Quality Racking Mat
Quality Rental
Tools
Old vs New
Safety
• Reduced slips & falls!
– #1 cause of lost time accidents!
• Reduced hand injuries!
– Significant to Shell’s hands-free initiative!
• Reduced eye & skin injuries!
– Loose boards result in chemical splash to
eyes and skin.
QRT Racking Mat
NON-SLIP SURFACE SLIPPERY-UNSAFE
QRT
Benefits
• Contained (SBM, OBM, Completion Fld.) for
disposal or reuse
• Mud treatment cost reduced
• Fewer man hours used for power washing
• Reduced repair and re-cut cost
• Reduced makeup time
• Reduced injuries
• Fewer slips and falls
• No plugs in hole
QRT
Clean Threads
QRT
• Reduces exposure to
hand injuries!
Less handling of pipe
for cleaning and
doping.
• Requires less power
washing.
Resulting in less
contaminated water
requiring disposal.
• Reduction in recut cost.
Due to zero embedded
trash.
No Plugs
QRT
No Wood Plugs!
No Barite Plugs!
No Rubber Plugs!
Clean Work Area
QRT
Quality Rental Tools
Case Study: Mat 3 – Mat 4
Mat Specifications
• Mat 3: SIZE 7’6” X 6’ 10”
• Mat 4: SIZE 6’9” X 6’ 11”
• Interlocked polypropylene grid
Application data
• Case study based upon both mats in deepwater semisubmersible rig
applications, with exposure to most extreme drilling conditions (recorded)
• Mat 3 is on driller’s side of rotary table; Mat 4 is on opposite side of rotary
table
• A 30” bit with a 12” motor has been placed on mats, equaling approximately
25,000 pounds of total weight with minimal impact observed (minor mashing
of polypropylene material) and no structural damage to mat grid
• 8 ½” collars 4 stands, 5 ½” HT-55 hevi-weight 7 stands, approximately 180
stands HT-55 drill pipe.
o Total weight of collars, hevi-weight and drill pipe (Mat 3) =
350,000 pounds (mat 4 holding the remainder) Tubular weight
total = over 500,000 lbs
• Both mats in operational use 5 ½ months, with approximately 150 trips made.
Only minor adjustments needed during subsequent rig shut-down
• Client testimony indicates a time savings on cleaning and re-doping from 15
minutes up to 1 hour for deeper trips. Over the 5 ½ month period, this equates
to approximately 2-3 days of rig time saved.
o Deepwater applications: @ a day rate of $500K/day on drill ship
applications, a cost savings of $1M to 1.5M
o Shelf applications: @ a day rate $150K/day on jack-up applications,
cost savings up to $450,000.
Repairs
• Client reported low repair ratio on HT-55 connections. 1,238 connections
with 63 repairs needed (6%)
Fluids
• 14.5 Synthetic base mud. 14.0 calcium bromide. No pitting reported.
QRT
User Feedback:
Since installing the racking mats on Nabors 623, we have seen a noticeable
decrease in the number of reface repairs on our pin end connections. Also
have been recovering an average of 30 bbls of OBM per trip out of the hole on
our deeper jobs in Jefferson and Hardin Co. The rig floor stays cleaner and
less of a slip hazard with all the OBM from the ID of the drill pipe being
contained and transferred back to the active system.
Prior to installing the racking mats we had an average reface repair rate of
33% (221 pins – 72 reface repairs) on our 4” XT-39 DP.
Our recent numbers are 11.5 % (190 pins – 22 reface repairs) and 15% (78
pins – 12 reface repairs) on XT-39 and 2-7/8” WT-23.
Troy Whittington
Drilling Supt.
Samson LoneStar
QRT
QRT
Cost Savings - Containment
•Drilling fluid treatment and conditioning.
•Reclaiming SBM, OBM or WBM.
•Reduction in fluid contamination and treatment of 18 bbls per
trip.
1/32” = 0.10 bbls/stand of 6 5/8” 34# Drill Pipe
Average Cost of SBM = $250.00/bbl
Results in a savings of $4,500.00 per trip
16 trips = $72,000.00 savings during the drilling
operation
•3 well drilling program would result in a total savings of
$226,000.00
Cost Savings – Disposal
• Reduced disposal cost due to total
recovery.
• At $20.00 per bbl disposal cost, averaging
5 bbls per day – daily savings of $100.00.
– $100.00 day
– $3,000.00 month
– $36,000.00 year
QRT
Cost Savings – Recuts
Drilling
– Current recut rate of 15%
– Average recut cost for premium connections is $800.00
– QRT Racking Mats will reduce recuts by at least 50%
– Result in a savings on a 30,000ft operation of $85,600.00
– Yearly cost savings of $214,000.00
Completions
– Current recut rate of 50%
– Average recut cost for premium connections is $800.00
– QRT Racking Mats will reduce recuts by at least 50%
– Result in a saving on a 30,000 operation of $285,600.00
– Yearly cost savings of $714,000.00
QRT
Cost Savings - Rig/Labor
• Client experience has show a reduction in make-up of from 15
minutes to 60 minutes per trip, depending on depth.
• At a savings of just 41.5 minutes per trip the savings over one
year period:
• 20,000ft / 120ft = 166 stands
• 166 x 15 seconds = 2,490 seconds per trip
• 2,490 seconds = 41.5 minutes per trip
• 150 trips per year = 6,225 minutes = 103.75 hours = 4.33
days
• Deepwater @ $1,200,000.00 per day - $5,196,000.00
• Shelf @ $150,000.00 - $649,500.00
QRT
Quality Design & Manufacturing
QRT
The Value Story
• Material Cost
–High Intensity – High Heat
Polypropylene
• Each piece is machine cut to precise
tolerances.
• Holes are hand drilled.
• All-thread rods are used throughout for
support.
• Hand constructed and welded.
QRT
Franklin Analysis
Positives
1.Slip & Falls
2.Hand, Eye & Skin
Injuries
3.Rig Time/Labor
Cost
4.Recut Cost
5.Mud Loss
6.Disposal Cost
Negatives
1.Mud Extraction
2.Purchase vs Rental
QRT

More Related Content

What's hot

Slurry Seal Presentation for CalAPA LA Tech Meeting
Slurry Seal Presentation for CalAPA LA Tech MeetingSlurry Seal Presentation for CalAPA LA Tech Meeting
Slurry Seal Presentation for CalAPA LA Tech Meeting
California Asphalt Pavement Association
 
Loudon rf fc europe presentation5
Loudon rf fc europe presentation5Loudon rf fc europe presentation5
Loudon rf fc europe presentation5
Nelson Izaguirre
 
Sewerage department convention center
Sewerage department convention centerSewerage department convention center
Sewerage department convention center
Shazana Zulkifli
 
Предимствата на вакуумни канализационни системи 2
Предимствата на вакуумни канализационни системи 2Предимствата на вакуумни канализационни системи 2
Предимствата на вакуумни канализационни системи 2
Emil Hristov
 
Предимствата на вакуумни канализационни системи
Предимствата на вакуумни канализационни системиПредимствата на вакуумни канализационни системи
Предимствата на вакуумни канализационни системи
Emil Hristov
 
Calculating porosity and water saturation
Calculating porosity and water saturationCalculating porosity and water saturation
Calculating porosity and water saturation
haider Shabaan Khalil
 
GRIT CHAMBER...
GRIT CHAMBER...GRIT CHAMBER...
GRIT CHAMBER...Niaz Memon
 

What's hot (7)

Slurry Seal Presentation for CalAPA LA Tech Meeting
Slurry Seal Presentation for CalAPA LA Tech MeetingSlurry Seal Presentation for CalAPA LA Tech Meeting
Slurry Seal Presentation for CalAPA LA Tech Meeting
 
Loudon rf fc europe presentation5
Loudon rf fc europe presentation5Loudon rf fc europe presentation5
Loudon rf fc europe presentation5
 
Sewerage department convention center
Sewerage department convention centerSewerage department convention center
Sewerage department convention center
 
Предимствата на вакуумни канализационни системи 2
Предимствата на вакуумни канализационни системи 2Предимствата на вакуумни канализационни системи 2
Предимствата на вакуумни канализационни системи 2
 
Предимствата на вакуумни канализационни системи
Предимствата на вакуумни канализационни системиПредимствата на вакуумни канализационни системи
Предимствата на вакуумни канализационни системи
 
Calculating porosity and water saturation
Calculating porosity and water saturationCalculating porosity and water saturation
Calculating porosity and water saturation
 
GRIT CHAMBER...
GRIT CHAMBER...GRIT CHAMBER...
GRIT CHAMBER...
 

Viewers also liked

Giotto
GiottoGiotto
Giotto
lacorsos
 
A Case of Digoxin Toxicity In elderly chronic use
A Case of Digoxin Toxicity In elderly chronic useA Case of Digoxin Toxicity In elderly chronic use
A Case of Digoxin Toxicity In elderly chronic use
University of Technology
 
La recetta
La recettaLa recetta
La recetta
Alexlr24
 
LB letter of recommendation
LB letter of recommendationLB letter of recommendation
LB letter of recommendationMeloney Ridley
 
d&f - ESPERIENZE _ HERO - Breakfast Hero
d&f - ESPERIENZE _ HERO - Breakfast Herod&f - ESPERIENZE _ HERO - Breakfast Hero
d&f - ESPERIENZE _ HERO - Breakfast HeroGiovanni Tripicchio
 
Digital marketing training-IDMM
Digital marketing training-IDMMDigital marketing training-IDMM
Digital marketing training-IDMM
Amitesh Kumar
 
Lo aconsejable que tienes que conocer sobre la gran la jardineria es consider...
Lo aconsejable que tienes que conocer sobre la gran la jardineria es consider...Lo aconsejable que tienes que conocer sobre la gran la jardineria es consider...
Lo aconsejable que tienes que conocer sobre la gran la jardineria es consider...
carlota67
 
Обеспечение информационной безопасности в гос.секторе
Обеспечение информационной безопасности в гос.сектореОбеспечение информационной безопасности в гос.секторе
Обеспечение информационной безопасности в гос.секторе
smart-soft
 
Expo 10
Expo 10Expo 10
Sssssssssssssssssssssssssawedwafdewsrgergwerdge
SssssssssssssssssssssssssawedwafdewsrgergwerdgeSssssssssssssssssssssssssawedwafdewsrgergwerdge
SssssssssssssssssssssssssawedwafdewsrgergwerdgeBhoxz JoYrel
 
Pangarap - Shintine JAbines
Pangarap - Shintine JAbinesPangarap - Shintine JAbines
Pangarap - Shintine JAbines
University Student Council-Molave
 
Sssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss
SssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssSssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss
SssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssBhoxz JoYrel
 
Tuloy parin
Tuloy parinTuloy parin
Tuloy parinnlabong
 
Elehiya para kay mark jil
Elehiya para kay mark jilElehiya para kay mark jil
Elehiya para kay mark jil
Jenita Guinoo
 
Cançoneta incerta
Cançoneta incertaCançoneta incerta
Cançoneta incerta
anonimsliteraris
 
7 years Lukas Graham - educacao musical letra e cifra
7 years   Lukas Graham - educacao musical letra e cifra7 years   Lukas Graham - educacao musical letra e cifra
7 years Lukas Graham - educacao musical letra e cifra
Educacao Musical Jose Galvao
 

Viewers also liked (20)

Giotto
GiottoGiotto
Giotto
 
C.V
C.VC.V
C.V
 
A Case of Digoxin Toxicity In elderly chronic use
A Case of Digoxin Toxicity In elderly chronic useA Case of Digoxin Toxicity In elderly chronic use
A Case of Digoxin Toxicity In elderly chronic use
 
La recetta
La recettaLa recetta
La recetta
 
LB letter of recommendation
LB letter of recommendationLB letter of recommendation
LB letter of recommendation
 
d&f - ESPERIENZE _ HERO - Breakfast Hero
d&f - ESPERIENZE _ HERO - Breakfast Herod&f - ESPERIENZE _ HERO - Breakfast Hero
d&f - ESPERIENZE _ HERO - Breakfast Hero
 
Digital marketing training-IDMM
Digital marketing training-IDMMDigital marketing training-IDMM
Digital marketing training-IDMM
 
Page11
Page11Page11
Page11
 
Lo aconsejable que tienes que conocer sobre la gran la jardineria es consider...
Lo aconsejable que tienes que conocer sobre la gran la jardineria es consider...Lo aconsejable que tienes que conocer sobre la gran la jardineria es consider...
Lo aconsejable que tienes que conocer sobre la gran la jardineria es consider...
 
Обеспечение информационной безопасности в гос.секторе
Обеспечение информационной безопасности в гос.сектореОбеспечение информационной безопасности в гос.секторе
Обеспечение информационной безопасности в гос.секторе
 
Expo 10
Expo 10Expo 10
Expo 10
 
Tema 5. lección 1
Tema 5. lección 1Tema 5. lección 1
Tema 5. lección 1
 
Sssssssssssssssssssssssssawedwafdewsrgergwerdge
SssssssssssssssssssssssssawedwafdewsrgergwerdgeSssssssssssssssssssssssssawedwafdewsrgergwerdge
Sssssssssssssssssssssssssawedwafdewsrgergwerdge
 
Pangarap - Shintine JAbines
Pangarap - Shintine JAbinesPangarap - Shintine JAbines
Pangarap - Shintine JAbines
 
Sssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss
SssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssSssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss
Sssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss
 
Kate's elegy
Kate's elegyKate's elegy
Kate's elegy
 
Tuloy parin
Tuloy parinTuloy parin
Tuloy parin
 
Elehiya para kay mark jil
Elehiya para kay mark jilElehiya para kay mark jil
Elehiya para kay mark jil
 
Cançoneta incerta
Cançoneta incertaCançoneta incerta
Cançoneta incerta
 
7 years Lukas Graham - educacao musical letra e cifra
7 years   Lukas Graham - educacao musical letra e cifra7 years   Lukas Graham - educacao musical letra e cifra
7 years Lukas Graham - educacao musical letra e cifra
 

Similar to Quality Racking Mat Presentation 02192015

Treatment of wastewater
Treatment of wastewaterTreatment of wastewater
Treatment of wastewater
Arpit Budania
 
SpinArc® Productivity Case Studies
SpinArc® Productivity Case StudiesSpinArc® Productivity Case Studies
SpinArc® Productivity Case Studies
Scott Funderburk
 
Filtek presentation v2
Filtek presentation v2Filtek presentation v2
Filtek presentation v2
Filtek_filters
 
Drycake Headworks V2303.pptx
Drycake Headworks V2303.pptxDrycake Headworks V2303.pptx
Drycake Headworks V2303.pptx
markvanderbeken
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
odiliagilby
 
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
California Asphalt Pavement Association
 
Pavement Preservation - What are your roads worth?
Pavement Preservation - What are your roads worth?Pavement Preservation - What are your roads worth?
Pavement Preservation - What are your roads worth?
Crystal Lance
 
Flood Barrier US inflated for water restriction
Flood Barrier US inflated for water restrictionFlood Barrier US inflated for water restriction
Flood Barrier US inflated for water restriction
PRANTIKSINHA2
 
A project report on nagpur metro rail corporation
A project report on nagpur metro rail corporationA project report on nagpur metro rail corporation
A project report on nagpur metro rail corporation
Nikhil Kumar
 
Sewage treatment plant design calculation
Sewage treatment plant design calculationSewage treatment plant design calculation
Sewage treatment plant design calculation
Sharifah Ain
 
Rapid Deployment Inflatable Dam PPT
Rapid Deployment Inflatable Dam  PPTRapid Deployment Inflatable Dam  PPT
Rapid Deployment Inflatable Dam PPTCherylwitmer
 
Viper Wire Rope Lubricator
Viper Wire Rope LubricatorViper Wire Rope Lubricator
Viper Wire Rope Lubricator
Rodney Fitzpatrick
 
Wwwe
WwweWwwe
Wwwe
ascivil
 
Reducing your carbon footprint (Senior Project - Mexico)
Reducing your carbon footprint (Senior Project - Mexico)Reducing your carbon footprint (Senior Project - Mexico)
Reducing your carbon footprint (Senior Project - Mexico)
asauter93
 
Physical Unit Operation- Screening, Grit Removal, Equalization
Physical Unit Operation-Screening, Grit Removal,EqualizationPhysical Unit Operation-Screening, Grit Removal,Equalization
Physical Unit Operation- Screening, Grit Removal, Equalization
Yash Patel
 
ZBC in commodities.ppt
ZBC in commodities.pptZBC in commodities.ppt
ZBC in commodities.ppt
SoulmananIndia
 
فلاتر المعالجة الثلاثية
فلاتر المعالجة الثلاثيةفلاتر المعالجة الثلاثية
فلاتر المعالجة الثلاثية
Rheoserve Industrial Solutions
 
2023 CalAPA Spring Asphalt Conference presentation by John Harvey of the CCPI...
2023 CalAPA Spring Asphalt Conference presentation by John Harvey of the CCPI...2023 CalAPA Spring Asphalt Conference presentation by John Harvey of the CCPI...
2023 CalAPA Spring Asphalt Conference presentation by John Harvey of the CCPI...
California Asphalt Pavement Association
 
Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Mazen Alqadi
 
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTIONROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
iQHub
 

Similar to Quality Racking Mat Presentation 02192015 (20)

Treatment of wastewater
Treatment of wastewaterTreatment of wastewater
Treatment of wastewater
 
SpinArc® Productivity Case Studies
SpinArc® Productivity Case StudiesSpinArc® Productivity Case Studies
SpinArc® Productivity Case Studies
 
Filtek presentation v2
Filtek presentation v2Filtek presentation v2
Filtek presentation v2
 
Drycake Headworks V2303.pptx
Drycake Headworks V2303.pptxDrycake Headworks V2303.pptx
Drycake Headworks V2303.pptx
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
 
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
 
Pavement Preservation - What are your roads worth?
Pavement Preservation - What are your roads worth?Pavement Preservation - What are your roads worth?
Pavement Preservation - What are your roads worth?
 
Flood Barrier US inflated for water restriction
Flood Barrier US inflated for water restrictionFlood Barrier US inflated for water restriction
Flood Barrier US inflated for water restriction
 
A project report on nagpur metro rail corporation
A project report on nagpur metro rail corporationA project report on nagpur metro rail corporation
A project report on nagpur metro rail corporation
 
Sewage treatment plant design calculation
Sewage treatment plant design calculationSewage treatment plant design calculation
Sewage treatment plant design calculation
 
Rapid Deployment Inflatable Dam PPT
Rapid Deployment Inflatable Dam  PPTRapid Deployment Inflatable Dam  PPT
Rapid Deployment Inflatable Dam PPT
 
Viper Wire Rope Lubricator
Viper Wire Rope LubricatorViper Wire Rope Lubricator
Viper Wire Rope Lubricator
 
Wwwe
WwweWwwe
Wwwe
 
Reducing your carbon footprint (Senior Project - Mexico)
Reducing your carbon footprint (Senior Project - Mexico)Reducing your carbon footprint (Senior Project - Mexico)
Reducing your carbon footprint (Senior Project - Mexico)
 
Physical Unit Operation- Screening, Grit Removal, Equalization
Physical Unit Operation-Screening, Grit Removal,EqualizationPhysical Unit Operation-Screening, Grit Removal,Equalization
Physical Unit Operation- Screening, Grit Removal, Equalization
 
ZBC in commodities.ppt
ZBC in commodities.pptZBC in commodities.ppt
ZBC in commodities.ppt
 
فلاتر المعالجة الثلاثية
فلاتر المعالجة الثلاثيةفلاتر المعالجة الثلاثية
فلاتر المعالجة الثلاثية
 
2023 CalAPA Spring Asphalt Conference presentation by John Harvey of the CCPI...
2023 CalAPA Spring Asphalt Conference presentation by John Harvey of the CCPI...2023 CalAPA Spring Asphalt Conference presentation by John Harvey of the CCPI...
2023 CalAPA Spring Asphalt Conference presentation by John Harvey of the CCPI...
 
Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111
 
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTIONROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
 

Quality Racking Mat Presentation 02192015

  • 3. Safety • Reduced slips & falls! – #1 cause of lost time accidents! • Reduced hand injuries! – Significant to Shell’s hands-free initiative! • Reduced eye & skin injuries! – Loose boards result in chemical splash to eyes and skin.
  • 4. QRT Racking Mat NON-SLIP SURFACE SLIPPERY-UNSAFE QRT
  • 5. Benefits • Contained (SBM, OBM, Completion Fld.) for disposal or reuse • Mud treatment cost reduced • Fewer man hours used for power washing • Reduced repair and re-cut cost • Reduced makeup time • Reduced injuries • Fewer slips and falls • No plugs in hole QRT
  • 6. Clean Threads QRT • Reduces exposure to hand injuries! Less handling of pipe for cleaning and doping. • Requires less power washing. Resulting in less contaminated water requiring disposal. • Reduction in recut cost. Due to zero embedded trash.
  • 7. No Plugs QRT No Wood Plugs! No Barite Plugs! No Rubber Plugs!
  • 9. Quality Rental Tools Case Study: Mat 3 – Mat 4 Mat Specifications • Mat 3: SIZE 7’6” X 6’ 10” • Mat 4: SIZE 6’9” X 6’ 11” • Interlocked polypropylene grid Application data • Case study based upon both mats in deepwater semisubmersible rig applications, with exposure to most extreme drilling conditions (recorded) • Mat 3 is on driller’s side of rotary table; Mat 4 is on opposite side of rotary table • A 30” bit with a 12” motor has been placed on mats, equaling approximately 25,000 pounds of total weight with minimal impact observed (minor mashing of polypropylene material) and no structural damage to mat grid • 8 ½” collars 4 stands, 5 ½” HT-55 hevi-weight 7 stands, approximately 180 stands HT-55 drill pipe. o Total weight of collars, hevi-weight and drill pipe (Mat 3) = 350,000 pounds (mat 4 holding the remainder) Tubular weight total = over 500,000 lbs • Both mats in operational use 5 ½ months, with approximately 150 trips made. Only minor adjustments needed during subsequent rig shut-down • Client testimony indicates a time savings on cleaning and re-doping from 15 minutes up to 1 hour for deeper trips. Over the 5 ½ month period, this equates to approximately 2-3 days of rig time saved. o Deepwater applications: @ a day rate of $500K/day on drill ship applications, a cost savings of $1M to 1.5M o Shelf applications: @ a day rate $150K/day on jack-up applications, cost savings up to $450,000. Repairs • Client reported low repair ratio on HT-55 connections. 1,238 connections with 63 repairs needed (6%) Fluids • 14.5 Synthetic base mud. 14.0 calcium bromide. No pitting reported. QRT
  • 10. User Feedback: Since installing the racking mats on Nabors 623, we have seen a noticeable decrease in the number of reface repairs on our pin end connections. Also have been recovering an average of 30 bbls of OBM per trip out of the hole on our deeper jobs in Jefferson and Hardin Co. The rig floor stays cleaner and less of a slip hazard with all the OBM from the ID of the drill pipe being contained and transferred back to the active system. Prior to installing the racking mats we had an average reface repair rate of 33% (221 pins – 72 reface repairs) on our 4” XT-39 DP. Our recent numbers are 11.5 % (190 pins – 22 reface repairs) and 15% (78 pins – 12 reface repairs) on XT-39 and 2-7/8” WT-23. Troy Whittington Drilling Supt. Samson LoneStar QRT
  • 11. QRT Cost Savings - Containment •Drilling fluid treatment and conditioning. •Reclaiming SBM, OBM or WBM. •Reduction in fluid contamination and treatment of 18 bbls per trip. 1/32” = 0.10 bbls/stand of 6 5/8” 34# Drill Pipe Average Cost of SBM = $250.00/bbl Results in a savings of $4,500.00 per trip 16 trips = $72,000.00 savings during the drilling operation •3 well drilling program would result in a total savings of $226,000.00
  • 12. Cost Savings – Disposal • Reduced disposal cost due to total recovery. • At $20.00 per bbl disposal cost, averaging 5 bbls per day – daily savings of $100.00. – $100.00 day – $3,000.00 month – $36,000.00 year QRT
  • 13. Cost Savings – Recuts Drilling – Current recut rate of 15% – Average recut cost for premium connections is $800.00 – QRT Racking Mats will reduce recuts by at least 50% – Result in a savings on a 30,000ft operation of $85,600.00 – Yearly cost savings of $214,000.00 Completions – Current recut rate of 50% – Average recut cost for premium connections is $800.00 – QRT Racking Mats will reduce recuts by at least 50% – Result in a saving on a 30,000 operation of $285,600.00 – Yearly cost savings of $714,000.00 QRT
  • 14. Cost Savings - Rig/Labor • Client experience has show a reduction in make-up of from 15 minutes to 60 minutes per trip, depending on depth. • At a savings of just 41.5 minutes per trip the savings over one year period: • 20,000ft / 120ft = 166 stands • 166 x 15 seconds = 2,490 seconds per trip • 2,490 seconds = 41.5 minutes per trip • 150 trips per year = 6,225 minutes = 103.75 hours = 4.33 days • Deepwater @ $1,200,000.00 per day - $5,196,000.00 • Shelf @ $150,000.00 - $649,500.00 QRT
  • 15. Quality Design & Manufacturing QRT
  • 16. The Value Story • Material Cost –High Intensity – High Heat Polypropylene • Each piece is machine cut to precise tolerances. • Holes are hand drilled. • All-thread rods are used throughout for support. • Hand constructed and welded. QRT
  • 17. Franklin Analysis Positives 1.Slip & Falls 2.Hand, Eye & Skin Injuries 3.Rig Time/Labor Cost 4.Recut Cost 5.Mud Loss 6.Disposal Cost Negatives 1.Mud Extraction 2.Purchase vs Rental QRT