student life @ ctu
02   Information & Communication Technology defined

02   The CTU Career Campus

03   Why CTU?

04   Career Guidance

05   How do we C2U?

07   Certifications and Accreditations @ CTU

08   Our Passion: Develop ICT Professionals

09   IT Systems Support: CISCO Certified Network Professional

09   IT Technical Support: Professional

10   Graphic Design

10   Multimedia & Web Development

11   Computer Aided Draughting & Design

11   Computer Aided Draughting & Design 2nd Year

12   IT Systems Support: Microsoft Enterprise Administrator

12   Microsoft Specialised: Enterprise Administrator

13   IT Systems Developer: Microsoft Certified Professional

13   Microsoft Business Intelligence Developer

14   Project Management

14   Office Administration Executive

15   e-Marketing

15   QR Codes Page

16   Information Card

17   Consultation & Registration

17   Student Loans

18   Campus Details
information and communication technology defined
              A career in the Information Technology (IT) industry opens up an increasing world of opportunities. Career/Job opportunities for IT
              Candidates from entry level right through to professional level are increasing rapidly… great news for aspiring IT learners.

              The industry demands skills focused individuals with International Certifications.

              The IT job market is booming, this means with the right qualification and certification you will be equipped to grab the perfect entry level
              position. In applying for a job, one will need to have industry specific certifications that are dictated by the industry i.e. specific systems
              and technological needs like A+, N+, CCNA, CCNP or MCTS, MCITP, MCPD. The correct choice of training provider is crucial in obtaining
              these qualifications and certifications.
              Visit career website for more information:
              www.pnet.co.za | www.itweb.co.za | www.careerjunction.co.za | www.jobmail.co.za | www.jobs4u.co.za


              the CTU career campus



     •	 “To provide excellent facilitator - led training, in order to qualify learners on a National and
        International level, in the ICT sector, for the South African Job Market.”

     •	 “To develop ICT Professionals.”

              Become an ICT professional at CTU and start your exciting career in ICT; a fast moving dynamic environment.

              CTU Training Solutions is fully accredited by the ISETT SETA. The CTU Career Campus offers a variety of programmes preparing graduates
              for employment opportunities in the industry. In line with industry requirements, CTU Training Solutions (PTY) Ltd is fully accredited
              by the ISETT SETA and provisionally registered with the Department of Education as a Private Further Education and Training College,
              in terms of section 31 (3) of the Further Education and Training Colleges Act, 2006 (Act No. 16 of 2006) and Regulation 15(4)(b) of the
              Regulations for the Registration of Further Education and Training Institutions.

              The CTU Career Campus offers a variety of programmes with National Qualifications and International Certifications which develop
              skills and prepares the graduates for a future filled with exciting opportunities.

              Our facilitator-led programmes are developed and updated regularly according to new technological developments and market trends.
              Small classes ensure that a great deal of attention is given to each individual with emphasis on practical training.

              CTU developed a “Student Life @ CTU” programme managed by CTU Staff and the campus SRC (student representative council) with some
              activities executed on a national level, for example: Social responsibility programmes and projects with and for non-profit organisations.

              Our “Workplace experience programme” enables learners to become familiar with the corporate/working environment through various
              field trips and internship programmes hosted by participating corporate clients.


02
why ctu




              Accredited                                                                                                        Our programmes are                     HRD in IT @ CTU
                                                              HRD in IT @ CTU                 The demand for
   National qualifications approved                                                                                             in demand, relevant,                 A high percentage of our
       and accredited by SAQA                          Excellent earning potential for    Certified CTU graduates                                                   graduates are employed in
                                                                                                                               updated regularly and
           and ISETT SETA                                      IT graduates*                       is high                                                        the IT industry within weeks of
                                                                                                                                occupation focussed                         graduating *




                                                                                           Study Full time at the                  HRD in IT @ CTU                International Certifications
                                                            Small Classes                                                                                            increase employment
                                                                                           Career Campus or Part                  Work after one year or
    Facilitator - led training                        (each learner with his/her                                                                                   opportunities anywhere
                                                                                           Time at our Corporate                study for a 2nd year with
                                                           own computer)                                                                                            in South Africa or in the
                                                                                             Training Division                      specialisation *
                                                                                                                                                                             world




         HRD in IT @ CTU                                                                  National Qualifications &              Student Life @ CTU                  CTU is in the process
  We work closely with corporate                       Student loans available           International Certifications                                                 of developing our
                                                                                                                                Various campus activities,
      companies to provide                            (leading banks and other           Training Programme Approval by                                               programmes and
                                                                                                                             social responsibility projects are
   workplace experience and/
                                                            organisations)                the SA Institute of Draughting -       held during the year by             academic offering…
  or internships to our learners,                                                        Computer Aided Drawing Office                                               watch this space for more
                                                                                                                                      the campus SRC
   when and where available*                                                                          Practice                                                             information

                                                                                                                                                                                                 03
*Not CTU, Corporate clients or recruitment consultants can ever guarantee employment
career guidance
     Suppose you get it wrong?
     ONE in every THREE students drop out of university before completing their first year of study, meaning that the student will have spent
     R16-R35k (average tuition fees). Experts say that the majority of people are stuck in careers to which they are not suited.
                                                                                                                    Source: www.perfectcareers.co.za
     You can get it right!
     Choosing a career is becoming increasingly difficult every year and this is why the CTU Career Campus would like to make itself available
     to you for the purpose of assessing needs and answering any queries, thus enabling you to make the correct career choice.

     High Costs of wrong career choice...
     Most young people leave school with only a vague knowledge of employment opportunities and with little insight on the most appropriate
     career direction for their abilities, interests and personalities. A large number of school leavers receive no training at all beyond school
     and become virtually unemployable.

     The solution lies in proper career guidance and assessment at grade 11 level. This is standard in most first world countries, and would
     help alleviate much of this hardship and unnecessary expense. It could also play an important role in reducing the high unemployment
     rate. With the aid of modern technology and the use of Psychometric assessments, choosing the wrong career at an early age should be
     a thing of the past. But, somehow, this doesn’t always happen.

     One should however be aware that these assessments are not perfect and you should be careful before basing a career choice on the
     results produced. For a Psychometric assessment to be effective in career guidance and HR Development, it needs to:

     •   Combine ability, personality and interest in ways that can be made transparent for the end user
     •   Meet ethical and legislative requirements
     •   Be affordable, flexible and user friendly
     •   Provide input into possible career suitability based on realistic measures




                               You can write a career mapper assessment @ any CTU Career Campus.
                               Book with your Career Consultant today!!


                                           Visit Perfect Careers www.perfectcareers.co.za for more information.

     Book Career Mapper today!
     Career Mapper is a unique software based tool that supports an individual in making decisions about their preferred IT career path and helps
     them to plan what they need to do to achieve their goals. Career Mapper has been developed with input from experienced
     Career Advisors at Career decisions Ltd. and is based on a high quality occupational psychometric measure, Prevue ICES.

     Prevue is a highly efficient instrument which gathers information about an individual’s core abilities, interests and their
     personality. Developed by Prof. David Bartram and Dr. Pat Lindley, Prevue is a valid and reliable measure and is registered
     with the SA Health Professions Council. Make an informed career choice; let’s examine your skills, interest areas and career
     goals.
04
how do we c2u?
        Training Methodology
        The facilitator-led skills training enable our learners to have a thorough understanding of the programme material at all times. Our
        programmes focus on the practical approach of content and learners graduate with hands-on skills required within the IT industry,
        enabling them to function fully as IT or Business Professionals.
        Language Policy: English

        Our Study Material
        All programme material is included in the fee. CTU spends a considerable amount of time assessing and evaluating study materials. Tried
        and tested programme manuals are used and our alliance with registered vendors gives us access to original resources to choose from.

        Progress
        The purpose of the assessment is to inform learners of their learning progress and to enable facilitators to adjust their instruction to the
        needs of learners. Throughout the formative assessment process the results and progress of the learner will be continually discussed,
        reviewed and further development strategies will be implemented to improve learning programmes and instruction. Each learner will be
        issued with two academic transcripts during their year of study in order to monitor their progress.

        Workplace Experience Programme
        This programme includes field trips, corporate visits and internships during the year. This allows the learner the opportunity to gain a
        better understanding of the business environment in relation to their field of study.



NQF registered qualifications: National Certificates accredited by SAQA and ETQA’s ISETT SETA.

        Department of Education
        CTU Training Solutions is provisionally registered with the Department of Education as
        a Private Further Education and Training College, in terms of section 31 (3) of the Further Education and Training Colleges Act, 2006
        (Act No. 16 of 2006) and Regulation 15(4)(b) of the Regulations for the Registration of Further Education and Training Institutions.
        FET No: 2007/FEO/013.

        ISETT SETA
        All of the CTU Training Solutions branches have full accreditation with the ISETT SETA. The ISETT SETA is a training accreditation body
        committed to skills development in the ICT (Information and Communications Technology) sector. ISETT SETA accreditation means
        that CTU complies with specific regulations ensuring that our training programmes are nationally recognised and comply with the
        Skills Development legislation. As a SETA (Sector Education and Training Authority) ISETT SETA is a body established under the Skills
        Development Act (RSA,1998c) whose main purpose is to contribute to the improvement of skills in South Africa. ACC 2006/07/186.
        Website: www.isett.org.za



issued by various organisations through the completion of International Exams.


                                                                                                                                                 05
certifications and accreditations @ CTU

CTU was awarded the Learning Solutions Partner Network Award in 2010.
Gold Certified Partners represent the highest level of competence and expertise with Microsoft technologies, and have the closest working relationship with Microsoft.
The Value of Certification: CTU Training Solutions is the top Microsoft provider in terms of the International Certifications in SA and MEA (Middle East and Africa).

Why Certify with Microsoft
Microsoft Certifications and the learning resources that you’ll use to prepare for exams are dynamic, and built around the common (and not so common) challenges that you encounter daily.
The exams are tested with working IT Professionals to ensure that they are relevant, accurate, and reflect the skills and capabilities you need to be more productive on the job. Microsoft Certifications are
performance-based, therefore it can have a significant impact on the way you work. In fact, certifications have been proven to increase an individual’s efficiency in their job. Studies show that in order to
achieve “top tier” performance, an organization must ensure that 45–65% of their teams receive Microsoft Certification.

Achieving Microsoft Certifications will help your team work better together by providing a common framework of problem-solving Microsoft technology skills. Microsoft Certification validates the skills
you use every day. It aids your technology problem-solving and helps improve your performance on the job. Certification exams are continually measured and updated to reflect the latest technology
solutions and support your professional success - today, tomorrow, and beyond. Source: www.microsoftlearning.com

CISCO

                                   Cisco is an international corporation that designs and sells consumer electronics, networking and communications technology and services. Cisco Systems also
                                   sponsors a line of IT Professional certifications for Cisco products. CCNA Certification: Cisco Certified Network Associate (CCNA®) validates the ability to install, configure,
                                   operate, and troubleshoot medium-size route and switched networks, including implementation and verification of connections to remote sites in a WAN. CCNP
                                   Certification: Cisco Certified Network Professional (CCNP®) validates the ability to plan, implement, verify and troubleshoot local and wide-area enterprise networks and
                                   work collaboratively with specialists on advanced security, voice, wireless and video solutions.


ISETT SETA

               All of the CTU Training Solutions branches have full accreditation with the ISETT SETA. The ISETT SETA is a training accreditation body committed to skills development in the ICT (Information
               and Communications Technology) sector. ISETT SETA accreditation means that CTU complies with specific regulations ensuring that our training programmes are nationally recognised
               and comply with the Skills Development legislation. As a SETA (Sector Education and Training Authority) ISETT SETA is a body established under the Skills Development Act (RSA,1998c)
               whose main purpose is to contribute to the improvement of skills in South Africa. ACC 2006/07/186. Website: www.isett.org.za


Department of Education

               CTU Training Solutions is provisionally registered with the Department of Education as a Private Further Education and Training College, in terms of section 31 (3) of the Further Education
               and Training Colleges Act, 2006 (Act No. 16 of 2006) and Regulation 15(4)(b) of the Regulations for the Registration of Further Education and Training Institutions. FET No: 2007/FEO/013.


Certify with CIW

               CIW comprises the world’s fastest growing vendor-neutral Web technology education and certification programs for professionals. More than a certification or a curriculum publisher, CIW
               has become the educational standard adopted by academic institutions, governments and businesses worldwide for Web technology skills. CIW includes applications and competencies,
               but our core curriculum focuses on the foundational standards of the Web, including Web design, Web development and Web security. CIW certifications verify that certified individuals
               have the skills necessary to master a technology-driven world. In today’s competitive workplace, certified CIW professionals have proven abilities that set them apart from other Web
06
               professionals.
Comptia Certification

             Expand your resume with networking credentials ... Your CompTIA A+ certification lets employers know you have a broad base of knowledge and competency in core hardware
             and operating system technologies including installation, configuration, diagnosing, preventive maintenance and basic networking. Now, you can enhance your skills and make
             your résumé stand out even more by earning your CompTIA Network+ certification. CompTIA A+ is a prerequisite for this higher-level certification, which is held by more than
             160,000 people worldwide. CompTIA Network+ is among the certifications most frequently recommended by community colleges and training organizations to those pursuing
             a career in IT. It is also incorporated into certification tracks by leading hardware and software suppliers - for example, Microsoft includes CompTIA Network+ as an elective in its
             MCSA certification track. CompTIA Network+ certification is proof of your professional achievement, providing you with:
             • A viable career path • Enhanced job opportunities • Proof of professional achievement • Foundational knowledge for advanced certifications

Give yourself a promotion. Become Adobe Certified

            It can be difficult to get ahead in today’s market. To stand out and be noticed. More than ever, you need a clear and focused way to tell the world
            about your expertise. The solution? Become Adobe Certified. Adobe certification is an industry standard of excellence, and it’s the absolute
            best way to communicate your proficiency in leading products from Adobe.                             As an individual, an Adobe Certified credential allows you to:
            • Differentiate yourself from competitors • Get your résumé noticed • Attract and win new business • Gain recognition from your employer • Leverage the power of the Adobe brand

SAID
            The South African Institute of Draughting (SAID) is an independent, professional body established in 1953. The Institute’s objective is to improve the academic and technical
            qualifications of draughtspersons in all disciplines of technical drawing and design. It is proud to be recognised as a Voluntary Association of both the South African Council for the
            Architectural Profession (SACAP) and the Engineering Council of South Africa (ECSA).

Autodesk

            Autodesk certifications are a reliable validation of your skills and knowledge and can lead to accelerated professional development, improved productivity and enhanced credibility
            in your field. Each Autodesk certification signifies the experience and expertise of design professionals around the world.


Pearson VUE

            VUE has the approval of the Sylvan corporation to deliver International Computer Based Certification Testing on behalf of Sylvan clients. CTU Training Solutions is an authorised VUE
            Testing Centre.


PASTEL Accounting

            Pastel is a leading global developer of accounting, payroll and related software, offering a comprehensive range of solutions for all types of small and medium sized businesses.


Prometric

            We are a Platinum Provider. Prometric is the recognised global leader in technology enabled testing and assessment services.

                                                                                                                                                                                                07
our passion is to develop ICT Professionals




                                                                                                                                                           No career is a straight climb to the
                                                                                                                                                           top. In today’s highly competitive job
                                                                                                                                                           market, companies are looking for
                                                                                                                                                           pre-trained employees.
                                                                                                                                                           To get to that next level, sometimes
                                                                                                                                                           you need a boost: enrol for the 1 year
                                                                                                                                                           programmes e-marketing or project
                                                                                                                                                           management or add them as a 2nd or
                                                                                                                                                           3rd year career booster to any of our
                                                                                                                                                           other programmes




08
                                              Please note: The content of this prospectus is subject to change without notification due to market trends in the IT industry, legislation and/or programme version updates. The CTU Career Campus a divisio
more information available @ open day/s or visit your nearest campus

                                                                                                                           it system support: cisco certified network professional
                                                                                                                           Cisco is an international corporation that designs and sells consumer electronics, networking and communications technology and services. Cisco
                                                                                                                           Systems also sponsors a line of IT Professional certifications for Cisco products. About the Certifications:
                                                                                                                           CCNA Certification: Cisco Certified Network Associate (CCNA®) validates the ability to install, configure, operate, and troubleshoot medium-size route and switched networks,
                                                                                                                           including implementation and verification of connections to remote sites in a WAN. CCNA curriculum includes basic mitigation of security threats, introduction to wireless
                                                                                                                           networking concepts and terminology, and performance-based skills. This new curriculum also includes (but is not limited to) the use of these protocols: IP, Enhanced Interior
                                                                                                                           Gateway Routing Protocol (EIGRP), Serial Line Interface Protocol Frame Relay, Routing Information Protocol Version 2 (RIPv2),VLANs, Ethernet, access control lists (ACLs).
                                                                                                                           CCNP Certification: Cisco Certified Network Professional (CCNP®) validates the ability to plan, implement, verify and troubleshoot local and wide-area enterprise networks and
                                                                                                                           work collaboratively with specialists on advanced security, voice, wireless and video solutions. The CCNP certification is appropriate for those with at least one year of networking
                                                                                                                           experience who are ready to advance their skills and work independently on complex network solutions. Those who achieve CCNP have demonstrated the skills required in
                                                                                                                           enterprise roles such as network technician, support engineer, systems engineer or network engineer. http://www.cisco.com

                                                                                                                           subjects: Windows 7, CompTIA Network +, CompTIA CTP+, Customer Service,
                                                                                                                                     CCNA®: ICDN1, ICDN2, CCNP®: Routing, Switching, Troubleshooting

                                                                                                                           qualifications: National Qualification: National Certificate: IT Systems Support | SAQA ID: 48573 | NQF 5 | 147 Credits
                                                                                                                                           International Exam/s: CCNA®: ICDN1, ICDN2, Exam: 640 - 802;
                                                                                                                                                                   CCNP®: Routing: 642 - 902, Switching 642 - 813, Troubleshooting 642 - 832
                                                                                                                                           International Certification/s: CCNA® (Certified Cisco Network Administrator) CCNP® (Certified Cisco Network Professional)
                                                                                                                                                                                                                                                                           job opportunities:
                                                                                                                                                                                                                                Network Associate, Network Professional, Network Engineer,
                                                                                                National Senior Certificate (Grade 12), Mathematics                                                                Sales Engineer, Hardware Engineer, Software Engineer, Telecoms Engineer,
                                                                                                                                                                                                                                    Security Engineer, Storage Engineer, Solutions Specialists
                                                                                                                                                                                                                                                                                             (Suggestions Only)



                                                                                                                          it technical support: professional
                                                                                                                          Help Desk Technicians are responsible primarily for supporting end-user software applications. PC Support specialists are responsible for assisting
                                                                                                                          end-users either remotely or in person, with personal computer maintenance, troubleshooting and management. The Microsoft Certified IT
                                                                                                                          Professional: Consumer Support Technician (MCITP: Consumer Support Technician) credential is the premier certification to highlight and validate
                                                                                                                          your expertise and skill set in a job role supporting a broad range of consumer desktop operating systems, desktop applications, mobile devices,
                                                                                                                          networking, and hardware support issues related to the Windows operating system.

                                                                                                                          subjects: Computer Literacy, Windows 7, Microsoft Office (Word, Excel, Outlook, Access, Powerpoint)
                                                                                                                                    CompTIA A+ Hardware, CompTIA A+ Software, CompTIA Network +
                                                                                                                                    MCTS: 70-680 TS: Microsoft Windows Configuring, MCITP: 70-686 PRO: Supporting and Troubleshooting
                                                                                                                                    Applications on a Windows Client for Consumer Support Technicians, Customer Service

                                                                                                                          qualifications: National Qualification: National Certificate: IT Technical Support | SAQA ID: 78964 | NQF 4 | 163 Credits
                                                                                                                                          International Exam/s: CompTIA A+ Hardware, CompTIA A+ Software, MCTS 70-680 TS, MCITP 70-686 PRO
                                                                                                                                          International Certification/s: CompTIA A+, Microsoft Certified Technology Specialist (MCTS),
                                                                                                                                                                         Microsoft Certified IT Professional (MCITP): Consumer Support Technician

                                                                                                                                                                                                                                                               job opportunities:
                                                                                                                                                       Computer Technician, Support Technician, Network Technician, IT Helpdesk Agent, IT Sales, Desktop Technician, Entrepreneur
                                                                                                                                                                                                                                                                                             (Suggestions Only)
                                                                                                National Senior Certificate (Grade 12)




                                                                                                                                                                                                                                                                                                           09
on of CTU Training Solutions (PTY) Ltd reserves the right to change the programme content without prior notice. Additional international exams may be written but are not included in the programme fee.
graphic design
                         Graphic designers plan, analyse and create visual solutions using typography and images to present information. They develop the overall layout
                         and design of magazines, newspapers, journals, corporate identity and other publications. Graphic Designers with Web skills also develop material
                         for Internet Web Pages, Interactive Media and Multimedia Projects. Adobe offers multiple options for learners and facilitators to validate their
                         digital media skills. Now learners can get certified for both entry-level (Adobe Certified Associate) and professional-level (Adobe Certified Expert)
                         skills.

                         subjects: Business English, Computer Literacy, Windows 7, Design Fundamentals (Layout Theory, Design Theory, Digital Photography)
                                   Adobe Creative Suite (Adobe Photoshop , Adobe Dreamweaver, Adobe Fireworks, Adobe Illustrator, Adobe Flash, Adobe Indesign,
                                                        Adobe Acrobat)
                                   Web Development (HTML/DHTML, JavaScript , XML for Flash, Introduction to PHP & MySQL, Introduction to ActionScript)
                                   Customer Service, Project, Portfolio

                         qualifications: National Qualification: FET Certificate: Design Foundation | SAQA ID: 49127 | NQF 4 | 141 Credits
                                         International Exam/s: Adobe Certified Expert (ACE) Photoshop, Adobe Certified Expert (ACE) Flash,
                                                                 Adobe Certified Expert (ACE) Dreamweaver
                                         International Certification/s: Adobe Certified Expert (ACE) Photoshop, Adobe Certified Expert (ACE) Flash,
                                                                        Adobe Certified Expert (ACE) Dreamweaver
                                                                                                                                                            job opportunities:
                                                      Graphic Artist, Graphic Designer, Brand Designer, Flash Designer, Web Artist, Web Designer, Web Developer, Entrepreneur
                                                                                                                                                                                                                   (Suggestions Only)
     National Senior Certificate (Grade 12)




                         multimedia and web development
                         In an increasingly competitive world, learners need to be more than familiar users of digital communications technology to be successful.
                         Certification can help provide the added credential as well as open new opportunities for learners in the 21st century. Adobe offers multiple
                         options for learners to validate their digital media skills. Now learners can get certified for both entry-level (Adobe Certified Associate) and
                         professional-level (Adobe Certified Expert) skills. Web Development is not a single function but a series of functions that includes designing,
                         producing branding, building and supporting websites. The CIW (Certified Internet Web Professional) programme is the world’s fastest growing
                         vendor-neutral Internet certification for the knowledge economy. More than a certification or a curriculum publisher, CIW is a Web technology
                         standard adopted by governments and businesses worldwide.

                         subjects: Multimedia (Adobe Premiere Pro, Adobe Audition, Adobe Flash (Advanced), Adobe Acrobat) Web Development, ASP,
                                   Advanced PHP and MySQL, Advanced JavaScript, XML, ActionScript 2.0 & 3.0, Certified Internet Webmaster (Internet Business
                                   Associate, Site Development Associate, Network Technology Associate) Project, Portfolio

                         qualifications: National Qualification: FET Certificate: Systems Development | SAQA ID: 48872 | NQF 5 | 131 Credits
                                         International Exam/s: CIW Web Foundations Associate 1DO-510, Adobe Certified Expert (ACE) Acrobat
                                         International Certification/s: CIW Web Foundations Associate Certification, Adobe Certified Expert Web Specialist

                                                                                                                                                                         job opportunities:
                                                                                                   Graphic Designer, Flash Designer, Web Artist, Web Designer, Web Developer, Entrepreneur
                                                                                                                                                                                                                   (Suggestions Only)


     Adobe Certified Expert (ACE), Photoshop, Flash, Dreamweaver




10
                                              Please note: The content of this prospectus is subject to change without notification due to market trends in the IT industry, legislation and/or programme version updates. The CTU Career Campus a divisio
computer aided draughting and design                                                                                                  www.said.co.za

                                                                                                                          As the world moves forward into a globally competitive market, trends, designs and developments are changing daily. Architects, engineers,
                                                                                                                          designers, manufacturers and shop fitters are now using AutoCAD, Revit and Inventor, so making Computer Aided Drawing (CAD) Operators a
                                                                                                                          much-needed commodity. A Computer Aided Drawing (CAD) Operator visualises a given sketch of an idea into a Computer Aided Drawing (CAD)
                                                                                                                          two dimensional drawing through to a three-dimensional Computer Aided Drawing (CAD) model.

                                                                                                                          subjects: Business English, Computer Literacy, Windows 7, Drawing Fundamentals (Basic AutoCAD 2D and 3D),
                                                                                                                                    Drawing Office Orientation (Architectural and Civil Construction, Mechanical) Introduction: (Autodesk Inventor Mechanical,
                                                                                                                                    Autodesk Revit Architecture), Customer Service, Final Project, Portfolio

                                                                                                                          qualifications: National Qualification: FET Certificate: Computer Aided Drawing Office Practice | SAQA ID: 66071 | NQF 4 | 131 Credits
                                                                                                                                                                                     Training Programme Approval by the SA INSTITUTE OF DRAUGHTING
                                                                                                                                                International Exam/s: AutoCAD Associate Exam
                                                                                                                                                International Certification/s: Autodesk AutoCAD Associate Certification
                                                                                                                                                                                                                                                               job opportunities:
                                                                                                                                                     Apprentice Draughtsman (work experience required & registration with SAID), Technical Illustrator, CAD Operator, 3D Designer
                                                                                                                                                                                                                                                                                                    (Suggestions Only)

                                                                                                                                                *Please note that this programme has stationery requirements not included in the programme fee and not supplied by CTU. Please ask your Career Consultant for the list.




                                                                                               National Senior Certificate (Grade 12), Mathematics / Technical Drawings



                                                                                                                                                                                                                                                                www.said.co.za
                                                                                                                          computer aided draughting and design 2nd Year
                                                                                                                          A structure doesn’t create itself... It takes a design. The design must be communicated in a way that everyone who needs to use it can
                                                                                                                          understand. Draughters prepare technical drawings and plans used by production and construction workers to build everything from
                                                                                                                          manufactured products such as industrial machinery to structures such as office buildings or gas pipelines. Their drawings provide visual
                                                                                                                          guidelines showing the technical details of the products and structures specifying dimensions, materials to be used, procedures and processes.
                                                                                                                          Draughting is done mostly on the computer using computer aided drawing (CAD) systems.

                                                                                                                          subjects: Drawing Office Orientation ( Mechanical Drawing, Concrete Reinforcing and Structural Steel Drawing, Piping), Construction
                                                                                                                          Methods (HVAC Heating, Ventilation and Air-Conditioning), CAD Packages (Revit, Inventor), MS Project, Final Project, Portfolio

                                                                                                                          qualifications: National Qualification: FET Certificate: Computer Aided Drawing Office Practice | SAQA ID: 66071 | NQF 4 | 131 Credits
                                                                                                                                                                  + additional 98 credits
                                                                                                                                                                                      Training Programme Approval by the SA INSTITUTE OF DRAUGHTING
                                                                                                                                                 International Exam/s: Revit Associate Exam, Inventor Associate Exam
                                                                                                                                                 International Certification/s: Revit Associate Certification, Inventor Associate Certification
                                                                                                                                                                                                                                                                job opportunities:
                                                                                                                                                      Apprentice Draughtsman (work experience required & registration with SAID), Technical Illustrator, CAD Operator, 3D Designer
                                                                                                                                                                                                                                                                                                    (Suggestions Only)
                                                                                                                                                *Please note that this programme has stationery requirements not included in the programme fee and not supplied by CTU. Please ask your Career Consultant for the list.


                                                                                                CAD 1st Year




                                                                                                                                                                                                                                                                                                                  11
on of CTU Training Solutions (PTY) Ltd reserves the right to change the programme content without prior notice. Additional international exams may be written but are not included in the programme fee.
it system support: microsoft enterprise administrator
                         Network Engineers usually design and implement large networks and are required to have significant expertise in designing and administering
                         network hardware and software. Systems administrators normally manage and maintain several large-scale operating systems including backup
                         and recovery, adding and deleting user accounts and performing software upgrades. Enterprise administrators are recognised among their peers
                         and managers as leaders in Windows infrastructure design. Earn the MCITP: Enterprise Administrator certification, distinguishing you as an IT
                         professional committed to excellence in working with Windows Server.

                         subjects: Business English, Computer Literacy, Windows 7, CompTIA A+ Hardware, CompTIA A + Software, CompTIA Network +
                                   MCTS: 70-680 TS: Configuring Microsoft Windows Client, MCTS: 70-642 TS: Windows Server Network Infrastructure,
                                   MCTS: 70-640 TS: Windows Server Active Directory Configuring,
                                   MCTS: 70-643 TS: Windows Server Applications Infrastructure Configuring,
                                   MCITP:70-647 PRO: Windows Server Enterprise Administrator, Customer Service

                         qualifications: National Qualification: National Certificate: IT Systems Support | SAQA ID: 48573 | NQF 5 | 147 Credits
                                         International Exam/s: MCTS: 70-680 TS, MCTS: 70-642 TS, MCTS: 70-640 TS, MCTS: 70-643 TS, MCITP: 70-647 PRO
                                         International Certification/s: Microsoft Certified Technology Specialist (MCTS)
                                                                        Microsoft Certified IT Professional (MCITP): Enterprise Administrator

                                                                                                                                                       job opportunities:
                                       Enterprise Administrator, Systems Administrator, Network Administrator, Network Technician, Support Technician, Network Manager,
                                                                                                                              Network Analyst, IT Engineer, Entrepreneur
     National Senior Certificate (Grade 12)                                                                                                                                                                         (Suggestions Only)




                         microsoft specialised: enterprise administrator
                         Database Administrator: Database administrators install or configure Microsoft SQL Server and manage or maintain databases or multidimensional
                         databases, user accounts, database availability, recovery, and reporting. They also design or implement security or server automation and monitor
                         and troubleshoot SQL Server activity. Exchange: For most businesses today, e-mail is the mission-critical communications tool that allows their
                         people to produce the best results. Today, IT departments must contend with e-mail security threats that are wide ranging. Microsoft Exchange
                         Server has been designed specifically to meet these challenges and address the needs of the different groups who have a stake in the messaging
                         system. Sharepoint: An organization can use Office SharePoint Server to facilitate collaboration, provide content management features, implement
                         business processes, and supply access to information that is essential to organizational goals and processes.

                         subjects: Database Administrator: MCTS 70-432 TS: Microsoft SQL Server, Implementation and Maintenance, MCITP 70-450 PRO:
                                                           Designing, Optimising and Maintaining a Database Server Infrastructure using Microsoft SQL Server,
                                   Exchange: MCTS 70-662 TS: Microsoft Exchange Server, Configuring
                                   Sharepoint: MCTS 70-667 TS: Microsoft Sharepoint, Configuring
                                   Project Management

                         qualifications: National Qualification: National Certificate: Certificate IT Database Administration | SAQA ID: 71869 | NQF 6 | 120 Credits
                                         International Exam/s: Database Administrator: MCTS 70-432 TS, MCITP 70-450 PRO
                                                                 Exchange: MCTS 70-662
                                                                 Sharepoint: MCTS 70-667
                                         International Certification/s: MCITP: Database Administrator, Exchange MCTS 70-662, Sharepoint MCTS 70-667
     Int Cert: MCTS & MCITP: Enterprise Administrator
                                                                                                                                                                                   job opportunities:
                                                                                                                             Database Administrator, Enterprise Administrator, Network Administrator,
                                                                                                                                  Network Manager, Network Analyst, Project Manager, Entrepreneur
                                                                                                                                                                                                                   (Suggestions Only)
12
                                              Please note: The content of this prospectus is subject to change without notification due to market trends in the IT industry, legislation and/or programme version updates. The CTU Career Campus a divisio
it systems developer: microsoft certified professional
                                                                                                                          This programme introduces the learner to software development processes, computer software, different languages, techniques and technologies
                                                                                                                          used in the software development process. When you earn the Microsoft Certified Professional Developer (MCPD) credential, you demonstrate
                                                                                                                          your ability to use Microsoft Visual Studio and the Microsoft .NET Framework to excel in a specific, real-world job role. An MCPD credential validates
                                                                                                                          a comprehensive set of skills required to be successful on the job, and gives hiring managers and potential customers a reliable indicator of your
                                                                                                                          job performance. This credential offers a simple, targeted framework that makes the certification paths easier to understand and allows you to
                                                                                                                          stand out from the crowd.

                                                                                                                          subjects: Business English, Computer Literacy, Windows 7, Introduction to Programming: Visual Studio, MCTS: 70 - 536 TS: Application
                                                                                                                                    Development Foundations, MCTS: 70 - 505 TS: Windows Forms Application Development, MCTS: 70 - 561 TS: ADO.NET Application
                                                                                                                                    Development, MCTS: 70 - 503 TS: Windows Communication Foundation, MCTS: 70 - 562 PRO: ASP.NET Applications,
                                                                                                                                    MCTS: 70 - 565 PRO: Enterprise Application Developer 3.5, Customer Service, Business Communication

                                                                                                                          qualifications: National Qualification: National Certificate: IT Systems Development | SAQA ID: 48872 | NQF 5 | 131 Credits
                                                                                                                                          International Exam/s: MCTS 70-536 TS, MCTS 70-505 TS, MCTS 70-561 TS, MCTS 70-503 TS, MCTS 70-562 PRO, MCPD 70-565 PRO
                                                                                                                                          International Certification/s: Microsoft Certified Technology Specialist (MCTS),
                                                                                                                                                                         Microsoft Certified Professional Developer, (MCPD): Enterprise Application Developer

                                                                                                                                                                                                                                                             job opportunities:
                                                                                                                                                   Junior Programmer, Analyst Programmer, Software Tester, IT Consultant, Entrepreneur, .Net Web Developer, Software Developer
                                                                                                                                                                                                                                                                      (Suggestions Only)
                                                                                               National Senior Certificate (Grade 12), Mathematics




                                                                                                                          microsoft business intelligence developer
                                                                                                                          Database developers design and implement relational database models (logical and physical) and database storage objects. They also program
                                                                                                                          servers by using user-defined functions, triggers, stored procedures, Transact-SQL, or the CLR. They retrieve or modify data by using SQL queries
                                                                                                                          or tune and optimise queries. Business intelligence developers design and implement multi-dimensional database models (logical and physical),
                                                                                                                          data marts, data warehousing, data transforms, data analytics, and reporting solutions. This includes programming and customizing servers
                                                                                                                          that use Multidimensional Expressions (MDX), customer transforms, and custom reporting solutions. Sharepoint: An organization can use
                                                                                                                          Office SharePoint Server to facilitate collaboration, provide content management features, implement business processes, and supply access to
                                                                                                                          information that is essential to organizational goals and processes. A Sharepoint developer can use a variety of languages, frameworks, object
                                                                                                                          models, and tools to build scalable distributed web applications on the SharePoint development platform.

                                                                                                                          subjects: introduction to business analysis and security
                                                                                                                                    Database Developer: MCTS 70-433 TS: Microsoft SQL Server, Database Development, MCITP 70-451 PRO: Designing Database
                                                                                                                                    Solutions and Data Access using Microsoft SQL Server, Business Intelligence Developer: MCTS 70-448 TS: Microsoft SQL
                                                                                                                                    Server, Business Intelligence Development and Maintenance, MCITP 70-452 PRO: SQL Server
                                                                                                                                    Development and Maintenance, Sharepoint MCTS 70-573 TS: Microsoft Office Sharepoint Server - Application Development,

                                                                                                                          qualifications: National Qualification: National Certificate: Advance Certificate IT Database Development | SAQA ID: 71850 | NQF 6 | 120 Credits
                                                                                                                                          International Exam/s: Database Developer MCTS 70-433 TS, MCITP 70-451 Pro Business Intelligence Developer MCTS 70-448 TS,
                                                                                                                                                                  MCITP 70-452 PRO, Sharepoint MCTS 70-573
                                                                                                                                          International Certification/s: MCITP: Database Developer, MCITP: Business Intelligence Developer; Sharepoint MCTS 70-573
                                                                                               Int Cert: MCTS & MCPD: Enterprise Application Developer
                                                                                                                                                                                                                                                                  job opportunities:
                                                                                                                                                                                                           Software Developer, Business Intelligence Developer, Database Developer
                                                                                                                                                                                                                                       Project Leader, Software Analyst, IT Manager
                                                                                                                                                                                                                                                                      (Suggestions Only)
                                                                                                                                                                                                                                                                                    13
on of CTU Training Solutions (PTY) Ltd reserves the right to change the programme content without prior notice. Additional international exams may be written but are not included in the programme fee.
more information available @ open day/s or visit your nearest campus

                                                                                     project management
                                                                                     The primary purpose of the qualification is to provide learners with a foundation of basic project management knowledge and skills which can
                                                                                     be used to build further project management related competencies. The Project Management qualification will give learners the knowledge and
                                                                                     skill to put strategies together and the ability to implement the techniques and processes to manage projects. Over the year period the learners
                                                                                     will cover all the project management phases within the project management cycle.

                                                                                     subjects: Windows 7 (Word, Excel, Powerpoint, Outlook), Numeracy, Introduction to Project Management, Costing your Project,
                                                                                               Quality and Risk in Project Management, Preparing and Managing a Project Plan, Meeting your Deliverables, MS Project,
                                                                                               Customer Service, Business Writing, Business Communication

                                                                                     qualifications: National Qualification: FET Certificate: Project Management | SAQA ID: 50080 | NQF 4 | 136 Credits
                                                                                                     International Exam/s: MCTS: MS Project 70-178
                                                                                                     International Certification/s: MCTS: MS Project
                                                                                                                                    CAPM: Certified Associate in Project Management

                                                                                                                                                                                                                                              job opportunities:
                                                                                                                                                                                          Project Manager, Project Manager Assistant, Team Leader, Event Planner
                                                                                                                                                                                                                                                                               (Suggestions Only)




                                                                 National Senior Certificate (Grade 12)




                                                                                     office administration executive
                                                                                     Highly skilled administration personnel are always in demand. In today’s workplace it is essential that office administration personnel are
                                                                                     skilled at using productivity software. This programme provides learners with relevant administrative and high-level technological skills
                                                                                     to meet the demands of the current and emerging business environment. Learners acquire a solid foundation of business office procedures
                                                                                     and computer skills. Computer skills and business office practices are also readily transferable to other academic and career paths. By
                                                                                     completing basic bookkeeping and Pastel accounting the learner can now offer a wide range of invaluable skills to a business or entrepreneur.

                                                                                     subjects: Business English, Windows 7, Microsoft Office (Word, Excel, Powerpoint, Outlook, Access, MS Publisher, Basic MS Project)
                                                                                               Pastel Accounting (Basic Bookkeeping, Pastel)

                                                                                     qualifications: National Qualification: FET Certificate: End User Computing | SAQA ID: 71853 | NQF 4 | 132 Credits
                                                                                                                              Pastel Intermediate Certification
                                                                                                     International Exam/s: Microsoft Office Word
                                                                                                                             Microsoft Office Excel
                                                                                                     International Certification/s: Microsoft Office Word
                                                                                                                                    Microsoft Office Excel
                                                                                                                                                                                                                       job opportunities:
                                                                                                   Office Assistant, Office Administrator, Junior Secretary, Accounts Clerk, Junior Bookkeeper, Personal Assistant, Secretary, Pastel Clerk
                                                                                                                                                                                                                                                                               (Suggestions Only)



                                                                 National Senior Certificate (Grade 12)




14
                                                                                                          Please note: The content of this prospectus is subject to change without notification due to market trends in the IT industry, legislation and/or programme version updates. The CTU Career Campus a divisio
more information available @ open day/s or visit your nearest campus

                                                                                                                          e-marketing
                                                                                                                          Today, the internet is responsible for constantly changing our markets, media, branding, advertising and consumer behaviour. With this
                                                                                                                          programme you can complement your skills with new dimensions of marketing. This course is designed to give professionals and students the
                                                                                                                          opportunity to learn how to practically apply holistic Internet marketing tactics to small, medium and large businesses. The CIW Internet Business
                                                                                                                          Foundations course prepares you to work effectively in today’s business environment. In this course, you will learn about the tasks involved in
                                                                                                                          various Web Technology job roles, and you will learn the skills and technologies to perform them. The career opportunities that demand these
                                                                                                                          common Web-based skills are endless. Once certified, you have proven that you have foundational knowledge of important technologies that
                                                                                                                          affect virtually every business. This certification is ideal for all students and professionals who use the Internet on the job.

                                                                                                                          subjects: Introduction to internet marketing, Marketing fundamentals, Web design and development, Web public relations &
                                                                                                                                    copywriting, Email Marketing, Online advertising, Search engine optimisation, Social media and viral marketing,
                                                                                                                                    Web analytics and conversion optimisation, Mobile marketing, Internet marketing strategy

                                                                                                                          qualifications: National Qualification: FET Certificate: Marketing | SAQA ID: 67464 | NQF 4 | 139 Credits
                                                                                                                                          International Exam/s: Internet Business Associate Exam 1DO-51A
                                                                                                                                          International Certification/s: Internet Business Associate Certification
                                                                                                                                                                                                                                                                     job opportunities:
                                                                                                                                                                             Viral Campaign Developer, e-Marketing Assistant, e-Marketer, Web Administrator, Social Media Administrator
                                                                                                                                                                                                                                                                           (Suggestions Only)



                                                                                               Graphic design knowledge/skills preferable




              qr codes




                                                                                                                                                                                                                                                                               r codes
                                                                                                                                                                                                                    what is a qr code? A QR code (short for Quick Response)
                                                                                                                                                                                                                    is a specific matrix barcode (or two-dimensional code),
                                                                                                                                                                                                                    readable by dedicated QR barcode readers and camera
                                                                                                                                                                                                                    phones. Users with a camera phone equipped with the
                                                                                                                                                                                                                    correct reader application can scan the image of the QR
                                                                                                                                                                                                                    code to display text, contact information, connect to a
                                                                                                                                                                                                                    wireless network, or open a web page in the phone’s
                                                                                                                                                                                                                    browser. http://www.denso-wave.com/qrcode/index-e.html;
                                                                                                                                                                                                                    http://en.wikipedia.org/wiki/QR_Code

                         call 0861 100 395                                                          view “did you know?” #2                                                                link to twitter          how to use the qr codes here Make sure your phone
                                                                                                                                                                                                                    can scan a QR code with its camera, either with an applica-
                                                                                                                                                                                                                    tion that you download or via software that’s already in-
                                                                                                                                                                                                                    stalled on your phone. To find out what application to use
                                                                                                                                                                                                                    for your phone, we recommend doing a Google search for
                                                                                                                                                                                                                    the model of your phone along with “QR reader”. NOTE:
                                                                                                                                                                                                                    You can download a QR Code reader application from your
                                                                                                                                                                                                                    Applications Store. (Useful websites: http://www.mobile-
                                                                                                                                                                                                                    barcodes.com/qr-code-software/;         http://www.beetagg.
                                                                                                                                                                                                                    com/downloadreader/). When you see a QR code, use your
                                                                                                                                                                                                                    phone’s application to scan it: Open your phone’s bar code/qr
                                                                                                                                                                                                                    reader on your phone, scan, and link/read.
                           link to facebook                                                        link to ctu career website                                                     view interesting fact #2                                                                                15
on of CTU Training Solutions (PTY) Ltd reserves the right to change the programme content without prior notice. Additional international exams may be written but are not included in the programme fee.
consultation and registration                        student loans

Registration process                                 CTU has partnered with some of the major commercial banks to
                                                     assist our students with student loans at better rates that we could
You can register TODAY!                              offer. Our banking partners are professionally equipped to assess
                                                     creditworthiness in accordance with the National Credit Act. If
1. Schedule an appointment with a Career             they do not qualify you for credit, CTU, if we were a credit provider,
   Consultant                                        would have had to decline credit on the same grounds.
  a. Meet with us prior to registration to discuss
     your needs and requirements                     Students must provide the following documentation:
  b. Request a programme quote from your Career        • Proof of registration.
     Consultant                                        • A quote from a CTU Career Campus for study fees.
  c. Talk to us about student loans and payment        • Green bar-coded Identity Document.
     options                                           • Results of the previous academic year.
  d. Get an accommodation list (where applicable)      • Proof of current residential address, e.g. electricity or cellphone
                                                         statement, etc.
2. Optional: Write the “Career Mapper” career          • Please note - a study loan is taken out in the name of the
   guidance assessment                                    sponsor and therefore the sponsor will be required to provide
                                                          the information listed in the sponsor section.
3. Reserve your space early!!
  a. By completing an enrolment form                 Sponsors must provide the following documentation:
  b. Registration fee R1 000                           • Proof of earnings or latest payslip.
                                                       • Green bar-coded Identity Document.
Please bring:                                          • Proof of current residential address, e.g. electricity or cellphone
  c. Certified copy of your ID                           statement, etc.
  d. Certified copy of your parent/guardian’s ID       • Banking details (name of bank, account number, branch code
  e. 1 x ID photo black & white or colour                and 6 months’ bank statements if non-Absa client).
                                                       • If the sponsor is married in Community of Property their
4. CTU requires a deposit to complete your               spouse’s details are required, if not an Anti Nuptial Contract or a
   registration. (Refer to your quote)                   copy of Divorce Decree is required.

5. Payment options at CTU:                           Absa
  a. Credit Card                                     0860 100 372 | Read more: www.absa.co.za
  b. Cash
  c. Student Loans                                   Standard Bank
                                                     0860 123 456 | Read more: http://www.standardbank.co.za
6. Programmes commence 1 February 2012
                                                     Nedbank
Your bank requires proof of registration, please     0861 254 368 | Read more: http://www.nedbank.co.za
ask your Career Consultant for a CTU Registration
letter (proof of registration) and a quote/pro-      FNB
forma invoice to submit with your student loan       0861 404040 | Read more: http://www.fnb.co.za
application.

                                                                                                                         17
0861 100 395           Auckland Park    Forum 1, 2nd Entrance, Braampark, 33 Hoofd Street, Braamfontein, 2001
                                                       Tel: 011 726 1028/46 | Fax: 086 578 6081 | aucklandpark@ctutraining.co.za | facebook: CTU Career Campus Auckland Park

enquiry@ctutraining.co.za              Bloemfontein    1st Floor, Pretty Suites Office Block, Pretty Gardens Lifestyle Centre, Du Plessis Road, Langenhoven Park
                                                       Tel: 051 451 2210/09 | Fax: 086 572 8205 | bloemfontein@ctutraining.co.za | facebook: CTU Career Campus Bloemfontein

   www.ctutraining.co.za                               36 Edgar Street, Everleigh, Boksburg
                                          Boksburg
                                                       Tel: 011 918 1176 | Fax: 011 918 1570 | boksburg@ctutraining.co.za | facebook: CTU Career Campus East Rand

                                                       Coming soon! Contact Jaco van der Riet: 021 887 5372/3
                                         Cape Town
                                                       Tel: 0861 100 395 | capetown@ctutraining.co.za | facebook: CTU Career Campus Cape Town

                                                       Coming soon! Contact Christine Clothier: 083 634 0367
                                      Kwazulu-Natal
                                                       Tel: 0861 100 395 | kzn@ctutraining.co.za | facebook: CTU Career Campus Durban
      Join CAREER CHATz on Facebook

                                                       Shop C3, Lower Level, Tarentaal Shopping Centre, Cnr. N4 & Ou Kaapschehoop Rd
                                           Nelspruit
                                                       Tel: 013 741 2352 | Fax: 086 665 4268 | nelspruit@ctutraining.co.za | facebook: CTU Career Campus Nelspruit
     Follow CAREER_CHATz on Twitter
                                                       25 Devenish Street, Polokwane
                                        Polokwane
                                                       Tel: 015 297 3250 | Fax: 015 297 3252 | polokwane@ctutraining.co.za | facebook: CTU Career Campus Polokwane

    Add CTU_CAREER_CHATz on Skype                      Coming soon! Contact Izanne Haarhoff: 078 456 8034
                                      Port Elizabeth
                                                       Tel: 0861 100 395 | portelizabeth@ctutraining.co.za | facebook: CTU Career Campus Port Elizabeth

                                                       39 Buskus Street, Baillie Park
                                      Potchefstroom
                                                       Tel: 018 290 5340 | Fax: 018 290 7509 | potchefstroom@ctutraining.co.za | facebook: CTU Career Campus Potchefstroom

                                                       Glen Manor Office Park, Block 1, Frikkie de Beer Street, Menlyn
                                            Pretoria
                                                       Tel: 012 361 6688 | Fax: 012 348 8394 | pretoria@ctutraining.co.za | facebook: CTU Career Campus Pretoria

                                                       U76/77, Brightwater Commons, Republic Road, Randburg
                                          Randburg
                                                       Tel: 011 781 0445 | Fax: 011 781 1637 | randburg@ctutraining.co.za | facebook: CTU Career Campus Randburg

                                                       Shop 59, The Village @ Horizon, Cnr. Sonop & Ontdekkers Road, Horizon
                                        Roodepoort
                                                       Tel: 011 760 4321 | Fax: 011 760 2905 | roodepoort@ctutraining.co.za | facebook: CTU Career Campus West Rand

                                                       Jan Celliers Street, Mullerhof Building, Ground Floor
                                       Stellenbosch
                                                       Tel: 021 887 5372/3 | Fax: 021 887 5379 | stellenbosch@ctutraining.co.za | facebook: CTU Career Campus Stellenbosch

                                                       140 Genl Hertzog Avenue, Three Rivers
                                        Vereeniging
                                                       Tel: 016 423 7341 | Fax: 016 423 1998 | vereeniging@ctutraining.co.za | facebook: CTU Career Campus Vaal Triangle

Prospectus New 2011

  • 2.
  • 3.
    02 Information & Communication Technology defined 02 The CTU Career Campus 03 Why CTU? 04 Career Guidance 05 How do we C2U? 07 Certifications and Accreditations @ CTU 08 Our Passion: Develop ICT Professionals 09 IT Systems Support: CISCO Certified Network Professional 09 IT Technical Support: Professional 10 Graphic Design 10 Multimedia & Web Development 11 Computer Aided Draughting & Design 11 Computer Aided Draughting & Design 2nd Year 12 IT Systems Support: Microsoft Enterprise Administrator 12 Microsoft Specialised: Enterprise Administrator 13 IT Systems Developer: Microsoft Certified Professional 13 Microsoft Business Intelligence Developer 14 Project Management 14 Office Administration Executive 15 e-Marketing 15 QR Codes Page 16 Information Card 17 Consultation & Registration 17 Student Loans 18 Campus Details
  • 4.
    information and communicationtechnology defined A career in the Information Technology (IT) industry opens up an increasing world of opportunities. Career/Job opportunities for IT Candidates from entry level right through to professional level are increasing rapidly… great news for aspiring IT learners. The industry demands skills focused individuals with International Certifications. The IT job market is booming, this means with the right qualification and certification you will be equipped to grab the perfect entry level position. In applying for a job, one will need to have industry specific certifications that are dictated by the industry i.e. specific systems and technological needs like A+, N+, CCNA, CCNP or MCTS, MCITP, MCPD. The correct choice of training provider is crucial in obtaining these qualifications and certifications. Visit career website for more information: www.pnet.co.za | www.itweb.co.za | www.careerjunction.co.za | www.jobmail.co.za | www.jobs4u.co.za the CTU career campus • “To provide excellent facilitator - led training, in order to qualify learners on a National and International level, in the ICT sector, for the South African Job Market.” • “To develop ICT Professionals.” Become an ICT professional at CTU and start your exciting career in ICT; a fast moving dynamic environment. CTU Training Solutions is fully accredited by the ISETT SETA. The CTU Career Campus offers a variety of programmes preparing graduates for employment opportunities in the industry. In line with industry requirements, CTU Training Solutions (PTY) Ltd is fully accredited by the ISETT SETA and provisionally registered with the Department of Education as a Private Further Education and Training College, in terms of section 31 (3) of the Further Education and Training Colleges Act, 2006 (Act No. 16 of 2006) and Regulation 15(4)(b) of the Regulations for the Registration of Further Education and Training Institutions. The CTU Career Campus offers a variety of programmes with National Qualifications and International Certifications which develop skills and prepares the graduates for a future filled with exciting opportunities. Our facilitator-led programmes are developed and updated regularly according to new technological developments and market trends. Small classes ensure that a great deal of attention is given to each individual with emphasis on practical training. CTU developed a “Student Life @ CTU” programme managed by CTU Staff and the campus SRC (student representative council) with some activities executed on a national level, for example: Social responsibility programmes and projects with and for non-profit organisations. Our “Workplace experience programme” enables learners to become familiar with the corporate/working environment through various field trips and internship programmes hosted by participating corporate clients. 02
  • 5.
    why ctu Accredited Our programmes are HRD in IT @ CTU HRD in IT @ CTU The demand for National qualifications approved in demand, relevant, A high percentage of our and accredited by SAQA Excellent earning potential for Certified CTU graduates graduates are employed in updated regularly and and ISETT SETA IT graduates* is high the IT industry within weeks of occupation focussed graduating * Study Full time at the HRD in IT @ CTU International Certifications Small Classes increase employment Career Campus or Part Work after one year or Facilitator - led training (each learner with his/her opportunities anywhere Time at our Corporate study for a 2nd year with own computer) in South Africa or in the Training Division specialisation * world HRD in IT @ CTU National Qualifications & Student Life @ CTU CTU is in the process We work closely with corporate Student loans available International Certifications of developing our Various campus activities, companies to provide (leading banks and other Training Programme Approval by programmes and social responsibility projects are workplace experience and/ organisations) the SA Institute of Draughting - held during the year by academic offering… or internships to our learners, Computer Aided Drawing Office watch this space for more the campus SRC when and where available* Practice information 03 *Not CTU, Corporate clients or recruitment consultants can ever guarantee employment
  • 6.
    career guidance Suppose you get it wrong? ONE in every THREE students drop out of university before completing their first year of study, meaning that the student will have spent R16-R35k (average tuition fees). Experts say that the majority of people are stuck in careers to which they are not suited. Source: www.perfectcareers.co.za You can get it right! Choosing a career is becoming increasingly difficult every year and this is why the CTU Career Campus would like to make itself available to you for the purpose of assessing needs and answering any queries, thus enabling you to make the correct career choice. High Costs of wrong career choice... Most young people leave school with only a vague knowledge of employment opportunities and with little insight on the most appropriate career direction for their abilities, interests and personalities. A large number of school leavers receive no training at all beyond school and become virtually unemployable. The solution lies in proper career guidance and assessment at grade 11 level. This is standard in most first world countries, and would help alleviate much of this hardship and unnecessary expense. It could also play an important role in reducing the high unemployment rate. With the aid of modern technology and the use of Psychometric assessments, choosing the wrong career at an early age should be a thing of the past. But, somehow, this doesn’t always happen. One should however be aware that these assessments are not perfect and you should be careful before basing a career choice on the results produced. For a Psychometric assessment to be effective in career guidance and HR Development, it needs to: • Combine ability, personality and interest in ways that can be made transparent for the end user • Meet ethical and legislative requirements • Be affordable, flexible and user friendly • Provide input into possible career suitability based on realistic measures You can write a career mapper assessment @ any CTU Career Campus. Book with your Career Consultant today!! Visit Perfect Careers www.perfectcareers.co.za for more information. Book Career Mapper today! Career Mapper is a unique software based tool that supports an individual in making decisions about their preferred IT career path and helps them to plan what they need to do to achieve their goals. Career Mapper has been developed with input from experienced Career Advisors at Career decisions Ltd. and is based on a high quality occupational psychometric measure, Prevue ICES. Prevue is a highly efficient instrument which gathers information about an individual’s core abilities, interests and their personality. Developed by Prof. David Bartram and Dr. Pat Lindley, Prevue is a valid and reliable measure and is registered with the SA Health Professions Council. Make an informed career choice; let’s examine your skills, interest areas and career goals. 04
  • 7.
    how do wec2u? Training Methodology The facilitator-led skills training enable our learners to have a thorough understanding of the programme material at all times. Our programmes focus on the practical approach of content and learners graduate with hands-on skills required within the IT industry, enabling them to function fully as IT or Business Professionals. Language Policy: English Our Study Material All programme material is included in the fee. CTU spends a considerable amount of time assessing and evaluating study materials. Tried and tested programme manuals are used and our alliance with registered vendors gives us access to original resources to choose from. Progress The purpose of the assessment is to inform learners of their learning progress and to enable facilitators to adjust their instruction to the needs of learners. Throughout the formative assessment process the results and progress of the learner will be continually discussed, reviewed and further development strategies will be implemented to improve learning programmes and instruction. Each learner will be issued with two academic transcripts during their year of study in order to monitor their progress. Workplace Experience Programme This programme includes field trips, corporate visits and internships during the year. This allows the learner the opportunity to gain a better understanding of the business environment in relation to their field of study. NQF registered qualifications: National Certificates accredited by SAQA and ETQA’s ISETT SETA. Department of Education CTU Training Solutions is provisionally registered with the Department of Education as a Private Further Education and Training College, in terms of section 31 (3) of the Further Education and Training Colleges Act, 2006 (Act No. 16 of 2006) and Regulation 15(4)(b) of the Regulations for the Registration of Further Education and Training Institutions. FET No: 2007/FEO/013. ISETT SETA All of the CTU Training Solutions branches have full accreditation with the ISETT SETA. The ISETT SETA is a training accreditation body committed to skills development in the ICT (Information and Communications Technology) sector. ISETT SETA accreditation means that CTU complies with specific regulations ensuring that our training programmes are nationally recognised and comply with the Skills Development legislation. As a SETA (Sector Education and Training Authority) ISETT SETA is a body established under the Skills Development Act (RSA,1998c) whose main purpose is to contribute to the improvement of skills in South Africa. ACC 2006/07/186. Website: www.isett.org.za issued by various organisations through the completion of International Exams. 05
  • 8.
    certifications and accreditations@ CTU CTU was awarded the Learning Solutions Partner Network Award in 2010. Gold Certified Partners represent the highest level of competence and expertise with Microsoft technologies, and have the closest working relationship with Microsoft. The Value of Certification: CTU Training Solutions is the top Microsoft provider in terms of the International Certifications in SA and MEA (Middle East and Africa). Why Certify with Microsoft Microsoft Certifications and the learning resources that you’ll use to prepare for exams are dynamic, and built around the common (and not so common) challenges that you encounter daily. The exams are tested with working IT Professionals to ensure that they are relevant, accurate, and reflect the skills and capabilities you need to be more productive on the job. Microsoft Certifications are performance-based, therefore it can have a significant impact on the way you work. In fact, certifications have been proven to increase an individual’s efficiency in their job. Studies show that in order to achieve “top tier” performance, an organization must ensure that 45–65% of their teams receive Microsoft Certification. Achieving Microsoft Certifications will help your team work better together by providing a common framework of problem-solving Microsoft technology skills. Microsoft Certification validates the skills you use every day. It aids your technology problem-solving and helps improve your performance on the job. Certification exams are continually measured and updated to reflect the latest technology solutions and support your professional success - today, tomorrow, and beyond. Source: www.microsoftlearning.com CISCO Cisco is an international corporation that designs and sells consumer electronics, networking and communications technology and services. Cisco Systems also sponsors a line of IT Professional certifications for Cisco products. CCNA Certification: Cisco Certified Network Associate (CCNA®) validates the ability to install, configure, operate, and troubleshoot medium-size route and switched networks, including implementation and verification of connections to remote sites in a WAN. CCNP Certification: Cisco Certified Network Professional (CCNP®) validates the ability to plan, implement, verify and troubleshoot local and wide-area enterprise networks and work collaboratively with specialists on advanced security, voice, wireless and video solutions. ISETT SETA All of the CTU Training Solutions branches have full accreditation with the ISETT SETA. The ISETT SETA is a training accreditation body committed to skills development in the ICT (Information and Communications Technology) sector. ISETT SETA accreditation means that CTU complies with specific regulations ensuring that our training programmes are nationally recognised and comply with the Skills Development legislation. As a SETA (Sector Education and Training Authority) ISETT SETA is a body established under the Skills Development Act (RSA,1998c) whose main purpose is to contribute to the improvement of skills in South Africa. ACC 2006/07/186. Website: www.isett.org.za Department of Education CTU Training Solutions is provisionally registered with the Department of Education as a Private Further Education and Training College, in terms of section 31 (3) of the Further Education and Training Colleges Act, 2006 (Act No. 16 of 2006) and Regulation 15(4)(b) of the Regulations for the Registration of Further Education and Training Institutions. FET No: 2007/FEO/013. Certify with CIW CIW comprises the world’s fastest growing vendor-neutral Web technology education and certification programs for professionals. More than a certification or a curriculum publisher, CIW has become the educational standard adopted by academic institutions, governments and businesses worldwide for Web technology skills. CIW includes applications and competencies, but our core curriculum focuses on the foundational standards of the Web, including Web design, Web development and Web security. CIW certifications verify that certified individuals have the skills necessary to master a technology-driven world. In today’s competitive workplace, certified CIW professionals have proven abilities that set them apart from other Web 06 professionals.
  • 9.
    Comptia Certification Expand your resume with networking credentials ... Your CompTIA A+ certification lets employers know you have a broad base of knowledge and competency in core hardware and operating system technologies including installation, configuration, diagnosing, preventive maintenance and basic networking. Now, you can enhance your skills and make your résumé stand out even more by earning your CompTIA Network+ certification. CompTIA A+ is a prerequisite for this higher-level certification, which is held by more than 160,000 people worldwide. CompTIA Network+ is among the certifications most frequently recommended by community colleges and training organizations to those pursuing a career in IT. It is also incorporated into certification tracks by leading hardware and software suppliers - for example, Microsoft includes CompTIA Network+ as an elective in its MCSA certification track. CompTIA Network+ certification is proof of your professional achievement, providing you with: • A viable career path • Enhanced job opportunities • Proof of professional achievement • Foundational knowledge for advanced certifications Give yourself a promotion. Become Adobe Certified It can be difficult to get ahead in today’s market. To stand out and be noticed. More than ever, you need a clear and focused way to tell the world about your expertise. The solution? Become Adobe Certified. Adobe certification is an industry standard of excellence, and it’s the absolute best way to communicate your proficiency in leading products from Adobe. As an individual, an Adobe Certified credential allows you to: • Differentiate yourself from competitors • Get your résumé noticed • Attract and win new business • Gain recognition from your employer • Leverage the power of the Adobe brand SAID The South African Institute of Draughting (SAID) is an independent, professional body established in 1953. The Institute’s objective is to improve the academic and technical qualifications of draughtspersons in all disciplines of technical drawing and design. It is proud to be recognised as a Voluntary Association of both the South African Council for the Architectural Profession (SACAP) and the Engineering Council of South Africa (ECSA). Autodesk Autodesk certifications are a reliable validation of your skills and knowledge and can lead to accelerated professional development, improved productivity and enhanced credibility in your field. Each Autodesk certification signifies the experience and expertise of design professionals around the world. Pearson VUE VUE has the approval of the Sylvan corporation to deliver International Computer Based Certification Testing on behalf of Sylvan clients. CTU Training Solutions is an authorised VUE Testing Centre. PASTEL Accounting Pastel is a leading global developer of accounting, payroll and related software, offering a comprehensive range of solutions for all types of small and medium sized businesses. Prometric We are a Platinum Provider. Prometric is the recognised global leader in technology enabled testing and assessment services. 07
  • 10.
    our passion isto develop ICT Professionals No career is a straight climb to the top. In today’s highly competitive job market, companies are looking for pre-trained employees. To get to that next level, sometimes you need a boost: enrol for the 1 year programmes e-marketing or project management or add them as a 2nd or 3rd year career booster to any of our other programmes 08 Please note: The content of this prospectus is subject to change without notification due to market trends in the IT industry, legislation and/or programme version updates. The CTU Career Campus a divisio
  • 11.
    more information available@ open day/s or visit your nearest campus it system support: cisco certified network professional Cisco is an international corporation that designs and sells consumer electronics, networking and communications technology and services. Cisco Systems also sponsors a line of IT Professional certifications for Cisco products. About the Certifications: CCNA Certification: Cisco Certified Network Associate (CCNA®) validates the ability to install, configure, operate, and troubleshoot medium-size route and switched networks, including implementation and verification of connections to remote sites in a WAN. CCNA curriculum includes basic mitigation of security threats, introduction to wireless networking concepts and terminology, and performance-based skills. This new curriculum also includes (but is not limited to) the use of these protocols: IP, Enhanced Interior Gateway Routing Protocol (EIGRP), Serial Line Interface Protocol Frame Relay, Routing Information Protocol Version 2 (RIPv2),VLANs, Ethernet, access control lists (ACLs). CCNP Certification: Cisco Certified Network Professional (CCNP®) validates the ability to plan, implement, verify and troubleshoot local and wide-area enterprise networks and work collaboratively with specialists on advanced security, voice, wireless and video solutions. The CCNP certification is appropriate for those with at least one year of networking experience who are ready to advance their skills and work independently on complex network solutions. Those who achieve CCNP have demonstrated the skills required in enterprise roles such as network technician, support engineer, systems engineer or network engineer. http://www.cisco.com subjects: Windows 7, CompTIA Network +, CompTIA CTP+, Customer Service, CCNA®: ICDN1, ICDN2, CCNP®: Routing, Switching, Troubleshooting qualifications: National Qualification: National Certificate: IT Systems Support | SAQA ID: 48573 | NQF 5 | 147 Credits International Exam/s: CCNA®: ICDN1, ICDN2, Exam: 640 - 802; CCNP®: Routing: 642 - 902, Switching 642 - 813, Troubleshooting 642 - 832 International Certification/s: CCNA® (Certified Cisco Network Administrator) CCNP® (Certified Cisco Network Professional) job opportunities: Network Associate, Network Professional, Network Engineer, National Senior Certificate (Grade 12), Mathematics Sales Engineer, Hardware Engineer, Software Engineer, Telecoms Engineer, Security Engineer, Storage Engineer, Solutions Specialists (Suggestions Only) it technical support: professional Help Desk Technicians are responsible primarily for supporting end-user software applications. PC Support specialists are responsible for assisting end-users either remotely or in person, with personal computer maintenance, troubleshooting and management. The Microsoft Certified IT Professional: Consumer Support Technician (MCITP: Consumer Support Technician) credential is the premier certification to highlight and validate your expertise and skill set in a job role supporting a broad range of consumer desktop operating systems, desktop applications, mobile devices, networking, and hardware support issues related to the Windows operating system. subjects: Computer Literacy, Windows 7, Microsoft Office (Word, Excel, Outlook, Access, Powerpoint) CompTIA A+ Hardware, CompTIA A+ Software, CompTIA Network + MCTS: 70-680 TS: Microsoft Windows Configuring, MCITP: 70-686 PRO: Supporting and Troubleshooting Applications on a Windows Client for Consumer Support Technicians, Customer Service qualifications: National Qualification: National Certificate: IT Technical Support | SAQA ID: 78964 | NQF 4 | 163 Credits International Exam/s: CompTIA A+ Hardware, CompTIA A+ Software, MCTS 70-680 TS, MCITP 70-686 PRO International Certification/s: CompTIA A+, Microsoft Certified Technology Specialist (MCTS), Microsoft Certified IT Professional (MCITP): Consumer Support Technician job opportunities: Computer Technician, Support Technician, Network Technician, IT Helpdesk Agent, IT Sales, Desktop Technician, Entrepreneur (Suggestions Only) National Senior Certificate (Grade 12) 09 on of CTU Training Solutions (PTY) Ltd reserves the right to change the programme content without prior notice. Additional international exams may be written but are not included in the programme fee.
  • 12.
    graphic design Graphic designers plan, analyse and create visual solutions using typography and images to present information. They develop the overall layout and design of magazines, newspapers, journals, corporate identity and other publications. Graphic Designers with Web skills also develop material for Internet Web Pages, Interactive Media and Multimedia Projects. Adobe offers multiple options for learners and facilitators to validate their digital media skills. Now learners can get certified for both entry-level (Adobe Certified Associate) and professional-level (Adobe Certified Expert) skills. subjects: Business English, Computer Literacy, Windows 7, Design Fundamentals (Layout Theory, Design Theory, Digital Photography) Adobe Creative Suite (Adobe Photoshop , Adobe Dreamweaver, Adobe Fireworks, Adobe Illustrator, Adobe Flash, Adobe Indesign, Adobe Acrobat) Web Development (HTML/DHTML, JavaScript , XML for Flash, Introduction to PHP & MySQL, Introduction to ActionScript) Customer Service, Project, Portfolio qualifications: National Qualification: FET Certificate: Design Foundation | SAQA ID: 49127 | NQF 4 | 141 Credits International Exam/s: Adobe Certified Expert (ACE) Photoshop, Adobe Certified Expert (ACE) Flash, Adobe Certified Expert (ACE) Dreamweaver International Certification/s: Adobe Certified Expert (ACE) Photoshop, Adobe Certified Expert (ACE) Flash, Adobe Certified Expert (ACE) Dreamweaver job opportunities: Graphic Artist, Graphic Designer, Brand Designer, Flash Designer, Web Artist, Web Designer, Web Developer, Entrepreneur (Suggestions Only) National Senior Certificate (Grade 12) multimedia and web development In an increasingly competitive world, learners need to be more than familiar users of digital communications technology to be successful. Certification can help provide the added credential as well as open new opportunities for learners in the 21st century. Adobe offers multiple options for learners to validate their digital media skills. Now learners can get certified for both entry-level (Adobe Certified Associate) and professional-level (Adobe Certified Expert) skills. Web Development is not a single function but a series of functions that includes designing, producing branding, building and supporting websites. The CIW (Certified Internet Web Professional) programme is the world’s fastest growing vendor-neutral Internet certification for the knowledge economy. More than a certification or a curriculum publisher, CIW is a Web technology standard adopted by governments and businesses worldwide. subjects: Multimedia (Adobe Premiere Pro, Adobe Audition, Adobe Flash (Advanced), Adobe Acrobat) Web Development, ASP, Advanced PHP and MySQL, Advanced JavaScript, XML, ActionScript 2.0 & 3.0, Certified Internet Webmaster (Internet Business Associate, Site Development Associate, Network Technology Associate) Project, Portfolio qualifications: National Qualification: FET Certificate: Systems Development | SAQA ID: 48872 | NQF 5 | 131 Credits International Exam/s: CIW Web Foundations Associate 1DO-510, Adobe Certified Expert (ACE) Acrobat International Certification/s: CIW Web Foundations Associate Certification, Adobe Certified Expert Web Specialist job opportunities: Graphic Designer, Flash Designer, Web Artist, Web Designer, Web Developer, Entrepreneur (Suggestions Only) Adobe Certified Expert (ACE), Photoshop, Flash, Dreamweaver 10 Please note: The content of this prospectus is subject to change without notification due to market trends in the IT industry, legislation and/or programme version updates. The CTU Career Campus a divisio
  • 13.
    computer aided draughtingand design www.said.co.za As the world moves forward into a globally competitive market, trends, designs and developments are changing daily. Architects, engineers, designers, manufacturers and shop fitters are now using AutoCAD, Revit and Inventor, so making Computer Aided Drawing (CAD) Operators a much-needed commodity. A Computer Aided Drawing (CAD) Operator visualises a given sketch of an idea into a Computer Aided Drawing (CAD) two dimensional drawing through to a three-dimensional Computer Aided Drawing (CAD) model. subjects: Business English, Computer Literacy, Windows 7, Drawing Fundamentals (Basic AutoCAD 2D and 3D), Drawing Office Orientation (Architectural and Civil Construction, Mechanical) Introduction: (Autodesk Inventor Mechanical, Autodesk Revit Architecture), Customer Service, Final Project, Portfolio qualifications: National Qualification: FET Certificate: Computer Aided Drawing Office Practice | SAQA ID: 66071 | NQF 4 | 131 Credits Training Programme Approval by the SA INSTITUTE OF DRAUGHTING International Exam/s: AutoCAD Associate Exam International Certification/s: Autodesk AutoCAD Associate Certification job opportunities: Apprentice Draughtsman (work experience required & registration with SAID), Technical Illustrator, CAD Operator, 3D Designer (Suggestions Only) *Please note that this programme has stationery requirements not included in the programme fee and not supplied by CTU. Please ask your Career Consultant for the list. National Senior Certificate (Grade 12), Mathematics / Technical Drawings www.said.co.za computer aided draughting and design 2nd Year A structure doesn’t create itself... It takes a design. The design must be communicated in a way that everyone who needs to use it can understand. Draughters prepare technical drawings and plans used by production and construction workers to build everything from manufactured products such as industrial machinery to structures such as office buildings or gas pipelines. Their drawings provide visual guidelines showing the technical details of the products and structures specifying dimensions, materials to be used, procedures and processes. Draughting is done mostly on the computer using computer aided drawing (CAD) systems. subjects: Drawing Office Orientation ( Mechanical Drawing, Concrete Reinforcing and Structural Steel Drawing, Piping), Construction Methods (HVAC Heating, Ventilation and Air-Conditioning), CAD Packages (Revit, Inventor), MS Project, Final Project, Portfolio qualifications: National Qualification: FET Certificate: Computer Aided Drawing Office Practice | SAQA ID: 66071 | NQF 4 | 131 Credits + additional 98 credits Training Programme Approval by the SA INSTITUTE OF DRAUGHTING International Exam/s: Revit Associate Exam, Inventor Associate Exam International Certification/s: Revit Associate Certification, Inventor Associate Certification job opportunities: Apprentice Draughtsman (work experience required & registration with SAID), Technical Illustrator, CAD Operator, 3D Designer (Suggestions Only) *Please note that this programme has stationery requirements not included in the programme fee and not supplied by CTU. Please ask your Career Consultant for the list. CAD 1st Year 11 on of CTU Training Solutions (PTY) Ltd reserves the right to change the programme content without prior notice. Additional international exams may be written but are not included in the programme fee.
  • 14.
    it system support:microsoft enterprise administrator Network Engineers usually design and implement large networks and are required to have significant expertise in designing and administering network hardware and software. Systems administrators normally manage and maintain several large-scale operating systems including backup and recovery, adding and deleting user accounts and performing software upgrades. Enterprise administrators are recognised among their peers and managers as leaders in Windows infrastructure design. Earn the MCITP: Enterprise Administrator certification, distinguishing you as an IT professional committed to excellence in working with Windows Server. subjects: Business English, Computer Literacy, Windows 7, CompTIA A+ Hardware, CompTIA A + Software, CompTIA Network + MCTS: 70-680 TS: Configuring Microsoft Windows Client, MCTS: 70-642 TS: Windows Server Network Infrastructure, MCTS: 70-640 TS: Windows Server Active Directory Configuring, MCTS: 70-643 TS: Windows Server Applications Infrastructure Configuring, MCITP:70-647 PRO: Windows Server Enterprise Administrator, Customer Service qualifications: National Qualification: National Certificate: IT Systems Support | SAQA ID: 48573 | NQF 5 | 147 Credits International Exam/s: MCTS: 70-680 TS, MCTS: 70-642 TS, MCTS: 70-640 TS, MCTS: 70-643 TS, MCITP: 70-647 PRO International Certification/s: Microsoft Certified Technology Specialist (MCTS) Microsoft Certified IT Professional (MCITP): Enterprise Administrator job opportunities: Enterprise Administrator, Systems Administrator, Network Administrator, Network Technician, Support Technician, Network Manager, Network Analyst, IT Engineer, Entrepreneur National Senior Certificate (Grade 12) (Suggestions Only) microsoft specialised: enterprise administrator Database Administrator: Database administrators install or configure Microsoft SQL Server and manage or maintain databases or multidimensional databases, user accounts, database availability, recovery, and reporting. They also design or implement security or server automation and monitor and troubleshoot SQL Server activity. Exchange: For most businesses today, e-mail is the mission-critical communications tool that allows their people to produce the best results. Today, IT departments must contend with e-mail security threats that are wide ranging. Microsoft Exchange Server has been designed specifically to meet these challenges and address the needs of the different groups who have a stake in the messaging system. Sharepoint: An organization can use Office SharePoint Server to facilitate collaboration, provide content management features, implement business processes, and supply access to information that is essential to organizational goals and processes. subjects: Database Administrator: MCTS 70-432 TS: Microsoft SQL Server, Implementation and Maintenance, MCITP 70-450 PRO: Designing, Optimising and Maintaining a Database Server Infrastructure using Microsoft SQL Server, Exchange: MCTS 70-662 TS: Microsoft Exchange Server, Configuring Sharepoint: MCTS 70-667 TS: Microsoft Sharepoint, Configuring Project Management qualifications: National Qualification: National Certificate: Certificate IT Database Administration | SAQA ID: 71869 | NQF 6 | 120 Credits International Exam/s: Database Administrator: MCTS 70-432 TS, MCITP 70-450 PRO Exchange: MCTS 70-662 Sharepoint: MCTS 70-667 International Certification/s: MCITP: Database Administrator, Exchange MCTS 70-662, Sharepoint MCTS 70-667 Int Cert: MCTS & MCITP: Enterprise Administrator job opportunities: Database Administrator, Enterprise Administrator, Network Administrator, Network Manager, Network Analyst, Project Manager, Entrepreneur (Suggestions Only) 12 Please note: The content of this prospectus is subject to change without notification due to market trends in the IT industry, legislation and/or programme version updates. The CTU Career Campus a divisio
  • 15.
    it systems developer:microsoft certified professional This programme introduces the learner to software development processes, computer software, different languages, techniques and technologies used in the software development process. When you earn the Microsoft Certified Professional Developer (MCPD) credential, you demonstrate your ability to use Microsoft Visual Studio and the Microsoft .NET Framework to excel in a specific, real-world job role. An MCPD credential validates a comprehensive set of skills required to be successful on the job, and gives hiring managers and potential customers a reliable indicator of your job performance. This credential offers a simple, targeted framework that makes the certification paths easier to understand and allows you to stand out from the crowd. subjects: Business English, Computer Literacy, Windows 7, Introduction to Programming: Visual Studio, MCTS: 70 - 536 TS: Application Development Foundations, MCTS: 70 - 505 TS: Windows Forms Application Development, MCTS: 70 - 561 TS: ADO.NET Application Development, MCTS: 70 - 503 TS: Windows Communication Foundation, MCTS: 70 - 562 PRO: ASP.NET Applications, MCTS: 70 - 565 PRO: Enterprise Application Developer 3.5, Customer Service, Business Communication qualifications: National Qualification: National Certificate: IT Systems Development | SAQA ID: 48872 | NQF 5 | 131 Credits International Exam/s: MCTS 70-536 TS, MCTS 70-505 TS, MCTS 70-561 TS, MCTS 70-503 TS, MCTS 70-562 PRO, MCPD 70-565 PRO International Certification/s: Microsoft Certified Technology Specialist (MCTS), Microsoft Certified Professional Developer, (MCPD): Enterprise Application Developer job opportunities: Junior Programmer, Analyst Programmer, Software Tester, IT Consultant, Entrepreneur, .Net Web Developer, Software Developer (Suggestions Only) National Senior Certificate (Grade 12), Mathematics microsoft business intelligence developer Database developers design and implement relational database models (logical and physical) and database storage objects. They also program servers by using user-defined functions, triggers, stored procedures, Transact-SQL, or the CLR. They retrieve or modify data by using SQL queries or tune and optimise queries. Business intelligence developers design and implement multi-dimensional database models (logical and physical), data marts, data warehousing, data transforms, data analytics, and reporting solutions. This includes programming and customizing servers that use Multidimensional Expressions (MDX), customer transforms, and custom reporting solutions. Sharepoint: An organization can use Office SharePoint Server to facilitate collaboration, provide content management features, implement business processes, and supply access to information that is essential to organizational goals and processes. A Sharepoint developer can use a variety of languages, frameworks, object models, and tools to build scalable distributed web applications on the SharePoint development platform. subjects: introduction to business analysis and security Database Developer: MCTS 70-433 TS: Microsoft SQL Server, Database Development, MCITP 70-451 PRO: Designing Database Solutions and Data Access using Microsoft SQL Server, Business Intelligence Developer: MCTS 70-448 TS: Microsoft SQL Server, Business Intelligence Development and Maintenance, MCITP 70-452 PRO: SQL Server Development and Maintenance, Sharepoint MCTS 70-573 TS: Microsoft Office Sharepoint Server - Application Development, qualifications: National Qualification: National Certificate: Advance Certificate IT Database Development | SAQA ID: 71850 | NQF 6 | 120 Credits International Exam/s: Database Developer MCTS 70-433 TS, MCITP 70-451 Pro Business Intelligence Developer MCTS 70-448 TS, MCITP 70-452 PRO, Sharepoint MCTS 70-573 International Certification/s: MCITP: Database Developer, MCITP: Business Intelligence Developer; Sharepoint MCTS 70-573 Int Cert: MCTS & MCPD: Enterprise Application Developer job opportunities: Software Developer, Business Intelligence Developer, Database Developer Project Leader, Software Analyst, IT Manager (Suggestions Only) 13 on of CTU Training Solutions (PTY) Ltd reserves the right to change the programme content without prior notice. Additional international exams may be written but are not included in the programme fee.
  • 16.
    more information available@ open day/s or visit your nearest campus project management The primary purpose of the qualification is to provide learners with a foundation of basic project management knowledge and skills which can be used to build further project management related competencies. The Project Management qualification will give learners the knowledge and skill to put strategies together and the ability to implement the techniques and processes to manage projects. Over the year period the learners will cover all the project management phases within the project management cycle. subjects: Windows 7 (Word, Excel, Powerpoint, Outlook), Numeracy, Introduction to Project Management, Costing your Project, Quality and Risk in Project Management, Preparing and Managing a Project Plan, Meeting your Deliverables, MS Project, Customer Service, Business Writing, Business Communication qualifications: National Qualification: FET Certificate: Project Management | SAQA ID: 50080 | NQF 4 | 136 Credits International Exam/s: MCTS: MS Project 70-178 International Certification/s: MCTS: MS Project CAPM: Certified Associate in Project Management job opportunities: Project Manager, Project Manager Assistant, Team Leader, Event Planner (Suggestions Only) National Senior Certificate (Grade 12) office administration executive Highly skilled administration personnel are always in demand. In today’s workplace it is essential that office administration personnel are skilled at using productivity software. This programme provides learners with relevant administrative and high-level technological skills to meet the demands of the current and emerging business environment. Learners acquire a solid foundation of business office procedures and computer skills. Computer skills and business office practices are also readily transferable to other academic and career paths. By completing basic bookkeeping and Pastel accounting the learner can now offer a wide range of invaluable skills to a business or entrepreneur. subjects: Business English, Windows 7, Microsoft Office (Word, Excel, Powerpoint, Outlook, Access, MS Publisher, Basic MS Project) Pastel Accounting (Basic Bookkeeping, Pastel) qualifications: National Qualification: FET Certificate: End User Computing | SAQA ID: 71853 | NQF 4 | 132 Credits Pastel Intermediate Certification International Exam/s: Microsoft Office Word Microsoft Office Excel International Certification/s: Microsoft Office Word Microsoft Office Excel job opportunities: Office Assistant, Office Administrator, Junior Secretary, Accounts Clerk, Junior Bookkeeper, Personal Assistant, Secretary, Pastel Clerk (Suggestions Only) National Senior Certificate (Grade 12) 14 Please note: The content of this prospectus is subject to change without notification due to market trends in the IT industry, legislation and/or programme version updates. The CTU Career Campus a divisio
  • 17.
    more information available@ open day/s or visit your nearest campus e-marketing Today, the internet is responsible for constantly changing our markets, media, branding, advertising and consumer behaviour. With this programme you can complement your skills with new dimensions of marketing. This course is designed to give professionals and students the opportunity to learn how to practically apply holistic Internet marketing tactics to small, medium and large businesses. The CIW Internet Business Foundations course prepares you to work effectively in today’s business environment. In this course, you will learn about the tasks involved in various Web Technology job roles, and you will learn the skills and technologies to perform them. The career opportunities that demand these common Web-based skills are endless. Once certified, you have proven that you have foundational knowledge of important technologies that affect virtually every business. This certification is ideal for all students and professionals who use the Internet on the job. subjects: Introduction to internet marketing, Marketing fundamentals, Web design and development, Web public relations & copywriting, Email Marketing, Online advertising, Search engine optimisation, Social media and viral marketing, Web analytics and conversion optimisation, Mobile marketing, Internet marketing strategy qualifications: National Qualification: FET Certificate: Marketing | SAQA ID: 67464 | NQF 4 | 139 Credits International Exam/s: Internet Business Associate Exam 1DO-51A International Certification/s: Internet Business Associate Certification job opportunities: Viral Campaign Developer, e-Marketing Assistant, e-Marketer, Web Administrator, Social Media Administrator (Suggestions Only) Graphic design knowledge/skills preferable qr codes r codes what is a qr code? A QR code (short for Quick Response) is a specific matrix barcode (or two-dimensional code), readable by dedicated QR barcode readers and camera phones. Users with a camera phone equipped with the correct reader application can scan the image of the QR code to display text, contact information, connect to a wireless network, or open a web page in the phone’s browser. http://www.denso-wave.com/qrcode/index-e.html; http://en.wikipedia.org/wiki/QR_Code call 0861 100 395 view “did you know?” #2 link to twitter how to use the qr codes here Make sure your phone can scan a QR code with its camera, either with an applica- tion that you download or via software that’s already in- stalled on your phone. To find out what application to use for your phone, we recommend doing a Google search for the model of your phone along with “QR reader”. NOTE: You can download a QR Code reader application from your Applications Store. (Useful websites: http://www.mobile- barcodes.com/qr-code-software/; http://www.beetagg. com/downloadreader/). When you see a QR code, use your phone’s application to scan it: Open your phone’s bar code/qr reader on your phone, scan, and link/read. link to facebook link to ctu career website view interesting fact #2 15 on of CTU Training Solutions (PTY) Ltd reserves the right to change the programme content without prior notice. Additional international exams may be written but are not included in the programme fee.
  • 19.
    consultation and registration student loans Registration process CTU has partnered with some of the major commercial banks to assist our students with student loans at better rates that we could You can register TODAY! offer. Our banking partners are professionally equipped to assess creditworthiness in accordance with the National Credit Act. If 1. Schedule an appointment with a Career they do not qualify you for credit, CTU, if we were a credit provider, Consultant would have had to decline credit on the same grounds. a. Meet with us prior to registration to discuss your needs and requirements Students must provide the following documentation: b. Request a programme quote from your Career • Proof of registration. Consultant • A quote from a CTU Career Campus for study fees. c. Talk to us about student loans and payment • Green bar-coded Identity Document. options • Results of the previous academic year. d. Get an accommodation list (where applicable) • Proof of current residential address, e.g. electricity or cellphone statement, etc. 2. Optional: Write the “Career Mapper” career • Please note - a study loan is taken out in the name of the guidance assessment sponsor and therefore the sponsor will be required to provide the information listed in the sponsor section. 3. Reserve your space early!! a. By completing an enrolment form Sponsors must provide the following documentation: b. Registration fee R1 000 • Proof of earnings or latest payslip. • Green bar-coded Identity Document. Please bring: • Proof of current residential address, e.g. electricity or cellphone c. Certified copy of your ID statement, etc. d. Certified copy of your parent/guardian’s ID • Banking details (name of bank, account number, branch code e. 1 x ID photo black & white or colour and 6 months’ bank statements if non-Absa client). • If the sponsor is married in Community of Property their 4. CTU requires a deposit to complete your spouse’s details are required, if not an Anti Nuptial Contract or a registration. (Refer to your quote) copy of Divorce Decree is required. 5. Payment options at CTU: Absa a. Credit Card 0860 100 372 | Read more: www.absa.co.za b. Cash c. Student Loans Standard Bank 0860 123 456 | Read more: http://www.standardbank.co.za 6. Programmes commence 1 February 2012 Nedbank Your bank requires proof of registration, please 0861 254 368 | Read more: http://www.nedbank.co.za ask your Career Consultant for a CTU Registration letter (proof of registration) and a quote/pro- FNB forma invoice to submit with your student loan 0861 404040 | Read more: http://www.fnb.co.za application. 17
  • 20.
    0861 100 395 Auckland Park Forum 1, 2nd Entrance, Braampark, 33 Hoofd Street, Braamfontein, 2001 Tel: 011 726 1028/46 | Fax: 086 578 6081 | aucklandpark@ctutraining.co.za | facebook: CTU Career Campus Auckland Park enquiry@ctutraining.co.za Bloemfontein 1st Floor, Pretty Suites Office Block, Pretty Gardens Lifestyle Centre, Du Plessis Road, Langenhoven Park Tel: 051 451 2210/09 | Fax: 086 572 8205 | bloemfontein@ctutraining.co.za | facebook: CTU Career Campus Bloemfontein www.ctutraining.co.za 36 Edgar Street, Everleigh, Boksburg Boksburg Tel: 011 918 1176 | Fax: 011 918 1570 | boksburg@ctutraining.co.za | facebook: CTU Career Campus East Rand Coming soon! Contact Jaco van der Riet: 021 887 5372/3 Cape Town Tel: 0861 100 395 | capetown@ctutraining.co.za | facebook: CTU Career Campus Cape Town Coming soon! Contact Christine Clothier: 083 634 0367 Kwazulu-Natal Tel: 0861 100 395 | kzn@ctutraining.co.za | facebook: CTU Career Campus Durban Join CAREER CHATz on Facebook Shop C3, Lower Level, Tarentaal Shopping Centre, Cnr. N4 & Ou Kaapschehoop Rd Nelspruit Tel: 013 741 2352 | Fax: 086 665 4268 | nelspruit@ctutraining.co.za | facebook: CTU Career Campus Nelspruit Follow CAREER_CHATz on Twitter 25 Devenish Street, Polokwane Polokwane Tel: 015 297 3250 | Fax: 015 297 3252 | polokwane@ctutraining.co.za | facebook: CTU Career Campus Polokwane Add CTU_CAREER_CHATz on Skype Coming soon! Contact Izanne Haarhoff: 078 456 8034 Port Elizabeth Tel: 0861 100 395 | portelizabeth@ctutraining.co.za | facebook: CTU Career Campus Port Elizabeth 39 Buskus Street, Baillie Park Potchefstroom Tel: 018 290 5340 | Fax: 018 290 7509 | potchefstroom@ctutraining.co.za | facebook: CTU Career Campus Potchefstroom Glen Manor Office Park, Block 1, Frikkie de Beer Street, Menlyn Pretoria Tel: 012 361 6688 | Fax: 012 348 8394 | pretoria@ctutraining.co.za | facebook: CTU Career Campus Pretoria U76/77, Brightwater Commons, Republic Road, Randburg Randburg Tel: 011 781 0445 | Fax: 011 781 1637 | randburg@ctutraining.co.za | facebook: CTU Career Campus Randburg Shop 59, The Village @ Horizon, Cnr. Sonop & Ontdekkers Road, Horizon Roodepoort Tel: 011 760 4321 | Fax: 011 760 2905 | roodepoort@ctutraining.co.za | facebook: CTU Career Campus West Rand Jan Celliers Street, Mullerhof Building, Ground Floor Stellenbosch Tel: 021 887 5372/3 | Fax: 021 887 5379 | stellenbosch@ctutraining.co.za | facebook: CTU Career Campus Stellenbosch 140 Genl Hertzog Avenue, Three Rivers Vereeniging Tel: 016 423 7341 | Fax: 016 423 1998 | vereeniging@ctutraining.co.za | facebook: CTU Career Campus Vaal Triangle