507 Real-time Challenges Migration Suite on SAP HANA V2.3 - 2014
1. Orange County Convention Center
Orlando, Florida | June 3-5, 2014
Real-time Challenges ‒ Migration to SAP Business
Suite powered by SAP HANA
Praveen Sabbavarapu, ProSoft Technology Group
2. Why SAP Business Suite on SAP HANA?
Challenges in Migration to Suite on SAP HANA
Migration Options to Choose from & Dual Stack
SAP Business Suite Powered by SAP HANA POC
Scope
Tests & Results
Key Considerations
Partnerships
Q&A
LEARNING POINTS
3. ProSoft Technology Group
Founded in 1995
Presence across US,
Canada and India
Inc. 500 Fastest
Growing Companies
(2005, 2006, 2007,
2008, 2011)
Industry Focused
Expertise
• Retail
•Consumer Products
•Manufacturing
•Wholesale Distribution
350 + Associates
Globally
Management
Consulting +
Technical Delivery
Experience
Industry Retail Manufacturing
Technology
ECC
CRM
SAP Life Cycle Phase 2+
SCM PLM
PI EP
Wholesale
Distribution
HANA
Mobility
E-Comm
BA
Consumer
Products
4. Why SAP Business Suite on SAP HANA?
SAP HANA is a Next Gen Business Platform leveraging in-
memory technology
Brings transactions and analytics together
Dramatically increases the performance of applications
Gives ability to handle structured and unstructured data
Reporting can be done without latency
Open Architecture
Simplification of IT delivery processes
5. Initial Steps
Budget
Business Case
Trusted Partnership
Planning
Optimized Sizing & Infra
On-premise Vs Cloud
Right Migration Strategy
Execution
Manage Downtime
Unicode & Dual Stack Split
Code Optimization
Cutover
Challenges
Initial Steps
Planning
Execution
6. Application Server
There should be no change to the existing Application Server
Sizing
If it is a Greenfield migration/implementation, sizing should
be done exactly same as traditional non-HANA application
server sizing
Usually about 0% - 5% increase in CPU, Memory and Disk
Refer to SAP Note: 1723135 - Resource requirements for SAP
ERP Central Component 6.0 EHP6 (for upgrade
considerations)
Sizing
7. HANA Appliance Memory
If CR is >= 4:1 then HANA Appliance Memory size = ½ source
database uncompressed size + 20% + 10% + growth
If CR < 4:1 then HANA Appliance memory size = (½ source
database uncompressed size + 20% + 10% + growth) x 2
Refer to cookbook:
https://cookbook.experiencesaphana.com/bw/operating-bw-
on-hana/hana-database-administration/monitoring-
landscape/memory-usage/
Refer to SAP notes: 1793345 (for Greenfield) and 1872170
(ZNEWHDB_SIZE)
Sizing
8. HANA Appliance CPU
The appliance is configured in such a way that the CPU power
and the I/O capacity is sufficient.
For Parallel processing, SAP recommends a factor of 3 to 4
more CPU power
HANA Enterprise Search may require additional CPU
resources
HANA Disk Space
SAP recommends to use half of the required disk space that is
needed for the Business Suite for disk-based databases
If HANA Enterprise Search is used, an additional 20% disk
space is recommended
Sizing
9. High availability scenarios in a multi-node cluster with a
standby-node are released for the Suite on HANA, but are
restricted to the simplest case of two servers (one worker,
one standby) only
Scale-out scenarios with multiple worker nodes to scale
memory are not yet generally released for Suite on HANA. It
is recommended to scale-up memory by using a hardware
configuration that maximizes the available database
memory
High Availability & Scaling
10. SAP HANA Storage Replication
Synchronous
Asynchronous
Refer to the SAP Notes for certified solutions: 1755396 -
Released DT solutions for SAP HANA with disk replication
SAP HANA System Replication
Replication Modes
Synchronous
Synchronous in Memory
Asynchronous
Synchronous with Full Sync Option (SPS08)
Disaster Recovery
11. Backup to file system on Linux
SAP HANA Database backup (data & database configuration
files) using the Linux Cron Daemon or other scheduling tools:
1651055 - Scheduling SAP HANA Database Backups in Linux
Backup with third party tools
We can install the third party backup tools in the HANA
appliance after meeting the prerequisites.
SAP Notes: 1730932 - Using backup tools with Backint for
HANA
Backup
12. SAP HANA
Appliance
SAP HANA:
Infra
Subscription
SAP HANA:
Cloud
Platform
SAP HANA
Enterprise
Cloud
SAP HANA
on VMWare
Provider Certified H/W
(IBM, HP, Dell,
Cisco, Hitachi
etc.)
AWS SAP SAP TDI & Certified
H/W (vSphere)
Licensing Perpetual BYOL Monthly
subscription;
license included
BYOL Perpetual
Use case For Real-time
transactions
and analytics
Quick
provisioning of
H/W for trials,
Prototypes,
DEV, QAS &
PRD
Extension to
cloud and on
premise
applications
(e.g. SAP
SuccessFactors)
SAP Business
Suite on HANA;
SAP BW on
HANA;
Custom
Applications
For Real-time
transactions
and analytics
Tech. Spec. Single and Multi
node available
SAP offers 128
GB, 256 GB, 512
GB, 1 TB
AWS
Variety of
packages
ranging
from 1GB to
750GB data
Customized to
customer
requirements
Single and Multi
node available
Deployment Options
13. Appliance Vs TDI Deployment Model
Fast Implementation
Standardized and highly optimized
Preconfigured hardware set-up
Preinstalled software package
Fully supported by SAP
More flexibility
Reuse existing hardware components and
operation processes
Save IT Budget and existing investment
Customer should get HANA installed
Customer aligns with the hardware partner
on individual support model
14. The following are the Four approaches to migrate your
SAP Business Suite on to SAP HANA.
In-place Migration
Copy -> Upgrade -> Migrate
New Installation (Greenfield)
DMO (Database Migration Option) – this combines upgrade &
database migration in one step
There are two steps to migrate your existing SAP
Business Suite on to SAP HANA (for options 1 & 2):
Update to the latest SAP HANA and Netweaver enhancement
packs.
Migration from any database to SAP HANA; i.e., export from
any database and import to SAP HANA.
Migration Approach
15. Business value, system performance & hardware cost
reduction
Evaluate business value and system performance of key
transactions
MRP use-case
Price book creation use-case
Post goods issue (PGI) use-case
SAP HANA-Live analytics instead of SAP BW on SAP HANA
Mobility users’ impact on PRD live system performance
Determine how we may improve PRD performance as we add
more burden to the system
Develop a business case
SAP Business Suite on SAP HANA POC: Scope
16. Optimization
SAP delivered optimizations (2),
Optimizations of custom code (2),
Custom OLTP reporting based on SAP HANA Live content (1)
System used: SAP ERP 6.0 EHP6 SP02 (for SAP HANA) on
SAP HANA Rev 60
Client copy and data volume challenges
Determine a method & tool to enable a 1-day PRD client copy
Maintain data, configuration, and code integrity
About 9TB PRD into 2TB HANA appliance
Different support packs
SAP Business Suite on SAP HANA POC: Scope
17. ProSoft System Installation
Installed a SAP Business Suite on SAP HANA system
(incl. SP01)
Attunity Gold Client Solutions
Targeted and copied data specifically
focused on test cases
Brought across client independent
custom objects (Z Tables & Programs)
Configuration, programs, and
master/transactional data copied from
the customer’s live system into EHP6.16
Volume of data moved, only 500 GB
SAP Business Suite on SAP HANA POC: Setup
PRD
Older Support Package
9 TB
Suite on HANA
Select Transactional
and Master Data
Repository Custom Objects
500 GB
18. Suite on SAP HANA POC: Initial Tests
Test parameters and measurement details
Only the main elements of active MRP code were
ported to the Suite on HANA system
The MRP code was 10% optimized on HANA
105,000 relevant products
MRP run modifies up to ~90K purchase
requisitions in each systems for each plant
Several runs with different parameters performed
to avoid accidental results
19. We ensured apples-apples test comparisons for
optimized MRP functionality between a test
environment that matched the productive
system and the Suite on HANA system
Performance
Results vary with parameters however MRP on
HANA was found to be consistently faster than
on the test baseline system
The optimized code on HANA executed 10X
faster than the test baseline
Total performance gain of up to 20%
Suite on SAP HANA POC: Initial Results
20. Benchmark SAP delivered optimizations
relevant for the customer
Standard Customer Line Item Browser (FBL5H)
– Execution times improved by a factor of 6K
Billing Condition Report based on SAP HANA
Live content
Current situation: Not able to generate report
on non-HANA production system
Proof point: Various end user reporting
requirements proved with ~7M records in
conditions table, about multiple millions in
Billing Items table
Suite on SAP HANA POC: Final Results
21. Optimization of custom transaction & code in user exit
Custom program result list – Execution times improved by
factor of 3
Optimized custom code in SD pricing user exits - Identified
and performed optimizations on custom code, considerable
optimization potential in standard code identified
Execution time still almost same as there was very little
optimization potential in custom code
Suite on SAP HANA POC: Final Results
22. We can trust the technology
The HANA technology works better than expected
Realize value quickly through a “crawl, walk, run” approach
Gain business trust quickly
Key Considerations
23. HANA is an inelastic experience
Organizational change occurs as capabilities increase
Enhanced decision-making
A different way of implementation (scrum/Agile vs. ASAP)
Key Considerations
24. Be prepared to go faster than you’re comfortable
Transaction speed increases value
Organizational speed increases and job descriptions change
Implementation speed is in weeks/months
Key Considerations
25. Partnerships
Hosting
ProSoft, as a trusted partner, hosted the customer’s SAP
Business Suite on SAP HANA Servers
Technical Services
ProSoft provided Basis and ABAP Optimization Services for the
SAP Business Suite on SAP HANA Ramp-Up project
Attunity Gold Client Solutions targeted select production data
and imported it into SAP Business Suite on SAP HANA
It will help you create & win the business case /budget if you
enter into a trusted partnership for a Test Drive/POC with a
Systems Integrator.
26. 1865866 - SAP EHP 7 for SAP ERP 6.0 - Release Information
706478 - Preventing Basis tables from increasing
considerably
1774566 - SAP Business Suite – Restrictions
1730998 – Un-recommended versions of backup tools
1761546 - SAP ERP powered by SAP HANA – Optimizations
1875197 - Using DMO of SUM for SAP Business Suite
systems
1813548 - Database Migration Option (DMO) for Software
Update Manager
SAP Notes
28. THANK YOU
THANK YOU FOR PARTICIPATING