2. GMS SCORE CARD SEPT 2012
100.5
100
99.5
99 QUALITY
98.5 DELIVERY
98 OVER ALL
97.5
97
JC IR IY
Average Score for Quality 98 % and Delivery 99 % (based on data from 3 factories)
3. PRODUCTION CAPACITY 2012
30%
PRODUCTION
70%
OPEN CAPACITY
During the last four months shinta woosung produces about 70% of the Factory production capacity,
and Current we are having about 30% open capacity
4. WASTE WATER TREATMENT
•Build new facilities for preparation of Nike audit in november 2012
•April to May 2013 – Green Area project
Build
GREEN AREA
surrounding
Waste
Water
treatment
5. ERP SYSTEM
• New ERP system has been completed developed and has started to be used
for user testing and Running test since November 01 2012 in Cikande (factory)
• New ERP will be installed in BSD Office connected to Cikande (factory) ,
and project estimated will be completed on december 2012
Innovation of ERP for 2013
it allows all customers (factories) to track their material status by online
6. Two experts in the Textile dyeing
Hired Two expert (korean) who has experience in dyeing process for 30 years and 15 years
Both speciality in polyester.
expected to be of support shinta woosung to improve and maintain the color stability
Which is our (sws’s) weakness since a long time ago.