1. Project Schedule
2. Process Details
3. Business Overview
4. Special Requirements
5. Target Audience Analysis
6. Competitor Analysis
7. Visual Development
8. Final Design
1-PROPOSAL SUMMARY
1-PROJECT SCHEDULE
Stages Completion Date Cost Status
First Stage $700,00 completed
Planning 01/05/2015
Design 10/05/2015
Second Stage $2.000,00 pending on approval
Development 20/05/2015
Testing 23/05/2015
Release 1 25/05/2015
Refinement 30/05/2015
Final Stage month plan pending on approval
Post Launch ongoing services
1-PROCESS DETAILS
Planning
• Requirements analysis - client goals, target audience, detailed features 

• Site map 

• Contracts - Project closure clauses, exit clauses, copyright ownership
& timelines 

• Required Resources - software, stock photography, fonts, etc 

FIRST STAGE
Design
• Wireframe and design planning - the visual layout of the website begins to
take shape

• Mock-ups - allows for relatively easy modifications 

• Review and approval cycle - reviewing, tweaking and approving the mock-ups



SECOND STAGE
Development
• Build development framework - ensures that the server can 

handle the installation and set-up smoothly.
• Code templates for each page type - (e.g. home, general 

content, blog post, form) 

• Develop special features and interactivity - where the fancy 

elements come into play. 

• Populate with content - loading all of the content provided by 

the client or writer.

Testing
• Test links and functionality - walk through every single page created 

• Testing - final diagnostics using the available tools: code validators,
broken-link checkers, website health checks and spell-checker 

• Cross-Browser Checking - Checking that site works in multiple browsers
like IE, Firefox, Chrome, Safari, Opera, iPhone, BlackBerry
Release 1
• Inspection - Client given access to front & backend of website 

• Collaboration - discuss functionality and direction of website with client 

Refinement
• Fine Tuning - identify parts of the website that could be improved in small ways 

Launch
• Upload to live server - transferring from test server to the live web server 

• Hand site over to client - all contractual obligations have been met and the client is
satisfied with the product 

Pos-Launch
• Provide documentation and source files - Providing the client with documentation for
the website, a soft-copy site map and details on the framework and languages used.
• Project close, final documentation - the client signs off on the
last checks, provide your contact information for support, and officially close the project.
FINAL STAGE
Objective
To provide the business with more efficient tools which will enable it to interact
with current and new customers over the internet without loosing the traditional,
well established and successful identity.
Goals
To create a stronger rapport with customers and business partners by encouraging
their online interaction and loyalty providing the business with a further
competitive edge as well as progressing with his prestigious social networking.
Solution
To create a responsive website which is built in a particular way to adapt its look
and feel “responsively”, providing users with the best viewing experience for their
device – be it a smartphone, tablet or laptop – it literally adjust the page format to
suit the device.
3- BUSINESS OVERVIEW


1. Google Ad words/ Analytics/ Rankings/ Seo.
2. Set up a database to store and manage data/ Security.
3. Google maps/Geolocation/Get directions.
4. Responsive design/ Mobile first approach.
5. Develop content/ Share posts on Facebook.
6. Daily posts on Instagram.
7. Embbed videos (Josep channel on You Tube).
8. Cms system which allows client to manage content.





4-SPECIAL REQUIREMENTS
customer profile main values
gourmet lovers
travel, history, tradition, quality 

hipsters
cool, trendy, image, organic, social
media 

cafe and restaurant owners
quality, tradition, reliability, wholesale
price, consistency
house wife
quality, health, convenience, warmth,
trust
5- TARGET AUDIENCE ANALYSIS
TARGET AUDIENCE
TARGET AUDIENCE
BAKERS DELIGHT
BAKERS DELIGHT REVIEW
PROS:
Nice and strong logo which stands out and easily and communicates itself and the services
provided by the business.

All the relevant information about the business is visually easy to find. Site is user friendly.
Good use of product and staff images which well present and promote the business and its
ideology.

All the social media connections clearly displayed and visually communicated to the
customer.
CONS:
The colour is a bit too flat and clean, it does not stand out enough and effectively
communicates to the customer, perhaps another brighter more playful colour to be added
to the website overall design and layout.
The excess of information on the front page can be overwhelming. Apart from the logo the
website has a more corporate look rather than of a bakery business.
6-COMPETITOR ANALYSIS
PANDORO
PROS:
All the necessary information provided in a uniform matter, every aspect of their
business is clearly covered and communicated to the viewer.
Clean cut design of the first page layout, simple and effective use of colour.
The site is user friendly and easy to navigate through and make searches.
CONS:
Logo seems to be a bit too small not easy to spot as the large image in the background
overwhelms it.
The heading is a bit too big in relation to the rest of the the heading fonts and the page
layout as a whole.
The white colour font along with the white background doesn’t visually work due to its
lack of contrast.
The font used in the text is a bit too small, hard to read at the first glance.
No visible links to their social media connections in the first page.
PANDORO REVIEW
WILD WHEAT
PROS:
All the relevant information provided on the front page in a chronological order.
Website is easy to navigate and to find all the relevant information regards to the
business.

The page layout is very playful and inviting to the viewer.

High standard resolution images of products which communicate quality, passion
and high standard of commitment to the business and its products. The background
colour is effective as it makes the images stand out and visually striking to the
viewer.
CONS:
The logo does not communicate the business identity very well . The logo resembles
a wild bean coffee and therefore the logo itself would be more suitable for a cafe
business rather than a bakery.

At the welcome to wild wheat page the photo of the staff member doesn’t look very
inviting could use image of a friendlier staff members to make the website more
attractive as customer service is a very important aspect of the bakery business.
WILD WHEAT REVIEW
CREATIVE PROCESS
7-VISUAL DEVELOPMENT
Artistic Inspirations
COLOUR SCHEME
CROISSANT
Price:$1.50
Succulent, juicy, flaky, buttery
What more could you ask for…?


Average Weight:
0.084kg


Ingredients:

Wheat Flour, Water, Butter, Milk,
Yeast, Salt, Sugar, Vegetable Fat,
Shortening, Egg
CIABATTA LOAF
Price:$4.90
Ciabatta Loaf is made with
olive oil, this small loaf has a
light, moist and fluffy
interior with a slightly
crunchy shell.
Average Weight:
0.232kg


Ingredients:

85% Wheat Flour, 15% Rye
Flour, Water, Yeast, Salt,
Malt, Olive Oil
CIABATTA LOAF
Price:$4.90
Ciabatta Loaf is made with olive
oil, this small loaf has a light,
moist and fluffy interior with a
slightly crunchy shell.
Average Weight:
0.232kg


Ingredients:

85% Wheat Flour, 15% Rye Flour, Water, Yeast,
Salt, Malt, Olive Oil
PRODUCT PAGE
DETAILS
SIGN UP TO THE NEWSLETTER
Find out more about bread
Bread of the week
Our Price: $5.95
Alsace Loaf is a delicious white, long loaf with a crusty
shell and a moist, fluffy middle. Average Weight: 0.586kg

Ingredients:

100% Wheat Flour, Water, Yeast, Salt
ALSACE LOAF
ALSACE LOAF
The design of the new Breads by Josef website was inspired by all the traditional elements
found at the physical address of this renowned bakery.
From the colour pallet to the choice of materials the idea is to be loyal to the business
origins and its so well spoken artisan breads. Even the colour of its ingredients such as flour
and seeds play an inspirational role to its conceptual design.
In terms of colours, the tones of brown brings up a warmth feeling into its visual identity
which along with complementary colours like beiges and dark orange quiet suits a bakery
business.
The font choice was also inspired by elements found at the bakery,
the idea was to bring the chalkboard from the bakery shelf into the online environment,

following the same path even the chalkboard was lately incorporated to serve as a frame for
the font to be harmoniously displayed in a coherent manner.
All the elements intends to bring the traditional bakery scenario into an on line new window.
8-DESIGN PROPOSED
MOCK UPS
MOBILE
DESKTOP
MOCK UPS
MOCK UPS
DESKTOP
MOCK UPS
DESKTOP
MOCK UPS
DESKTOP

Breads by Josep

  • 1.
    BREADS BY JOSEF WEBSITE PROPOSAL
  • 2.
  • 3.
    1. Project Schedule 2.Process Details 3. Business Overview 4. Special Requirements 5. Target Audience Analysis 6. Competitor Analysis 7. Visual Development 8. Final Design 1-PROPOSAL SUMMARY
  • 4.
    1-PROJECT SCHEDULE Stages CompletionDate Cost Status First Stage $700,00 completed Planning 01/05/2015 Design 10/05/2015 Second Stage $2.000,00 pending on approval Development 20/05/2015 Testing 23/05/2015 Release 1 25/05/2015 Refinement 30/05/2015 Final Stage month plan pending on approval Post Launch ongoing services
  • 5.
  • 6.
    Planning • Requirements analysis- client goals, target audience, detailed features 
 • Site map 
 • Contracts - Project closure clauses, exit clauses, copyright ownership & timelines 
 • Required Resources - software, stock photography, fonts, etc 
 FIRST STAGE
  • 7.
    Design • Wireframe anddesign planning - the visual layout of the website begins to take shape
 • Mock-ups - allows for relatively easy modifications 
 • Review and approval cycle - reviewing, tweaking and approving the mock-ups
 

  • 8.
    SECOND STAGE Development • Builddevelopment framework - ensures that the server can 
 handle the installation and set-up smoothly. • Code templates for each page type - (e.g. home, general 
 content, blog post, form) 
 • Develop special features and interactivity - where the fancy 
 elements come into play. 
 • Populate with content - loading all of the content provided by 
 the client or writer.

  • 9.
    Testing • Test linksand functionality - walk through every single page created 
 • Testing - final diagnostics using the available tools: code validators, broken-link checkers, website health checks and spell-checker 
 • Cross-Browser Checking - Checking that site works in multiple browsers like IE, Firefox, Chrome, Safari, Opera, iPhone, BlackBerry
  • 10.
    Release 1 • Inspection- Client given access to front & backend of website 
 • Collaboration - discuss functionality and direction of website with client 

  • 11.
    Refinement • Fine Tuning- identify parts of the website that could be improved in small ways 

  • 12.
    Launch • Upload tolive server - transferring from test server to the live web server 
 • Hand site over to client - all contractual obligations have been met and the client is satisfied with the product 

  • 13.
    Pos-Launch • Provide documentationand source files - Providing the client with documentation for the website, a soft-copy site map and details on the framework and languages used. • Project close, final documentation - the client signs off on the last checks, provide your contact information for support, and officially close the project. FINAL STAGE
  • 15.
    Objective To provide thebusiness with more efficient tools which will enable it to interact with current and new customers over the internet without loosing the traditional, well established and successful identity. Goals To create a stronger rapport with customers and business partners by encouraging their online interaction and loyalty providing the business with a further competitive edge as well as progressing with his prestigious social networking. Solution To create a responsive website which is built in a particular way to adapt its look and feel “responsively”, providing users with the best viewing experience for their device – be it a smartphone, tablet or laptop – it literally adjust the page format to suit the device. 3- BUSINESS OVERVIEW
  • 16.
    
 1. Google Adwords/ Analytics/ Rankings/ Seo. 2. Set up a database to store and manage data/ Security. 3. Google maps/Geolocation/Get directions. 4. Responsive design/ Mobile first approach. 5. Develop content/ Share posts on Facebook. 6. Daily posts on Instagram. 7. Embbed videos (Josep channel on You Tube). 8. Cms system which allows client to manage content.
 
 
 4-SPECIAL REQUIREMENTS
  • 17.
    customer profile mainvalues gourmet lovers travel, history, tradition, quality hipsters cool, trendy, image, organic, social media cafe and restaurant owners quality, tradition, reliability, wholesale price, consistency house wife quality, health, convenience, warmth, trust 5- TARGET AUDIENCE ANALYSIS
  • 18.
  • 19.
  • 20.
  • 21.
    BAKERS DELIGHT REVIEW PROS: Niceand strong logo which stands out and easily and communicates itself and the services provided by the business.
 All the relevant information about the business is visually easy to find. Site is user friendly. Good use of product and staff images which well present and promote the business and its ideology.
 All the social media connections clearly displayed and visually communicated to the customer. CONS: The colour is a bit too flat and clean, it does not stand out enough and effectively communicates to the customer, perhaps another brighter more playful colour to be added to the website overall design and layout. The excess of information on the front page can be overwhelming. Apart from the logo the website has a more corporate look rather than of a bakery business. 6-COMPETITOR ANALYSIS
  • 22.
  • 23.
    PROS: All the necessaryinformation provided in a uniform matter, every aspect of their business is clearly covered and communicated to the viewer. Clean cut design of the first page layout, simple and effective use of colour. The site is user friendly and easy to navigate through and make searches. CONS: Logo seems to be a bit too small not easy to spot as the large image in the background overwhelms it. The heading is a bit too big in relation to the rest of the the heading fonts and the page layout as a whole. The white colour font along with the white background doesn’t visually work due to its lack of contrast. The font used in the text is a bit too small, hard to read at the first glance. No visible links to their social media connections in the first page. PANDORO REVIEW
  • 24.
  • 25.
    PROS: All the relevantinformation provided on the front page in a chronological order. Website is easy to navigate and to find all the relevant information regards to the business.
 The page layout is very playful and inviting to the viewer.
 High standard resolution images of products which communicate quality, passion and high standard of commitment to the business and its products. The background colour is effective as it makes the images stand out and visually striking to the viewer. CONS: The logo does not communicate the business identity very well . The logo resembles a wild bean coffee and therefore the logo itself would be more suitable for a cafe business rather than a bakery.
 At the welcome to wild wheat page the photo of the staff member doesn’t look very inviting could use image of a friendlier staff members to make the website more attractive as customer service is a very important aspect of the bakery business. WILD WHEAT REVIEW
  • 26.
  • 28.
  • 29.
  • 33.
    CROISSANT Price:$1.50 Succulent, juicy, flaky,buttery What more could you ask for…? 
 Average Weight: 0.084kg 
 Ingredients:
 Wheat Flour, Water, Butter, Milk, Yeast, Salt, Sugar, Vegetable Fat, Shortening, Egg CIABATTA LOAF Price:$4.90 Ciabatta Loaf is made with olive oil, this small loaf has a light, moist and fluffy interior with a slightly crunchy shell. Average Weight: 0.232kg 
 Ingredients:
 85% Wheat Flour, 15% Rye Flour, Water, Yeast, Salt, Malt, Olive Oil
  • 34.
    CIABATTA LOAF Price:$4.90 Ciabatta Loafis made with olive oil, this small loaf has a light, moist and fluffy interior with a slightly crunchy shell. Average Weight: 0.232kg 
 Ingredients:
 85% Wheat Flour, 15% Rye Flour, Water, Yeast, Salt, Malt, Olive Oil PRODUCT PAGE DETAILS
  • 35.
    SIGN UP TOTHE NEWSLETTER Find out more about bread Bread of the week Our Price: $5.95 Alsace Loaf is a delicious white, long loaf with a crusty shell and a moist, fluffy middle. Average Weight: 0.586kg
 Ingredients:
 100% Wheat Flour, Water, Yeast, Salt ALSACE LOAF ALSACE LOAF
  • 36.
    The design ofthe new Breads by Josef website was inspired by all the traditional elements found at the physical address of this renowned bakery. From the colour pallet to the choice of materials the idea is to be loyal to the business origins and its so well spoken artisan breads. Even the colour of its ingredients such as flour and seeds play an inspirational role to its conceptual design. In terms of colours, the tones of brown brings up a warmth feeling into its visual identity which along with complementary colours like beiges and dark orange quiet suits a bakery business. The font choice was also inspired by elements found at the bakery, the idea was to bring the chalkboard from the bakery shelf into the online environment,
 following the same path even the chalkboard was lately incorporated to serve as a frame for the font to be harmoniously displayed in a coherent manner. All the elements intends to bring the traditional bakery scenario into an on line new window. 8-DESIGN PROPOSED
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.