Problem Solving Training for
        Behavior

            Tier 2
    Secondary Interventions



                               1
Overview
•   Data Decision Rules
•   Behavior Basics
•   Data Tools
•   Classroom Implementation
•   Targeted Social Skill Instruction
•   Check In- Check Out



                                        2
Expectations
• Be Responsible
  – Return promptly from breaks
  – Be an active participant
• Be Respectful
  – Turn off cell phone ringers
  – Listen attentively to others
• Be Kind
  – Participate in activities
  – Listen and respond appropriately to others‟
    ideas
Attention Signal

• Trainer will raise
  his/her hand
• Participants will raise
  their hand and wait
  quietly
Group Activity
• Create a picture or visually document to
  describe where your school is with
  Problem Solving Implementation.
  – Accomplishments
  – Challenges




                                             5
Core – Tier 1
                           GOAL: 100% of students
                           achieve at high levels

                           Tier I: Begins with clear goals:

                           1.What do we expect all
                           students to know, understand
                           and do as a result of our
                           instruction?
                           2.How will we know if these
                           goals are met?
                           3.How will we respond when
                           students do not meet the goals
                           with initial instruction?
                           4.How will we respond when
                           some students have already met
                           the goals?

(Batsche, 2010)
                                                              6
Questions your team needs to
    consider at Tier 1…

– What types of Behavioral Needs are not being
  addressed by our Behavior Core at an
  effectiveness rate of 80%?
– What data do we need to look at to determine
  this?
Supplemental – Tier II
                      < 20% of student Core
                      + Supplemental

                      To Achieve Benchmarks

                      1.Where are the students
                      performing now?
                      2.Where do we want them to be?
                      3.How long do we have to get them
                      there?
                      4.How much do they have to grow
                      per year/month to get there?
                      5.What resources will move them at
                      that rate?
                      6.How will we monitor the growth of
                      students receiving supplemental
                      instruction?



(Batsche, 2010)
                                                    8
Questions your team needs to
           consider at Tier 2…

• What types of Behavioral Needs are occurring
  for 10-15% of your population?
• What additional supports are needed to ensure
  success for students not responding to the core?
• What data are needed to respond to the
  questions above?
Team Initiated Problem Solving
         (TIPS) Model




                                 10
DATA DECISION RULES


                      11
WHO is appropriate
 for Secondary interventions?

• Universal Behavior Screening Data
        • 2-5 office referrals
How can we use data?

• Can be used by teams to determine set
  points where students will be referred for
  additional support
• Individual schools must determine the
  timeframes for data decisions (2 – 5 ODRs
 per 9 weeks)
Data Decision Rules Examples...
                                          6 or more ODR referrals
                                                    Tertiary Prevention:
2-5 ODR Referrals                                        Specialized
                                                       Individualized
   Secondary Prevention            ~5%            Systems for Students with
     Specialized Group                              High Risk Behavior
  Systems for Students with
      At Risk Behavior
                                   ~15%

                                                    Other data decision rules:
                                                  -# referrals
                                                  -# minor incident referrals
0-1 ODR Referral                                  -absences
                                                  -teacher concern
   Primary Prevention                             -behavior screening results
    School wide and
 Classroomwide Systems
     for All Students,
    Staff, & Settings         ~ 80% of Students
Data Decision Rule Examples
             Continued…
• Any student that is absent more than 3 days in one
  month (or one 4 week period) will be referred for
  intervention
• Any student who receives 2 or more ODRs within a
  9-week period will be referred for intervention
• Any student who fails one or more classes will be
  invited to join a small group related to classroom
  success
Using ODRs to evaluate your                                                                                      Workbook
                                                                                                                       pg. 2

       continuum of supports
                                           IF...                                                       FOCUS ON...

   More than 40% of students receive one or more office referrals
   More than 2.5 office referrals per student                                                      School Wide System


   More than 35% of office referrals come from non-classroom settings
   More than 15% of students referred from non-classroom settings
                                                                                                  Non-Classroom System


   More than 60% of office referrals come from the classroom
   50% or more of office referrals come from less than 10% of classrooms
                                                                                                    Classroom Systems


   More than 10-15 students receive 5 or more office referrals                       Targeted Group Interventions / Classroom Systems


   Less than 10 students with 10 or more office referrals
   Less than 10 students continue rate of referrals after receiving targeted group
    settings                                                                                     Individual Student Systems
   Small number of students destabilizing overall functioning of school
Team Time
• Discuss and document your data decision
  rules.

                Visit the PSM wiki
              •Click on pages/files (right tab)
          •Look for Data decision team planning,
                   then select download
BEHAVIOR BASICS


                  18
To correctly match
appropriate interventions
       to problem
  behaviors, teams will
 rely on the science of
        behavior.
TIPS – Step 1



   Identify the
     Problem




                  20
How do we identify the problem?




          DATA COLLECTION
              & TOOLS




                                  21
Measurable or Not?
                                      Not Measurable
Measurable
                     oppositional
           lazy
                                    talking out

       swearing

                                          inattentive
   out of area
                    defiant     on task
   rude
                    bothering              fighting
Objective Descriptors
Objective                                                   Subjective
                             Talking during seatwork

               Disobedient                         Seldom

                                                         Repeatedly
            Passing notes

    Hurrying through work                              Once or twice a week

  Five times each day                                   Leaning back in chair


     Sometimes                                         Bothering a neighbor

                                                       Continuously
     Every ten minutes             Bizarre
                                                 Tapping pencil on desk
                         Twice each period
Data Considerations:
      Clear Definition of Problem Behavior
     The ―Stranger Test‖
•Is the description of the behavior
clearly defined?

•Would a stranger’s description
match yours?

•If a stranger read your
description, would they be able to
identify the problem behavior?

                  Developed by the Behavior Specialist
                  Team of Wake County Public Schools
Data Considerations:
              Data to Collect
How often does                                               How
 the behavior                                               extreme
                          Frequency
    occur?                                                   is it?
                            Intensity
                           Duration
 How long                                                 Under what
                          Context
  does it                                               circumstances
   last?                                                does it occur?

                 Developed by the Behavior Specialist
                 Team of Wake County Public Schools
Data Collection Strategies
• What is already collected?
  – Anecdotal notes by teacher
  – Office referrals
  – Disciplinary actions
• What else can be collected?
  – Products from Consequences
  – Behavior Contracts
  – Checklists
  – DBRs
  – Direct Observation
  – Interviews
Direct Assessment – Frequency Counts
                                  Behavior Counting

       Name ____Shamel              ____           Week of __Nov 5, 200X______

 Behavior to be counted ____Negative Comments to Peers: (Get out of my face. )


           Mon.        Tue.            Wed.            Thurs.        Fri.    Total

Arrival    IIII        IIIII II        II              IIIII IIIII   I       40
                                                       IIIII I
Math       I           I                               I                     3

Science    II          I               III             IIII          I       11

Art        IIII        IIIII           IIIII III       IIIII IIII    I       24

Reading                I               II              III                   6
Direct Assessment – Duration Recording
    Record the elapsed time, usually in minutes, from onset to conclusion of target
    behavior. Be sure to indicate the date, and the activity in which the student was
                 engaged when the target behavior began to escalate.

       Student Name: ___Shamel                             __ Week of / Day : __Nov 15, 200X____

             Target Behavior: Tantrum (screams, lays on floor, throws items)



                                Transition


                                             Large Group


                                                            Small Group


                                                                          Individual Work


                                                                                            Read Aloud


                                                                                                         Read Silently


                                                                                                                         In Crowds


                                                                                                                                     Library


                                                                                                                                               Specials


                                                                                                                                                          Specific Subject
      Behavior Incident
Briefly describe, making sure
 to note date, time, and any
   circumstances you think
         noteworthy.


#1 9:45-10:15, Mon, Nov 15
Group was doing read aloud


#2 9:35-10:15, Tue, Nov 16
Went to an assembly in the
gym

#3 9:28-10:05, Fri, Nov 19
#3
Oral vocabulary test
Behavior

• What is the challenging behavior?
• What can you observe?
  – What does it look or sound like?
• Prioritize
• Choose one



                                       29
30
                                    Behavior
                 25


                 20
# of incidents




                 15


                 10


                  5


                  0
                      refusing to    cursing peers   Leaving assigned
                      participate                          area         30
Setting Events
• What environmental, personal, situational
  or daily events impact the behavior?
  – Eating/Sleeping routines
  – Medical/Physical problems
  – Familial and staff interactions
• Do not immediately precede problem
  behavior


                                              31
Setting Events
                                                       Setting Event
                 18

                 16

                 14

                 12
# of incidents




                 10

                 8

                 6

                 4

                 2

                 0
                      Exhibits/reports sickness   No breakfast         Missed the bus   Visit with mom
                                                                                                         32
Antecedent
• What happens immediately before the
  behavior?
• Predicts problem behavior
• When, Where, With whom, Activity
  –   Time of day
  –   Physical Setting
  –   People present
  –   Types of interactions (demands, directives, etc.)


                                                          33
Antecedent
25

20

15

10

5

0
     Reading   Math   Social Specials Small   Direct
                      Studies         Group   Instr 34
Consequence
• What happens immediately after the
  behavior?
• Gives student a reason to repeat the
  problem behavior
• Not related to punishment




                                         35
Consequence:
                                    Pink=Attention Maintained; Purple= Escape

                 45


                 40


                 35                                                             Redirection

                                                                                Calling name
                 30
                                                                                Outisde conference
# of incidents




                 25
                                                                                Reminder

                 20                                                             Ignore

                                                                                Time-out
                 15


                 10


                 5


                 0

                      Redirection   Calling    Outisde     Reminder   Ignore   Time-out
                                    name      conference                                             36
Function …

• People behave for a reason - we call
  this “function”
• Function:
  • Does he/she get something?
    • Tangibles, attention, stimulation, people, etc.
  • Does he/she avoid or escape something?
    • People, activities, embarrassment, tasks, etc.



                                                        37
Only Two Basic Functions
                                        Problem
                                        Behavior




                                                    Escape/
                           Obtain/Get
                                                     Avoid
                           Something
                                                   Something




                 Stimulation/                                  Tangible/
                                         Social
                  Sensory                                       Activity




from Horner &                   Adult                Peer
   Sugai at
 www.pbis.org
TIPS – Step 2



    Develop
   Hypothesis




                39
Hypothesis Statements

       Information about the
       problem behavior is used
       to write a hypothesis
       statement that helps us
       predict when the problem
       behavior is likely to occur
       and the function of that
       behavior.

                                     40
Hypothesis Statements
         When Estes is ___________ and __________ (happens), he
                       where/setting        context/antecedent




          typically responds by _________ to gain/avoid __________.

                                 behavior               function



   Hypothesis:
When Estes is in language arts       and the teacher is providing direct instruction

   he typically responds by making verbal noises (ex. Burping)

  to access peer and teacher attention.
                                                                                  41
Activity
http://www.sonoma.edu/cihs/classroom/mod_3/lesson1.html
    http://www.sonoma.edu/cihs/classroom/mod_3/lesson1.html
                                                                      Write a hypothesis statement about
        http://www.sonoma.edu/cihs/classroom/mod_3/lesson1.html
            http://www.sonoma.edu/cihs/classroom/mod_3/lesson1.html   Robert‟s behavior                42
Identifying the function helps us :
• Choose an appropriate intervention
  – Will this intervention meet the functional
    need?
• Choose an appropriate replacement
  behavior
  – Alternative behavior taught to the student
  – What you want the student to do instead
  – Must meet functional need

                                                 43
Which reinforcement would be most effective: a
                              behavior plan that gives student lunch with the
                                 teacher or a “drop an assignment” pass?
                 45


                 40


                 35


                 30

                                                                                          Redirection
# of incidents




                 25                                                                       Calling name
                                                                                          Outisde conference

                 20                                                                       Reminder
                                                                                          Ignore
                                                                                          Time-out
                 15


                 10


                 5


                 0

                      Redirection   Calling    Outisde     Reminder   Ignore   Time-out                 44
                                    name      conference
TIPS – Step 3



   Discuss and
      select
    Solutions



                 45
Some Secondary Solutions…

-Small Group Social Skills Instruction
-Check In/Check Out (CICO or BEP)
Targeted
Social Skills
Instruction
Students learn
appropriate behavior in
 the same way a child
who doesn’t know how
to read learns to read—
         through
  instruction, practice,
       feedback, and
    encouragement.
Teaching Behavior
• Inappropriate behavior is viewed as a skill
  deficit
• Social skills training teaches students a
  process or strategy to resolve problems.
• Teaching behavior is used when a student
  needs to replace problem behavior with a
  more desirable behavior.
Two Types of Social Skill Deficits
• Skill deficits (cannot do)
  – Direct teaching approach
     • Coaching, modeling, behavior rehearsal
• Performance deficits (will not do)
  – Incentive-based management approach
     •   Prompting, cuing, reinforcement
     •   Prompted social initiations
     •   Home and school rewards
     •   Individual and group contingencies
Assessment of Social Skills


• Skill based deficit
  – Provide strong incentive to observe if student
    can perform under such conditions.
Assessment of Social Skills

• Performance based deficit
  – Motivational deficit
     • Observe if student performs skill following
       introduction of motivational strategy.
     • motivation=value*belief in ability*get reward promised
       (Vroom, 1964)

  – Discrimination deficit
     • Student frequently performs skill, but fails to
       perform under specific circumstances.
     • Oblivious to social cues or social demands of
       situation.
Social Skills Instruction
• Direct instruction
   – Skill based approach
• Social problem solving
   – Strategy based approach
• Opportunistic teaching (not enough alone)
   – Prompt students who have missed an opportunity to
     practice a skill
   – Provide correction when skill is incorrectly or
     inappropriately demonstrated
   – Debrief when student uses inappropriate behavior in
     place of appropriate social skill
To effectively teach
social skills you must ALWAYS
   determine what you want
  the student to do INSTEAD
Social Skill Areas

•   Cooperation skills
•   Assertion skills
•   Friendship skills
•   Empathy skills
•   Self-control skills
•   School and classroom skills
Social Skills Instruction for
             Small Groups
•   Select & group students with similar needs
•   Determine staff responsible
•   Determine best time for instruction
•   Select curricula & write lessons
•   Communicate with teacher and parents
•   Evaluate effectiveness
Social Skills Instruction for
          Small Groups

• Select & group students with similar
  needs
  – Type of problem behavior
  – Intensity of problem behavior
  – Age/Developmental Level
  – Gender
  – Develop Group Behavior Management Plan
Social Skills Instruction for
          Small Groups

• Determine staff responsible
  – Consider size of group and type of
    problem behavior when assigning staff to
    (co) lead
• Determine best time for instruction
  – Lunchtime, After/Before School, Rotating
    Schedule, intervention block
Social Skills Instruction for
          Small Groups                   Workbook
                                          Pg, 8


• Select curricula & write lessons
  – Consider students‟ developmental level
  – Commercial curricula, online lessons, or
    custom lessons
  – Materials needed
  – Meeting space requirements/limitations

  Tell, Show. Practice, Assess and
               Repeat
Generalization Strategies
• Provide a range of useful skill variations.
• Teach in the targeted setting.
• When teaching, include peers the target
  student is likely to encounter in the
  problem setting.
• Use a number of adults when teaching.
• Continue teaching for a sufficient amount
  of time.
Social Skills Instruction for
          Small Groups

• Communicate with teacher and
  parents
  – Written parent permission best practice
  – Determine how teacher(s)/parent(s)
    can encourage/participate (homework)
Social Skills Instruction for
          Small Groups

• Evaluate effectiveness
  – Pre/Post Data Comparison
  – Teacher/Parent Feedback
  – Student Assessment
Researched Based SS Curriculums
Second Step
   Video
Team Time

• Using your ODR data determine which social
  skills lessons and groups are most needed at
  your school, list
• when will lessons be taught
• how will team ensure instruction is occurring
• Evidence of lessons
• Possible reinforcers for participation
Assessing Social Skills lessons


         Visit the PSM wiki
       •Click on pages/files (right tab)
     •Look for Social Skills Observation
      Checklist, then select download
Check-In Check-Out
 (CICO, aka BEP)
CICO
Features:
• Research-based intervention effective with 75%
  of students who participate
• Students identified and receive support within a
  week
• Check-in and check-out daily with an adult at
  school
• Regular feedback and reinforcement from
  teachers
• Family component
• Daily performance data used to evaluate
  progress
10 Critical Features of CICO/BEP
1.    Linked directly to school-wide expectations and/or
      academic goals

2.    Continuously available for student participation

3.    Implemented within 3 school days of determination that
      the student should receive the intervention

4.    Can be modified based on assessment and/or outcome
      data

5.    Includes structured prompts for „what to do‟ in relevant
      situations
10 Critical Features of CICO/BEP
                 continued…
6. Results in student receiving positive feedback from staff

7.    Includes a school-home communication exchange
      system at least weekly

8. Orientation materials provide information for a student to
   get started on the intervention

9.    Orientation materials provide information for staff/ subs./
      volunteers who have students using the intervention

10. Opportunities to practice new skills are provided daily
Behavior
Education
Program
 (aka…CICO)

  DVD
Why does the CICO work?
• Improved structure
     • Prompts throughout the day for correct behavior
     • System for linking student with at least one adult
• Increase in contingent feedback
     • Feedback occurs more often and is tied to student
       behavior
     • Inappropriate behavior is less likely to be rewarded
• Elevated reward for appropriate behavior
     • Adult and peer attention
• Linking school and home support
• Organized to morph into a self-management
  system
Is My School Ready to
              Implement a CICO System?

• School-wide system of behavior support in place (SET
  Score 80% or higher)

• Staff buy-in for implementation of the CICO

• Administrative support
   – Time & money allocated

• No major changes in school climate
   – e.g. teacher strikes, administrative turnover, major
     changes in funding

• CICO implementation a top priority
How Do You Build Student and Staff “buy-in”
             for the CICO?

• Give CICO program a high profile in your
  school

• Promote CICO as positive support not
  punishment

• Collaboratively involve referring teachers in
  CICO process

• Provide regular feedback to
  staff, students, and families
Is It Really Resistance For
            Intervention?

  Before Implementing a Secondary
      Intervention, You Must Ask:


   Is the Student Receiving an
Adequate “DOSE” of the Universal
Intervention?
Team Time
Use your workbook to begin planning for
Social Skills and CICO implementation.
TIPS – Step 4



  Develop and
   Implement
  Action Plan



                77
Creating a Behavior Goal
• Clear goal needs to be set that can be
  evaluated using data
• Goals can be measured in the following
  ways:
  – % reduction
  – Absolute reduction
  – Satisfaction level



                                           78
Tips for Writing Behavior Goals
• Use the baseline data as a guide for
  where you want behavior to go
• Intervention must match the goal
  statement
• Achievable and age appropriate (in
  comparison to peers)
• Must include a time frame


                                         79
Example Behavior Goal

_______________ will (increase or decrease)
(Student Name)              (select one)



_________________________ by or to
  _________________
           (Behavior)                      (% or number)



by _______________.
      (date/timeframe)


                                                           80
3 Questions that Action Plan must
             Answer

       • What are you doing?
         • Who is doing it?
            • By when?




                                    81
TIPS – Step 5



  Evaluate and
  Revise Action
      Plan



                  82
How do we Progress Monitor
          for Behavior?
              DBRs
• Daily Behavior Report = DBR
• The DBR involves a brief rating of target
  behavior over a specified period of time
• Additional examples at
• http://www.interventioncentral.org/index.php/
  tools/197-behavior-report-card-generator


                                            83
Characteristics of DBR

The DBR involves a brief rating of
target behavior over a specified
period of time
– behavior(s) is specified
– rating of the behavior(s) typically occurs at least
  daily
– obtained information is shared across individuals
  (e.g., parents, teachers, students)
– the card is used to monitor
   • the effects of an intervention
   • as a component of an intervention
                          (Chafouleas, Riley-Tillman & McDougal, 2002)
                                                                         84
How are DBR data summarized?

  1
0.9                           Class on Time
0.8
0.7
0.6
0.5
0.4                           Completed
0.3                           Work
0.2
0.1
  0
                              Positive
                              Participation




                                        85
DBR Considerations
•   Measures perception of behavior
•   “3 to 7” not “he is a 7”
•   No absolutes in Social Behavior
•   Rater Effects




                                      86
Do we have a problem?

(Example of the PSM process for
           Behavior
Team
   Initiated
  Problem                              Identify
   Solving                            Problems

(TIPS) Model
               Evaluate and
                                                          Develop
                  Revise
                                                         Hypothesis
                Action Plan
                    .

                                       Collect
                                       and Use
                                        Data




                                                  Discuss and
                        Develop and                  Select
                         Implement                 Solutions
                        Action Plan
Problem Statements
• Write a “problem statement” that specifies the
  precise nature of the problem
• The more Ws (what, when, where, who, why)
  you incorporate into the problem
  statement, the more precise the problem
  statement will be
• The more precise the problem statement, the
  easier it will be to generate a solution that “fits”
  the problem
Problem-Solving Action Plan
         Write your
           Precise
          Problem
                                                                      Implementation and Evaluation
         Statement
             here.
   Precise Problem Statement,        Solution Actions (e.g.,                        Goal withTimeline,
     based on review of data        Prevent, Teach, Prompt,     Who?       By       Fidelity & Outcome
   (What, When, Where, Who,           Reward, Correction,                 When?     Measures, & Updates
             Why)                     Extinction, Safety)

 We have 8 students with 2-
 ODRs from Sept. to Nov. for             Re-teach
    primarily disrespectful                                    SS         11/1/10 JM will earn 80% of
                                   Responsibility lessons
   behaviors in the morning          Implement CICO                               his daily points on his
 reading class and afternoon         Reinforce on-task         JA         11/3/10
                                                                                  daily progress report
social studies class in order to    behaviors with DPR                            per day for 4/5 days per
    access peer and adult                                      All        11/3/10 week by 12/18/10
           attention.                                          teachers
Team
   Initiated
  Problem                              Identify
   Solving                            Problems

(TIPS) Model
               Evaluate and
                                                          Develop
                  Revise
                                                         Hypothesis
                Action Plan
                    .

                                       Collect
                                       and Use
                                        Data




                                                  Discuss and
                        Develop and                  Select
                         Implement                 Solutions
                        Action Plan
Solutions – Generic Strategies
•   Prevent – Remove or alter “trigger” for problem behavior
•   Define & Teach – Define behavioral expectations; provide
    demonstration/instruction in expected behavior (alternative to problem
    behavior
•   Reward/reinforce – The expected/alternative behavior when it occurs;
    prompt for it, as necessary
•   Withhold reward/reinforcement – For the problem behavior, if possible
    (“Extinction”)
•   Use non-rewarding/non-reinforcing corrective consequences – When
    problem behavior occurs
    Although not a “solution strategy,” Safety may need to be considered
    (i.e., procedures that may be required to decrease likelihood of injuries
    or property damage)
Trevor Test Middle School
    Problem statement: We have 8 students with 2-5 ODRs from Sept. to Nov. for primarily
disrespectful behaviors n the morning reading class and afternoon social studies class in order
                              to access peer and adult attention.
Prevent “Trigger”


Define & Teach              Reteach Respect lessons
                            Implement CICO to provide more frequent feedback and instruction
                            about respectful behaviors.
Reward/Reinforce            Reward students earning 80% of points on DPR

Withhold Reward

Corrective consequence

Other



Safety
Problem-Solving Action Plan

                                     Write
                                    Solutions                       Implementation and Evaluation
                                     here.
    Precise Problem Statement,     Solution Actions (e.g.,                        Goal withTimeline,
      based on review of data     Prevent, Teach, Prompt,     Who?       By       Fidelity & Outcome
    (What, When, Where, Who,        Reward, Correction,                 When?     Measures, & Updates
               Why)                 Extinction, Safety)


  JM has received 2 ODRs
during the first grading period    Re-teach Respect
                                                             SS         11/1/10 JM will earn 80% of
for disruptive behaviors in the         lessons
                                   Implement CICO                               his daily points on his
  classroom during reading                                                      daily progress report
     possibly motivated by        Reinforce respectful       JA         11/3/10
                                  behaviors with DPR                            per day for 4/5 days per
           attention.
                                                             All        11/3/10 week by 12/18/10
                                                             teachers
Team
   Initiated
  Problem                              Identify
   Solving                            Problems

(TIPS) Model
               Evaluate and
                                                          Develop
                  Revise
                                                         Hypothesis
                Action Plan
                    .

                                       Collect
                                       and Use
                                        Data




                                                  Discuss and
                        Develop and                  Select
                         Implement                 Solutions
                        Action Plan
Problem-Solving Action Plan                                                             Documen
                                                                Document
                                                                                               t
                                                              Implementatio
                                                                                            Goal
                                                                 n here.
                                                                                           here.
                                                                     Implementation and Evaluation

    Precise Problem Statement,      Solution Actions (e.g.,                         Goal withTimeline,
      based on review of data      Prevent, Teach, Prompt,     Who?        By       Fidelity & Outcome
    (What, When, Where, Who,         Reward, Correction,                  When?     Measures, & Updates
               Why)                  Extinction, Safety)


  JM has received 2 ODRs
during the first grading period         Re-teach
                                                              SS          11/1/10 All 8 students will earn
for disruptive behaviors in the   Responsibility lessons
                                    Implement CICO                                80% of daily points on
  classroom during reading                                                        their daily progress
     possibly motivated by          Reinforce on-task         JA (cico)   11/3/10
                                   behaviors with DPR                             report per day for 4/5
           attention.
                                                              All         11/3/10 days per week by
                                                              teachers            12/18/10
Team
   Initiated
  Problem                              Identify
   Solving                            Problems

(TIPS) Model
               Evaluate and
                                                          Develop
                  Revise
                                                         Hypothesis
                Action Plan
                    .

                                       Collect
                                       and Use
                                        Data




                                                  Discuss and
                        Develop and                  Select
                         Implement                 Solutions
                        Action Plan
CICO Avg Points Per Day
100


90


80


70


60


50
                                                CICO Avg Points Per Day

40


30


20


10


 0
      1   2   3    4      5      6      7   8
Problem-Solving Action Plan
                                                                                            Evaluate
                                                                                             here.
                                                                       Implementation and Evaluation

         Precise Problem                Solution Actions                              Goal withTimeline,
  Statement, based on review of   (e.g., Prevent, Teach, Prom    Who?       By        Fidelity & Outcome
               data               pt, Reward, Correction, Ext              When?      Measures, & Updates
  (What, When, Where, Who, W             inction, Safety)
               hy)

  JM has received 2 ODRs                                                                         11/1
during the first grading period         Re-teach
                                                                SS         11/1/10   JM willstudents are
                                                                                            5 earn 80% of
for disruptive behaviors in the   Responsibility lessons
                                    Implement CICO                                   his meeting 80%on his
                                                                                         daily points goals
  classroom during reading                                                           dailyconsistently and
                                                                                           progress report
     possibly motivated by          Reinforce on-task           JA         11/3/10       might benefit from
                                   behaviors with DPR                                permaintenancedays per
                                                                                         day for 4/5 plans.
           attention.                                                                week by 12/18/10 are
                                                                All        11/3/10       Three students
                                                                teachers               not making progress.
                                                                                         Consider modifying
                                                                                         plan and/or adding
                                                                                              additional
                                                                                            interventions.
Problem Solving Practice
• Use your disciplinary data to practice the
  problem solving process.
• Use the TIPS problem solving worksheet
  to assist you with the process.
Implementation Inventory
• Evaluates all three levels of
  implementation
• Considers Systems, Data, and Practices
• Goal is 80% in each area
• Use this evaluation to continue to develop
  and strengthen all three levels of your
  problem solving model.


                                           101
Are we done YET??
• Using your Action Plan document
  complete the section on Behavior Tier 2.

• Complete the evaluation.

• Thank you!!!



                                             102

Psm behavior tier 2 8212

  • 1.
    Problem Solving Trainingfor Behavior Tier 2 Secondary Interventions 1
  • 2.
    Overview • Data Decision Rules • Behavior Basics • Data Tools • Classroom Implementation • Targeted Social Skill Instruction • Check In- Check Out 2
  • 3.
    Expectations • Be Responsible – Return promptly from breaks – Be an active participant • Be Respectful – Turn off cell phone ringers – Listen attentively to others • Be Kind – Participate in activities – Listen and respond appropriately to others‟ ideas
  • 4.
    Attention Signal • Trainerwill raise his/her hand • Participants will raise their hand and wait quietly
  • 5.
    Group Activity • Createa picture or visually document to describe where your school is with Problem Solving Implementation. – Accomplishments – Challenges 5
  • 6.
    Core – Tier1 GOAL: 100% of students achieve at high levels Tier I: Begins with clear goals: 1.What do we expect all students to know, understand and do as a result of our instruction? 2.How will we know if these goals are met? 3.How will we respond when students do not meet the goals with initial instruction? 4.How will we respond when some students have already met the goals? (Batsche, 2010) 6
  • 7.
    Questions your teamneeds to consider at Tier 1… – What types of Behavioral Needs are not being addressed by our Behavior Core at an effectiveness rate of 80%? – What data do we need to look at to determine this?
  • 8.
    Supplemental – TierII < 20% of student Core + Supplemental To Achieve Benchmarks 1.Where are the students performing now? 2.Where do we want them to be? 3.How long do we have to get them there? 4.How much do they have to grow per year/month to get there? 5.What resources will move them at that rate? 6.How will we monitor the growth of students receiving supplemental instruction? (Batsche, 2010) 8
  • 9.
    Questions your teamneeds to consider at Tier 2… • What types of Behavioral Needs are occurring for 10-15% of your population? • What additional supports are needed to ensure success for students not responding to the core? • What data are needed to respond to the questions above?
  • 10.
    Team Initiated ProblemSolving (TIPS) Model 10
  • 11.
  • 12.
    WHO is appropriate for Secondary interventions? • Universal Behavior Screening Data • 2-5 office referrals
  • 13.
    How can weuse data? • Can be used by teams to determine set points where students will be referred for additional support • Individual schools must determine the timeframes for data decisions (2 – 5 ODRs per 9 weeks)
  • 14.
    Data Decision RulesExamples... 6 or more ODR referrals Tertiary Prevention: 2-5 ODR Referrals Specialized Individualized Secondary Prevention ~5% Systems for Students with Specialized Group High Risk Behavior Systems for Students with At Risk Behavior ~15% Other data decision rules: -# referrals -# minor incident referrals 0-1 ODR Referral -absences -teacher concern Primary Prevention -behavior screening results School wide and Classroomwide Systems for All Students, Staff, & Settings ~ 80% of Students
  • 15.
    Data Decision RuleExamples Continued… • Any student that is absent more than 3 days in one month (or one 4 week period) will be referred for intervention • Any student who receives 2 or more ODRs within a 9-week period will be referred for intervention • Any student who fails one or more classes will be invited to join a small group related to classroom success
  • 16.
    Using ODRs toevaluate your Workbook pg. 2 continuum of supports IF... FOCUS ON...  More than 40% of students receive one or more office referrals  More than 2.5 office referrals per student School Wide System  More than 35% of office referrals come from non-classroom settings  More than 15% of students referred from non-classroom settings Non-Classroom System  More than 60% of office referrals come from the classroom  50% or more of office referrals come from less than 10% of classrooms Classroom Systems  More than 10-15 students receive 5 or more office referrals Targeted Group Interventions / Classroom Systems  Less than 10 students with 10 or more office referrals  Less than 10 students continue rate of referrals after receiving targeted group settings Individual Student Systems  Small number of students destabilizing overall functioning of school
  • 17.
    Team Time • Discussand document your data decision rules. Visit the PSM wiki •Click on pages/files (right tab) •Look for Data decision team planning, then select download
  • 18.
  • 19.
    To correctly match appropriateinterventions to problem behaviors, teams will rely on the science of behavior.
  • 20.
    TIPS – Step1 Identify the Problem 20
  • 21.
    How do weidentify the problem? DATA COLLECTION & TOOLS 21
  • 22.
    Measurable or Not? Not Measurable Measurable oppositional lazy talking out swearing inattentive out of area defiant on task rude bothering fighting
  • 23.
    Objective Descriptors Objective Subjective Talking during seatwork Disobedient Seldom Repeatedly Passing notes Hurrying through work Once or twice a week Five times each day Leaning back in chair Sometimes Bothering a neighbor Continuously Every ten minutes Bizarre Tapping pencil on desk Twice each period
  • 24.
    Data Considerations: Clear Definition of Problem Behavior The ―Stranger Test‖ •Is the description of the behavior clearly defined? •Would a stranger’s description match yours? •If a stranger read your description, would they be able to identify the problem behavior? Developed by the Behavior Specialist Team of Wake County Public Schools
  • 25.
    Data Considerations: Data to Collect How often does How the behavior extreme Frequency occur? is it? Intensity Duration How long Under what Context does it circumstances last? does it occur? Developed by the Behavior Specialist Team of Wake County Public Schools
  • 26.
    Data Collection Strategies •What is already collected? – Anecdotal notes by teacher – Office referrals – Disciplinary actions • What else can be collected? – Products from Consequences – Behavior Contracts – Checklists – DBRs – Direct Observation – Interviews
  • 27.
    Direct Assessment –Frequency Counts Behavior Counting Name ____Shamel ____ Week of __Nov 5, 200X______ Behavior to be counted ____Negative Comments to Peers: (Get out of my face. ) Mon. Tue. Wed. Thurs. Fri. Total Arrival IIII IIIII II II IIIII IIIII I 40 IIIII I Math I I I 3 Science II I III IIII I 11 Art IIII IIIII IIIII III IIIII IIII I 24 Reading I II III 6
  • 28.
    Direct Assessment –Duration Recording Record the elapsed time, usually in minutes, from onset to conclusion of target behavior. Be sure to indicate the date, and the activity in which the student was engaged when the target behavior began to escalate. Student Name: ___Shamel __ Week of / Day : __Nov 15, 200X____ Target Behavior: Tantrum (screams, lays on floor, throws items) Transition Large Group Small Group Individual Work Read Aloud Read Silently In Crowds Library Specials Specific Subject Behavior Incident Briefly describe, making sure to note date, time, and any circumstances you think noteworthy. #1 9:45-10:15, Mon, Nov 15 Group was doing read aloud #2 9:35-10:15, Tue, Nov 16 Went to an assembly in the gym #3 9:28-10:05, Fri, Nov 19 #3 Oral vocabulary test
  • 29.
    Behavior • What isthe challenging behavior? • What can you observe? – What does it look or sound like? • Prioritize • Choose one 29
  • 30.
    30 Behavior 25 20 # of incidents 15 10 5 0 refusing to cursing peers Leaving assigned participate area 30
  • 31.
    Setting Events • Whatenvironmental, personal, situational or daily events impact the behavior? – Eating/Sleeping routines – Medical/Physical problems – Familial and staff interactions • Do not immediately precede problem behavior 31
  • 32.
    Setting Events Setting Event 18 16 14 12 # of incidents 10 8 6 4 2 0 Exhibits/reports sickness No breakfast Missed the bus Visit with mom 32
  • 33.
    Antecedent • What happensimmediately before the behavior? • Predicts problem behavior • When, Where, With whom, Activity – Time of day – Physical Setting – People present – Types of interactions (demands, directives, etc.) 33
  • 34.
    Antecedent 25 20 15 10 5 0 Reading Math Social Specials Small Direct Studies Group Instr 34
  • 35.
    Consequence • What happensimmediately after the behavior? • Gives student a reason to repeat the problem behavior • Not related to punishment 35
  • 36.
    Consequence: Pink=Attention Maintained; Purple= Escape 45 40 35 Redirection Calling name 30 Outisde conference # of incidents 25 Reminder 20 Ignore Time-out 15 10 5 0 Redirection Calling Outisde Reminder Ignore Time-out name conference 36
  • 37.
    Function … • Peoplebehave for a reason - we call this “function” • Function: • Does he/she get something? • Tangibles, attention, stimulation, people, etc. • Does he/she avoid or escape something? • People, activities, embarrassment, tasks, etc. 37
  • 38.
    Only Two BasicFunctions Problem Behavior Escape/ Obtain/Get Avoid Something Something Stimulation/ Tangible/ Social Sensory Activity from Horner & Adult Peer Sugai at www.pbis.org
  • 39.
    TIPS – Step2 Develop Hypothesis 39
  • 40.
    Hypothesis Statements Information about the problem behavior is used to write a hypothesis statement that helps us predict when the problem behavior is likely to occur and the function of that behavior. 40
  • 41.
    Hypothesis Statements When Estes is ___________ and __________ (happens), he where/setting context/antecedent typically responds by _________ to gain/avoid __________. behavior function Hypothesis: When Estes is in language arts and the teacher is providing direct instruction he typically responds by making verbal noises (ex. Burping) to access peer and teacher attention. 41
  • 42.
    Activity http://www.sonoma.edu/cihs/classroom/mod_3/lesson1.html http://www.sonoma.edu/cihs/classroom/mod_3/lesson1.html Write a hypothesis statement about http://www.sonoma.edu/cihs/classroom/mod_3/lesson1.html http://www.sonoma.edu/cihs/classroom/mod_3/lesson1.html Robert‟s behavior 42
  • 43.
    Identifying the functionhelps us : • Choose an appropriate intervention – Will this intervention meet the functional need? • Choose an appropriate replacement behavior – Alternative behavior taught to the student – What you want the student to do instead – Must meet functional need 43
  • 44.
    Which reinforcement wouldbe most effective: a behavior plan that gives student lunch with the teacher or a “drop an assignment” pass? 45 40 35 30 Redirection # of incidents 25 Calling name Outisde conference 20 Reminder Ignore Time-out 15 10 5 0 Redirection Calling Outisde Reminder Ignore Time-out 44 name conference
  • 45.
    TIPS – Step3 Discuss and select Solutions 45
  • 46.
    Some Secondary Solutions… -SmallGroup Social Skills Instruction -Check In/Check Out (CICO or BEP)
  • 47.
  • 48.
    Students learn appropriate behaviorin the same way a child who doesn’t know how to read learns to read— through instruction, practice, feedback, and encouragement.
  • 49.
    Teaching Behavior • Inappropriatebehavior is viewed as a skill deficit • Social skills training teaches students a process or strategy to resolve problems. • Teaching behavior is used when a student needs to replace problem behavior with a more desirable behavior.
  • 50.
    Two Types ofSocial Skill Deficits • Skill deficits (cannot do) – Direct teaching approach • Coaching, modeling, behavior rehearsal • Performance deficits (will not do) – Incentive-based management approach • Prompting, cuing, reinforcement • Prompted social initiations • Home and school rewards • Individual and group contingencies
  • 51.
    Assessment of SocialSkills • Skill based deficit – Provide strong incentive to observe if student can perform under such conditions.
  • 52.
    Assessment of SocialSkills • Performance based deficit – Motivational deficit • Observe if student performs skill following introduction of motivational strategy. • motivation=value*belief in ability*get reward promised (Vroom, 1964) – Discrimination deficit • Student frequently performs skill, but fails to perform under specific circumstances. • Oblivious to social cues or social demands of situation.
  • 53.
    Social Skills Instruction •Direct instruction – Skill based approach • Social problem solving – Strategy based approach • Opportunistic teaching (not enough alone) – Prompt students who have missed an opportunity to practice a skill – Provide correction when skill is incorrectly or inappropriately demonstrated – Debrief when student uses inappropriate behavior in place of appropriate social skill
  • 54.
    To effectively teach socialskills you must ALWAYS determine what you want the student to do INSTEAD
  • 55.
    Social Skill Areas • Cooperation skills • Assertion skills • Friendship skills • Empathy skills • Self-control skills • School and classroom skills
  • 56.
    Social Skills Instructionfor Small Groups • Select & group students with similar needs • Determine staff responsible • Determine best time for instruction • Select curricula & write lessons • Communicate with teacher and parents • Evaluate effectiveness
  • 57.
    Social Skills Instructionfor Small Groups • Select & group students with similar needs – Type of problem behavior – Intensity of problem behavior – Age/Developmental Level – Gender – Develop Group Behavior Management Plan
  • 58.
    Social Skills Instructionfor Small Groups • Determine staff responsible – Consider size of group and type of problem behavior when assigning staff to (co) lead • Determine best time for instruction – Lunchtime, After/Before School, Rotating Schedule, intervention block
  • 59.
    Social Skills Instructionfor Small Groups Workbook Pg, 8 • Select curricula & write lessons – Consider students‟ developmental level – Commercial curricula, online lessons, or custom lessons – Materials needed – Meeting space requirements/limitations Tell, Show. Practice, Assess and Repeat
  • 60.
    Generalization Strategies • Providea range of useful skill variations. • Teach in the targeted setting. • When teaching, include peers the target student is likely to encounter in the problem setting. • Use a number of adults when teaching. • Continue teaching for a sufficient amount of time.
  • 61.
    Social Skills Instructionfor Small Groups • Communicate with teacher and parents – Written parent permission best practice – Determine how teacher(s)/parent(s) can encourage/participate (homework)
  • 62.
    Social Skills Instructionfor Small Groups • Evaluate effectiveness – Pre/Post Data Comparison – Teacher/Parent Feedback – Student Assessment
  • 63.
  • 64.
  • 65.
    Team Time • Usingyour ODR data determine which social skills lessons and groups are most needed at your school, list • when will lessons be taught • how will team ensure instruction is occurring • Evidence of lessons • Possible reinforcers for participation
  • 66.
    Assessing Social Skillslessons Visit the PSM wiki •Click on pages/files (right tab) •Look for Social Skills Observation Checklist, then select download
  • 67.
  • 68.
    CICO Features: • Research-based interventioneffective with 75% of students who participate • Students identified and receive support within a week • Check-in and check-out daily with an adult at school • Regular feedback and reinforcement from teachers • Family component • Daily performance data used to evaluate progress
  • 69.
    10 Critical Featuresof CICO/BEP 1. Linked directly to school-wide expectations and/or academic goals 2. Continuously available for student participation 3. Implemented within 3 school days of determination that the student should receive the intervention 4. Can be modified based on assessment and/or outcome data 5. Includes structured prompts for „what to do‟ in relevant situations
  • 70.
    10 Critical Featuresof CICO/BEP continued… 6. Results in student receiving positive feedback from staff 7. Includes a school-home communication exchange system at least weekly 8. Orientation materials provide information for a student to get started on the intervention 9. Orientation materials provide information for staff/ subs./ volunteers who have students using the intervention 10. Opportunities to practice new skills are provided daily
  • 71.
  • 72.
    Why does theCICO work? • Improved structure • Prompts throughout the day for correct behavior • System for linking student with at least one adult • Increase in contingent feedback • Feedback occurs more often and is tied to student behavior • Inappropriate behavior is less likely to be rewarded • Elevated reward for appropriate behavior • Adult and peer attention • Linking school and home support • Organized to morph into a self-management system
  • 73.
    Is My SchoolReady to Implement a CICO System? • School-wide system of behavior support in place (SET Score 80% or higher) • Staff buy-in for implementation of the CICO • Administrative support – Time & money allocated • No major changes in school climate – e.g. teacher strikes, administrative turnover, major changes in funding • CICO implementation a top priority
  • 74.
    How Do YouBuild Student and Staff “buy-in” for the CICO? • Give CICO program a high profile in your school • Promote CICO as positive support not punishment • Collaboratively involve referring teachers in CICO process • Provide regular feedback to staff, students, and families
  • 75.
    Is It ReallyResistance For Intervention? Before Implementing a Secondary Intervention, You Must Ask: Is the Student Receiving an Adequate “DOSE” of the Universal Intervention?
  • 76.
    Team Time Use yourworkbook to begin planning for Social Skills and CICO implementation.
  • 77.
    TIPS – Step4 Develop and Implement Action Plan 77
  • 78.
    Creating a BehaviorGoal • Clear goal needs to be set that can be evaluated using data • Goals can be measured in the following ways: – % reduction – Absolute reduction – Satisfaction level 78
  • 79.
    Tips for WritingBehavior Goals • Use the baseline data as a guide for where you want behavior to go • Intervention must match the goal statement • Achievable and age appropriate (in comparison to peers) • Must include a time frame 79
  • 80.
    Example Behavior Goal _______________will (increase or decrease) (Student Name) (select one) _________________________ by or to _________________ (Behavior) (% or number) by _______________. (date/timeframe) 80
  • 81.
    3 Questions thatAction Plan must Answer • What are you doing? • Who is doing it? • By when? 81
  • 82.
    TIPS – Step5 Evaluate and Revise Action Plan 82
  • 83.
    How do weProgress Monitor for Behavior? DBRs • Daily Behavior Report = DBR • The DBR involves a brief rating of target behavior over a specified period of time • Additional examples at • http://www.interventioncentral.org/index.php/ tools/197-behavior-report-card-generator 83
  • 84.
    Characteristics of DBR TheDBR involves a brief rating of target behavior over a specified period of time – behavior(s) is specified – rating of the behavior(s) typically occurs at least daily – obtained information is shared across individuals (e.g., parents, teachers, students) – the card is used to monitor • the effects of an intervention • as a component of an intervention (Chafouleas, Riley-Tillman & McDougal, 2002) 84
  • 85.
    How are DBRdata summarized? 1 0.9 Class on Time 0.8 0.7 0.6 0.5 0.4 Completed 0.3 Work 0.2 0.1 0 Positive Participation 85
  • 86.
    DBR Considerations • Measures perception of behavior • “3 to 7” not “he is a 7” • No absolutes in Social Behavior • Rater Effects 86
  • 87.
    Do we havea problem? (Example of the PSM process for Behavior
  • 88.
    Team Initiated Problem Identify Solving Problems (TIPS) Model Evaluate and Develop Revise Hypothesis Action Plan . Collect and Use Data Discuss and Develop and Select Implement Solutions Action Plan
  • 89.
    Problem Statements • Writea “problem statement” that specifies the precise nature of the problem • The more Ws (what, when, where, who, why) you incorporate into the problem statement, the more precise the problem statement will be • The more precise the problem statement, the easier it will be to generate a solution that “fits” the problem
  • 90.
    Problem-Solving Action Plan Write your Precise Problem Implementation and Evaluation Statement here. Precise Problem Statement, Solution Actions (e.g., Goal withTimeline, based on review of data Prevent, Teach, Prompt, Who? By Fidelity & Outcome (What, When, Where, Who, Reward, Correction, When? Measures, & Updates Why) Extinction, Safety) We have 8 students with 2- ODRs from Sept. to Nov. for Re-teach primarily disrespectful SS 11/1/10 JM will earn 80% of Responsibility lessons behaviors in the morning Implement CICO his daily points on his reading class and afternoon Reinforce on-task JA 11/3/10 daily progress report social studies class in order to behaviors with DPR per day for 4/5 days per access peer and adult All 11/3/10 week by 12/18/10 attention. teachers
  • 91.
    Team Initiated Problem Identify Solving Problems (TIPS) Model Evaluate and Develop Revise Hypothesis Action Plan . Collect and Use Data Discuss and Develop and Select Implement Solutions Action Plan
  • 92.
    Solutions – GenericStrategies • Prevent – Remove or alter “trigger” for problem behavior • Define & Teach – Define behavioral expectations; provide demonstration/instruction in expected behavior (alternative to problem behavior • Reward/reinforce – The expected/alternative behavior when it occurs; prompt for it, as necessary • Withhold reward/reinforcement – For the problem behavior, if possible (“Extinction”) • Use non-rewarding/non-reinforcing corrective consequences – When problem behavior occurs Although not a “solution strategy,” Safety may need to be considered (i.e., procedures that may be required to decrease likelihood of injuries or property damage)
  • 93.
    Trevor Test MiddleSchool Problem statement: We have 8 students with 2-5 ODRs from Sept. to Nov. for primarily disrespectful behaviors n the morning reading class and afternoon social studies class in order to access peer and adult attention. Prevent “Trigger” Define & Teach Reteach Respect lessons Implement CICO to provide more frequent feedback and instruction about respectful behaviors. Reward/Reinforce Reward students earning 80% of points on DPR Withhold Reward Corrective consequence Other Safety
  • 94.
    Problem-Solving Action Plan Write Solutions Implementation and Evaluation here. Precise Problem Statement, Solution Actions (e.g., Goal withTimeline, based on review of data Prevent, Teach, Prompt, Who? By Fidelity & Outcome (What, When, Where, Who, Reward, Correction, When? Measures, & Updates Why) Extinction, Safety) JM has received 2 ODRs during the first grading period Re-teach Respect SS 11/1/10 JM will earn 80% of for disruptive behaviors in the lessons Implement CICO his daily points on his classroom during reading daily progress report possibly motivated by Reinforce respectful JA 11/3/10 behaviors with DPR per day for 4/5 days per attention. All 11/3/10 week by 12/18/10 teachers
  • 95.
    Team Initiated Problem Identify Solving Problems (TIPS) Model Evaluate and Develop Revise Hypothesis Action Plan . Collect and Use Data Discuss and Develop and Select Implement Solutions Action Plan
  • 96.
    Problem-Solving Action Plan Documen Document t Implementatio Goal n here. here. Implementation and Evaluation Precise Problem Statement, Solution Actions (e.g., Goal withTimeline, based on review of data Prevent, Teach, Prompt, Who? By Fidelity & Outcome (What, When, Where, Who, Reward, Correction, When? Measures, & Updates Why) Extinction, Safety) JM has received 2 ODRs during the first grading period Re-teach SS 11/1/10 All 8 students will earn for disruptive behaviors in the Responsibility lessons Implement CICO 80% of daily points on classroom during reading their daily progress possibly motivated by Reinforce on-task JA (cico) 11/3/10 behaviors with DPR report per day for 4/5 attention. All 11/3/10 days per week by teachers 12/18/10
  • 97.
    Team Initiated Problem Identify Solving Problems (TIPS) Model Evaluate and Develop Revise Hypothesis Action Plan . Collect and Use Data Discuss and Develop and Select Implement Solutions Action Plan
  • 98.
    CICO Avg PointsPer Day 100 90 80 70 60 50 CICO Avg Points Per Day 40 30 20 10 0 1 2 3 4 5 6 7 8
  • 99.
    Problem-Solving Action Plan Evaluate here. Implementation and Evaluation Precise Problem Solution Actions Goal withTimeline, Statement, based on review of (e.g., Prevent, Teach, Prom Who? By Fidelity & Outcome data pt, Reward, Correction, Ext When? Measures, & Updates (What, When, Where, Who, W inction, Safety) hy) JM has received 2 ODRs 11/1 during the first grading period Re-teach SS 11/1/10 JM willstudents are 5 earn 80% of for disruptive behaviors in the Responsibility lessons Implement CICO his meeting 80%on his daily points goals classroom during reading dailyconsistently and progress report possibly motivated by Reinforce on-task JA 11/3/10 might benefit from behaviors with DPR permaintenancedays per day for 4/5 plans. attention. week by 12/18/10 are All 11/3/10 Three students teachers not making progress. Consider modifying plan and/or adding additional interventions.
  • 100.
    Problem Solving Practice •Use your disciplinary data to practice the problem solving process. • Use the TIPS problem solving worksheet to assist you with the process.
  • 101.
    Implementation Inventory • Evaluatesall three levels of implementation • Considers Systems, Data, and Practices • Goal is 80% in each area • Use this evaluation to continue to develop and strengthen all three levels of your problem solving model. 101
  • 102.
    Are we doneYET?? • Using your Action Plan document complete the section on Behavior Tier 2. • Complete the evaluation. • Thank you!!! 102

Editor's Notes

  • #7 Primary prevention focuses on preventing the development of new cases of problem behaviors by focusing on all students and staff, across all settings. We expect that primary/school-wide/universal implementation will result in about 80% of students gaining the necessary behavioral and social skills necessary to be successful in school.Batsche, G.M. (August, 2010). We know what RtI is, now what do we do with it? Critical elements for successful implementation. Presented at the Response to Intervention (RtI) Summer 2010 Institute: Building a Context for Excellence, Macomb ISD, Clinton Township, MI. Retrieved from http://www.misd.net/rti/6A%20‑Batsche%20Critical%20Elements%20for%20Success%20keynote.pdf
  • #8 Be sure to emphasize that Needs don’t just exist with at-risk students. AIG students needing to be challenged is a problem as well that needs to be addressed. The difference would be that you would not be completing paperwork to document as you would with at-risk population.
  • #9 Secondary prevention focuses on reducing the number of existing cases of problem behaviors by establishing efficient and rapid responses to problem behavior. Secondary prevention is only implemented after the successful implementation of S-W PBIS and should result in an additional 15% of students learning necessary skills.Batsche, G.M. (August, 2010). We know what RtI is, now what do we do with it? Critical elements for successful implementation. Presented at the Response to Intervention (RtI) Summer 2010 Institute: Building a Context for Excellence, Macomb ISD, Clinton Township, MI. Retrieved from http://www.misd.net/rti/6A%20‑Batsche%20Critical%20Elements%20for%20Success%20keynote.pdf
  • #10 Be sure to emphasize that Needs don’t just exist with at-risk students. AIG students needing to be challenged is a problem as well that needs to be addressed. The difference would be that you would not be completing paperwork to document as you would with at-risk population.
  • #13 Generally, students who would benefit from secondary supports demonstrate low-level problem behavior, have 2-5 office referrals, and demonstrate behavior across settings. (If behavior is in one location, it might be an issue with the environment, rather than the student.)
  • #28 Direct assessment is another tool that can be utilized to measure behaviors. This tool is a direct assessment of the frequency of the a behavior across settings and across time. So, looking at this data what can we tell about when Shamel has the most difficulty with negative comments to peers?
  • #29 Another form of direct assessment is a duration recording. This allows you to document the length of incidents for behaviors that might not occur frequently but last for a considerable amount of time, such as tantrums.
  • #30 Sometimes it can be difficult to focus on one behavior, as many students present a variety of challenging behaviors. It is important to prioritize which behavior is having the most significant impact on the student and select that particular behavior to begin the intervention process.
  • #31 This is an example of a students behavior, in which the student demonstrates several challenging behaviors. After some data collection, it is evident that the behavior the student demonstrates most often is leaving his assigned area. Considering the frequency is just one way to prioritize student behaviors. Remember to always address behaviors that are safety issues immediately with a crisis plan if necessary.
  • #32 Setting events are environmental, personal, situations, or daily events that impact student behavior. They may or may not immediately precede the behavior, but are none-the-less a factor associated with the particular behaviors the student demonstrates.
  • #33 This is an example of Setting Event data. We can see from this particular graph that having missed the bus or not having breakfast, which may be related issues, are common setting events associated with the behavioral challenges we observe.
  • #34 Predictors of the occurrence or non-occurrence of the problem behavior Typically occur immediately before the problem behaviorWhen, Where, With whom, ActivityTime of dayPhysical SettingPeople presentTypes of interactions (demands, directives, etc.)
  • #35 This is not an exhaustive list of antecedents, rather it is an example of data that can be collected.Often teachers will say “There is no pattern. The behavior happens all the time. It’s unpredictable.” It is important to know that it is extremely rare to see a behavior happen exclusively during one time period or one class or one activity. Rather, we tend to see the teacher is correct, the behavior does happen “all of the time,” however, when we collect the data we can see patterns emerge. Very often we can see one antecedent is more frequently associated with the behavior. While it is not 100% of the time, even accounting for only 20-30% of the time can help us know where to intervene. In this example, which antecedent is most often associated with the problem behavior we observe?
  • #36 When we are talking about functional based approaches to behavior, consequences do not refer to punishments that follow behaviors. Rather, they are any particular outcome that happens immediately after the behavior. They are responses that allow the student to access something or avoid something. Even things we might not immediately recognize as a consequence can be enough to encourage a student to continue demonstrating a particular behavior.
  • #37 This is an example of a graph containing the consequences a student experienced after demonstrating problem behavior. While calling a students name might not immediately seem like attention, it might be sufficient attention for that particular student. In this example, when the student demonstrated the behavior the teacher responded by calling the students name, which suggests the student is motivated by attention. Further, we can see the time-out response is relatively low, which suggests that the student is not trying to escape the classroom activities. So when ever you are collecting data about consequences be mindful of what each of the responses is either giving access to or helping a student escape.
  • #38 Behavior communicates needNeed is determined by observing what happens prior to and immediately after behaviorKids engage in behavior for two reasons: to get what they want or avoid what they don’t want.Their behavior is based on their learning history. The behavior has worked in the past.Remember, there is no universal reinforcing or aversive stimulus. What we may find aversive, many find reinforcing, thereby inadvertently reinforcing inappropriate behavior. This is why we MUST observe what happens prior to and immediately after the inappropriate behavior.
  • #41 Now that we have worked through the components of determining the function of the behavior, we need to write a statement that helps us make sense of the data. A hypothesis statement will help us to predict when the problem behavior is likely to occur and will guide our intervention and support efforts.
  • #42 A hypothesis statement has four parts: where, context/antecedent, behavior, and the proposed function.
  • #43 People engage in behaviors for a reason. When we understand functions we can try to guess what a person is trying to get or avoid. What is Robert trying to get or avoid?
  • #44 It is not possible to determine function of a student’s challenging behavior simply by describing the behaviorChoose an appropriate interventionConnect the FUNCTION with the interventionAsk: Will this intervention meet the functional need?Ex. If the function of the behavior is to access adult attention:Intervention should prevent access to adult attention for inappropriate behaviorsIntervention should provide access to adult attention for appropriate behaviorsChoose an appropriate replacement behaviorNew or alternative behavior taught to the student as a replacement option for the problem behavior.Key points:It is probably more efficient for the student to engage in the problem behaviorReplacement behavior must allow student access to same functional need but more efficiently
  • #45 Based on this data about consequences, if you were selecting an reinforcement component for a behavior plan, which reinforcement would be most effective?
  • #88 Time to define hypothesis. Why are the behaviors occurring? This leads to more solvable solutions.
  • #89 Ready for hypothesis and solution building
  • #90 The TIPS model provides a framework for developing solutions. There are five main areas for intervention, not including safety.
  • #91 Same problem, changing reinforcer to match hypothesis is good.
  • #92 Ready for hypothesis and solution building
  • #93 Ready for action planning