Lost and Found 
Darwin Sarangaya - Arfa Khan - Omar Salah
● Something relateble 
● What happens to your lost items? 
● Who finds them? 
● Lose things all the time 
● Phones 
● Keys 
● Money 
Inspiration
Target Audience 
• Teenagers 14-19 
• Careless 
• Busy 
• Stressed 
• Don’t pay much attention
Project Requirement 
What resources are needed to complete 
project? 
● DSLR 
● Video Camera 
● Tripod 
● Microphones 
● Fast-processing computer
Project Timeline 
Up until January 
finalise the story line 
Week 1 
Start script writing 
Week 2 
Finalise script, fix any 
errors 
Week 3 
Come up with 
potential settings 
Week 4 
Visit all the areas, any 
problems? 
Alternatives? 
Week 5 
Start filming 
Week 6 
Filming 
Week 7 
Filming 
Week 8 
Take photos for stop-motion 
Week 9 
Photos 
Week 10 
Look over the scenes, 
roughly piece them 
together 
Week 11 
Any extra scenes 
needed, film it 
Week 12 
Start editing, till due 
date
Product Description 
• Non-Linear, short film 
• Flashbacks 
• Stop motion 
• Want to experiment by using both 
techniques together
Distribution 
• YouTube 
• Its free 
• Easy to reach target audience 
• Global 
• More than a billion users a month!
Distribution 
• Website 
• Solely dedicated to the production 
• Freely promote 
• Be able to show more 
information
Distribution 
• Social networks 
• Word of mouth 
• Free 
• Global 
• Celebrities 
• Able to talk directly to the audience- let 
them know of any upcoming promotions
Storyboard
Storyboard
Thank you 

Proposal

  • 1.
    Lost and Found Darwin Sarangaya - Arfa Khan - Omar Salah
  • 2.
    ● Something relateble ● What happens to your lost items? ● Who finds them? ● Lose things all the time ● Phones ● Keys ● Money Inspiration
  • 3.
    Target Audience •Teenagers 14-19 • Careless • Busy • Stressed • Don’t pay much attention
  • 4.
    Project Requirement Whatresources are needed to complete project? ● DSLR ● Video Camera ● Tripod ● Microphones ● Fast-processing computer
  • 5.
    Project Timeline Upuntil January finalise the story line Week 1 Start script writing Week 2 Finalise script, fix any errors Week 3 Come up with potential settings Week 4 Visit all the areas, any problems? Alternatives? Week 5 Start filming Week 6 Filming Week 7 Filming Week 8 Take photos for stop-motion Week 9 Photos Week 10 Look over the scenes, roughly piece them together Week 11 Any extra scenes needed, film it Week 12 Start editing, till due date
  • 6.
    Product Description •Non-Linear, short film • Flashbacks • Stop motion • Want to experiment by using both techniques together
  • 7.
    Distribution • YouTube • Its free • Easy to reach target audience • Global • More than a billion users a month!
  • 8.
    Distribution • Website • Solely dedicated to the production • Freely promote • Be able to show more information
  • 9.
    Distribution • Socialnetworks • Word of mouth • Free • Global • Celebrities • Able to talk directly to the audience- let them know of any upcoming promotions
  • 10.
  • 11.
  • 12.

Editor's Notes

  • #3 The motivation behind the idea, was to create something relatable for the audience as well as allowing them to feel apart of the short film. Therefore the story behind the film is based on losing and finding items such as losing your phone or keys. Do you ever wonder who the item belongs to? Do you wonder who has found the item you’ve lost? This is where the audience can relate. We decided that our target audience will be young teenagers aged around 14-19 years old as this may be more relatable to them as being a young teenager, they may be more careless and sometimes don’t pay attention. This is when we lose items.
  • #5 This project we will need various amounts of equipment. a video camera will be used to shoot the footage we need for the short film. The DLSR camera will be used to take photographs to create a stop motion for one of the scenes in the short film as well as to document and show behind the scenes development and progress on the short film which will be used to post on our individual blogs. A microphone attachment will be needed to record and capture sounds to create the atmosphere of the the short film as there will be minimal dialogue and more use of sounds. We will also need a tripod to make sure we take still moving shots. For post-production we will need to have a fast-processing computer than will allow us to make decisions and edit the footage we have shot. If possible we would like to use free-space on the campus, whether a free classroom or a studio to shoot some of the scenes.
  • #7 Summary: The product will be a non-linear short film which includes a stop-motion. The backstory of the short film is that a guy wakes up from a nap to see someone has misplaced their camera. When the guy picks up the camera and looks through it, he sees pictures of her and suddenly finds a picture of him sleeping. He then becomes curious to find out who she is and wants to return the camera back to her. We have decided that the media product will be distributed on a media platform. Either a website or on YouTube. We thought this was a suitable platform to view our product because YouTube is accessible to our target audience which are young teenagers around the ages of 14-19. Therefore makes it easier to share across different social networks and media platforms as our target audience is young and technology savvy. (E.g. Shared links through Facebook, Twitter and emails)