which incorporates Watford Junction, Milton Keynes, Birmingham, Manchester and Liverpool. It consists of 4,500 miles of track and is the busiest mixed‐ use (freight & passenger) railway in Europe. The route is the largest route in the UK and forms 24% of the overall business.  Activities Network Rail is a great company to progress both in your career and also personally. During my time at Network Rail, I was fortunate to be involved in a wide range of activities, both office and  site based, such as major  development  projects, new  departments  and national  campaigns. Throughout the year, the mini‐projects that I have worked on have evolved  into standards  and  practices that have been rolled out within the LNW RAM team in Manchester and Birmingham. Below is a summary of a few of my highlights whilst at Network Rail this year:  Photo 1: My workspace  Photo 4: Tapping away at High Level Neck  Photo 5: What happens when it goes wrong, Falkirk Photo 2:  Visiting Severfield Offices in Lostock  Photo 3: Tamping machine at Holme Chapel Viaduct  Route Asset Management (Structures) 7th September 2015—16th September 2016 Square One, Manchester Figure 1: Network Rail Organisation Chart showing the Route Asset Management Civils & Buildings Department for  London North Western Route, with a particular focus on Structures.  Annabel Kate Downing MEng Architectural Engineering School of Civil Engineering Renew. &  Enhance.  Tunnels  Assess‐ ments  South Central  Lancs &  Cumbria  Support  Route Asset Management  London North Western  Network Rail  Structures Buildings  Drainage  Off‐Track  Track  Signalling  E & P  The Chord Through contacts within Network Rail, I was able to gain some experience at a conserva‐ tional architects firm, BB Architects, in Manchester. They are working collaborative‐ ly with Network Rail on the Northern Hub, a development that will create better connec‐ tions in the North by joining Manchester Piccadilly to Victoria for the first time in history.  I attended onsite  meetings  to understand the role of a Conservational Architect. This  was a fantastic  opportunity  for me as it allowed me to understand  how  Architects  and Engineers interact with one another.  I was also fortunate to visit Severfield (UK) Ltd who have been commissioned to manu‐ facture  all of the steel  works  for the project. Severfield (UK) Ltd are considered as ex‐ perts in high volume structural steel production with specialist design engineer‐ ing expertise.  It’s a (bridge) strike Bridge Strikes are of growing concern for the railway industry, it is where a vehicle comes  into  contact  with  a  bridge  that  carries  the  railway.  In  2015/16  there  were  423  bridge  strikes, down from 448 in 2014/15 and up from 438 in 2013/14.  LNW Bridge Strike Campion, Mark Wheel, set a task for the Placement students to as‐ sess the top 108 bridges and to think of mitigating measures that could be easily car‐ ried out for each asset. I looked at all of the highlighted bridges in the North of England  (49). The task involved going to sites and carrying out an audit of the location, con‐ tacting  local  authority's for their support and presenting  the  findings  to a panel to  determine if the mitigation measures are worth while.  During my time at the company, we managed to implement mitigation to a number of  sites to reduce the risks of it being repeatedly struck.  Tunnels Team I moved to the Tunnels department after Christmas as I wanted to experience a different team and broaden my knowledge of the  railway in general. My new Line Manager, Ian Crossland, set me various tasks to standardise the way they examine Tunnels  as well as increase efficiency in reviewing the history and condition of the Tunnel database.  You must be STE 6 Competent to examine the condition of Tunnels, this means you must have adequate knowledge and  experience  working with Tunnels.  All this information was provided by Head Office based in Milton Keynes, however it was  presented in various documents repeating information with the specific competency process not being properly defined.  My first challenge was to extract the relevant information from the various documents and create a set of handbooks with  information about the becoming a Tunnel Examiner.  In the early 2000’s, LNW commissioned Donaldson's to produce a report containing background information for each of  their Tunnels. The findings were presented in various  folders  stowed at the Manchester office which was not  user‐friendly. I  digitalised the documents and stored them on a cloud based system making the documents easily accessible for reference.  Scottish Borders London Euston Placement Submission.dpp Plans & permits Right equipment Competency Drugs & alcohol Mobile devices Speed limit Test earths Test equipment Safety harness Exclusion zones