Query Alarm and Power Configuration
Hub Site Down Until_CW 9
Alwan Ramadan WX289116, March 16, 2016
HUAWEI TECHNOLOGIES CO., LTD. Page 2华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
20416_Tangguk Bongkar_3G
1. Overview from M2000 no indicated 3G down but from
power database battery back up time is 1.8 hours. And
required to add 1 rectifier module
2. 2G system using Nokia equipment, can’t be monitor by
m2000. Need NOC send the query alarm. Power database
battery backup is more than 2 hours.
3. No diesel generator.
HUAWEI TECHNOLOGIES CO., LTD. Page 3华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
20633_MerdekaPekan_TjPura_3G
1. Overview from M2000 no indicated 3G down but from
power database battery back up time is 3 hours.
2. 2G system using Nokia equipment, can’t be monitor by
m2000. Need NOC send the query alarm. Power database
battery backup is more than 2.5 hours.
3. Diesel generator Deactivated
4. LLVD/BLVD was configured, make sure that connection as
well.
HUAWEI TECHNOLOGIES CO., LTD. Page 4华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
30661_SITEBA2_3G
1. Overview from M2000 no indicated 3G down but from
power database battery back up time is 2 hours. And
required add 1 rectifier module
2. 2G system using Nokia equipment, can’t be monitor by
m2000. Need NOC send the query alarm. Power database
battery backup is more than 2.5 hours.
3. Diesel generator Deactivated
4. Recommendation to activate LLVD/BLVD and do rewiring
as well.
HUAWEI TECHNOLOGIES CO., LTD. Page 5华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
50943_Lintas Timur KM 28_Sakernan_2G<> 50060_Lintas Timur_Sakernan_2G
HUAWEI TECHNOLOGIES CO., LTD. Page 6华为保密信息,未经授权禁止扩散
 In a same time GSM in far end is down. Need Checking wiring transmission cable, and make
sure that cable are connected in BLVD
Make sure that LLVD setting is working
Recommendation to adjust LLVD Configuration lower than 47Vdc , if actually transmission
connect to LLVD and do rewiring as well.
In Power database battery back up time ismore than 2 hours.
No Diesel Generator
HUAWEI TECHNOLOGIES CO., LTD. Page 7华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
58012_Simpang Kuamang kuning (Repeater Site)
1. Overview from M2000 that site is repeater, can’t query
alarm. Recommendation to create enva and power alarm
indication through transmission. Power database batterys
status are stolen on february 28-2016 . Required to install
new battery 2*100Ah and add 1 rectifier module
2. 2G system using Nokia equipment, can’t be monitor by
m2000. Need NOC send the query alarm. Power database
battery backup is more than 2 hours.
3. Diesel Generator not issue
4. Recommendation to activate LLVD/BLVD and do rewiring
as well.
HUAWEI TECHNOLOGIES CO., LTD. Page 8华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
60030_Burangan Seberangulu_2G <> 62211_Era Ilir Timur
HUAWEI TECHNOLOGIES CO., LTD. Page 9华为保密信息,未经授权禁止扩散
 In a same time GSM in far end is down, after we trace that problem was’nt on site 60030,
but on site 60027 that impact to another site under.
Please ensure all alarm connected to BTS are function, because the critical alarm like Main
input not detect in M2000.
Recommendation to adjust LLVD Configuration lower than 48Vdc , if actually transmission
connect to LLVD and do rewiring as soon.
In Power database battery back up time is more than 2 hours
No Diesel Generetor
HUAWEI TECHNOLOGIES CO., LTD. Page 10华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
161138_Bukit Pinang_2G <> 161155_ Sinbaya Sebulu Modern
HUAWEI TECHNOLOGIES CO., LTD. Page 11华为保密信息,未经授权禁止扩散
While the non priority load like BTS and NodeB are switch OFF, but actually in a same time
the transmission are switch off also and caused far end site down.
Need Checking wiring transmission cable, and make sure that cable are connected in BLVD
Recommendation to adjust LLVD Configuration lower than 47Vdc , if actually transmission
connect to LLVD and do rewiring as well.
In Power database Battery back up time is more than 2 hours
No Diesel Generator
HUAWEI TECHNOLOGIES CO., LTD. Page 12华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
280106_Sanghiang_2G
HUAWEI TECHNOLOGIES CO., LTD. Page 13华为保密信息,未经授权禁止扩散
In Power database battery backup time is more than 2 hours.
Need check wiring connection as well
No Diesel Generator.
HUAWEI TECHNOLOGIES CO., LTD. Page 14华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
280020_Kp.Karya Mukti-Sindang laya Pagelaran
HUAWEI TECHNOLOGIES CO., LTD. Page 15华为保密信息,未经授权禁止扩散
Mostly each time the site was down, but there was not alarm power or main input detected in
M2000 before.
Need check alarm connection on BTS and make sure all alarm are function.
In Power database battery back up time is 2 hours.
No Diesel Generator
Copyright©2011 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements
regarding the future financial and operating results, future product portfolio, new technology, etc. There are a
number of factors that could cause actual results and developments to differ materially from those expressed or
implied in the predictive statements. Therefore, such information is provided for reference purpose only and
constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.
Thank you
www.huawei.com

More Related Content

What's hot

ALU 7360 5520_gpon_basic_configuration
ALU  7360 5520_gpon_basic_configurationALU  7360 5520_gpon_basic_configuration
ALU 7360 5520_gpon_basic_configuration
Wahyu Nasution
 
Sorrento Networks OCM10GF
Sorrento Networks OCM10GFSorrento Networks OCM10GF
Sorrento Networks OCM10GF
Phil Bartlett
 
Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.ppt
AIRTEL
 
Basics Of Minilink Microwave Networks
Basics Of Minilink Microwave NetworksBasics Of Minilink Microwave Networks
Basics Of Minilink Microwave NetworksAtif Mahmood
 
Cma5000a uta
Cma5000a utaCma5000a uta
Cma5000a uta
onlinestuden
 
Madge Collage 743/744/763/764 4 port 155 Mbps Modules
Madge Collage 743/744/763/764 4 port 155 Mbps ModulesMadge Collage 743/744/763/764 4 port 155 Mbps Modules
Madge Collage 743/744/763/764 4 port 155 Mbps Modules
Ronald Bartels
 
Accident avoidanve using controller area network protocol
Accident avoidanve using controller area network protocolAccident avoidanve using controller area network protocol
Accident avoidanve using controller area network protocol
Madhuri Apar
 
Alu xgpon solution for pt telkom akses 20130830+
Alu xgpon solution for pt telkom akses 20130830+Alu xgpon solution for pt telkom akses 20130830+
Alu xgpon solution for pt telkom akses 20130830+
Wahyu Nasution
 
CNSS_07_1345_P_CNS_FASS_Advanced
CNSS_07_1345_P_CNS_FASS_AdvancedCNSS_07_1345_P_CNS_FASS_Advanced
CNSS_07_1345_P_CNS_FASS_AdvancedTawakal Ezelden
 
SELTA Access Network Portfolio
SELTA Access Network PortfolioSELTA Access Network Portfolio
SELTA Access Network Portfolio
SELTA
 
American Fibertek ECR-16-POE Data Sheet
American Fibertek ECR-16-POE Data SheetAmerican Fibertek ECR-16-POE Data Sheet
American Fibertek ECR-16-POE Data Sheet
JMAC Supply
 
Alcatel lucent bts
Alcatel lucent btsAlcatel lucent bts
Alcatel lucent bts
Sayed Qaisar Shah
 
Fairchild solving design problems in motion control
Fairchild solving design problems in motion controlFairchild solving design problems in motion control
Fairchild solving design problems in motion controlFairchild Semiconductor
 
"The Great Train Cyber Robbery" SCADAStrangeLove
"The Great Train Cyber Robbery" SCADAStrangeLove"The Great Train Cyber Robbery" SCADAStrangeLove
"The Great Train Cyber Robbery" SCADAStrangeLove
Aleksandr Timorin
 

What's hot (16)

ALU 7360 5520_gpon_basic_configuration
ALU  7360 5520_gpon_basic_configurationALU  7360 5520_gpon_basic_configuration
ALU 7360 5520_gpon_basic_configuration
 
Sorrento Networks OCM10GF
Sorrento Networks OCM10GFSorrento Networks OCM10GF
Sorrento Networks OCM10GF
 
Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.ppt
 
Basics Of Minilink Microwave Networks
Basics Of Minilink Microwave NetworksBasics Of Minilink Microwave Networks
Basics Of Minilink Microwave Networks
 
Cma5000a uta
Cma5000a utaCma5000a uta
Cma5000a uta
 
Madge Collage 743/744/763/764 4 port 155 Mbps Modules
Madge Collage 743/744/763/764 4 port 155 Mbps ModulesMadge Collage 743/744/763/764 4 port 155 Mbps Modules
Madge Collage 743/744/763/764 4 port 155 Mbps Modules
 
Ome201101 gsm bts312 hardware structure issue4.0
Ome201101 gsm bts312 hardware structure issue4.0Ome201101 gsm bts312 hardware structure issue4.0
Ome201101 gsm bts312 hardware structure issue4.0
 
Accident avoidanve using controller area network protocol
Accident avoidanve using controller area network protocolAccident avoidanve using controller area network protocol
Accident avoidanve using controller area network protocol
 
Alu xgpon solution for pt telkom akses 20130830+
Alu xgpon solution for pt telkom akses 20130830+Alu xgpon solution for pt telkom akses 20130830+
Alu xgpon solution for pt telkom akses 20130830+
 
CNSS_07_1345_P_CNS_FASS_Advanced
CNSS_07_1345_P_CNS_FASS_AdvancedCNSS_07_1345_P_CNS_FASS_Advanced
CNSS_07_1345_P_CNS_FASS_Advanced
 
SELTA Access Network Portfolio
SELTA Access Network PortfolioSELTA Access Network Portfolio
SELTA Access Network Portfolio
 
American Fibertek ECR-16-POE Data Sheet
American Fibertek ECR-16-POE Data SheetAmerican Fibertek ECR-16-POE Data Sheet
American Fibertek ECR-16-POE Data Sheet
 
Alcatel lucent bts
Alcatel lucent btsAlcatel lucent bts
Alcatel lucent bts
 
Fairchild solving design problems in motion control
Fairchild solving design problems in motion controlFairchild solving design problems in motion control
Fairchild solving design problems in motion control
 
"The Great Train Cyber Robbery" SCADAStrangeLove
"The Great Train Cyber Robbery" SCADAStrangeLove"The Great Train Cyber Robbery" SCADAStrangeLove
"The Great Train Cyber Robbery" SCADAStrangeLove
 
Sim900
Sim900Sim900
Sim900
 

Viewers also liked

01 tdm voice introduction
01 tdm voice introduction01 tdm voice introduction
Bsc6900 gsm-site-maintenance-guide
Bsc6900 gsm-site-maintenance-guideBsc6900 gsm-site-maintenance-guide
Bsc6900 gsm-site-maintenance-guidemalikaliasadawan
 
Sharing session oss m2000 r009 system overview & troubleshooting
Sharing session oss m2000 r009 system overview & troubleshootingSharing session oss m2000 r009 system overview & troubleshooting
Sharing session oss m2000 r009 system overview & troubleshootingAji Teguh Prihatno
 
Huawei RET alarms Troubleshooting Guide Flow Chart
Huawei RET alarms Troubleshooting Guide   Flow Chart Huawei RET alarms Troubleshooting Guide   Flow Chart
Huawei RET alarms Troubleshooting Guide Flow Chart
Mohamed Abd El Razek Bakry
 
Transmission resource management
Transmission resource managementTransmission resource management
Transmission resource managementyascisse
 
Rtn
RtnRtn
Guide for Huwaei Telecom Equipments Of SDH, DWDM, Also Softawe U2000, T2000.....
Guide for Huwaei Telecom Equipments Of SDH, DWDM, Also Softawe U2000, T2000.....Guide for Huwaei Telecom Equipments Of SDH, DWDM, Also Softawe U2000, T2000.....
Guide for Huwaei Telecom Equipments Of SDH, DWDM, Also Softawe U2000, T2000.....jaisvy
 
E nodeb commissioning guide(v100r005c00 04)(pdf)-en
E nodeb commissioning guide(v100r005c00 04)(pdf)-enE nodeb commissioning guide(v100r005c00 04)(pdf)-en
E nodeb commissioning guide(v100r005c00 04)(pdf)-en
Vugar Ali
 
Mobilink 2G3G Swap Guide V1.8 20150406 (1)
Mobilink 2G3G Swap Guide V1.8 20150406 (1)Mobilink 2G3G Swap Guide V1.8 20150406 (1)
Mobilink 2G3G Swap Guide V1.8 20150406 (1)Abdul Mateen Rahim
 
Bts3900 Site Maintenance Guide(V200 01)
Bts3900 Site Maintenance Guide(V200 01)Bts3900 Site Maintenance Guide(V200 01)
Bts3900 Site Maintenance Guide(V200 01)Atif Mahmood
 
I manager u2000 v200r014 optional feature description (elte2.3) 01(20140314)
I manager u2000 v200r014 optional feature description (elte2.3) 01(20140314)I manager u2000 v200r014 optional feature description (elte2.3) 01(20140314)
I manager u2000 v200r014 optional feature description (elte2.3) 01(20140314)
Diego Badilla
 
OptiX OSN 8800 Slot Description
OptiX OSN 8800 Slot DescriptionOptiX OSN 8800 Slot Description
OptiX OSN 8800 Slot Description
Huanetwork
 
Opti x rtn 910950980 hardware description wind
Opti x rtn 910950980 hardware description windOpti x rtn 910950980 hardware description wind
Opti x rtn 910950980 hardware description windnctgayaranga
 
140556299 huawei-node b-data-configuration
140556299 huawei-node b-data-configuration140556299 huawei-node b-data-configuration
140556299 huawei-node b-data-configuration
Shelton Siziba
 
Mw training slide
Mw training slideMw training slide
Mw training slidededoyin
 
M2000 operation-guide
M2000 operation-guideM2000 operation-guide
M2000 operation-guideVirak Sou
 
01 Bts3900 System Structure
01 Bts3900 System Structure01 Bts3900 System Structure
01 Bts3900 System StructureAtif Mahmood
 
Huawei wcdma ran10.0 overview
Huawei wcdma ran10.0 overviewHuawei wcdma ran10.0 overview
Huawei wcdma ran10.0 overview
Riadh Bachrouch
 
Huawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopHuawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopnavaidkhan
 

Viewers also liked (20)

01 tdm voice introduction
01 tdm voice introduction01 tdm voice introduction
01 tdm voice introduction
 
Bsc6900 gsm-site-maintenance-guide
Bsc6900 gsm-site-maintenance-guideBsc6900 gsm-site-maintenance-guide
Bsc6900 gsm-site-maintenance-guide
 
Ome200301 gsm bts trouble shooting issue3.0
Ome200301 gsm bts trouble shooting issue3.0Ome200301 gsm bts trouble shooting issue3.0
Ome200301 gsm bts trouble shooting issue3.0
 
Sharing session oss m2000 r009 system overview & troubleshooting
Sharing session oss m2000 r009 system overview & troubleshootingSharing session oss m2000 r009 system overview & troubleshooting
Sharing session oss m2000 r009 system overview & troubleshooting
 
Huawei RET alarms Troubleshooting Guide Flow Chart
Huawei RET alarms Troubleshooting Guide   Flow Chart Huawei RET alarms Troubleshooting Guide   Flow Chart
Huawei RET alarms Troubleshooting Guide Flow Chart
 
Transmission resource management
Transmission resource managementTransmission resource management
Transmission resource management
 
Rtn
RtnRtn
Rtn
 
Guide for Huwaei Telecom Equipments Of SDH, DWDM, Also Softawe U2000, T2000.....
Guide for Huwaei Telecom Equipments Of SDH, DWDM, Also Softawe U2000, T2000.....Guide for Huwaei Telecom Equipments Of SDH, DWDM, Also Softawe U2000, T2000.....
Guide for Huwaei Telecom Equipments Of SDH, DWDM, Also Softawe U2000, T2000.....
 
E nodeb commissioning guide(v100r005c00 04)(pdf)-en
E nodeb commissioning guide(v100r005c00 04)(pdf)-enE nodeb commissioning guide(v100r005c00 04)(pdf)-en
E nodeb commissioning guide(v100r005c00 04)(pdf)-en
 
Mobilink 2G3G Swap Guide V1.8 20150406 (1)
Mobilink 2G3G Swap Guide V1.8 20150406 (1)Mobilink 2G3G Swap Guide V1.8 20150406 (1)
Mobilink 2G3G Swap Guide V1.8 20150406 (1)
 
Bts3900 Site Maintenance Guide(V200 01)
Bts3900 Site Maintenance Guide(V200 01)Bts3900 Site Maintenance Guide(V200 01)
Bts3900 Site Maintenance Guide(V200 01)
 
I manager u2000 v200r014 optional feature description (elte2.3) 01(20140314)
I manager u2000 v200r014 optional feature description (elte2.3) 01(20140314)I manager u2000 v200r014 optional feature description (elte2.3) 01(20140314)
I manager u2000 v200r014 optional feature description (elte2.3) 01(20140314)
 
OptiX OSN 8800 Slot Description
OptiX OSN 8800 Slot DescriptionOptiX OSN 8800 Slot Description
OptiX OSN 8800 Slot Description
 
Opti x rtn 910950980 hardware description wind
Opti x rtn 910950980 hardware description windOpti x rtn 910950980 hardware description wind
Opti x rtn 910950980 hardware description wind
 
140556299 huawei-node b-data-configuration
140556299 huawei-node b-data-configuration140556299 huawei-node b-data-configuration
140556299 huawei-node b-data-configuration
 
Mw training slide
Mw training slideMw training slide
Mw training slide
 
M2000 operation-guide
M2000 operation-guideM2000 operation-guide
M2000 operation-guide
 
01 Bts3900 System Structure
01 Bts3900 System Structure01 Bts3900 System Structure
01 Bts3900 System Structure
 
Huawei wcdma ran10.0 overview
Huawei wcdma ran10.0 overviewHuawei wcdma ran10.0 overview
Huawei wcdma ran10.0 overview
 
Huawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopHuawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shop
 

Similar to Query alarm and power configuration 2

SMA Residential Inverters.
SMA Residential Inverters.SMA Residential Inverters.
SMA Residential Inverters.
Optimus Energy Philippines
 
GCCIA POWER SYSTEM installed by AREVA
GCCIA POWER SYSTEM installed by AREVA GCCIA POWER SYSTEM installed by AREVA
GCCIA POWER SYSTEM installed by AREVA
Power System Operation
 
Manual router technicolor
Manual router technicolorManual router technicolor
Manual router technicolor
OscarLopez581
 
REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...
REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...
REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...
IRJET Journal
 
Introduction of LVAC Auto Change Over Scheme in DEWA Transmission System
Introduction of LVAC Auto Change Over Scheme in DEWA Transmission SystemIntroduction of LVAC Auto Change Over Scheme in DEWA Transmission System
Introduction of LVAC Auto Change Over Scheme in DEWA Transmission System
IRJET Journal
 
Optimized operation of current fed dual active bridge dc-dc converter for pv ...
Optimized operation of current fed dual active bridge dc-dc converter for pv ...Optimized operation of current fed dual active bridge dc-dc converter for pv ...
Optimized operation of current fed dual active bridge dc-dc converter for pv ...
LeMeniz Infotech
 
Topological Advancement in DVR; A review
Topological Advancement in DVR; A reviewTopological Advancement in DVR; A review
Topological Advancement in DVR; A review
IRJET Journal
 
Cataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_englishCataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_english
Dien Ha The
 
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
Dien Ha The
 
Cataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_englishCataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_english
Thuan Kieu
 
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
IRJET Journal
 
Data acquisition system to monitor electricity supply
Data acquisition system to monitor electricity supplyData acquisition system to monitor electricity supply
Data acquisition system to monitor electricity supply
Pushkar Limaye
 
New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal
KristyDyer
 
Goldwind - Microgrid Case Study
Goldwind - Microgrid Case StudyGoldwind - Microgrid Case Study
Goldwind - Microgrid Case Studygoldwindaus
 
Making Interconnection in the Gulf a Reality
Making Interconnection in the Gulf a RealityMaking Interconnection in the Gulf a Reality
Making Interconnection in the Gulf a Reality
Power System Operation
 
SAT COMPANY_INTRODUCTION_PRESENTATION
SAT COMPANY_INTRODUCTION_PRESENTATIONSAT COMPANY_INTRODUCTION_PRESENTATION
SAT COMPANY_INTRODUCTION_PRESENTATIONRAVI BHUSHAN
 
Appendix: San Joaquin Valley PEV Readiness Plan
Appendix: San Joaquin Valley PEV Readiness PlanAppendix: San Joaquin Valley PEV Readiness Plan
Appendix: San Joaquin Valley PEV Readiness Plan
Center for Sustainable Energy
 

Similar to Query alarm and power configuration 2 (20)

SMA Residential Inverters.
SMA Residential Inverters.SMA Residential Inverters.
SMA Residential Inverters.
 
GCCIA POWER SYSTEM installed by AREVA
GCCIA POWER SYSTEM installed by AREVA GCCIA POWER SYSTEM installed by AREVA
GCCIA POWER SYSTEM installed by AREVA
 
Manual router technicolor
Manual router technicolorManual router technicolor
Manual router technicolor
 
REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...
REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...
REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...
 
Introduction of LVAC Auto Change Over Scheme in DEWA Transmission System
Introduction of LVAC Auto Change Over Scheme in DEWA Transmission SystemIntroduction of LVAC Auto Change Over Scheme in DEWA Transmission System
Introduction of LVAC Auto Change Over Scheme in DEWA Transmission System
 
Optimized operation of current fed dual active bridge dc-dc converter for pv ...
Optimized operation of current fed dual active bridge dc-dc converter for pv ...Optimized operation of current fed dual active bridge dc-dc converter for pv ...
Optimized operation of current fed dual active bridge dc-dc converter for pv ...
 
Topological Advancement in DVR; A review
Topological Advancement in DVR; A reviewTopological Advancement in DVR; A review
Topological Advancement in DVR; A review
 
Juliet Joseph
Juliet JosephJuliet Joseph
Juliet Joseph
 
Cataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_englishCataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_english
 
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
 
Cataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_englishCataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_english
 
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
 
Data acquisition system to monitor electricity supply
Data acquisition system to monitor electricity supplyData acquisition system to monitor electricity supply
Data acquisition system to monitor electricity supply
 
Ramesh up dated CV
Ramesh up dated CVRamesh up dated CV
Ramesh up dated CV
 
New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal
 
Goldwind - Microgrid Case Study
Goldwind - Microgrid Case StudyGoldwind - Microgrid Case Study
Goldwind - Microgrid Case Study
 
Making Interconnection in the Gulf a Reality
Making Interconnection in the Gulf a RealityMaking Interconnection in the Gulf a Reality
Making Interconnection in the Gulf a Reality
 
SAT COMPANY_INTRODUCTION_PRESENTATION
SAT COMPANY_INTRODUCTION_PRESENTATIONSAT COMPANY_INTRODUCTION_PRESENTATION
SAT COMPANY_INTRODUCTION_PRESENTATION
 
Appendix: San Joaquin Valley PEV Readiness Plan
Appendix: San Joaquin Valley PEV Readiness PlanAppendix: San Joaquin Valley PEV Readiness Plan
Appendix: San Joaquin Valley PEV Readiness Plan
 
Hoist vfd control
Hoist vfd controlHoist vfd control
Hoist vfd control
 

Recently uploaded

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 

Recently uploaded (20)

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 

Query alarm and power configuration 2

  • 1. www.huawei.com Security Level: HUAWEI TECHNOLOGIES CO., LTD. Query Alarm and Power Configuration Hub Site Down Until_CW 9 Alwan Ramadan WX289116, March 16, 2016
  • 2. HUAWEI TECHNOLOGIES CO., LTD. Page 2华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 20416_Tangguk Bongkar_3G 1. Overview from M2000 no indicated 3G down but from power database battery back up time is 1.8 hours. And required to add 1 rectifier module 2. 2G system using Nokia equipment, can’t be monitor by m2000. Need NOC send the query alarm. Power database battery backup is more than 2 hours. 3. No diesel generator.
  • 3. HUAWEI TECHNOLOGIES CO., LTD. Page 3华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 20633_MerdekaPekan_TjPura_3G 1. Overview from M2000 no indicated 3G down but from power database battery back up time is 3 hours. 2. 2G system using Nokia equipment, can’t be monitor by m2000. Need NOC send the query alarm. Power database battery backup is more than 2.5 hours. 3. Diesel generator Deactivated 4. LLVD/BLVD was configured, make sure that connection as well.
  • 4. HUAWEI TECHNOLOGIES CO., LTD. Page 4华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 30661_SITEBA2_3G 1. Overview from M2000 no indicated 3G down but from power database battery back up time is 2 hours. And required add 1 rectifier module 2. 2G system using Nokia equipment, can’t be monitor by m2000. Need NOC send the query alarm. Power database battery backup is more than 2.5 hours. 3. Diesel generator Deactivated 4. Recommendation to activate LLVD/BLVD and do rewiring as well.
  • 5. HUAWEI TECHNOLOGIES CO., LTD. Page 5华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 50943_Lintas Timur KM 28_Sakernan_2G<> 50060_Lintas Timur_Sakernan_2G
  • 6. HUAWEI TECHNOLOGIES CO., LTD. Page 6华为保密信息,未经授权禁止扩散  In a same time GSM in far end is down. Need Checking wiring transmission cable, and make sure that cable are connected in BLVD Make sure that LLVD setting is working Recommendation to adjust LLVD Configuration lower than 47Vdc , if actually transmission connect to LLVD and do rewiring as well. In Power database battery back up time ismore than 2 hours. No Diesel Generator
  • 7. HUAWEI TECHNOLOGIES CO., LTD. Page 7华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 58012_Simpang Kuamang kuning (Repeater Site) 1. Overview from M2000 that site is repeater, can’t query alarm. Recommendation to create enva and power alarm indication through transmission. Power database batterys status are stolen on february 28-2016 . Required to install new battery 2*100Ah and add 1 rectifier module 2. 2G system using Nokia equipment, can’t be monitor by m2000. Need NOC send the query alarm. Power database battery backup is more than 2 hours. 3. Diesel Generator not issue 4. Recommendation to activate LLVD/BLVD and do rewiring as well.
  • 8. HUAWEI TECHNOLOGIES CO., LTD. Page 8华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 60030_Burangan Seberangulu_2G <> 62211_Era Ilir Timur
  • 9. HUAWEI TECHNOLOGIES CO., LTD. Page 9华为保密信息,未经授权禁止扩散  In a same time GSM in far end is down, after we trace that problem was’nt on site 60030, but on site 60027 that impact to another site under. Please ensure all alarm connected to BTS are function, because the critical alarm like Main input not detect in M2000. Recommendation to adjust LLVD Configuration lower than 48Vdc , if actually transmission connect to LLVD and do rewiring as soon. In Power database battery back up time is more than 2 hours No Diesel Generetor
  • 10. HUAWEI TECHNOLOGIES CO., LTD. Page 10华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 161138_Bukit Pinang_2G <> 161155_ Sinbaya Sebulu Modern
  • 11. HUAWEI TECHNOLOGIES CO., LTD. Page 11华为保密信息,未经授权禁止扩散 While the non priority load like BTS and NodeB are switch OFF, but actually in a same time the transmission are switch off also and caused far end site down. Need Checking wiring transmission cable, and make sure that cable are connected in BLVD Recommendation to adjust LLVD Configuration lower than 47Vdc , if actually transmission connect to LLVD and do rewiring as well. In Power database Battery back up time is more than 2 hours No Diesel Generator
  • 12. HUAWEI TECHNOLOGIES CO., LTD. Page 12华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 280106_Sanghiang_2G
  • 13. HUAWEI TECHNOLOGIES CO., LTD. Page 13华为保密信息,未经授权禁止扩散 In Power database battery backup time is more than 2 hours. Need check wiring connection as well No Diesel Generator.
  • 14. HUAWEI TECHNOLOGIES CO., LTD. Page 14华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 280020_Kp.Karya Mukti-Sindang laya Pagelaran
  • 15. HUAWEI TECHNOLOGIES CO., LTD. Page 15华为保密信息,未经授权禁止扩散 Mostly each time the site was down, but there was not alarm power or main input detected in M2000 before. Need check alarm connection on BTS and make sure all alarm are function. In Power database battery back up time is 2 hours. No Diesel Generator
  • 16. Copyright©2011 Huawei Technologies Co., Ltd. All Rights Reserved. The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice. Thank you www.huawei.com